lessee under four coal-mining leases brought claims against lessor based on a will-extend clause that the court found too indefinite to enforce

How later courts described this case

  • lessee under four coal-mining leases brought claims against lessor based on a will-extend clause that the court found too indefinite to enforce
  • “[T]he intent of the contracting parties is discerned from the whole of the contract.”
  • coal-mining lessee’s assignees brought action for specific performance of a lease after royalty arrearage was paid and the court held that the lease term was too indefinite to be ascertained

Written by the judges who cited it.

The opinion

In the United States Court of Federal Claims

No. 10-757L

(Filed: May 18, 2018)

**********************

GADSDEN INDUSTRIAL PARK, LLC, Takings Clause;

inverse condemnation;

Plaintiff, U.S. Const. amend. V;

cognizable property

v. interest; just

compensation.

THE UNITED STATES,

Defendant.

**********************

Kent E. Baldauf, Jr., Pittsburgh, PA, with whom were Bryan P. Clark,

Anthony W. Brooks, and Edward Levicoff for plaintiff.

Eric John Singley, United States Department of Justice, Civil Division,

Commercial Litigation Branch, Washington, DC, with whom were Kenneth M.

Dintzer and Margaret J. Jantzen for defendant.

OPINION

BRUGGINK, Judge.

This is a takings claim brought by Gadsden Industrial Park, LLC.

Plaintiff asserts that the Environmental Protection Agency (“EPA”) took kish1,

slag, and scrap belonging to it. Plaintiff alleges that it purchased the materials

at a bankruptcy auction from a defunct steel mill and that EPA either used the

materials itself or permitted its contractors to remove them despite GIP’s

ownership. Trial was conducted in Birmingham, Alabama, from July 25

through 28, 2017. We hold that EPA’s actions constituted a compensable

1

Kish is a byproduct of the steel-making process. We defer a more

particularized definition for now, as the meaning is disputed between the

parties.

taking under the Fifth Amendment Takings Clause, although we find that

plaintiff’s proof of the compensation to which it is entitled fails in most

respects.

BACKGROUND

The personal property in which plaintiff claims an interest is kish, slag,

and scrap located on a 761-acre site in Gadsden, Alabama. The site was used

for many years as a steel mill, most recently by Gulf States Steel, which went

into bankruptcy in 1999, leaving all personal and real property at the site to be

disposed of by the Trustee in Bankruptcy.

A north-south road transects the property. To the west side of this road,

Gulf States Steel housed its steel-making operation, including a coke plant,

blast furnace, and basic oxygen furnace, among other equipment. To the east

side of this road (“Eastern Excluded Property”), there were two settlement

lagoons, landfills, and two large areas where Gulf States Steel deposited

materials generated by steel-making, along with other discarded materials.

The parties referred to these areas where Gulf States Steel deposited steel-

making byproducts, scrap, and trash as the north and south piles.

When Gulf States Steel operated the mill, it contracted with Heckett, a

metal recovery company, to recover reusable or saleable materials from the

Eastern Excluded Property. Heckett screened material dumped on the Eastern

Excluded Property and returned recovered metals to Gulf States Steel to

recycle into its steel-making process or to sell. Heckett’s operation could not

keep pace with Gulf States Steel’s steel-making, however. Thus, a stockpile

of materials accumulated primarily on the Eastern Excluded Property. There

were two piles of stockpiled material. Each occupied more than ten acres and

contained an estimated total of three to four million cubic yards of material.

Each was more than eighty feet high.

Gulf States Steel filed a Chapter 11 bankruptcy petition in 1999 that

was converted to Chapter 7 in 2000. It ceased operations in 2000. Heckett’s

metal recovery ceased at the same time. Another metal recovery project

occurred on the property during the course of the bankruptcy proceeding,

however. Ableco Finance LLP (“Ableco”) enforced its senior security

interests and liens and received the necessary authorization to attempt to

collect amounts Gulf States Steel owed it. Ableco held “a first priority and

perfected lien on the kish iron” and chose to contract with Regional Recycling

in November 2001 “to recover and remove kish iron and other ferrous

materials from the slag heaps at the Gulf States Steel facility on a ‘constant

and continuing basis[.]’” Letter from Jeffrey Hermann, Ableco’s Counsel, to

Carrie Casey, GIP (Jan. 31, 2003), Pl.’s Ex. 15 at 3.

2

When Gulf States Steel filed its bankruptcy petition, a group of former

Gulf States Steel employees worked to secure the plant and catalogue assets.

A Gulf States Steel bondholder formed the Gulf States Reorganization Group

to purchase some of the assets in order to restart part of the plant. An entity

named DoveBid conducted a first auction, selling the blast furnace, railroad

tracks, cranes, and cold finishing mill. The remaining assets were catalogued,

including those that the Gulf States Reorganization Group wanted to buy.

Thereafter, the bankruptcy trustee, James Henderson, filed a motion for an

order to establish bidding procedures for the sale of the remaining Gulf States

Steel assets in July 2002 (“Bidding Motion”). Two instruments described the

property to be sold. The Bidding Motion first generally described the assets:

Tangible property, including real, personal and mixed property,

all situated at or adjacent to the site where the debtor [Gulf

States Steel] formerly conducted its manufacturing operations,

consisting of approximately 600 acres of real property and the

improvements thereon, easement rights appurtenant thereto,

inventory and equipment. The property that is the subject [of]

this sale is generally described in Exhibit A hereto.

Bidding Motion, Joint Ex. 1 at 1.

Exhibit A to the Bidding Motion was prepared by Gulf States

Reorganization Group. It included a general description providing that both

real and personal property would be auctioned. The real property included the

Eastern Excluded Property. The personal property for sale included “[a]ll

materials, whether raw minerals or by-products, situated within the boundaries

of the real property being sold, including kish and scrap.” Id. at 6. The

Bidding Motion explained that Gulf States Reorganization Group had offered

to purchase a list of assets detailed in an asset purchase agreement, Exhibit 1

to which included units that the group proposed to purchase:

ATTACHMENT 5 – INVENTORY

BY PRODUCTS OF MANUFACTURING INCLUDING BUT

NOT LIMITED TO KISH AND MISCELLANEOUS OTHER

MATERIALS AND ASSORTED SCRAP.

Id. at 32.

The bankruptcy trustee did not sell the assets to Gulf States

Reorganization Group because the presence of other bidders, including Don

Casey, required Mr. Henderson to open bidding to the public. Mr. Casey is the

proprietor of Casey Equipment, a family-owned business based in Pittsburgh,

Pennsylvania, since 1961. Casey Equipment is in the business of buying and

3

selling steel mill equipment and had worked with Gulf States Steel prior to its

bankruptcy. Mr. Casey, on behalf of Casey Equipment, participated in the first

bankruptcy auction. He became aware that Gulf States Reorganization Group

was interested in purchasing the remaining assets in the second auction and

inquired into partnering with the group. Ultimately, Mr. Casey determined that

his best option was to bid on the assets independently. To participate in the

second auction, Mr. Casey formed plaintiff Gadsden Industrial Park, LLC

(“GIP”). GIP was a bidder in the second auction. Carrie Casey, Mr. Casey’s

daughter who worked for Casey Equipment until her retirement in 2016,

represented GIP in the second auction process.

Attached to the Bidding Motion for the second auction was the asset

purchase agreement and the asset list drafted by Gulf States Reorganization

Group and set out above. GIP did not want to purchase all of those assets.

GIP thus requested a bidding procedure modification to permit competing

bidders to bid on a more limited set of assets. The bankruptcy court granted

the request. During the bidding process, on September 19, 2002, Mr. Casey

emailed Ms. Casey, “[W]e want to buy the rights to mine the slag piles[.]

[D]on’t let me forget[.]” Pl.’s Ex. 5.

GIP submitted an all-cash bid of $6.3 million for most, but not all, of

the remaining estate assets. The bankruptcy court found that GIP offered the

highest and best bid and directed Mr. Henderson to close the sale to GIP. Mr.

Henderson and GIP executed an asset purchase agreement on September 30,

2002, which was consummated on December 3, 2002. The trustee reported the

sale on December 13, 2002.

GIP purchased both real property and personalty. The Trustee’s Bill of

Sale and the Trustee in Bankruptcy Deed describe the real property that GIP

purchased as more than 400 acres of land and the buildings on them, but it was

not the entire real property estate. GIP purposely omitted approximately 200

acres, including the Eastern Excluded Property, although, as indicated below,

it purchased personal property present on the excluded acreage. It did this in

order to avoid potential environmental responsibility.

