Opinion

Center for Biological Diversity v. Department of Fish & Wildlife

  • 234 Cal. App. 4th 214
  • 183 Cal. Rptr. 3d 736
Court
California Court of Appeal
Filed
Feb 10, 2015
Status
Published
Author
Nicholson
On the bench
Nicholson
Cited by
43 cases
Authority
More cited than 75.6%

The opinion

Filed 2/10/15

CERTIFIED FOR PUBLICATION

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

THIRD APPELLATE DISTRICT

(Sacramento)

----

CENTER FOR BIOLOGICAL DIVERSITY, C072486

Plaintiff and Appellant, (Super.Ct.No. 06CS01451)

v.

DEPARTMENT OF FISH AND WILDLIFE,

Defendant and Respondent.

CALIFORNIA ASSOCIATION FOR C072790

RECREATIONAL FISHING,

(Super.Ct.No. 34-2010-

Plaintiff and Appellant, 80000588CUWMGDS)

v.

DEPARTMENT OF FISH AND WILDLIFE,

Defendant and Respondent.

1

CALIFORNIANS FOR ALTERNATIVES TO C073011

TOXICS et al.,

(Super.Ct.No. 34-2010-

Plaintiffs and Appellants, 80000566CUWMGDS)

v.

DEPARTMENT OF FISH AND WILDLIFE,

Defendant and Respondent.

APPEAL from a judgment of the Superior Court of Sacramento County, Lloyd G.

Connelly, Judge. Affirmed in part and reversed in part.

Environmental Law Clinic, Deborah A. Sivas, and Alicia E. Thesing for Plaintiff

and Appellant Center for Biological Diversity.

Alston & Bird, Maureen F. Gorsen, Shiraz D. Tangri, Rebecca Harrington; Pacific

Legal Foundation, M. Reed Hopper, Damien M. Schiff, Joshua P. Thompson, and

Jonathan Wood for Plaintiff and Appellant California Association for Recreational

Fishing.

Wild Earth Advocates and Julia A. Olson for Plaintiffs and Appellants

Californians for Alternatives to Toxics et al.

Kamala D. Harris, Attorney General, Robert W. Byrne, Assistant Attorney

General, Gavin G. McCabe, Randy L. Barrow, Russell B. Hildreth, and Marc N. Melnick,

Deputy Attorneys General, for Defendant and Respondent.

Facing for the first time a requirement to review for environmental impacts its

statutorily mandated fish hatchery and stocking enterprise that has been in operation for

more than 100 years, California’s Department of Fish and Wildlife (the Department)

chose to use a program environmental impact report (EIR) to analyze the enterprise’s

impacts on a statewide basis. Instead of addressing impacts on specific locations the

Department stocked, the EIR addressed the enterprise’s continuing and potential impacts

2

on individual species that could be located at many locations. The EIR formulated, and

the Department adopted, protocols and plans for discovering site-specific impacts at each

of the nearly 1,000 water bodies the Department stocks and the 24 hatcheries it oversees,

and it committed to mitigating the impacts discovered from those reviews. If, through

using the protocols, the Department discovered impacts that were not addressed in the

EIR, the Department committed to review and mitigate those impacts as required by

environmental law. The Department addressed unavoidable impacts in a statement of

overriding considerations.

Because the stocking and hatchery enterprise was ongoing and mandated by

statute, the EIR considered the existing enterprise exclusive of any proposed mitigation

measures as the environmental baseline and as the no project alternative. It did not

evaluate an alternative that would cease all stocking and hatchery operations. In addition

to the ongoing operations, the EIR evaluated the ongoing enterprise as proposed to be

mitigated and a project that further curtailed mountain lake stocking as alternatives.

The EIR also reviewed other Department stocking programs that involve private

fish vendors. The EIR proposed, and the Department adopted as mitigation measures,

new qualification requirements and monitoring and reporting obligations private vendors

would have to satisfy if they wanted to continue to participate in the stocking programs.

In these appeals, we address whether the EIR complies with the California

Environmental Quality Act (Pub. Resources, § 21000 et seq. (CEQA)). We also address

whether the Department’s imposition of these mitigation measures on private fish

vendors violated the requirements of the Administrative Procedure Act (Gov. Code, §

11340 et seq. (the APA)).

In case Nos. C072486 and C073011, plaintiffs, Center for Biological Diversity and

Californians for Alternatives to Toxics et al., respectively, argue the EIR is flawed

because it (1) did not perform site-specific review for each site in the state the

Department stocks with fish; (2) deferred forming mitigation measures to the future

3

formulation of protocols and management plans; (3) relied on the current stocking

enterprise as the environmental baseline; and (4) did not review a reasonable range of

alternatives, including a no project alternative consisting of ceasing all hatchery and

stocking operations. We disagree with the plaintiffs. Given the history, nature, and

scope of the project under review, the Department did not abuse its discretion in the

manner it organized the EIR, analyzed the project, and mitigated its numerous impacts.

We affirm the trial court’s judgment in these appeals.

In case No. C072790, plaintiff California Association for Recreational Fishing

contends the Department violated the APA by imposing the qualification requirements

and the monitoring and reporting obligations on private fish vendors without complying

with the APA’s notice and hearing procedures. We conclude each measure qualified as a

regulation under the APA that the Department did not properly adopt as such. We

reverse the trial court’s judgment in this appeal.

FACTS AND PROCEDURAL HISTORY

Since the late 1800’s, the State of California has constructed and operated fish

hatcheries, and it has stocked millions of trout, salmon, and steelhead reared in those

hatcheries into water bodies throughout the state. State statute mandates the Department

implement and oversee this enterprise. (Fish & G. Code, §§ 1120, 1725 et seq., 13007.) 1

The Department stocks millions of pounds of fish each year at close to 1,000 locations.

Currently, the Department operates 14 trout hatcheries and 10 salmon and

steelhead hatcheries throughout the state. The trout hatcheries raise fish for stocking in

inland waters to provide recreational opportunities for anglers, and to conserve and

restore native fish species. The salmon and steelhead hatcheries provide salmon and

1 We note the Department’s name at the time these actions were filed was the

Department of Fish and Game. The statutes under which the Department operates are

codified in what is still called the Fish and Game Code.

4

steelhead to mitigate the loss of wild anadromous fish habitat and upstream spawning

areas caused by dam construction, to mitigate fish loss at state-operated pumping

facilities in the Sacramento-San Joaquin Delta, and to enhance native anadromous fish

populations for recreational and commercial fishing.2

The hatchery and stocking enterprise predates CEQA. After CEQA’s enactment

in 1970, the Secretary of Natural Resources determined the Department’s hatchery and

stocking enterprise was categorically exempt from complying with CEQA. (CEQA

Guidelines, § 15301, subd. (j).)3 As a result, the Department did not conduct any type of

environmental review for the enterprise.

During the past two decades, concerns arose regarding the hatchery and stocking

enterprise’s impact on native and wild animals and their habitat. Scientific evidence

indicated frogs and other amphibians in high mountain lakes were more vulnerable to

predation by stocked nonnative trout, contributing to declining amphibian populations.

Scientific evidence also indicated planting hatchery salmonids led to genetic

hybridization of wild and hatchery anadromous fish, reducing their genetic diversity and

strength, and ultimately their populations.

In 2001, the Department began addressing these concerns. To assess the impact

stocking high mountain lakes had on amphibians and other wildlife, the Department

2 Anadromous fish are fish that ascend rivers from the sea for breeding. (Merriam-

Webster’s Collegiate Dict. (11th ed. 2006) p. 44, col. 1.)

3 The CEQA Guidelines are regulations adopted by the Secretary of the Natural

Resources Agency to implement CEQA. (Communities for a Better Environment v.

South Coast Air Quality Management Dist. (2010) 48 Cal.4th 310, 319, fn. 4.) They are

codified at title 14, chapter 3, of the California Code of Regulations (14 Cal. Code Regs.

§ 15000 et seq.). “In interpreting CEQA, we accord the Guidelines great weight except

where they are clearly unauthorized or erroneous. [Citations.]” (Vineyard Area Citizens

for Responsible Growth, Inc. v. City of Rancho Cordova (2007) 40 Cal.4th 412, 428, fn.

5.)

5

began surveying the lakes to determine the presence of several native amphibian and

reptile species, fish species, and their habitat, and to assess watershed characteristics (the

high mountain lakes project). These mountain lakes and streams were originally without

fish, but they were extensively stocked with nonnative trout over the past century, to the

extent that most of the lakes now have extant trout populations. The Department ceased

stocking most high mountain lakes in the state until the surveys were conducted. As of

January 2010, the Department had completed more than 16,000 surveys at approximately

11,000 sites.

The Department has used, and continues to use, the survey data to develop what it

calls aquatic biodiversity management plans to govern stocking in mountain waters.

Aquatic biodiversity management plans provide for maintaining recreational fisheries

while recovering native animals, especially amphibians. They require future mountain

lake stocking decisions to be based on the twin objectives of managing the lakes to

maintain or restore native biodiversity and habitat quality, and providing for recreational

opportunities considering historical and future use patterns. Under the aquatic

biodiversity management plans, lakes with existing populations of endangered or

threatened amphibian species and other species the Department believes may be

vulnerable to harm from stocking, referred to as “decision species,” generally will no

longer be stocked with fish. If decision species exist within two kilometers of a lake, the

Department will assess fishing use and the feasibility of removing the trout from the lake

to determine if the lake could be converted to a fishless condition in order to benefit the

decision species. Others lakes will be managed for recreational angling. As of January

2010, there were aquatic biodiversity management plans completed or in draft for 27

watershed areas, or “management units.”4

4 The Department asks us to take judicial notice of a final aquatic biodiversity

management plan, this one for the Desolation Wilderness Management Unit. It was not

6

To address the impacts hatchery salmon and steelhead have on wild populations of

native anadromous fish, the Department began preparing what are called hatchery genetic

management plans, creatures of federal regulation under the federal Endangered Species

Act. (50 C.F.R. § 223.203(b)(5); 16 U.S.C. § 1531 et seq.) Hatchery genetic

management plans require the Department to change the ways in which it collects fish for

spawning and releases hatchery fish in order to maintain genetic integrity and reduce

interactions between wild and hatchery fish. Hatchery genetic management plans must

be approved by the National Marine Fisheries Service (NMFS), and as of January 2010,

none prepared for California waters had been approved. In the interim, hatcheries that

have draft hatchery genetic management plans are following them, and the Department

and the NMFS continue to develop guidance and protocols for hatchery operations.

In 2005, the Legislature created a specific fund in the state treasury to finance the

Department’s hatchery and stocking enterprise. (Stats. 2005, ch. 689, § 1 [AB 7], pp.

5439-5441 [enacting Fish & G. Code, § 13007].) The Legislature directed that fund

proceeds be used by the Department in part to attain specific hatchery production goals.

