Opinion

Telesis Corporation v. United States

Court
United States Court of Federal Claims
Filed
Dec 18, 2018
Status
Published
On the bench
Margaret M. Sweeney
Cited by
0 cases
Authority
More cited than 6.6%

“The arbitrary and capricious standard . . . requires a reviewing court to sustain an agency action evincing rational reasoning and consideration of relevant factors.”

How later courts described this case

  • “The arbitrary and capricious standard . . . requires a reviewing court to sustain an agency action evincing rational reasoning and consideration of relevant factors.”
  • requiring clarification when the absence of information “clearly indicate[d] a clerical mistake”
  • “[The court] cannot accept the implication that there are never situations in which [the procuring agency’s] discretion would be abused by a failure to seek clarification.”
  • considering that the offeror submitted a duplicate page and that the evaluator knew the substance of the missing information

Written by the judges who cited it.

The opinion

In the United States Court of Federal Claims

No. 18-1119C

(Filed Under Seal: November 28, 2018)

(Reissued for Publication: December 18, 2018)

*************************************

TELESIS CORPORATION, *

*

Plaintiff, *

* Postaward Bid Protest; RCFC 52.1; Cross-

v. * Motions for Judgment on the

* Administrative Record; Clarifications

THE UNITED STATES, *

*

Defendant. *

*************************************

Russell D. Duncan, Washington, DC, for plaintiff.

Sheryl L. Floyd, United States Department of Justice, Washington, DC, for defendant.

OPINION AND ORDER

SWEENEY, Chief Judge

In this postaward bid protest, plaintiff Telesis Corporation (“Telesis”) alleges that its

proposal in connection with a solicitation issued by the United States General Services

Administration (“GSA”) for information technology services was improperly evaluated. Telesis

argues that the GSA erred by deducting points Telesis claimed for possessing relevant

experience without first seeking clarification regarding the missing information necessary to

sustain the points. The court is presented with the parties’ cross-motions for judgment on the

administrative record. For the reasons explained below, the court denies Telesis’s motion and

grants defendant’s motion.

I. BACKGROUND

A. Solicitation

On June 20, 2016, the GSA issued solicitation QTA0016GBA000 to procure information

technology services for the government. Administrative R. (“AR”) 4, 270. Specifically, the

GSA sought proposals for the Alliant 2 Small Business Governmentwide Acquisition Contract, a

 The court initially issued this Opinion and Order under seal with instructions for the

parties to propose any redactions. The parties did not propose any redactions.

multiple-award, indefinite-delivery, indefinite-quantity contract. Id. at 270. An awardee under

the solicitation would become eligible to receive task orders performed under the contract. Id. at

262-63. The GSA specified that proposals were due by October 7, 2016. Id. at 258.

1. Proposal Format and Contents

The GSA required offerors to submit their proposals in seven volumes—general;

responsibility; cost-price; past performance; relevant experience; organizational risk assessment;

and systems, certifications and clearances. Id. at 365. Within the general volume, offerors were

required to include, among other items, a completed copy of the Document Verification and Self

Scoring Worksheet (“Scoring Worksheet”). Id. The GSA also instructed offerors to submit a

paper copy of the completed Scoring Worksheet. Id. In the Scoring Worksheet, offerors were

required to claim points for meeting specific criteria in the solicitation. See id. at 372-73. For

every claimed point, offerors were required to include supporting documentation in the proposal

showing that they met the relevant criteria. Id.

