Opinion

Transcon. Gas Pipe Line Co. v. Permanent Easements for 2.14 Acres & Temp. Easements for 3.59 Acres in Conestoga Twp.

  • 907 F.3d 725
Court
Court of Appeals for the Third Circuit
Filed
Oct 30, 2018
Status
Published
Author
Roth
On the bench
Shwartz, Roth, Fisher
Cited by
37 cases
Authority
More cited than 81.4%

“Transcontinental extended written offers of compensation exceeding $3000 to each of the Landowners, but these offers were not accepted. Transcontinental thus satisfied the [jurisdictional] requirements.”

How later courts described this case

  • “Transcontinental extended written offers of compensation exceeding $3000 to each of the Landowners, but these offers were not accepted. Transcontinental thus satisfied the [jurisdictional] requirements.”
  • “[The plaintiff] extended written offers of compensation exceeding $3000 to each of the Landowners, but these offers were not accepted. [The plaintiff] thus satisfied the second and third requirements.”
  • “[S]ubsection (a) of Rule 71.1 incorporates the other Federal Rules of Civil Procedure . . . in condemnation proceedings to the extent Rule 71.1 does not govern.”

Written by the judges who cited it.

The opinion

PRECEDENTIAL

UNITED STATES COURT OF APPEALS

FOR THE THIRD CIRCUIT

________________

Nos. 17-3075, 17-3076, 17-3115 & 17-3116

TRANSCONTINENTAL GAS PIPE LINE COMPANY,

LLC

v.

PERMANENT EASEMENTS FOR 2.14 ACRES

AND TEMPORARY EASEMENTS

FOR 3.59 ACRES IN CONESTOGA TOWNSHIP,

LANCASTER COUNTY, PENNSYLVANIA, TAX

PARCEL NUMBER 1201606900000; HILLTOP HOLLOW

LIMITED PARTNERSHIP; HILLTOP HOLLOW

PARTNERSHIP LLC GENERAL PARTNER OF HILLTOP

HOLLOW LIMITED PARTNERSHIP; LANCASTER

FARMLAND TRUST; ALL UNKNOWN OWNERS

Hilltop Hollow Limited Partnership and

Hilltop Hollow Partnership, LLC,

Appellants in 17-3075

TRANSCONTINENTAL GAS PIPELINE COMPANY, LLC

v.

PERMANENT EASEMENT FOR 2.02 ACRES AND

TEMPORARY EASEMENTS FOR 2.76 ACRES IN

MANOR TOWNSHIP, LANCASTER COUNTY

PENNSYLVANIA, TAX PARCEL NUMBER

4100300500000, 3049 SAFE HARBOR ROAD,

MANOR TOWNSHIP, LANCASTER, PA; STEPHEN D.

HOFFMAN; AND ALL UNKNOWN OWNERS

Stephen D. Hoffman,

Appellant in 17-3076

TRANSCONTINENTAL GAS PIPELINE COMPANY, LLC

v.

PERMANENT EASEMENT FOR 1.33 ACRES AND

TEMPORARY EASEMENTS FOR 2.28 ACRES

CONESTOGA TOWNSHIP, LANCASTER

COUNTY, PENNSYLVANIA TAX PARCEL NUMBER

1202476100000, 4160 MAIN STREET CONESTOGA, PA

17516; LYNDA LIKE, also known as Linda Like,

AND ALL UNKNOWN DEFENDANTS

Lynda Like,

Appellant in 17-3115

2

TRANSCONTINENTAL GAS PIPELINE COMPANY, LLC

v.

PERMANENT EASEMENT FOR 0.94 ACRES AND

TEMPORARY EASEMENTS FOR 1.61 ACRES IN

CONESTOGA TOWNSHIP, LANCASTER COUNTY,

PENNSYLVANIA, TAX PARCEL NUMBER

1203589400000, SICKMAN MILL ROAD; BLAIR B.

MOHN; MEGAN E. MOHN, AND ALL UNKNOWN

OWNERS

Blair B. Mohn and Megan E. Mohn,

Appellants in 17-3116

On Appeal from the United States District Court

for the Eastern District of Pennsylvania

(D. C. Civil Actions Nos. 17-cv-00715, 17-cv-00723,

17-cv-00720, 17-cv-00722)

District Judge: Honorable Jeffery L. Schmehl

________________

Submitted under Third Circuit LAR 34.1(a)

on October 2, 2018

Before: SHWARTZ, ROTH and FISHER, Circuit Judges

(Opinion filed: October 30, 2018)

3

Siobhan K. Cole

White & Williams

1650 Market Street

One Liberty Place, Suite 1800

Philadelphia, PA 19103

Jeremy P. Hopkins

Cranfill Summer & Hartzog

5420 Wade Park Boulevard

Suite 300

Raleigh, NC 27607

Michael N. Onufrak

White & Williams

1650 Market Street

Suite 1800

Philadelphia, PA 19103

Carolyn Elefant

Law Offices of Carolyn Elefant

8th Floor

1440 G Street N.W.

Washington, DC 20005

Mark L. Freed

Curtin & Heefner

2005 South Easton Road

Suite 100

Doylestown, PA 18901

Counsel for Appellants

4

Patrick F. Nugent

Sean T. O’Neill

Saul Ewing Arnstein & Lehr

1500 Market Street

Centre Square West, 38th Floor

Philadelphia, PA 19102

Elizabeth U. Witmer

Saul Ewing Arnstein & Lehr

1200 Liberty Ridge Drive

Suite 200

Wayne, PA 19087

Counsel for Appellees

________________

OPINION

________________

ROTH, Circuit Judge

Congress may grant eminent domain power to private

companies acting in the public interest. This appeal requires

us to determine the limits on Congress’s grant of eminent

domain power to private companies building gas lines under

the Natural Gas Act (NGA), 15 U.S.C. § 717f(h).

