Opinion

Xpo Logistics Worldwide Government Services, LLC v. United States

  • 134 Fed. Cl. 783
Court
United States Court of Federal Claims
Filed
Nov 2, 2017
Status
Published
Author
Kaplan
On the bench
Elaine D. Kaplan
Cited by
7 cases
Authority
More cited than 50.7%

The opinion

In the United States Court of Federal Claims

BID PROTEST

No. 17-1080C

(Filed Under Seal: November 2, 2017 | Reissued: November 17, 2017)*

) Keywords: Bid Protest; Motion for

XPO LOGISTICS WORLDWIDE ) Judgment on the Administrative Record;

GOVERNMENT SERVICES, LLC, ) Discussions; Past Performance; Corrective

) Action.

Plaintiff, )

)

v. )

)

THE UNITED STATES OF AMERICA, )

)

Defendant, )

)

and )

)

CROWLEY LOGISTICS, INC., )

)

Defendant-Intervenor. )

)

Frederick W. Claybrook, Jr., Claybrook LLC, Washington, DC, for Plaintiff. Daniel R. Forman,

Mark A. Ries, James G. Peyster, and Charles Baek, Crowell & Moring LLP, Washington, DC,

Of Counsel.

Christopher L. Harlow, Trial Attorney, U.S. Department of Justice, Civil Division, Commercial

Litigation Branch, Washington, DC, with whom were Patricia M. McCarthy, Assistant Director

Robert E. Kirschman, Jr., Director, and Chad A. Readler, Acting Assistant Attorney General, for

Defendant. Robert D. Bowers, Willie J. McAlister, and Peter B. Ries, Attorney-Advisors, Office

of the Staff Judge Advocate, United States Transportation Command, Of Counsel.

Kara M. Sacilotto, Wiley Rein LLP, Washington, DC, for Defendant-Intervenor. Rand L. Allen,

Brian G. Walsh, Gary S. Ward, Cara L. Lasley, Wiley Rein LLP, Of Counsel.

*

This Opinion was originally issued under seal on November 2, 2017, and the parties were given

the opportunity to request redactions. In light of the suggested redactions, the Opinion is now

reissued, with redactions of potentially sensitive information indicated by brackets.

OPINION AND ORDER

KAPLAN, Judge.

This bid protest arises out of the award of a transportation services contract to Defendant-

Intervenor Crowley Logistics, Inc. The Department of Defense, through the United States

Transportation Command (USTRANSCOM or “the agency”), awarded the contract to Crowley

after taking corrective action recommended by the Government Accountability Office (GAO).

The agency took the GAO-recommended corrective action after this Court rejected bid protests

filed by Crowley and by Plaintiff XPO Logistics Worldwide Government Services, LLC (XPO),

in which each of them had objected to the proposed corrective action on various grounds. See

XPO Logistics Worldwide Gov’t Servs., LLC v. United States (XPO I), 133 Fed. Cl. 162, appeal

docketed, No. 17-2506 (Fed. Cir. Aug. 30, 2017).

In the present case, XPO has filed a protest of the award to Crowley that followed the

corrective action. In its complaint, XPO reasserts certain arguments that this Court rejected in

XPO I. It also contends, among other things, that the agency engaged in misleading and unequal

discussions with XPO regarding XPO’s past performance and that the agency’s decision to

downgrade XPO’s confidence assessment rating from “Substantial” to “Satisfactory” when it

undertook its corrective action was arbitrary, capricious, and contrary to law.

Currently before the Court are the parties’ cross-motions for judgment on the

administrative record, as well as XPO’s motion to supplement the administrative record. For the

reasons discussed below, XPO’s motion to supplement the administrative record and its motion

for judgment on the administrative record are DENIED. The government’s and Crowley’s

motions for judgment on the administrative record are GRANTED.

BACKGROUND

I. The Solicitation and Previous Protests

The background of this solicitation and the subsequent bid protests was set forth in detail

in the Court’s opinion in XPO I. See 133 Fed. Cl. at 167–76. To briefly recap, USTRANSCOM

is a combatant command that provides support to the other United States combatant commands,

the military services, defense agencies, and other government organizations. Admin. R. (AR)

Tab 6 at 151. On March 25, 2015, it issued a solicitation seeking proposals for an indefinite-

delivery, indefinite-quantity contract to provide transportation coordination services throughout

the continental United States as well as in Alaska and Canada, in connection with the

Department of Defense Freight Transportation Services (DFTS) program. Id. at 87, 150. The

winning offeror would be required to provide these services to both the Defense Logistics

Agency and the Defense Contract Management Agency. Id. at 152. In addition, USTRANSCOM

anticipated that other government agencies would join the DFTS contract over its lifetime. See

id. The contract would have a two-year base period and five one-year option periods. Id. at 89–

96.

The agency initially awarded the DFTS contract to GENCO Infrastructure Solutions, Inc.

on December 30, 2015. Id. Tab 57 at 11060; id. Tab 58 at 11061. Both XPO and Crowley

2

protested the award before GAO, and GAO ultimately sustained Crowley’s protest. See id. Tabs

67, 74. USTRANSCOM then reopened the competition and announced that it would hold

discussions with all offerors in the competitive range and would allow offerors to submit revised

proposals. See id. Tab 88 at 11982. GENCO withdrew following the reopening of the

competition, but both Crowley and XPO participated in discussions and submitted revised

proposals. See id. Tab 116 at 12273; id. Tab 120 at 12442–43.

The agency evaluated the revised proposals and awarded the contract to Crowley on

November 22, 2016. See id. Tab 120 at 12442; see also id. Tabs 121–22. XPO then filed a bid

protest with GAO. Id. Tab 126. On March 14, 2017, GAO sustained XPO’s protest in part,

agreeing that the agency’s determination that Crowley’s past performance references should be

rated “Somewhat Relevant” was flawed. See id. Tab 148 at 13003–04.1 As explained in greater

detail in XPO I, GAO found: 1) that “it [was] not clear from the contemporaneous record how

the agency determined that the magnitude of Crowley’s past efforts supported the ratings of

somewhat relevant,” id. at 13013–14; and 2) that in any event, “the agency’s selection of only

the relatively low-value base period of the contract as awarded to Crowley unreasonably

distort[ed] the comparison of the magnitude of Crowley’s past efforts to the magnitude of the

solicitation,” id. at 13012; see also XPO I, 133 Fed. Cl. at 174–75. Accordingly, GAO

recommended that USTRANSCOM “reevaluate Crowley’s past performance in a manner that is

reasonable and consistent with both the solicitation and [GAO’s] decision, and then make a new

source selection determination.” AR Tab 148 at 13017.

II. The Court’s Previous Decision

Shortly after GAO issued its decision, the contracting officer announced that

USTRANSCOM would follow GAO’s recommendation and take corrective action. Id. Tab 176

at 15860. Both XPO and Crowley then filed bid protests in this Court challenging the proposed

corrective action.

On June 30, 2017, this Court issued its decision, rejecting both Crowley’s and XPO’s

protests. The Court held that GAO’s decision was rational, and that USTRANSCOM’s decision

to take corrective action in accordance with GAO’s recommendation was therefore reasonable.

XPO I, 133 Fed. Cl. at 179–80. In particular, the Court concluded that GAO’s decision and

recommendation that USTRANSCOM take corrective action were rational because the record

did not reflect what factors the agency relied upon when it rated sixteen of Crowley’s past

performance references Somewhat Relevant. Id. at 179. The Court also agreed that the agency’s

proffered explanation before GAO, that the agency compared the dollar value of Crowley’s past

references to the value of the two-year base period of the DFTS contract, was not reasonable

1

The solicitation provided four possible relevancy ratings for past performance references: Very

Relevant, meaning that the “effort involved essentially the same scope and magnitude of effort

and complexities th[e] solicitation requires”; Relevant, meaning the “effort involved similar

scope and magnitude of effort and complexities”; Somewhat Relevant, meaning the “effort

involved some of the scope and magnitude of effort and complexities”; and Not Relevant,

meaning the “effort involved little or none of the scope and magnitude of effort and

complexities.” AR Tab 20 at 9501.

3

because the five option years were significantly higher in value and performing the options was

part of the “efforts” the “solicitation requires.” Id. at 179–80.