Of particular import here, offerors could claim points for having relevant experience. Id.

at 225-26. The GSA identified two categories of relevant experience: (1) Product or Service

Code1 (“PSC”) projects and (2) leading edge technology (“LET”) projects. Id. at 379; see also

id. (explaining that a “project” consists of a contract or task order performed for a public or

private entity). The GSA further defined relevant experience by delineating what types of work

qualified under each category. Id. at 380, 387. Specifically, the GSA chose thirty-five PSCs—

which were separated into three groups—that would be accepted and ten technology fields in

which experience would qualify as LET.2 Id. at 385-87, 390. Offerors were permitted to submit

no more than (1) four projects for the first PSC group, two projects for the second group, and one

project for the third group; and (2) three projects in each LET field. Id. at 380, 387. Subject to

those restrictions, offerors could claim points for each qualifying project. Id. at 225-26. With

regard to PSC projects, offerors could claim 3000 points for each project in the first group, 2000

points for each project in the second group, and 1000 points for a project in the third group. Id.

at 225. Offerors could also claim 500 additional points for each substantiated PSC project that

was performed for a different federal government customer. Id. As to the LET projects, offerors

could claim 100 points for the first project in each LET field, 200 points for the second such

project, and 300 for the third such project. Id. at 226.

As germane to Telesis’s protest, the process was identical for substantiating the points for

relevant experience in either the PSC or LET categories. Specifically, offerors were required to

submit, along with other items, a completed relevant experience project template (“Experience

1

PSCs are codes that are established by the government and “represent major products

or services offered by a business.” AR 387.

2

For example, a contract to provide “IT and Telecom – Systems Development” (PSC

D302) qualified as relevant experience in the PSC category, while a task order concerning “cloud

computing” met the criteria for the LET category. AR 385, 390.

-2-

Form”) signed by the cognizant contracting officer (“CO”) for each project.3 Id. at 382, 388. If

offerors could not reach the CO, the GSA permitted the CO’s representative (“COR”) directly

associated with the project to sign the Experience Form. Id. Offerors who relied on the COR’s

signature were also required to provide (1) the CO’s and COR’s contact information and (2) an

electronic-mail (“e-mail”) message from the COR to the CO containing the completed

Experience Form. Id. at 382, 388-89. The GSA requested the e-mail message to “provide

verification that the CO was made aware of the COR’s concurrence with the [Experience

Form].” Id. at 382 (PSC projects); accord id. at 389 (LET projects).

2. Evaluation Process

The GSA explained in the solicitation that the awardees would be selected based on

which offerors presented the highest technically rated proposals with a fair and reasonable price.

Id. at 402. For evaluating proposals, the GSA set forth a step-by-step review process for each

proposal. This process consisted of the following steps, which the CO was required to perform

in the order noted below:

• Step One: The CO preliminarily identifies the top eighty proposals by sorting

all of the submissions from the highest score to the lowest score based on the

offerors’ Scoring Worksheets. Id. at 402-03. The CO then reviews the top

eighty proposals in accordance with the following steps.

• Step Two: For each proposal, the CO verifies that a support document exists

for each of the evaluation elements included on the Scoring Worksheet. Id. at

403. Any discrepancies at this stage are treated as clarifications. Id.

• Step Three: The CO conducts an acceptability review to determine whether

each offeror submitted all of the requested information for the general volume

in the specified manner. Id. If a proposal does not pass the review, the

proposal is replaced by the next highest scoring proposal that passes the

acceptability review. Id.

• Step Four: The CO determines whether a support document substantiates

each claimed point on the Scoring Worksheet. Id. If the claimed points are

not validated, then (1) those points are deducted, (2) the proposals are resorted

based on the revised score, and (3) the proposal is replaced if its new score is

below the cutoff for the top eighty proposals. Id.

3

For PSC projects, an offeror could also substantiate its points by submitting a Federal

Procurement Data System – Next Generation report if the information in that document matched

the information in the Experience Form. AR 381. Telesis, however, does not argue that it

pursued this method of verification for any of the projects at issue in this protest.

-3-

• Step Five: The CO evaluates whether the offeror proposed fair and reasonable

pricing. Id. An offeror who fails to provide such pricing is eliminated from

the competition. Id.

