Opinion

Public Housing Authorities Directors Association v. United States

  • 130 Fed. Cl. 522
  • 2017 U.S. Claims LEXIS 20
  • 2017 WL 192820
Court
United States Court of Federal Claims
Filed
Jan 18, 2017
Status
Published
Author
Kaplan
On the bench
Elaine D. Kaplan
Cited by
7 cases
Authority
More cited than 48.7%

holding that Housing and Urban Development Regulations at Title 24 of the Code of Federal Regulations are expressly incorporated because “section 5 of the [contracts] specifies that the parties must comply with the regulations ‘promulgated by HUD at Title 24 of the Code of Federal 12 Regulations, which are hereby incorporated into this [contract] by reference’”

How later courts described this case

  • holding that Housing and Urban Development Regulations at Title 24 of the Code of Federal Regulations are expressly incorporated because “section 5 of the [contracts] specifies that the parties must comply with the regulations ‘promulgated by HUD at Title 24 of the Code of Federal 12 Regulations, which are hereby incorporated into this [contract] by reference’”
  • holding that “[HUD] breached its obligations under the ACCs when it applied the operating expense offset in response to the 2012 Appropriations Act, rather than the pro rata reduction rule prescribed by Title 24[,]” and thus implicitly establishing this Court’s jurisdiction over breach of ACC claims
  • stating that in 2012 “the reduction of the PHAs’ payments to account for the budget shortfall were not made on a pro rata basis” and describing the procedure in detail
  • arguing that “the ACCs require compliance with statutes and regulations”

Written by the judges who cited it.

The opinion

In the United States Court of Federal Claims

Nos. 13-0006C, 13-6000C thru 13-6356C (Consolidated)

(Filed: January 18, 2017)

) Keywords: Breach of Contract; United

PUBLIC HOUSING AUTHORITIES ) States v. Winstar Corp.; Incorporation

DIRECTORS ASSOCIATION, ) by Reference; Funds Subject to

) Availability; 24 C.F.R. § 990.210(c).

Plaintiff, )

)

v. )

)

THE UNITED STATES OF AMERICA, )

)

Defendant. )

)

Carl A.S. Coan, III, Coan & Lyons, Washington, DC, for Plaintiff. Raymond K. James,

Coan & Lyons, Of Counsel.

Eric J. Singley, Trial Counsel, Commercial Litigation Branch, Civil Division, U.S.

Department of Justice, Washington, DC, with whom were Steven J. Gillingham, Assistant

Director, Robert E. Kirschman, Jr., Director, and Benjamin C. Mizer, Principal Deputy

Assistant Attorney General, for Defendant.

OPINION AND ORDER

KAPLAN, Judge.

Plaintiffs in these consolidated cases are over three hundred public housing

authorities (PHAs) that have entered into Annual Contributions Contracts (ACCs) with

the Department of Housing and Urban Development (HUD), as well as two national PHA

trade associations. 1st Am. Compl. (Am. Compl.) ¶ 2, ECF No. 8. They allege, among

other things, that HUD breached the ACCs in 2012 when it did not comply with the rules

set forth at Title 24 of the Code of Federal Regulations that govern the allocation of

operating subsidies when funds are not available to pay them in full. Id. ¶¶ 101–05.

Plaintiffs request an aggregate amount of $135,836,467 in compensatory damages as well

as the costs and expenses of bringing this action. Id. at 60.

Currently pending before the Court are: 1) the government’s motion to dismiss the

complaints of the two PHA trade associations and sixteen of the individual PHA

plaintiffs for lack of standing; and 2) the parties’ cross-motions for partial summary

judgment as to Count I of the amended complaint. For the reasons set forth below: 1) the

government’s motion to dismiss is GRANTED-IN-PART and DENIED-IN-PART;

2) the plaintiffs’ motion for partial summary judgment is GRANTED; and 3) the

government’s motion for partial summary judgment is DENIED.

BACKGROUND1

I. Statutory and Regulatory Framework

The federal public housing program, authorized by the United States Housing Act

of 1937, 42 U.S.C. §§ 1437–40, exists “to assist States and political subdivisions of

States to remedy the unsafe housing conditions and the acute shortage of decent and safe

dwellings for low-income families” and “to address the shortage of housing affordable to

low-income families.” 42 U.S.C. § 1437(a)(1).

The federal government does not own, manage, or maintain public housing;

rather, the statute vests the responsibility for program administration in public housing

authorities, see id. § 1437a(a)(1)(C), defined as “State, county, municipality, or other

governmental entit[ies] or public bod[ies] . . . authorized to engage in or assist in the

development or operation of public housing,” id. § 1437a(b)(6)(A). Pursuant to statute,

HUD “may make annual contributions to public housing agencies to assist in achieving

and maintaining the lower income character of their projects.” Id. § 1437c(a)(1). To that

end, Congress has established two sources of funds: (1) the capital fund, which provides

funds “to carry out capital and management activities,” id. § 1437g(d); and (2) the

operating fund, which supplies funding “for the operation and management of public

housing,” id. § 1437g(e). Plaintiffs’ claims in this case involve disbursements from the

operating fund.

Congress has specified that HUD must “establish a formula for determining the

amount of assistance provided to public housing agencies from the Operating Fund for

[each] fiscal year.” Id. § 1437g(e)(2)(A). The formula may take into account a number of

factors, including, among others, costs of operations; the number of public housing

dwelling units owned, assisted, or operated by the public housing agency; and “any other

factors that the Secretary determines to be appropriate.” Id. § 1437g(e)(2)(A)(i)-(iii),

(vii).

HUD has implemented this statutory authority through regulations codified at 24

C.F.R. Part 990. These regulations define an “operating subsidy” as “the amount of

annual contributions for operations a PHA receives each funding period under section 9

of the 1937 Act as determined by the Operating Fund Formula.” 24 C.F.R. § 990.115.

Under the Operating Fund Formula set forth in the regulations, PHAs are eligible for an

operating subsidy (or annual contribution) equal to “the difference between formula

expense and formula income.” Id. § 990.110(a)(2); see also id. § 990.200. Formula

income consists of an estimate of a PHA’s non-operating-subsidy revenue, which is

calculated by dividing the amount of rent charged to tenants by the respective months the

1

The facts set forth in this section are not in dispute and are based on the parties’

pleadings and the exhibits that they submitted in support of their cross-motions for

summary judgment.

