Opinion

W.K. Baker v. DEP

Court
Commonwealth Court of Pennsylvania
Filed
Mar 2, 2017
Status
Unpublished
On the bench
Cohn Jubelirer, J. ~ Dissenting Opinion by Cosgrove, J.
Cited by
0 cases
Authority
More cited than 3.6%

“the waiver exception that exists for claims ‘questioning the validity of a statute,’ 2 Pa. C.S. § 703(a), applies only to facial challenges to a statute’s constitutionality; such claims need not be raised before the administrative agency to be preserved for appellate review”

How later courts described this case

  • “the waiver exception that exists for claims ‘questioning the validity of a statute,’ 2 Pa. C.S. § 703(a), applies only to facial challenges to a statute’s constitutionality; such claims need not be raised before the administrative agency to be preserved for appellate review”

Written by the judges who cited it.

The opinion

IN THE COMMONWEALTH COURT OF PENNSYLVANIA

Wayne K. Baker, :

Petitioner :

:

v. : No. 633 C.D. 2016

: Argued: October 17, 2016

Department of Environmental :

Protection, :

Respondent :

BEFORE: HONORABLE RENÉE COHN JUBELIRER, Judge

HONORABLE JOSEPH M. COSGROVE, Judge

HONORABLE JAMES GARDNER COLINS, Senior Judge

OPINION NOT REPORTED

MEMORANDUM OPINION BY

JUDGE COHN JUBELIRER FILED: March 2, 2017

Wayne K. Baker (Petitioner) appeals from an Order of the Environmental

Hearing Board (EHB) dismissing his appeal of the Department of Environmental

Protection’s (DEP) approval of a Stage 1 bond release to Amerikohl Mining, Inc.

(Amerikohl) related to surface mining of coal on Petitioner’s property (Site). This

appeal addresses two requirements of the Stage 1 bond release: (1) that all waste

and materials associated with the mining operation be removed from the mining

site; and (2) that the mining site is returned to its approximate original contours

(AOC). Petitioner argues that the EHB erred by improperly placing the burden

upon him to prove that Amerikohl met a heightened standard for the first

requirement, and by concluding that both requirements were met. We affirm.

Government efforts related to the conservation and improvement of lands

impacted by surface mining of coal are governed primarily by the Surface Mining

Conservation and Reclamation Act1 (SMCRA). Section 1 of SMCRA sets forth its

purpose and provides:

This act shall be deemed to be an exercise of the police powers of the

Commonwealth for the general welfare of the people of the

Commonwealth, by providing for the conservation and improvement

of areas of land affected in the surface mining of bituminous and

anthracite coal and metallic and nonmetallic minerals, to aid thereby

in the protection of birds and wild life, to enhance the value of such

land for taxation, to decrease soil erosion, to aid in the prevention of

the pollution of rivers and streams, to protect and maintain water

supply, to protect land and to enhance land use management and

planning, to prevent and eliminate hazards to health and safety, to

promote and provide incentives for the remining of previously

affected areas, to allow for government-financed reclamation

contracts authorizing incidental and necessary coal extraction, to

authorize a remining and reclamation incentive program, to prevent

combustion of unmined coal, and generally to improve the use and

enjoyment of said lands, to designate lands unsuitable for mining and

to maintain primary jurisdiction over surface coal mining in

Pennsylvania. It is also the policy of this act to assure that the coal

supply essential to the Nation’s and the Commonwealth’s energy

requirements, and to their economic and social well-being, is provided

and to strike a balance between protection of the environment and

agricultural productivity and the Nation’s and the Commonwealth’s

need for coal as an essential source of energy.

52 P.S. § 1396.1.

In order to effectuate its purpose, Section 4(a) of SMCRA requires mine

operators to obtain a permit from DEP prior to any surface mining of coal. 52 P.S.

1

Act of May 31, 1945, P.L. 1198, as amended, 52 P.S. §§ 1396.1 - 1406.

2

§ 1396.4(a). In conjunction with the permit, Section 4(d) of SMCRA requires

mine operators to put up a bond to cover the costs of any reclamation. Section 4(d)

of SMCRA provides, in relevant part:

Prior to commencing surface mining, the permittee shall file with

[DEP] a bond for the land affected by each operation on a form to be

prescribed and furnished by [DEP], payable to the Commonwealth

and conditioned that the permittee shall faithfully perform all of the

requirements of this act and . . . “The Clean Streams Law,[2]” [and

other acts not relevant here] . . . . The amount of the bond required

shall be in an amount determined by [DEP] based upon the total

estimated cost to the Commonwealth of completing the approved

reclamation plan, or in such other amount and form as may be

established by [DEP] pursuant to regulations for an alternate coal

bonding program which shall achieve the objectives and purposes of

the bonding program.

52 P.S. § 1396.4(d).

In addition to requiring mine operators to return the land to a productive

and/or environmentally sustainable state, SMCRA and DEP’s associated

regulations address the restoration of the mine site’s topography. Section

4(a)(2)(E) of SMCRA, 52 P.S. § 1396.4(a)(2)(E). Pursuant to DEP’s regulations,

areas disturbed by mining operations “shall be returned to their approximate

original contour . . . .” 25 Pa. Code § 87.141(a). Section 3 of SMCRA defines

“contour[]” as that which “closely resembles the general surface configuration of

the land prior to mining and blends into and complements the drainage pattern of

the surrounding terrain with no highwall, spoil piles[,] or depressions to

accumulate water and with adequate provision for drainage.” 52 P.S. § 1396.3.

2

Act of June 22, 1937, P.L. 1987, as amended, 35 P.S. §§ 691.1 - 691.1001.

