Opinion

In Re Addicks and Barker (Texas) Flood-Control Reservoirs v. United States

Court
United States Court of Federal Claims
Filed
Dec 8, 2017
Status
Published
On the bench
Susan G. Braden
Cited by
0 cases
Authority
More cited than 4.1%

relevant to a physical takings inquiry are: “the character of the land at issue and the owner's reasonable investment- backed expectations regarding the land's use”

How later courts described this case

  • relevant to a physical takings inquiry are: “the character of the land at issue and the owner's reasonable investment- backed expectations regarding the land's use”

Written by the judges who cited it.

The opinion

In the United States Court of Federal Claims

Filed: December 8, 2017

IN RE ADDICKS AND BARKER

(TEXAS) FLOOD-CONTROL

RESERVOIRS Master Docket No. 17-3000L

THIS DOCUMENT APPLIES TO:

ALL CASES

MEMORANDUM OPINION AND ORDER DENYING THE GOVERNMENT’S

MOTION TO VACATE THE COURT’S NOVEMBER 20, 2017 ORDERS

On December 1, 2017, the Government filed a Motion To Vacate four Orders issued on

November 20, 2017,1 that the court addresses herein.

1

On November 13, 2017, the court issued an Order, directing the parties to identify whether

their respective cases concern upstream or downstream claims. ECF No. 10. The November 13,

2017 Order also stated that “[o]nce each case has been identified . . . the Clerk of Court will divide

In re Addicks And Barker (Texas) Flood-Control Reservoirs, Master Docket No. 17-3000L, into

two Sub-Master Dockets,” one for upstream cases and the other for downstream cases. ECF No.

10.

On November 20, 2017, the court issued the following Orders:

a. Order Regarding Judicial Assignment, Appointment Of Plaintiffs’ Counsel For The

Purpose Of Pre-Trial Jurisdictional Discovery, The Government’s Motion To Dismiss

Pursuant To Rule Of The United States Court Of Federal Claims 12(b)(1)–(7), And

Scheduling (Downstream Claims). ECF No. 67.

b. Order Regarding Judicial Assignment, Appointment Of Plaintiffs’ Counsel For The

Purpose Of Pre-Trial Jurisdictional Discovery, The Government’s Motion To Dismiss

Pursuant To Rule Of The United States Court Of Federal Claims 12(b)(1)–(7), And

Scheduling (Upstream Claims). ECF No. 68.

c. Order Regarding Judicial Assignment, Appointment Of Plaintiffs’ Counsel For The

Purpose Of Pre-Trial Discovery, Dispositive Motions For Partial Or Summary Judgment

And/Or Cross-Motions Pursuant To Rule Of The United States Court Of Federal Claims

56 And/Or A Trial On Liability, And Scheduling (Downstream Claims). ECF No. 69.

d. Order Regarding Judicial Assignment, Appointment Of Plaintiffs’ Counsel For The

Purpose Of Pre-Trial Discovery, Dispositive Motions For Partial Or Summary Judgment

I.

The Government asserts that “the parties have not yet consulted with each other and

proposed a schedule for proceedings,” so that the November 20, 2017 Orders “do not comply with

RCFC 16(b).” ECF No. 100 at 1, 5. This assertion is inaccurate.

Between October 2, 2017 and October 6, 2017, Plaintiffs in Docket Nos. 17-1189L, 17-

1191L, 17-1195L, 17-1206L, 17-1235L, 17-1277L, 17-1300L, 17-1303L, 17-1332L, 17-1374L,

17-1390L, 17-1408L, 17-1409L, 17-1423L, 17-1427L, 17-1428L, 17-1430L, 17-1450L, 17-1461L

filed position statements in response to a September 15, 2017 Order requesting the parties’ views

about how these cases should proceed. ECF No. 5. Those position statements addressed whether

to consolidate individual and class action cases; the potential for interlocutory appeal; the time

required to proceed through summary judgment and related discovery; and proposals regarding

scheduling. See, e.g., Y And J Properties, Ltd. v. United States, No. 17-1189, Dkt. 9 (Fed. Cl. Sept.

15, 2017).