The NGA gives natural gas companies the power to

acquire property by eminent domain, but it provides only for

standard eminent domain power, not the type of eminent

5

domain called “quick take” that permits immediate

possession. 1 The District Court granted a preliminary

injunction to Transcontinental Gas Pipe Line Company,

which effectively gave the company immediate possession of

certain rights of way owned by appellant landowners. The

landowners claim that granting immediate possession violated

the constitutional principle of separation of powers because

the taking of property by eminent domain is a legislative

power and the NGA did not grant “quick take.” We disagree

and hold that the District Court’s order did not violate the

principle of separation of powers because Transcontinental

properly sought and obtained the substantive right to the

property before seeking equitable relief. We will therefore

affirm.

I

Transcontinental is building a natural gas pipeline that

runs through Pennsylvania, Maryland, Virginia, North

Carolina, and South Carolina. For this project, named

“Atlantic Sunrise Expansion Project,” Transcontinental

needed certain rights of way, including those owned by

appellants Hilltop Hollow Limited Partnership, Stephen

Hoffman, Lynda Like, and Blair and Megan Mohn

(collectively “Landowners”). Under § 717f(h) of the NGA,

gas companies may acquire property by eminent domain if

they meet three requirements. A gas company must

demonstrate, first, that it holds a certificate of public

convenience and necessity from the Federal Energy

Regulatory Commission (FERC); second, that it was unable

to acquire the right of way through negotiation with the

1

For a further description of “quick take” see Section III.A

infra.

6

landowner; and third, that the amount claimed by the owner

of the property exceeds $3,000. If these conditions are met,

the gas company may “acquire the [necessary right-of-way]

by the exercise of the right of eminent domain in the district

court.” 2

Transcontinental has met all three requirements of §

717f(h). The administrative review leading up to the

certificate of public convenience and necessity lasted almost

three years and, as is evident from the record, included

extensive outreach and many avenues of public participation.

The process started when FERC granted the company’s

request to use the pre-filing process on April 4, 2014. 3 On

July 29, 2014, FERC issued a Notice of Intent to Prepare an

Environmental Impact Statement (EIS) for the Planned

Atlantic Sunrise Expansion Project, Request for Comments

on Environmental Issues, and Notice of Public Scoping

Meetings (NOI). 4 The NOI was then mailed to 2500

interested parties. It invited comment on the project’s

environmental issues from all levels of government, interest

groups, Native American tribes, affected property owners,

local media and libraries, and other interested parties. The

Commission heard from 93 speakers and received over 600

written comments. 5 On March 31, 2015, the company filed

its application to construct and operate the Atlantic Sunrise

project. 6 FERC mailed letters to potentially affected

landowners (as well as to government officials and other

2

§ 717f(h).

3

A1424.

4

A1424; 79 Fed. Reg. 44,023 (2014).

5

A1424.

6

A1425.

7

stakeholders) on October 22, 2015. 7 FERC issued the draft

EIS on May 5, 2016, and published it on May 12, 2016. 8 At

four public meetings in June 2016, FERC heard from 203

speakers and received over 560 written comments and 900

identical letters on the draft EIS. 9 Two alternative pipeline

routes were identified following the draft EIS, and additional

notices were mailed to potentially affected stakeholders, in

response to which FERC received 25 additional comment

letters. 10 FERC issued the final EIS on December 30, 2016,

and published it on January 9, 2017. 11

The Commission issued a certificate of public

convenience and necessity to Transcontinental—the first

requirement of § 717f(h) of the NGA—on February 3,

2017. 12 It found “[b]ased on the benefits” of the pipeline,

“the minimal adverse effects on landowners or surrounding

communities,” and “the absence of adverse effects on existing

customers and other pipelines and their captive customers, . . .

that the public convenience and necessity require[d]

approval” of the project “subject to the conditions” set out in

the Order Issuing Certificate. 13 Those conditions included

requirements that Transcontinental, inter alia, construct the

pipeline and make it available for service within three years

of the date of the order, 14 comply with certain environmental

7

A1425.

8

81 Fed. Reg. 29,557 (2016).

9

A1425.

10

A1426.

11

A1426; 82 Fed. Reg. 2,344 (2017).

12

A1396.

13

A1410.

14

See 18 C.F.R. § 157.20(b), A1466.

8

conditions, and follow certain rate schedules. 15 FERC also

required that Transcontinental execute firm contracts for

volumes and service terms “equivalent to those in its

precedent agreements” before construction. 16 The Order

Issuing Certificate contained information on those binding

precedent agreements, comprising 100% of the capacity

generated by the project, with nine shippers. 17 The

Landowners sought rehearing and included a request to stay

the Order Issuing Certificate and construction of the project, 18

15

A1466-67.

16

A1467.

17

A1400-01, A1407-10. FERC noted that while “a number

of the project shippers are producers,” its “policy does not

require that shippers be end-use consumers of natural gas. . . .

[A] project driven primarily by marketers and producers does

not render it speculative. Marketers or producers who

subscribe to firm capacity on a proposed project on a long-

term basis presumably have made a positive assessment of the

potential for selling gas to end-use consumers in a given

market and have made a business decision to subscribe to the

capacity on the basis of that assessment.” A1408.

18

Request for Rehearing and Motion for Stay of Certain

Landowners (Mar. 6, 2017), Accession No. 20170306-5123;

Petition for Rehearing of Lynda Like of Order Issuing

Certificate for the Atlantic Sunrise Project and Request for

Stay of Certificate (Mar. 6, 2017), Accession No. 20170306-

5204; Petition for Rehearing of Follin Smith and Blair and

Megan Mohn of Order Issuing Certificate for the Atlantic

Sunrise Project and Request for Stay of Certificate (Mar. 6,

2017), Accession No. 20170306-5202.