3

As a general matter, SMCRA addresses the impact mining operations have

on the land. The Clean Streams Law, on the other hand, imposes requirements on

surface coal mining operations with regard to the impact the mining operations

have on the waters of the Commonwealth.3 Section 315(b) of the Clean Streams

Law provides in relevant part:

[DEP] may require an applicant for a permit to operate a mine, or a

permittee holding a permit to operate a mine under the provisions of

this section, to post a bond or bonds on forms prescribed and

furnished by [DEP] in favor of the Commonwealth of Pennsylvania

and with good and sufficient collateral, irrevocable bank letters of

credit or corporate surety guarantees acceptable to [DEP] to insure

that there will be compliance with the law, the rules and regulations of

[DEP], and the provisions and conditions of such permit including but

not limited to conditions pertaining to restoration measures or other

provisions insuring that there will be no polluting discharge after

mining operations have ceased. [DEP] shall establish the amount of

the bond required for each operation based on the cost to the

Commonwealth of taking corrective measures in cases of the

3

In enacting the Clean Streams Law, the General Assembly stated its objective in Section

4 as follows:

(1) Clean, unpolluted streams are absolutely essential if Pennsylvania is to attract

new manufacturing industries and to develop Pennsylvania’s full share of the

tourist industry;

(2) Clean, unpolluted water is absolutely essential if Pennsylvanians are to have

adequate out of door recreational facilities in the decades ahead;

(3) It is the objective of the Clean Streams Law not only to prevent further

pollution of the waters of the Commonwealth, but also to reclaim and restore to a

clean, unpolluted condition every stream in Pennsylvania that is presently

polluted;

(4) The prevention and elimination of water pollution is recognized as being

directly related to the economic future of the Commonwealth; and

(5) The achievement of the objective herein set forth requires a comprehensive

program of watershed management and control.

35 P.S. § 691.4. Added by Section 2 of the Act of August 23, 1965, P.L. 372, as amended.

4

operator’s failure to comply, or in such other amount and form as may

be established by [DEP] pursuant to regulations for an alternate coal

bonding program which shall achieve the objectives and purposes of

the bonding program. . . . Upon the completion of any mining

operation and prior to the release by [DEP] of any portion of the

bond liability, the operator shall remove and clean up all temporary

materials, property, debris or junk which were used in or resulted

from his mining operations. . . . If the operator fails or refuses to

comply with the requirements of the act in any respect for which

liability has been charged on the bond, the Secretary of [DEP] shall

declare the bond forfeited, and shall certify the same to the Attorney

General, who shall proceed to enforce and collect the amount of

liability forfeited thereon, and where the operator has deposited cash

or securities as collateral in lieu of a corporate surety, the secretary

shall declare said collateral forfeited. If the operator is or was

engaged in surface mining operations at the time of the violation, the

secretary shall direct the State Treasurer to pay said funds into the

Surface Mining Conservation and Reclamation Fund, or to proceed to

sell said securities to the extent forfeited and pay the proceeds thereof

into the Surface Mining Conservation and Reclamation Fund.

35 P.S. § 691.315(b)4 (emphasis added). The requirements of SMCRA and the

Clean Streams Law are to be read as complementary measures protecting the land

and waters of the Commonwealth, respectively.

Mine operators must apply to DEP for a bond release and give public notice

in a newspaper of general circulation that it has applied for such. Sections 4(b) and

4(g) of SMCRA, 52 P.S. §§ 1396.4(b), (g). The bonds are released by DEP in

three stages. See Section 4(g) of SMCRA, 52 P.S. § 1396.4(g) (detailing the three

stages); 25 Pa. Code § 86.174 (same). Stage 1 involves the “[r]elease of an amount

not to exceed 60% of the total bond amount[,]” 25 Pa. Code § 86.175, and is met

when the permit area “has been backfilled and regraded to the approximate

original contour or approved alternative, and when drainage controls have been

4

Added by Section 5 of the Act of August 23, 1965, P.L. 372, as amended.

5

installed in accordance with the approved reclamation plan,” 25 Pa. Code § 86.174

(emphasis added).

DEP may release all or a portion of the bond if it “is satisfied the

reclamation covered by the bond or portion thereof has been accomplished.” 52

P.S. § 1396.4(g). DEP’s review of an application for a bond release is detailed in

Section 86.171(f) of DEP’s regulations, which provides in relevant part:

(f) Departmental review and decision will be as follows:

(1) [DEP] will consider during inspection, evaluation, hearing

and decision:

(i) Whether the permittee has met the criteria for release

of the bond [discussed above related to the schedule of

release for each stage].

(ii) Whether the permittee has satisfactorily completed

the requirements of the reclamation plan, or relevant

portion thereof, and complied with the requirements of

the acts, regulations thereunder and the conditions of the

permit, and the degree of difficulty in completing

remaining reclamation, restoration or abatement work.

(iii) Whether pollution of surface and subsurface water is

occurring, the probability of future pollution or the

continuance of present pollution, and the estimated cost

of abating pollution.

25 Pa. Code § 86.171(f).

I. DEP’S DECISION

The Site is in Fayette County, Pennsylvania. (EHB Decision, Findings of

Fact (FOF) ¶ 4.) Amerikohl conducted surface mining activities at the Site

pursuant to a surface mining permit issued in 2011 and posted a bond of $141,520.

(Id. ¶¶ 4, 9.) No party conducted a pre-mining survey of the Property, but the

6

permit states that no pre-mining slope exceeded 8.5 degrees. (Id. ¶¶ 14, 15.) Upon

the completion of active mining, Amerikohl submitted a request to DEP on July

23, 2014, for a Stage 1 release of 60% of the total bond, or $77,659. (Id. ¶ 10.)