With respect to XPO’s challenges to the agency’s corrective action, the Court found that

USTRANSCOM followed the requirements of the FAR for assessing unbalanced pricing by

comparing the prices received in response to the solicitation. Id. at 182. It also rejected both

XPO’s assertion that the solicitation required the agency to consider some other, undefined

concept of price beyond the total evaluated price and its argument that the agency changed its

consideration of price between the first and second evaluations. Id. at 182–84. Finally, the Court

rejected as contrary to the evidence in the record XPO’s claim that the agency did not look

beyond adjectival ratings in assessing the proposals. Id. at 185–86.

Thereafter, on July 3, 2017, the contracting officer informed both XPO and Crowley that

“USTRANSCOM [was] taking corrective action in accord with [the] GAO decision.” See AR

Tab 194 at 16556–58; id. Tab 195 at 16559. He also informed the parties that “discussions

[were] closed and nothing [was] required to be submitted.” Id. Tab 194 at 16556.

III. USTRANSCOM’s Re-Evaluation of Past Performance

A. Standards Applied

In the meantime, on April 11, 2017, after GAO issued its recommendation but before the

Court issued its decision, USTRANSCOM’s Past Performance Evaluation Team (PPET)

completed a new analysis of the past performance references supplied by both XPO and

Crowley. Id. Tab 192 at 16352–95. The PPET noted that each past performance “effort was

evaluated independently to determine recency and relevancy.” Id. at 16352. It further explained

that “determination[s] of relevancy [were] made on the evaluation of scope and magnitude of

effort and complexities this solicitation requires for each evaluated past performance effort.” Id.

With respect to the “magnitude” of past performance efforts, the PPET stated that it

“compared the Value Per Year Equivalency of each past performance effort to the average value

of transportation CLINS for each year of performance (including options) of the DFTS contract,

which equates to $370,166,666.67.” Id. at 16352–53. It also compared “the monthly number of

shipments for each past performance effort to the projected 20,000 monthly shipments to be

performed under the DFTS contract.” Id. at 16353. In addressing the “complexity” factor, the

PPET stated that it had examined whether an offeror’s past performance efforts included tasks

similar in complexity to the DFTS program.2 Id.

2

The tasks identified included “supporting multiple agencies; the use of numerous shipping

systems; three tiers of pricing based on response and pickup times; the requirement to support

unit moves, FEMA shipments, and Foreign Military Sales shipments; the requirement to conduct

customs brokerage services; and utilization of specialized equipment such as flatbeds, lowboys,

stepdecks, goosenecks, and reefer vans.” AR Tab 192 at 16353.

4

B. Reevaluation of XPO’s Past Performance

1. The Defense Transportation Coordination Initiative Contract

The PPET first addressed XPO’s work on the predecessor program to DFTS, the Defense

Transportation Coordination Initiative (DTCI). The DTCI effort (which was one of [***] past

performance references that XPO submitted) had been rated as Very Relevant during prior stages

of the procurement. Id. at 16353–54.

In the new evaluation, the PPET remarked that the DTCI reference was recent (in fact,

contract performance was ongoing) and that XPO had been assigned “exceptional” and “very

good” quality ratings on the contract. Id. at 16353. It found, however, that the DTCI contract

requirements differed from the DFTS requirements in scope and complexity. Specifically, the

PPET noted that the DFTS contract, but not the DTCI contract, included “Time Definite

Delivery, three tiers of pricing, shipping into Canada and the potential of shipping into Alaska,

on-ramp[ing of] other federal government agencies outside of the DoD, and customs brokerage

services.” Id. Therefore, it found that the requirements of the DTCI contract were “similar, but

not essentially the same as the DFTS requirement.” Id.

The PPET also compared the “magnitude” of the DTCI contract—i.e., its dollar value and

volume of shipments—with the magnitude of the DFTS requirements. It calculated the “value

per year equivalency” of the DTCI contract as [***], which it stated was approximately [***]%

of the average annual value of the DFTS contract.3 Id. at 16354. It further found that under the

DTCI contract, XPO had been coordinating [***] shipments per month, which was [***]% of

the number of shipments estimated under the DFTS contract. Id.

Based on the foregoing, the PPET concluded that the DTCI contract “involv[es] similar

scope and magnitude of effort and complexities [to what] th[e] solicitation requires.” Id. It

therefore rated the DTCI reference as Relevant. Id.

2. The [***] Contract

XPO’s [***] remaining past performance efforts, [***] of which had been rated as

Relevant during the prior stages of the procurement, were each found Not Relevant by the PPET

during the corrective action reevaluation. The PPET concluded that none of the [***] contracts

involved any of the complexities of effort required by the solicitation. Id. at 16354–55. In this

3

XPO asserts, and the government and Crowley appear to concede, that the agency committed a

computational error when it determined the average annual value of the DFTS contract because it

divided the total contract value by six years, rather than seven. See XPO’s Br. in Supp. of Its

Mot. for J. on the Admin. R. (XPO’s Br.) at 24–25, ECF No. 30-1; Def.’s Cross-Mot. for J. on

the Admin. R. & Opp’n to Pl.’s Mot. for J. on the Admin. R. (Def.’s Mot.) at 18–19, ECF No.

35; Crowley’s Mem. in Supp. of Its Cross-Mot. for J. on the Admin. R. (Crowley’s Mem.) at 28–

29, ECF No. 36-2. As XPO points out, when seven is used as a divisor, the value per year

equivalency of the DTCI contract would be approximately [***]% of the annual value of the

DFTS contract, rather than [***]%. See XPO’s Br. at 25.

5

protest, XPO challenges the Not Relevant ratings assigned to its past contracts with [***] and

[***].

The PPET concluded that XPO’s [***] performance reference was recent. It also noted

that in the past performance questionnaire, [***] had assigned XPO two “Marginal” quality

ratings, three “Satisfactory” quality ratings, and one “Very Good” quality rating, but that [***]

had stated that XPO “has made improvements” and that the areas to which the marginal ratings

applied were “not considered a concern regarding future performance.” Id. at 16354.

The PPET turned next to an assessment of the scope and complexity of the [***]

contract. It observed that the contract did not include work involving “on time pick-up of freight,

on time delivery of freight, and availability of equipment, to include specialized equipment,” and

thus it only “involved some of the scope of the requirement” and “little or none of the

complexities of the DFTS effort.” Id.

Turning to the magnitude of effort, the PPET calculated a value per year equivalency for

the [***] effort of [***], or [***]% of the value per year of the DFTS contract.4 Id. It noted,

however, that the [***] monthly shipments under the [***] contract were [***]% of the number

of monthly shipments expected under DFTS. Id.

Nevertheless, the PPET found that “[w]hile the number of shipments [***] what is

anticipated . . . the dollar magnitude of the effort is minimal compared to the average value of

transportation CLINS of the DFTS contract.” Id. Thus, the team concluded that the [***]

contract “involv[ed] some of the scope and magnitude of the effort,” but “little or none [of its]

complexities,” and the PPET “therefore rated [the [***] contract] as Not Relevant.” Id.

(emphasis in original).

3. The [***] Contract

The PPET found the [***] contract recent and determined that its value per year

equivalency was [***]. Id. It noted that the contract’s annual value was [***]% of the average

value of DFTS, but that the [***] contract’s monthly shipments amounted to [***]% of the

magnitude of shipments under DFTS.5 Id. at 16355. As with the [***] contract, the team

concluded that although the number of shipments exceeded what was expected under DFTS, “the

dollar magnitude of the effort is minimal compared to the average value of transportation CLINS

of the DFTS contract.” Id.

The agency had not received a past performance questionnaire from [***], but requested

specific information from it. According to [***], XPO was “the lead logistics provider managing

[***]’s inbound transportation network to [***]’s North American production facilities,” whose

shipments included automotive parts for trucks and buses. Id. The PPET concluded that the

“reference demonstrates little or none of the complexities of the DFTS effort reflected in

4

This value per year equivalency is subject to the same apparent error as noted above. See n.3,

supra.

5

See n.4, supra.

6

paragraph I.E. above,” i.e., it did not involve supporting multiple agencies, the use of numerous

shipping systems, three tiers of pricing, and other complexities of the DFTS contract. Id. It

concluded therefore that “this reference . . . involv[ed] some of the scope and magnitude of the

effort” but “little or none [of its] complexities and [was] therefore rated as Not Relevant.” Id.