It initially required the Department to attain a goal of stocking 2.25 pounds of trout for

each sport fishing license sold the previous year. (Ibid.) By July 2009, the statute

required the Department to attain a goal of stocking 2.75 pounds of trout for each sport

fishing license sold. (Stats. 2008, ch. 350, § 1, p. 2735.) In 2007, more than two million

fish licenses were sold, translating into a goal of stocking more than five million pounds

of trout. By comparison, in 2008, the Department actually stocked 4.3 million pounds of

trout.

In 2006, plaintiff Center for Biological Diversity (the Center) sued the

Department, claiming the hatchery and stocking enterprise did not qualify for a

presented to the trial court as it was finalized on December 19, 2012, after judgment was

executed. Because it was not before the trial court, we deny the request.

7

categorical exemption from CEQA, and seeking a writ of mandate compelling the

Department to review its hatchery and stocking enterprise in an EIR. That same year, the

Department announced it would prepare an “environmental document describing

impacts” of its hatchery and stocking enterprise and the protocols it used to determine

where fish would be stocked, but it still contended the enterprise was exempt from

CEQA.

In 2007, the trial court granted the Center’s petition for writ of mandate. It

concluded the hatchery and stocking enterprise was not categorically exempt from CEQA

because it likely caused significant environmental impacts. It ordered the Department to

comply with CEQA and prepare an EIR on its enterprise. However, the court refused to

enjoin the Department from operating the enterprise pending completion of the EIR. The

Department did not appeal this judgment.

In 2008, the Department moved to modify the judgment to receive additional time

to prepare the EIR. The Department had expanded the EIR’s scope beyond its hatchery

and stocking enterprise to include other Department hatchery programs in part supported

by federal funds that involved hatchery fish in other locations and from other vendors.

That expansion required the EIR to be a combined EIR/environmental impact statement

(EIS) under federal environmental law, and the Department did not have sufficient funds

at the time to pay the estimated $1.8 million needed to complete the review. (For ease of

reference, we will refer to the EIR/EIS as an EIR.)

The trial court granted the Department’s motion and extended the time to complete

the EIR. However, it also ordered the Department to suspend stocking nonnative fish in

fresh water bodies where surveys showed the presence of sensitive native aquatic or

amphibian species, or where such surveys had not been completed.

The Department certified the final EIR in January 2010. It is a significant effort.

It includes approximately 650 pages of discussion and an additional 1,800 pages of

appendices, of which more than 1,250 pages are responses to public comments. The

8

record also includes the reference material the Department relied upon to prepare the

EIR, which totals some 43,700 pages.

The EIR has a broad scope. It is meant to cover the Department’s entire fish

hatchery and stocking enterprise statewide. It also analyzes three other programs the

Department administers: the Fishing in the City program (which provides fishing

opportunities in urban areas), the Classroom Aquarium Education Project (which

provides school children with opportunities to see fish hatch and grow), and the Private

Stocking Permit Program (by which the Department authorizes fish stocking by private

aquaculture facilities in private and public lakes and ponds).

Of significance here, the Department selected its current hatchery and stocking

operations from 2004 through 2008 as an environmental baseline for its analysis in the

EIR. Against this baseline, the EIR analyzed the enterprise’s impacts on hydrology,

water supply, and water quality; biological resources; recreation and economics; and

cultural resources. The EIR identified more than 200 impacts on biological resources,

many of which were significant.

The EIR found trout stocking adversely impacted a number of frog species.

Stocked fish may directly prey upon some native amphibians and reptiles, and may cause

ecological changes that affect the competition for resources between fish and amphibians.

To mitigate these impacts to less than significant, the EIR recommended the Department

utilize a new protocol to determine whether to stock an inland water body with trout.

Under the protocol, referred to as a pre-stocking evaluation protocol (the evaluation

protocol), Department biologists would evaluate each stocking location within the range

of a decision species in a stepwise fashion to determine whether interactions between

stocked trout and decision species may occur, and to evaluate whether stocking may

significantly impact the species. If the biologist determines a significant impact is likely,

the Department will cease stocking at that location unless and until it develops and

implements an aquatic biodiversity management plan for that location. If decision

9

species are not present, stocking may proceed. A positive stocking determination is valid

for five years unless new information necessitates a new evaluation protocol be

performed.

The EIR also found that stocking hatchery salmon and steelhead in waters with

wild salmon and steelhead significantly and, in some cases, unavoidably impacted wild

populations of native anadromous fish. Stocked fish may prey on and compete with

some wild fish populations. They may also cause adverse effects on the long-term

genetic fitness and diversity of some wild populations. To mitigate these impacts to the

extent possible, the EIR called for the Department to continue to develop an expanded

hatchery genetic management plan process to govern operation of the salmon and

steelhead hatcheries in order to mitigate impacts on wild populations of native

anadromous fish. The hatchery genetic management plan process would include

developing and implementing with the NMFS a comprehensive plan to mitigate the

impacts and protect decision species, and establishing an independent review panel for

the hatcheries.

The EIR also determined stocking for other Department programs could adversely

impact decision species. Stocking for the Fishing in the City program could cause some

significant impacts. Stocking activities for this program introduce hatchery fish and

warm water fish into some water bodies that may contain decision species, resulting in

some instances of predation and competition for resources, the introduction of pathogens

to native amphibian populations, and the spread of invasive species. To mitigate these

impacts, the EIR proposed Department biologists use a protocol analogous to the

evaluation protocol, called the private stocking permit evaluation protocol, prior to

stocking any water body for the Fishing in the City program. If biologists identify any

amphibians susceptible to pathogens in the water, they will not stock at that location.

The EIR also proposed requiring private aquaculture facilities who participate in the

program to monitor and report for invasive species in their stocks on a quarterly basis.

10

Approval of private stocking permits could also cause similar impacts to decision

species. To mitigate these impacts, the EIR proposed that before the Department

approves a private stocking permit, a Department biologist visit the water body proposed

to be stocked and perform the private stocking permit evaluation protocol to determine if

the body hosts any decision species, and, if it does, whether stocking in that body would

significantly impact that species. If it would, the Department would not approve the

permit application.

The EIR considered three project alternatives: (1) continue the existing hatchery

and stocking enterprise without change, which the EIR treated as the no project

alternative required by CEQA; (2) continue to operate the enterprise but in compliance

with the mitigation measures proposed by the EIR to minimize the enterprise’s impacts

on the environment, including use of evaluation protocols and aquatic biodiversity

management plans for trout stocking and hatchery genetic management plans for salmon

and steelhead stocking; and (3) permanently operate the enterprise as limited by the trial

court during the EIR process, ceasing all stocking in fresh water lakes where decision

species exist. The EIR named the second alternative as the preferred alternative.

The EIR did not consider closing the hatcheries or eliminating trout stocking as

alternatives. It did not because ceasing operations did not meet what the Department

believed was a statutory mandate under Fish and Game Code section 13007 to operate

hatcheries to provide fish to meet recreational demand. Ceasing to stock would also

place considerable pressure on native and wild stocks that already exist, and would

eliminate a large portion of recreational fishing in the state.

In certifying the EIR, the Department approved the second alternative as the

project it would undertake, and it adopted findings, a statement of overriding

considerations, and a mitigation monitoring and reporting plan, as required by CEQA.

As part of adopting the mitigation plan, the Department approved using the evaluation

protocol and aquatic biodiversity management plans to mitigate impacts on native trout,

11

the expanded hatchery genetic management plan process to mitigate impacts on wild

salmon and steelhead, and the proposed protocols and monitoring and reporting

requirements to mitigate impacts caused by the Fishing in the City program and the

Private Stocking Permit Program.

The Center, plaintiffs Californians for Alternatives to Toxics et al. (collectively,

the Center), and plaintiff California Association for Recreational Fishing (the

Association) each petitioned for a writ of mandate against the Department and its

certification of the EIR. The Center alleged the EIR did not comply with CEQA. The

Association alleged the Department imposed the mitigation measures on the Fishing in

the City Program and the Private Stocking Permit Program as underground regulations in

violation of the APA.

The trial court denied each of the petitions. The petitioners appealed, and we

consolidated the matters for purposes of decision and argument.

DISCUSSION

I

Standard of Review

Our standard of review is as follows:

“In reviewing an agency’s compliance with CEQA in the course of its legislative

or quasi-legislative actions, the courts’ inquiry ‘shall extend only to whether there was a

prejudicial abuse of discretion.’ (Pub. Resources Code, § 21168.5.) Such an abuse is

established ‘if the agency has not proceeded in a manner required by law or if the

determination or decision is not supported by substantial evidence.’ ([Pub. Resources

Code,] § 21168.5; see Western States Petroleum Assn. v. Superior Court [(1995)] 9

Cal.4th [559,] 568; Laurel Heights Improvement Assn. v. Regents of University of

California (1988) 47 Cal.3d 376, 392-393 (Laurel Heights I).)

“An appellate court’s review of the administrative record for legal error and

substantial evidence in a CEQA case, as in other mandamus cases, is the same as the trial

12

court’s: The appellate court reviews the agency’s action, not the trial court’s decision; in

that sense appellate judicial review under CEQA is de novo. [Citations.] We therefore

resolve the substantive CEQA issues . . . by independently determining whether the

administrative record demonstrates any legal error by the [Department] and whether it

contains substantial evidence to support the [Department’s] factual determinations.”

(Vineyard Area Citizens for Responsible Growth, Inc. v. City of Rancho Cordova, supra,

40 Cal.4th at pp. 426-427, fns. omitted.)

II

Case Nos. C072486 and C073011

The Center contends the Department did not comply with CEQA when it prepared

and certified the EIR because it allegedly and improperly:

1. Used a program EIR to approve future site-specific stocking decisions

without performing site-specific review;

2. Deferred the formulation of mitigation measures for each future stocking

decision to future use of the evaluation protocol, the aquatic biodiversity management

plans, and the hatchery genetic management plans;

3. Relied upon the current hatchery and stocking enterprise as the

environmental baseline; and

4. Omitted sufficient consideration of a reasonable range of project

alternatives, including a no project alternative of no stocking, and a sufficient explanation

for possible alternatives it chose not to review.

We address, and reject, each of these contentions.

A. The EIR’s level of analysis

The Center contends the Department improperly used a program EIR as a project

or site-specific EIR. It argues the EIR’s level of review is insufficient to approve future

stocking decisions because it does not contain site-specific environmental analysis. As a

13

result, no further CEQA process is allegedly contemplated before final stocking decisions

will be made for particular water bodies.

The Department contends the EIR’s level of analysis was appropriate. The level

of specificity required in an EIR is determined by the nature of the project and the rule of

reason. (Al Larson Boat Shop, Inc. v. Board of Harbor Commissioners (1993) 18

Cal.App.4th 729, 741-742.) The Department argues the Center’s contention would

require it to conduct separate environmental review for each stocking decision every

year. The Department claims reading CEQA in that fashion would violate the governing

rule of reason.

