noting that an "indispensable" employee-shareholder's personal guaranty of a $ 1.5 million bank loan was "crucial" to a large project
How later courts described this case
- noting that an "indispensable" employee-shareholder's personal guaranty of a $ 1.5 million bank loan was "crucial" to a large project
Written by the judges who cited it.
The opinion
T.C. Memo. 1998-315
UNITED STATES TAX COURT
LEONARD PIPELINE CONTRACTORS, LTD., Petitioner v.
COMMISSIONER OF INTERNAL REVENUE, Respondent*
Docket No. 28985-91. Filed September 1, 1998.
Marc L. Spitzer and James P. Powers, for petitioner.
Susan E. Seabrook, for respondent.
SUPPLEMENTAL MEMORANDUM FINDINGS OF FACT AND OPINION
JACOBS, Judge: This case is before us on remand from the
Court of Appeals for the Ninth Circuit. Leonard Pipeline
*
This opinion supplements our Memorandum Findings of
Fact and Opinion in Leonard Pipeline Contractors, Ltd. v.
Commissioner, T.C. Memo. 1996-316, revd. and remanded 142 F.3d
1133 (9th Cir. 1998).
-2-
Contractors, Ltd. v. Commissioner, 142 F.3d 1133 (9th Cir. 1998),
revg. and remanding T.C. Memo. 1996-316.
The issue for decision concerns the reasonableness of the
amount of compensation paid by petitioner to its president, Richard
L. Leonard, in 1987. We previously determined in Leonard Pipeline
Contractors, Ltd. v. Commissioner, T.C. Memo. 1996-316 (Leonard
Pipeline I), that of the $1,777,800 petitioner paid Mr. Leonard in
1987, only $700,000 was reasonable and thus deductible as a section
162 business expense.1 The Court of Appeals has directed us to
explain how we arrived at our conclusion that $700,000 represented
a reasonable amount of compensation. The Court of Appeals has
further directed us to consider that the burden of proof is on
petitioner, and to
determine what, if any, factors, have been
demonstrated so as to require a setting aside
of the Commissioner's determination, the
recognition of a right to increased
compensation, and the establishment of an
amount qualifying as reasonable under
§ 162(a)(1).
142 F.3d at 1136.
FINDINGS OF FACT
The findings of fact are set forth in Leonard Pipeline I and
are incorporated herein by this reference. For convenience, we
shall repeat those facts as necessary to clarify the ensuing
1
All section references are to the Internal Revenue Code
in effect for the year in issue, and all Rule references are to
the Tax Court Rules of Practice and Procedure.
-3-
discussion. The stipulation and exhibits are also incorporated
herein by this reference.
Leonard Pipeline Contractors, Ltd., petitioned this Court
contesting respondent’s determination of an $807,983 deficiency in
its Federal income tax for its taxable year ended September 30,
1987, and additions to tax pursuant to section 6653(a)(1)(A) in the
amount of $40,399 and section 6653(a)(1)(B) in the amount of 50
percent of the interest on $807,983. The deficiency was based on
respondent's determination that $1,642,593 of the $1,777,800
petitioner deducted as compensation paid to Richard L. Leonard was
unreasonable. Respondent subsequently conceded the additions to
tax.
At the time petitioner Leonard Pipeline Contractors, Ltd.,
filed its petition herein, its principal place of business was in
Scottsdale, Arizona. Petitioner filed the relevant Federal income
tax return based on a fiscal year ended September 30, 1987. (All
references hereinafter to petitioner's relevant years refer to
petitioner's fiscal years ended September 30.)
Richard L. Leonard had extensive experience in the pipeline
industry, dating from the 1950's. In 1977, he caused petitioner to
be established in Canada and became its president and chief
financial and operating officer. At all relevant times,
petitioner's stock was wholly owned by R.L. Leonard Holdings, Ltd.
(RLLH), whose stock in turn was wholly owned by Mr. Leonard.
Petitioner became a U.S. corporation on April 18, 1985.
-4-
Between 1978 and 1987, petitioner had gross revenues of
$123,124,905 and after-tax net income of $1,705,958. Petitioner's
primary source of income in 1985 and 1986 arose from its work on
the All American Pipeline project,2 which involved coating,
insulating, and wrapping 325 miles of pipeline in Texas, Arizona,
and California. In connection with this project, Mr. Leonard
personally guaranteed petitioner's $1.5 million debt to the Royal
Bank of Canada. The All American Pipeline project was finished in
1987; thereafter petitioner continued to receive payments on the
contract but undertook no new business.
