Opinion

Dr. N.O. Brown v. PA Turnpike Commission

Court
Commonwealth Court of Pennsylvania
Filed
Jan 7, 2019
Status
Unpublished
On the bench
Simpson, J.
Cited by
0 cases
Authority
More cited than 6.8%

The opinion

IN THE COMMONWEALTH COURT OF PENNSYLVANIA

Dr. Nancy O. Brown :

: No. 235 C.D. 2018

v. : Argued: December 11, 2018

:

Pennsylvania Turnpike Commission, :

Appellant :

BEFORE: HONORABLE ROBERT SIMPSON, Judge

HONORABLE PATRICIA A. McCULLOUGH, Judge

HONORABLE CHRISTINE FIZZANO CANNON, Judge

OPINION NOT REPORTED

MEMORANDUM OPINION

BY JUDGE SIMPSON FILED: January 7, 2019

In this eminent domain case involving an alleged de facto taking by

stormwater discharge, the Pennsylvania Turnpike Commission (Condemnor)

appeals an order of the Court of Common Pleas of Montgomery County 1 (trial

court) that overruled Condemnor’s preliminary objections to Dr. Nancy O.

Brown’s (Condemnee) petition for appointment of a board of viewers under

Section 502(c) of the Eminent Domain Code (Code), 26 Pa. C.S. §502(c). The trial

court determined that Condemnor condemned, by means of a permanent

stormwater easement, the rear undeveloped portion of Condemnee’s property

located at 2303 Hickory Road, Plymouth Meeting, Pennsylvania, and that the date

of the de facto taking was August 6, 2014, and it directed the appointed board of

viewers to conduct a hearing to determine just compensation or other damages

under the Code. Upon review, we affirm.

1

The Honorable Carolyn Tornetta Carluccio presided.

I. Background

A. Generally

Condemnee owns and operates Hickory Veterinary Hospital, a large

veterinary hospital located on Hickory Road near the intersection of the

Pennsylvania Turnpike and its Northeast Extension (collectively, the Turnpike).

The hospital is a 24-hour, full-service, small-animal hospital offering a wide range

of veterinary services. In 2012-14, Condemnor began a project to widen 10 miles

of the Turnpike, including the portion that abuts Condemnee’s property. As a

result of the widening project, Condemnee’s property is now bounded to the west

by the Turnpike and a retaining wall.

Condemnee’s property is shaped like a hockey stick adjacent to the

Turnpike. See Expert Report of Gregory C. Newell, P.E. (Newell Report),

7/12/17, Ex. No. 1; Supplemental Reproduced Record (S.R.R.) at 370a. The

hospital is located in the developed area at the northern end of the handle of the

stick. Toward the upper portion of the stick is an auxiliary gravel parking area. Id.

The undeveloped area below and south of the gravel parking area is

the area affected by increased and now concentrated stormwater discharge from the

Turnpike. This area is undeveloped, consisting of brush and other vegetation. The

affected area is bounded to the west by the Turnpike retaining wall and to the east

by Plymouth Creek.

Below and to the south of the affected area is the rear of the property,

which extends in an easterly direction. Condemnee intends to expand her

2

veterinary facilities by constructing a canine rehabilitation facility (rehab facility)

on this part of her property. Plymouth Creek ultimately crosses this part of the

property.

In order to reach the planned rehab facility from the existing hospital,

a driveway would need to be constructed from the developed area through the

affected area to reach the rear of the property. Although not relevant to the

stormwater discharge problems at issue in this case, the proposed driveway must

also cross Plymouth Creek.

Condemnor’s construction project significantly changed the grade of

the Turnpike. The widening of the roadway increased the stormwater flow, which

necessitated the construction of 10 water detention basins along the Turnpike to

keep the water flow at pre-construction levels.

However, Condemnor did not place a water detention basin in the area

of the project abutting Condemnee’s property. Rather, Condemnor constructed a

riprap swale (a stone-filled U-shaped channel) to collect stormwater runoff from

three pipes running under the retaining wall and then discharge the runoff from the

swale directly into the affected area of Condemnee’s property. By Condemnor’s

own calculations, the post-construction stormwater flow onto Condemnee’s

property from the Turnpike increased by 500%.

3

B. Temporary Construction Easement; De Jure Taking

In a separate proceeding between the parties before a different trial

judge, Condemnor formally condemned a temporary construction easement to

build a temporary erosion and sedimentation basin on Condemnee’s property to

contain sediment and runoff from the construction project. At the conclusion of

the project, Condemnor removed the sedimentation basin, restored the property

and vacated the temporary construction easement.