9

but FERC tolled the rehearing request on March 13, 2017, 19

denied the stay requests on August 31, 2017, 20 and finally

denied the rehearing request on December 6, 2017. 21

The second and third requirements for using the

eminent domain powers under § 717f(h) of the NGA are that

the gas company negotiate with the landowner for the

necessary right of way and that value of the right of way

exceeds $3000. Transcontinental extended written offers of

compensation exceeding $3000 to each of the Landowners,

but these offers were not accepted. 22 Transcontinental thus

satisfied the second and third requirements. The company

filed condemnation complaints pursuant to Rule 71.1 in four

19

The tolling order noted that if FERC had not responded to

the rehearing requests within 30 days, the requests would be

considered denied under 18 C.F.R. § 385.713 (2016);

therefore, FERC tolled the request “[i]n order to afford

additional time for consideration of the matters.” A669.

20

Order Denying Stay, Transcontinental Gas Pipe Line Co.,

LLC, 160 FERC ¶ 61,042 (Aug. 31, 2017), Accession No.

20170831-3088.

21

Order on Rehearing, Transcontinental Gas Pipe Line Co.,

LLC, 161 FERC ¶ 61,250 (Dec. 6, 2017), Accession No.

20171206-3073.

22

Transcontinental submitted a declaration in its summary

judgment briefing from Aaron Blair, a “Senior Land

Representative” for Transcontinental’s parent company,

Williams Partners, L.P., establishing that it had made these

offers, and there was also testimony to that effect at the

preliminary injunction hearing. A609 (Blair Declaration);

A1049 (Blair testimony).

10

separate actions against the Landowners on February 15,

2017. 23

Having met the three requirements of § 717f(h),

Transcontinental moved for partial summary judgment on

February 20, 2017, in the Hilltop, Hoffman, and Mohn

condemnation actions and on February 22, 2017, in the Like

condemnation action. 24 Transcontinental also requested an

injunction giving immediate access for the purpose of

conducting a survey in the Hilltop and Hoffman actions and

claimed immediate entitlement based on the existence of the

FERC order. 25 On April 6, 2017, the District Court denied

the motion for an injunction under the NGA because it had

not yet determined the merits of Transcontinental’s

condemnation action, though it granted Transcontinental

limited survey access pursuant to Pennsylvania state law. 26

The court held that it would have been premature to grant

such an injunction at that time given that the Landowners in

related cases had not yet finished briefing the summary

judgment motions. 27 The court noted that if Transcontinental

later established its right to condemn, the court would be able

to use its equitable power to award preliminary injunctive

relief. 28

After briefing on the summary judgment motions

concluded, Transcontinental filed an omnibus motion for

23

A130, A1537, A1709, A1832.

24

A130, A1538, A1833, A1709.

25

A679.

26

A679, A680.

27

A680.

28

A679.

11

preliminary injunction on June 28, 2017. 29 The Landowners

responded on July 14, 2017. 30 On June 30, 2017, the District

Court scheduled oral argument on the motions for July 17 and

20, 2017. At oral argument, a witness for Transcontinental

testified that construction was planned to begin in the fall of

2017 and that it would need access to the rights of way by

August 18, 31 or else it would suffer various harms. 32 The

Landowners cross-examined Transcontinental’s witness, 33

and all four Landowners testified. 34 The Landowners’

testimony included statements that they had all participated in

the FERC administrative process. 35 Counsel for Landowners

presented argument that the taking constituted a “quick take”

and that it violated separation of powers principles. 36

On August 23, 2017, the District Court granted

Transcontinental’s motions for partial summary judgment and

omnibus motion for a preliminary injunction. 37 The court

found no dispute that Transcontinental met the three

requirements for seeking eminent domain under the NGA and

held that the company was therefore entitled to the entry of

29

A685.

30

A135, A1541, A1712, A1835.

31

A953-54, A957.

32

A957-961.

33

A963.

34

A1068, A1110, A1152, A1184.

35

A1108 (Hilltop), A1124-25 (Hoffman), A1158-59 (Mohn),

A1191 (Like).

36

A1202-10, A1214-16.

37

A35; A20-28, A75-82, A97-103, A114-21; A18-19, A73-

74, A95-96, A112-13.

12

partial summary judgment. 38 The court addressed the

Hilltop/Hoffman Landowners’ due process claims and ruled

that they were essentially attacks on the FERC certificate, and

were therefore outside the court’s jurisdiction. 39 The court

added that, even if it were to exercise jurisdiction, it would

find that the Hilltop/Hoffman Landowners had received

“adequate due process” because they had participated in oral

argument, had filed a request for rehearing with FERC, and

had filed an appeal in the D.C. Circuit Court of Appeals. 40

The Hilltop/Hoffman Landowners had also argued that

FERC’s tolling order deprived them of due process because it

indefinitely extended FERC’s time limit to rule on their

Motion for Rehearing and Stay. The court rejected this

argument on the grounds that mere delay in the adjudication

of a claim does not amount to a deprivation. 41 The court then

addressed the Like/Mohn Landowners’ claim that because the

FERC certificate was conditioned on certain requirements,

some of which had not yet been met, the certificate could not

be used to exercise eminent domain. As the NGA does not

require FERC certificate holders to satisfy all the certificate’s

conditions before exercising eminent domain, and because the

certificate itself contained no such requirement, the District

Court rejected this argument. 42

On the basis of this review, the court held that

Transcontinental had met the four factor test for a preliminary

injunction. Under that test, the movant must demonstrate: 1)

38

A41-42.

39

A42.

40

A44.

41

A46-47.

42

A48-49.