In February 1987, Mr. Leonard began contemplating retirement.
On September 28, 1987, 2 days before the end of petitioner's tax
year, petitioner's board of directors (consisting of Mr. Leonard
and his son) voted to pay Mr. Leonard a $1.68 million bonus in
addition to his $97,800 salary for the year. The board's decision
was purportedly based on several considerations, including: (1) Mr.
Leonard's efforts in obtaining the All American Pipeline project;
(2) Mr. Leonard's development of a new insulation process; and (3)
2
On Sept. 19, 1991, Mr. Leonard ultimately pled guilty
to a criminal information filed against him in the District Court
for the Southern District of Texas for obtaining the All American
Pipeline contract through fraud. He was sentenced to 3 years of
unsupervised probation and fined $1,000.
-5-
the fact that petitioner did not pay Mr. Leonard any compensation
in 1985 or 1986.3
3
The minutes of the board meeting stated, in pertinent
part:
1. The President, through his efforts as early as
1984 and resultant personal and business contacts
acquired from those efforts, was able to have the
corporation placed on the bidding list for All American
Pipeline Company.
2. The President[,] having acquired expertise in the
coating and insulation of pipe in Saudi Arabia during
1978 through to 1980[,] was able to develop a new
insulation process starting in 1984, which process was
ultimately successful in securing the All American
contract (the “contract”).
3. The corporation, notwithstanding the successful
insulating process, would have been unable to complete
the contract without the financial backing of a public
corporation or a joint venture partner with financial
backing. The President, through his thirty years
association with the President of the Permanent
Concrete Ltd., was able to secure a financially strong
joint venture partner for the corporation, which
partner secured for the joint venture Five Million
Dollars ($5,000,000) of financing and obtained
approximately Twenty-Three Million Dollars
($23,000,000) of bonding. This was accomplished
without giving up more than fifty percent of the
participation which would have otherwise been the case.
4. The President personally guaranteed the
corporation’s share of the bank financing and
indemnified the joint venture partner, Anchor Wate, a
subsidiary of Permanent Concrete Ltd., in respect of
the bonding and further pledged his assets in support
of the guarantee.
5. The President has received no compensation from
the corporation for 1985 and 1986. In addition, the
corporation was unable to pay compensation to its
President in those years due to Royal Bank of Canada
credit line restrictions, which credit line was also
(continued...)
-6-
On its 1987 fiscal year return, petitioner deducted the amount
of salary and bonus ($1,777,800) it paid Mr. Leonard.
In 1985, Mr. Leonard and his wife initiated divorce
proceedings, and in 1987, they divorced. Pursuant to their
property settlement, Mr. Leonard provided his former wife money and
property valued at $1.68 million.
OPINION
The U.S. Court of Appeals for the Ninth Circuit has directed
us to further explain the method we employed to arrive at $700,000
as reasonable compensation for Mr. Leonard in 1987. Leonard
Pipeline Contractors, Ltd. v. Commissioner, 142 F.3d at 1136. With
the discussion that follows, we attempt to provide the Court of
Appeals with "a trail" to follow as to how we reached our prior
conclusion. See Akers v. Commissioner, 798 F.2d 894, 897 (6th Cir.
1986), revg. and remanding T.C. Memo. 1984-208; Estate of Gilford
v. Commissioner, 88 T.C. 38, 50 (1987); Symington v. Commissioner,
87 T.C. 892, 904 (1986).
3
(...continued)
personally guaranteed by him. Not until now, with the
contract completed and the benefits from subsequent
grading and fencing contracts awarded being realized,
is the corporation in a position to adequately
compensate its President for his unique and extremely
profitable contribution to the corporation.
-7-
Burden of Proof
"The burden of proof remains on the Taxpayer to show that the
Commissioner's determination was wrong." Leonard Pipeline
Contractors, Ltd. v. Commissioner, 142 F.3d at 1136. "This burden
is a burden of persuasion; it requires * * * [petitioner] to show
the merits of [its] claim by at least a preponderance of the
evidence." Rockwell v. Commissioner, 512 F.2d 882, 885 (9th Cir.
1975), affg. T.C. Memo. 1972-133. Where the Commissioner has made
a deficiency determination denying the taxpayer's entitlement to a
claimed deduction (such as here), "the taxpayer has 'the burden of
producing enough evidence to rebut the deficiency determination and
the burden of persuasion in substantiating a claimed deduction'."