On October 5, 2017, the Government submitted a proposed pre-trial schedule for filing

certain pleadings and motions. See, e.g., Y And J Properties, Ltd. v. United States, No. 17-1189,

Dkt. 10 at 5 (Fed. Cl. Oct. 5, 2017) (e.g., “Plaintiffs File Amended Complaint”; “United States

Files its Response to the Operative Complaints”; “Plaintiffs Identify Liaison Counsel”; “Plaintiffs

File Their Motion(s) Seeking Class Certification”; “The Parties File a Joint Preliminary Status

Report (including the parties’ proposal for consolidating and coordinating discovery)”).

On October 6, 2017, the court convened a hearing at the United States District Court for

the Southern District of Texas in Houston to discuss the views of all parties about how these cases

should proceed. See, e.g., Y And J Properties, Ltd. v. United States, No. 17-1189, Dkt. 15 (Fed.

Cl. Oct. 10, 2017) (“10/6/17 TR”). The Government attended and was an active participant.

10/6/17 TR 7, 9, 15–38. As the October 6, 2017 hearing transcript reflects, the Government agreed

that “the court rules [are] the starting point . . . [but the Government] would like to see a single

schedule to the extent that it can be done feasibly across the cases, and that something needs to be

done to deal with later-filed cases, to make sure that the cases that have been filed and the ones

that we are working on can move forward expeditiously.” 10/6/17 TR 43.

On October 23, 2017, Plaintiffs’ counsel was notified by the Government via email that it

would be filing “a motion asking the court to extend existing deadlines and set a uniform deadline

for the [Government] to respond to pending complaints[.]” Email from Jacqueline C. Brown,

Senior Trial Attorney, United States Department of Justice, to Jack E. McGehee, Counsel for

Plaintiffs (Oct. 23, 2017, 5:19 PM). The Government’s October 23, 2017 email scheduled “a call

And/Or Cross-Motions Pursuant To Rule Of The United States Court Of Federal Claims

56 And/Or A Trial On Liability, And Scheduling (Upstream Claims). ECF No. 70.

Each of the November 20, 2017 Orders: (1) assigned a United States Court of Federal

Claims judge; (2) appointed lead counsel; and (3) established a pre-trial schedule. ECF Nos. 67,

68, 69, 70.

2

[with all Plaintiff’s counsel on] Wednesday October 25 at 11:00 am Eastern to discuss any

objections or opposition plaintiffs may have to this proposed motion” regarding scheduling and

provided dial-in information for the telephone conference call. Id. (emphasis added).

On October 25, 2017, the Government filed a Motion To Establish Uniform Deadlines To

File Responses To Complaints, “request[ing] that the [c]ourt set a uniform deadline for Plaintiffs

to amend or consolidate their complaints and to establish a date by which the [Government] is to

file responses to the operative complaints. See, e.g., Y And J Properties, Ltd. v. United States, No.

17-1189, Dkt. 26 (Fed. Cl. Oct. 25, 2017).

On November 1, 2017, the court convened a second hearing at the United States District

Court for the Southern District of Texas in Houston. ECF No. 7 (“11/1/17 TR”). During that

hearing, the court not only considered presentations made by several counsel who requested to be

appointed in a lead counsel role, but also heard the views of other counsel,2 and the Government,3

about a schedule for this litigation.

Therefore, the requirements of RCFC 16(b)(1)(B), requiring the court to issue a scheduling

order “after consulting with the parties’ attorneys and any unrepresented parties at a scheduling

conference,” were more than satisfied prior to issuance of the November 20, 2017 Orders and

raises a serious concern about the care taken by the Government to ensure that assertions in the

December 1, 2017 Motion were accurate.

II.

The Government asserts that the November 20, 2017 Orders “do not permit resolution of

[RCFC] 12 motions until after discovery is complete, which conflicts with the purpose of [RCFC]

12(b) motions[.]”4 ECF No. 100 at 5.

2

11/1/17 TR 18–25 (Edelson); 11/1/17 TR 35–42, 53–54 (Frederick); 11/1/17 TR 44–49

(Easterby); 11/1/17 TR 58–65 (Potts); 11/1/17 TR 81–83 (Hagans); 11/1/17 TR 95–97 (Buzbee);

11/1/17 TR 108–12 (McGehee); 11/1/17 TR 118–24 (Fulkerson); 11/1/17 TR 132–37 (Sigman);

11/1/17 TR 141–42 (Mitby).