2

property was leased. Id. § 990.195(a) (2005).2 Formula expense is an estimate of a PHA’s

operating expenses, determined by adding together (1) the PHA’s project expense level

(PEL), which represents the normal expenses of operating public housing projects (such

as costs of administration, management, and leasing, see id. at § 990.165(a)); (2) its

utility expense level (UEL); and (3) several other formula expenses (or “add-ons”). Id.

§ 990.110(a)(3).

Further, the regulations contain a provision for adjusting the amount of each

PHA’s operating subsidy payment in circumstances where Congress fails to appropriate

sufficient funds to pay the aggregate amount due to PHAs under the Operating Fund

Formula. That provision, 24 C.F.R. § 990.210(c), states that “[i]n the event that

insufficient funds are available, HUD shall have discretion to revise, on a pro rata basis,

the amounts of operating subsidy to be paid to PHAs.” Id.; see also id. § 990.110(b)(3)

(stating that the payment of operating subsidies “will be limited to the availability of

funds as described in § 990.210(c)”).3

II. The Annual Contributions Contracts

The Housing Act requires that “the provisions for [] annual contributions” made

to PHAs be embodied “in a contract guaranteeing their payment.” 42 U.S.C.

§ 1437c(a)(1); see also 24 C.F.R. § 990.115 (defining an ACC as “a contract prescribed

by HUD for loans and contributions, which may be in the form of [an] operating subsidy,

whereby HUD agrees to provide financial assistance and the PHA agrees to comply with

HUD requirements for the development and operation of its public housing projects”).

Accordingly, each of the PHA plaintiffs in this case is a party to an ACC with HUD that

2

This regulation was amended in 2016, but the amendment has no effect on the outcome

of this case.

3

This version of 24 C.F.R. § 990.210(c) was issued in 2005. Before 2005, if Congress

failed to appropriate sufficient funds to cover the aggregate amount of operating subsidies

for which all PHAs were eligible, HUD’s regulations gave it “complete discretion to

revise, on a pro rata basis or other basis,” the amount of operating subsidy to be paid to

PHAs. See Allocation of Operating Subsidies Under the Operating Fund Formula, 66

Fed. Reg. 17276, 17297 (Mar. 29, 2001). On May 11, 2005, during the negotiated

rulemaking process that is mandated by 42 U.S.C. § 1437g(f), HUD and the stakeholders

who were members of the negotiated rulemaking committee reached consensus to cabin

HUD’s discretion so that its only option in the event of a budget shortfall was to reduce

operating subsidies on a prorated basis. See Pls.’ Mot. for Summ. J. (Pls.’ Mot.) App. at

A49–51. HUD incorporated this change into its proposed and final rules. See Revisions

to the Public Housing Operating Fund Program, 70 Fed. Reg. 19858, 19871 (Apr. 14,

2005) (proposed rule); Revisions to the Public Housing Operating Fund Program, 70 Fed.

Reg. 54984, 55004 (Sept. 19, 2005) (final rule).

3

outlines the terms and conditions pursuant to which they are entitled to receive operating

subsidies.4

As pertinent to the issues presented in this case, the ACCs between the PHA

Plaintiffs and HUD specify that the PHAs shall “develop and operate all projects covered

by this ACC in compliance with . . . all applicable statutes, executive orders, and

regulations issued by HUD, as they shall be amended from time to time.” Pls.’ Mot. App.

at A65 § 5. In particular, the PHAs agree to comply with “those regulations promulgated

by HUD at Title 24 of the Code of Federal Regulations, which are hereby incorporated

into this ACC by reference as if fully set forth herein, and as such regulations shall be

amended from time to time.” Id. The contracts further require HUD to provide annual

contributions to the PHAs “in accordance with all applicable statutes, executive orders,

regulations, and this ACC.” Id. at A64 § 3.

Section 11 of the ACCs sets forth the procedure by which PHAs must prepare

their annual budgets and submit their requests for operating subsidies for the upcoming

fiscal year. It requires PHAs to “submit a calculation of operating subsidy eligibility in

the manner prescribed by HUD in regulations in Title 24 of the Code of Federal

Regulations.” Id. at A67 § 11. The ACCs provide that “HUD shall review the calculation

and, if correct, and subject to the availability of funds, take action within 45 days of

submission to obligate the funds and approve a payment schedule,” subject to exceptions

not relevant here. Id. HUD may also “revise or amend the subsidy calculation to bring it

into conformity with regulatory requirements,” in which case the PHA “shall submit

revised calculations in support of mandatory or other adjustments based on procedures

and deadlines prescribed by HUD.” Id.

III. The 2012 Appropriations Act

Plaintiffs’ breach of contract claims in this case arise out of changes to the

calculation and allocation of operating subsidies that HUD implemented for 2012 on the

basis of the Consolidated and Further Continuing Appropriations Act [of] 2012 (2012

Appropriations Act), Pub. L. 112-55, 125 Stat. 552, 680.

The pertinent provisions of the 2012 Appropriations Act had their genesis in the

President’s proposed budget for 2012. See Pls.’ Mot. App. at A54–55. Thus, the

President’s proposal (which included a proposed appropriation of $3,961,850,000 to

HUD to pay operating subsidies in FY 2012) contained a proviso stating that “in

determining [PHAs’] . . . calendar year 2012 funding allocations . . . the Secretary shall

take into account PHAs’ excess operating reserves, as determined by the Secretary.” Id.

4

The current version of the standard ACC was issued by HUD in June 1995. See Dep’t

of Housing and Urban Dev., Notice PIH 95-44 (June 23, 1995),

https://portal.hud.gov/hudportal/HUD?src=/program_offices/administration/hudclips/noti

ces/pih/95pihnotices. The ACC was written by HUD and its terms were not the subject of

negotiation by the PHAs.

4

at A54. According to the proposal, the $3,961,850,000 requested, when “coupled with $1

billion from [PHAs’] operating reserves, will fund 100 percent of PHAs’ estimated

eligibility for operating subsidies under the Operating Fund formula ($4.962 billion).”