The GSA explained that the process would continue until the top eighty proposals (or more, in

the case of a tie for the last spot) were identified, at which point evaluations cease and contracts

would be awarded to the offerors of those proposals. Id. Offerors were also informed that the

GSA did not intend to hold discussions but would conduct clarifications as necessary. Id. at 402.

As explained in the Source Selection Decision Memorandum, the GSA adhered to above process

for evaluating proposals and did not hold discussions. Id. at 466-68.

B. Telesis’s Proposal

In its proposal, Telesis stated that it was entitled to 71,700 points. Id. at 499. Of

particular import here, Telesis claimed points for (1) PSC Projects 1-4 and 2-2; and (2) LET

Projects 1-1, 1-2, 5-1, 10-1, and 10-3.4 Id. at 496-98. For each of those projects, Telesis

attempted to substantiate its points by submitting (1) an e-mail message from Telesis to the

cognizant CO and COR requesting a signature on the attached Experience Form and (2) the form

signed by the COR. E.g., id. at 608-09. But Telesis did not include an e-mail message from the

applicable COR to the CO for any of the projects. E.g., id. at 606-82 (PSC Project 1-4). Telesis

also claimed points for other PSC and LET projects, id. at 496-98, and substantiated those points

without relying on the COR’s signature, e.g. id. at 815 (PSC Project 3-1).

The GSA reviewed Telesis’s proposal in accordance with the procedures noted above.

See id. at 1462-65. The GSA reached the fourth step of the evaluation process: verifying that

the support documents substantiated every claimed point on the Scoring Worksheet. See id.

(validating claimed points); see also id. at 402-03 (describing the evaluation process). At this

stage, the GSA deducted 7000 points from Telesis’s proposal. Id. at 1462-65. Specifically, the

GSA subtracted the 6000 points that Telesis claimed for PSC Projects 1-4 and 2-2 and LET

Projects 1-1, 1-2, 5-1, 10-1, and 10-3.5 Id. The GSA explained that Telesis’s failed to

substantiate those 6000 points because it relied on the COR’s signature but did not provide the

required e-mail message from the COR to the CO. Id. at 1462, 1464. Because PSC Projects 1-4

4

In all project numbers, the first digit represents the PSC group or LET field, and the

second digit represents the ordinal number of projects the offeror submitted in that group or field.

See AR 179. For example, Telesis’s reference to PSC Project 1-4 refers to the fourth project

with a PSC code in the first group. Id. at 497.

5

The GSA deducted 3000 points for PSC Project 1-4 and 2,000 points for PSC Project

2-2. AR 1462. The precise allocation of the deducted points for the LET projects is more

complicated because an unsubstantiated LET project could affect the scores for substantiated

projects in the same field. See id. at 226 (providing more points for each validated project in a

LET field). Simply stated, Telesis’s failure to substantiate (1) LET Projects 1-1 and 1-2 resulted

in a 300-point deduction; (2) LET Project 5-1 led to a 200-point deduction; and (3) LET Projects

10-1 and 10-3 caused a 500-point deduction. Id. at 1466-67.

-4-

and 2-2 were not substantiated, the GSA also deducted 1000 points that Telesis claimed for

performing those projects for different federal government customers. Id. at 1463.

On February 14, 2018, the GSA posted an award notice reflecting that it had selected

eighty-one awardees.6 Id. at 480-88. Telesis was not listed as an awardee. Id. Telesis promptly

requested a debriefing. Id. at 1607. In a March 9, 2018 debriefing letter, the GSA explained

why it deducted points and how that deduction placed Telesis below the award cutoff. Id. at

1609-12. After it received the debriefing letter, Telesis filed a protest with the GSA. Id. at 2114.

The GSA denied the protest on April 16, 2018. Id. at 3067.