The personal property GIP purchased is described in part in the

Trustee’s Bill of Sale, which included Exhibit A, the Bidding Motion, with its

general description of personal property: “[a]ll materials, whether raw minerals

or by-products, situated within the boundaries of the real property being sold,

including kish and scrap.” Joint Ex. 19 at 67. Exhibit A, the list of property

units sold, included “Attachment 5 – Inventory:”

4

BY PRODUCTS OF MANUFACTURING INCLUDING BUT

NOT LIMITED TO KISH AND MISCELLANEOUS OTHER

MATERIALS AND ASSORTED SCRAP.

Id. at 117. This material had accumulated on the land that GIP did not buy.

Exhibit B to the Trustee in Bankruptcy Deed not only carved out the

eastern portion of the site, but it also excluded certain personal property

(“Exclusion List”):

1. With reference to the property identified in “ATTACHMENT

5 – INVENTORY,” Purchaser excludes:

A. All miscellaneous other materials.

B. All by-products of production other than kish and 420,000

cubic yards of slag which are located on the Excluded Real

Property as is described on Exhibit B to the deed from Seller to

Purchaser of even date herewith, together with a reasonable

period of time to remove such items.

Id. at 120.

Ms. Casey wrote the Exclusion List. She testified that the Exclusion

List was the only part of the bankruptcy sale contract that GIP had participated

in writing and that she “cut and pasted” terms in the Exclusion List. Trial

Transcript (“Tr.”) at 105. Ms. Casey did not discuss the reasonable period of

time language with the bankruptcy trustee. She added the reasonable period

of time language because she was in the habit of including such a term in

contracts she was involved in negotiating for Casey Equipment. She did not

know how long GIP would require to retrieve the materials it bought and thus

added language that she believed would secure GIP’s right to access the

Eastern Excluded Property to retrieve the materials.

Following the bankruptcy sale, GIP began work at the site and became

aware of Regional Recycling’s metal recovery operation on behalf of Ableco.

GIP believed that Ableco had recovered and sold materials GIP purchased.

Thus, on January 2, 2003, GIP wrote a letter to Ableco informing it that GIP

purchased “the kish and scrap metal located at the former Gulf States Steel

site.” Letter from Carrie Casey, GIP, to Jeffrey Hermann, Ableco’s Counsel

(Jan. 2, 2003), Pl.’s Ex. 14 at 1. GIP demanded “restitution in an amount equal

to the value of the assets sold[.]” Id. Ableco responded, contesting any

liability to GIP for the materials recovered and sold, explaining that Regional

Recycling ran its recovery operation until December 2002 “at which time

Ableco terminated the Kish Iron Contract based upon Ableco’s understanding

5

that the Trustee . . . had agreed to transfer to GIP the right to remove kish iron

after the date of the Closing . . . .” Letter from Jeffrey Hermann, Ableco’s

Counsel, to Carrie Casey, GIP (Jan. 31, 2003), Pl.’s Ex. 15 at 3.

Immediately after the bankruptcy sale, GIP found tenants for some of

the buildings and dismantled others and found purchasers for some of the steel

mill equipment it had purchased. GIP used slag from the Eastern Excluded

Property to fill the below-ground-level voids left after the removal of

equipment. It also sold additional slag. In total, Mr. Casey estimated that GIP

used or sold approximately 15,000 cubic yards of slag, which he estimated was

ten percent of the slag on the Eastern Excluded Property.

In 2004 and 2005, GIP brought Watkins Metals Co., Inc. (“Watkins”),

on site to recover metal from a pile of slag located in the northwest corner of

the real property that GIP had purchased, not from the piles on the Eastern

Excluded Property. Watkins is located in Birmingham, Alabama, and is in the

business of metal recovery, scrap processing, and recycling. To recover metal

from GIP’s real property, Watkins used separating equipment, weighed the

recoverable metal, and loaded it into railcars for GIP. During the one-year

project, Watkins recovered metal pieces ranging from six inches to four feet

in size. Watkins received $35 per ton of metals retrieved and loaded for its

work recovering the metal, but GIP retained ownership of the metals. GIP

later contracted with Watkins to complete another recovery project near the

middle of GIP’s property from which Watkins recovered items such as steel

beams and metal mixed in with slag.

After a request from the Alabama Department of Environmental

Management and pursuant to an Action Memorandum relating to potential

Superfund sites, EPA began its first removal action on the site in 2003. EPA

investigated a claim that contaminants were leaching out of the piles and from

nearby lagoons. Barbara Scott, EPA’s on-scene coordinator from 2003 to

2006, determined that the piles as well as the lagoons were causing

environmental problems. Specifically, EPA was concerned that environmental

contaminants associated with the piles and lagoons, such as oil and leachate,

were migrating from the Eastern Excluded Property. Although EPA did

endeavor to remove as much oil as possible, Ms. Scott determined that simply

removing the oil from the lagoons would not be a long-term solution, because

the equipment to maintain the lagoons had deteriorated, and solids within the

lagoons also posed a problem. The EPA’s on-scene coordinator for 2007 and

2008, Randy Nattis, and the remedial project manager, Jordan Garrard, elected

to fill one of the lagoons with on-site slag as a way to reduce contaminated

overflow.

6

In 2006, MultiServ, a mill service company that is a division of the

Harsco Corporation (“Harsco”), contacted the EPA Remedial Project Manager,

Amy McLaughlin, regarding recovering materials from the piles on the Eastern

Excluded Property. She had reviewed GIP’s bankruptcy sale contract and

informed MultiServ: “It looks like the Gadsden Industrial Park has the mining

rights for the slag at the Gulf States Steel Property. If you are interested in

reclaiming the slag, I suggest contacting Don Casey.” Email from Amy

McLaughlin, Remedial Project Manager, EPA, to Ken Orndoff, Business

Development Manager, MultiServ (Feb. 13, 2006), Pl.’s Ex. 25. MultiServ

subsequently made a proposal to GIP to process the piles, but the two parties

did not move beyond initial discussions.

In 2007, EPA inquired into ownership of the piles and materials

stockpiled on the Eastern Excluded Property in connection with its efforts to

address environmental concerns. This began a series of communications

between EPA and GIP that fueled confusion regarding what GIP had

purchased from the bankruptcy estate. EPA sent GIP a request for information

through Mike Stevenson, counsel for EPA, under section 104 of the

Comprehensive Environmental Response, Compensation, and Liability Act2

(“CERCLA”). Pl.’s Ex. 37. The request noted that, “GIP purchased what is

now operated as the Gadsden Industrial Park as well as two large slag piles

located on the remaining Gulf States Steel property and that are adjacent to the

waste lagoons and Black Creek.” Id. at 1. EPA asked if Gadsden had

“conducted or arranged for any environmental cleanup or management of

hazardous materials” and whether GIP had taken action to stop or prevent “any

continuing releases of hazardous substances.” Id. at 6.

Thereafter, a series of emails and meetings follow, some of which we

set out herein. Initially, Mr. Casey responded by email to Mike Stephenson,

EPA counsel, on January 29, 2008, explaining, “In your cover letter it is

mentioned that GIP bought two large slag piles adjacent to the lagoon. My

understanding is Gadsden does not own the two remaining slag piles but does

have the right to mine them.” Pl.’s Ex. 39. He provided details regarding

various aspects of GIP’s operation on the site and closed by writing,

It is to GIP’s best interest that the GIP property and the

surrounding estate owned properties be remediated. GIP will

continue to remediate its property and has already volunteered

to work with the EPA to discuss ways to more efficiently clean

up the coke plant area. Outside of the coke plant area, GIP will

2

42 U.S.C. §§ 9601–9675 (2012).

7

continue to help the clean up of the estate property by

continuing to reduce the size of the two slag plies. In addition

GIP is now studying ways to reduce the very large and very ugly

Kish piles[.]

Id. at 3.

On February 4, 2008, Mr. Casey emailed Mr. Stephenson again to

discuss alleged environmental concerns on the Eastern Excluded Property. He

wrote:

The two big piles are kish or furnace dust which is ferrous oxide

and is not basic[.] Slag piles are basic with high PH[.] I am not

sure what slag piles remain or where they are located[.] We

bought the right to mine 400[,]000 cu ft which we may have

already used. We used a lot for filling the PM pits and other pits

around the park. We let the city of Gadsden take truck loads.

We sold some and gave away truck loads to churches for use on

their parking lots.

Pl.’s Ex 41.

Mr. Casey’s communications with GIP’s attorneys at this time recited

that GIP was “presently negotiating a contract for the sale of the kish which is

the name [GIP] uses for the ‘red dirt’ in the landfill and which is ferrous oxide

or rust.” Pl.’s Ex. 45. Mr. Casey noted that “the purchase agreement is clear that

GIP did not buy anything else in the landfill[,] none of the other GSS by

products.” Id.