Following a week-long trial in June 2017, a jury awarded Condemnee

compensation for the de jure taking. In that proceeding, the parties resolved all

damage issues regarding the construction easement.

C. Petition for Appointment of Board of Viewers

Meanwhile, in January 2017, Condemnee filed a petition for

appointment of a board of viewers alleging the de facto condemnation of a

permanent easement as a result of the increased stormwater discharge. Condemnee

sought damages related to the alleged de facto taking, including consequential

damages under Section 714 of the Code, 26 Pa. C.S. §714. The trial court granted

Condemnee’s petition and appointed a board of viewers to determine

compensation and other damages.

In response, Condemnor filed preliminary objections alleging

noncompliance with the requirements of Section 502(a) of the Code, 26 Pa. C.S.

§502(a), waiver, and statute of limitations.

4

D. Hearing on Preliminary Objections

In July 2017, the month following the jury trial on the de jure

temporary taking, the trial court held a hearing on Condemnor’s preliminary

objections to the petition alleging a de facto taking. See Tr. Ct. Hr’g, 7/17/17, at 1-

132; Reproduced Record (R.R.) at 154a-285a. In its opinion in support of its order

overruling Condemnor’s preliminary objections, the trial court noted that it

accepted Condemnee’s testimony as credible. Condemnee owns and runs the

Hickory Veterinary Hospital on her property. She purchased the property in 1983.

Condemnee testified that prior to the Turnpike widening project, the rear of her

property, where she planned to build the rehab facility, did not flood. However,

after Condemnor completed the project, the rear of her property floods even during

modest rainfalls. Condemnee further testified that prior to the project, there was

one feasible spot to build an access road to the rear of her property. However, after

the project and continuous flooding that resulted, it was no longer feasible to

construct the access road.

Condemnee testified that the flooding interferes with her access to the

rear of the property and her use and enjoyment of the property because she planned

to expand her practice to include the rehab facility. In addition, the flooding is

damaging the surface support of her property through erosion, destruction of plant

life, and the creation of storm water tributaries arising from the paths of the water

flow. In particular, the stormwater erosion directly crosses the area where

Condemnee planned to construct the access road to the rear of her property. See

Newell Report, Exs. Nos. 3, 4, 13; S.R.R. at 372a, 373a, 378a.

5

The trial court also found the expert report2 of Condemnee’s

engineering expert, Gregory C. Newell, P.E. (Engineer), to be very credible.

Engineer’s report explained that the swale discharge, 650 feet south of Hickory

Road, is a concentrated discharge located right at Condemnee’s property line.

Stormwater enters Condemnee’s property from the swale and flows south parallel

to the property line with the Turnpike to an area where a small pre-project pipe

also discharges onto the property. See Newell Report, Ex. No. 3; S.R.R. at 372a.

The combined discharge from the large swale and the smaller pre-

project pipe flows east/southeast across Condemnee’s property to a tributary. See

Newell Report, Ex. No. 4; S.R.R. at 373a. During a storm, the combined

swale/pipe discharge constitutes more than a 500% increase over the pre-project

pipe discharge.

Near the end of project construction, Condemnor removed a

temporary erosion and sedimentation basin it constructed on Condemnee’s

property pursuant to a temporary construction easement. Condemnor also graded

and lined the swale to its permanent condition. On this date, August 14, 2014, the

unmitigated stormwater discharges from the swale began. This resulted in the

creation of a continuous and permanent flooding condition on Condemnee’s

property.

2

See Expert Report of Gregory C. Newell, P.E. (Newell Report), 7/12/17, 1-71,

Reproduced Record (R.R.) at 287a-357a; see also Exhibits from Newell Report, Supplemental

Reproduced Record (S.R.R.) at 370a-75a.

6

The trial court also accepted Engineer’s testimony as persuasive.

Engineer testified that before the project, stormwater flowed onto Condemnee’s

property and dispersed in heavy brush, weeds and briers. Nothing concentrated the

water flow or created a defined channel. As a result, at that time stormwater had

little or no impact on Condemnee’s property.

Condemnor’s project increased the volume of stormwater discharge

by 500% and concentrated the discharge at a specific point. Flooding and erosion

began to occur with even the smallest storms. A clear erosion channel now exists.

Engineer further testified that the increased stormwater flows interfere

with safe access to the rear of Condemnee’s property. The concentrated flow

would come barreling down the only feasible access road at a very high velocity

and cause significant damage to any development on the rear property. Engineer

testified this flooding is a permanent condition resulting from Condemnor’s

widening project. Engineer also testified that as a result of steep slopes and a

nearby stream, there is no feasible way to construct an access road to the rear of the

property other than in the area depicted in Exhibit No. 13 of his expert report. See

Newell Report, Ex. No. 13; S.R.R. at 378a.