C. Procedural History

On July 31, 2018, Telesis filed its protest with the court. In its complaint, Telesis alleges

that the GSA abused its discretion by not seeking clarification on whether each CO was notified

by the respective COR regarding the latter’s concurrence with Telesis’s representations on its

Experience Forms. Based on that purported error, Telesis requests that the court declare that the

GSA erred by deducting 6800 points from the points it claimed on its Scoring Worksheet and

enjoin the GSA from proceeding with the current awardee list until it recalculates Telesis’s

score.7 Pursuant to the schedule they proposed, the parties briefed cross-motions for judgment

on the administrative record, and the court heard argument on Tuesday, November 27, 2018.

The motions are now ripe for adjudication.

II. LEGAL STANDARDS

In ruling on motions for judgment on the administrative record pursuant to Rule 52.1(c)

of the Rules of the United States Court of Federal Claims, “the court asks whether, given all the

disputed and undisputed facts, a party has met its burden of proof based on the evidence in the

record.” A & D Fire Prot., Inc. v. United States, 72 Fed. Cl. 126, 131 (2006) (citing Bannum,

Inc. v. United States, 404 F.3d 1346, 1356 (Fed. Cir. 2005)). Because the court makes “factual

findings . . . from the record evidence,” judgment on the administrative record “is properly

understood as intending to provide for an expedited trial on the administrative record.” Bannum,

404 F.3d at 1356.

The court reviews challenged agency actions pursuant to the standards set forth in the

Administrative Procedure Act. 28 U.S.C. § 1491(b)(4) (2012). Specifically, “the proper

standard to be applied in bid protest cases is provided by 5 U.S.C. § 706(2)(A): a reviewing

court shall set aside the agency action if it is ‘arbitrary, capricious, an abuse of discretion, or

otherwise not in accordance with law.’” Banknote Corp. of Am. v. United States, 365 F.3d

1345, 1350 (Fed. Cir. 2004). Under this standard, the court

6

The GSA exceeded its stated target of eighty awardees as a result of a four-way tie for

the seventy-eighth position. AR 1615.

7

Telesis disputes all of the deductions except for the 200 points removed because of its

failure to substantiate LET Project 5-1.

-5-

may set aside a procurement action if “(1) the procurement official’s decision

lacked a rational basis; or (2) the procurement procedure involved a violation of

regulation or procedure.” A court reviews a challenge brought on the first ground

“to determine whether the contracting agency provided a coherent and reasonable

explanation of its exercise of discretion, and the disappointed bidder bears a

heavy burden of showing that the award decision had no rational basis.” “When a

challenge is brought on the second ground, the disappointed bidder must show a

clear and prejudicial violation of applicable statutes or regulations.”

Centech Grp., Inc. v. United States, 554 F.3d 1029, 1037 (Fed. Cir. 2009) (citations omitted)

(quoting Impresa Construzioni Geom. Domenico Garufi v. United States, 238 F.3d 1324, 1332-

33 (Fed. Cir. 2001)); accord Advanced Data Concepts, Inc. v. United States, 216 F.3d 1054,

1058 (Fed. Cir. 2000) (“The arbitrary and capricious standard . . . requires a reviewing court to

sustain an agency action evincing rational reasoning and consideration of relevant factors.”).

Procurement officials “are ‘entitled to exercise discretion upon a broad range of issues

confronting them’ in the procurement process.” Impresa, 238 F.3d at 1332 (quoting Latecoere

Int’l, Inc. v. U.S. Dep’t of the Navy, 19 F.3d 1342, 1356 (11th Cir. 1994)). Thus, the court’s

review of a procuring agency’s decision is “highly deferential.” Advanced Data Concepts, 216

F.3d at 1058; see also Citizens to Preserve Overton Park, Inc. v. Volpe, 401 U.S. 402, 416 (1971)

(“The court is not empowered to substitute its judgment for that of the agency.”). Furthermore, a

“protestor’s burden of proving that the award was arbitrary, capricious, an abuse of discretion, or

otherwise not in accordance with law is greater [in negotiated procurements] than in other types

of bid protests.” Galen Med. Assocs., Inc. v. United States, 369 F.3d 1324, 1330 (Fed. Cir.