(emphasis in original).6

4. Confidence Assessment Rating

The PPET then summarized its analysis of XPO’s efforts and assigned a confidence

assessment rating.7 It noted that it had “reviewed [***] past performance references which

demonstrated a broad range of performance ratings from Marginal to Exceptional.” Id. The team

observed that XPO received four Exceptional ratings, seven Very Good ratings, three

Satisfactory ratings, and two Marginal ratings in its past performance questionnaires. Id. at

16356. It then concluded that “[o]ne effort was rated as Relevant and the other [***] were rated

as Not Relev[a]nt.” Id. “Considering the relevancy of the references and the associated

performance ratings,” the agency then assigned XPO “an overall Confidence Assessment Rating

of Satisfactory Confidence; meaning, based on the Offeror’s recent/relevant performance

record, the Government has a reasonable expectation that the offeror will successfully perform

the required effort.” Id. (emphasis in original).

C. Reevaluation of Crowley’s Past Performance

As noted, prior to GAO’s recommendation that the agency take corrective action it had

rated a number of Crowley’s past performance references Somewhat Relevant. It had not,

however, provided a sufficient justification for that conclusion. In taking corrective action, the

PPET examined in some detail fifty-six different past performance references, this time finding

each of them Not Relevant. Id. at 16358–88. The PPET report also listed over 150 additional past

performance references provided by Crowley for which the government either did not receive

past performance questionnaires, did not raise the references in evaluation notices, or did not

solicit additional information from the references. Id. at 16388–93. Each of these efforts was also

found Not Relevant. Id.

The PPET concluded that “[a]lthough Crowley has demonstrated corporate experience

with this type of work and it has performed considerably well across the efforts it performed, all

past performance references were determined Not Relevant, or could not be validated or

determined recent. As such, Crowley’s recent/relevant performance record is so sparse that no

6

The narrative also contains a seemingly contradictory and incomplete sentence which asserts

that information received from [***] “verified [that] the effort consists of some of the scope and

complexity of the DFTS requirement, but not similar.” AR Tab 192 at 16355. The parties do not

address the meaning of this language and the Court concludes that it should be disregarded as it

is inconsistent with the remainder of the paragraph.

7

The solicitation included five possible confidence assessment ratings: Substantial Confidence,

Satisfactory Confidence, Limited Confidence, No Confidence, and Unknown Confidence. AR

Tab 20 at 9501–02.

7

meaningful confidence assessment rating can be reasonably assigned. Crowley is rated as

Unknown Confidence (Neutral).” Id. at 16395 (emphasis in original).

IV. The New Source Selection Evaluation Board Report

On July 11, 2017, after the Court issued its decision in the prior bid protest, the Source

Selection Evaluation Board (SSEB) issued a new report. Id. Tab 196 at 16560–619. It noted that

it was following “GAO’s recommendation to reevaluate Crowley’s past performance,” and that,

“in addition, to ensure equal treatment, the contracting officer decided to reevaluate both

Offerors[’] past performance.” Id. at 16571; see also id. at 16610–11. The SSEB reported that

“[i]t was determined unnecessary to re-open discussions” and that “no proposal revisions were

requested, nor received.” Id. at 16571. Additionally, it stated that “[t]he only factor re-evaluated

was Factor 4, Past Performance.” Id.

The SSEB described its reevaluation as a “comprehensive review of each past

performance effort to determine recency and relevancy.” Id. at 16611. It referred to and relied

upon the PPET’s April 2017 past performance analysis discussed above, stating that “[t]he Past

Performance Summary dated 11 April 2017 details the scope, magnitude, and complexity of each

past performance reference.” Id. Additionally, it noted that “[t]he determination of relevancy was

made on the evaluation of scope and magnitude of effort and complexities th[e] solicitation

requires.” Id.

The reevaluation, the SSEB noted, resulted in “both remaining Offerors’ confidence

assessment ratings [being] impacted.” Id. The results were as follows:

Id.8

Whereas the agency previously assigned Crowley a rating of Satisfactory Confidence, id.

Tab 119 at 12441, the SSEB noted that the new rating was Unknown Confidence (Neutral), id.

Tab 196 at 16611. Similarly, whereas XPO previously had a confidence assessment rating of

Substantial Confidence, id. Tab 118 at 12398, the SSEB had now assigned it a rating of

Satisfactory Confidence, id. Tab 196 at 16611. For Crowley, the SSEB noted that all of its 217

references were determined Not Relevant. Id. Although the SSEB concluded that some of

Crowley’s recent references had “some of the scope . . . the effort requires,” others had “little or

none of the scope the effort requires.” Id. Tab 196 at 16611. Further, all of Crowley’s references

8

The SSEB’s reference to Menlo refers to a prior corporate entity now known as XPO. See AR

Tab 126 at 12576 n.1.

8

“were found to involve little or none of the magnitude[]of effort and complexities of the DFTS

effort.” Id.

For XPO, the SSEB concluded as follows:

In all, the Government reviewed [***] past performance references

for [XPO] which demonstrated a broad range of performance ratings

from Marginal to Exceptional. Of the [***] references, only the

DTCI effort was rated as relevant,[]the other [***] were rated as Not

Relevant. The DTCI contract is considered Relevant as the effort is

similar, but not essentially the same as the DFTS requirement. The

scope and complexity of the DFTS solicitation differs from the

scope of the DTCI contract because the DFTS solicitation is broader

as it includes mode of Time Definite Delivery, three tiers of pricing,

shipping into Canada and the potential of shipping into Alaska, on-

ramps other federal government agencies outside of the DoD, and

customs brokerage services. Furthermore, the DTCI contract is

[***] percent of the average performance magnitude in dollars of

the DFTS contract and [***] percent of the magnitude of shipments.

Of the [***] determined Not Relevant, [***] involved some of the

scope and magnitude of the effort; however, involved little or none

of the complexity of the requirement. The other reference involved

little of the scope and magnitude of effort and complexities of the

requirement. Considering the relevancy of the references and the

associated performance ratings, [XPO] has been assigned an overall

Confidence Assessment Rating of Satisfactory Confidence.

Id. at 16611–12. Finally, the SSEB stated in its “draft comparative analysis for consideration by

the Source Selection Advisory Council” that XPO’s “past performance is the higher rated of the

two offerors. Crowley’s past performance is neither favorable nor unfavorable.” Id. at 16612,

16617.

V. The Revised Source Selection Advisory Council Comparative Analysis

On July 18, 2017, the Source Selection Advisory Council (SSAC) issued its updated

comparative analysis. Id. Tab 197 at 16970, 16983. The SSAC “reviewed the SSEB report and

the underlying evaluation documents and concur[red] in their findings.” Id. at 16972. The SSAC

also “verified [that] the SSEB’s evaluation followed the solicitation evaluation criteria and [that]

the ratings were consistently applied.” Id. Based upon this information, it conducted an

“integrated assessment,” taking into account “adjectival and risk ratings, past performance

confidence assessment ratings, and the Total Evaluated Price (TEP).” Id. at 16973.

The SSAC first assessed the strengths and risks of each offeror’s technical proposal in

detail. Id. at 16974–80. Then, with respect to past performance, the SSAC reiterated the

conclusions of the SSEB report as to both Crowley and XPO. Id. at 16980. With respect to XPO,

the SSAC noted that its [***] past performance efforts “demonstrated a broad range of

performance ratings from Marginal to Exceptional,” but that the “Marginal ratings did not impact

9

[XPO’s] overall confidence assessment rating because the respondent indicated [XPO] had made

improvements in the areas receiving these ratings and are not considered a concern regarding

future performance.” Id. at 16980–81. It also noted that only “[o]ne effort was rated as

Relevant.” Id. at 16981.

As to price, the SSAC noted that because “the solicitation provides all rated evaluation

factors (technical capability and past performance) when combined, are approximately equal to

price,” “price carries considerable weight in this acquisition.” Id. It concluded that both the TEPs

and unit prices for each offeror were “fair and reasonable based on adequate price competition”

and that there was “no indication of unbalanced pricing.” Id. It also found that XPO’s TEP was

8.4% higher than Crowley’s. Id.