Petitioner was concerned with apparent changes to the Site’s topography

after the completion of the mining operation and hired William G. Rosner, a

professional surveyor with 50 years of experience in the mining industry, to survey

the Site. (Id. ¶¶ 16-17.) Mr. Rosner took measurements of the Site using an

Abney level, a handheld device used to measure slopes. (Id. ¶ 18.) While his

results showed that most of the site was returned to approximate original contour,

one slope on the Site measured 22.6 degrees. (Id. ¶¶ 18, 20.) The slope at issue

was “upslope from a portion of the collection ditch at the perimeter of the site on

the northern portion of the mine site.” (Id. ¶ 19.)

Matthew Somogyi was the assigned DEP Surface Mining Conservation

Inspector of the Site from the beginning of the mining operations. (Hr’g Tr. at

445, R.R. at 337a.) Mr. Somogyi took photographs of the Site on July 11, 2014,

shortly after mining operations were completed and the Site was backfilled,

regraded, seeded, and mulched. (Hr’g Tr. at 450, R.R. at 338a.) DEP also sent Mr.

Pytash, Mr. Somogyi’s supervisor, to meet with Petitioner to informally discuss his

concerns. (Hr’g Tr. at 475-76, R.R. at 344a-45a.) When Mr. Pytash retired,

William Shuss, a Mine Conservation Inspector Supervisor with DEP, assumed Mr.

Pytash’s responsibilities. (Id.)

Mr. Shuss visually inspected the Site for compliance with the slope

requirements and concluded that the site blended well with the surrounding

topography. (FOF ¶¶ 29-30.) Mr. Shuss’ typical process is to visually assess

whether a mining site has been “re-graded in a manner consistent with the

7

regulations.” (Hr’g Tr. at 479, R.R. at 345a.) Mr. Shuss will take measurements

or ask the mine operator to do so if the site looks like it violates the regulation

when he assesses it with the naked eye. (FOF ¶ 29; Hr’g Tr. at 480, R.R. at 346a.)

Mr. Shuss observed that the collection ditch, which he saw as a temporary water

control measure, caused a depression in the property and relayed to Amerikohl that

the ditch had to be regraded. (Hr’g Tr. at 486-87, R.R. at 347a.) However, he did

not think that the collection ditch should be fixed at that time due to the possible

impact on the newly planted vegetation. (Id.) Mr. Shuss thought that the best

approach was to fill the collection ditch once the vegetation further matured. (Id.)

After hearing Petitioner’s concerns, Mr. Shuss asked Amerikohl to survey

the Site. (Hr’g Tr. at 493, R.R. at 349a.) Amerikohl contracted with Earth Tech to

conduct a study, which was submitted in July of 2014. (Hr’g Tr. at 651, 653, R.R.

at 420-21a.) Charles Lightfoot of Earth Tech oversaw the project. (FOF ¶ 35.)

The study concluded that the Site was returned to AOC and that Amerikohl met the

reclamation standards. (Hr’g Tr. at 652-53, R.R. at 420a-21a.)

In addition to concerns over the topography, Petitioner objected to the

Stage 1 bond release on the grounds that waste was left on the Site. Petitioner

testified that he saw a mechanic named Mike Richter drain oil from an excavator

on to the ground in March or April 2014 and told Amerikohl’s foreman about what

he saw. (Hr’g Tr. at 141-45, R.R. at 229a-30a.) Petitioner filed a complaint with

the federal Environmental Protection Agency (EPA) in July 2014, shortly before

Amerikohl applied for the Stage 1 bond release. The EPA complaint was referred

to DEP and received on July 7, 2014. (R.R. at 602a.) An inspector sent to the Site

by DEP did not observe any evidence of a spill. (Id.; Hr’g Tr. at 489, R.R. at

348a.)

8

DEP concluded that Amerikohl satisfied the requirements of Stage 1 bond

release and approved the release. (FOF ¶ 11.) According to a letter dated

September 19, 2014, from Mr. Shuss to Petitioner explaining DEP’s decision,

Your concern that the currently constructed collection ditch and

sedimentation pond, previously mentioned on the southern slope will

prevent access to the disturbed area of the site was addressed during

our site inspection with you and Mr. Rosner. [DEP] will insure that

the area near the pond blends with the natural ground and the slope of

the site above the ditch after the pond is removed.

Collection ditch C3, a temporary drainage control, is impounding

water, at its eastern end because it was installed incorrectly.

Amerikohl is to remove this ditch after successful vegetation is

established probably in the spring of next year. Remedial work on the

ditch is not recommended at this time as it will destroy the vegetation

on the slope above the ditch and will lead to increased erosion and

loss of topsoil.

Based on the above, [DEP] has granted Stage [1] bond release to

Amerikohl Mining Inc. for the subject site.

(R.R. at 23a.) DEP’s letter did not address Petitioner’s allegations of waste oil

dumping.

II. APPEAL TO EHB

Petitioner appealed DEP’s decision to the EHB on October 30, 2014. (R.R.

at 9a.) Therein, Petitioner argued: (1) that the Site was not returned to AOC; (2)

that waste oil was spilled at the Site and remains in the ground; and (3) that

Amerikohl “has failed to bury all acid- and toxic-forming material in accordance

with Pennsylvania law and the permit conditions.” (R.R. at 10a.)

In anticipation of the EHB adjudication of the matter, Petitioner, Amerikohl,

and DEP procured additional evidence, which was presented to the EHB at a

9

hearing that lasted three days. With regard to the Site’s topography, Mr. Rosner

surveyed the Site a second time on March 11, 2015, this time using “conventional

surveying equipment.” (FOF ¶ 21.) The conventional survey measurements

supported his earlier measurements using the Abney level. (Id. ¶ 22.) The

collection ditch was removed on or about April 20, 2015. (Id. ¶ 25; Hr’g Tr. at

487, R.R. at 347a.) After the collection ditch was removed, Mr. Rosner visited the

Site on August 21, 2015, and measured the slope at issue as 23 degrees using an

Abney level that he rested on his truck. (FOF ¶ 26.)