We conclude the EIR contains a sufficient level of analysis for a program EIR. It

evaluates the known impacts in a comprehensive fashion, and we read it to provide for

further environmental review where warranted.

CEQA allows public agencies to use special types of EIR’s to simplify preparation

and avoid duplication. (Californians for Alternatives to Toxics v. Department of Food &

Agriculture (2005) 136 Cal.App.4th 1, 22, fn. 10; see 1 Kostka & Zischke, Practice

Under the Cal. Environmental Quality Act (Cont.Ed.Bar 2d ed. 2014) § 10.2, p. 10-4

(Kostka).)

One of those EIR’s is a program EIR. (CEQA Guidelines, § 15168.) “A program

EIR is an EIR which may be prepared on a series of actions that can be characterized as

one large project and are related [among other possibilities] [¶] [a]s individual activities

carried out under the same authorizing statutory or regulatory authority and having

generally similar environmental effects which can be mitigated in similar ways.” (CEQA

Guidelines, § 15168, subd. (a)(4).) The hatchery and stocking enterprise is such a

project.

Using a program EIR can provide a public agency many advantages as it proceeds

with its program. For one, the agency can avoid preparing multiple EIR’s for the

program and its activities if the program EIR is comprehensive. “Preparation of a

14

program EIR allows a public agency to characterize the overall program as the project

that is proposed for approval. If a sufficiently comprehensive and specific program EIR

is prepared, the agency may dispense with further environmental review of activities

within the program that are adequately covered by the program EIR. ([CEQA

Guidelines,] § 15168, subd. (c).)” (Kostka, supra, § 10.14, p. 10-20.)

Program EIR’s have other advantages. They may be used to address impacts and

mitigation measures that apply to the program as a whole to simplify later environmental

review for program activities. (CEQA Guidelines, § 15168, subd. (d); Kostka, supra, §

10.14, p. 10-20.) They may also be used to consider broad programmatic issues for

related actions at an early planning stage when the agency has greater flexibility to deal

with basic problems or cumulative impacts. (CEQA Guidelines, § 15168, subd. (b);

Kostka, supra, § 10.14, p. 10-20.)

The CEQA Guidelines do not specify the level of analysis required to be

performed in a program EIR. Indeed, “[n]o ironclad rules can be imposed regarding the

level of detail required . . . . EIR requirements must be ‘sufficiently flexible to

encompass vastly different projects with varying levels of specificity.’ [Citation.]” (Al

Larson Boat Shop, Inc. v. Board of Harbor Commissioners, supra, 18 Cal.App.4th at pp.

745-746.) “The degree of specificity required in an EIR will correspond to the degree of

specificity involved in the underlying activity which is described in the EIR.” (CEQA

Guidelines, § 15146.)

Accordingly, the CEQA Guidelines require an EIR to provide sufficient

information in light of what is reasonably feasible. “An EIR should be prepared with a

sufficient degree of analysis to provide decisionmakers with information which enables

them to make a decision which intelligently takes account of environmental

consequences. An evaluation of the environmental effects of a proposed project need not

be exhaustive, but the sufficiency of an EIR is to be reviewed in the light of what is

reasonably feasible. . . . The courts have looked not for perfection but for adequacy,

15

completeness, and a good faith effort at full disclosure.” (CEQA Guidelines, § 15151.)

Certainly, a program EIR will better fulfill its purpose of reducing the need for

subsequent environmental review the more comprehensive and specific the analysis it

provides. (CEQA Guidelines, § 15168, subd. (c).)

The program EIR here satisfies these standards. It reviews and analyzes the

hatchery and stocking enterprise specifically and comprehensively, but within reason.

Given the nature and statewide scope of the project and the consistency of its impacts

across the state, the analysis is adequate to serve as a program EIR that also operates as a

project EIR.

Relying upon thousands of pages of compiled data, databases, reports, interviews,

peer-reviewed scientific publications, and computer models, the EIR describes in great

detail the impacts hatcheries and stocking have on other wildlife on a statewide basis. It

reviews the impacts of hatchery operations and stocking in general and on each of the

decision species. In particular, it describes the impacts trout stocking has on the

amphibian and reptile decision species historically located at high mountain lakes, and

the impacts salmon and steelhead stocking has on wild salmon and steelhead in waters

with outlets to the ocean.

The EIR organizes its analysis of both stocking enterprises’ impacts on biological

resources into six categories: (1) impacts related to predation, competition, and related

changes in ecological relationships between stocked and native species; (2) impacts

related to the catch of native fish by fishermen drawn to the area because the waters are

stocked; (3) impacts related to invasive species and pathogens that are accidentally

introduced during stocking operations; (4) impacts from interbreeding of hatchery and

wild fish, altering the genetic composition of wild populations; (5) impacts that arise

from accidental or otherwise unauthorized releases of hatchery trout; and (6) impacts

caused by anglers during their pursuit of stocked trout. Within these categories, the EIR

reviews the potential impact on each decision species.

16

Examples from the EIR illustrate the detailed analysis the document provides.

Regarding the impacts stocking fish in mountain lakes has on decision species, the EIR

states stocking mountain lakes is a factor that has led to the decline of native amphibians

and reptiles in California. Amphibians and reptiles are substantially and adversely

affected due to competition and predation with hatchery fish. Those found in formerly

fishless areas lack adaptations for defense against predatory fish. Hatchery fish, besides

preying on native amphibians and reptiles, may also cause ecological changes that affect

the competition for resources.

The EIR analyzes stocking’s effect on each of the decision species. For example,

the EIR describes lake stocking’s effect on the mountain yellow-legged frog. There are

451 trout stocking locations within this species’ range. The species has experienced

serious population declines in the last century, and stocking is a primary factor in those

declines. Introduced trout prey on the species as well as fragment and isolate their

populations, reducing their ability to recolonize. The January 2010 EIR stated that recent

assessments indicate only a small percentage of mountain yellow-legged frog sites

represent healthy populations, and many may not persist without efforts to protect them.

As a result, the Department in 1999 began restoration efforts by removing

introduced trout from select lakes. These efforts have resulted in substantial increases in

the affected mountain yellow-legged frog populations. The Department is continuing to

remove nonnative trout from other lakes. Field experiments suggest removing nonnative

trout results in mountain yellow-legged populations recovering quickly.

The EIR concludes trout stocking’s effect on mountain yellow-legged frogs is

potentially significant. To mitigate the effect, the EIR directs the Department to utilize

the evaluation protocol at each location where stocking is planned to occur within the

species’ range. If the potential for trout and mountain yellow-legged frogs to interact

exists, and if that potential could result in a substantial impact on the frog, trout will not

17

be stocked at that location unless and until the Department adopts an aquatic biodiversity

management plan for that location to mitigate the impact.

The EIR repeats this type of analysis and evaluation for each decision species.

And the analysis applies wherever the species is located.

The EIR also details the effects hatchery salmon and steelhead have on wild

populations of native anadromous fish. The EIR states stocking hatchery fish can

increase the likelihood of predation and competition with wild fish, depending on a

number of factors, including the age, size, feeding habits, and density of the fish. The

EIR analyzes whether this impact occurs with any of the decision species, and it

concludes the impact is significant and unavoidable in certain strains of salmon and

steelhead.

The EIR states all aspects of the hatchery enterprise have the potential to adversely

affect the long-term genetic fitness and diversity of wild populations of salmon and

steelhead that occupy stocked waters. This occurs from capturing native fish that might

otherwise spawn in natural waters, rearing fish in artificial channels and reducing their

ability to survive in natural conditions, and interbreeding. These factors may cause loss

of genetic diversity within and among populations, and reduced fitness, productivity, and

abundance. The EIR analyzes these possible effects on each decision salmon and

steelhead population group, and finds many of them to be significant and unavoidable.

For example, the EIR states stocking has had, and will continue to have, a

significant effect on the genetic integrity of Chinook salmon populations that run in

Central Valley rivers in the fall and late fall. This population is genetically homogenized,

and that homogenization has often been attributed to the long history of hatchery stocking

and to frequent stock transfers between hatcheries. There is a high incidence of straying

by these hatchery fish. Some studies suggest hatchery fall-run Chinook have replaced

locally adapted populations, a result of a significant gene flow from hatchery stocking

programs to the wild fish and a reduced abundance of productive wild fish. The EIR

18

concludes this population is clearly experiencing a significant impact. “Excessive

hatchery adults have been demonstrated or are probable in all areas currently supporting

at least some wild production of fall-run or late fall-run Chinook salmon.” The hatchery

enterprises are causing, and will continue to cause, significant environmental effects on

this population.

To mitigate these impacts, the EIR directs the Department to continue working

with the NMFS to complete the hatchery genetic management plans. However, even

with mitigating the effects by developing and operating under a hatchery genetic

management plan, the effects would be unavoidable.

The EIR repeats this type of analysis and evaluation for each decision species of

wild salmon and steelhead.

In this manner, the EIR disclosed and evaluated all known impacts from hatchery

operations and stocking to each decision species. It did so comprehensively and

specifically to each species. It allows the Department to go forward with its enterprise,

knowing the likely impacts from any stocking decision it makes should it find a decision

species in the water body to be stocked.

The Center contends the EIR is inadequate to serve as a project EIR because it

does not contain site-specific analysis for each water body to be stocked, and it

improperly defers that analysis until the Department performs the evaluation protocol for

each site. It argues our decision in Friends of Mammoth v. Town of Mammoth Lakes

Redevelopment Agency (2000) 82 Cal.App.4th 511 (Mammoth Lakes) compels a site-

specific analysis be performed before the Department can implement its enterprise at

each water body it stocks. We disagree, because unlike the EIR at issue in Mammoth

Lakes, this EIR is sufficiently comprehensive, as just described, to enable the Department

to go forward with its project in compliance with CEQA.

In Mammoth Lakes, we determined a program EIR prepared for a proposed

redevelopment plan was inadequate under CEQA. The redevelopment plan contained

19

detailed descriptions of 72 different projects to be developed under the plan, but the EIR

did not review the potential impacts from any of those projects. We wrote: “[B]ecause a

redevelopment plan EIR [under the CEQA Guidelines that existed then] is not a true first

tier EIR, and because the Town’s redevelopment plan was as detailed as it was, CEQA

required the Town’s redevelopment plan EIR to contain more analysis of the 72 proposed

projects than it did. The Town’s failure to analyze the impacts caused by each proposed

project, to the extent information was known or reasonably could have been known about

each project, constituted a failure to proceed in the manner required by CEQA.”

(Mammoth Lakes, supra, 82 Cal.App.4th at p. 535.)