3

11/1/17 TR 65–66, 144–55 (Government Counsel) (“So the first thing is that we agree with

several of the Plaintiffs here that coordination and appointment of counsel should come first, and

that’s both for either responding to class certification or responding to any 12(b) motion that we

do file.”).

4

Specifically, the Government asserts that the deadline set in the court’s November 20, 2017

Orders for “all initial disclosures and electronically stored information and hard copy documents

filed in the pre-trial phase of this case . . . incongruously precedes both the [Government’s] time

to file [RCFC] 12 motions . . . and its time to answer[.]” ECF No. 100 at 10. And, “[the court’s

November 20, 2017] Orders do not schedule oral argument on [RCFC] 12 motions until . . . after

discovery closes . . . and after dispositive motions are . . . filed.” ECF No. 100 at 10 (emphasis

omitted).

3

The purpose of a 12(b)(1) motion is to determine whether a complaint properly alleges

subject matter jurisdiction. Since the burden of establishing jurisdiction is on the plaintiff, the

plaintiff may want to conduct limited jurisdictional discovery. And, it is well established that the

trial court has broad jurisdiction to consider relevant and competent evidence on a motion to

dismiss for lack of subject matter jurisdiction. See WRIGHT & MILLER, FEDERAL PRACTICE AND

PROCEDURE (“WRIGHT & MILLER”) § 1350 at 160 (Vol. 5B Supp. 2017). Given the nature of the

allegations in Plaintiffs’ complaints, both upstream and downstream, jurisdictional facts may well

be contested and require discovery and jurisdictional fact-finding.

In contrast to a motion filed under RCFC 12(b)(1), the purpose of a motion filed under

RCFC 12(b)(6) is “an adjudication as to whether a cognizable legal claim has been stated.”

WRIGHT & MILLER § 1350 at 106. If the decision of a motion filed under RCFC 12(b)(6) requires

a ruling on the underlying substantive merits of the case, it “should await a determination of the

merits either . . . on a summary judgement motion or . . . at the trial.” Id. at 246, 249. Moreover,

the court even “may postpone a decision until evidence is submitted at trial if the jurisdictional

issue is intertwined with the merits of the case.” Id. at 253. Stated another way, the purpose of a

Rule 12(b)(6) motion “is to test the formal sufficiency of the statement of a claim for relief; the

motion is not a procedure for resolving a contest between the parties about the facts or the

substantive merits of plaintiff’s case.” WRIGHT & MILLER § 1356 at 354. As such, the trial court’s

“inquiry essentially is limited to the content of the complaint” (Id. at 372), although it may consider

matters subject to judicial notice, public record, and “items appearing in the record of the case, and

exhibits attached to the complaint whose authenticity is unquestioned . . . without converting the

motion into one for summary judgment.” WRIGHT & MILLER § 1357 at 376. Therefore, the court’s

resolution of a RCFC 12(b) motion is not necessarily dependent on the completion of all discovery.

The type of the RCFC 12 motion that the Government may file and the arguments that the

Government makes in support thereof will dictate when and the manner of the court’s resolution.

III.

The Government asserts that the court’s pre-trial schedule should “begin[] with the

amendment of the complaints,5 the resolution of [RCFC] 12 motions, and the answer to any

surviving claims.” ECF No. 100 at 6 (citing RCFC 12(b), 15(a)). 6 In fact, the court’s pre-trial

schedule follows this sequence. As the November 20, 2017 Orders state, Plaintiffs must file

Amended Complaints on or by January 15, 2018; the Government must file any Motions To

5

RCFC 12(b) does not state any time certain for when any RCFC 12(b) motion should be

filed in relation to an Amended Complaint. Instead, the preface to RCFC 12(b) provides only that

“[e]very defense to a claim for relief in any pleading must be asserted in the responsive pleading[,]

if one is required.” RCFC 12(b).