Goldberg v. United States, 789 F.2d 1341, 1343 (9th Cir. 1986)
(quoting Valley Title Co. v. Commissioner, 559 F.2d 1139, 1141 (9th
Cir. 1977), revg. and remanding T.C. Memo. 1975-48).
In the instant case, petitioner produced sufficient evidence
to overcome the presumption of correctness of respondent's
determination. We were convinced that petitioner was entitled to
a greater compensation deduction than that allowed by respondent.
Ample evidence demonstrated the magnitude of Mr. Leonard's
contributions to petitioner: (1) Mr. Leonard was directly
responsible for petitioner's growth and success--providing
invaluable services to the company by obtaining contracts and
generating business for petitioner; (2) over its 10 years of
existence, petitioner had total gross revenues of $123,124,905 and
-8-
after-tax net income of $1,705,958, which was all attributable to
Mr. Leonard's efforts; (3) the board of directors minutes supported
the notion that in paying Mr. Leonard in 1987, petitioner was
attempting in part to compensate him for services performed in 1985
and 1986; and (4) petitioner never provided Mr. Leonard with
retirement benefits, which an individual in his position justly
deserved. These four factors led us to the conclusion that we must
set aside respondent's determination in the notice of deficiency.
Because, in our opinion, petitioner had proven respondent’s
determination incorrect, we were forced to decide the proper amount
of reasonable compensation on the basis of the entire record before
us. See Pepsi-Cola Bottling Co. v. Commissioner, 61 T.C. 564, 568
(1974), affd. 528 F.2d 176 (10th Cir. 1975).
Section 162(a)(1) Deduction
Section 162(a)(1) permits a corporation to deduct “a
reasonable allowance for salaries or other compensation for
personal services actually rendered” as an ordinary and necessary
business expense. Compensation payments are deductible under
section 162(a)(1) if they are reasonable and paid “purely for
services” rendered to the business. Sec. 1.162-7(a), Income Tax
Regs. Bonuses paid to employees are deductible only when made in
good faith and as additional compensation for services actually
rendered by the employees, provided that when added to the
salaries, they do not exceed reasonable compensation for the
services rendered. RAPCO, Inc. v. Commissioner, T.C. Memo. 1995-
-9-
128, affd. 85 F.3d 950 (2d Cir. 1996); sec. 1.162-9, Income Tax
Regs. Courts generally focus on the reasonableness requirement.
Elliotts, Inc. v. Commissioner, 716 F.2d 1241, 1243 (9th Cir.
1983), revg. and remanding T.C. Memo. 1980-282. "The inquiry into
reasonableness is a broad one and generally subsumes the inquiry
into compensatory intent." Summit Publg. Co. v. Commissioner, T.C.
Memo. 1990-288.
Five-Factor Test
The U.S. Court of Appeals for the Ninth Circuit uses a five-
factor test, as enumerated in Elliotts, Inc. v. Commissioner, supra
at 1245-1248, to determine reasonableness of compensation: (1) The
employee’s role in the company; (2) a comparison of the
compensation paid to the employee with the compensation paid to
similarly situated employees in similar companies; (3) the
character and condition of the company; (4) whether a conflict of
interest exists that might permit the company to disguise dividend
payments as deductible compensation; and (5) whether the
compensation was paid pursuant to a structured, formal, and
consistently applied program. No single factor is dispositive.
Pacific Grains, Inc. v. Commissioner, 399 F.2d 603, 606 (9th Cir.
1968), affg. T.C. Memo. 1967-7.
A detailed discussion of these factors is set forth in Leonard
Pipeline I. We will briefly summarize herein our findings with
respect to each factor, and, where appropriate, provide some
elaboration.
-10-
First, there was little doubt that Mr. Leonard was essential
to petitioner's success from its inception and indispensable to
petitioner's business. Moreover, he personally guaranteed
petitioner’s $1.5 million debt to the Royal Bank of Canada, which
was crucial to the All American Pipeline project. See Owensby &
Kritikos, Inc. v. Commissioner, 819 F.2d 1315, 1325 n.33 (5th Cir.
1987), affg. T.C. Memo. 1985-267. Although during 1987 Mr. Leonard
was in the process of retiring and petitioner's only activity was
to report previously earned income, these facts were
inconsequential in light of Mr. Leonard's experience and past
services.
Second, both parties relied upon expert testimony and written
opinions for purposes of determining external comparison. The
range of figures offered by these experts was unreasonably
disparate. Respondent's expert, Emmett James Brennan III,
determined the highest average amount of total compensation for Mr.