Id.5

On September 26, 2011, in anticipation of Congress’s approval of the President’s

proposal, HUD issued PIH Notice 2011-055, Public Housing Operating Subsidy

Calculations for Calendar Year 2012 (PIH Notice). See Pls.’ Mot. App. at A75–78. That

Notice provided public housing agencies with “instructions for operating subsidy

calculation submissions in Calendar Year (CY) 2012 as funded from Federal Fiscal Year

(FFY) 2012 appropriations.” Id. at A75.

In the PIH Notice, HUD announced that, consistent with the President’s proposal,

after it determined the 2012 Operating Fund Formula eligibility for each PHA, it would

make an allocation adjustment based on the PHA’s excess operating reserves—i.e., the

amount of the PHA’s operating reserves above a specified “minimum level.” Id. at A76.

The PIH Notice defined operating reserves to include unspent operating subsidies and

tenant rents, based upon four prior financial submissions (June 30, 2010, September 30,

2010, December 31, 2010, and March 31, 2011). Id. at A76–77. And it defined the

minimum level of reserves as four months of PHAs’ estimated formula operating

expenses for most PHAs, and six months of estimated expenses for small PHAs. Id. at

A76.

In November 2011, approximately two months after HUD issued the PIH Notice,

the 2012 Appropriations Act was enacted. The relevant provision of the Act stated, in

pertinent part, that it appropriated $3,961,850,000, “[f]or 2012 payments to public

housing agencies for the operation and management of public housing, as authorized by

section 9(e) of the United States Housing Act of 1937 . . . [p]rovided, [t]hat in

determining public housing agencies’ . . . calendar year 2012 funding allocations under

this heading, the Secretary shall take into account public housing agencies’ excess

operating fund reserves, as determined by the Secretary.” 125 Stat. at 680 (emphasis in

original).

The Act thus adopted the President’s proposed budget amount for operating

subsidies, as well as his proposal that the Secretary be given the authority to “offset

[PHAs’] allocations of operating funds in fiscal year 2012 based on excess reserves they

have available to meet their operating needs.” See Pls.’ Mot. App. at A57–58 (report by

the Senate Committee on Appropriations regarding the 2012 Appropriations Act, S. Rep.

5

In the Administration’s view, many PHAs were “holding significant operating reserves

accumulated primarily from prior-year appropriations for the Operating Fund program.”

Pls.’ Mot. App. at A55. These reserves, according to the explanatory section in the

President’s proposed budget, “represent cash available to PHAs for operating expenses

and other eligible activities under the program.” Id. The President thus proposed “to

reduce funding allocations to PHAs that have more than sufficient (i.e., excess) operating

reserve levels.” Id.

5

No. 112-83 (2011)). In addition, Congress imposed certain restrictions on the amount of

the offset, which were not included in the President’s proposal, to ensure that no PHA

would see its reserves reduced below $100,000. 125 Stat. at 680. It also limited the

aggregate amount of reserves that HUD could use as an offset to $750 million, rather than

the $1 billion the President had proposed. Id.

HUD’s implementation of the authority it was given under the 2012

Appropriations Act changed the methodology used for calculating the amount of

operating subsidies to be paid to the PHAs. In prior years, pursuant to its regulations,

HUD had reduced each PHA’s operating subsidy payment by a uniform percentage that

reflected the shortfall between the total amount Congress had appropriated and the total

amount payable under the Operating Formula. Because of the changes HUD made to

comply with the 2012 Act, however, the reduction of the PHAs’ payments to account for

the budget shortfall were not made on a pro rata basis.

The process HUD employed to implement the reduction was as follows. First,

employing the Operating Formula set forth in its regulations to each PHA, HUD

determined that the aggregate formula amount to which the PHAs were entitled was

$4,888,046,046. See id. at A17. Then, in accordance with the methodology set forth in

the PIH Notice, it determined each PHA’s excess operating reserves. The aggregate

amount of excess operating reserves so determined was $738,316,329. Id.; see also id. at

A77. HUD then subtracted the aggregate amount of the PHAs’ excess operating reserves

($738,316,329) from the aggregate Operating Formula amount ($4,888,046,046). Id. at

A17. Finally, it took the difference ($4,149,983,999) and compared it to the total amount

Congress had appropriated for operating subsidies ($3,961,850,000). Id. It then arrived at

the percentage (94.97%) which would be used to adjust the amount of the PHAs’ subsidy

payments so that HUD would remain within the $3,961,850,000 that Congress had

appropriated to pay operating subsidies. Id.

With that analysis complete, HUD went on to determine the operating subsidy

payment each individual PHA would receive. As in previous years, the starting point for

this determination was each PHA’s eligibility amount under the Operating Formula. See

Def.’s Mot. to Dismiss and Cross-Mot. for Summ. J. (Def.’s Mot.) App. at 13. But unlike

in previous years, HUD then made an “allocation adjustment” by offsetting each

individual PHA’s excess operating reserves against its Operating Formula eligibility

amount. See id. Finally, HUD then multiplied the adjusted amount by 94.97% to

determine the payment each PHA would actually receive (thus ensuring that HUD did not

exceed the Congressional appropriation). See id.; see also Pls.’ Opp’n to Def.’s Mot. to

Dismiss and Cross-Mot. for Summ. J. (Pls.’ Opp’n) App. at A18–21 (providing examples

of the results of these calculations).

Because the amount of excess operating reserves varied from PHA to PHA, so did

the percentage reduction in their Operating Formula eligibility amounts. PHAs without

excess operating reserves received 94.97% of their formula eligibility amount while,

according to Plaintiffs (Pls.’ Mot. at 20), many PHAs experienced as much as a 100%

reduction in their operating subsidies below the amount derived from application of the

Operating Formula.

6

IV. These Actions

These actions were originally brought in a single complaint filed on behalf of 359

separate plaintiffs on January 3, 2013. ECF No. 1. An amended complaint was filed on

March 1, 2013. ECF No. 8. Thereafter, by Order of July 3, 2013, the Court severed the

claims of each of the 358 plaintiffs listed on the Amended Complaint after the Public

Housing Authorities Directors Association; directed the Clerk to assign separate docket

numbers to each claim; directed each plaintiff to pay the court’s filing fee; and consolidated

the now-severed cases for all purposes pursuant to Rule 42 of the Rules of the Court of

Federal Claims (RCFC). ECF No. 15.