Condemnee and Engineer also persuaded the trial court that

Condemnee was planning the construction of the proposed rehab facility on the

rear of her property in response to the ongoing expansion of her veterinary

practice. Condemnee employs 19 veterinarians, 4 surgeons and 94 staff members.

7

Condemnee further testified that she expanded the hospital six times. The hospital

has approximately 18,000 active patient files and operates a 24/7 emergency clinic.

Condemnee also testified there is a strong demand for a larger canine

rehab facility in the area, and there is no such facility within a 30-mile radius of the

hospital. The hospital’s current one-room rehab center is much too small and can

accommodate only one patient at a time. The proposed rehab facility would be

able to treat multiple patients at one time and would have a pool and an underwater

treadmill.

In addition, Engineer testified that Condemnee planned to build the

new rehab facility long before the Turnpike project began. In particular,

Condemnee and Engineer began working on the plan before the Turnpike project

started. Engineer further opined, as someone experienced in land development,

that Condemnee would have been able to obtain all the permits and approvals

necessary to construct the rehab facility.

E. Overruling of Preliminary Objections

In January 2018, the trial court filed an order overruling Condemnor’s

preliminary objections. The trial court determined that Condemnor “de facto

condemned, via a permanent stormwater easement, the rear undeveloped portion of

Condemnee’s property ….” Tr. Ct. Order, 1/24/18, ¶2. The trial court also

directed the appointed board of viewers to conduct a hearing to determine just

compensation and consequential damages. Id., ¶4.

8

F. Condemnor’s Appeal; Statement of Errors

Condemnor filed a notice of appeal. The trial court issued an order

directing Condemnor to file a Concise Statement of Errors Complained of on

Appeal. R.R. at 146a. Condemnor complied, alleging: Condemnee introduced no

evidence of any legitimate issue as to lateral or surface support; Condemnee

introduced inadequate evidence of erosion or other impact to her property;

Condemnee introduced no evidence of any restriction on her ability to make use of

her property as a result of Condemnor’s activities; Condemnee introduced no

evidence that any proposed rehab facility would ever be constructed on the rear of

her property, or that any use at all would be made of the woodlands allegedly

affected by Condemnor’s construction activities; Condemnee introduced no

evidence of any market need for the proposed rehab facility; to the extent

Condemnee established occasional flooding, this does not establish a de facto

taking as a matter of law; and in the absence of any actual utilization of the

property in question, there can be no compensable interference with the use of that

property. R.R. at 150a-51a.

G. Trial Court’s Opinion in Support of Order

In its opinion in support of its order, the trial court noted that

Condemnor did not obtain its own expert or present any witnesses to counter

Condemnee’s testimony and Engineer’s report and testimony. Rather, Condemnor

relied solely on its cross-examination of Engineer. See N.T. at 74-91; R.R. at

227a-44a. However, the trial court found Condemnor’s cross-examination

unpersuasive and ineffective. Tr. Ct., Slip Op., 5/23/18, at 20.

9

In addressing Condemnor’s assignment of errors, the trial court

explained that it never determined the flooding at issue was occasional or sporadic.

Rather, based on the evidence, including videos and testimony from Condemnee

and Engineer, the trial court determined the flooding at issue was continuous and

permanent. Id. at 21.

The trial court also rejected Condemnor’s allegation that Condemnee

presented no evidence that she would have actually built a rehab facility on the rear

of the property. To the contrary, the trial court indicated that plans for the rehab

facility existed prior to the construction project and revealed Condemnee needed to

build the new rehab facility given the limited rehab facility currently in use. Id. In

particular, the trial court explained that Condemnee’s history of expanding the

veterinary hospital in stages, with the proper approvals, weighed in favor of a

finding that construction of the new rehab facility was not speculative. Id.

Condemnor appeals.3

II. Issues

Condemnor presents three issues for our review. First, Condemnor

contends the trial court erred in finding a de facto taking occurred where there is no

dispute that the area in question is entirely undeveloped at present and therefore

any stormwater discharge does not impact Condemnee’s existing operations.

3

Our review of a trial court’s order overruling or sustaining preliminary objections to a

petition for appointment of a board of viewers is limited to determining whether the trial court’s

findings of fact were supported by substantial evidence and whether the trial court committed an

error of law or an abuse of discretion. Colombari v. Port Auth. of Allegheny Cty., 951 A.2d 409

(Pa. Cmwlth. 2008).