Earth Tech also returned to the Site on behalf of Amerikohl after the ditch

was filled and the area re-graded. (Hr’g Tr. at 657, R.R. at 422a.) Earth Tech

estimated pre-mining slopes using PASDA.5 (FOF ¶ 39.) The EHB considered

PASDA mapping as more accurate than other methods, such as United States

Geological Survey (USGS), because, inter alia, it takes advantage of modern

mapping technologies. (Id. ¶ 37.) The Earth Tech survey, conducted with GPS

measurements and consistent with the measuring standard articulated in DEP’s

regulations on pre-mining mapping,6 showed that the post-mining slopes were less

5

“‘PASDA’ is the acronym for Pennsylvania Spatial Data Access and, according to its

website ‘is the official public access geospatial information clearinghouse for the

Commonwealth of Pennsylvania.’” (EHB Decision at 14 n.3.)

6

Section 87.54(21) of DEP’s regulations provide:

(21) Sufficient slope measurements to adequately represent the existing land

surface configuration of the proposed permit area, measured and recorded

according to the following:

(i) Each measurement shall consist of an angle of inclination along the

prevailing slope extending 100 linear feet above and below or beyond the

coal outcrop or the area to be disturbed, or, when this is impractical, at

locations specified by the Department.

(Footnote continued on next page…)

10

severe than the pre-mining slopes. (FOF ¶ 41.) DEP also photographed the

Property on August 6, 2015. (Id. ¶ 32.) These photographs “depict gradual slopes

and no high[ ]walls, spoil piles or depressions.” (Id.)

With regard to waste on the Site, in an effort to obtain more information on

the alleged waste oil dumping, Petitioner, Mr. Rosner, and a representative from

American Geosciences (AGI), an environmental consulting firm retained by

Petitioner, excavated six test pits where Amerikohl kept its oil and fuel tanks and

performed maintenance on its equipment. (Id. ¶ 47; Hr’g Tr. at 348, R.R. at 313a.)

The excavation unearthed “three oil filters, a fuel/water separator filter, three oily

rags and a plastic lid.” (FOF ¶ 48.) Petitioner removed the items and presented

them at the hearing. (EHB Decision at 17 & n.6.) No other materials were

discovered by Petitioner.

Testimony on possible waste oil dumping on the Site was presented to the

EHB by William Parsonage of AGI on behalf of Petitioner. Mr. Parsonage and his

colleague, Brice Rupp, visited the Site in February and April of 2015, respectively.

(Hr’g Tr. at 342, R.R. at 311a.) Mr. Rupp was present when Petitioner excavated

the pits. (Id.) Mr. Rupp conducted a test of the pits with a photoionization

detector (PID), which is a device that measures concentrations of volatile organic

_____________________________

(continued…)

(ii) The measurements shall extend at least 100 feet beyond the limits of

mining disturbances, or another distance determined by the Department to

be representative of the premining configuration of the land, when the area

has been previously mined.

(iii) Slope measurement shall take into account natural variations in slope,

to provide accurate representation of the range of natural slopes and reflect

geomorphic differences of the area to be disturbed.

25 Pa. Code § 87.54(21).

11

compounds in the air. (Id. at 314a.) The results “ranged from background to one

location w[h]ere the reading was 8.5 parts per million” (ppm). (Id.) Mr.

Parsonage testified that a reading of 8.5 ppm was significant because waste oils or

lubricating oils typically would not produce such high readings. (Id.)

Amerikohl responded to Petitioner’s evidence presented by AGI with its

expert, James Pinta from Civil and Environmental Consultants. Mr. Pinta

reviewed the reports from AGI and witnessed Mr. Parsonage’s and Mr. Baker’s

testimony. (Hr’g Tr. at 574, R.R. at 401a.) He demonstrated to the EHB how a

PID reader works and opined as follows.

[An] 8.5 reading could very well be a background reading. I mean, I

put the cap of that Sharpie pen over here and it went up to almost 60,

which is almost eight times that reading. So, most of the health and

safety plans that I’ve been involved with, there’s no action required

for in the breathing zone until you get up around probably 15 or 20

parts per million, and then the action would be to check in more

detail. It’s not abandon the site or run away from the site or anything

like that. So, the reading of 8.5 is, I would say, is probably within

background. It would likely be within background noise of the

instrument.

(Id. at 402a.)

DEP also took samples of the soil from the area where the pits were dug.

(FOF ¶ 52.) While collecting the samples, DEP’s inspector did some “minor

probing with a spade shovel,” and “some oil was liberated” and floated to the

surface of water that had ponded in a test pit. (Hr’g Tr. at 297-99, R.R. at 300a.)

The liberated oil caused a sheen to become apparent on the surface of the water.

(Id.) The samples were tested and revealed the presence of petroleum compounds.

(FOF ¶ 53.) DEP concluded that “[a]ll of the constituents were lower than the

health based residential remediation standards established under [the Land

12

Recycling and Environmental Remediation Standards Act, commonly known as]

Act 2.”[7] (FOF ¶ 53.) DEP also interviewed four Amerikohl staff members. (R.R.

555a-60a.) Three staff members reported that no significant spill had occurred, but

one staff member, Mr. Richter, “stated that near the end of the . . . job, vandals

entered the site, removed a 2 [inch] pipe plug from the drain of the tank and

opened the valve on the tank.” (Id. at 557a.) Richter estimated that 20 gallons of

oil may have spilled. (Id.) According to Richter, the act of vandalism was not

reported to Petitioner or the State Police. (Id.)