In Count I of the amended complaint, Plaintiffs alleged that HUD breached the

ACCs in question because, by taking their excess reserves into account when determining

their operating subsidy payments, HUD in fact reduced their operating subsidy payments

on a non-pro rata basis, in conflict with the Title 24 regulations incorporated into the

ACCs. Id. ¶¶ 88–106.6 Plaintiffs seek compensatory damages in the aggregate amount of

at least $135,836,467, as well as an award for the costs and expenses of bringing this

action. Id. at 60.

On May 2, 2013, before any discovery had taken place, the government filed a

motion for partial summary judgment as to Counts I and III of the amended complaint.

ECF No. 10. On August 20, 2013, Judge Allegra, who was then presiding over the case,

denied the government’s motion for partial summary judgment as premature. See Order

Denying Mot. for Partial Summ. J. (Aug. 20, 2013). On December 4, 2015, after a period

of discovery, during which the case was transferred to the undersigned, Plaintiffs filed a

motion for summary judgment as to Count I of their amended complaint. ECF No. 36. On

February 12, 2016, the government in turn filed a cross-motion for summary judgment as

to Count I as well as a motion to dismiss certain Plaintiffs whom the government claims

lack standing to pursue their claims. ECF No. 41.

Oral argument was held on the cross-motions on July 20, 2016. After argument,

the Court requested that the parties file supplemental briefs concerning the proper

interpretation and application of § 11(A) of the ACCs, which states that HUD’s duty to

pay operating subsidies is “subject to the availability of funds.” ECF No. 54.

Supplemental briefing was completed on December 7, 2016. ECF Nos. 57, 64–65.

6

Counts II and III of the amended complaint are not before the Court on the cross-

motions for partial summary judgment. In those Counts, Plaintiffs allege that HUD

violated its regulations when, as a basis for reducing their operating subsidy payments, it

considered their non-rental income as well as extra income they earned from the rental

income incentive HUD provided them for the years 2007 through 2009. See Am. Compl.

¶¶ 107–20.

7

DISCUSSION

I. Jurisdiction

The Court of Federal Claims has jurisdiction under the Tucker Act to hear “any

claim against the United States founded either upon the Constitution, or any Act of

Congress or any regulation of an executive department, or upon any express or implied

contract with the United States, or for liquidated or unliquidated damages in cases not

sounding in tort.” 28 U.S.C. § 1491(a)(1) (2006). Claims for damages arising out of a

breach of contract by the United States are squarely within the express terms of the

Tucker Act.

The government contends, however, that the Court lacks jurisdiction over the

claims of sixteen of the public housing agency plaintiffs, as well as the two PHA trade

associations, because they lack standing. Def.’s Mot. to Dismiss at 8–9. Specifically, it

argues that these sixteen PHA plaintiffs did not suffer any injury-in-fact because they did

not have excess operating reserves and therefore were not subject to the offset about

which they complain. Id. at 13. It further contends that because the two association

plaintiffs were not parties to any contract with HUD, they also did not suffer any injury-

in-fact. Id. at 9.

“Standing is a threshold jurisdictional issue that implicates Article III of the

Constitution.” First Annapolis Bancorp, Inc. v. United States, 644 F.3d 1367, 1373 (Fed.

Cir. 2011) (citing Steel Co. v. Citizens for a Better Env’t, 523 U.S. 83, 102 (1998)).

Although this Court is an Article I court, it applies the same standing requirements as do

Article III courts. See Glass v. United States, 258 F.3d 1349, 1355–56 (Fed. Cir.),

amended on reh’g, 273 F.3d 1072 (Fed. Cir. 2001). To satisfy those requirements, “a

plaintiff must show that (1) it suffered an injury-in-fact that is (2) fairly traceable to the

challenged conduct of the defendant and (3) likely redressable by a favorable judicial

decision.” Salmon Spawning & Recovery All. v. U.S. Customs & Border Prot., 550 F.3d

1121, 1130 (Fed. Cir. 2008) (citing Figueroa v. United States, 466 F.3d 1023, 1029 (Fed.

Cir. 2006)).

Plaintiffs do not dispute that thirteen of the sixteen PHA plaintiffs whose

complaints the government seeks to dismiss were not subject to the offset and did not

suffer any monetary damages from the alleged breach of the ACCs at issue in these

cases.7 Pls.’ Opp’n at 8. Because these thirteen plaintiffs acknowledge that they did not

7

These thirteen plaintiffs are: Housing Authority of the City of Warner Robins (No. 13-

6058); Housing Authority of the City of Slidell (No. 13-6115); Brunswick Housing

Authority (No. 13-6121); Housing and Redevelopment Authority of Jackson, Minnesota

(No. 13-6150); Washington County Housing and Redevelopment Authority (No. 13-

6153); Housing Authority of the City of Joplin, Missouri (No. 13-6168); Housing

Authority of the City of Raleigh (No. 13-6245); Housing Authority of the City of

Greenville (No. 13-6244); Statesville Housing Authority (No. 13-6247); Rahway

Housing Authority (No. 13-6214); East Orange Housing Authority (No. 13-6222); Akron

8

suffer any injury-in-fact as a result of the breach, they lack standing to bring an action for

breach of contract and their complaints must be dismissed for lack of jurisdiction.8

Further, neither of the two PHA association plaintiffs was itself a party to an

ACC. In order to sue the government on a contract claim, a plaintiff must be in privity

with the United States. First Annapolis Bancorp, Inc., 644 F.3d at 1373 (citing Anderson

v. United States, 344 F.3d 1343, 1351 (Fed. Cir. 2003)). “Not only is privity a

fundamental requirement of contract law, but it takes on even greater significance in

cases such as this, because the ‘government consents to be sued only by those with whom

it has privity of contract.’” S. Cal. Fed. Sav. & Loan Ass’n v. United States, 422 F.3d

1319, 1328 (Fed. Cir. 2005) (quoting Erickson Air Crane Co. of Wash. v. United States,

731 F.2d 810, 813 (Fed. Cir. 1984)).

Plaintiffs argue nonetheless that while the two trade associations—the Public

Housing Authorities Directors Association (PHADA) and the National Association of

Housing and Redevelopment Officials (NAHRO)—may not have standing in their own

right under Article III, they may sue on behalf of their members under principles of

associational standing. Pls.’ Opp’n at 5. They observe that, in fact, 270 of the 355 public

housing agency plaintiffs are members of the lead plaintiff, PHADA, and that “[t]he

remaining 85 PHA Plaintiffs are either members only of NAHRO or not members of

PHADA or NAHRO.” Id.