10

Second, Condemnor asserts the trial court erred in finding a de facto taking

occurred because Condemnee did not establish any present plans or intent to

develop the rear of the property in any respect. Third, Condemnor argues the trial

court erred in finding a de facto taking occurred where Engineer testified there

were engineering solutions available as part of the construction of any hypothetical

access road that may be constructed to serve any hypothetical canine rehab facility

located on the rear portion of the property.

III. Discussion

A. Taking of Undeveloped Property

1. Argument

Condemnor contends that its discharge of stormwater across an

undeveloped, wooded section of Condemnee’s property did not result in a de facto

taking. Here, the area in question lies to the south of Condemnee’s auxiliary

gravel parking lot, which is located to the south of the hospital complex.

Condemnor asserts this is raw, undeveloped land. The only use to which this land

has ever been put was for Condemnor’s temporary construction easement and

sedimentation basin. Following completion of its five-year construction project,

Condemnor removed the sediment trap and restored the property to its previous

condition. See N.T. at 51; R.R. at 204a.

Consequently, even assuming the stormwater discharge is greater than

it was pre-construction, Condemnor argues there is absolutely no evidence that the

post-construction discharge causes Condemnee any meaningful or compensable

damage or harm at the present time. Condemnor asserts our decision in McMaster

11

v. Township of Bensalem, 161 A.3d 1031 (Pa. Cmwlth. 2017), is controlling. In

McMaster, the property owners alleged that the township, through its construction

activities, flooded an undeveloped portion of their property near their residence.

All the flooding in McMaster occurred in a wooded area that the owners partially

cleared for such things as a horseshoe set-up for a picnic, mini-bike riding and a

tree fort for their children. The owners did not view this property as part of their

lawn. The trial court sustained the township’s preliminary objections. It

determined the flooding did not constitute a de facto taking because the flooding

did not substantially deprive the owner of the use and enjoyment of the property.

The flooding in McMaster did not interfere with the property owners’

preexisting use of their house or lawn. The owners did not show that they used the

wooded area in any way that the flooding affected. Absent any showing of

interference with the use of the flooded, wooded property, the trial court concluded

that the owners failed to establish that the township’s stormwater redirection

established a de facto taking. Id.

Ultimately, this Court affirmed. Although the township diverted

water from its natural channel and caused substantial and recurring flooding on a

part of the owners’ property, we determined that neither the nature of the

township’s conduct nor the damage to property rose to the level of a de facto

taking. We also observed that the discharge onto the owners’ property resulted

from the township’s negligence rather than an intentional discharge, and that the

flooding was ultimately abated.

12

Specifically, this Court reasoned (with emphasis added):

The [t]ownship’s flooding did not interfere with

[owners’] use of their house or lawn. [Owners] did not

show that they actually used the wooded area of the

[p]roperty in any way that was affected by the flooding

or that the flooding prevented any development of that

area that would have otherwise been likely to occur.

[Owners] showed only some sporadic use of the cleared

area that may have been affected by the flooding and

some damage to trees from the flooding. In addition, the

fact that the 2010 pipe installation solved the flooding

showed that the flooding was abatable and preventable,

although this remediation was something that only the

[t]ownship could do.

McMaster, 161 A.3d at 1037. Condemnor asserts McMaster is nearly on all fours

with the present case and is therefore controlling. As such, Condemnor argues the

trial court erred in finding a de facto taking occurred.

2. Analysis

In order to establish a de facto taking, a property owner must show:

(1) the condemnor has the power to condemn land under eminent domain

procedures; (2) exceptional circumstances have substantially deprived her of the

use and enjoyment of her property; and (3) the damages sustained were the

immediate, necessary and unavoidable consequences of the exercise of eminent

domain. In re: Mountaintop Area Joint Sanitary Auth., 166 A.3d 553 (Pa. Cmwlth.

2017). Here, the trial court noted the first element was not at issue. Clearly,

Condemnor possesses the power to condemn the property at issue under eminent

domain procedures. Second, the trial court determined Condemnee presented

ample evidence that the flooding at issue substantially deprived her of the use of

13

her property. Third, the trial court determined that the damages sustained were the

immediate, necessary and unavoidable consequences of the exercise of eminent

domain power.

Where the evidence shows the flooding of land is the direct result of a

condemnor’s drainage plan, a de facto taking is established. Greger v. Canton

Twp., 399 A.2d 138 (Pa. Cmwlth. 1979) (citing Hereda v. L. Burrell Twp., 48

A.2d 83 (Pa. 1946)). In Hereda, the township constructed a drainage pipe under a

street, which immediately began flooding the plaintiffs’ property and frequently

resulted in the need for the plaintiffs to pump water from their basement of their

home. Prior to the installation of the drainage pipe, the plaintiffs were unaffected

by water or drainage from the street.