Leonard for 1987 to be $160,710. He also determined that in the
event we concluded that Mr. Leonard was entitled to a retirement
benefit, an additional $167,450 should be allocated for that
benefit. One of petitioner's experts, Michael Wagner, offered a
$180,000 to $200,000 range for Mr. Leonard's 1987 base salary and
a $1.2 million to $2 million range for Mr. Leonard's 1987 bonus.
Petitioner's other expert, Michael Kesner, concluded that the total
amount of compensation petitioner paid Mr. Leonard in 1987 was
reasonable because, according to Mr. Kesner, among other reasons,
-11-
Mr. Leonard was undercompensated by $2,050,000 to $2,700,000 in
prior years. Mr. Kesner suggested an additional $296,000 should
have been paid to Mr. Leonard as retirement benefits.
We evaluate the opinions of experts in light of their
demonstrated qualifications and when considered with the other
evidence in the record. Anderson v. Commissioner, 250 F.2d 242,
249 (5th Cir. 1957), affg. in part and remanding in part T.C. Memo.
1956-178. We have broad discretion to evaluate "'the overall
cogency of each expert's analysis.'" Sammons v. Commissioner, 838
F.2d 330, 334 (9th Cir. 1988) (quoting Ebben v. Commissioner, 783
F.2d 906, 909 (9th Cir. 1986), affg. in part and revg. in part T.C.
Memo. 1983-200), affg. in part and revg. in part T.C. Memo. 1986-
318. We may accept or reject an expert's opinion in toto, or we
may pick and choose the portions of the opinion which we decide to
adopt. Helvering v. National Grocery Co., 304 U.S. 282, 294-295
(1938); Seagate Tech., Inc. & Consol. Subs. v. Commissioner, 102
T.C. 149, 186 (1994); Parker v. Commissioner, 86 T.C. 547, 562
(1986); Pabst Brewing Co. v. Commissioner, T.C. Memo. 1996-506.
Here, the experts reached conclusions which patently favored
their respective clients, and their reports were designed to
support their conclusions. Previously, we have observed that
experts may lose their usefulness and credibility when they merely
become advocates for one side. See, e.g., Buffalo Tool & Die
Manufacturing Co. v. Commissioner, 74 T.C. 441, 452 (1980). We
have not hesitated to reject expert testimony when we find that the
-12-
methods presented by the experts constitute advocacy. Laureys v.
Commissioner, 92 T.C. 101, 127-129 (1989); see also Estate of Halas
v. Commissioner, 94 T.C. 570, 578 (1990).
With regard to the instant case, in some instances,
petitioner's experts were nothing more than advocates for their
client and in those instances, we dismissed their conclusions;
however, in other instances, we found the experts' testimony
credible and thus accepted that part, as discussed infra.
Our disagreement with the analyses performed by petitioner's
experts was limited to their determination of exaggerated figures--
Mr. Wagner advocated a bonus in the $1.2 million to $2 million
range, and Mr. Kesner believed Mr. Leonard was undercompensated by
$2,050,000 to $2,700,000. With regard to the opinion of Mr.
Brennan, respondent's expert, we rejected it because Mr. Brennan
relied upon information from businesses different than petitioner's
in reaching a result that understated reasonable compensation.
Notwithstanding the aforesaid, given the relative proximity of
the figures between petitioner's and respondent's experts with
respect to the base salary and retirement components, we found both
Mr. Wagner's base salary figures ($180,000 to $200,000) and Mr.
Kesner's retirement figure ($296,000) to be reasonable, as
discussed infra.
Third, Mr. Leonard's new insulation process promoted
petitioner's business. Also, the ratio of Mr. Leonard's bonus to
petitioner's taxable income before the compensation deduction was
-13-
34 percent ($1,680,000 divided by $4,922,631), which was
appropriate in light of Mr. Leonard's work history and
undercompensation in 1985 and 1986. However, during the year in
issue, Mr. Leonard was attempting to wind down the business.
Fourth, because Mr. Leonard indirectly owned all of
petitioner's stock, a potential for conflict of interest clearly
existed. Thus, we carefully scrutinized the reasonableness of the
compensation paid to him. See Owensby & Kritikos, Inc. v.
Commissioner, supra at 1322-1324; see also Nor-Cal Adjusters v.
Commissioner, 503 F.2d 359, 361 (9th Cir. 1974), affg. T.C. Memo.