Thereafter Mr. Stevenson requested that Mr. Casey meet with EPA to

discuss leachate that was accumulating in a collection ditch bordering the north

and south piles. During a March 4, 2008 meeting, Mr. Casey informed EPA

that GIP had purchased kish and 420,000 cubic yards of slag and had a

reasonable amount of time to remove it. GIP communicated during the

meeting that it was planning to begin recovering metal from the Eastern

Excluded Property in the near future. Mr. Nattis and Mr. Garrard understood

through this meeting that kish was ferrous oxide, which Mr. Casey referred to

as red dirt. In his contemporaneous summary of the meeting, Mr. Casey wrote

that GIP might be able to work with EPA if a reasonable amount of time is

defined as when “the EPA is ready to go to work on the piles.” Pl.’s Ex. 46.

This would give GIP time to remove some Kish and if possibly [sic] some

more slag helping to reduce the sizes of the piles, a win win for both parties[.]”

Id.

8

Mr. Casey followed up with EPA via email on March 19, 2008,

reminding EPA of GIP’s plans to start removing kish in the near future. Pl.’s

Ex. 51 at 2. In that email, he wrote, “I believe I already answered you

concerning the Kish or red dirt as we call it[.] GIP has not removed any Kish

or red dirt to date. . . . GIP plans to start removal of Kish in the very near

future.” Id. Mr. Casey then provided an explanation regarding GIP’s use of

slag by separating slag into “Arc Furnace Slag” and “Blast Furnace Slag,”

writing that the former has little market value and GIP used it to fill pits or

gave it away to the city or churches, whereas the latter has market value and

GIP had been selling it. Id. Mr. Casey explained that “no records are kept” of

how much slag was taken. Id. These communications are silent regarding

scrap.

Further dissection of the communications between GIP and EPA

concerning plaintiff’s ownership rights is unnecessary. They can be

summarized as a desultory and imprecise conversation, the substance of which

was that GIP claimed the right to extract kish and slag, and that EPA persisted

in demanding to know of plaintiff’s intentions and plans. Given Mr. Casey’s

imprecise characterizations of what GIP bought, we are not surprised that he

did not itemize scrap. The communications are best seen in the context of

EPA’s concern about environmental issues, and GIP’s lack of precision about

title matters is hardly surprising. The issue of what GIP owned is one of law,

which we explore below.

At the same time that Mr. Casey was communicating with EPA

regarding what GIP owned and GIP’s own remediation efforts, GIP was

making plans to recover materials from the Eastern Excluded Property and sell

them. GIP negotiated with Metawise Group to purchase C fines, which are

small pieces of ferrous material less than one inch in size, for $4.50 per ton

after loading costs. In 2007, GIP reached out to Watkins to discuss whether

it would be interested in recovering the materials GIP believed to be in the

piles on the Eastern Excluded Property. It proposed the same $35 per ton

agreement as GIP and Watkins had on the previous recovery project. See Pl.’s

Ex. 55. The projects that Watkins had completed on the northwest corner of

GIP’s property had been smaller in scale, but Danny Stevens, Watkins’ owner,

was familiar with the piles on the Eastern Excluded Property. He agreed with

GIP that recyclable material could be extracted.

Mr. Stevens rejected the $35 per ton proposal, however. Instead, Mr.

Stevens proposed to recover metal at Watkins’ own expense and pay GIP a

commission after the sale of recovered materials. Mr. Stevens explained that

reclaiming materials from the piles on the Eastern Excluded Property would

9

be “a lot more labor intensive and is not as easy to get the iron out as that

northwest corner was.” Tr. 373. Mr. Stevens wrote in his letter to GIP that

Watkins would list the products it hoped to recover and develop a pricing

formula to avoid confusion regarding the amount of commission for each

material. Pl.’s Ex. 55.

GIP did not accept Watkins’ proposal, so Watkins proposed an

alternative in which GIP would pay Watkins a fee per ton of recovered metal

with GIP retaining ownership of the metal along with responsibility for its sale.

This proposal was memorialized in a draft “Agreement to Process Kish.” Pl.’s

Ex. 71. The agreement recited, “This agreement details the processing of

Kish, more commonly known as Red Dirt which consists of various size

metals. The Kish is located on the landfill East of the Park on property owned

by the defunct Gulf States Steel.” Id. Watkins agreed to provide the

equipment and labor to “separate and screen the Kish in order for [GIP] to

recover and sell the metals in the Kish.” Id. The draft identified six categories

of recoverable materials: four metal sizes ranging from “less than one inch

(fines)” to metals greater than three feet along with two categories of scrap.

Id.

The proposal involved GIP paying Watkins seventy dollars per gross

ton to screen, separate, and load metals that were more than one inch in size.3

Watkins also proposed to screen, separate, move, and pile the smaller fines at

no cost to GIP. Watkins would obtain an option to purchase separated piles

of fines for ten dollars per ton. Watkins also would obtain the exclusive right

to recover materials from the piles “so long as Watkins reclaims 500 gross tons

of material each month.” Id. The proposal would permit Watkins to withdraw

after a two-week written notice if the quantity of material available for

processing did not allow for profitable operations.

Mr. Stevens anticipated being able to begin within a month after an

agreement was reached. At trial he described how Watkins would have

performed the work. The basic process for metal recovery was to excavate the

material, pull out the larger pieces of visible metal, and run the smaller

materials over a magnetized conveyor belt that would separate and screen out

3

Plaintiff’s damages expert, Mark Gleason, incorporated into his analysis an

oral revision to the agreement that Mr. Casey and Mr. Stevens communicated

to him in his preparation: GIP would not have paid Watkins for materials that

GIP ultimately sold for less than $70 per ton. This term does not appear in the

draft agreement, and it also was not referenced in Mr. Casey’s or Mr. Steven’s

testimony. We find that the oral provision was not proven.

10

the metal. The leftover nonmetallic material would be re-piled on the Eastern

Excluded Property. Watkins had bulldozers, magnetic cranes, screens,

magnetic conveyors, and trucks. It had five or six local employees. If it was

necessary to increase the rate of processing the piles, Watkins could bring in

a second set of equipment or purchase additional equipment. Mr. Stevens

expected the job to take ten years or more.

As GIP and Watkins negotiated their metal recovery agreement, EPA

had tasked an on-site contractor, CMC Inc., with addressing environmental

issues, including how to stop calcium in the slag from precipitating out as

leachate. EPA’s initial plan was to remove slag from the site. EPA also

considered other alternatives to a massive removal of slag. It considered

capping the piles as they stood and simultaneously improving the surrounding

drainage ditches. Mr. Casey testified that GIP had offered to improve these

same ditches at no cost to the government. Another alternative, and the one

EPA ultimately adopted, was to reduce the size of the piles by removing

saleable metal, and then capping what was left of the piles. In order to pursue

the latter alternative, EPA sought bids to perform an investigation into the

feasibility of recovering saleable materials from the piles to offset the cost of

CMC’s remediation work. There was no testimony that EPA employees

believed the materials GIP purchased constituted an environmental hazard. By

this time, EPA officials understood that the metal in the piles had value.

In April 2008, representatives from MultiServ toured the site.

Afterwards Mr. Nattis informed members of the EPA team via email in May

2008 that he had “a firm very interested in taking ALL the Slag / Kish from the

site for reuse, but [that] is [contingent] on taking all of it, including the before

mentioned Kish.” Pl.’s Ex. 65 at 1. Mr. Nattis noted in this email, however,

that “GIP claims they own the right to ‘some’ of the material (Kish) within the

pile.” Id.

As a result of EPA’s exploration of a metal recovery operation of its

own, Watkins ultimately declined to enter an agreement with GIP. Mr.

Stevens met with EPA’s on-site coordinator, Mr. Nattis, and through that

meeting understood that EPA was planning to recover the metals in the piles

by hiring its own recycling contractor. Mr. Stevens recalled the meeting

occurring in May or June of 2008. Mr. Nattis’ records indicate that he

interacted with Mr. Stevens on June 4, 2008. As a result of these

communications with EPA, Mr. Stevens believed that, as of June 4, GIP would

not be permitted to perform its own recovery operation. GIP and Watkins thus

did not consummate the draft agreement, and Watkins never began recovery

11

of metals from the piles. Watkins was also among the contractors who

submitted a bid to EPA to conduct EPA’s recovery operation.

By late June 2008, GIP knew from Mr. Stevens that EPA planned to

hire a recycling contractor and that Watkins did not believe GIP had the

authority to conduct its own recovery operation. Mr. Casey emailed counsel

for EPA on June 29, 2008, stating that GIP had become aware that EPA

intended to recover the metal but that GIP would be contracting with Watkins

to extract the same materials. Mr. Casey again asserted GIP’s right to kish and

requested a meeting with EPA to resolve “any differences between the EPA

and GIP concerning the Kish.” Pl.’s Ex. 82 at 5. Mr. Greg Luetscher, counsel

for EPA, responded via email on June 30, 2008, proposing a conference call

at which the parties would discuss “the nature, extent, and derivation of GIP’s

rights to the kish” and “administrative mechanisms under which persons other

than EPA might typically perform removal work at a Superfund site.” Id. at

4. After Mr. Luetscher’s email, Mr. Casey met with Mr. Nattis in October

2008, and learned from him that EPA did not want GIP to leave hazardous

materials behind after extracting valuable materials. The only hazardous

materials, of course, were associated with the same slag that EPA proposed to

leave on site.