The SSAC concluded that “Crowley’s proposal [was] the best value to the government”

because “the tradeoff of Implementation risk and Satisfactory past performance is not worth the

additional Total Evaluated Price expenditure of $625M to award to [XPO].” Id. at 16973–74; see

also id. at 16981 (SSAC “recommend[ing] award of the DFTS [contract] to Crowley” because

the “difference of approximately $625M, or 8.4%, is disproportionate to the benefit associated

with [XPO’s] strengths and lower risk rating under Subfactor 2 and [XPO’s] past performance

confidence assessment rating of Satisfactory Confidence”). The SSAC found that “Crowley’s

moderate risk rating under” the second technical evaluation subfactor was not “so substantial that

it cannot be overcome with special contractor emphasis and close Government monitoring.” Id.

at 16981. Further, it found that:

While it is noted there is some risk associated with awarding a

contract to an Offeror with a Confidence Assessment Rating of

Unknown Confidence, we are willing to accept that risk. Even

though Crowley was unable to provide any individual referenced

effort which was considered even Somewhat Relevant, they do

provide numerous smaller transportation services, making the risk

of successful performance worth the $625M lower price.

Id.

Moreover, the SSAC noted that the government had “some built in mitigation factors in

place to significantly reduce any risk.” Id. Accordingly, the SSAC that found Crowley’s proposal

“avoids the Government’s payment of a disproportionate price premium to [XPO] for its slightly

favorable past performance rating . . . and its slightly favorable technical approach.” Id. at 16982.

VI. The Source Selection Authority Decision

On July 20, 2017, the Source Selection Authority (SSA) issued the Source Selection

Decision Document. Id. Tab 198. It contained the same analysis and conclusions as the SSAC

report. See id. When describing the history of the corrective action, the SSA noted that “the

Contracting Officer thought it unreasonable to evaluate one Offeror under conditions different

from the other Offeror, and to reconcile this consideration, the Contracting Officer, to ensure

equal treatment, decided to reevaluate both Offerors’ past performance under identical

conditions.” Id. at 16985. The SSA then affirmed the past performance conclusions of the SSEB

10

and SSAC. Id. at 16989. As pertinent to XPO’s protest, the SSA wrote that “[i]n all, the

Government reviewed [***] past performance references which demonstrated a broad range of

performance ratings from Marginal to Exceptional. One effort was rated as Relevant and the

other [***] were rated as Not Relevant.” Id. He also reiterated that XPO’s Satisfactory

Confidence assessment rating was “based on the Offeror’s recent/relevant past performance

record.” Id.

After reviewing the solicitation’s other criteria, the SSA concluded that “the Total

Evaluated Price difference of $625,139,516, or 8.4%, is disproportionate to the benefit associated

with [XPO’s] technical strengths and lower risk rating under Subfactor 2 and [XPO’s] past

performance confidence assessment rating of Satisfactory Confidence.” Id. at 16989–90. Thus,

he wrote that “based on [his] integrated assessment of all proposals . . . it [was his] independent

assessment that the proposal submitted by Crowley Logistics represents the best overall value to

the Government.” Id. at 16991.

VII. XPO’s New Bid Protest

On July 24, 2017, USTRANSCOM notified both offerors that Crowley had again been

selected for the contract award. Id. Tab 199 at 16992–93; id. Tab 201 at 17012. The next day, on

July 25, 2017, Crowley and USTRANSCOM signed Modification Number 1 to the contract,

which lifted the previous stay of performance and revised the periods of performance. Id. Tab

202 at 17030.

On August 8, 2017, XPO filed its complaint in this court. ECF No. 1. Two days later,

Crowley filed a motion to intervene, which the Court granted that same day. ECF Nos. 11, 18.

On September 5, 2017, XPO filed an amended complaint. ECF No. 32.

In its amended complaint, XPO asserts five causes of action: 1) that the agency engaged

in misleading and unequal discussions with XPO regarding past performance; 2) that the agency

made a number of errors in downgrading XPO’s confidence assessment rating from Substantial

to Satisfactory and that its past performance evaluation was therefore arbitrary and capricious;

3) that the agency failed to evaluate unbalanced pricing in accordance with the FAR; 4) that the

agency’s best value determination was arbitrary and capricious because it failed to appropriately

consider the cost to the government; and 5) that the agency engaged in misleading discussions by

considering price in its best value tradeoff in a manner different from its previous best value

tradeoffs, and that it engaged in an irrational tradeoff analysis because it improperly relied upon

Crowley’s Corporate Experience. Am. Compl. ¶¶ 93–126.

As noted above, the parties have now cross-moved for judgment on the administrative

record. The Court held oral argument on all pending motions on October 13, 2017. Order, ECF

No. 25.

DISCUSSION

I. Subject Matter Jurisdiction

The Court of Federal Claims has jurisdiction over bid protests in accordance with the

Tucker Act, 28 U.S.C. § 1491, as amended by the Administrative Dispute Resolution Act of

11

1996 § 12, 28 U.S.C. § 1491(b). Specifically, the Court has the authority “to render judgment on

an action by an interested party objecting to a solicitation by a Federal agency for bids or

proposals for a proposed contract or to a proposed award or the award of a contract or any

alleged violation of statute or regulation in connection with a procurement or a proposed

procurement.” 28 U.S.C. § 1491(b)(1); see also Sys. Application & Techs., Inc. v. United States,

691 F.3d 1374, 1380–81 (Fed. Cir. 2012) (observing that § 1491(b)(1) “grants jurisdiction over

objections to a solicitation, objections to a proposed award, objections to an award, and

objections related to a statutory or regulatory violation so long as these objections are in

connection with a procurement or proposed procurement”).

To possess standing to bring a bid protest, a plaintiff must be an “interested party”—i.e.,

an actual or prospective bidder (or offeror) who possesses a direct economic interest in the

procurement. Sys. Application & Techs., Inc., 691 F.3d at 1382 (citing Weeks Marine, Inc. v.

United States, 575 F.3d 1352, 1359 (Fed. Cir. 2009)); see also Orion Tech., Inc. v. United States,

704 F.3d 1344, 1348 (Fed. Cir. 2013). An offeror has a direct economic interest if it suffered a

competitive injury or prejudice as a result of an alleged error in the procurement process. Myers

Investigative & Sec. Servs., Inc. v. United States, 275 F.3d 1366, 1370 (Fed. Cir. 2002) (holding

that “prejudice (or injury) is a necessary element of standing”); see also Weeks Marine, Inc., 575

F.3d at 1359.

In post-award protests, like this one, a plaintiff may demonstrate competitive injury or

prejudice by showing that it would have had a “substantial chance” of winning the award “but

for the alleged error in the procurement process.” Weeks Marine, Inc., 575 F.3d at 1359–62

(quoting Info. Tech. & Applications Corp. v. United States, 316 F.3d 1312, 1319 (Fed. Cir.

2003)). In making the standing determination, the Court assumes well-pled allegations of error in

the complaint to be true. Square One Armoring Serv., Inc. v. United States, 123 Fed. Cl. 309,

323 (2015) (citing Digitalis Educ. Sols., Inc. v. United States, 97 Fed. Cl. 89, 94 (2011), aff’d,

664 F.3d 1380 (Fed. Cir. 2012)); see also Salmon Spawning & Recovery All. v. U.S. Customs

& Border Prot., 550 F.3d 1121, 1131–32 & n.9 (Fed. Cir. 2008) (citing Lujan v. Defs. of

Wildlife, 504 U.S. 555, 561 (1992)); Linc Gov’t Servs., LLC v. United States, 96 Fed. Cl. 672,

694–95 (2010) (noting that the showing of prejudice as an element of standing “turns entirely on

the impact that the alleged procurement errors had on a plaintiff’s prospects for award, taking the

allegations as true,” and distinguishing “allegational prejudice” required to establish standing

from the “prejudicial error” required to prevail on the merits).

Here, the Court has subject matter jurisdiction. XPO was an actual offeror and challenges

the award of a contract. It alleges, among other errors, that the agency wrongly downgraded its

past performance ratings and confidence assessment. Taking XPO’s allegations as true, and

considering XPO’s status as the incumbent on the predecessor contract and as the only other

offeror besides Crowley, it has sufficiently shown that absent the errors, it had a substantial

chance of securing the award. XPO is thus an interested party and the Court has jurisdiction over

its bid protest.