At the close of evidence, Petitioner argued to the EHB that Stage 1 bond

release was inappropriate for two reasons. First, with regard to the discovery of

buried oil and solid waste on the Site, Petitioner argued that he met his burden to

show facts necessary to compel a shifting of the burden to DEP and Amerikohl to

show compliance with Section 315(b) of the Clean Streams Law, 35 P.S. §

691.315(b). (R.R. at 671a.) Because neither DEP nor Amerikohl presented

evidence showing that no other waste was on the Site, Petitioner argued that the

EHB should reverse DEP’s decision. Second, with regard to the topography of the

Site, Petitioner argued that the EHB should reverse DEP because the evidence

showed that the Site was not returned to its AOC as required by Section 87.1 of

DEP’s regulations, 25 Pa. Code § 87.1. (R.R. at 674a.)

The EHB considered the evidence and the arguments made by the parties

and issued its decision on March 23, 2016. The EHB applied Section 122(c)(2) of

the EHB’s Rules of Practice and Procedure8 (EHB’s Rules) and placed the burden

7

Act of May 19, 1995, P.L. 4, 35 P.S. §§ 6026.101 – 6026.908.

8

25 Pa. Code § 1021.122(c)(2). Rule 122(c)(2) provides that: “A party appealing an

action of the Department shall have the burden of proof . . . [w]hen a party who is not the

recipient of an action by the Department protests the action.” Id.

13

on Petitioner to prove that DEP abused its discretion in approving the Stage 1 bond

release. (EHB Decision at 9.) The EHB reasoned that “in order to meet his burden

of proof, [Petitioner] must demonstrate that his allegations of waste disposal and

failure to meet [AOC] are supported by a preponderance of the evidence.” (Id. at

10.)

The EHB then addressed Petitioner’s arguments on AOC. The EHB found

that Mr. Lightfoot’s measurements were more credible than Mr. Rosner’s since

Mr. Lightfoot “used the methodology set forth in the mining regulations.” (Id. at

14-15.) The EHB also found the photographs produced by DEP as highly

probative. “The photographs show a gently sloped hillside that blends in with the

area around it.” (Id. at 16.) Based on Mr. Lightfoot’s testimony and the

photographs, the EHB concluded that Petitioner did not meet his burden of proof.

(Id. at 16-17.)

Next, the EHB addressed Petitioner’s contention that the Stage 1 bond

release should not have been granted due to his allegations of dumped waste oil

and solid waste. With regard to the oily rags, filters, and a lid from a bucket buried

on the Site, the EHB concluded:

We find that the presence of those materials, though disconcerting, is

de minimus [sic] and does not constitute a basis for overturning

[DEP’s] approval of Stage 1 bond release. The presence of a handful

of items in an area where equipment maintenance took place is not

evidence of widespread disposal throughout the site. Moreover, the

items have been removed from the site, albeit by [Petitioner], and

there appears to be no further basis for withholding bond release on

these grounds.

(Id. at 17.) With regard to the alleged oil dumping on the Site, the EHB found that

“some amount of waste oil is present on the site,” but found the amount to be

14

insignificant. (Id. at 19.) DEP performed sampling in the vicinity of the staging

area and found constituents associated with waste oil in concentrations less than

Act 2 standards, and no other testing repudiated these results. (Id. at 19-20.)

According to the EHB:

Based on [Petitioner’s] testimony and the results of [DEP’s] sampling,

we do not dispute [Petitioner’s] allegation that some amount of waste

oil is present on the site. We have no doubt that waste oil was spilled

in the staging area where equipment was kept and maintained. The

question is whether the amount of oil spilled is significant and/or

widespread. The evidence indicates it is not. As noted earlier,

sampling was performed only in one area of the site, in the vicinity of

the staging area, and the sampling showed the presence of waste oil in

insignificant amounts less than the Act 2 health based standards.

(Id. at 19.) Petitioner argued that sampling should have been conducted in other

areas of the Site, but the EHB reasoned that DEP and Amerikohl did not have the

burden of proving that no other waste oil was on the Site because the most likely

area for such a spill was the staging area, which was sampled and determined to

contain petroleum in quantities less than Act 2 standards. (Id.) Thus, the EHB

concluded “that the Department did not err in granting the Stage 1 bond release to

Amerikohl.” (Id. at 20.)

Petitioner sought reconsideration from the EHB. (R.R. at 866a-74a.)

Therein, Petitioner raised, for the first time, an allegation that the EHB enabled

DEP to avoid its obligations under Article I, Section 27 of the Pennsylvania

Constitution, Pa. Const. art. 1, § 27, also known as the Environmental Rights

Amendment (ERA). The EHB denied reconsideration in an opinion that did not

15

address Petitioner’s ERA argument. (R.R. at 921a-25a.) This appeal from the

EHB’s March 23, 2016 merits decision followed.9

III. DISCUSSION

Petitioner raises four issues on appeal.10 Petitioner first argues that the EHB

erred by placing the burden of proof to show that there was no other waste on the

Site upon Petitioner when it is Amerikohl that knows where any waste oil or solid

waste may have been dumped or buried on the Site. Second, Petitioner argues that

the EHB erred by determining that Petitioner did not meet his burden to show that

the Stage 1 bond release was unacceptable under the Clean Streams Law in light of

the oil and other waste uncovered on the Site. Third, Petitioner argues that DEP’s

conduct falls short of conduct required by the ERA. Finally, Petitioner contends

that the EHB’s conclusion that the Site was returned to its AOC is not supported by

substantial evidence. We shall address each issue raised seriatim.