EPA ultimately chose MultiServ to complete the project. On October

21, 2008, EPA’s contractor CMC entered a “Site Investigation Agreement”

with MultiServ, which provided for a pilot study of the Eastern Excluded

Property to determine whether a metal recovery operation was economically

feasible. The pilot study took place in 2009. During the site investigation,

EPA sent a second Request for Information to GIP in April 2009, inquiring

into what GIP’s interest was in the landfills. GIP’s response claimed that it

had rights to kish and slag, referencing the bankruptcy sale contract.

Based on its pilot recovery test, MultiServ determined that it was

economically feasible to conduct a full scale metal recovery operation. It

thereafter entered into a “Slag Processing Agreement” with CMC in October

2009, which gave MultiServ the right to mine the north and south piles to

recover metal and other valuable material. MultiServ also had the authority to

market and sell what it recovered. The remaining materials, mainly slag,

would then be capped by CMC. At the time, MultiServ issued a press release

stating that it believed a $50 million recovery was possible.

Under the agreement, MultiServ would pay CMC fifteen percent of the

gross proceeds MultiServ received from the sale of the recovered materials for

the first twelve calendar months of the agreement and twenty percent of the

gross proceeds in each calendar month thereafter. That payment was expected

12

to relieve EPA from paying for CMC’s remediation activities. CMC

determined the percentage based on the total estimated revenue from

MultiServ’s metal recovery and its estimated cost to complete the capping

process. MultiServ would retain the balance of the proceeds from the sale of

any materials.

MultiServ’s metal recovery process was basically the same as that

which Watkins anticipated using, although MultiServ apparently began with

more equipment and employees. Larger pieces of metal, such as ingots, slabs,

and I-beams were removed before the other material was processed to capture

smaller pieces of metal. MultiServ sold the ferrous materials on a freight-on-

board basis at Gadsden. To complete the project, MultiServ built a

maintenance facility and a large processing plant near the north pile.

MultiServ had approximately twenty employees working on site when

processing the north pile. When work expanded to the south pile in late 2011,

MultiServ added four hourly equipment operators. It ran two shifts, totaling

sixteen hours of production per day, five days per week. MultiServ processed

450 tons of material per hour at the north pile. Michael Brady, Harsco’s site

manager, testified that such a processing plant would cost approximately

$150,000 per month to rent. MultiServ used a second, lower capacity

processing plant at the south pile.

MultiServ had help from CMC, which extracted mixed material and

placed it in a location from which it could be loaded for processing. CMC also

moved nonmetallic materials out of the processing zone for storage on site.

Mr. Brady estimated that CMC performed approximately forty percent of the

work.

MultiServ sold recovered materials beginning in October 2009.

Throughout the course of the project, it processed and sold 245,890 tons of

material, grossing more than $13.5 million of metal-bearing materials. Out of

the $13.5 million in gross sales, MultiServ paid CMC approximately $2.4

million. According to MultiServ’s sales report, it recovered the following

categories of materials: 1” x 0” slag; 3” x 1” slag; A scrap; B scrap; three types

of C fines; C scrap; ingots; manganese scrap; miscellaneous; oversized scrap;

oversized skulls; plate; skulls; slabs; slag “overbur:” small pit scrap; small

skulls; steel fines; steel pit scrap; and wire rope.

During the course of MultiServ’s work, GIP did not attempt its own

recovery operation. Instead, GIP purchased slag from MultiServ for five to six

dollars per ton, or approximately twelve dollars per cubic yard. The total

volume of slag GIP purchased from MultiServ is not set out in the record.

13

MultiServ and CMC continued the recovery project through January

2013, when recovery from saleable materials became insufficient to fund

CMC’s remediation work. MultiServ project managers estimated that it had

processed approximately seventy percent of the north pile and twenty percent

of the south pile by the time it ceased working. Peter Mazzarella, who is the

North American sales manager for Harsco Metals & Minerals and who joined

Harsco in 2008, estimated that fifty percent of the piles remained. Neither

CMC nor any other EPA contractor ever capped the piles.

DISCUSSION

After reviewing the bankruptcy sale contract, we find that GIP

purchased kish, assorted scrap, and 420,000 cubic yards of slag at the

bankruptcy auction. GIP successfully proved that each material was present

on the Eastern Excluded Property and that it was used or sold by EPA. We

hold that EPA’s actions constituted a compensable taking under the Fifth

Amendment Takings Clause. We find, however, that plaintiff’s proof of the

compensation to which it is entitled fails regarding kish and assorted scrap.

We thus award plaintiff compensation for EPA’s taking of 92,500 cubic yards

of slag.

I. Was There A Taking?

GIP claims that the government took from it kish, 92,500 cubic yards

of slag, and assorted scrap, all of which it claims to have purchased from the

Trustee in Bankruptcy. The complaint and GIP’s pre-trial materials assert that

the only materials as to which a taking is claimed were those actually used by

EPA and sold by MultiServ. In other words, GIP is not claiming a taking of

all materials in the piles as of a particular date, only those removed by the

government.

Preliminarily, the government argues that plaintiff did not include

assorted scrap in its taking claim until the post-trial briefing stage and thus any

claim for just compensation for scrap is not properly before the court. We

disagree. GIP pled that EPA took plaintiff’s property purchased at the

bankruptcy sale, a claim which fairly encompasses kish, slag, and assorted

scrap. The original complaint alleges the government took its property on the

Eastern Excluded Property, and specifically mentions kish. Plaintiff’s

amended complaint states that it purchased “kish and other materials.” Pl.’s

Am. Compl. ¶ 12. Even if a claim for assorted scrap had not been pled

specifically before trial, the issue was tried by consent. Rule of United States

Court of Federal Claims 15(b)(2). Both parties’ witnesses testified to the

differences between kish and scrap, whether GIP owned scrap, and whether

EPA took kish, scrap, or both. See, e.g., Tr. 86–88 (C. Casey), 103 (C. Casey),

14

263–70 (D. Casey), 494–97 (Clayman), 618–20 (Garrard), 757–58 (Nattis).

The government did not object to that testimony at trial.

With respect to slag, as of trial, plaintiff only sought compensation for

92,500 cubic yards of slag that EPA used to fill the lagoon on the Eastern

Excluded Property, and the report of its compensation expert was limited in

that respect. In its post-trial brief, plaintiff adds a separate calculation for slag

it expects to require in the future (113,000 cubic yards), which counsel

estimates to be worth between $1.3 and $6.7 million. Since plaintiff’s

additional damages calculation for slag was introduced post-trial and was not

tried by consent, we decline to consider it. As we explain below, moreover,

the post-trial claim for additional slag raises a more general problem about

how GIP approached its claim.

There is no question that the materials at issue—kish, slag, and assorted

scrap—may constitute personal property for purposes of a takings claim.

Horne v. Department of Agriculture, 135 S. Ct. 2419, 2425–28 (U.S. 2015).

To decide whether the government owes GIP compensation, we must

determine whether GIP had a cognizable property interest in the materials the

government removed.

The government contends that GIP purchased a non-exclusive right for

a limited period of time to retrieve only kish, which it characterizes as a

worthless, non-ferrous material, along with 420,000 cubic yards of slag. It

asserts that the valuable ferrous materials EPA’s contractor removed do not

constitute kish, that GIP excluded scrap from the materials it purchased, and

that any right GIP had to retrieve the limited materials it did buy had expired

by the time MultiServ performed its work. Plaintiff responds that kish is a

blast furnace byproduct that does have valuable ferrous content and that it did

not exclude scrap from its purchase. Finally, it contends that its right to

retrieve the materials had not expired when MultiServ was on site. To

determine what GIP purchased, we return to the bankruptcy sale contract.

The relevant language is found in the Trustee’s Bill of Sale Exhibit A

clause “Attachment 5 – Inventory:” “By products of manufacturing including

but not limited to kish and miscellaneous other materials and assorted scrap.”

Joint Ex. 19 at 117. This provision is then modified by the Exclusion List

written by Ms. Casey:

1. With reference to the property identified in

“ATTACHMENT 5 – INVENTORY,” Purchaser excludes:

A. All miscellaneous other materials.

B. All by-products of production other than kish and 420,000

15

cubic yards of slag which are located on the Excluded Real

Property as is described on Exhibit B to the deed from Seller

to Purchaser of even date herewith, together with a reasonable

period of time to remove such items.

Id. at 120.