13

that there is reasonable probability of success on the merits,

2) that there will be irreparable harm to the movant in the

absence of relief, 3) that granting the injunction will not result

in greater harm to the nonmoving party, and 4) that the public

interest favors granting the injunction. 43 The first two factors

are the “most critical.” 44 On the first prong, it found that

“Transco[ntinental] ha[d] already succeeded on the merits.” 45

The court quoted our decision in Columbia Gas

Transmission, LLC v. 1.01 Acres. In that case, we affirmed

the grant of partial summary judgment in an action for

condemnation and the grant of a preliminary injunction,

noting that there was “no remaining merits issue” because the

District Court had already ruled that the gas company had the

right to the easements by eminent domain. 46

On the second prong, the District Court found that

Transcontinental would suffer irreparable harm in the form of

construction delays, inability to complete surveys required to

satisfy environmental conditions, risk of non-compliance with

shipper contracts, and monetary harm. 47

43

Reilly v. City of Harrisburg, 858 F.3d 173, 176 (3d Cir.

2017).

44

Id. at 179. If the first two “gateway” factors are met, the

court “then considers the remaining two factors and

determines in its sound discretion if all four factors, taken

together, balance in favor of granting the requested

preliminary relief.” Id.

45

A51.

46

768 F.3d 300, 315 (3d Cir. 2014).

47

A53-54. The project is at an advanced stage. FERC has

issued a series of Notices to Proceed on the construction of

14

On the third prong, the District Court noted again that

Transcontinental already had the substantive right to

possession and the only question was “the timing of the

possession.” 48 If the permits to build certain pipeline sections

on the Landowners’ property were eventually denied, the

Landowners would have legal recourse to recover their

property. 49

Finally, on the public interest prong, the District Court

noted the project’s potential to provide the general public

“throughout a vast area of the country” with access to natural

gas, and found that “the mere fact that [certain subscribers]

will have access to export facilities does not mean that they

will in fact export the natural gas out of the country.” 50 The

District Court noted also that FERC had found the project to

be in the public interest, which further tipped this factor in

favor of Transcontinental. 51

The Landowners appealed.

the project, and Transcontinental states in its brief that only

23% of the construction remains to be completed.

48

A54.

49

A55.

50

The Hilltop/Hoffman Landowners point out that the project

is designed to generate 1,700,002 dekatherms per day, and

they argue that of this amount, 850,000 dekatherms, which is

just barely under 50%, will go to one shipper, Cabot Oil &

Gas, which plans to export this entire amount.

51

A56-57.

15

II

As the grant of partial summary judgment did not end

the litigation as to all claims and all parties, only the grant of

the preliminary injunction is before us. 52 We have

jurisdiction over the appeal of the injunction under 28 U.S.C.

§ 1292(a). The Landowners, however, do not bring a

standard appeal of a preliminary injunction, reviewable for

abuse of discretion. The Landowners contest only the

constitutionality of the lower court’s procedure, not the

application of the four-factor preliminary injunction test. 53

Therefore, we review their claims de novo. 54

III

The Landowners ask us to hold that the procedure

followed by the District Court—grant of partial summary

judgment, awarding possession of the rights-of-way, followed

by equitable relief in the form of preliminary injunction—is

unconstitutional. The Landowners argue that such a

procedure is an unconstitutional grant of “quick take”

eminent domain power, the type of eminent domain that

allows for immediate possession. Congress granted “quick

take” eminent domain power to government actors in the

Declaration of Taking Act (DTA), 55 but the NGA neither

contains nor incorporates such a provision. The Landowners

argue that since Congress did not grant natural gas companies

52

Andrews v. United States, 373 U.S. 334, 340 (1963).

53

A56.

54

Free Speech Coalition, Inc. v. Attorney General, 825 F.3d

149, 159 (3d Cir. 2016).

55

40 U.S.C. § 3114.

16

“quick-take” eminent domain power in the NGA, the court

cannot, in effect, grant such powers on its own; doing so

usurps the legislature’s authority. The question before us

then is whether Congress, in passing the NGA, intended to

remove the judiciary’s access to equitable remedies to enforce

an established substantive right. Put another way, did

Congress intend to forbid immediate access to the necessary

rights of way when it granted only standard condemnation

powers to natural gas companies?

A

We begin with the Landowners’ premise: that the

District Court effected a “quick-take.” As an initial matter,

eminent domain is a legislative power, but Congress can

delegate it to other governmental actors 56 or to private actors

“execut[ing] works in which the public is interested.” 57

56

E.g., 33 U.S.C. § 594 (providing the Secretary of the Army

the authority to acquire land, through eminent domain

proceedings, “needed for a work of river and harbor

improvements duly authorized by Congress”).

57

Mississippi & Rum River Boom Co. v. Patterson, 98 U.S.

403, 406 (1878); see also First English Evangelical Lutheran

Church of Glendale v. Los Angeles County, Cal., 482 U.S.

304, 321 (1987) (“[T]he decision to exercise the power of

eminent domain is a legislative function.”); Monongahela

Nav. Co. v. United States, 148 U.S. 312, 321 (1893). The

Landowners acknowledge the existence of judicial takings,

citing Stop the Beach Renourishment, Inc. v. Florida Dep’t

Enviro. Protection, 560 U.S. 702, 713-14 (2010)), but

maintain that only Congress can grant eminent domain

powers. See Secombe v. Milwaukee & St. P.R. Co., 90 U.S.

17

Congress generally does this by delegating the power of

eminent domain. There are two primary types of eminent

domain at the government’s disposal. One is “quick take,”

permitted by the DTA, 40 U.S.C. § 3114, in which the

government files a “declaration of taking” that states the

authority for the taking, the public use, and an estimate of

compensation. Upon depositing the estimated compensation,

title vests automatically with the United States. The other is

standard condemnation, permitted by 40 U.S.C. § 3113, in

which title passes and the right to possession vests after a

final judgment and determination of just compensation. The

procedures for standard condemnations are set forth in Fed.