In Hereda, the Supreme Court reasoned that the township’s drainage

plan resulted in injury to the plaintiffs’ property. The plan accumulated and

directed water and sewage from the street into an artificial conduit and then

discharged it in volume onto plaintiffs’ property. The Hereda Court noted that

such injury was the direct, immediate, necessary and unavoidable consequence of

the exercise of the township’s conferred power and the township’s action in

implementing its drainage plan.

Here, the record supports the trial court’s finding of a de facto taking.

Condemnee testified that prior to the construction project, the rear of her property

did not flood. After Condemnor completed the construction project, the rear of

Condemnee’s property would flood during even modest rainfalls. In addition,

14

Condemnee testified that prior to the project, there was one feasible area to build

an access road to the rear of her property where she planned to construct the rehab

facility. However, because of post-project flooding, the proposed access road is no

longer feasible. See N.T. at 113-18; R.R. at 266a-71a.

Condemnee further testified she needs to have access to her entire

property as part of her planned expansion of her veterinary facilities and in case

she would need to sell the property, including the veterinary facilities. Id. On voir

dire examination, Condemnee qualified as an expert in veterinary medicine. N.T.

at 95-101; R.R. at 248a-54a.

On direct examination, Condemnee testified that her hospital’s

survival will be contingent on developing new strategies to meet the expectations

of pet owners for the best care available. N.T. at 103; R.R. at 256a. This includes

the need to develop the rear of the property as a new rehab facility with an access

driveway, a drop off and parking area, a treatment building, a caretaker’s

apartment and play/walking areas. Id. The current rehab facility consists of only

one room where only one patient can be treated at a time. N.T. at 107; R.R. at

260a; see also Expert Report of Nancy O. Brown, V.M.D., 7/13/17 (Brown

Report), Ex. A (“Need to Provide Canine Rehabilitation Services In the Rear of the

Hickory Veterinary Hospital”); S.R.R. at 369a. Condemnee testified she could

triple or quadruple the number of patients in rehab. N.T. at 107; R.R. at 260a.

The trial court also found Engineer’s testimony to be “extremely

persuasive” that there was a taking of Condemnee’s property. Tr. Ct., Slip Op., at

15

12. Engineer testified that prior to the construction, the stormwater coming off the

Turnpike was not an obstacle to development of the access road. N.T. at 22-23;

R.R. at 175a-76a. The water flowed through heavy brush, weeds and briers, where

it dispersed. N.T. at 23; R.R. at 176a. It had little or no impact on the property,

and there were no obvious signs of erosion or disruption of the property. Id. As

such, Engineer opined the stormwater flow prior to the Turnpike project would not

have impacted the proposed driveway. Id.

However, the Turnpike construction widened the paved area and

added a third travel lane in both directions. N.T. at 24; R.R. at 177a. The project

also raised the elevation of the Turnpike and installed a retaining wall and

extensive storm drainage facilities, including a number of drainage pipes and a

well-defined riprap swale. Id. Engineer explained that the Turnpike was much

higher than Condemnee’s property prior to the project construction and the grass

area sloped down toward the property line. It had roughly 40 to 50 feet to make up

a grade difference. N.T. at 26; R.R. at 179a. Therefore, when Condemnor widened

the roadway, it eliminated most of the grass area and added fill to build the new

roadway at the Turnpike level. Id. Condemnor constructed a large retaining wall

to support the added fill. Id.

To remove the stormwater from the roadway, Condemnor added

additional drainage pipes through the retaining wall that discharged into the U-

shaped riprap swale. N.T. at 28; R.R. at 181a. Eventually, the swale discharges

the stormwater directly onto Condemnee’s property at one specific point. N.T. at

29-30; R.R. at 182a-83a. Condemnor made no effort to disperse water at the point

16

of discharge. Id. As a result, there was a 500% increase in stormwater discharge

onto the property, which is highly concentrated at one point. N.T. at 31; R.R. at

184a.

Engineer further testified that as a result of the design of the swale

discharge, the stormwater will flow over the area where Condemnee planned to

build the access road. N.T. at 32-43; R.R. at 185a-96a. The concentrated water

flow would erode the surface support and destabilize the area, therefore interfering

with the design, construction and maintenance of the access road. Id. Engineer

further testified Condemnee could not build the access road anywhere else. N.T. at

44; R.R. at 197a.