The asset purchase agreement attached to the Trustee’s Bill of Sale

states that it “shall be governed by and construed in accordance with the laws

of the State of Alabama[.]” Id. at 75. Alabama applies the general rule of

contract construction that “the intention of the parties controls in construing

a written contract, and the intention of the parties is to be derived from the

contract itself, where the language is plain and unambiguous.” Loerch v. Nat’l

Bank of Commerce of Birmingham, 624 So. 2d 552, 553 (Ala. 1993); see also

Homes of Legend, Inc. v. McCollough, 776 So. 2d 741, 746 (Ala. 2000)

(“[T]he intent of the contracting parties is discerned from the whole of the

contract.”). Moreover, “if there exists inconsistency between two clauses of

a contract which cannot be reconciled, the inconsistency must be resolved in

favor of the prior clause, unless an intention to thereafter qualify is plainly

expressed.” City of Fairhope v. Town of Daphne, 208 So. 2d 917, 924 (Ala.

1968).

The government reads Attachment 5 to include a single category of

property: byproducts of manufacturing, which include but are not limited to

kish, miscellaneous other materials, and assorted scrap. This interpretation

reads all the words following “including but not limited to” as types of

byproducts. Because GIP excluded “all by-products” except for kish and a

portion of slag, defendant concludes that GIP excluded assorted scrap.

GIP reads Attachment 5 to include three categories of property:

byproducts of manufacturing, miscellaneous other materials, and assorted

scrap. GIP argues that the Exclusion List excluded miscellaneous other

materials and narrowed byproducts of manufacturing to only kish and 420,000

cubic yards of slag, but did not affect GIP’s purchase of assorted scrap.

The parties agree that the language of Attachment 5 and the Exclusion

List unambiguously provides that GIP excluded from its purchase any

“miscellaneous other materials.” The instruments also provide that GIP

purchased only two byproducts of manufacturing: “kish” and “420,000 cubic

yards of slag.” The remaining term in Attachment 5 is “assorted scrap.” The

Exclusion List is silent regarding assorted scrap. Given that “assorted scrap”

was first listed in Attachment 5 as purchased property, and GIP did not qualify

its purchase by placing assorted scrap on the Exclusion List, it follows that

GIP purchased “assorted scrap” at the bankruptcy sale. We note as well that

16

the testimony at trial was that scrap is typically a finished product, something

like an I-beam, for example, and not a byproduct intended for discard.

The structure of GIP’s Exclusion List also contradicts the government’s

construction that kish, miscellaneous materials, and assorted scrap are all

byproducts of manufacturing. Although miscellaneous other materials is listed

after “including but not limited to” in Attachment 5, along with kish and

assorted scrap, the Exclusion List does not treat miscellaneous other materials

as a byproduct. Instead, miscellaneous other materials is a category called out

in its own provision. If all terms following “including but not limited to” were

byproducts, then miscellaneous other materials would have been excluded by

the second sentence of the Exclusion List. Because miscellaneous other

materials was not treated as a byproduct on the Exclusion List, it is not

reasonable to lump the term “assorted scrap” from Attachment 5 into

byproducts. Thus, at the bankruptcy sale, GIP purchased kish, 420,000 cubic

yards of slag, and assorted scrap.

Even though we find that GIP purchased kish, scrap, and slag,

important questions remain: what are these materials, do they have any value,

and did the government take them from plaintiff?

The bankruptcy sale contract did not define these terms. Moreover, the

bankruptcy trustee did not communicate with GIP before, during, or after

executing the sale instruments regarding the definition of kish, or the other

materials GIP purchased, slag and assorted scrap. Where the meaning of an

undefined word or phrase must be ascertained, “the court should simply give

the undefined word or phrase the same meaning that a person of ordinary

intelligence would give it.” Twin City Fire Ins. Co. v. Alfa Mut. Ins. Co., 817

So. 2d 687, 692 (Ala. 2001). Additionally, “[p]arties to a contract will not be

imputed with using language that is meaningless or without effect.” Black

Diamond Dev., Inc. v. Thompson, 979 So. 2d 47, 51 (Ala. 2007). Each

material can be defined by drawing on the language of the agreement,

communications between EPA and GIP after the bankruptcy sale, and

testimony from those involved with recovery projects on the Eastern Excluded

Property.

The most straightforward term to define is “slag.” The language of the

bankruptcy sale contract lists slag as a byproduct of manufacturing. Trial

testimony from those familiar with steel production defined slag as a non-

ferrous material that separates during smelting. E.g., 89–90 (C. Casey),

176–80 (D. Casey), 479–95 (Clayman), 875–76 (Kingham). After being

siphoned away, the slag hardens. It consists primarily of calcium oxide and

17

silicon dioxide, the material that EPA associated with pollution problems on

site.

According to the Caseys, assorted scrap is metal of various sizes that

may or may not be ferrous, but that can be either recycled into steel

manufacturing or sold for other purposes. It is typically finished steel product,

like an I-beam, a railroad car, or wire, which has been discarded in a finished

form and is thus not a byproduct.

The parties hotly contest the meaning of “kish.” The bankruptcy

contract describes kish as a byproduct of manufacturing. After GIP’s

purchase, Mr. Casey characterized kish to EPA representatives as red dirt with

fifty percent or more iron content. Similarly, EPA’s on-scene coordinator Mr.

Nattis testified that through meetings with Mr. Casey he understood kish to be

ferrous material with resale value. Mr. Nattis testified that the piles held both

what he perceived as kish and scrap metal.

Both Ms. Casey and her father testified to their understanding of kish.

Ms. Casey explained that kish is metal siphoned off with slag during steel

manufacturing. Mr. Casey differentiated between ESP kish, which is a fine

metallic that resembles rust or red dirt, and larger chunks of ferrous material

that accumulates in the smelting process and is siphoned off with the slag. He

stated that it was his intent at the time of the purchase to purchase all the

recyclable metals left in the north and south piles, whether they were what he

termed kish or scrap metal.

The Casey’s use of the term kish is consistent with both the draft

Watkins agreement and the Ableco recovery contract. Prior to the GIP

purchase, the Ableco recovery contract with Regional Recycling, denominated

a “Kish Iron Contract,” provided that Regional Recycling would “recover and

remove kish iron and other ferrous materials from the slag heaps.” Pl.’s Ex.

15 at 3. The draft “Agreement to Process Kish” between GIP and Watkins

defined kish as “more commonly known as Red Dirt which consists of various

size metals.” Pl.’s Ex. 71. Both of these agreements reflect the understanding

that kish is or contains recoverable metal of various sizes.

Mr. Stevens of Watkins testified as someone familiar with the recovery

process. He viewed kish as a metal that could be recovered from the slag piles

and recycled. He explained that he had heard the term “kish iron” used by Mr.

Casey and others in the metal recovery industry and that he took it to be “steel

and iron” that could be recovered, regardless of its size. Tr. 377. Mr. Stevens

testified that he did not personally use the term “kish,” but that his goal was to

extract and process metals from the pile, whatever the metal was called.

18

Similarly, Harsco’s sales manager Mr. Mazzarella testified that he

understood kish to be the same thing as kish iron, a byproduct of the blast

furnace process. Kish, he testified, is a grade of iron, but he had never sold it

and did not know if it was in the piles. He explained that MultiServ made no

distinction between kish and other recoverable materials. Instead, MultiServ’s

goal was to extract all metals within the piles. Stevens and Mazzarella thus

indicated that, from the perspective of recycling contractors, “kish” referred

to a metal byproduct of manufacturing; it was just another metal to be

recovered. We note that, consistent with testimony from those familiar with

the metal recycling industry, MultiServ referred to iron byproduct on its sales

report not as kish but as A scrap, B scrap, C scrap, and fines, depending on the

size of the metal recovered.

Both parties also offered expert testimony on the definition of kish.

Plaintiff’s expert on the meaning of kish within the metal recycling industry

was Charles Brown, who had experience in metal recovery and had worked

with both Gulf States Steel and Regional Recycling. He testified that kish was

a term used in the metal recycling industry. He testified that kish is “iron

containing slag.” Tr. 1195. He explained that the terms kish, kish iron, and

foundry kish were interchangeable as long as the recovered material contained

a minimum percentage of iron. Mr. Brown testified that when recovering kish,

the recovery might include material that was almost 100% iron, which would

be classified as A, B, or C scrap according to its size and iron content (A scrap

being the largest and highest in iron content). He explained that the recycling

would remove ferrous materials of all sizes, but that kish was essentially a

catch-all term for iron mixed with slag.

Moreover, plaintiff’s expert on the metal recycling market, Gary

Clayman, who is employed by a scrap metal processing company, testified that

kish is a metallic byproduct of the blast furnace operation that is generated

when skimming byproducts out of the iron ore. He defined it as “iron off of

the blast furnace. It comes from an integrated mill that has a blast furnace.