II. XPO’s Motion to Supplement the Administrative Record

XPO has filed a motion to supplement the administrative record with the affidavit of

Keith A. Dyer, its senior vice president of managed transportation. XPO’s Mot. to Suppl. the

12

Admin. R. at 1, ECF No. 31. According to Mr. Dyer, the purpose of his affidavit is “to explain

certain aspects of the industry for the Court, to point out certain errors in USTRANSCOM’s

Round 3 past performance evaluation of XPO that may not be obvious or are difficult to compute

from the record, to explain how XPO could have addressed perceived deficiencies and improved

its score if it had been given the opportunity through discussions, and to explain how XPO would

be injured if it is unfairly denied award of the DFTS contract.” Dyer Aff. ¶ 3, ECF No. 31-2. The

government and Crowley oppose XPO’s motion. ECF Nos. 34, 37.

It is well established that in a bid protest case the Court of Federal Claims is to “apply the

appropriate APA standard of review . . . to the agency decision based on the record the agency

presents” to it. See Axiom Res. Mgmt., Inc. v. United States, 564 F.3d 1374, 1379 (Fed. Cir.

2009) (emphasis in original). Therefore, “the focal point for judicial review should be the

administrative record already in existence, not some new record made initially in the reviewing

court.” Id. (quoting Camp v. Pitts, 411 U.S. 138, 142 (1973)). This limitation guards against the

possibility that the court’s scope of review will be transformed from an examination of the

reasonableness of the agency’s determination under APA standards “into effectively de novo

review.” Id. at 1380 (quoting Murakami v. United States, 46 Fed. Cl. 731, 735 (2000), aff’d, 398

F.3d 1342 (Fed. Cir. 2005)). In light of these principles, the court of appeals has held that in bid

protests, “supplementation of the record should be limited to cases in which the omission of

extra-record evidence precludes effective judicial review.” Id. (quotation omitted).

Here, an examination of the assertions in Mr. Dyer’s affidavit shows that it does not fall

within that limited category of cases in which supplementation of the administrative record is

appropriate. First, paragraphs one through seven of the affidavit merely include identifying

information and a summary of the administrative record. Paragraphs eight through fifteen consist

of Mr. Dyer’s critique of the methodology the agency used to compare the value of the [***] and

[***] contracts to the value of the DFTS contract. Specifically, he argues that the agency should

have considered the value of the freight XPO handled under those contracts in addition to the

value of the logistics management services it provided. Mr. Dyer, however, is not an independent

expert; he is the XPO officer responsible for preparing its proposals. In any event, his views on

how the agency should have evaluated the proposal he helped prepare are not necessary for

meaningful review of the agency’s decision; rather, they represent an invitation for the Court to

substitute Mr. Dyer’s less-than-impartial views for the judgment of the agency.

Similarly, in paragraphs eighteen through twenty-five, Mr. Dyer expresses his objections

to and disagreements with the agency’s conclusions regarding the differences in complexity

between the DFTS and DTCI contracts and the significance of those differences. XPO’s effort to

supplement the record with such material again ignores that the Court’s job is not to determine

de novo which past performance efforts were relevant and which were not, but rather to review

the reasonableness of the agency’s determination based on the administrative record before it.

In paragraphs sixteen, seventeen, and twenty-six, Mr. Dyer attempts to identify the type

of information XPO would have provided to the agency if the agency had held discussions with

the offerors when conducting its reevaluation as part of the corrective action. These paragraphs

are irrelevant and not necessary for the Court to engage in meaningful review, given the Court’s

conclusion, infra, that the agency was not required to hold additional discussions.

13

Finally, paragraph twenty-seven of the affidavit identifies what Mr. Dyer characterizes as

the irreparable harm XPO will suffer if it does not receive the contract award. These harms

include an unspecified amount of lost profits and the layoff of approximately twenty-five

employees. While it may sometimes be necessary to supplement the record with evidence

concerning irreparable harm, in this case Mr. Dyer’s observations are not necessary for the Court

to address irreparable harm because, as discussed below, XPO has not succeeded on the merits of

its claims. Even if it had, the loss of employees, in and of itself, does not constitute irreparable

harm, and the fact that XPO would not earn profits from the contract if the award to Crowley

stands is self-evident.

Accordingly, XPO’s motion to supplement the administrative record is DENIED.

III. Standard of Review

Pursuant to Rule 52.1 of the Rules of the Court of Federal Claims (RCFC), the Court

reviews an agency’s procurement decision based on the administrative record. Bannum, Inc. v.

United States, 404 F.3d 1346, 1353–54 (Fed. Cir. 2005). The court makes “factual findings under

RCFC [52.1] from the record evidence as if it were conducting a trial on the record.” Id. at 1357.

Thus, “resolution of a motion respecting the administrative record is akin to an expedited trial on

the paper record, and the Court must make fact findings where necessary.” Baird v. United

States, 77 Fed. Cl. 114, 116 (2007). The Court’s inquiry is “whether, given all the disputed and

undisputed facts, a party has met its burden of proof based on the evidence in the record.” A&D

Fire Prot., Inc. v. United States, 72 Fed. Cl. 126, 131 (2006). Unlike a summary judgment

proceeding, genuine issues of material fact will not foreclose judgment on the administrative

record. Bannum, Inc., 404 F.3d at 1356.

In a bid protest, the Court reviews challenges to procurement decisions under the same

standards used to evaluate agency actions under the Administrative Procedure Act, 5 U.S.C.

§ 706. See 28 U.S.C. § 1491(b)(4) (stating that “[i]n any action under this subsection, the courts

shall review the agency’s decision pursuant to the standards set forth in section 706 of title 5”).

Thus, to successfully challenge an agency’s procurement decision, a plaintiff must show that the

agency’s decision was “arbitrary, capricious, an abuse of discretion, or otherwise not in

accordance with law.” 5 U.S.C. § 706(2)(A); see also Bannum, Inc., 404 F.3d at 1351.

This “highly deferential” standard of review “requires a reviewing court to sustain an

agency action evincing rational reasoning and consideration of relevant factors.” Advanced Data

Concepts, Inc. v. United States, 216 F.3d 1054, 1058 (Fed. Cir. 2000) (citing Bowman Transp.,

Inc. v. Ark.-Best Freight Sys., Inc., 419 U.S. 281, 285 (1974)). Thus, the Court cannot substitute

its judgment for that of the agency. See Honeywell, Inc. v. United States, 870 F.2d 644, 648

(Fed. Cir. 1989) (holding that as long as there is “a reasonable basis for the agency’s action, the

court should stay its hand even though it might, as an original proposition, have reached a

different conclusion” (quoting M. Steinthal & Co. v. Seamans, 455 F.2d 1289, 1301 (D.C. Cir.

1971))). Instead, the Court’s function is limited to “determin[ing] whether ‘the contracting

agency provided a coherent and reasonable explanation of its exercise of discretion.’” Impresa

Construzioni Geom. Domenico Garufi v. United States, 238 F.3d 1324, 1332–33 (Fed. Cir. 2001)

(quoting Latecoere Int’l, Inc. v. U.S. Dep’t of Navy, 19 F.3d 1342, 1356 (11th Cir. 1994)); see

also Motor Vehicle Mfrs. Ass’n v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29, 43 (1983) (court

14

should review agency action to determine if the agency has “examine[d] the relevant data and

articulate[d] a satisfactory explanation for its action”). A disappointed offeror “bears a heavy

burden” in attempting to show that a procuring agency’s decision lacked a rational basis. Impresa

Construzioni, 238 F.3d at 1338.