“To establish standing based upon harm to one or more of its members . . . an

association must establish ‘(a) [that] its members would otherwise have standing to sue in

their own right; (b) [that] the interests it seeks to protect are germane to the

organization’s purpose; and (c) [that] neither the claim asserted nor the relief requested

requires the participation of individual members in the lawsuit.’” Disabled Am. Veterans

v. Gober, 234 F.3d 682, 689 (Fed. Cir. 2000) (quoting Hunt v. Wash. State Apple Advert.

Comm’n, 432 U.S. 333, 343 (1977)). Leaving aside whether PHADA and NAHRO have

met the first two criteria for establishing standing based on harm to their membership,

they cannot meet the third prong of the Hunt test because the damages claims of their

members require individualized proof. See United Food & Commercial Workers Union

Local 751 v. Brown Grp., Inc., 517 U.S. 544, 554 (1996) (observing that Warth v. Seldin,

422 U.S. 490 (1975), and other precedents “have been understood to preclude

Metropolitan Housing Authority (No. 13-6263); and Chester Housing Authority (No. 13-

6284). Def.’s Mot. at 8–9; Pls.’ Opp’n at 8.

8

Three of the plaintiffs challenge the government’s assertion that they did not have any

excess operating reserves and therefore were not injured by the breach of contract that

they allege. Pls.’ Opp’n at 8. In its reply brief, the government states that—to the extent

that these plaintiffs can establish such damages, it will not contest jurisdiction. Def.’s

Reply in Supp. of Def.’s Mot. to Dismiss and Cross-Mot. for Summ. J. (Def.’s Reply) at

2. The Court concludes that given this factual dispute, it would be improper to dismiss

these three plaintiffs from the suit on the basis of the government’s current motion.

9

associational standing when an organization seeks damages on behalf of its members”).

Accordingly, PHADA and NAHRO lack standing as associations to bring suit on behalf

of their members.9

Finally, the Court is not persuaded by Plaintiffs’ citation of Bowsher v. Synar,

478 U.S. 714, 721 (1986) for the proposition that—given that the standing of the majority

of the plaintiffs is clear—it should maintain jurisdiction over the complaints of the

plaintiffs who lack standing. Pls.’ Opp’n at 6–7. In Bowsher, the Court chose not to

address the difficult question of whether members of Congress had standing to challenge

the constitutionality of the Balanced Budget Act, because at least one of the other

plaintiffs in the case did possess standing. 478 U.S. at 721. The dismissal of the

Congressional plaintiffs on standing grounds would have had no practical effect on the

Supreme Court’s disposition of the case on the merits, and the Supreme Court’s decision

would mark the end of the litigation. In this case, however, the standing issues are not

difficult; indeed, Plaintiffs concede that the thirteen individual plaintiffs lack standing.

Moreover, at this stage in the case, it serves the interests of judicial economy and

efficiency to dismiss from these consolidated cases those complaints that are not within

the Court’s jurisdiction.

For these reasons, the government’s motion to dismiss Nos. 13-6121, 13-6115,

13-6153, 13-6245, 13-6247, 13-6214, 13-6263, 13-6284, 13-6058, 13-6168, 13-6150, 13-

6222, 13-6244, 13-0006, and 13-6000 is GRANTED.

II. Summary Judgment Standards

In accordance with RCFC 56(a), summary judgment may be granted “if the

movant shows that there is no genuine dispute as to any material fact and the movant is

entitled to judgment as a matter of law.” See Celotex Corp. v. Catrett, 477 U.S. 317, 322

(1986). A fact is material if it “might affect the outcome of the suit under the governing

law.” Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986). An issue is genuine if

it “may reasonably be resolved in favor of either party.” Id. at 250.

The material facts in this case are not in dispute. Further, Plaintiffs’ breach of

contract claims depend upon the resolution of questions of law—the interpretation of the

ACCs and whether HUD breached the ACCs when it took operating reserves into

consideration in determining Plaintiffs’ operating subsidies. Therefore, Plaintiffs’ breach

of contract claims are appropriate for resolution by summary judgment. Gov’t Sys.

Advisors, Inc. v. United States, 847 F.2d 811, 812 n.1 (Fed. Cir. 1988) (observing that

9

The fact that a number of the organizations’ members are also plaintiffs in this case

does not establish—as Plaintiffs argue—that every member of the organizations that

might claim an injury is a party to the suit and therefore can provide the individualized

proof required to fashion an award of damages to the organizational plaintiffs on their

behalves. See Pls.’ Opp’n at 6. And to the extent that the injured members of the

organizations are also plaintiffs in the suit as individuals, the participation of the

associations as proxies seems, in any event, superfluous.

10

claims alleging breach of contract that rise or fall with the interpretation of the contract

are generally “amenable to decision on summary judgment”); see also Varilease Tech.

Grp. v. United States, 289 F.3d 795, 798 (Fed. Cir. 2002) (same).

III. Merits

Plaintiffs argue that the ACCs incorporated by reference HUD’s regulations at

Title 24 of the Code of Federal Regulations, including § 990.210(c), which provides that

“[i]n the event that insufficient funds are available, HUD shall have discretion to revise,

on a pro rata basis, the amounts of operating subsidy to be paid to PHAs.” According to

Plaintiffs, HUD breached the ACCs in 2012 when, rather than reducing their subsidy

payments by a uniform percentage (i.e., on a pro rata basis), it first offset each PHA’s

payment by a figure that varied from one PHA to another—the amount of its excess

operating reserves.

The government’s central argument in response is that HUD’s methodology was

compelled by the requirements of the 2012 Appropriations Act, and that compliance with

that Act was required by the ACCs themselves. In addition, the government contends that

Plaintiffs’ arguments are foreclosed by provisions in the ACCs and HUD’s regulations

which state that operating subsidy payments are subject to or limited by the availability of

funds.

For the reasons set forth below, the Court concludes that Plaintiffs’ arguments are

the more persuasive ones. Accordingly, Plaintiffs’ motion for partial summary judgement

is GRANTED and the government’s cross-motion is DENIED.