There is no other word for this but kish. US Steel calls it kish.” Tr. 474. He

explained that kish is a chunky material that may be recovered in different

sizes and may be sold under names such as A scrap, 3-foot iron, or blast

furnace iron.

The only witness on the meaning of kish who testified that it was not

a ferrous byproduct of a blast furnace operation was the government’s expert,

Dr. R. Fruehan. Dr. Fruehan holds a Ph.D. in metallurgical engineering. He

served as a scientist for US Steel and has been a professor at Carnegie Mellon

19

and director of its Center for Iron and Steelmaking Research. Dr. Fruehan

defined kish as graphite flakes without iron content or resale value.

We do not doubt Dr. Fruehan’s expertise in the craft of steel

manufacturing, but his understanding of the meaning of kish was plainly not

how the Caseys, persons associated with the bankruptcy, other steel companies

or metal recovery companies, and EPA employees used the term. Contracting

parties are entitled to reach their own understanding of the meaning of

technical terms in an industry. That is plainly what happened here. Although

the trustee did not testify as to his understanding of kish, he and those assisting

him in obtaining value from the bankrupt estate clearly were offering for sale

materials that they understood bidders such as GIP were interested in

recycling. There is certainly no evidence offered by the government, which

appears as a third party to the agreement, that there was no meeting of the

minds. In buying kish from the trustee, GIP purchased material that both

parties understood to be a ferrous byproduct of a blast furnace operation in

various sizes that has economic value.

The government’s final argument regarding GIP’s property interest is

that, according to the reasonable period of time language in the Exclusion List,

GIP only purchased a license to explore the Eastern Excluded Property, which

was too indefinite to enforce or had expired by the time EPA used or sold

materials on the site. We disagree. The Trustee’s Bill of Sale states,

[The] Trustee does hereby grant, bargain, sell and convey, as is,

unto Gadsden Industrial Park, LLC, all right, title and interest

which the bankrupt Debtor had on the date of the

commencement of the proceedings in bankruptcy on the

following property referenced in [the Bidding Motion] and more

particularly described [in the asset purchase agreement] less and

except those items set forth on an exclusion list, prepared by the

purchaser . . . to have and to hold all the right, title and interest

in and to said property unto the said Gadsden Industrial Park,

LLC, and to its assigns forever.

Joint Ex. 19 at 59 (emphasis omitted). This is not a license. It is an outright

sale of personalty, and it is not shared with anyone else.

Admittedly, GIP introduced confusion in the contract when it wrote a

provision in the Exclusion List that states,

All by-products of production other than kish and 420,000 cubic

yards of slag which are located on the Excluded Real Property

as is described on Exhibit B to the deed from Seller to Purchaser

20

of even date herewith, together with a reasonable period of time

to remove such items.

Joint Ex. 19 at 120 (emphasis added). This is clearly a limitation on what was

not excluded. As a limitation on the excluded materials it would be useless

language. So we can safely presume it is a limitation on plaintiff’s right to

take possession of what it purchased, which is understandable, as the

personalty was located on land GIP did not own. Although the provision is a

limitation on GIP’s time to remove the materials, we find that GIP’s time to

remove its materials had not expired by the time EPA used or sold those

materials and that the government is not the proper party to determine when

GIP’s access to the Eastern Excluded Property ended.

First, the government contends that the reasonable period of time

language is too indefinite to be enforceable. Defendant cites to cases in which

the Supreme Court of Alabama struck down lease extension provisions in coal-

mining leases that it determined were too indefinite to be enforceable.

Drummond Co., Inc. v. Walter Industries, Inc., 962 So. 2d 753, 758 (Ala.

2006) (lessee under four coal-mining leases brought claims against lessor

based on a will-extend clause that the court found too indefinite to enforce);

Linton Coal Co. v. South Central Resources, Inc., 590 So. 2d 911, 912 (Ala.

1991) (coal-mining lessee’s assignees brought action for specific performance

of a lease after royalty arrearage was paid and the court held that the lease term

was too indefinite to be ascertained). In those cases both parties to the lease

were the parties before the court, disputing the term of the lease. Here, the

owner of the underlying real property is not a party and there is no evidence

that it has challenged GIP’s access to the Eastern Excluded Property. It is

therefore unnecessary for this court to inquire into definiteness of the

reasonable period of time provision’s end date.

Alternatively, the government maintains that GIP’s time to enter the

Eastern Excluded Property expired either when the bankruptcy estate closed

or within six years of GIP’s purchase. It argues that, because the agreement

that GIP could enter the Eastern Excluded Property to remove its materials was

made between the bankruptcy trustee and GIP, when the bankruptcy estate

closed, GIP’s reasonable period of time ended as well. This is incorrect. The

bankruptcy trustee acts as the representative of the estate in the bankruptcy

process, which includes sales of property to reduce the estate to money. 11

U.S.C. §§ 541(a), 701-704 (2012). When the bankruptcy estate is closed, any

property scheduled but not administered is abandoned to the debtor. Id. §§

554(c), 726(a)(6). Thus, GIP continued to own the materials it had purchased

after the close of the bankruptcy proceeding. The proper party to dispute when

21

GIP’s reasonable time ends is the underlying real property owner, who, as

noted above, did not limit GIP’s access prior to the EPA using or selling

materials from the Eastern Excluded Property. Relatedly, the government

argues that the six years that GIP owned the materials prior to MultiServ’s

recovery operation was a reasonable time to remove the materials. This

expiration argument is an additional red herring: GIP’s reasonable period of

time was not constrained by the government’s perception, as a stranger to the

contract, of when that period ended.

Finally the government suggests that Mr. Casey’s confused

communications with EPA amounted to abandonment of its property interest.

Under Alabama law, “[a] determination whether certain personalty is

abandoned stems from a consideration of the nature of the particular property,

the intent to abandon, and some external act evidencing this intent.” Milford

v. Tennessee River Pulp & Paper Co., 355 So. 2d 687, 698-90 (Ala. 1978).

Moreover, “ordinarily there exists a presumption that one does not intend to

abandon his property,” but this presumption does not exist “where the article

claimed to have been abandoned is generally considered valueless.” Id. The

government relies on Milford as an example of abandonment, but in that case

“Milford admit[ted] he considered the coal valueless and that all purchasers

had refused future shipments of it.” Id. GIP, on the other hand, assigned value

to the materials at the time of the bankruptcy auction, maintained a right to the

materials as evidenced by its correspondence with Ableco, EPA, and Watkins,

and attempted to recover those materials.

In sum, we are satisfied that GIP purchased the materials outright and

that GIP was within its reasonable period of time to remove its materials when

EPA used and sold materials from the Eastern Excluded Property.

Having found that GIP bought kish, 420,000 cubic yards of slag, and

assorted scrap, and was within its reasonable period of time to remove those

materials at the time of MultiServ’s recovery operation, we now turn to

“whether the government action at issue amounted to a compensable taking of

that property interest.” American Pelagic Fishing Co., L.P. v. United States,

379 F.3d 1363, 1372 (Fed. Cir. 2004). A compensable taking may occur when

the government invades or physically appropriates a claimant’s property.

Lucas v. S.C. Coastal Council, 505 U.S. 1003, 1014–15 (1992). EPA does not

dispute that it did not purchase any of the property at issue but nevertheless

used and sold materials from the Eastern Excluded Property.

As for scrap, MultiServ’s sales report indicates it sold materials

expressly classified as scrap as well as assorted other metals such as plate,

skulls, slabs, or ingots that were not byproducts of steel manufacturing but

22

were metals Gulf States Steel had discarded in the piles. MultiServ’s sales

report does not list materials sold as “kish,” but it does list several materials

such as A scrap, B scrap, C scrap, and fines that overlap with the sizes and

terms used for kish in trial testimony. Plainly EPA took GIP’s scrap and kish.

Regarding slag, GIP purchased 420,000 cubic yards. EPA contractors

used 92,500 cubic yards during the clean-up of at least one lagoon.

MultiServ’s sales records also reflect that it sold 9392 tons of slag; presumably

some or all of this was purchased by plaintiff, although we do not know the

amount. Although the government hints that, slag being fungible, we cannot

be certain that GIP’s slag was used, we reject that defense. Although Ms.

Casey testified that 420,000 cubic yards was not all the slag on site, the

government offers no evidence as to who owns any slag beyond the 420,000

cubic yards plaintiff purchased, nor of any permission EPA or any other party

obtained to remove slag. We note as well that EPA sculpted the remaining

piles to minimize pollutant runoff in such a way as, for all practical purposes,

to embalm permanently all remaining materials, including slag.

Thus, GIP demonstrated that EPA used and sold slag, kish, and scrap.

Plainly, by the time MultiServ had concluded its operation, EPA had taken

those quantities of slag and metal that Mr. Gleason attempted to value. That

does not answer the question of when the taking or takings occurred, however.