Unlike in Mammoth Lakes, the program EIR here analyzes every impact that

reasonably could occur by stocking fish in any water body in the state based on the

information currently known. Due to the nature of the project, the EIR explains what the

impacts will likely be to decision species at any site where the Department operates

hatcheries and stocks fish. Site-specific analysis will likely not reveal any unanticipated

impacts; instead, it will reveal whether the impacts discussed in the EIR are occurring at

that site.

The Center complains that if site-specific analysis is not done now, it may never

be done, or if done, will not be done in a manner that allows public input. CEQA,

however, does not require an additional site-specific environmental review document if

the agency determines the site-specific impacts were sufficiently addressed in the

program EIR, nor does it require that determination to be made in a public process. Only

if the agency discovers new impacts will they be addressed in a public process.

When a program EIR is used to avoid preparing subsequent EIR’s, such as here,

the public agency must examine site-specific program activities “in the light of the

program EIR to determine whether an additional environmental document must be

prepared.” (CEQA Guidelines, § 15168, subd. (c).) If the site-specific activity will not

create effects or require mitigation measures that were not discussed in the program EIR,

20

the public agency is not required to prepare any other site-specific environmental

document. (CEQA Guidelines, § 15168, subd. (c)(2.)

Specifically, the rules governing environmental review of subsequent program

activities under a program EIR are as follows:

“(1) If a later activity would have effects that were not examined in the program

EIR, a new initial study would need to be prepared leading to either an EIR or a negative

declaration.

“(2) If the agency finds that pursuant to [CEQA Guidelines] Section 15162, no

new effects could occur or no new mitigation measures would be required, the agency

can approve the activity as being within the scope of the project covered by the program

EIR, and no new environmental document would be required.

“(3) An agency shall incorporate feasible mitigation measures and alternatives

developed in the program EIR into subsequent actions in the program.

“(4) Where the subsequent activities involve site specific operations, the agency

should use a written checklist or similar device to document the evaluation of the site and

the activity to determine whether the environmental effects of the operation were covered

in the program EIR.

“(5) A program EIR will be most helpful in dealing with subsequent activities if it

deals with the effects of the program as specifically and comprehensively as possible.

With a good and detailed analysis of the program, many subsequent activities could be

found to be within the scope of the project described in the program EIR, and no further

environmental documents would be required.” (CEQA Guidelines, § 15168, subd. (c),

italics added.)

In effect, after a sufficiently comprehensive and specific program EIR has been

certified, CEQA allows much of the initial site-specific review to occur outside a formal

CEQA process and beyond public view. CEQA does not require the Department to

engage in a public process when it determines whether the impacts from a site-specific

21

project were addressed and adequately mitigated in the program EIR. And if the

Department finds the impacts were addressed, it need not prepare a new environmental

document at all.

“To hold that a project-specific EIR must be prepared for all activities proposed

after the certification of the program EIR, even where the subsequent activity is ‘within

the scope of the project described in the program EIR’ ([CEQA] Guidelines, § 15168,

subd. (c)(5)), would be directly contrary to one of the essential purposes of program

EIR’s, i.e., to streamline environmental review of projects within the scope of a

previously completed program EIR. We conclude that a program EIR may serve as the

EIR for a subsequently proposed project to the extent it contemplates and adequately

analyzes the potential environmental impacts of the project . . . .” (Citizens for

Responsible Equitable Environmental Development v. City of San Diego Redevelopment

Agency (2005) 134 Cal.App.4th 598, 615.)

The Center contends the evaluation protocol is an inadequate and untimely method

for performing site-specific review. To the contrary, the evaluation protocol is a type of

“written checklist or similar device” CEQA allows an agency to use to document site-

specific impacts and determine whether those impacts were sufficiently analyzed in the

program EIR. (CEQA Guidelines, § 15168, subd. (c)(2), (4).)

Before the Department will stock a high mountain lake, it will utilize the

evaluation protocol to determine if any decision species are present in that water body. If

a decision species is present, the Department will determine whether stocking will have a

substantial environmental affect on the species. This review will by necessity include

application of the impacts analysis contained in the EIR, as well as a determination of any

other impacts that may not have been addressed in the EIR. This is exactly the type of

process CEQA requires an agency to utilize outside of public review when it intends to

approve a site-specific project that is part of a program previously reviewed in a program

EIR. If the Department upon using the evaluation protocol discovers an impact that was

22

not sufficiently addressed in the EIR, it will then be obligated to begin a CEQA process,

but only if the Department intends to approve the activity.

The Department has complied with CEQA in preparing a sufficiently adequate

program EIR that reviews in a reasonable manner the impacts the enterprise will have on

decision species throughout the state, and that will allow it to proceed with its enterprise,

subject to the requirements of CEQA.

B. Deferral of formulating mitigation measures

The Center contends the EIR impermissibly defers the formulation of mitigation

measures. It allegedly does this by proposing the Department rely upon the future

development of aquatic biodiversity management plans and hatchery genetic

management plans to mitigate impacts as a basis for approving future stocking now. The

Center claims CEQA prohibits agencies from approving EIR’s that defer formulation of

mitigation measures to the future development of a plan. The Center acknowledges

CEQA allows such deferral if the EIR specifies performance standards that future

mitigation must meet, but it contends no such standards guide the development of future

aquatic biodiversity management plans and hatchery genetic management plans.

We disagree with the Center. The EIR does not impermissibly defer formulation

of mitigation measures, as it provides sufficient performance standards for future

mitigation to meet. It commits the Department to render impacts on inland decision

species insignificant before it plants any fish in the high mountain lakes, and it commits

the Department to mitigate impacts on wild populations of native anadromous fish by

bringing salmon and steelhead planting into conformity with governing federal

regulations.

CEQA requires an EIR to propose and describe mitigation measures to minimize a

project’s significant environmental impacts. (Pub. Resources Code, §§ 21002.1, subd.

(a); 21100, subd. (b)(3).) Any action, whether it be part of the project or imposed as a

condition of approval, that is designed to avoid, minimize, rectify, or reduce or eliminate

23

a significant environmental impact or to compensate for the impact qualifies as a

mitigation measure. (CEQA Guidelines, §§ 15126.4, subd. (a)(1); 15370.)

Generally, CEQA requires mitigation measures to be formulated in an EIR and not

deferred to the development of future plans or measures, but there is an exception to that

rule. “Formulation of mitigation measures should not be deferred until some future time.

However, measures may specify performance standards which would mitigate the

significant effect of the project and which may be accomplished in more than one

specified way.” (CEQA Guidelines, § 15126.4, subd. (a)(1)(B).)

“ ‘Impermissible deferral of mitigation measures occurs when an EIR puts off

analysis or orders a report without either setting standards or demonstrating how the

impact can be mitigated in the manner described in the EIR.’ [Citation.]” (Clover Valley

Foundation v. City of Rocklin (2011) 197 Cal.App.4th 200, 236.)

“[W]hen, for practical reasons, mitigation measures cannot be fully formulated at

the time of project approval, the lead agency may commit itself to devising them at a later

time, provided the measures are required to ‘satisfy specific performance criteria

articulated at the time of project approval.’ (Sacramento Old City Assn. v. City Council

(1991) 229 Cal.App.3d 1011, 1028–1029, [original italics].) In other words, ‘[d]eferral

of the specifics of mitigation is permissible where the local entity commits itself to

mitigation and lists the alternatives to be considered, analyzed and possibly incorporated

in the mitigation plan. [Citation.] On the other hand, an agency goes too far when it

simply requires a project applicant to obtain a biological report and then comply with any

recommendations that may be made in the report. [Citation.]’ (Defend the Bay v. City of

Irvine (2004) 119 Cal.App.4th 1261, 1275.)

“In sum, ‘it is sufficient to articulate specific performance criteria and make

further [project] approvals contingent on finding a way to meet them.’ (Endangered

Habitats League, Inc. v. County of Orange (2005) 131 Cal.App.4th 777, 793.)

Essentially, the rule prohibiting deferred mitigation prohibits loose or open-ended

24

performance criteria. Deferred mitigation measures must ensure that the applicant will be

required to find some way to reduce impacts to less than significant levels. If the

measures are loose or open-ended, such that they afford the applicant a means of

avoiding mitigation during project implementation, it would be unreasonable to conclude

that implementing the measures will reduce impacts to less than significant levels.”

(Rialto Citizens for Responsible Growth v. City of Rialto (2012) 208 Cal.App.4th 899,

944-945 (Rialto Citizens), original italics.)

However, “when a public agency has evaluated the potentially significant impacts

of a project and has identified measures that will mitigate those impacts, the agency does

not have to commit to any particular mitigation measure in the EIR, as long as it commits

to mitigating the significant impacts of the project. Moreover, . . . the details of exactly

how mitigation will be achieved under the identified measures can be deferred pending

completion of a future study.” (California Native Plant Society v. City of Rancho

Cordova (2009) 172 Cal.App.4th 603, 621.)

The Center contends the Department could have formulated site-specific

mitigation measures in the program EIR had it performed site-specific reviews, and there

was no justification for its decision not to do either. Even if the Department could defer

forming site-specific mitigation measures, the Center claims the EIR still fails because it

does not contain specific performance standards or a commitment to mitigate the impacts.

We have already concluded the EIR, as a program EIR, was not required to

perform site-specific review. We are left with the Center’s assertion that the EIR does

not contain specific performance standards for the ultimate mitigation measures to meet

or a commitment to mitigate. We disagree with the Center’s claim.

CEQA does not define how specific the performance standards set forth in an EIR

must be in order to defer formulating mitigation measures. However, Rialto Citizens,

supra, 208 Cal.App.4th 899, a decision of Division Two of the Fourth Appellate District

Court of Appeal, provides persuasive reasoning that supports our conclusion the EIR did

25

not improperly defer formulating mitigation measures. Rialto Citizens concerned the

adequacy of mitigation measures proposed by an EIR for a large retail development

project. Five special status plant species and three special status wildlife species had the

potential to occur on the project site. (Id. at p. 942.) To mitigate the project’s impacts to

those species, the EIR proposed the following mitigation measures: for the five plant

species, the EIR required a botanist to survey each site. If less than 20 individuals of any

of the species were found, no further action was required. If 20 or more were found, the

EIR required the botanist to prepare a plan providing for the salvage and transportation of

the plants to another location on the project site in permanent open space. The new

location had to be maintained and protected for a period of three years. The plan had to

include performance criteria, but at a minimum there had to be no less than 80 percent

establishment of the individual plants at the end of three years. If those criteria were not

met, the monitoring period would be extended another two years. The plan had to be

submitted and approved prior to site grading. In addition, if the surveys discovered any

state or federal threatened or endangered species, the project would be subject to formal

consultation and permitting requirements under state and federal endangered species law.

(Id. at p. 943.)