The evidence cited above supports the trial court’s determination that

Condemnee established the flooding caused by Condemnor’s construction project

substantially deprived her of the use of her property by significantly restricting and

interfering with her ability to access and develop the rear of property, where she

intended to expand her veterinary facility to include a canine rehab facility. The

evidence also supports the trial court’s determination that the damages Condemnee

sustained were the immediate, necessary and unavoidable consequences of

Condemnor’s construction project, which intentionally diverted a greatly increased

and concentrated stormwater flow directly onto Condemnee’s property. As such

Condemnee’s evidence, found credible by the trial court, established a de facto

taking of the rear portion of Condemnee’s property. Hereda.

17

In addition, we reject Condemnor’s argument that our decision in

McMaster is controlling here, for the following reasons. To the contrary, we

conclude the circumstances in McMaster are significantly distinguishable from

those in the present case. In determining whether a de facto taking occurred, each

case turns on its own facts. In re: Borough of Blakely, 25 A.3d 458 (Pa. Cmwlth.

2011).

First, in McMaster, the trial court did not find a de facto taking where

the stormwater discharged onto a residential property and did not interfere with the

owners’ use of their house or lawn. Although the flooding in McMaster also

occurred in a wooded area, the owners did not show they actually made significant

use of the wooded area or that the flooding prevented any development of that area

that otherwise would have been likely to occur. In the current case, however, there

was significant evidence of the likely development of the flooded area. This point

will be discussed further below.

Second, when the township in McMaster initially redirected the

stormwater flow in 1988 or 1989, it mistakenly believed the stormwater flowed

into a bordering creek. The township never intended to discharge the stormwater

onto the owners’ property.

In the present case, however, Condemnor’s construction project

created a drainage system that intentionally discharged a greatly increased and

concentrated flow of stormwater onto the rear of Condemnee’s property.

18

Condemnee testified that a normal rainfall is now sufficient to cause flooding.

N.T. at 116; R.R. at 269a.

Third, in McMaster, the flooding was actually abated. In particular,

the township installed a new pipe in 2010 that resolved the flooding problem.

Here, however, the flooding is not abated, no specific plans for abatement were

presented, and there is expert testimony and a finding from the trial court that the

condition is permanent. This point will be discussed below.

In sum, given the factual differences between McMaster and the

present case, we reject Condemnor’s contention that McMaster is controlling.

B. Intention to Develop Property

1. Argument

Condemnor next contends the trial court erred in finding a de facto

taking occurred because Condemnee did not establish any present plans or intent to

develop the rear of the property in any respect. Condemnor asserts that during the

jury trial on the de jure taking for the temporary construction easement,

Condemnee alleged the stormwater issues precluded her development of the rehab

facility. However, Engineer conceded both in the de jure trial and the present trial

that nobody obtained, or even applied for, any permits for the construction of the

rehab facility.

Further, Condemnee testified that a need for the rehab facility existed

based on demographic studies she commissioned in 1991, regarding the need for

19

the rehab facility. See N.T. at 104-06; R.R. at 257a-59a. Condemnee admitted she

did not update the studies. N.T. at 106; R.R. at 259a. The trial court struck any

reference to the study as untimely. Id.

Summarizing, Condemnor points out that in both the de jure jury trial

and the present bench trial, Condemnee and Engineer conceded that she took no

actual steps to pursue the rehab facility. As such, the area of Condemnee’s

property at issue remains undeveloped. Therefore, in accord with McMaster, the

discharge of stormwater onto raw, undeveloped land cannot be considered a de

facto taking.

2. Analysis

In its opinion, the trial court rejected Condemnor’s contention that the

record contained no evidence showing that a canine rehab facility would ever have

been built on Condemnee’s property or that there is a market need for the same.

Tr. Ct., Slip Op., at 21. To the contrary, the trial court noted:

the record demonstrates that plans for such a facility had

been in place long before the Turnpike Project, and that,

[Condemnee] needed to build such a canine rehab facility

given her limited physical space to rehab all of her

patients. In addition, [Condemnee’s] history of

expanding the Veterinary Hospital in stages, and history

of obtaining the necessary variances, all weighed in a

finding that the eventual construction of such a facility

was not speculative.

Id.

20

The beneficial use of a property includes not only its present use but

all potential uses, including its highest and best use. Gaughen v. Dep’t of Transp.,

554 A.2d 1008 (Pa. Cmwlth. 1989) (citing Visco v. Dep’t of Transp., 498 A.2d 984

(Pa. Cmwlth. 1985)). The property owner bears the burden of proving that the

property is adaptable for a use other than its current use, and that there is a need for

this other use. Id. (citing Shillito v. Metro. Edison Co., 252 A.2d 650 (Pa. 1969)).