6

RCFC 15(a)(1)(B) provides that “[a] party may amend its pleadings once[,] as matter of

course[,] within . . . 21 days after service of a motion under RCFC 12(b)[.]” RCFC 15(a)(1)(B)

(emphasis added). That Rule does not require a resolution of any RCFC 12(b) motion at any

specific time or in any particular order.

4

Dismiss on or by February 15, 2018; and the Government must file any Answers to the Plaintiffs’

Amended Complaints on or by February 28, 2018.7 ECF Nos. 67, 68, 69, 70.

IV.

The Government asserts that having the cases proceed in “parallel schedules” risks

“inconsistent decisions on the merits.” ECF No. 100 at 8 (citing RCFC 12(d)). ECF No. 100 at 8.

The factual circumstances that gave rise to the upstream claims, however, likely may differ from

those concerning the downstream claims. Therefore, it is possible that there will be different

decisions on jurisdictional issues as well as the merits. But if that happens, it will reflect the factual

record developed and not any scheduling decision.

V.

The Government asserts that the November 20, 2017 Orders are problematic, because

“there is no provision in the [RCFC] that contemplates transferring the same case to more than one

judge, so that multiple judges may rule on the merits in a single case.” ECF No. 100 at 8. But,

RCFC 40.1(b) states that “the assigned judge . . . may order the transfer of all or any part of a case

to another judge upon the agreement of both judges.” RCFC 40.1(b). In addition, RCFC 40.1(c)

provides that, “[t]he chief judge may reassign any case upon a finding that the transfer is necessary

for the efficient administration of justice.” RCFC 40(1)(c). In this case, as the “assigned judge”

and Chief Judge, different judges were assigned to supervise and adjudicate different parts of these

cases, complying with both Rules 40.1(b) and 40.1(c). Moreover, the Rules of the United States

Court of Federal Claims “should be construed and administered to secure the just, speedy, and

inexpensive determination of every action and proceeding.” RCFC 1. In addition, the Case

Management Procedure provides that, “[f]or the purpose of promoting the efficient administration

of justice, a judge may modify these procedures as appropriate[.]” RCFC App. A, Section I.2.

The In re Addicks And Barker (Texas) Flood-Control Reservoirs cases present the court

and the parties with procedural challenges that are exacerbated by the fact that approximately 9,500

individuals have lost their personal effects and homes by the alleged actions of the Army Corps of

Engineers after Hurricane Harvey in August 2017. To date, over 153 cases have been filed in the

United States Court of Federal Claims, including twelve putative class actions, requesting just

compensation under the Takings Clause of the Fifth Amendment to the United States Constitution.

Even if one judge was assigned to handle only the upstream claims and another judge to handle

7

On October 5, 2017, the Government requested that the court set the deadline for Plaintiffs

to file Amended Complaints by November 15, 2017. See Y And J Properties, Ltd. v. United States,

No. 17-1189, Dkt. 10 at 5 (Fed. Cl. Oct. 5, 2017). The court’s November 20, 2017 Orders afford

the Plaintiffs with two additional months to file Amended Complaints. ECF Nos. 67, 68.

On October 5, 2017, the Government also requested that the court set the deadline for the

Government to file a Motion To Dismiss by January 15, 2018. See Y And J Properties, Ltd. v.

United States, No. 17-1189, Dkt. 10 at 5 (Fed. Cl. Oct. 5, 2017). The court’s November 20, 2017

Orders afford the Government with an additional month to file a Motion To Dismiss. ECF Nos.

67, 68.

5

only the downstream claims, it likely would take two years or more to issue decisions on

jurisdiction and dispositive motions and require redistribution of their existing dockets to the other

judges. This would be disruptive and impose significant burdens on the other parties, including

the Government. Therefore, the undersigned judge separated claims arising from upstream and

downstream flooding to facilitate their efficient adjudication. 11/1/17 TR 145–46 (Government

Counsel) (“Our challenges on any type of a [RCFC] 12 motion will either apply to all of the

Plaintiffs or either to the upstream or downstream group separately. I don’t think that there would

be any distinction between individuals and classes.); see also 11/1/17 TR 147 (Government

Counsel agreeing that two amended complaints—one with downstream claims and one with

upstream claims—would be acceptable). Therefore, by separating the claims and making

functional assignments among judges with experience with Takings Clause and similar complex

cases, the court’s November 13 and 20, 2017 Orders fully comply both with RCFC 1 and RCFC

Appendix A I.2 to allow these cases to be adjudicated in a “just, speedy, and inexpensive” manner,

albeit these case management decisions may well offend the Government’s sense of what it

perceives to be “well-established and important litigation norms.” ECF No. 100 at 2.