For the three wildlife species, the EIR proposed separate sets of mitigation

measures; one for two federally endangered kangaroo rat species, and one for the

burrowing owl. (Rialto Citizens, supra, 208 Cal.App.4th at pp. 943-944.) To mitigate

impacts on the two kangaroo rat species, the EIR required a mammalogist to survey the

site for habitat prior to the issuance of grading permits and determine whether trapping

efforts were necessary. If habitats were found, trapping efforts would proceed following

federal protocols. If actual species were found, the project applicant would engage in

formal consultation and permitting with the appropriate federal agency as required under

federal endangered species law to determine appropriate off-site mitigation. (Id. at p.

943.)

26

To mitigate impacts on the burrowing owl, the EIR required a biologist to survey

the site prior to grading to identify burrows and occupied burrows by using a protocol

approved by federal and state environmental agencies. After the initial survey, the

biologist must conduct four additional surveys focusing on owls during the owl’s

breeding season. If no owls were located, no further mitigation was required. If owls

were observed, the project applicant was required to consult with the city to determine

appropriate mitigation, based on conditions at the site. (Rialto Citizens, supra, 208

Cal.App.4th at p. 944.)

A citizens group alleged the EIR improperly deferred formulation of mitigation

measures, but the Court of Appeal held it did not. It determined these mitigation

measures were sufficiently definite to ensure the impacts would be mitigated, and the EIR

did not improperly defer formulation of the measures. The requirement to prepare a plant

salvage and transportation plan to mitigate for impacts on the plant species was not an

improper deferral. The EIR included sufficient performance standards for the salvage

plan (maintaining the plant species in an open space area for three to five years if 20 or

more individual plants of any species are found prior to grading) to ensure development

and operation of the plan will reduce impacts on the plant species to less than significant

levels. (Rialto Citizens, supra, 208 Cal.App.4th at p. 946.)

The measures protecting the endangered kangaroo rat species and any other

endangered or threatened plant species were also adequate, as they required the project

applicant to comply with applicable government consulting and permitting regulations.

Complying with government regulations as a mitigation measure is not an improper

deferral. (Rialto Citizens, supra, 208 Cal.App.4th at pp. 945-946.)

Finally, and most significantly here, the Court of Appeal held the EIR’s proposed

mitigation measures for impacts on the burrowing owl were not improper deferrals. Even

though the EIR did not specify exactly what would be done if any burrowing owls were

found, by requiring the applicant to conduct five surveys and consult with the city to

27

determine proper mitigation if any owls were found, the EIR committed the applicant and

the City to find a way to render any impact insignificant before the City issued a grading

permit. (Rialto Citizens, supra, 208 Cal.App.4th at pp. 946-947.)

The mitigation measures at issue here pass muster in the same fashion the

measures at issue in Rialto Citizens survived. The mitigation measures for trout stocking

in mountain lakes commit the Department to mitigating impacts to insignificance before

the Department recommences stocking. The mitigation measures for the salmon and

steelhead stocking commit the Department to mitigate impacts in compliance with federal

regulation and to the extent possible for impacts which are unavoidable and cannot

feasibly be mitigated fully.

Requiring the Department to survey each mountain lake using the evaluation

protocol and to develop an aquatic biodiversity management plan before it stocks any

mountain lake where impacts may occur did not impermissibly defer formulating

mitigation measures. Rather, it committed the Department to mitigate potential impacts

before they occurred. Impacts on mountain lake fish were completely but temporarily

mitigated when the trial court and the EIR prohibited the Department from conducting

any stocking in the lakes. Stocking will not resume unless and until the Department

surveys each lake, and, if any decision species existing in the lake could be adversely

affected by stocking, adopts an aquatic biodiversity management plan to govern stocking

in that lake. The Department’s inability to stock until each lake has been surveyed and an

aquatic biodiversity management plan is adopted for any lake where significant impacts

may occur commits the Department to mitigating the impacts should it decide to stock in

any lake. The Department has no discretion to go forward without first mitigating the

impacts.

Also, the EIR provides sufficient performance standards to ensure the aquatic

biodiversity management plans will mitigate impacts in mountain lakes to insignificance.

The EIR directs the plans to end stocking in most mountain lakes that contain decision

28

species or their habitat. The plans are to be designed to recover native wildlife,

especially amphibians, as well as maintain some recreational fisheries.

The EIR directs aquatic biodiversity management plans to satisfy three objectives.

First, they are to “[m]anage high elevation aquatic resources in a manner that maintains

or restores native biodiversity and habitat quality, supports viable populations of native

species, and provides for recreational opportunities considering historical and future use

patterns. In some areas, most or all of the waters may be managed as natural resources

with little or no angling available. Likewise, in areas of high recreational demand, most

or all of the waters may be managed for recreational angling.”

Second, all stocking allotments and changes must be based on site-specific data

preferably collected within the previous five years.

Third, for each mountain lake, stocking is to be guided by the following relevant

principles: (1) Lakes with extant or existing populations of decision species should

generally not be stocked with fish. Moreover, if decision species populations exist within

two kilometers of the lake, the Department must assess the feasibility of removing all

trout from that lake to convert it to a fishless condition in order to benefit the decision

species.

(2) After achieving these native biodiversity objectives, mountain lakes are to be

managed to optimize angling quality and opportunity within a given basin.

These mitigation measures inform the Department how it is to mitigate any

impacts on decision species. In most circumstances, it is not to stock lakes where

decision species exist, and, additionally, it is to remove all trout from such lakes where it

is feasible. These standards are sufficient to inform the Department what it is to do and

what it must accomplish, and they commit the Department to mitigating impacts before

proceeding with the enterprise.

Requiring the Department to implement hatchery genetic management plans also

did not impermissibly defer formulating mitigation measures for impacts on anadromous

29

fish. Indeed, the EIR determined many of the impacts on anadromous fish were

unavoidable and could not feasibly be mitigated to less than significant. In compliance

with CEQA, the Department adopted findings of fact stating the impacts could not be

feasibly mitigated or that mitigation was the ultimate responsibility of another federal

agency. The Department also adopted a statement of overriding considerations by which

it expressly declared it was approving the project, despite its environmental harm,

because of the project’s overriding benefits and the Department’s statutory mandate. At

that point, there was no additional mitigation to be done. The Center does not challenge

these findings.

The Department agreed to lessen impacts to the extent reasonably feasible by

developing hatchery genetic management plans for approval by the NMFS. By doing so,

the Department relied upon federal regulations requiring a state to develop hatchery

genetic management plans in order to continue hatchery and stocking operations as

exempt from take prohibitions imposed by the federal Endangered Species Act in waters

populated by endangered anadromous species. (50 C.F.R. § 223.203(b)(5).) The plan

must effectively protect and achieve “a level of salmonid productivity commensurate

with the conservation of the listed salmonids.” (50 C.F.R. § 223.203(b)(5)(vi).) It must

ensure broodstock collection programs meet a listed species’ conservation needs before

they can be used to sustain recreational and commercial fisheries. (50 C.F.R.

§ 223.203(b)(5)(i)(C).)

The hatchery genetic management plan must also minimize the impacts hatchery

fish have on wild fish. (50 C.F.R. § 223.203(b)(5)(i)(E).) It must ensure hatchery

programs and harvest management are designed to provide as few biological risks as

possible on listed species. (50 C.F.R. § 223.203(b)(5)(i)(F).) It must require adequate

hatchery facilities to exist to maintain population diversity and avoid hatchery-influenced

selection or domestication. (50 C.F.R. § 223.203(b)(5)(i)(G).) And the plan must be

approved by the NMFS. (50 C.F.R. § 223.203(b)(5)(K)(v).)

30

These regulations provide sufficient performance standards to satisfy CEQA.

“[A] condition requiring compliance with regulations is a common and reasonable

mitigation measure and may be proper where it is reasonable to expect compliance.

[Citations.]” (Oakland Heritage Alliance v. City of Oakland (2011) 195 Cal.App.4th

884, 906.) Here, it is reasonable to expect compliance, as the Department previously

initiated developing hatchery genetic management plans, and it continues to work with

the NMFS to obtain its approval. Otherwise, it may run afoul of federal law. There is no

doubt the Department is committed to mitigating its impacts on anadromous fish to the

extent it feasibly can by adopting and implementing hatchery genetic management plans.

Thus, requiring the Department to adopt the plans as a mitigation measure was not an

improper deferral of formulating mitigation.

Asserting the EIR improperly defers formulating mitigation measures, the Center

claims the issue is governed by Preserve Wild Santee v. City of Santee (2012) 210

Cal.App.4th 260 (Preserve Wild Santee), in which Division One of the Fourth District

Court of Appeal invalidated an EIR for improperly deferring formulation of mitigation

measures. We find the case distinguishable. The relevant issue in Preserve Wild Santee

concerned a proposed residential development’s impacts on an endangered butterfly

species. The EIR required the developer to create a habitat preserve by means of a

conservation easement that would be managed long term under a habitat management

plan. The EIR established broad and general goals for the management plan to achieve.

It required the plan to accomplish “ ‘the goal of maintaining appropriate, high-value

native plant communities,’ ” “ ‘address management and monitoring of vegetation

communities through specific minimum survey and management requirements,’ ” and

describe how impacts to vegetation communities will be avoided. (Id. at p. 272.) It also

required the plan to include a specific section providing for the active management of the

endangered butterfly within the preserve. (Ibid.)

31

The city circulated a draft version of a habitat management plan. The draft plan

concluded the biological resources within the preserve would be managed by allowing

ecological processes to occur naturally while managing the effects of human recreational

uses of the land by such activities as maintaining trails and fences and removing

nonnative vegetation. (Preserve Wild Santee, supra, 210 Cal.App.4th at pp. 272-273.)

Regarding the endangered butterfly, the draft plan stated the key consideration was

proper vegetation management. Without specifying any particular actions, the plan

called for promoting butterfly habitat where host and nectar plants were present, creating

other habitat sites, and keeping habitat open by means of periodic fire or other vegetation

management, such as grazing. However, the plan indicated the timing and other specifics

for undertaking these management activities would be subject to the preserve manager’s

discretion. It also did not discuss the fact its call for prescribed burns or grazing

conflicted with the city’s prior decision not to permit prescribed burns or grazing in the

project’s open space area. (Preserve Wild Santee, supra, 210 Cal.App.4th at p. 273.)

The Court of Appeal held the EIR improperly deferred formulating mitigation

measures. Although the EIR contained measures to mitigate the loss of the butterfly’s

habitat, it did not describe any actions for actively managing the butterfly within the

preserve, nor did it specify any performance standards or other guidelines for the active

management requirement. As a result, the EIR left the success or failure of mitigating the

project’s impacts on the butterfly to an unformulated plan’s eventual directives for

actively managing the butterfly within the preserve, and to the preserve manager’s

discretion to implement the plan. “ ‘An EIR is inadequate if “[t]he success or failure of

mitigation efforts . . . may largely depend upon management plans that have not yet been

formulated, and have not been subject to analysis and review within the EIR.” ’

[Citations.]” (Preserve Wild Santee, supra, 210 Cal.App.4th at p. 281.)