At the preliminary objection stage of a de facto taking case, evidence of highest

and best use is relevant to the issue of whether a de facto taking occurred, that is,

whether the condemnee’s property was so affected that the condemnee was

deprived of the beneficial use and enjoyment of the property’s highest and best

use. Appeal of Dep’t of Transp., 605 A.2d 1286 (Pa. Cmwlth. 1992).

Here, Condemnee sought to establish not an entirely different use, but

rather a more intensified version of the current professional use. She testified as to

her long-standing plans for expansion and the need for such expansion. See Brown

Report, Ex. A (“Need to Provide Canine Rehabilitation Services In the Rear of the

Hickory Veterinary Hospital”); S.R.R. at 369a (“A rehab center is needed for

Hickory Veterinary Hospital to achieve its highest and best use as a modern full-

service veterinary facility.”). Engineer also testified as to the long-standing plans

for such expansion and the adaptability for such expansion. The trial court

accepted this evidence.

More specifically, regardless of the stricken 1991 demographic

studies, the trial court noted that both Condemnee and Engineer provided

persuasive testimony that Condemnee planned to construct the proposed rehab

21

facility in response to the ongoing expansion of her veterinary practice.

Condemnee explained that the hospital has about 18,000 active files. N.T. at 97;

R.R. at 250a. The hospital employs 19 veterinarians. Id. Previously, Condemnee

expanded the veterinary facility six times. N.T. at 111; R.R. at 264a. She obtained

municipal approval for every expansion. Id.

Further, Engineer testified that Condemnee began implementing her

master plan 10 to 15 years ago. N.T. at 22; R.R. at 175a. The plans for the rehab

facility go back to that time. Id. Condemnee proceeded in stages; she took care of

the front of the property first, which involved the clinical practice. Id.

Engineer further testified Condemnee began planning construction of

the access road three years ago. N.T. at 21; R.R. at 174a. Also, Engineer opined

that it is highly likely that Condemnee would have been able to obtain all the

permits and approvals necessary to construct the rehab facility. N.T. at 91; R.R. at

244a; see also Newell Report at 21; R.R. at 307a.

In eminent domain cases, questions concerning witness credibility and

conflicts in the evidence are for the trial court to resolve. In Re: Condemnation by

Beaver Falls Mun. Auth. for Penndale Water Line Extension, 960 A.2d 933 (Pa.

Cmwlth. 2008). If sufficient evidence supports the trial court’s findings as fact-

finder, we will not disturb these findings. Id. In addition, we may not disturb a

trial court’s credibility determinations. Id.

22

Here, the trial court credited Condemnee’s testimony and Engineer’s

testimony that Condemnee definitely planned to build an access road and rehab

facility on the rear of the property, and that it was highly likely Condemnee would

have been permitted to do so. Because the trial court’s findings and credibility

determinations are supported by the evidence, we may not disturb them. Beaver

Falls Mun. Auth.

C. Abatement of Stormwater Problems

1. Argument

Condemnor next contends the trial court erred in finding a de facto

taking occurred where Engineer testified there were engineering solutions available

as part of the construction of any hypothetical access road and canine rehab facility

located on the rear of the property. Citing McMaster, Condemnor argues that a

critical factor weighing against the determination of a de facto taking is that any

harm arguably suffered by a property owner may be readily abatable. Condemnor

asserts the stormwater flow could be addressed, and easily so, through engineering

solutions such as a culvert. On cross-examination, Engineer acknowledged that he

must design a driveway to cross Plymouth Creek, a tributary on Condemnee’s

property, by building a bridge over it or installing a culvert. N.T. at 85-86; R.R. at

238a-39a. Condemnor asserts that the stormwater discharge is less of an

engineering challenge than crossing Plymouth Creek.

Essentially, Condemnor argues that Engineer conceded that there

might be a solution to the stormwater problem that would permit driveway

construction. Therefore, because the stormwater problem is readily abatable,

23

Condemnor asserts that McMaster supports a conclusion that no de facto taking

occurred.

In response, Condemnee asserts Condemnor waived the issue of

whether the stormwater problem is abatable by failing to raise it in its Pa. R.A.P.

1925(b) Concise Statement of Errors Complained of on Appeal. See R.R. at 150a-

53a. Issues not included in the Concise Statement of Errors or not raised in

accordance with the provisions of Rule 1925(b)(4) are waived. Mountaintop Area

Joint Sanitary Auth.