2004). And, when a contract is to be awarded on a “best value” basis, procurement officials have

“even greater discretion than if the contract were to have been awarded on the basis of cost

alone.” Id. (citing E.W. Bliss Co. v. United States, 77 F.3d 445, 449 (Fed. Cir. 1996)

(“Procurement officials have substantial discretion to determine which proposal represents the

best value for the government.”)).

III. ANALYSIS

Telesis argues that its failure to include the requisite e-mail messages in its proposal was

an apparent clerical error such that the GSA abused its discretion by not seeking clarification

regarding the missing messages. Telesis asserts that this failure was a clerical error because the

omission of the messages did not change the proposal’s substance—the substantive information

sought by the GSA was contained on the signed Experience Forms, which were included in the

proposal. Telesis further contends that the error was apparent because its intent to obtain the

necessary documentation from the government was clear from the submission of the e-mail

messages it sent to the CO and COR. Defendant counters that Telesis did not make an apparent

clerical error because it failed to submit the correct materials for multiple projects. Defendant

also argues that the missing e-mail messages were an essential part of the GSA’s verification

process such that their omission was a material deficiency not subject to clarification.

The Federal Acquisition Regulation (“FAR”) provides the framework for evaluating

Telesis’s argument that its protest should be sustained because the GSA did not seek clarification

-6-

regarding the missing e-mail messages. “Clarifications are limited exchanges, between the

Government and offerors, that may occur when award without discussions is contemplated.”

FAR 15.306(a)(1). Indeed, “offerors may be given the opportunity to clarify certain aspects of

proposals (e.g., the relevance of an offeror’s past performance information and adverse past

performance information to which the offeror has not previously had an opportunity to respond)

or to resolve minor or clerical errors.” FAR 15.306(a)(2) (emphasis added). Flowing from the

permissive wording of the regulation, the GSA’s decision to seek (or not to seek) clarification is

within its discretion. Id.; see BCPeabody Constr. Servs., Inc. v. United States, 112 Fed. Cl. 502,

509 (2013) (“[T]he regulatory provisions regarding mistakes discovered before award in bids for

negotiated procurements are largely discretionary.”). But see Camden Shipping Corp. v. United

States, 89 Fed. Cl. 433, 438 (2009) (“[T]he agency is required to seek clarification only in the

case of a clerical error.”).

The permissive nature of clarifications does not insulate from judicial review the GSA’s

decision to not seek clarification. See BCPeabody, 112 Fed. Cl. at 512 (“[The court] cannot

accept the implication that there are never situations in which [the procuring agency’s] discretion

would be abused by a failure to seek clarification.”). A critical component of evaluating the

GSA’s decision to not seek clarification is whether it should have discerned that the protestor

made an error rather than a deliberate decision. See Dell Fed. Sys. v. United States, 133 Fed. Cl.

92, 106 (2017) (deeming relevant the fact that the procuring agency “had notice that a clerical

error had likely occurred”); Level 3 Commc’ns, LLC v. United States, 129 Fed. Cl. 487, 505

(2016) (giving weight to the fact that the offeror made representations in the proposal concerning

the substance of the missing information); BCPeabody, 112 Fed. Cl. at 512 (considering that the

offeror submitted a duplicate page and that the evaluator knew the substance of the missing

information); Griffy’s Landscape Maint. LLC v. United States, 46 Fed. Cl. 257, 259-60 (2000)

(requiring clarification when the absence of information “clearly indicate[d] a clerical mistake”).

Indeed, Telesis has not provided (and the court is not aware of) any precedent in which the

United States Court of Appeals for the Federal Circuit or this court held that the procuring

agency abused its discretion by not seeking clarification when the error was not apparent.

Therefore, the obviousness of the error is an important consideration for determining whether the

GSA acted reasonably by not seeking clarification.