R. Civ. P. 71.1. The NGA is an example of a grant of

eminent domain power from Congress to a private actor to

condemn land for public use, but it only embodies the second

type—standard condemnation power, not “quick take.” 58

In the case before us, Transcontinental followed

standard condemnation procedure. The company filed

condemnation complaints under Rule 71.1, not a declaration

of taking. Rule 71.1 has requirements that go beyond the

DTA. 59 Transcontinental followed these procedures by filing

108, 117-18 (1874) (“[T]he mode of exercising the right of

eminent domain, in the absence of any provision in the

organic law prescribing a contrary course, is within the

discretion of the legislature.”).

58

East Tennessee Natural Gas Co. v. Sage, 361 F.3d 808,

820-21 (4th Cir. 2004) (citing Mississippi & Rum River Boom

Co. v. Patterson, 98 U.S. at 406).

59

E.g., a condemnation complaint that explains the authority

for the taking, the uses for the property, a description

sufficient to identify the property, the interests to be acquired,

18

condemnation complaints under Rule 71.1; it then established

its substantive right to the property by filing for summary

judgment. Only after the District Court granted summary

judgment in Transcontinental’s favor did it grant injunctive

relief. Transcontinental also posted bond at three times the

appraised value of the rights of way, as required by the orders

of condemnation. 60 If Transcontinental had in fact exercised

and each owner; notice and personal or publication service;

and procedures for the determination and payment of just

compensation.

60

See A22, A99, A116, A77. We note that the Landowners

have not received any of this money. Rule 71.1(c)(4) allows

the court to “order any distribution of a deposit that the facts

warrant.” At least one court has interpreted this provision to

apply only after the final determination of just compensation.

UGI Sunbury LLC v. A Permanent Easement for 71.7575

Acres, 16-cv-788, 2016 WL 7239945, at *2 n.14 (M.D. Pa.

Dec. 15, 2016). In UGI Sunbury, the court interpreted an

Advisory Committee note on this section, which states that

the sentence “enables the court to expedite the distribution of

a deposit, in whole or in part, as soon as pertinent facts of

ownership, value and the like are established,” to mean that

distribution can only occur after just compensation is

determined. Such a reading conflicts with subsection (j)(2),

which provides that “[i]f the compensation finally awarded to

a defendant exceeds the amount distributed to that

defendant,” the court must recoup the deficiency from the

plaintiff, and the reverse is true if the final amount awarded is

less than the amount distributed. Such a scheme would be

unnecessary if deposits never occurred before final

determination of just compensation. In sum, while it does not

seem to be common practice to distribute compensation upon

19

“quick take,” it would have simply filed a declaration of

taking with an estimate of compensation; title would have

vested automatically. Here, unlike in a “quick take” action,

Transcontinental does not yet have title but will receive it

once final compensation is determined and paid. 61 Unlike in

a “quick take” action, the Landowners had the opportunity to

brief the summary judgment motions and participate in the

preliminary injunction hearing. The different procedures and

opportunities for participation distinguish the grant of the

injunction here from an exercise of “quick take” power.

B

The Landowners contend, nevertheless, that even if the

procedure below was not technically an exercise of “quick

take” eminent domain, the use of a preliminary injunction

amounted to a “quick take.” However, the technical

distinctions they seek to elide are, in the end, meaningful

distinctions in the law. According to the Landowners, there is

a difference between the substantive right to access that arises

under the NGA, and the substantive right to immediate

access, which only Congress can authorize. The Like/Mohn

Landowners argue that granting injunctive relief for

immediate possession is in itself a substantive right of

eminent domain that a court cannot confer in the absence of

Congressional authorization. There is, however, no case law

to support the proposition that an injunctive right of

immediate possession is a substantive right, conferrable only

by Congress. The fact that “quick take” power exists does

posting of the bonds, in cases presenting hardship to

landowners, the court’s hands may not be tied.

61

Danforth v. United States, 308 U.S. 271, 284-85 (1939).

20

not prohibit other kinds of immediate access. The only

substantive right at issue is the right to condemn using

eminent domain, conferred by Congress in the NGA. The

District Court found that Transcontinental had obtained that

right. 62 The preliminary injunction merely hastened the

enforcement of the substantive right—it did not create any

new rights. 63

The Like/Mohn Landowners portray Transcontinental

as a customer who pays for 90% of an item and then takes it

home, but Transcontinental did not have 90% of a right to the

rights of way—it had the whole right. The Hilltop/Hoffman

Landowners argue that the fact that title to the property had

not yet been transferred is immaterial; it is the grant of the

preliminary injunction that is the essence of the “quick take”

power. To the contrary, we conclude that the equitable means

by which Transcontinental’s possession vested through the

preliminary injunction differed in significant ways from

“quick take” under the DTA. We decline the invitation to

conflate the two processes. These are not trivial differences

of procedure or paperwork.

62

See Seymour v. Freer, 75 U.S. 202, 213-14 (1868)

(property rights “distinct from the legal ownership . . .

constitute an equity which a court of equity will protect and

enforce whenever its aid for that purpose is properly

invoked”).

63

De Beers Consol. Mines, Ltd. v. United States, 325 U.S.

212, 220 (1945) (issuing preliminary injunction

“appropriate to grant intermediate relief of the same character

as that which may be granted finally”).