1971-200. Mr. Leonard's compensation was bonus-heavy and salary-
light, which could have suggested masked dividends. See RAPCO,
Inc. v. Commissioner, 85 F.3d at 955. Although petitioner paid
dividends to RLLH4 in prior years, it did not pay any dividends in
1987. But petitioner's rate of return for 1987 (175 percent) would
have satisfied a hypothetical investor.
Fifth, petitioner did not determine Mr. Leonard's bonus on the
basis of any consistently applied formula or plan. The amount of
4
Petitioner paid RLLH a Can$743,828 dividend in 1983,
and an Can$878,787 dividend in January 1985 out of petitioner's
capital account. Under Canadian law at the time, when a dividend
was paid out of a capital account, the distribution was not
taxable because it represented the nontaxable portion of capital
gain.
William T. Perks, a Canadian chartered accountant and
attorney, advised petitioner and Mr. Leonard with regard to tax
and legal matters. Before Apr. 18, 1985 (when petitioner became
a U.S. corporation), it appears that it was financially
advantageous for petitioner to declare dividends under Canadian
law.
-14-
Mr. Leonard's bonus was not set according to any business
considerations; rather, it was meant to recoup from petitioner an
amount equal to the amount of money and property awarded to his
estranged wife in their divorce ($1.68 million). Indeed,
petitioner paid Mr. Leonard's wife $3,000 a month beginning at
least in February 1986 as part of Mr. Leonard's support obligation
during the pendency of their marriage dissolution action.
Interestingly, because Mrs. Leonard did not work for petitioner,
the amount paid to her would not have been deductible by petitioner
and would have been taxable to Mr. Leonard as a constructive
dividend.
Raising a salary (or in this case setting a bonus) towards the
end of the year has been held to be an indication that the salary,
or bonus, is really a distribution of earnings rather than
additional compensation. See, e.g., Rich Plan, Inc. v.
Commissioner, T.C. Memo. 1978-514. This is particularly true where
no dividends have been paid. We believed that because the board
(consisting of Mr. Leonard and his son) passed the resolution 2
days before the end of petitioner's fiscal year, and shortly before
Mr. Leonard's retirement, petitioner, to a certain extent, made a
deliberate effort to distribute its earnings to Mr. Leonard. On
the other hand, petitioner's 1987 compensation to Mr. Leonard did
partially represent an attempt to rectify his 1985 and 1986
undercompensation.
-15-
Amount of Reasonable Compensation
After considering and weighing the five Elliotts factors, we
were faced with a most difficult dilemma because no clear-cut
"answer" was apparent. Although petitioner proved respondent's
determination to be too low, petitioner did not show the totality
of the amount paid to Mr. Leonard to be reasonable. Accordingly,
we were forced to decide for ourselves an amount which constituted
a reasonable compensation figure on the basis of the record before
us. See Silverman v. Commissioner, 538 F.2d 927, 933 (2d Cir.
1976), affg. T.C. Memo. 1974-285; Acme Constr. Co. v. Commissioner,
T.C. Memo. 1995-6. And in this regard, we agree with the Court of
Appeals for the Ninth Circuit's observation that determining
"reasonableness" of compensation depends "to a degree on the eye of
the beholder." Leonard Pipeline Contractors, Ltd. v. Commissioner,
142 F.3d at 1135. Any attempt to determine reasonable compensation
with mathematical precision is impossible, see, e.g., Jones Bros.
Bakery, Inc. v. United States, 188 Ct. Cl. 226, 245, 411 F.2d 1282,
1294 (1969), and petitioner's experts testified as to this
difficulty.5
On the basis of all of the evidence before us, we were
convinced, and we remain convinced, that the $1,777,800 petitioner
paid Mr. Leonard in 1987 was unreasonable. In our opinion, the
5
Mr. Wagner admitted that "bonus awards, in my
experience, have been subjective", and Mr. Kesner testified that
"This is not--and I repeat not--an exercise in mathematics. It
is an exercise in judgment."
-16-
amount petitioner paid to Mr. Leonard in 1987 was chosen to a large
extent on the basis of the amount Mr. Leonard paid his wife in
connection with their divorce settlement. Moreover, it is clear to
us that, to a certain extent, the board of directors made a
deliberate effort to distribute petitioner's earnings to Mr.
Leonard by paying him the $1.68 million bonus 2 days before the end
of petitioner's tax year. That being said, however, we believed,
and we still believe, that a portion of the $1.68 million bonus
petitioner paid Mr. Leonard was intended to compensate him for past
and other valuable services he rendered to petitioner, and in that
regard that portion constituted reasonable compensation.