A. Incorporation of Title 24 Regulations, as Amended, into the ACCs

It is well established that “[t]o incorporate material by reference, a contract must

use clear and express language of incorporation, which unambiguously communicates

that the purpose is to incorporate the referenced material, rather than merely acknowledge

that the referenced material is relevant to the contract.” Precision Pine & Timber, Inc. v.

United States, 596 F.3d 817, 826 (Fed. Cir. 2010); see also Northrop Grumman Info.

Tech., Inc. v. United States, 535 F.3d 1339, 1344 (Fed. Cir. 2008) (observing that “the

incorporating contract must use language that is express and clear, so as to leave no

ambiguity about the identity of the document being referenced, nor any reasonable doubt

about the fact that the referenced document is being incorporated” (emphasis in

original)). The Court of Appeals “has been reluctant to find that statutory or regulatory

provisions are incorporated into a contract with the government unless the contract

explicitly provides for their incorporation.” Northrop Grumman Info. Tech., 535 F.3d at

1344 (quoting St. Christopher Assocs., L.P. v. United States, 511 F.3d 1376, 1384 (Fed.

Cir. 2008) (emphasis in original)).

In this case, the ACCs contain language expressly incorporating HUD’s

regulations at Title 24 into the contracts. Thus, section 5 of the ACCs specifies that the

parties must comply with the regulations “promulgated by HUD at Title 24 of the Code

of Federal Regulations, which are hereby incorporated into this ACC by reference as if

11

fully set forth herein, and as such regulations shall be amended from time to time.” Pls.’

Mot. App. at A65 (emphasis supplied). This language “unambiguously communicates

that the purpose” of section 5 “is to incorporate the referenced material,” i.e., Title 24,

including any amendments made to Title 24 after the contracts’ executions. See Precision

Pine, 596 F.3d at 826; see also S. Cal. Edison Co. v. United States, 226 F.3d 1349, 1353

(Fed. Cir. 2000) (holding that the contracts at issue incorporated the terms and conditions

of certain regulations by specifically referring to the regulations (the text of which was

attached to the contract as an exhibit) as being part of the contract “as fully and

completely as though set forth herein [i.e., in the contract] in length”).

Further, the intent to incorporate the provisions of Title 24 (as they may be

amended from time to time) into the contracts is also reflected in the preamble to the

ACCs. It states that each ACC “incorporates by reference into this ACC those regulations

issued by HUD for the development, modernization, and operation of public and Indian

housing projects contained in Title 24 of the Code of Federal Regulations, as said Title

shall be amended from time to time.” Pls.’ Mot. App. at A63.

These express statements of intent that HUD’s Title 24 regulations, as amended,

are incorporated into the contract, are sufficient to establish that the parties undertook a

contractual obligation to comply with the terms of those regulations. Indeed, the

government does not argue otherwise. The Court turns, therefore, to the question of

whether HUD violated that contractual obligation in its allocation of operating subsidies

to Plaintiffs in 2012.

B. Breach of Contract Claims

1. HUD’s Contractual Commitment

It is well established that the “rights and duties” contained in a Government

contract “are governed generally by the law applicable to contracts between private

individuals.” United States v. Winstar Corp., 518 U.S. 839, 912 (1996) (quoting Lynch v.

United States, 292 U.S. 571, 579 (1934)); see also Mobil Oil Expl. & Producing Se., Inc.

v. United States, 530 U.S. 604, 607–08 (2000). Further, a breach of the government’s

contractual obligations may be effected through legislation that requires the government

to take actions that are inconsistent “with the promises that . . . earlier contracts

contain[].” Mobil Oil, 530 U.S. at 624. In such instances, where a subsequent statute

makes the government unable to fulfill its contractual promises, it may be liable to pay

damages for breach of contract. See Winstar, 518 U.S. at 870.

Notwithstanding the foregoing, the government argues that the principles set forth

in Winstar and Mobil Oil do not apply to Plaintiffs’ claims. It contends that —unlike the

plaintiffs in those cases—the PHAs did not bargain for the right they claim here, which

the government characterizes as the right to have their 2012 formula subsidies reduced on

a pro rata basis. Indeed, the government notes, “the claimed right is based entirely upon a

2005 language change in the Title 24 regulations, which occurred ten years after the

contracts were written and signed.” Def.’s Reply at 5 (emphasis in original).

12

The government’s arguments miss the mark. The government is correct that the

PHAs did not bargain for the right to have HUD employ a particular methodology for

determining their operating subsidy payments in the event of a budget shortfall. But they

did bargain for the right to require HUD to use whatever methodology was set forth in the

regulations at Title 24 of the C.F.R., as amended from time to time. And the content of

those regulations would be determined with their participation and input, through the

negotiated rulemaking process.10 Indeed, the record shows that it was upon the initiative

of public housing stakeholders on the rulemaking committee that the regulation upon

which Plaintiffs rely in this case was amended in 2005 to preclude HUD from reducing

operating subsidy payments on anything other than a pro rata basis in the event of

insufficient appropriations. Because Plaintiffs argue that the 2012 Act deprived them of

their important contractual right to have their operating subsidy payments determined

consistent with the applicable provisions of Title 24, their claims fall squarely within the

rationale of Winstar and Mobil Oil.

2. The Alleged Breach

As described in greater detail above, HUD’s regulations provide that a PHA is

entitled to an operating subsidy determined on the basis of a specified Operating Fund

Formula, and that, in the event that “insufficient funds are available,” “amounts of [the]

operating subsidy to be paid” shall be revised “on a pro rata basis.” 24 C.F.R.

§ 990.210(c). In 2012, HUD did not revise the amounts to be paid to each PHA under the

Operating Formula on a pro rata basis—i.e., by a uniform percentage. Instead, it made an

initial reduction in each Plaintiff’s subsidy by offsetting that particular PHA’s “excess

operating reserves” against its formula eligibility amount. Thus, the PHAs’ formula

eligibility amounts were reduced on a non-pro rata basis, contrary to the provisions of

Title 24. It was only after that offset was applied that HUD applied a uniform percentage

(94.97%) to make a second reduction.11

10

Congress mandated that HUD employ the negotiated rulemaking procedures set forth

at 5 U.S.C. §§ 561–70a when issuing regulations concerning the operating subsidy

formula. See 42 U.S.C. § 1437g(f). Those procedures provide for collaboration and

greater stakeholder participation in the rulemaking process than exists under the

traditional notice-and-comment procedures prescribed in the Administrative Procedure

Act. In a negotiated rulemaking, a committee consisting of stakeholders and agency

representatives meets publicly to negotiate the content of new regulations before they are

issued in proposed form. See 5 U.S.C. §§ 565–66. Because of the enhanced opportunities

for stakeholder input, “[p]roponents of negotiated rulemaking claim that these

procedures—which encourage affected parties to reach an agreement at the outset—will

decrease the amount of time it takes to develop regulations and, more notably, reduce or

eliminate subsequent judicial challenges.” Cary Coglianese, Assessing Consensus: The

Promise and Performance of Negotiated Rulemaking, 46 Duke L.J. 1255, 1257 (1997).