IV. XPO’s Allegations of Misleading and Unequal Discussions Regarding Past

Performance

In Count I of its amended complaint, XPO alleges that the agency engaged in misleading

and unequal discussions. Am. Compl. ¶¶ 93–97. Specifically, according to XPO, prior to the

recent corrective action, “XPO’s past performance proposal remained unchanged, and the agency

provided XPO one, consistent message regarding its past performance: XPO’s references (at

least [***] of [***]) were recent, Very Relevant and Relevant, and supported the agency’s

unwavering Substantial Confidence rating.” XPO’s Br. at 4; see also id. at 5 (citing AR Tab 62)

(noting that the agency informed XPO during initial discussions in August 2015 that XPO’s

“past performance proposal had been assessed the highest possible rating under the past

performance factor” and that “the agency did not provide XPO with any evaluation notices

(‘ENs’) or otherwise address XPO’s past performance proposal”). Notwithstanding those

assurances, XPO complains, “in its most recent reevaluation undertaken without reopening

discussions, the agency abruptly changed course and . . . downgraded XPO’s past performance

evaluation, . . . assessing a reduced Satisfactory Confidence rating.” Id. at 4. It argues that this

“changed evaluation,” which USTRANSCOM conducted “without reopening discussions or

providing the offerors an opportunity to revise their proposals . . . . rendered [the agency’s

earlier] discussions with XPO misleading.” Id. at 8.

As noted, XPO also contends that the agency engaged in unequal treatment. Specifically,

XPO notes that because the agency did not conduct discussions in connection with the most

recent corrective action, XPO did not have the opportunity to address USTRANSCOM’s

concerns about its past performance or to improve its proposal. By contrast, XPO observes that

prior to the previous evaluations “[t]he agency repeatedly informed Crowley that its references

were Not Relevant, resulting in a rating of Unknown Confidence/Neutral[,] and issued Crowley

at least one EN related to past performance”; moreover, the agency allowed Crowley to take

“advantage of those opportunities to make multiple proposal revisions in an attempt to improve

this area of its proposal.” Id. at 9.

As discussed below, under Federal Circuit precedent, XPO has waived its misleading and

unequal discussions claims by failing to raise them when the agency announced its corrective

action plan. Further, even if the claims were not waived, they lack merit.

A. XPO’s Waiver of Misleading and Unequal Discussions Claims

XPO’s argument that the agency should have held discussions as part of the corrective

action is barred by the doctrine of waiver set forth in Blue & Gold Fleet, LP v. United States, 492

F.3d 1308, 1313–15 (Fed. Cir. 2007). In that case, the court of appeals held that a party that is

aware of an error in the solicitation may not wait until after the government selects another

contractor to challenge that error. See id. at 1313.

15

Here, it is beyond dispute that XPO has been on notice since before XPO I was litigated

that its past performance ratings would likely change upon reevaluation and that the agency did

not intend to hold discussions as part of any corrective action. First, at XPO’s own urging, GAO

opined that past contracts whose values were less than 10% of the properly calculated average

annual value of the DFTS contract should presumptively be considered Not Relevant. See AR

Tab 148 at 13016. In light of GAO’s decision, XPO should have known that if and when the

agency took corrective action, the two XPO past performance references that the agency had

previously identified as Somewhat Relevant would be vulnerable to being downgraded to Not

Relevant based solely on their lack of comparable magnitude. In fact, the administrative record

in XPO I contained an internal agency email from the contracting officer in which he stated that

“[w]e will re-evaluate past performance for both Offerors utilizing what GAO considers a

reasonable benchmark” and that “we have already discovered this new benchmark will effect

[sic] both Offerors’ Confidence Assessment Ratings.” Id. Tab 175 at 15859.

Further, the email also stated that “[i]t is determined unnecessary to . . . re-open

discussions as the evaluation criteria meets the requirement needs, no weaknesses or deficiencies

remain, discussions were held fairly, and each Offeror[’]s total evaluated price is indicative of

the benefit each Offeror provides.” Id. And, on July 3, 2017, just after the Court issued its

decision in the prior protest, but before the completion of the corrective action, XPO was directly

advised that no discussions would take place during the reevaluation. Id. Tab 194 at 16556–58.

Notwithstanding the foregoing, XPO did not protest the agency’s decision not to hold

discussions until after USTRANSCOM again awarded the contract to Crowley. Accordingly,

XPO has waived its misleading and unequal discussions arguments. See Blue & Gold Fleet, LP,

492 F.3d at 1313 (noting that the “proper procedure [is] for the offeror . . . not to wait to see if it

is the successful offeror before deciding whether to challenge the procurement, but rather to raise

the objection in a timely fashion,” and that “[v]endors cannot sit on their rights to challenge what

they believe is an unfair solicitation, roll the dice and see if they receive award and then, if

unsuccessful, claim the solicitation was infirm” (internal quotations and alteration omitted)).

B. The Merits of XPO’s Misleading and Unequal Discussions Claims

In any event, even assuming that XPO did not waive its misleading and unequal

discussions arguments, those arguments lack merit. “[M]isleading discussions are characterized

by communications from the government that are incorrect, confusing or ambiguous.” DMS All-

Star Joint Venture v. United States, 90 Fed. Cl. 653, 670 (2010). The requirement that

discussions be meaningful and not misleading means that an agency must not “misdirect the

protestor as it revises its proposal.” Greenland Contractors I/S v. United States, 131 Fed. Cl. 216,

225 (2017) (quoting DMS All-Star Joint Venture, 90 Fed. Cl. at 670) (alteration omitted); see

also Caddell Constr. Co. v. United States, 125 Fed. Cl. 30, 45 (2016) (“An error in

communicating a weakness that causes an offeror to revise its proposal is quintessentially a

misleading discussion.”).

As noted above, during the two rounds of discussions that preceded the previous two

evaluations, the agency advised XPO that it intended to assign XPO a Substantial Confidence

rating and, in fact, it did so. Thus, XPO does not argue that the information regarding its past

performance efforts that the agency provided to it was incorrect, confusing, or ambiguous when

16

it was relayed to XPO during the discussions that accompanied the first and second rounds of the

evaluation process. Instead, it contends that the agency somehow rendered the past discussions

misleading on a retroactive basis when it later took corrective action and assigned a lower

confidence rating to XPO based on a reevaluation that XPO itself had urged.

This argument—elements of which bring to mind the plot of the motion picture “Back to

the Future”—is illogical and unpersuasive. XPO could not have been misled by the agency’s

assurances regarding its initial two Substantial Confidence ratings either at the time of the

discussions (preceding the first and second evaluations) or later when USTRANSCOM

announced that it was going to take corrective action. At the time of the discussions, as explained

above, the information imparted to XPO was accurate. And when the agency announced and then

initiated corrective action, XPO could not have been misled by those prior discussions into

believing that the agency’s earlier assessments would remain the same after the reevaluation. In

fact, as described above, XPO had every reason to expect that its past performance rating would

be adversely affected by the corrective action.

The decisions in Raytheon Co. v. United States, 121 Fed. Cl. 135, 142–44, aff’d, 809

F.3d 590 (Fed. Cir. 2015) and AshBritt, Inc. v. United States, 87 Fed. Cl. 344, 358, 372–73

(2009), upon which XPO relies, are inapposite. In those cases, during discussions the agencies

led at least some of the offerors to believe that their proposals would be evaluated based on a

particular methodology and those offerors revised their proposals or otherwise proceeded

accordingly. The agencies then applied different methodologies without ever notifying those

offerors of the change. In this case, by contrast, XPO was never misinformed about how it would

be evaluated at any stage. And, the discussions that took place in connection with stages one and

two of the evaluation process did not somehow become misleading at the final stage.

For similar reasons, there is no merit to XPO’s argument that it was subjected to unequal

treatment. Unequal discussions are those which prejudicially favor one offeror over another, such

as where an agency provides one offeror a “crucial” or “advantageous” piece of information

during discussions, but does not provide the same to another offeror. DMS All-Star Joint

Venture, 90 Fed. Cl. at 672. In this case, the offerors were treated equally during each evaluation

round. In the earlier rounds, each was afforded the opportunity to engage in discussions and each

was accurately informed of the agency’s tentative view of its past performance. Further, the

offerors also received equal treatment during the most recent round of evaluations, pursuant to

the corrective action, because the agency neither held discussions with either party nor accepted

proposal revisions.

Accordingly, based upon the foregoing, XPO’s motion for judgment on the

administrative record as to Count I is DENIED and Crowley’s and the government’s cross-

motions are GRANTED.