A. Burden of Proof

Petitioner first argues that by requiring Petitioner to prove that there was

widespread contamination of the Site, the EHB engrafted a standard for a Stage 1

bond release that is entirely new and not based on the law. Petitioner

acknowledges that pursuant to the EHB’s Rules, he bears the initial burden to show

that the bond should not be released. He argues that he satisfied that burden by

9

This Court’s scope of review of an order of the EHB is whether the EHB ‘“committed

an error of law or a constitutional violation, or whether any necessary findings of fact are not

supported by substantial evidence.’” Brockway Borough Mun. Auth. v. Dep’t of Envtl. Prot.,

131 A.3d 578, 585 n.9 (Pa. Cmwlth. 2016) (quoting The Ainjar Trust v. Dep’t of Envtl. Prot.,

806 A.2d 482, 487 (Pa. Cmwlth. 2002)).

10

We have adjusted the order of the issues raised to ease the discussion.

16

showing oil disposed of in the ground and the presence of solid waste. Petitioner

contends that the EHB should have shifted the burden of production to Amerikohl

to show that the evidence presented by Petitioner is the “total and complete

evidence of contamination at the Site.” (Petitioner’s Br. at 19.) This approach

makes sense in Petitioner’s view because it is Amerikohl that possesses the most

knowledge of the facts relevant to the inquiry. Petitioner also argues that public

policy supports shifting the burden of proof to Amerikohl, as it will serve the

purpose of the Clean Streams Law by deterring illegal dumping.

A person affected by DEP’s decision to release a bond may file an appeal

with the EHB, which will adjudicate the matter pursuant to the EHB’s Rules. 25

Pa. Code § 86.171. According to EHB’s Rules:

the burden of proceeding and the burden of proof shall be the same as

at common law in that the burden shall normally rest with the party

asserting the affirmative of an issue. It shall generally be the burden

of the party asserting the affirmative of the issue to establish it by a

preponderance of the evidence. In cases where a party has the burden

of proof to establish the party’s case by a preponderance of the

evidence, the Board may nonetheless require the other party to assume

the burden of proceeding with the evidence in whole or in part if that

party is in possession of facts or should have knowledge of facts

relevant to the issue.

25 Pa. Code § 1021.122(a). The EHB’s Rules state that the party appealing the

action bears the burden of proof “[w]hen a party who is not the recipient of an

action by [DEP] protests the action.” 25 Pa. Code § 1021.122(c)(2). “After the

protesting party produces evidence that [DEP’s action] was erroneous, the burden

of production shifts to DEP to justify [its action], but only after the protesting party

presents evidence showing a likelihood of environmental harm. However, the

ultimate burden of proof remains at all times with the protesting party.”

17

Pennsylvania Trout v. Dep’t of Envtl. Prot., 863 A.2d 93, 105 (Pa. Cmwlth. 2004)

(citing Pa. Game Comm’n v. Dep’t of Envtl. Prot., 509 A.2d 877, 884 (Pa.

Cmwlth. 1986)) (emphasis added).

The EHB properly utilized its Rules to place the burden on Petitioner to

prove that DEP erred when it concluded that Amerikohl was entitled to Stage 1

bond release in spite of the presence of small amounts of oil and other waste on the

Site. After Petitioner provided information on the oil and waste left on the Site,

EHB shifted the burden of production to DEP. DEP presented evidence of

sampling and interviews with Amerikohl staff members. The EHB found this

evidence probative and held that Petitioner did not sustain his burden of proof.

The soil sample showed a small amount of waste oil, but the EHB found such

evidence insufficient to prove that DEP erred by releasing the Stage 1 bond.

Similarly, the EHB concluded that the presence of solid waste found buried at the

Site, “though disconcerting,” was “de minimus” [sic] and did “not constitute a

basis for overturning the Department’s approval of Stage 1 bond release.” (EHB

Decision at 17.)

It appears that the focus of Petitioner’s appeal is less that the burden was

improperly placed on Petitioner, but that the burden placed on Petitioner was too

heavy, i.e. that EHB required a showing beyond that which is required by the

Clean Streams Law. We shall now proceed to address that issue.

B. Compliance with Clean Streams Law

Petitioner argues that by requiring a showing of “widespread contamination”

to defeat a Stage 1 bond release, the EHB improperly engrafted a standard beyond

what is required by the Clean Streams Law. Petitioner argues that Section 315(b)

18

of the Clean Streams Law requires “all temporary materials, property, debris or

junk” be removed prior to the bond release of any stage. 35 P.S. § 691.315(b)

(emphasis added). Petitioner contends that the evidence he produced showing the

presence of both waste oil and unexpected trash is sufficient under the Clean

Streams Law to preclude the Stage 1 bond release. Under Petitioner’s

understanding of the Clean Streams Law, the EHB should have required DEP to

show that the waste oil and trash found by Petitioner were the only materials

buried on the Site by Amerikohl.

DEP’s regulations enacted pursuant to SMCRA list the factors relevant to

the reclamation of the land that DEP must consider in making its bond release

determination, 25 Pa. Code § 86.174, and Section 4(g) of SMCRA authorizes

release of a bond if DEP “is satisfied the reclamation covered by the bond or

portion thereof has been accomplished,” 52 P.S. § 1396.4(g). In contrast to the

discretion given to DEP under SMCRA and DEP’s associated regulations

regarding the reclamation of the land, Section 315(b) of the Clean Streams Laws

sets a clear standard regarding the impact of the mining operation on the waters of

the Commonwealth. Section 315(b) of the Clean Streams Law provides, in

relevant part, that “[u]pon the completion of any mining operation and prior to the

release by [DEP] of any portion of the bond liability, the operator shall remove and

clean up all temporary materials, property, debris or junk which were used in or

resulted from his mining operations.” 35 P.S. § 691.315(b) (emphasis added).