VI.

The Government asserts that it cannot comply with the court's May 31, 2018 discovery

deadline, by which time it must have: (1) collected information from the Army Corps of Engineers;

(2) served written discovery notices and deposed potentially thousands of witnesses; and (3)

"complete[d] highly technical expert discovery in a variety of fields." ECF No. 100 at 12 (citing

Arkansas Game & Fish Commission v. United States, 568 U.S. 23, 39 (2012) (relevant to a physical

takings inquiry are: “the character of the land at issue and the owner's reasonable investment-

backed expectations regarding the land's use”)). As to the Government’s specific concerns, the

Army Corps of Engineers was present at the October 6, 2017 hearing, at which time, many of these

cases had been filed for several weeks. The current deadline provides the Government with seven

months to obtain Army Corps of Engineers documents and retain experts. Seven months is also

more than enough time to file “written discovery notices,” particularly since Plaintiffs have

indicated their willingness to cooperate with the Government. As to the Government’s need to

depose potentially thousands of witnesses, there is no basis in Arkansas Game & Fish, 568 U.S.

23 that would support any motion to compel such extensive discovery on jurisdictional issues.8

VII.

The Government asserts that the court’s November 20, 2017 Orders “relieve the Plaintiffs

of the notice-pleading requirements under RCFC 89 and the even more stringent requirements of

8

The best evidence of this is the fact that only twenty-two depositions were taken by both

parties in a Takings Clause case that shares some similar legal issues with the Addicks and

Barker (Texas) Flood-Control Reservoirs cases. See St. Bernard Parish Gov’t v. United States,

No. 5-1119L, Dkt. No. 273.

9

The pleading requirements in RCFC 8 are not dependent on when a Rule 12 motion is filed.

RCFC 8 states only that “[a] pleading [that] states a claim for relief must contain: (1) a short and

plain statement of the grounds for the court’s jurisdiction, unless the court already has jurisdiction

and the claim needs no new jurisdictional support; (2) a short and plain statement of the claim

6

RCFC 9(i)10 . . . by requiring that dispositive motions be filed before Rule 12 motions are decided.”

ECF No. 100 at 10. The Government further states, without any support, that “both [parties will]

incur significant costs to complete fact and expert discovery that will only be necessary if the

United States’ motions are denied.” ECF No. 100 at 11. During the November 1, 2017 hearing,

however, the parties discussed this issue at some length and Plaintiffs’ counsel stated they would

assume the risk of that cost. 11/1/17 TR 53 (Frederick) (“We assume the risk that if the [c]ourt

were to find no jurisdiction and this goes up on appeal and that [Plaintiffs] ends up not prevailing,

that we would have put some costs into this . . . but we assume the risk of that in the interest of

trying to advance the liability determinations.”); 11/1/17 TR 118 (Fulkerson) (“You have attorneys

who are willing to take risk and to do things on the possibility that they may get an adverse decision

on jurisdiction or on [RCFC] 12(b)(6)[.]”). Therefore, the pre-trial schedules set forth in the

court’s November 20, 2017 Orders do not contravene these Rules. See RCFC App. A. Section I.2.

(“For the purpose of promoting the efficient administration of justice, a judge may modify these

procedures as appropriate[.]”).

VIII.