V. XPO’s Challenges to the Agency’s Past Performance Reevaluation

A. USTRANSCOM’s Evaluation of XPO’s [***] and [***] Contracts

In Count II of its amended complaint, XPO challenges the agency’s reevaluation of the

relevance of its past contracts with [***] and [***]. It contends that when comparing the

17

magnitude of those contracts to the magnitude of the DFTS contract, the agency “did not do an

apples-to-apples comparison” because, although the value assigned to the DFTS contract was

based on “freight under management” (FUM), the agency did not use FUM as a measure of the

value of the [***] and [***] contracts. XPO’s Br. at 12–13; see also id. at 13–14. This contention

lacks merit.

First, consistent with the solicitation, USTRANSCOM did not prescribe any particular

methodology for offerors to use when identifying the value of their past performance references.

During the evaluation process, it assigned dollar values to offerors’ past performance efforts on

the basis of the values the offerors themselves set forth in their proposals, and as reflected in the

past performance references the offerors submitted. Thus, in its proposal, XPO stated that the

[***] contract value was [***] for its five-year term, which translates to an approximate annual

value slightly less than [***]. See AR Tab 207 at 17172–73. And when [***] responded to

agency questions as part of the agency’s efforts to validate the past performance reference, it

similarly informed USTRANSCOM that the annual contract value was [***]. Id. Tab 187 at

16326. The agency, relying on these values, concluded that the “annual total contract value” of

XPO’s past contract with [***] was [***]. Id. Tab 192 at 16354.

Similarly, XPO asserted in its proposal that the [***] contract value was “~[***]” over a

nine-year term. Id. Tab 207 at 17172–75. [***] reported to USTRANSCOM more specifically an

annual value of [***]. Id. Tab 188 at 16329. The agency then assigned the contract an annual

value of [***]. Id. Tab 192 at 16354. The agency’s valuation of XPO’s past efforts involving

[***] and [***] is thus supported by XPO’s own representations reflected in the record.

Moreover, XPO’s argument that the agency considered FUM in the earlier evaluations

but ignored it during the corrective action has no support in the record. The values the agency

assigned to the [***] and [***] contracts during the corrective action match those assigned by

the agency in the two previous evaluation rounds. See id. Tab 115 at 12270–71 (concluding that

the [***] contract had an approximate total value of [***] and that the [***] contract had an

annual value of [***]). And, there is no mention of “freight under management” anywhere in the

solicitation or in the previous rounds’ evaluations. See id.9

Finally, and in any event, XPO was not prejudiced by the alleged error regarding the

valuation of its past performance references. See Bannum, Inc., 404 F.3d at 1353 (in order to

prevail in a bid protest, the protester must “establish ‘significant prejudice’” by showing there

was a substantial chance it would have received the contract absent the error the court has

found). In determining that the [***] and [***] contracts were Not Relevant, the agency relied

primarily upon their lack of comparable complexity, not their magnitude, noting that they

“involve[d] little or none [of the] complexities [of the DFTS contract] and [were] therefore rated

as Not Relevant.” AR Tab 192 at 16354–55 (emphasis in original) (observing that the [***]

reference provided no evidence of XPO’s capabilities with respect to “on time pick-up of freight,

on time delivery of freight, and availability of equipment, to include specialized equipment,” and

9

To the extent XPO is contending that the solicitation should have required the agency to

consider FUM in assessing the magnitude of past efforts, that argument is a challenge to the

terms of the solicitation and is untimely. See Blue & Gold Fleet, LP, 492 F.3d at 1314–15.

18

that the [***] reference “demonstrated little or none of the complexities of the DFTS effort”).

XPO accordingly has not demonstrated a substantial chance of obtaining the award absent the

error it alleges.10

B. USTRANSCOM’s Evaluation of XPO’s DTCI Contract

XPO also challenges the agency’s decision to assign the DTCI contract a “Relevant”

rating rather than the “Very Relevant” rating it received in the first two evaluation rounds. It

argues that “[w]hile there are minor differences . . . in the DFTS program, [DFTS and DTCI] are

essentially the same in size, scope, and complexities.” XPO’s Br. at 17–18.

Determining that a past performance reference involved “similar” as opposed to

“essentially the same” scope and magnitude of effort and complexities involves an exercise in

judgment that is best left to the expertise and discretion of the agency. Therefore, as noted above,

the Court’s review is limited to ascertaining whether the agency “provided a coherent and

reasonable explanation of its exercise of discretion.” Impresa Construzioni, 238 F.3d at 1332.

In this case, the determination that the DTCI and the DFTS contracts were not essentially

the same in terms of scope and complexity was based on several differences between the two

efforts that the agency identified. First, the DFTS contract (but not the DTCI contract) provides a

shipping agency with the option of selecting a “Time Definite Delivery.” AR Tab 20 at 9538.

When this option is selected, shipment must occur “with delivery constraints less than the

standard transit time which require the Contractor to determine the appropriate level of service.”

Id.

XPO observes that air delivery is the mode of transport that will generally be used for

time-definite deliveries under this requirement of the DFTS contract, and implies that it similarly

provided air freight services under the DTCI contract. XPO’s Br. at 19–20; see also XPO’s

Reply in Supp. of Its Mot. for J. on the Admin. R. & Opp’n to the Gov’t’s and Crowley’s Cross-

Mots. at 17, ECF No. 39 (claiming that between March 2008 and July 2013, the DTCI contract

provided for air freight services). But the version of the DTCI contract found in the record (dated

August 17, 2007), which appears to be the version of the DTCI contract submitted by XPO and

found recent by USTRANSCOM, expressly excluded such services. See AR Tab 181 at 16037,

16132–33, 16140. The agency was therefore entitled to find that the two efforts were similar, but

not essentially the same. See id. Tab 20 at 9501.

Second, the agency reasonably concluded that the DFTS contract and the DTCI contract

are not essentially the same because the DFTS contract contains three pricing tiers that are based

on three possible response/pick-up times: a tier based on a four-hour response/eight-hour pick-up

time, a tier based on a twelve-hour response/twenty-four-hour pick-up time, and a tier based on a

twenty-four-hour response/forty-eight-hour pick-up time. Id. Tab 20A; see also id. Tab 5 at 73.

10

For this same reason, XPO was not prejudiced by another error it alleges—that the agency

miscalculated the DFTS average annual value against which past efforts were measured. XPO’s

Br. at 23–25; see also n.3, supra. As noted, the relevancy ratings for the [***] and [***] contracts

were based primarily upon differences in complexity and scope, not magnitude.

19

The DTCI contract, on the other hand, provides only [***]. Id. Tab 181 at 16143, 16174; see also

id. Tab 5 at 73; id. Tab 22 at 10122 (agency stating during DFTS solicitation question and

answer opportunity that “[t]he three tier pricing option is new to this requirement”).11

The agency also noted that the DFTS requirement for shipping into Canada, and

potentially Alaska, differed from the DTCI contract, which involves shipping only within the

continental United States. XPO argues that shipping into Canada and Alaska is only a small part

of the contract and that it will involve the same transportation services that XPO provides under

DTCI in the continental United States. Notwithstanding these arguments, providing for shipping

services in Canada certainly adds an additional level of complexity into the contract, as such

services will be subject to different laws than those in the United States and may require a border

crossing. The agency acted within its discretion when it identified shipping outside the

continental United States under the DFTS but not the DCTI contract as another material

difference between the two contracts.12

Finally, the agency concluded that DFTS is not essentially the same as DTCI because the

former “on-ramps other federal government agencies outside of the DoD.” Id. Tab 192 at 16353;

see also id. Tab 196 at 16611–12. According to XPO, this distinction “is something that only

potentially may happen”; further, it observes that “XPO held extensive, serious discussions with

USTRANSCOM and GSA about folding GSA into the DTCI program.” XPO’s Br. at 21. The

fact remains, however, that under the DFTS program the contractor may be required to on-ramp

additional agencies and that XPO never actually performed that service under DTCI. See AR

Tab 20 at 9521; see also id. Tab 5 at 73 (noting that DTCI does not have an “On-Ramp[] for

others to join,” while DFTS does). Thus this distinction is also supported by the record.

In short, the record provides support for each of the scope and complexity distinctions

that USTRANSCOM drew between the DTCI contract and the DFTS contract. For that reason,

the Court concludes that the agency acted within its discretion when it determined that the scope

and complexities of the DTCI contract were “similar to” but not “essentially the same” as the

DFTS contract.