21

The cases relied on by the Landowners are easily

distinguishable as they involve gas companies that failed to

obtain the crucial substantive right to condemn before seeking

a preliminary injunction. In one, Transwestern Pipeline Co.

v. 17.19 Acres of Property Located in Maricopa County, 64 the

Ninth Circuit held that a preliminary injunction was not

appropriate because the company did not obtain an order of

condemnation. While the gas company argued that it was

guaranteed success on the merits due to its FERC certificate

and the fact that it met the § 717f(h) factors, at the time it

sought equitable relief it had no right to condemn. 65 The

Ninth Circuit explicitly endorsed the procedure of first

obtaining an order of condemnation (as Transcontinental did

here through partial summary judgment) followed by a

request for preliminary injunction. 66

The Seventh Circuit’s Northern Border decision is

similar. 67 There, the gas company moved for immediate

possession before the district court issued a decision on the

merits of its eminent domain proceeding. Since the company

had only the FERC certificate, the court denied its request:

“A preliminary injunction may issue only when the moving

party has a substantive entitlement to the relief sought. . . .

[The company has] an entitlement that will arise at the

conclusion of the normal eminent domain process” but not the

right of immediate access. 68 The Landowners place much

64

550 F.3d 770 (9th Cir. 2008).

65

Id. at 773, 777.

66

Id. at 777.

67

Northern Border Pipeline Co. v. 86.72 Acres of Land, 144

F.3d 469 (7th Cir. 1998).

68

144 F.3d at 471.

22

emphasis on the recognition in Northern Border that the NGA

does not incorporate “quick take” authority under state law or

under the DTA and on the statement in Northern Border that

the NGA “does not create an entitlement to immediate

possession of the land.” 69 Both those statements are true: the

NGA does not incorporate “quick take” authority and does

not on its own create an entitlement to immediate possession.

But Northern Border is clearly distinguishable because of the

gas company’s failure to “obtain an order determining that it

had the right to condemn before it sought a preliminary

injunction .... Without having that right in substantive law

determined, the company could not invoke equity.” 70

The Landowners also suggest that due process, the

Fifth Amendment, or some combination of the two require

payment of just compensation before a condemnor can take

possession. Such an argument directly contradicts established

law that “due process does not require the condemnation of

land to be in advance of its occupation by the condemning

authority, provided only that the owner have opportunity, in

the course of the condemnation proceedings, to be heard and

to offer evidence as to the value of the land taken.” 71 In

69

Id. at 471, 472 (citation omitted).

70

Sage, 361 F.3d at 827-28.

71

Bailey v. Anderson, 326 U.S. 203, 205 (1945); see also

Presley v. City of Charlottesville, 464 F.3d 480, 489-90 (4th

Cir. 2006) (“[W]hen the alleged deprivation is effectively a

physical taking, procedural due process is satisfied so long as

private property owners may pursue meaningful

postdeprivation procedures to recover just compensation.”);

Collier v. City of Springsdale, 733 F.2d 1311, 1314 (8th Cir.

1984).

23

addition, compensation need not be paid contemporaneously

with the taking; instead, the Fifth Amendment requires only

that a provision for payment must be available. 72 Thus the

Landowners’ reliance on Kirby Forest Industries v. United

States, 73 Cherokee Nation v. Southern Kansas Railway Co.,74

and Atlantic Seaboard Corp. v. Van Sterkenburg 75 is

72

See Preseault v. I.C.C., 494 U.S. 1, 11 (1990).

73

467 U.S. 1 (1984). Kirby explained how Rule 71.1

operates in standard condemnation proceedings, where the

“practical effect of final judgment on the issue of just

compensation is to give the Government an option to buy the

property at the adjudicated price.” Id. at 4. The central

question in Kirby was how to determine the date on which a

taking should be deemed to occur, a question that affected the

amount of interest due on a condemnation proceeding award.

74

135 U.S. 641 (1890). The act at issue in Cherokee

provided for full compensation “before the railway shall be

constructed,” though the Court also stated that the

Constitution “does not provide or require that compensation

shall be actually paid in advance of the occupancy of the land

to be taken; but the owner is entitled to reasonable, certain,

and adequate provision for obtaining compensation before his

occupancy is disturbed.” Id. at 659. The Court noted that it

could sometimes be difficult to judge whether a particular

provision was “sufficient to secure the compensation” to

which a landowner is entitled under the Constitution, but that

it had no trouble finding the statute at issue constitutional. Id.

75

318 F.2d 455 (4th Cir. 1963). The gas company in this

case followed the condemnation procedures of Rule 71.1, and

after the determination of just compensation, announced that

it wished to proceed immediately with the construction of the

pipeline. Id. at 459-60. It is not clear why the gas company

24

misplaced. None of these cases lend support to the

Landowners’ argument that Transcontinental’s right to

possession of the properties will not vest until

Transcontinental has exercised its option to buy the properties

at the adjudicated price.

The Landowners go on to contend that because the

NGA does not grant “quick take” power, the statute does not

permit immediate possession. 76 They make this argument

chose to wait until after the just compensation phase to seek

possession. In any event, the court upheld an order

permitting the company to pay the award and begin using the

easement because “[i]nherently . . . the condemnation court

possesses the power to authorize immediate entry by the

condemnor upon the condemned premises . . .. There is no

valid reason why an owner . . . should be allowed, by a

fruitless and meritless appeal, to postpone indefinitely the

condemnor’s enjoyment of the premises, imposing upon the

condemnor great, perhaps irreparable, damage, all without

risk of further loss or injury to the owner.” Id. at 460

(emphasis added). The case is distinguishable because the

gas company completed condemnation procedures before

seeking possession, but even so, Atlantic Seaboard’s

recognition of an “inherent[]” power to authorize “immediate

entry” more squarely helps Transcontinental.