11

The Court notes that 24 C.F.R. § 990.110(c) states that “this part does not codify

certain secondary elements that will be used in the revised Operating Fund Formula,” and

13

Notwithstanding the foregoing, the government contends that HUD’s failure to

comply with Title 24 did not constitute a breach of contract because the ACCs

contemplated that their terms were subject to both existing and future applicable laws,

including the 2012 Appropriations Act. See Def.’s Mot. at 14–16. This argument is

unpersuasive.

First, the government’s argument collides with the principles, set forth above,

which demand “clear and express language of incorporation” to make material outside

the contract a part of the contract. Precision Pine, 596 F.3d at 826. The ACCs contain no

express statement of intent to incorporate by reference into the contract any statutory

provisions that might be enacted in the future, or even any statute in existence at the time

of the contracts’ executions. See id.

For example, the preamble to the ACC (upon which the government relies) does

not even reference the government’s obligations, nor does it contain express language of

incorporation. It merely states that “[n]othing herein shall release the HA [Housing

Authority] from compliance with all applicable laws, executive orders, and regulations

that are not specifically incorporated herein by reference.” Pls.’ Mot. App. at A63.

Similarly, while section 3 of the ACC at least refers to HUD’s obligations, it simply

recites a truism, stating that “HUD shall provide annual contributions to the HA in

accordance with all applicable statutes, executive orders, regulations, and this ACC.” See

id. at A64.

The relevant precedent confirms that contract language stating that a party’s

obligations shall be governed by or subject to “applicable statutes” is not sufficient to

evince the incorporation of any particular statute into the contract by reference (either as

then in existence or as might be subsequently enacted). See Mobil Oil, 530 U.S. at 615–

16 (lease contracts stating that they were subject to specific statutory provisions and

regulations, as well as “all other applicable statutes and regulations,” incorporated

specific statutes and regulations existing at the time of the contract’s formation and

referenced therein, but not other subsequently enacted statutes and regulations); Smithson

v. United States, 847 F.2d 791, 794 (Fed. Cir. 1988) (rejecting plaintiff’s argument that

entire body of regulations promulgated by the Farmers Home Administration was

that “HUD will more appropriately provide this information in non-codified guidance

such as a Handbook, Federal Register notice, or other non-regulatory means that HUD

determines appropriate.” Although the government referenced this provision in its

opening brief, see Def.’s Mot. at 3–4, it has never argued that consideration of a PHA’s

excess operating reserves in determining its subsidy could be characterized as the use of a

“secondary element” in the Operating Fund Formula. Nor could it. As HUD explained in

the preamble to its regulations, this language was intended to refer to situations in which

“HUD has determined that clarification of existing regulatory requirements is needed”

and so “will issue such guidance through non-regulatory means.” Revisions to the Public

Housing Operating Fund Program, 70 Fed. Reg. 54984, 54989 (Sept. 19, 2005). Imposing

an excess operating reserve offset was a new regulatory requirement, not a clarification of

existing ones.

14

incorporated by reference into plaintiff’s contract, based on a provision stating that the

contract was “subject to” such regulations, noting among other things that “if that were

the parties’ purpose, they would have explicitly so provided”); Earman v. United States,

114 Fed. Cl. 81, 103–04 (2013) (provision stating that the contract “shall be carried out in

accordance with all applicable Federal statutes and regulations” “does not refer to any

particular statutory or regulatory provision,” and therefore “cannot reasonably be read as

incorporating the entire corpus of the [relevant] statute into plaintiff’s contract”), aff’d,

589 F. App’x 991 (Fed. Cir. 2015).

Further, it is illuminating to compare the language that the ACCs employ when

describing the relationship between the Title 24 regulations and the contract to the

language the ACCs use when referencing either statutes or other potentially applicable

regulations. Thus, in the very same sentence of § 5 stating that “[t]he HA shall develop

and operate all projects covered by this ACC in compliance with all the provisions of this

ACC and all applicable statutes, executive orders, and regulations issued by HUD, as

they shall be amended from time to time,” the ACCs explicitly and specifically

“incorporate[] . . . by reference as if fully set forth herein” only “those regulations

promulgated by HUD at Title 24 of the Code of Federal Regulations. . . as such

regulations shall be amended from time to time.” Pls.’ Mot. App. at A65. This

demonstrates that where the ACC was intended to incorporate external legal requirements

(as with the Title 24 regulations), the contract employs the kind of express language of

incorporation that Precision Pine and Northrop Grumman require. By contrast, the ACCs

do not use the language of incorporation in reference to any statutes (whether then-

existing or subsequently enacted), which further supports the conclusion that the 2012

Act is not incorporated by reference into the ACC.

Nor does the language in § 11 of the ACC stating that “HUD may revise or amend

the subsidy calculation to bring it into conformity with regulatory requirements” assist

the government’s argument. See id. at A67. First, the language refers to “regulatory”

requirements, not statutory requirements. And the government does not argue that the

PIH Notice contains “regulatory requirements”; nor could it, as such Notices are not

promulgated in accordance with the negotiated rulemaking procedures required by the

statute.

Further, and in any event, the “regulatory requirements” to which § 11 refers are

those set forth in Title 24. Thus, the language appears within a clause that lays out the

administrative process by which HUD will determine a PHA’s annual operating subsidy

eligibility. See id. It requires the PHA to submit to HUD an annual “calculation of

operating subsidy eligibility in the manner prescribed by HUD in regulations in Title 24

of the Code of Federal Regulations.” Id. It then specifies that HUD will review the

submission and that, if it is not in conformity with the regulations, HUD may “revise or

amend” it. Id. Read in context, it is unreasonable to construe the reference to the revision

or amendment of a subsidy eligibility calculation “to bring it into conformity with

regulatory requirements” as reflecting anything other than a description of the actions

HUD may take in response to a submission that does not comply with Title 24.