In light of the above, Telesis fails to demonstrate that the GSA abused its discretion by

not seeking clarification. Telesis does not direct the court to any record evidence before the

GSA during the evaluation stage suggesting that Telesis’s submission of the e-mail messages it

sent to the COs and CORs rather than the messages sent by the CORs to the COs was an

apparent error rather than a deliberate choice. Indeed, Telesis relied on the COR’s signature

seven times to substantiate the claimed relevant experience, and each time Telesis repeated the

-7-

same error: submitting the wrong e-mail message.8,9 The repetition suggests a calculated

decision. See Westfield Ins. Co. v. Harris, 134 F.3d 608, 615 (4th Cir. 1998) (“[W]here prior

acts of apparent coincidence are similar, the repeated reoccurrence of such an act takes on

increasing relevance to support the proposition that there is an absence of accident.”). This

conclusion is bolstered by the evidence in the administrative record suggesting that Telesis did

not interpret the solicitation as requiring an e-mail message from the COR to the CO. In the e-

mail messages Telesis sent to its customers and submitted with its proposal, Telesis never asked

that a COR signing the Experience Form also (1) send an e-mail message notifying the cognizant

CO that the COR concurred with Telesis’s representations on the form or (2) forward that

message to Telesis for inclusion in its proposal. Moreover, Telesis’s argument that it made an

apparent clerical error requiring clarification is further undermined by the nature of the error: the

submission of documents—e-mail messages from Telesis to the COs and CORs requesting a

signature on an Experience Form—that are relevant to (but insufficient for) substantiating the

claimed points. The inclusion of these messages is not so peculiar that the GSA was obligated to

seek clarification. See Criterion Systems, Inc. v. United States, No. 18-875, 2018 WL 4474672,

at *7 (Fed. Cl. Sept. 13, 2018) (explaining that the GSA was not required to seek clarification

when the offeror provided a private audit of its accounting system rather than the required

government audit). Compare id., with BCPeabody, 112 Fed. Cl. at 511 (requiring clarification

when the offeror made a clerical error by submitting a duplicate page). Simply stated, Telesis

fails to demonstrate that it committed an apparent clerical error or otherwise show that the GSA

abused its discretion by not seeking clarification.

IV. CONCLUSION

For the reasons discussed above, the court DENIES Telesis’s motion for judgment on the

administrative record and GRANTS defendant’s cross-motion for judgment on the

administrative record. Telesis’s protest is DISMISSED. No costs. The clerk shall enter

judgment accordingly.

The court has filed this ruling under seal. The parties shall confer to determine

8

Although the GSA identified seven projects that were not validated because they lacked

the required e-mail message, Telesis seemingly made the same error on an eighth project—LET

Project 6-3—because it relied on the COR’s signature without providing an e-mail message from

the COR to CO. See AR 1154-78.

9

The court is perplexed by Telesis’s statement that it “submitted the correct form of the

CO ‘awareness email’” for fifteen projects. Pl.’s Opp’n to Def.’s Mot. J. on the Administrative

R. 2 (citing AR 1462-63). The record contains no such e-mail messages. Indeed, the inclusion

of such messages would be peculiar because Telesis relied on the CO’s signature for all of its

validated projects (with the exception of LET Project 6-3, as discussed in note 8, supra) so no e-

mail messages from the CORs to the COs were required to substantiate the points. Moreover,

Telesis’s statement is not helpful because the referenced pages in the administrative record are

unrelated to validating experience. See AR 1462-63 (documenting part of an audit and

agreement to extend the acceptance period).

-8-

proposed redactions to which all the parties agree. Then, by no later than Wednesday,

December 12, 2018, the parties shall file a joint status report indicating their agreement with the

proposed redactions, attaching a copy of those pages of the court’s ruling containing

proposed redactions, with all proposed redactions clearly indicated.

IT IS SO ORDERED.

s/ Margaret M. Sweeney

MARGARET M. SWEENEY

Chief Judge

-9-