76

For example, the Hilltop/Hoffman Landowners cite to

Washington Metropolitan Area Transit Authority v. One

Parcel of Land in Montgomery County, 706 F.2d 1312 (4th

Cir. 1983). In that case, the Fourth Circuit upheld a quick

take because Congress explicitly made the DTA available to

the transit authority. It did not do so in the NGA. The case

does not address the use of injunctions to permit immediate

25

without any explanation for why a district court’s authority to

issue a preliminary injunction should disappear when a

condemnation proceeding has been filed. Nothing in the

NGA suggests either explicitly or implicitly that the rules

governing preliminary injunctions should be suspended in

condemnation proceedings.

Historically, the NGA, when first enacted, did

countenance a wide variety of eminent domain procedures

because it required district courts to conform “as nearly as

may be” with the eminent domain procedure of the state in

which the property was situated. The state procedures

protected landowners to a varying degree. 77 Reliance on state

eminent domain procedures ended with the adoption of Rule

71.1 (previously numbered 71A), which created a nationally

uniform approach to eminent domain proceedings, and which,

because it conflicted with § 717f(h), superseded the state-

possession, and we do not find the case to be persuasive

evidence that the NGA prohibits such injunctions.

77

In states with no specific pipe line condemnation statutes,

courts made do with laws intended for private utilities in

general. E.g., Williams v. Transcontinental Gas Pipe Line

Corp., 89 F. Supp. 485, 487-88 (W.D.S.C. 1950) (“[A]ll that

is needed to make the grant effective is a State court

procedure which meets the requirements of due process and

which can be reasonably utilized . . .. The [state] procedure . .

. meets these requirements. It furnishes due process. With its

Clerks’ juries, composed of the landowners’ neighbors, to

pass upon the compensation originally, and with the right of

appeal therefrom to the Common Pleas Court with a de novo

jury trial, the procedure affords every protection to the

landowner.” (citations omitted)).

26

conformity language in the NGA. 78 Courts now generally

agree that condemnation proceedings under the NGA should

follow Rule 71.1. 79

78

Northern Border Pipeline Co. v. 64.111 Acres of Land, 344

F.3d 693, 694 (7th Cir. 2003) (“Congress may itself decide

that procedural rules in statutes should be treated as fallbacks,

to apply only when rules are silent. And it has done just this.

. . . Thus Rule 71A(h) prevails: its nationally uniform

approach conflicts with the conformity-to-state-practice

approach of § 717f(h), and under [the Rules Enabling Act’s

supersession clause] the statutory rule ‘shall be of no further

force or effect.’”) (citing Henderson v. United States, 517

U.S. 654 (1996)); see also United States v. 93.970 Acres of

Land, 360 U.S. 328, 333 n.7 (1959) (holding similar language

in another statute “clearly repealed by Rule 71A”).

79

Northern Border Pipeline Co., 344 F.3d at 694; Sage, 361

F.3d at 822; Southern Natural Gas Co. v. Land, Cullman

County, 197 F.3d 1368, 1375 (11th Cir. 1999) (“It is clear to

us that Rule 71A was promulgated to override a number of

confusing federal eminent domain practice and procedure

provisions, such as that of 15 U.S.C. § 717f(h), and to provide

a unified and coherent set of rules and procedures to be used

in deciding federal eminent domain actions.”). But see

Delaware Riverkeeper Network v. FERC, 895 F.3d 102, 110-

11 (3d Cir. 2018) (noting that the NGA ensures the

occurrence of “a hearing that itself affords due process” with

respect to the taking because the statute provides that eminent

domain actions conform with the practice and procedure of

such actions in the courts of the state where the property is

situated); contra Township of Bordentown, NJ v. FERC, Nos.

17-1047, 17-3207, 2018 WL 4212061, at *18 n.21 (3d Cir.

27

Moreover, we see no reason to read a repeal of Rule

65, governing preliminary injunctions, into the NGA. In fact,

subsection (a) of Rule 71.1 incorporates the other Federal

Rules of Civil Procedure—including the preliminary

injunction rule, Rule 65—in condemnation proceedings to the

extent Rule 71.1 does not govern. We do not so easily

exterminate equitable remedies.

In so holding, we find the Fourth Circuit opinion in

East Tennessee Natural Gas Co. v. Sage 80 persuasive. There,

the landowners argued “that Congress does not intend for gas

companies to gain immediate possession because it has not

granted statutory quick-take power to gas companies as it has

to government officers who condemn property in the name of

the United States.” 81 But the court held that this argument

“overlooks the preliminary injunction remedy provided in the

Federal Rules.” 82 Rule 71.1 “provides . . . that the regular

rules of procedure apply to any subject not covered by the

special rule.” 83 Thus, there was no reason why equitable

relief “in the form of immediate possession” would be

“barred in a condemnation case.” 84 As the Sage court noted,

the landowners, in their attempts to protect themselves from

immediate possession, seemed to assume that the preliminary

injunction process was somehow less protective of their

interests than “quick take” procedures. The court held,

Sept. 5, 2018) (NGA “requires district courts to attempt to

mirror the state courts’ condemnation proceedings”).

80

361 F.3d 808.

81

Id. at 824.

82

Id.

83

Id.

84

Id.

28

however, that when condemning land under the NGA, “a gas

company that seeks immediate possession has a much stiffer

burden than the government does under the DTA” because

the gas company must first establish the substantive right to

condemn and then prevail on the four factors considered in

preliminary injunctions. 85

Under either procedure, a “quick take” or

condemnation under Rule 71.1, landowners are protected

from the possibility of initial underpayment; with standard

condemnation plus preliminary injunction, if the company

does not pay the difference within a reasonable time, it will

be liable for trespass. 86 The Landowners claim that Sage did

not address the separation of powers arguments they bring

here, but a panel of the Fourth Circuit recently followed Sage

and persuasively demonstrated that the opinion did in fact

consider separation of powers principles. 87 And this Court,

too, albeit with less discussion, has ruled that where summary

judgment is properly granted on a condemnation complaint, a

preliminary injunction is appropriate as well. We effectively

granted immediate access on the basis that the gas company

85

Id. at 825-26.