The date of asserted taking for kish, scrap, and slag is June 4, 2008. This

is the date on which plaintiff asserts EPA precluded it from beginning its own

recovery operation. We agree that June 4, 2008, can be used as the date of

taking for scrap and kish, because Mr. Casey legitimately concluded at that

time that GIP would be barred from beginning its own recycling operation.

We note, however, that by June 4, 2008, the slag for which plaintiff seeks

compensation had already been taken by EPA. Although plaintiff may have

chosen to propose an earlier date, it is therefore also correct to say that the

taking occurred no later than June 4, 2008. The government does not present

a competing date of taking.

As discussed earlier, plaintiff’s taking claim is limited to the value of

the material the government took from the Eastern Excluded Property. If

plaintiff had sought compensation for the value of materials in place, it would

have had to present evidence of what a willing buyer would have paid for

those materials immediately before access ended, even though the precise

quantity was unknowable. It chose instead to quantify the volume taken by

limiting its claim to materials actually removed, but then valued those

materials as of June 4, 2008. This is a problem. The price of recycled material

in June 2008 happens to coincide with a relatively brief but significant spike

23

in the price of recycled steel. Even though GIP has limited the quantity taken

by valuing only what MultiServ sold, the abnormal prices in June 2008 make

that date an unfair one for valuation purposes. It would only be a fair date if

plaintiff also had undertaken to prove what a willing buyer would have paid

for the opportunity to recover all the kish and scrap, and 420,000 cubic yards

of slag. But GIP did not undertake that exercise. Although June 2008 is a

legitimate date for asserting that EPA took all of plaintiff’s rights to what it

had purchased, GIP also did not then follow that line of proof by showing what

a willing buyer would have paid as of June 2008, a date for which the evidence

of quantity would be problematic.4 Alternatively, GIP could have claimed a

series of rolling dates of taking for specific quantities, beginning with EPA’s

use of slag before 2008, but then plaintiff would have had to value the taking

on those dates. Once again, something it did not do.

II. Just Compensation

When the United States takes private property for public use, it must

pay just compensation, which requires the government to pay the “equivalent

in money of the property taken,” to place the owner in the same pecuniary

position as if the property had not been taken. United States v. Miller, 317

U.S. 369, 370–71 (1943); see also United States v. Reynolds, 397 U.S. 14, 16

(1970). The Supreme Court has emphasized that just compensation cannot be

reduced to a specific formula and that compensation must be based on all

relevant facts. See United States v. Cors, 337 U.S. 325, 332 (1949); see also

Jack Daniel Distillery v. United States, 379 F.2d 569, 574 (Ct. Cl. 1967).

When the government physically appropriates plaintiff’s property, however,

the general rule in measuring compensation is the fair market value of the

property on the date it is appropriated. Kirby Forest Indus., Inc. v. United

States, 467 U.S. 1, 9–10 (1984) (citing United States v. 564.54 Acres of Land,

441 U.S. 506, 511–513 (1979)). “Under this standard, the owner is entitled to

receive ‘what a willing buyer would pay in cash to a willing seller’ at the time

of the taking.” Id. at 511 (quoting United States v. Miller, 317 U.S. 369, 374

(1943)).

Plaintiff offered two measures of just compensation: lost profits and fair

market value. Because lost profits is not the appropriate measure of just

compensation, United States v. General Motors Corp., 323 U.S. 373, 379

(1945), we set that theory aside and turn to plaintiff’s fair market value

4

But not impossible, as MultiServ’s site investigation would be available as

some contemporaneous proof of quantity.

24

calculation.5 As mentioned above, Mr. Gleason, determined the fair market

value of the materials as of June 4, 2008.

Mr. Gleason’s damage claim is calculated based only on materials

recovered and sold by MultiServ, along with 92,500 cubic yards of slag which

EPA used in the lagoons.6 He explained that he was unaware of any reliable

estimate on the volumes of recoverable materials as of the date of taking.

“[Y]ou couldn’t reasonably estimate what’s in these piles or what’s the yield

or recovery in these piles.” Tr. 1265 (Gleason). He therefore did not attempt

to reconstruct what a willing buyer would have paid for materials in the piles

using what was known or knowable at the time. Instead, he attempted to

calculate the fair market value of the materials taken based on a projection

using the earnings or income approach, which projects future earnings from

the property and then discounts those future earnings to a specific point in

time. Once again, however, he did not have actual figures to work with as of

June 2008, other than the general projections by MultiServ. Instead, he used

the actual figure for the volume of materials recovered between 2008 and

2013: 245,890 tons. As to price, he attempted to recreate what those materials

would have been worth in June 2008. Against this calculation, he then applied

his own calculation of avoided costs and discounted the results back to June

2008.

Because MultiServ’s characterization of the various materials sold did

not line up with the types of items that could be priced from publicly available

records, Mr. Gleason calculated an assumed 2008 price by picking a

comparison metal to the metal that MultiServ sold. To calculate a selling price

for kish and scrap, he drew from a publication of the American Metal Market,

which collects and publishes price lists for various types of metal on a monthly

basis. The comparison metal he chose was “No. 1 heavy metal” or “heavy

melt,” which Mr. Gleason explained was a close equivalent to the “scrap” that

MultiServ sold. He then projected selling prices for A scrap, B scrap,

miscellaneous scrap, small pit scrap, skulls, plate scrap, oversized scrap,

ingots, and manganese.

5

We note, however, that Mr. Gleason’s lost profit calculation suffers from

many of the same defects discussed below due to the unreliable calculation of

avoided costs.

6

There was testimony that plaintiff had to buy other slag from MultiServ for

its own use. Unless the purchased amount is included in the 92,500 cubic

yards, the specific quantity of purchased slag does not appear to surface in Mr.

Gleason’s calculations.

25

The projected selling price was the result of multiplying the average

relationship of MultiServ’s price to the quote price for heavy melt in

Birmingham by the average quoted price for heavy melt in Cleveland in April,

May, and June 2008. Mr. Gleason found that MultiServ sold A scrap at an

average discount of approximately sixty-eight percent of the Birmingham

quoted market price for June 2008 and then multiplied that by the average

Cleveland heavy melt price from April to June 2008 to reach $486.67 per ton.

Mr. Gleason conceded that $486 per ton was historically a high value

per ton and that the 2008 price spike was relatively short-lived. If the taking

date were set twelve months later, in 2009 when the metal recovery operation

began, for instance, the market price would have fallen much lower. Or if the

taking had been, for example, in the 2000 to 2002 period, the price per ton

would have been approximately $100.

That calculus accounts for the vast majority of materials. For the C

fines, Mr. Gleason input GIP’s agreement with Metawise Group to purchase

C fines for $4.50 per ton after loading costs. For other materials, he estimated

selling price as of June 2008 to be the actual average selling price reported by

MultiServ. Mr. Gleason concluded that the projected revenue stream as of

June 2008 would have been $19,873,418. We note, by way of comparison,

that MultiServ actually only recovered $13.5 million during the nearly five

years of its recovery efforts.

For the avoided costs, Mr. Gleason assumed that GIP and Watkins

would have executed their Agreement to Process Kish. He thus applied the

cost structure in that draft agreement: GIP would pay Watkins $70 per ton for

materials recovered in excess of one inch in size (e.g., A scrap). GIP would

not pay Watkins anything for materials less than one inch in size. He also

assumed, based on Mr. Casey’s explanation to him, that he and Mr. Stevens

modified the draft agreement orally so that GIP would not pay Watkins for

recovered materials one inch or larger that sold for less than $70 per ton. In

other words, if material sold for $69 per ton, GIP owed Watkins nothing. He

assumed that materials were loaded as they were processed. Furthermore, the

assumption was made that GIP had no other additional cost than freight

because GIP would use its existing infrastructure. Using those terms, he

determined that the avoided cost based on payments to Watkins was $4.5

million. Mr. Gleason also included a freight adjustment to account for GIP’s

cost to ship the material. He calculated the price to ship to Birmingham or to

Cleveland, since Cleveland was approximately $20 more per ton. Total

avoided costs for payments to Watkins and freight were $4,928,603.

26

Using these inputs, Mr. Gleason concluded that the projected revenue

for GIP was $19,873,418, avoided costs were $4,928,603, and the total net

$14,944,815 recovered over an approximately 5-year period, from June 2008

to February 2013. To establish the present value of that revenue as of June 4,

2008, Mr. Gleason applied a discounted cash flow analysis. He used a

weighted average cost of capital approach with a twenty-one percent discount

rate. Ultimately, Mr. Gleason found that the fair market value of the metal

taken as of the date of taking, and net of all costs, was either $9,780,560, using

a Birmingham freight adjustment, or $10,446,005, using a Cleveland freight

adjustment.