15

In short, the government’s argument that compliance with the 2012 Act was itself

a contractual obligation lacks merit. The Court turns therefore to the government’s final

argument—that Plaintiffs’ breach of contract claims are foreclosed by provisions in the

ACCs and HUD’s regulations that make the PHAs’ entitlements to operating subsidies

“subject to” or “limited by” the availability of funds.

3. Availability of Funds

The government’s final argument is that language at 24 C.F.R. § 990.110(b)(3),

which states that “[o]perating subsidy payments will be limited to the availability of

funds as described in § 990.210(c),” “serves as an independent bar to plaintiffs’ claims

because it limits the Government’s liability to the amount appropriated by Congress.”

Def.’s Reply at 7. This argument lacks merit because it ignores § 990.110(b)(3)’s cross-

reference to § 990.210(c), which “describe[s]” how the payments will be limited in the

event of a shortfall in appropriations. Section 990.210(c)—stating that “[i]n the event that

insufficient funds are available, HUD shall have discretion to revise, on a pro rata basis,

the amounts of operating subsidy to be paid to PHAs”—is the very provision Plaintiffs

seek to enforce in this case. Plaintiffs do not seek an award of subsidies in excess of the

amount appropriated by Congress for such subsidies. Instead, their claims concern the

methodology for allocating the amounts Congress has appropriated.

For similar reasons, the Court also rejects the government’s reliance upon § 11(A)

of the ACCs, which states that HUD “shall review [the PHA’s calculation of operating

subsidy eligibility under Title 24] and, if correct, and subject to the availability of funds,”

take action within 45 days to obligate the funds and approve a payment schedule. As the

Supreme Court explained in Cherokee Nation of Oklahoma v. Leavitt, 543 U.S. 631

(2005), language stating that the government’s provision of funds is “subject to the

availability of appropriations” “is often used with respect to Government contracts.” Id.

at 643 (citations omitted). “This kind of language normally makes clear that an agency

and a contracting party can negotiate a contract prior to the beginning of a fiscal year but

that the contract will not become binding unless and until Congress appropriates funds

for that year.” Id. “It also makes clear that a Government contracting officer lacks any

special statutory authority needed to bind the Government without regard to the

availability of appropriations.” Id. (citations omitted).

Further, “[w]hether appropriated funds are legally available for something

depends on three things: 1) the purpose of the obligation or expenditure must be

authorized; 2) the obligation must occur within the time limits applicable to the

appropriation; and 3) the obligation and expenditure must be within the amounts

Congress has established.” U.S. Gov’t Accountability Off., GAO-04-261SP, GAO

General Principles of Federal Appropriations Law—Vol. I, ch. 4, 4-6 (3d ed. 2004). In

this case, under the 2012 Appropriations Act, funds were available for the purpose of

providing subsidies to PHAs for the operation and management of public housing.

Further, the obligation to pay Plaintiffs’ operating subsidies was within the time limits of

the Act (FY 2012). And compliance with Title 24’s rules for allocating operating

subsidies did not require HUD to spend more than $3,961,850,000, the amount Congress

had established. Accordingly, inclusion of the standard proviso in the ACCs, making

16

payment of operating subsidies “subject to the availability of funds” does not preclude

Plaintiffs from claiming their contractual right to have those funds allocated consistent

with the requirements of Title 24.

* * * * * * * * * * *

In short, the language of the ACCs reflects an intent to incorporate by reference

into the contract the provisions of Title 24 of the C.F.R., but no intent to incorporate by

reference future statutory provisions like the 2012 Appropriations Act. Further, the

language in the regulations (and in the ACCs) that makes the government’s obligation to

pay operating subsidies “subject to the availability of funds” does not excuse HUD’s

failure to apply the methodology set forth in the regulations for determining the amount

of the operating subsidy payments based on the availability of funds. Therefore, the Court

concludes that the government breached its obligations under the ACCs when it applied

the operating expense offset in response to the 2012 Appropriations Act, rather than the

pro rata reduction rule prescribed by Title 24.12

CONCLUSION

For the foregoing reasons:

1) The government’s motion to dismiss is GRANTED-IN-PART and DENIED-

IN-PART;

2) Nos. 13-6121, 13-6115, 13-6153, 13-6245, 13-6247, 13-6214, 13-6263, 13-

6284, 13-6058, 13-6168, 13-6150, 13-6222, 13-6244, 13-0006, and 13-6000

are DISMISSED without prejudice;

3) Plaintiffs’ motion for partial summary judgment is GRANTED; and

4) The government’s motion for partial summary judgment is DENIED.

The Clerk is directed to enter judgment accordingly in Nos. 13-6121, 13-6115,

13-6153, 13-6245, 13-6247, 13-6214, 13-6263, 13-6284, 13-6058, 13-6168, 13-6150, 13-

12

The government’s motion for partial summary judgment includes a brief argument that

it is entitled to summary judgment on the ground that Plaintiffs’ damages claims are

“inherently speculative” because they “appear[] to be based upon its belief that Congress

would have appropriated the same amount of operating subsidy funds in fiscal year 2012

even without the direction to the Secretary to take into account PHAs[’] excess operating

reserves.” Def.’s Mot. at 16 (citing San Carlos Irr. & Drainage Dist. v. United States, 111

F.3d 1557, 1563 (Fed Cir. 1997)). This contention is unpersuasive. Plaintiffs’ claims are

not based on speculation about how much money Congress would have appropriated had

it not decided to require HUD to consider the PHAs’ excess operating reserves. Their

claims are based on HUD’s failure to follow its Title 24 regulations (which were

incorporated into their contracts) in allocating the $3,961,850,000 that Congress in fact

did appropriate.

17

6222, 13-6244, 13-0006, and 13-6000. Further, the Clerk is directed to make No. 13-

6040, Clearwater Housing Authority v. United States, the lead case in this consolidated

action. The parties shall amend the captions of all future filings accordingly.

The parties shall file a joint status report within 30 days, proposing a schedule to

govern further proceedings in these cases.

IT IS SO ORDERED.

s/ Elaine D. Kaplan

ELAINE D. KAPLAN

Judge

18