Unlike in Preserve Wild Santee, the EIR here did not leave the success of its

mitigation measures only to an unformulated plan and executive discretion to implement

32

the plan. Instead, the EIR, the Department, and the court directed all stocking in high

mountain lakes be ceased unless and until an aquatic biodiversity management plan was

adopted with its objectives of ending stocking in mountain lakes where decision species

would be substantially affected, of removing trout from those lakes where feasible, and

then managing lakes for recreation purposes. The Department has no discretion to

continue stocking until mitigation measures are in place.

Similarly, the Department relied upon federal regulations to develop mitigation

measures for impacts on anadromous fish. The Department’s commitment to comply

with federal regulations to develop hatchery genetic management plans ensures impacts

on wild salmon and steelhead will be reduced to the extent reasonably feasible. Preserve

Wild Santee does not apply here.

The Center also contends relying on the aquatic biodiversity management plans is

inadequate because the plans could allow recreational angling to continue in some lakes.

This argument ignores the EIR and the enterprise’s scope and the other objectives of

aquatic biodiversity management plans. The EIR’s scope is statewide, as the enterprise is

statewide. Given that size and scope, the Department reasonably determined to mitigate

impacts on a statewide and watershed-wide basis by means of the plans, and to mitigate

on a site-specific basis by means of the evaluation protocol. To the extent fishing and

stocking continue to create impacts, those impacts are addressed in the statement of

overriding considerations. In addition, the aquatic biodiversity management plans’

objectives call for restoring species and habitat and removing trout where feasible first

before addressing recreational needs. As a result, mitigating the impacts takes priority

over providing recreational opportunities.

We conclude the EIR did not improperly defer formulation of mitigation

measures.

33

C. Using the existing enterprise as the environmental baseline

The EIR used the Department’s hatchery and stocking enterprise from 2004

through 2008 as the environmental baseline against which all impacts from continuing

the project would be compared. The EIR states that because the proposed project being

evaluated is the continuation of the existing stocking enterprise, “the environmental

baseline necessarily includes the implementation of the Program in substantially its

present form.”

The Center contends the baseline was invalid under CEQA, as it equated the

proposed project -- continuing the hatchery and stocking enterprise -- with the current

environmental condition. The Center asserts the EIR must use the existing environmental

conditions -- absent the project -- as the baseline.

We disagree. CEQA and case authority hold the baseline for a continuing project

is the current environmental condition including the project, even if the project has not

undergone prior environmental review.

CEQA requires an EIR to “focus on impacts to the existing environment, not

hypothetical situations.” (County of Amador v. El Dorado County Water Agency (1999)

76 Cal.App.4th 931, 955.) “[T]he impacts of a proposed project are ordinarily to be

compared to the actual environmental conditions existing at the time of CEQA

analysis . . . .” (Communities for a Better Environment v. South Coast Air Quality

Management Dist., supra, 48 Cal.4th at p. 321 (Communities).)

To accomplish this, CEQA directs an EIR to include what is called an

environmental baseline, a description of the project site’s physical and environmental

conditions at the time the EIR is prepared. “An EIR must include a description of the

physical environmental conditions in the vicinity of the project, as they exist at the time

the notice of preparation is published . . . from both a local and regional perspective.

This environmental setting will normally constitute the baseline physical conditions by

34

which a lead agency determines whether an impact is significant.” (Guidelines, § 15125,

subd. (a).)

The “normal” rule is that the baseline must reflect the “physical conditions

existing at the time [the] environmental analysis” begins. (Communities, supra, 48

Cal.4th at pp. 320, 323.) This is so even if the current condition includes unauthorized

and even environmentally harmful conditions that never received, and, as a result of

being incorporated into the baseline, may never receive environmental review. (Citizens

for East Shore Parks v. California State Lands Com. (2011) 202 Cal.App.4th 549, 561

(East Shore Parks).)

The facts in East Shore Parks, a decision of the First Appellate District’s Division

One, are similar to those we face, and the case’s holding and analysis apply here. The

case concerned the renewal of a lease to operate a marine terminal built on state land near

an oil refinery. The terminal had been in use since 1902, and the State Lands

Commission had granted its operator a 50-year ground lease in 1947. Thus, no CEQA

study had examined the terminal’s construction or operation, or any improvements the

operator had made to the terminal during the lease term. (East Shore Parks, supra, 202

Cal.App.4th at pp. 553-554.) Before approving a lease renewal in 1997 to allow the

operator to continue operating the terminal, the Commission determined the renewal

required CEQA review in an EIR. During the course of preparing the EIR, the

Commission decided the appropriate environmental baseline was the existing, actual use

and operation of the terminal. Using this baseline, the EIR concluded the renewal could

result in significant environmental impacts due to potential oil spills. The Commission

certified the EIR and approved the renewal in 2009. (Id. at pp. 554-555 & fn. 2.)

Opponents to the lease sued, claiming the EIR violated CEQA by incorporating

the ongoing use of the terminal into the environmental baseline. (East Shore Parks,

supra, 202 Cal.App.4th at pp. 556, 557-558.) The Court of Appeal disagreed. It

35

concluded the Commission complied with CEQA when it used a baseline that included

the terminal’s use and operation. (Id. at p. 558.)

The court relied on a long line of appellate cases that hold the EIR uses the actual

environmental conditions existing at the time of CEQA analysis as a baseline, even when

the actual conditions are in violation of current regulatory provisions or were not subject

to previous CEQA review. “For example, in Riverwatch v. County of San Diego (1999)

76 Cal.App.4th 1428 (Riverwatch), [Division One of the Fourth Appellate District]

approved the county’s chosen baseline, which included illegal development that had

occurred at a mining operation seeking a use permit. The respondents could not, said the

court, essentially turn back the clock and insist upon a baseline that excluded existing

conditions. (Id. at pp. 1452-1453.) How present conditions come to exist may interest

enforcement agencies, but that is irrelevant to CEQA baseline determinations -- even if it

means preexisting development will escape environmental review under CEQA.

(Riverwatch, at pp. 1452-1453.) In Fat [v. County of Sacramento (2002)] 97 Cal.App.4th

1270 [(Fat)], the [Third Appellate District] upheld the county’s choice of a baseline

reflecting present-day conditions to evaluate the impact of a proposed airport expansion.

Even though ‘the Airport developed over a period of nearly 30 years without County

authorization, there was evidence of environmental damage during that period, and the

Airport had been the subject of at least two zoning enforcement actions . . . ,’ the county

acted within its discretion using current airport operations as the baseline for CEQA

review. (Fat, at pp. 1280-1281.) Similarly, in Eureka Citizens for Responsible

Government v. City of Eureka (2007) 147 Cal.App.4th 357 [(Eureka)], [Division Five of

the First Appellate District] upheld a project description for CEQA purposes that took

into account an existing playground built contrary to code. ‘While any alleged code

violations in the construction of the playground may have been relevant to the City’s

consideration of the variance requested, it was not a CEQA consideration.’ (Eureka, at p.

371, italics omitted; see also Fairview Neighbors v. County of Ventura (1999) 70

36

Cal.App.4th 238, 242-243 [EIR prepared in conjunction for application to expand mining

operation ‘properly discussed the existing physical condition of the affected area as

including the long-operating mine’]; Bloom v. McGurk (1994) 26 Cal.App.4th 1307,

1312-1316 & fn. 3 [‘ “existing facility” ’ for categorical exemption purposes means a

facility ‘as it exists at the time of the agency’s determination, rather than . . . at the time

CEQA was enacted’; this is consistent ‘with cases that have required potential impacts to

be examined in light of the environment as it exists when a project is approved’].)” (East

Shore Parks, supra, 202 Cal.App.4th at pp. 559-560; cf. Communities, supra, 48 Cal.4th

at p. 322 [EIR set improper baseline by relying on what uses could occur under current

permit as opposed to the uses that were actually occurring].)

Based on these holdings, the East Shore Parks court concluded the baseline used

by the Commission was correct. It reflected “ ‘what was actually happening’ at the site

of the proposed project (Communities, supra, 48 Cal.4th at p. 322) -- that is, an operating

marine terminal. [Citations.] Indeed, we note that in Riverwatch and Fat, the appellate

courts held even unlawful prior development and activity was properly included within

the CEQA baselines for evaluation of proposed projects. Here, in contrast, the ‘ “ ‘real

. . . on the ground’ ” ’ terminal operations (Communities, supra, 48 Cal.4th at p. 321)

included in the baseline were entirely lawful.” (East Shore Parks, supra, 202

Cal.App.4th at p. 560.)

Plaintiffs in East Shore Parks argued the baseline should exclude use of the

marine terminal and the physical structure itself. Otherwise the terminal would never

undergo environmental review. They also claimed the line of appellate cases the court

relied on did not apply because those cases involved expansions to existing projects. The

Center makes the same arguments here. The East Shore Parks court rejected these

arguments, and we do, too, for the same reasons: “[P]laintiffs claim the baseline here

should reflect conditions that have not existed at the locale for more than a century. This

is so, say plaintiffs, because if the baseline does not exclude current conditions, there will

37

never be full environmental review of the marine terminal, since it predates CEQA. [¶]

However, neither the statute, nor any CEQA case, supports plaintiffs’ revisionist

approach to the baseline. To the contrary, the CEQA Guidelines require a ‘description of

the physical conditions in the vicinity of the project, as they exist at the time the notice of

preparation [of an EIR] is published’ and specify ‘[t]his environmental setting will

normally constitute the baseline. . . .” (CEQA Guidelines, § 15125, subd. (a), italics

added.) The cases further make clear the baseline must include existing conditions, even

when those conditions have never been reviewed and are unlawful. (See Fat, supra, 97

Cal.App.4th at pp. 1280-1281; Riverwatch, supra, 76 Cal.App.4th at pp. 1452-1453; see

also Communities, supra, 48 Cal.4th at p. 321 & fn. 7.) That Fat and Riverwatch

involved applications to expand and not merely renew operations, is immaterial. In both,

baselines reflecting current conditions, including unauthorized and even environmentally

harmful conditions, meant those conditions would never receive environmental review.”

(East Shore Parks, supra, 202 Cal.App.4th at pp. 560-561, fn. omitted.) These

arguments apply equally here.

The Center claims the holding of these cases runs afoul of CEQA because the

Supreme Court in Communities, supra, 48 Cal.4th 310, stated the EIR must describe the

baseline “absent the project” under review. (Id. at p. 315.) The high court, however,

clarified that the project under review there, the addition of a new refining process to an

oil refinery, could not be characterized as the refinery’s continued operation. It required

installing new equipment, and modifying and increasing operation of other equipment in

order to add the new process. It was, in short, a new project. (Id. at p. 326.) The

Communities court did not face the issue here -- review of a continuing project that was

not planned to undergo expansion or modification.