11

XPO calls this a “false distinction” because “DTCI also has rate applications dependent upon

many criteria.” XPO’s Br. at 20. But the fact that both contracts include rates that depend on

multiple criteria does not speak to the distinction the agency identified, which concerns the

existence of multiple response/pick-up time options.

12

Similarly, XPO quarrels with the significance the agency gave to the fact that the DFTS

contract requires customs brokerage services, although it admits that the DFTS requirement to

provide such services is a valid distinction. XPO’s Br. at 21. The agency, however, acted within

its discretion in finding that this undisputed difference between the programs contributed to its

conclusion that the contracts were not essentially the same.

20

C. USTRANSCOM’s Alleged Consideration of XPO’s Not Relevant Past

Performance References

XPO also contends that when assigning it a confidence rating of Satisfactory rather than

Substantial, the agency improperly considered certain marginal quality ratings contained in past

performance references that it had determined Not Relevant. XPO’s Br. at 26–30. XPO bases its

argument on a passage in the SSA’s decision that reads as follows:

[XPO’s] proposal under the Past Performance evaluation factor

received a Past Performance Confidence Assessment rating of

Satisfactory Confidence meaning, based on the Offeror’s

recent/relevant performance record, the Government has a

reasonable expectation that the offeror will successfully perform the

required effort. In all, the Government reviewed [***] past

performance references which demonstrated a broad range of

performance ratings from Marginal to Exceptional. One effort was

rated as Relevant and the other [***] were rated as Not Relevant.

AR Tab 198 at 16989.

While XPO focuses on the summary description of XPO’s past performance references

contained in the second and third sentences of this passage, it ignores the topic sentence, which

explicitly states that XPO’s Satisfactory Confidence assessment rating was “based on the

Offeror’s recent/relevant past performance record.” Id. (emphasis added). Moreover, the SSEB

and SSAC reports, upon which the SSA explicitly relied and with which he concurred, each

reflect that their Satisfactory Confidence ratings were based solely on XPO’s one Relevant

effort, the DTCI contract. See id. Tab 196 at 16611–12; id. Tab 197 at 16980–81 (also

concluding that XPO’s Satisfactory Confidence rating was “based on the Offeror’s

recent/relevant performance record”). Accordingly, when read as a whole, the record does not

support XPO’s contention that the SSA relied upon quality ratings from XPO’s non-relevant past

performance efforts in assigning XPO a Satisfactory Confidence rating.13

* * * * * * * * * * * * *

For all of the foregoing reasons, XPO’s motion for judgment on the administrative record

as to Count II is DENIED and the government’s and Crowley’s cross-motions as to that count

are GRANTED.

VI. XPO’s Challenge to the Agency’s Best Value Tradeoff

Finally, XPO claims that in conducting its best value tradeoff analysis, the agency

improperly considered past performance efforts by Crowley that the agency had found Not

Relevant. Am. Compl. ¶ 125; see also XPO’s Br. at 30. Specifically, XPO cites the following

13

In light of this conclusion, the Court will not address XPO’s alternative argument that if it was

appropriate for the SSA to consider irrelevant quality ratings, it failed to properly consider the

mitigation surrounding XPO’s marginal ratings. See XPO’s Br. at 30–34.

21

passage in the SSA’s decision, addressing the risk posed to the agency by Crowley’s Unknown

Confidence assessment:

While it is noted there is some risk associated with awarding a

contract to an Offeror with a Confidence Assessment rating of

Unknown Confidence, I am willing to accept that risk. Because,

even though Crowley was unable to provide any individual

referenced effort which was considered Somewhat Relevant, it

provided numerous smaller transportation services, making the risk

of successful performance worth the $625M lower price.

AR Tab 198 at 16990.

Notwithstanding XPO’s argument, there was nothing improper about the SSA

considering the “numerous smaller transportation services” Crowley had provided in conducting

its best value tradeoff. While those services were irrelevant in assessing Crowley’s Past

Performance, they nonetheless bear on a separate factor appropriately considered in making the

tradeoff decision—Crowley’s Corporate Experience.14 As GAO has recognized, “[g]enerally, an

agency’s evaluation under an experience factor is distinct from its evaluation of an offeror’s past

performance.” See, e.g., Shaw-Parsons Infrastructure Recovery Consultants, LLC, B-401679.4 et

al., 2010 WL 1180085, at *11 (Comp. Gen. Mar. 10, 2010).15 Where an agency includes separate

experience and past performance factors, the “former focuses on the degree to which an offeror

has actually performed similar work, whereas the latter focuses on the quality of the work.” CSI,

Inc., B-407332.5 et al., 2015 WL 468260, at *4 n.3 (Comp. Gen. Jan. 12, 2015).

Here, the agency was required under the solicitation to consider both the Corporate

Experience and Past Performance factors in making its best value decision. See AR Tab 20 at

9494. Thus, the solicitation stated that “[t]o receive award, the offeror must . . . (3) represent a

best value to the Government, price and other factors considered.” Id. It also provided that

“[e]ach offeror’s proposal will be evaluated against the following criteria: a. Corporate

Experience . . . d. Past Performance . . . .” Id.

14

Under the solicitation, offerors were to submit separate Corporate Experience and Past

Performance volumes which were subject to separate evaluation criteria. AR Tab 20 at 9494. For

Corporate Experience, the solicitation required offerors to “submit recent and relevant corporate

experience related to the tasks described within the [Performance Work Statement].” Id. at 9485.

Specifically, the agency sought prior contracts relevant to three specific sub-tasks: 1) carrier

management; 2) operational support; and 3) interfaces and data exchanges with government

systems. Id. at 9486.

15

Although GAO opinions are not binding on the Court of Federal Claims, the Court “may draw

on GAO’s opinions for its application of [its] expertise.” See Allied Tech. Grp., Inc. v. United

States, 649 F.3d. 1320, 1331 n.1 (Fed. Cir. 2011); see also Univ. Research Co., LLC v. United

States, 65 Fed. Cl. 500, 503 (2005) (noting that GAO decisions are not binding on the court but

“are persuasive”).

22

In short, based on the plain language of the solicitation, the agency was permitted to

consider Corporate Experience in its tradeoff analysis. Therefore, when the SSA weighed the

experience Crowley possessed on the basis of its smaller efforts against the risks of its Unknown

Confidence rating he was acting consistent with the solicitation.

VII. XPO’s Claims Regarding Unbalanced Pricing and the Agency’s Consideration of

Price

With the exception of its claim that the agency improperly considered past performance

efforts by Crowley that the agency had found Not Relevant, which is made at the end of Count

V, XPO makes the same claims and relies upon the same legal arguments in Counts III, IV, and

V of its amended complaint that it pursued in its previous protest: namely, that the agency “did

not consider Crowley’s unbalanced pricing and improperly considered only the TEP in the price

tradeoff.” XPO’s Br. at 38; see also Am. Compl. ¶ 3; compare Am. Compl. ¶¶ 104–126, with

Am. Compl. ¶¶ 69–74, 83–89, 101–108, XPO I, No. 17-452 (Fed. Cl. Apr. 10, 2017), ECF No.

28. The Court rejected those claims on their merits in XPO I. See 133 Fed. Cl. at 180–84. “Under

the doctrine of claim preclusion [or res judicata], ‘a judgment on the merits in a prior suit bars a

second suit involving the same parties or their privies based on the same cause of action.’”

Acumed LLC v. Stryker Corp., 525 F.3d 1319, 1323 (Fed. Cir. 2008) (quoting Parklane Hosiery

Co. v. Shore, 439 U.S. 322, 327 n.5 (1979)) (footnote omitted). Accordingly, XPO’s motion for

judgment on the administrative record as to Counts III, IV, and V are DENIED and the

government’s and Crowley’s cross-motions as to those counts are GRANTED.

CONCLUSION

Based on the foregoing, XPO’s motion to supplement the administrative record is

DENIED. Its motion for judgment on the administrative record is DENIED and the

government’s and Crowley’s motions for judgment on the administrative record are GRANTED.

The Clerk is directed to enter judgment accordingly. Each side shall bear its own costs.

IT IS SO ORDERED.

s/ Elaine D. Kaplan

ELAINE D. KAPLAN

Judge

23