Here, trash was left on the Site and waste oil entered the soil. With regard to

the trash – the four filters, three oily rags, and plastic lid – discovered on the Site,

these items were removed from the Site, albeit by Petitioner, and no other items

were found. As such, Petitioner produced no evidence showing that Section

19

315(b) was not met with regard to the removal of solid waste from the Site, and so

failed to meet his burden in this regard.

With regard to the waste oil left on the Site, the General Assembly enacted

Act 2 in order to, inter alia, “set[] environmental remediation standards to provide

a uniform framework for cleanup decisions because few environmental statutes set

cleanup standards and to avoid potentially conflicting and confusing environmental

standards.” Section 2(4) of Act 2, 35 P.S. § 6026.102(4). To that end, the General

Assembly declared:

Cleanup plans should be based on the actual risk that contamination

on the site may pose to public health and the environment, taking into

account its current and future use and the degree to which

contamination can spread offsite and expose the public or the

environment to risk, not on cleanup policies requiring every site in

this Commonwealth to be returned to a pristine condition.

35 P.S. § 6026.102(6). The standards established under Act 2 apply whenever site

remediation is voluntarily conducted or required under various enactments,

including the Clean Streams Law. Section 6(a) of Act 2, 35 P.S. § 6026.106(a)

(emphasis added). We recognize that the Site is not an Act 2 site, and additional

samples would be required if Amerikohl was seeking Act 2 liability protection,

(Hr’g Tr. at 367, R.R. at 317a);11 however, should DEP require Amerikohl to

remediate the Site, DEP would require remediation to the contamination levels set

by the regulations enforcing Act 2. As such, DEP did not abuse its discretion in

using Act 2 remediation standards as a benchmark.

11

Amerikohl has not taken the steps to seek liability protection under Act 2 as required

by Section 250.2(c) of the Department’s regulations. 25 Pa. Code § 250.2(c) (“To qualify for

liability protection under the act, a person conducting remediation shall comply with this chapter

and the act.”).

20

DEP collected soil samples from the area most likely to contain waste oil.

(EHB Decision at 19.) These samples showed petroleum compounds “lower than

the health based residential remediation standards established under Act 2.” (FOF

¶ 53.) Because Petitioner presented no evidence showing contamination above Act

2 levels or point to any other areas of the Site likely to contain waste oil, Petitioner

did not meet his burden to show that the presence of waste oil precluded the Stage

1 bond release.

We do not agree with Petitioner that the EHB set a new and illegal standard

for site remediation by stating that the materials found on the Site do not preclude

the Stage 1 bond release because “the amount of oil spilled is [not] significant

and/or widespread,” and that the solid waste disposed on the site was “de minimis”.

(EHB Decision at 17, 19). While the EHB’s phrasing may not be ideal, the EHB

was responding directly to Petitioner’s argument that Amerikohl or DEP must

produce sampling of the entire site to prove compliance with Section 315(b) of the

Clean Streams Law. (Id.) We understand the EHB’s decision, not as setting a new

standard, but as correctly concluding that neither Amerikohl nor DEP is required to

conduct further testing based on Petitioner’s evidentiary showing. The burden is

on Petitioner, as the party challenging DEP’s decision, to prove, by a

preponderance of the evidence, that the bond should not be released. 25 Pa. Code

§ 1021.122(c)(2). Because the only debris or waste discovered was removed or

fell below Act 2 health standards and Petitioner has not shown that other areas of

the Site are likely to be contaminated, Petitioner failed to meet his burden.

21

C. Compliance with the Environmental Rights Amendment

Petitioner next argues that DEP’s conduct does not satisfy the obligations of

the ERA as detailed in Payne v. Kassab, 312 A.2d 86, 94 (Pa. Cmwlth. 1973). The

ERA provides:

The people have a right to clean air, pure water, and to the

preservation of the natural, scenic, historic and esthetic values of the

environment. Pennsylvania’s public natural resources are the

common property of all the people, including generations yet to come.

As trustee of these resources, the Commonwealth shall conserve and

maintain them for the benefit of all the people.

Pa. Const. art. I, § 27. This Court determines whether a cause of action under the

ERA has been alleged, in part, by applying the threefold test established in Payne.

The Payne test requires this Court to assess the following questions:

(1) Was there compliance with all applicable statutes and regulations

relevant to the protection of the Commonwealth’s public natural

resources? (2) Does the record demonstrate a reasonable effort to

reduce the environmental incursion to a minimum? (3) Does the

environmental harm which will result from the challenged decision or

action so clearly outweigh the benefits to be derived therefrom that to

proceed further would be an abuse of discretion?

Payne, 312 A.2d at 94. Petitioner argues that the test is satisfied because: first,

DEP’s conduct violated the Clean Streams Law and other provisions of law;

second, DEP undertook limited efforts to reduce the environmental incursion; and

third, DEP’s decision provided no environmental benefit so it cannot be said to

outweigh the harm to the environment and Petitioner’s property. Petitioner further

contends, without extensive argument, that DEP’s determination that the Site was

22

returned to AOC did not satisfy the ERA because it simply “eyeballed” the slopes,

which is insufficient.

DEP argues in response that Petitioner waived this issue by not raising it

below. We agree. Petitioner did not present any argument related to the ERA to

the EHB prior to the EHB issuing its decision. While the issue was raised in

Petitioner’s Petition for Reconsideration (R.R. at 873a-74a), “issues raised for the

first time in a reconsideration request, after the agency has issued its adjudication,

cannot be regarded as raising the issues while the matter was before the agency.”