The Center claims the stocking enterprise is distinguishable from the cases cited

above because the Department decides each year whether and where to stock -- in other

words, the hatchery and stocking enterprise is not a continuing program. The facts

38

disprove this assertion, as the enterprise has been running for more than 100 years.

Adjustments are made, but a program EIR allows for adjustments to be made without

having to prepare a new environmental document with every change. Indeed here, the

Department proposes to make no changes to its enterprise except as feasible to mitigate

the enterprise’s environmental impacts.

The Center’s concern that the enterprise’s environmental impacts will never be

reviewed if the current project is used as the baseline is also disproved by the facts. The

EIR does what the Center seeks. Despite using the existing enterprise as the baseline, the

EIR describes, as much as reasonably possible, the impacts hatcheries and stocking have

had statewide on the environment and the decision species from the enterprise’s inception

more than a century ago up to this time, and it proposes how to mitigate those continuing

impacts, even to the extent of removing fish from lakes that have been populated for

decades, and, in many cases, not restocking them again. The Department’s use of the

current project as its baseline did not violate CEQA or prevent the EIR from analyzing

the project’s environmental impacts.

D. Adequacy of range of alternatives and the no project alternative

The Center contends the EIR violates CEQA by not considering a no project

alternative of no stocking anywhere, or a reasonable range of alternative projects. It also

asserts the EIR failed to explain why it chose not to review other alternatives suggested

by the Center and others. We conclude the EIR meets CEQA’s requirements for

reviewing alternatives.

CEQA requires an EIR to “describe a range of reasonable alternatives to the

project, or to the location of the project, which would feasibly attain most of the basic

objectives of the project but would avoid or substantially lessen any of the significant

effects of the project, and evaluate the comparative merits of the alternatives. An EIR

need not consider every conceivable alternative to a project. Rather it must consider a

reasonable range of potentially feasible alternatives that will foster informed

39

decisionmaking and public participation. An EIR is not required to consider alternatives

which are infeasible. The lead agency is responsible for selecting a range of project

alternatives for examination and must publicly disclose its reasoning for selecting those

alternatives. There is no ironclad rule governing the nature or scope of the alternatives to

be discussed other than the rule of reason. [Citations.]” (CEQA Guidelines, § 15126.6,

subd. (a).)

In addition to analyzing a range of reasonable alternatives, the EIR must also

examine a no project alternative. “The purpose of describing and analyzing a no project

alternative is to allow decisionmakers to compare the impacts of approving the proposed

project with the impacts of not approving the proposed project. . . .” (CEQA Guidelines,

§ 15126.6, subd. (e)(1).) “The ‘no project’ analysis shall discuss the existing conditions

. . . as well as what would be reasonably expected to occur in the foreseeable future if the

project were not approved, based on current plans and consistent with available

infrastructure and community services. . . .” (CEQA Guidelines, § 15126.6, subd. (e)(2).)

1. The no project alternative

The EIR reviewed the baseline project, continuing the existing enterprise without

making any changes, as the no project alternative. It stated consideration of this

alternative as the no project alternative was consistent with the CEQA Guidelines. (See

CEQA Guidelines, § 15126.6, subd. (e)(3)(A).) This alternative would include the

elimination of federal funding used to operate certain hatcheries. Loss of the funding

would result in a continued but constrained enterprise, with impacts on other Department

programs whose funding would be used to support the stocking enterprise. The EIR did

not review a no stocking alternative, although it has already ceased stocking in many

lakes by the trial court’s order.

The Center faults the EIR for considering the baseline project as the no project

alternative. It claims the EIR was required to consider the elimination of the stocking

enterprise as the no project alternative. We disagree. Under CEQA, where the EIR is

40

reviewing an existing operation or changes to that operation, the no project alternative is

the existing operation. Moreover, where a statutory mandate leaves a state agency no

discretion to cease or discontinue an existing operation, the no project alternative is the

statutorily mandated project.

The purpose of a no project alternative “is to allow decisionmakers to compare the

impacts of approving the proposed project with the impacts of not approving the

proposed project.” (CEQA Guidelines, § 15126.6, subd. (e)(1).) Discussing a no project

alternative in an EIR “provides the decision makers and the public with specific

information about the environment if the project is not approved. It is a factually based

forecast of the environmental impacts of preserving the status quo. It thus provides the

decision makers with a base line against which they can measure the environmental

advantages and disadvantages of the project and alternatives to the project.” (Planning &

Conservation League v. Department of Water Resources (2000) 83 Cal.App.4th 892,

917-918, italics added.)

When a project involves a proposed change to an ongoing operation, or even the

continuation of an ongoing operation, a decision to reject the project would leave the

operation in place. In such a situation, CEQA defines the no project alternative as a

continuation of the existing operation. (Kostka, supra, § 15.20, p. 15-28.) The CEQA

Guidelines state: “The ‘no project’ analysis shall discuss the existing conditions at the

time the notice of preparation is published, or if no notice of preparation is published, at

the time environmental analysis is commenced, as well as what would be reasonably

expected to occur in the foreseeable future if the project were not approved, based on

current plans and consistent with available infrastructure and community services.”

(CEQA Guidelines, § 15126.6, subd. (e)(2).)

“When the project is the revision of an existing land use or regulatory plan, policy

or ongoing operation, the ‘no project’ alternative will be the continuation of the existing

plan, policy or operation into the future. Typically this is a situation where other projects

41

initiated under the existing plan will continue while the new plan is developed. Thus, the

projected impacts of the proposed plan or alternative plans would be compared to the

impacts that would occur under the existing plan.” (CEQA Guidelines, § 15126.6, subd.

(e)(3)(A).)

“After defining the no project alternative . . . , the lead agency should proceed to

analyze the impacts of the no project alternative by projecting what would reasonably be

expected to occur in the foreseeable future if the project were not approved, based on

current plans and consistent with available infrastructure and community services.”

(CEQA Guidelines, § 15126.6, subd. (e)(3)(C).)

Under these rules, an ongoing operation such as the Department’s hatchery and

stocking enterprise is the no project alternative, as the status quo is the enterprise’s

continuation without undergoing any changes. The EIR is not the approval of a new

program; it is the review of an ongoing one.

The Center asserts stocking is a new project because the Department must decide

every year to approve the enterprise, but this assertion is incorrect. The Department

approved this enterprise decades ago, and what is decided each year is where to stock, not

whether to stock at all.

Indeed, a determination to cease all stocking is not a feasible alternative under

CEQA, and thus need not be reviewed in detail in the EIR. As a result, the no project

alternative is by definition the continuing stocking enterprise in this instance. As used in

CEQA, “ ‘[f]easible’ means capable of being accomplished in a successful manner within

a reasonable period of time, taking into account economic, environmental, legal, social,

and technological factors.” (CEQA Guidelines, § 15364, italics added.) “[A]n

alternative is not feasible where there is no way to legally implement it.” (Uphold Our

Heritage v. Town of Woodside (2007) 147 Cal.App.4th 587, 602, citing Sequoyah Hills

Homeowners Assn. v. City of Oakland (1993) 23 Cal.App.4th 704, 714-715.)

42

The Legislature has mandated the Department to operate hatcheries and stock

water bodies, and it gave the Department no authority to cease those activities. Fish and

Game Code section 13007 requires the Department to use state revenues to attain

hatchery production and stocking goals imposed by the statute of millions of pounds of

trout per year. (Fish & G. Code, § 13007, subd. (b).) When the trial court required the

Department to prepare the EIR, it acknowledged Fish and Game Code section 13007

directed the Department “to release certain minimum quantities of trout each year.” The

Department retained discretion only “to determine where it will [stock], and how much

trout to plant in any given location.”

Fish and Game Code section 1120 also mandates the Department to establish fish

hatcheries for stocking the state’s waters. The statute reads: The [Fish & Wildlife

Commission] shall establish fish hatcheries for stocking the waters of this State with fish.

The department shall maintain and operate such hatcheries.” (Fish & G. Code, § 1120.)

The Trout and Steelhead Conservation and Management Planning Act of 1979

(Fish & G. Code, § 1725 et seq.) further reflects the statutory mandate to raise and stock

fish. The act declares as a matter of state policy that “[h]atchery production and stocking

of California's waters started over 140 years ago and is an enduring part of California’s

history and attempts to steward its natural resources. [¶] . . . Sustainable and adaptive

management provides and improves recreational angling opportunities while protecting

and maintaining native and wild trout fisheries, other species, and their mutual habitat.”

(Fish & G. Code, § 1726.1, subds. (a), (b).) The act obligates the Department to prepare

a Strategic Plan for Trout Management that, among other things, establishes

“ecologically and environmentally sustainable hatchery and stocking practices for native

trout.” (Fish & G. Code, § 1728, subd. (c)(4).)

Under these statutes, the Department has no legal authority to discontinue its

hatchery and production enterprise. Because the Department cannot legally implement a

no stocking alternative, it is an infeasible alternative, and the Department was under no

43

obligation to review it in detail in the EIR. Review of the existing enterprise satisfied the

requirement to analyze a no project alternative.

2. Range of alternatives

As its range of alternatives, the EIR reviewed three different versions of

continuing the hatchery and stocking enterprise: (1) continuing the existing enterprise

without making any changes (the no project alternative); (2) continuing the existing

enterprise with the environmental mitigations proposed in the EIR; and (3) continuing the

existing enterprise according to the restrictions set by the trial judge’s interim order when

it granted the Department additional time to prepare the EIR but prohibited stocking fish

in fresh water bodies where decision species existed. The Center claims the EIR failed to

analyze a reasonable range of feasible alternatives. We disagree.

“[I]f a reasonable basis for the choices the agency makes is found in the EIR or

elsewhere in the record, a reviewing court will defer to the agency’s selection of

alternatives.” (Kostka, supra, § 15.17, p. 15-24.) “The selection will be upheld, unless

the challenger demonstrates ‘that the alternatives are manifestly unreasonable and that

they do not contribute to a reasonable range of alternatives.’ [Citation.]” (California

Native Plant Society v. City of Santa Cruz (2009) 177 Cal.App.4th 957, 988.) “CEQA

does not require that an agency consider specific alternatives that are proposed by

members of the public or other outside agencies.” (City of Maywood v. Los Angeles

Unified School Dist. (2012) 208 Cal.App.4th 362, 420.)

To develop a range of alternatives, the Department used the enterprise’s objectives

of meeting the production goals of Fish and Game Code section 13007, providing for

fishing opportunities, mitigating impacts caused by development as well as the enterprise

itself, and providing for long-term recovery and survival of native fish. It found most of

the alternatives suggested to it in the scoping process did not meet these basic criteria.