The Government asserts that the court’s November 20, 2017 Orders should be vacated,

“because they indefinitely delay determination of class certification [.]” ECF No. 100 at 8. As the

November 20, 2017 Orders state, the “court has determined that the issue of class certification is

premature at this juncture.” ECF Nos. 67, 68, 69, 70 (emphasis added). No part of the November

20, 2017 Orders suggests an “indefinite delay determination of class certification[.]” ECF No. 100

at 8. As the Department of Justice is aware, RCFC 23(c)(1)(A) adopted the language that class

certification should be determined “[a]t an early practicable time,” from the Federal Judicial

Center’s MANUAL FOR COMPLEX LITIGATION § 21.133 (4th ed. 2004). But, the MANUAL FOR

COMPLEX LITIGATION also recognizes that a trial court may decide to “hear and determine

threshold dispositive motions, particularly motions that do not require extensive discovery, before

hearing and determining class certification motions.” Id. at § 21.11 (emphasis in original). Some

years after the publication of the MANUAL FOR COMPLEX LITIGATION, the United States Supreme

Court issued Wal-Mart Stores, Inc. v. Dukes, 564 U.S. 338 (2011), reversing a trial court’s

certification of a class action at the pre-trial stage, because the evidence provided was not sufficient

to establish the “commonality” element of Rule 23(a)(2) of the Federal Rules of Civil Procedure:

What matters to class certification . . . [is] the capacity of a classwide proceeding

to generate common answers apt to drive the resolution of the litigation.”

Id. at 350 (internal quotations omitted).

showing that the pleader is entitled to relief; and (3) a demand for the relief sought, which may

include relief in the alternative or different types of relief.” RCFC 8(a).

10

Likewise, the pleading requirements in RCFC 9(i) are not dependent on when a Rule 12

motion is filed. RCFC 9(i) states only that “[i]n pleading a claim for just compensation under the

Fifth Amendment of the United States Constitution, a party must identify the specific property

interest alleged to have been taken by the United States.” RCFC 9(i).

7

Therefore, the Supreme Court has advised that, in many cases, discovery is required to

establish the commonality element of RCFC 23(a)(2) and, in some cases, a liability determination

first may be required.

Likewise, in Comcast Corporation v. Behrend, 133 S. Ct. 1426 (2013), the United States

Supreme Court held that a class action improperly was certified under FRCP 23(b)(3), because

“[t]he first step in a damages study is the translation of the legal theory of the harmful event into

an analysis of the economic impact of that event.” Id. at 1435 (quoting FEDERAL JUDICIAL CENTER,

REFERENCE MANUAL ON SCIENTIFIC EVIDENCE § 432 (3d ed. 2011)). Therefore, the economic

impact of the Army Corps of Engineers’ actions in these cases requires discovery and full

consideration of the legal theory that may require a liability determination, before class action

certification is considered. Moreover, the United States Court of Appeals for the Federal Circuit

has held that United States Supreme Court precedent does not “require[] that class certification be

addressed before ruling on a motion to dismiss.” See Greenlee Cty., Ariz. v. United States, 487

F.3d 871, 880 (Fed. Cir. 2007); see also Schweizer v. Trans Union Corp., 136 F.3d 233, 239 (2d

Cir. 1998) (“There is nothing in Rule 23 [that governs class certification] which precludes the court

from examining the merits of plaintiff’s claims on a proper Rule 12 motion to dismiss or Rule 56

motion for summary judgment simply because such a motion precedes resolution of the issue of

class certification.”)).

IX.

The intent of the court’s November 20, 2017 Orders was to assign jurisdictional discovery

and any motion filed under RCFC 12 to one judge and assign a different judge to handle other pre-

trial discovery and any RCFC 56 motions, to accommodate Plaintiffs’ request to be allowed to a

complete discovery and make a record, while jurisdictional issues were adjudicated to a final

judgment. Nevertheless, the court is willing to consider two alternative approaches. First, whether

the jurisdictional issues are “so intertwined with the merits of the case” (WRIGHT & MILLER § 1350

at 253) that the interests of justice require the court instead to establish a scheduling order setting

a target date for a liability trial in the late fall of 2018. Second, the court also will consider any

other reasonable and instructive recommendations about how to adjudicate jurisdiction and

dispositive issues in these cases, within the general temporal parameters set forth in the November

20, 2017 Orders. These submissions should be filed with the court no later than 5:00 PM (EST)

on December 18, 2017.

For these reasons, the Government’s December 1, 2017 Motion To Vacate is denied.

IT IS SO ORDERED.

s/ Susan G. Braden

SUSAN G. BRADEN

Chief Judge

8