86

Id. at 825 (citing Cherokee Nation, 135 U.S. at 660).

87

Columbia Gas Transmission, LLC v. 76 Acres, More or

Less, 701 F. App’x 221, 231 n.7 (4th Cir. 2017) (rejecting

landowners’ argument that “Sage is distinguishable because it

did not mention the words ‘separation of powers’” in part

because Sage explicitly rejected the assertion “that only

Congress can grant the right of immediate possession”).

29

had demonstrated success on the merits and strong arguments

on the other prongs of the preliminary injunction test. 88

As the preliminary injunction was permitted by the

Rules, permitted by the NGA, and did not amount to a grant

of “quick take” eminent domain power in either name or

substance, the court did not usurp legislative power or

otherwise overstep the boundaries of its judicial power. We

therefore see no violation of the principle of separation of

powers in the District Court’s procedure.

The Hilltop/Hoffman Landowners argue separately

that the District Court’s procedure deprived them of any

meaningful opportunity to challenge FERC’s public use

determination. This argument also fails.

First, and most importantly, the Hilltop/Hoffman

Landowners do not dispute that they had the opportunity to

88

Columbia Gas v. 1.01 Acres, 768 F.3d at 315-16. We note

that district courts around the country have implemented the

procedure, relying on the Circuit decisions like Sage. See

Transcontinental Gas Pipe Line Co., LLC v. Permanent

Easement for 0.03 Acres, 17-cv-565, 2017 WL 3485752, at

*4 (M.D. Pa. Aug. 15, 2017) (“It is commonplace for district

courts to order immediate possession after FERC has taken a

lengthy period of time determining whether or not to issue a

certificate of public convenience and necessity.”) (collecting

cases). See also Alliance Pipeline L.P. v. 4.360 Acres of

Land, 746 F.3d 362 (8th Cir. 2014) (no abuse of discretion in

granting pipeline’s immediate use and possession following

FERC certificate and grant of summary judgment and

preliminary injunction).

30

raise their concerns with FERC and did in fact do so; 89 sought

stays of the construction, which were denied; 90 and sought

rehearing, 91 which was also denied on December 6, 2017.92

Before the order denying rehearing, the Landowners appealed

to the D.C. Circuit Court, where the case is pending. 93 The

NGA explicitly provides that neither a request for rehearing

before FERC nor judicial review can stay the effectiveness of

a FERC certificate. 94

89

Hilltop/Hoffman Landowners submitted 9 comments to

FERC. Like/Mohn Landowners submitted 47 comments.

90

Order Denying Stay, Transcontinental Gas Pipe Line Co.,

LLC, 160 FERC ¶ 61,042 (Aug. 31, 2017), Accession No.

20170831-3088.

91

Request for Rehearing and Motion for Stay of Certain

Landowners (Mar. 6, 2017), Accession No. 20170306-5123;

Petition for Rehearing of Lynda Like of Order Issuing

Certificate for the Atlantic Sunrise Project and Request for

Stay of Certificate (Mar. 6, 2017), Accession No. 20170306-

5204; Petition for Rehearing of Follin Smith and Blair and

Megan Mohn of Order Issuing Certificate for the Atlantic

Sunrise Project and Request for Stay of Certificate (Mar. 6,

2017), Accession No. 20170306-5202.

92

Order on Rehearing, Transcontinental Gas Pipe Line Co.,

LLC, 161 FERC ¶ 61,250 (Dec. 6, 2017), Accession No.

20171206-3073. The D.C. Circuit denied the landowners’

request for a stay pending the appeal of the FERC Order.

Allegheny Def. Project v. Fed. Energy Regulatory Comm’n,

Nos. 17-1098, 17-1128, 17-1263, 18-1030, 2018 WL

1388557 (D.C. Cir. Feb. 16, 2018) (per curiam).

93

Nos. 17-1128, 18-1030.

94

15 U.S.C. § 717r(c).

31

In sum, the Hilltop/Hoffman Landowners are attacking

the underlying FERC order, but review of the underlying

FERC order is only properly brought to FERC on rehearing

and then to an appropriate circuit court, as the

Hilltop/Hoffman Landowners are pursuing. We lack

jurisdiction to hear collateral attacks on the FERC certificate,

which contained a finding that the project was for public

use. 95 Neither the District Court nor this Court in this case

may entertain arguments such as those brought by the

Hilltop/Hoffman Landowners that FERC unduly credited

self-serving statements by Transcontinental and ignored the

potential that the project might have been intended to provide

companies with greater access to the higher priced overseas

market. 96

V

The Landowners do not appeal the preliminary

injunction based on an abuse of discretion in the District

Court’s analysis and so have waived that argument on appeal.

Even so construed, their petition lacks merit.

Transcontinental clearly showed success on the merits and

would have been harmed if the injunction were denied.

For the above reasons, we hold that the NGA’s grant

of standard condemnation powers to natural gas companies

does not preclude federal courts from granting equitable relief

in the form of a preliminary injunction when gas companies

have obtained the substantive right to condemn and otherwise

95

15 U.S.C. § 717r(b) (appeal of the certificate allowed in the

circuit where the gas company is located or in the D.C.

Circuit).

96

Hilltop/Hoffman Brief at 37, 38.

32

qualify for equitable relief. Because the Landowners fail to

recognize the District Court’s equitable power to enter

preliminary injunctions once substantive rights are

determined, their appeals lack merit. We therefore affirm the

orders of the District Court, granting the motions for

preliminary injunctions.

33