We concluded that $700,000 represented a reasonable amount of
total compensation for Mr. Leonard for 1987. This amount comprised
$200,000 as a salary, $195,000 as a bonus, and $296,000 as a lump-
sum retirement payment.6 See Pepsi-Cola Bottling Co. v.
Commissioner, 61 T.C. at 568. We rounded the $395,000 salary and
bonus to $400,000, and the $296,000 retirement figure to $300,000.
We determined the reasonableness of $395,000 (rounded to
$400,000) as a salary and bonus on the basis of the following
considerations: (1) All of the experts herein agreed that Mr.
6
In the context of valuations, we have determined that
the figure arrived at need not be one as to which there is
specific testimony if the amount is within the range of values
that may properly be arrived at giving consideration to all the
evidence. Silverman v. Commissioner, 538 F.2d 927, 933 (2d Cir.
1976), affg. T.C. Memo. 1974-285.
-17-
Leonard was undercompensated during prior years; (2) Mr. Leonard
received no prior reward for his personal efforts in obtaining the
All American Pipeline contract; and (3) Mr. Leonard received no
prior reward for development of the new insulation process.
Both petitioner's and respondent's experts agreed that Mr.
Leonard was undercompensated in 1985 and 1986. Yet, despite that
conclusion, respondent's expert, Mr. Brennan, made no adjustments
to Mr. Leonard's 1987 base salary figure. Rather, Mr. Brennan
opined that Mr. Leonard was entitled to $160,710 in 1987, even
though he received only $162,252 in 1985 and $142,748 in 1986 from
joint ventures involving petitioner. Thus, Mr. Brennan's 1987
figure failed to reflect the fact that Mr. Leonard was entitled to
a greater base salary.
Petitioner's expert Mr. Wagner adjusted his 1987 base salary
upward to a $180,000 to $200,000 range to reflect the fact that Mr.
Leonard was entitled to a greater base salary than he had
previously received. We believed an adjustment for the 1987 base
salary to $200,000 was appropriate and reasonable. Further, we
believed Mr. Leonard should have been given credit for the
difference between the amount of his 1985 and 1986 base salaries
and $200,000, reflecting Mr. Leonard's undercompensation for those
years. (The 1985 and 1986 base salaries were short by $37,748
($200,000 - $162,252) and $57,252 ($200,000 - $142,748),
respectively.) Thus, Mr. Leonard was entitled to $95,000 to
reflect his undercompensation for 1985 and 1986. Finally, we
-18-
believed a $100,000 bonus was appropriate and reasonable to reflect
Mr. Leonard's personal efforts at securing the All American
Pipeline contract and guaranteeing the loan to the Royal Bank of
Canada, as well as his development of the pipeline insulation
process. Therefore, we concluded that $395,000 ($200,000 + $95,000
+ $100,000) represented an appropriate total amount for Mr.
Leonard's salary and bonus for 1987, and as stated, rounded this
amount to $400,000.
We also concluded that $296,000 paid to Mr. Leonard was
appropriate and, after rounding to $300,000, represented reasonable
compensation as a lump-sum retirement payment. We reached this
conclusion on the basis of the fact that petitioner did not offer
Mr. Leonard any retirement or pension benefits, a feature common,
if not expected, for someone of Mr. Leonard's position with
petitioner. High compensation is reasonable when there is a
corresponding lack of fringe benefits such as pension plans or
stock options which might normally be expected. Rutter v.
Commissioner, 853 F.2d 1267, 1274 (5th Cir. 1988), affg. T.C. Memo.
1986-407.
Both parties' experts provided figures for retirement
benefits. Petitioner's expert Mr. Kesner believed that Mr. Leonard
was entitled to a lump-sum payment for retirement benefits of
$296,000. Respondent's expert, Mr. Brennan, stated that in the
event the Court determined that Mr. Leonard is entitled to a
retirement benefit, he would allocate $167,450 for that benefit.
-19-
We found Mr. Kesner's figure more reasonable than Mr. Brennan's
figure. Mr. Leonard dedicated much of the latter part of his
career to petitioner's success, often with little or no direct
compensation or security for his future. Mr. Brennan's retirement
figure would not have even represented 1 year's salary (under our
analysis).
We therefore concluded, and still conclude, that $700,000
represented a reasonable amount of total compensation (salary,
bonus, and retirement benefits) for Mr. Leonard in 1987.
Decision will be entered
as previously entered on
February 7, 1997.