Alternatively, Condemnee asserts Engineer could not abate the

stormwater problem because the source of the stormwater problem is on

Condemnor’s side of the property. Moreover, Condemnor presented no evidence

that Engineer could abate the stormwater problem.

In addition, Condemnee asserts Condemnor mischaracterized

Engineer’s testimony on cross-examination. Engineer never conceded that the

stormwater problem caused by Condemnor’s construction project was abatable.

Finally, Condemnee argues that even if Condemnor presented

evidence that the stormwater problem could be abated, the trial court determined

that the flooding issue was continuous and permanent. See Tr. Ct., Slip Op. at 21.

Condemnee asserts this finding is supported by the evidence.

24

2. Analysis

We first reject Condemnee’s contention that Condemnor waived the

issue of whether the stormwater problem is abatable by failing to raise it in its Pa.

R.A.P. 1925(b) Concise Statement of Errors Complained of on Appeal.

Rule 1925(b)(4)(v) provides that each error identified in the Concise

Statement of Errors will be deemed to include every subsidiary issue contained

therein that was raised in the trial court. The presence of a possible engineering

solution to the stormwater problem can be a factor in evaluating whether a de facto

taking occurred. Condemnor clearly questioned the sufficiency of proof of a de

facto taking in its Concise Statement of Errors, and abatement is a subsidiary issue.

Further, Condemnor raised the issue of whether Condemnee could abate the

stormwater problem in its cross-examination of Engineer. See N.T. at 85-86; R.R.

at 238a-39a. Because Condemnor raised the abatement issue before the trial court,

and because abatement is a subsidiary issue of proof of de facto taking, it is

properly before this Court.

Nevertheless, as the trial court observed, Condemnor presented no

evidence at trial. Rather, Condemnor relied on its cross-examination of Engineer

to attempt to show that Condemnee could solve the stormwater problem by herself.

Condemnor argues that Engineer “readily conceded” that there is an engineering

solution to the stormwater problem. See Appellant’s Br. at 15.

We disagree. Our review of Engineer’s testimony indicates that

Condemnor, not Condemnee, could have lessened the damage from the stormwater

25

flow by constructing a basin on Condemnee’s property. N.T. at 60-61; R.R. at

213a-14a. This would require a de jure taking of Condemnee’s property because

there is no room for it on the Turnpike side. Id. However, there would still be

damages to Condemnee’s property resulting from the increased amount of runoff

and the concentrated discharge at a specific point. Id.

Further, the trial court found Condemnor’s cross-examination of

Engineer unpersuasive and ineffective in rebutting the evidence of a de facto

taking. Tr. Ct., Slip Op., at 20. For example, Engineer recalled on cross-

examination that when asked if there was an engineering solution to the drainage

problems at issue, he gave no testimony concerning anything about a solution to

Condemnor’s decision to flood Condemnee’s property. N.T. at 86; R.R. at 239a.

Although Engineer indicated that he suspected there could be an engineering

solution to the flooding problem, he never testified what the solution would be,

what it would cost, or who would implement it. Consequently, we reject

Condemnor’s argument that Engineer’s testimony on cross-examination was

sufficient to establish that the stormwater problem was readily abatable.

In addition, Engineer testified that the flooding is continuous and

permanent. N.T. at 42, 56; R.R. at 195a, 209a. The trial court accepted this as

fact. Tr. Ct., Slip Op., at 21. To effectuate a taking, an overflow of water must

constitute an actual, permanent invasion of the land. Colombari v. Port Auth. of

Allegheny Cty., 951 A.2d 409 (Pa. Cmwlth. 2008). Because the trial court found

the stormwater problem to be continuous and permanent, it cannot be considered

abatable to the extent McMaster would control this case. Therefore, we reject

26

Condemnor’s contention that it established through Engineer’s testimony on cross-

examination that there were engineering solutions available as part of the

construction of an access road that could address and abate any stormwater

problems.

IV. Conclusion

For the above reasons, we discern no error or abuse of discretion in

the trial court’s determination that Condemnor de facto condemned, by means of a

permanent stormwater easement, the rear undeveloped portion of Condemnee’s

property as described by the trial court in its order. Accordingly, we affirm.

ROBERT SIMPSON, Judge

27

IN THE COMMONWEALTH COURT OF PENNSYLVANIA

Dr. Nancy O. Brown :

: No. 235 C.D. 2018

v. :

:

Pennsylvania Turnpike Commission, :

Appellant :

ORDER

AND NOW, this 7th day of January, 2019, for the reasons stated in the

foregoing opinion, the order of the Court of Common Pleas of Montgomery

County is AFFIRMED.

ROBERT SIMPSON, Judge

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.