Mr. Gleason separately valued the slag used by EPA. Mr. Gleason’s

understanding was that EPA had taken 92,500 cubic yards of slag as part of its

environmental remediation efforts. He applied a conversion from cubic yards

to tons, totaling 137,363 tons. He then applied an estimated price term

between five and six dollars per ton, using the sales price applied when

MultiServ sold slag to GIP, to determine that EPA had taken $755,494 of slag.

The government challenges several aspects of plaintiff’s fair market

value calculation. The government contends that the relevant question is

“what a would-be miner would have paid Gadsden for the purported right to

dig in the waste piles.” Def.’s Post-Trial Br. at 64, ECF No. 193 (Jan. 5,

2018). In other words, the government argues that plaintiff would only be

owed the equivalent of what a buyer would have paid GIP to explore the piles

for retrievable materials in 2008.

On Mr. Gleason’s calculations, defendant argues that his analysis is not

based on information known at the time of the taking because it relies on

quantity figures drawn from what MultiServ’s eventually recovered.

Regarding the price term, the government argues that a buyer of the right to

process the piles would not have assumed that the spike in prices

contemporaneous with the time of taking would continue indefinitely. Mr.

Gleason and Mr. Clayman readily acknowledged that scrap iron prices were

high in mid-2008 and that they could have been expected to, and in fact did,

fall throughout the course of MultiServ’s recovery project.

The government also challenges GIP’s reliance on the unexecuted

Watkins agreement as a basis on which to calculate avoided costs. It was a

draft rather than a contract, and Watkins had not completed recovery work on

these piles in the past. The draft cost structure only guaranteed payment per

ton for material sold in excess of one inch in size and, if the purported oral

modification were taken into account, sold for at least $70 per ton. The

government notes that plaintiff lumped B scrap in with small, less than $70 per

27

ton materials, altering the amount GIP hypothetically would have paid Watkins

by up to $3 million. Even assuming that Watkins would be able to sustain a

recovery project under such terms, the agreement, if it had ever been executed,

also contained a walk-away provision that would allow Watkins to terminate

the contract in its discretion, which presumably it would do if it became

unprofitable.

We sympathize with Mr. Gleason in putting together a damage

calculation. It would have been difficult to measure with any precision what

was actually recoverable in the piles as of June 2008, either at that time or

subsequently. What is not disputable, however, is that every single witness

involved in processing the piles before, during, and after the bankruptcy sale

agreed that the piles concealed recoverable materials, including EPA, which

was able to persuade MultiServ to undertake an exploratory operation, which

produced favorable enough results for the agency to enter into a sales contract.

At the time, the parties to that arrangement touted the possibility of $50 million

in recoverable metals. We are thus persuaded that a buyer would have paid

something for the opportunity to retrieve the materials from the piles.

Determining what that value would have been, however, is not an exercise Mr.

Gleason undertook.

We agree with the government that there are a number of problems with

Mr. Gleason’s approach. The government, we believe, is correct that

Gleason’s figures are seriously distorted in at least two ways. First, his

construction of an artificial sales price as of June 2008 for materials sold later

was inappropriate. Although these figures may accurately reflect values as of

the date sold, they do not reflect the reality that a buyer would know that it

would not recover that value instantly; in fact, the recovery operation itself did

not result in sales until 2009. And a buyer also would be presumed to know

that the price in June 2008 was abnormally high. The evidence from Mr.

Clayman and Mr. Gleason was that it was known in the industry that prices

would not remain inflated in the long term, or at least not for a years-long

recovery operation. A purchaser could not rely on receiving those high prices

over the years required to go through the piles. A buyer would discount value

to account for the virtual certainty that prices would decline.

The second defect in Mr. Gleason’s calculation concerns how he

calculated the costs to retrieve the materials. He based his cost figures on the

assumption that the agreement between plaintiff and Watkins would have been

performed, i.e., that plaintiff would only have to pay $70 per ton for qualifying

materials and that qualifying materials did not include materials sold for less

than $70 per ton. All of the risk in this hypothetical arrangement would have

28

been borne by Watkins, which, in actuality, maintained the right to walk away

from the recovery operation by the terms of the draft agreement. Nevertheless,

building size and price limitations into GIP’s payment obligation results in GIP

paying Watkins, at most, for 64,285 tons of processed material, whereas

MultiServ processed 245,890 tons. Mr. Gleason, in effect, is assuming that

GIP is getting a substantial amount of Watkin’s labor at no cost. Without

crediting the oral addendum, GIP would have paid Watkins an additional $2

to $3 million. Applying the $70 per ton cost to both A scrap and B scrap

uniformly results in $5.6 million avoided costs for those two materials alone.

When the $70 per ton cost is applied to all materials other than C scrap or

fines, the avoided costs before considering freight are at least $7 million.

We also find that it is not likely that the balance of the draft agreement

would have been performed as written. The draft agreement required Watkins

to process 500 tons per month to maintain exclusivity. MultiServ was able to

process nearly that amount per hour. Thus Mr. Gleason’s reliance on

assumptions drawn from MultiServ’s records are highly questionable. Even

if we assumed Watkins could maintain such an operation, the government

correctly points out that GIP would have experienced other costs. GIP retained

the ownership of the saleable materials, meaning it would have had to market

and sell those materials in addition to the possibility of paying for loading the

materials as well as supervising the Watkins operation. GIP may have worked

within its existing infrastructure to sell the materials, but like any other

business, there would be some costs associated with marketing and delivering

the materials.

The government’s expert on damages, Steven Dowd, did not place an

estimate on those costs, but he aptly observed that “to assume that there’s no

cost to that of any type, zero, I think is unreasonable.” Tr. 1677. EPA had two

contractors handling the materials pre- and post-processing that, at its height,

involved two processing plants and nearly two dozen employees just to assist

in MultiServ’s processing. This is not including what the remediation

contractor, CMC, was doing to facilitate the MultiServ recovery operation.

Despite CMC’s help, MultiServ terminated the recovery operation because it

was no longer profitable. See Pl.’s Ex. 195.

Ultimately, plaintiff asks the court to accept that a hypothetical buyer

would have projected that the piles held at least 245,890 tons of material and

that the buyer would incur substantially less costs than that actually incurred

by MultiServ and CMC. We find these assumptions unsupportable. Although

a trial judge “may award damages, even if he does not fully credit that party’s

methodology,” Precision Pine & Timber, Inc. v. United States, 596 F.3d 817,

29

833 (Fed. Cir. 2010), we are not given sufficient reliable proof of what a

willing buyer would have paid for the scrap and kish.

We have a different view of the slag EPA actually used. GIP purchased

420,000 cubic yards of slag. Mr. Casey estimated at trial that GIP had used

15,000 cubic yards, prior to EPA’s use of slag for environmental clean-up.7

Thus, GIP had not used all the slag it had purchased before EPA took 92,500

cubic yards, or 137,363 tons, for environmental clean-up. Mr. Gleason valued

the 92,500 cubic yards of slag at $755,494, using the five to six dollars per ton

rate at which MultiServ actually sold slag to GIP. In the case of the slag, we

know both what GIP owned and what EPA took, and plaintiff presented a

credible valuation of the taking. Thus, we award plaintiff $755,494 for the

taking of its slag.

III. Prejudgment Interest

In addition to the value of the property taken, just compensation

includes interest from the date of the taking to the date of payment in order to

place plaintiff in “as good a position pecuniarily as he would have occupied

if the payment had coincided with the appropriation.” Kirby Forest Indus.,

Inc., 467 U.S. at 10–11. GIP did not present a calculation of interest at trial,

and the government did not argue for a particular rate of interest. This court,

however, consistently has employed the rate set forth in the Declaration of

Takings Act (“DTA”), 40 U.S.C. § 3116 (2012), as the proper interest rate in

a takings claim. See, e.g., Waverley View Investors, LLC v. United States, No.

15-371L, 2018 WL 1193439, *3–*4 (Mar. 8, 2018); Textainer Equip. Mgmt.

Ltd. v. United States, 99 Fed. Cl. 211, 223 (2011); Vaizburd v. United States,

67 Fed. Cl. 499, 504 (2005). Thus, we find that plaintiff is entitled to interest

at the DTA rate from the date of the taking, June 4, 2008, to the date of

payment.

CONCLUSION

In sum, we hold that EPA’s actions constituted a taking compensable

under the Fifth Amendment Takings Clause and hold that GIP is entitled to

just compensation in the amount of $755,494, together with interest calculated

7

We recognize that this is inconsistent with some of his email correspondence

with EPA in 2008, in which he speculates that GIP may have used up all its

allotment. We find Mr. Casey to be a credible witness, however, and rely on

his trial testimony. GIP did not do any recovery operations on the Eastern

Excluded Property and, in any event, kept no records to support the email

estimate.

30

from June 4, 2008, to the date of payment in accordance with 40 U.S.C. §

3116. The Clerk is directed to enter judgment for plaintiff.

s/Eric G. Bruggink

Eric G. Bruggink

Senior Judge

31

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.