Bedford Downs Mgmt. Corp. v. State Harness Racing Comm’n, 926 A.2d 908, 924

(Pa. 2007). Unlike situations where the EHB is assessing a constitutional

challenge to DEP’s enabling legislation, which would not be waived on appeal,

challenges to DEP’s action under the ERA must be raised to the EHB in order to

preserve the issue for appeal. See Lehman v. Pa. State Police, 839 A.2d 265, 276

(Pa. 2003) (“the waiver exception that exists for claims ‘questioning the validity of

a statute,’ 2 Pa. C.S. § 703(a), applies only to facial challenges to a statute’s

constitutionality; such claims need not be raised before the administrative agency

to be preserved for appellate review”). Accordingly, we will not consider

Petitioner’s argument that DEP’s conduct violates the ERA.

D. Approximate Original Contour

Finally, Petitioner argues that the EHB’s conclusion that the Site was

restored to its AOC was not supported by substantial evidence. Petitioner contends

that his own unrebutted testimony and the testimony of Mr. Rosner show that the

Site contained slopes steeper than those that existed before the mining operation

began. Petitioner dismisses contrary testimony by Mr. Lightfoot of Earth Tech by

23

stating that Mr. Lightfoot did not survey the pre-mining condition of the Site nor

survey the area examined by Mr. Rosner. Petitioner further dismisses the

testimony of Mr. Shuss, DEP’s Mine Conservation Inspector Supervisor, because

Mr. Shuss admitted that he only “eyeballed” the Site to determine that AOC was

met, which is insufficient under EHB case law.

Presented with conflicting evidence by two experts, the EHB exercised its

discretion as fact-finder and relied on the testimony of Mr. Lightfoot showing that

the Site was returned to its AOC. According to the EHB, “[a]lthough we were

very impressed with Mr. Rosner and his credentials and experience, we assign a

higher degree of reliability to Mr. Lightfoot’s measurements since he used the

methodology set forth in the mining regulations.” (EHB Decision at 14-15.) The

EHB also found probative photographs produced by DEP showing “a gently sloped

hillside that blends in with the area around it.” (Id. at 16.)

“It is axiomatic that questions of resolving conflicts in the evidence, witness

credibility, and evidentiary weight are properly within the exclusive discretion of

the fact finding agency, and are not usually matters for a reviewing court.”

Birdsboro & Birdsboro Mun. Auth. v. Dep’t of Envtl. Prot., 795 A.2d 444, 447 (Pa.

Cmwlth. 2002) (quotation omitted). The EHB need not accept uncontested

evidence, nor give any reason for finding one expert witness credible over another.

Id. Regardless of the reason the EHB accepted Mr. Lightfoot’s testimony and the

photographs over any contrary evidence, we will not disturb the EHB’s credibility

determination and conclude that the EHB’s finding that the Site was returned to its

AOC is supported by substantial evidence.

24

IV. CONCLUSION

Finding no error of law and that the EHB’s finding that the Site was returned

to AOC is supported by substantial evidence, the EHB’s Order is affirmed.

_____________________________________

RENÉE COHN JUBELIRER, Judge

25

IN THE COMMONWEALTH COURT OF PENNSYLVANIA

Wayne K. Baker, :

Petitioner :

:

v. : No. 633 C.D. 2016

:

Department of Environmental :

Protection, :

Respondent :

ORDER

NOW, March 2, 2017, the Order of the Environmental Hearing Board

in the above-captioned matter is hereby AFFIRMED.

_____________________________________

RENÉE COHN JUBELIRER, Judge

IN THE COMMONWEALTH COURT OF PENNSYLVANIA

Wayne K. Baker, :

Petitioner :

:

v. :

:

Department of Environmental :

Protection, : No. 633 C.D. 2016

Respondent : Argued: October 17, 2016

BEFORE: HONORABLE RENÉE COHN JUBELIRER, Judge

HONORABLE JOSEPH M. COSGROVE, Judge

HONORABLE JAMES GARDNER COLINS, Senior Judge

OPINION NOT REPORTED

DISSENTING OPINION

BY JUDGE COSGROVE FILED: March 2, 2017

The Environmental Hearing Board (EHB) acknowledged that “some

amount of waste oil [was] present” on the site at issue in this matter, Majority

Opinion at 14, and further stated that it “ha[d] no doubt that waste oil was spilled

in the staging area where equipment was kept and maintained.” Id. at 15. The

EHB then noted the obvious: “The question is whether the amount of oil spilled is

significant and/or widespread.” Id. Instead of recognizing that the answer to this

question was essential to a determination of whether a Stage I bond release was

proper, the EHB stated that “sampling was performed only in one area of the site,

in the vicinity of the staging area, and the sampling showed the presence of waste

oil in insignificant amounts less than the Act 21 health based standards.” Id.

1

Act of May 19, 1995, P.L. 4, 35 P.S. §§ 6026.101-6026.908.

Rather than withhold the Stage I bond release and require further

testing, the EHB reasoned that, given the levels of waste oil found and the area in

which it was found, “the Department did not err in granting” the bond release.

Majority Opinion at 15. Thus the EHB apparently assumed the amount of oil

spilled was insignificant and not widespread, without a hint of proof to support this

position other than pure speculation.

There is a certain illogic to this conclusion. Waste oil was present in

the one sample taken, but the EHB reached a conclusion that the bond release,

without further testing, was appropriate, since Petitioner did not show proof

otherwise. This burden shifting is simply inconsistent with the Clean Streams

Law2, and despite the Majority’s best efforts, it cannot fashion reasoning which

sufficiently supports a contrary view. As such, I am compelled to dissent.

___________________________

JOSEPH M. COSGROVE, Judge

2

Act of June 22, 1937, P.L. 1987, as amended, 35 P.S. §§ 691.1-691.1001.

JMC - 2