Where possible, it incorporated some of the suggested elements into the broader

alternatives it reviewed in the EIR. As a result, the range of alternatives reviewed in the

44

EIR provided the Department with feasible alternatives to consider that met the project’s

objectives and mitigated its impacts. The Center has not shown the range of alternatives

in this circumstance was unreasonable.

The Center argues the EIR did not consider a reasonable range, as the first

alternative was just the continuation of the enterprise, the second alternative allegedly did

not provide any environmental advantages, and the third alternative prevents further

studies from being performed. But both the second and third alternative did provide

environmental advantages over continuing the enterprise unchanged. Contrary to the

Center’s contention, the second alternative assumes no stocking will occur in lakes

populated with decision species unless and until an aquatic biodiversity management plan

is approved, and those plans will limit stocking to prevent impacts to any decision

species. Many lakes will no longer be stocked. Expansion into other lakes will occur

according to the evaluation protocol to prevent impacts on decision species.

Alternative three also provides environmental benefit, as it permanently prevents

stocking in all high mountain lakes where decision species are known to exist, or where

surveys to determine their existence were not completed. The Center complains this

alternative is not reasonable because it is based on a court order, but there can be no

denying this alternative prevents the enterprise from detrimentally impacting decision

species, as no stocking will occur in those waters.

Under these circumstances, the range was reasonable. It provided the Department

with two alternatives, both environmentally superior over the continuing enterprise, by

which to mitigate impacts.

3. Rejection of other alternatives

The EIR briefly considered but ultimately rejected for detailed analysis four

additional alternatives. One was to eliminate all Department-operated hatcheries. The

Department eliminated this alternative because it did not meet Fish and Game Code

section 13007’s requirement to use state revenues to meet fish stocking goals. A second

45

rejected alternative called for eliminating trout stocking in flowing waters, as the State of

Montana has apparently done. The Department eliminated this alternative because

fishing demand in California exceeds that in Montana, and eliminating stocking in

flowing waters would eliminate a large proportion of recreational fishing opportunities

and would put considerable pressure on native and wild stocks.

A third rejected alternative was to establish permanent stocking closures.

Although the Department rejected this alternative in full, it incorporated the principal of

no longer stocking certain areas in two of the alternatives the EIR considered in detail. A

fourth rejected alternative proposed developing and operating conservation and

restoration trout hatcheries. The Department noted there were already some hatcheries

that provided for conservation and restoration on an as-needed basis; however, other

Department policies require the use of other management actions to preserve and restore

native trout populations.

The Center faults the EIR for not including these or other suggested alternatives or

explaining in more detail why the other alternatives were rejected. However, an EIR

need only “indentify any alternatives that were considered by the lead agency but were

rejected as infeasible during the scoping process and briefly explain the reasons

underlying the lead agency’s determination.” (CEQA Guidelines, § 15126.6, subd. (c).

The EIR complied with this directive. The Department did not abuse its discretion in

complying with CEQA’s requirements for consideration of alternatives.

In sum, we conclude the Department did not abuse its discretion in preparing and

certifying the EIR.

III

Case No. C072790

The Association contends three mitigation measures imposed by the Department

on the Fishing in the City Program and private stocking permit applications are actually

underground regulations -- regulations adopted without complying with the notice and

46

procedure requirements imposed by the APA. We conclude the three measures are

underground regulations.

A. Additional background information

1. Fishing in the City program

Fishing in the City is a program implemented by the Department to provide

angling opportunities in urban areas. Under the program, the Department stocks fish in

urban lakes and ponds. Department biologists select the water bodies to be stocked, and

the Department contracts with vendors to provide and stock the fish.

The Fishing in the City program is not mandated by statute. However, a statute

requires the Department to use all funds allocated for purchasing fish for the program to

purchase the fish from private registered aquaculture facilities pursuant to the rules of the

Public Contract Code unless the private facilities are unable to provide the fish or their

fish are diseased. (Fish & G. Code, § 1123.5.)

The Department adopted two mitigation measures proposed by the EIR, BIO-226

and BIO-229, to mitigate impacts the Fishing in the City program may have on any

decision species. BIO-226 requires Department biologists to evaluate water bodies

proposed for stocking under the Fishing in the City program to determine the presence of

any decision species by using a stocking protocol similar to the evaluation protocol called

the private stocking permit evaluation protocol. If decision species may occur, the

biologist must consider whether stocking hatchery fish in the water body would adversely

affect those species or their habitat. This review process must be implemented in each

region sponsoring Fishing in the City programs.

The other mitigation measure, BIO-229, requires private aquaculture facilities

participating in the Fishing in the City program to monitor and report the existence of

invasive species at their facilities. The monitoring shall be done quarterly by a qualified

person using Department standards, and reports shall be submitted to the Department.

47

Presently, the facilities are to monitor for New Zealand mudsnails, quagga mussels, and

zebra mussels.

2. Private stocking permits

Under state statute, a person may apply to the Department for a permit to stock

fish in a stream or lake. (Fish & G. Code, § 6401.) Department regulations prohibit

private stocking of fish which are parasitized, diseased, or of an unauthorized species.

(Cal. Code Regs., tit. 14, § 238.5, subd. (a).) They also prohibit stocking any species of

fish in any water in which such stocking is contrary to the Department’s fishery

management plans. (Cal. Code Regs., tit. 14, § 238.5, subd. (d)(3).)

The Department adopted mitigation measure BIO-223b to address impacts private

stocking may have on decision species. BIO-233b requires a Department biologist,

before approving a private stocking permit application, to review the proposed stocking

water body for the presence of decision species by using the private stocking permit

evaluation protocol. If decision species are found, the biologist must determine whether

the proposed stocking would result in a substantial adverse effect on a decision species.

If it would, the biologist must deny the permit application.

B. Analysis

“Unless it is subject to one of the enumerated exceptions, every regulation must be

adopted consistent with the procedural requirements of the APA. (Gov. Code, § 11340 et

seq.) This requires, among other things, public notice and an opportunity for public

comment before the regulation takes effect. (Morning Star Co. v. State Bd. of

Equalization (2006) 38 Cal.4th 324, 333 (Morning Star).) A regulation that is adopted

inconsistently with the APA is an ‘underground regulation’ (Cal. Code Regs., tit. 1, §

250) and may be declared invalid by a court (Morning Star, supra, at p. 333; Gov. Code,

§ 11350). Such a declaration is what the [Association] seek[s] in this action.

“The APA defines a ‘regulation’ as a rule or standard of general application.

(Gov. Code, § 11342.600.) The state agency rule or standard is a regulation subject to the

48

APA if (1) it applies generally rather than to a specific case and (2) it implements,

interprets, or makes specific the law enforced or administered by the state agency

imposing the rule or standard.

“Several exceptions exempt regulations from the requirements of the APA. These

exceptions allow the state agency to enforce or impose the rule or standard without

promulgating it pursuant to the APA, even though the rule or standard fits the definition

of a ‘regulation.’ ” (Bollay v. California Office of Administrative Law (2011) 193

Cal.App.4th 103, 106-107 (Bollay).)

The Department claims the mitigation measures are exempt from the APA under

two exemptions: One exempts from the APA a regulation that “relates only to the

internal management of the state agency.” (Gov. Code, § 11340.9, subd. (d).) A second

exempts a regulation that “embodies the only legally tenable interpretation of a provision

of law.” (Gov. Code, § 11340.9, subd. (f).) We turn to decide whether the three

mitigation measures contested by the Association qualify under either of these

exemptions to the APA.

1. BIO-226

The Department claims BIO-226, the measure requiring Department biologists to

evaluate whether water bodies should be stocked for the Fishing in the City program, is

exempt from the APA as a rule governing the Department’s internal management

practices. It asserts the measure qualifies for this exemption because the rule applies only

to the Department and its biologists in making stocking decisions. Any impact on

venders who do not receive contracts to supply fish because a water body is not chosen

for the program is incidental.

To support its argument, the Department relies upon a case from this court,

Californians for Pesticide Reform v. California Dept. of Pesticide Regulation (2010) 184

Cal.App.4th 887 (Pesticide Reform), which held the internal management exemption

49

applied where an “agency’s rule does not require the individuals or entities affected to do

anything they are not already required to do . . . .” (Id. at p. 909.)

The Association contends Pesticide Reform is an outlier, and urges us to apply a

more narrow interpretation of the internal management exemption such as that given in

Grier v. Kizer (1990) 219 Cal.App.3d 422 (Grier) (disapproved on another ground by

Tidewater Marine Western, Inc. v. Bradshaw (1996) 14 Cal.4th 557, 577 (Tidewater)), a

case from Division Three of the Second Appellate District that Pesticide Reform refused

to follow. Relying upon Armistead v. State Personnel Board (1978) 22 Cal.3d 198

(Armistead), Grier held the exemption applied only to purely internal rules which govern

an agency’s procedure, not to rules that had an external impact. According to Grier,

whether a rule requires affirmative conduct by an affected party is not dispositive.

(Grier, supra, 219 Cal.App.3d at p. 437.)

We need not resolve the disagreement between Pesticide Reform and Grier over

whether a rule must require affirmative conduct by an affected party in order to be

classified as a regulation subject to the APA. Instead, we further define the test first

expressed by Pesticide Reform, and conclude BIO-226 goes beyond the Department’s

internal management. In Pesticide Reform, a state statute required the state Department

of Pesticide Regulation to assess the risk of harm presented by pesticides used in the

state, determine whether they are toxic air contaminants, and adopt measures to control

them. The Department established a policy to prioritize pesticides in the order it would

review them. (Pesticide Reform, supra, 184 Cal.App.4th at pp. 893-894.) We concluded

the prioritization policy was exempt from the APA as an internal management policy

because it required no affirmative conduct by an affected party. (Id. at pp. 907-908.)

However, we emphasized that the “Department was authorized to evaluate all pesticides

in California, and the director was given the discretion to determine the order in which

the pesticides would be evaluated. . . . [T]he prioritization policy will not determine if

50

the pesticides will undergo review, but merely prioritize when the pesticides will undergo

review.” (Id. at p. 909.)

Unlike the policy at issue in Pesticide Reform, BIO-226 does not merely grant the

Department discretion to allocate or prioritize its own resources before performing a

statutory duty. It requires the Department to perform a new duty. The mitigation

measure is not a determination of when or in what order a water body will be evaluated;

it is a directive to evaluate all water bodies the Department proposes to include in the

Fishing in the City program, to do so in a particular manner, and to eliminate what could

be a significant number of water bodies from the program. BIO-226 does not concern

only internal affairs; it substantively affects a public program the Department

administers.

The mitigation measure also significantly affects numerous citizens, both those

who run established fish stocking businesses and those, especially children, who enjoy

participating in the Fishing in the City program. While BIO-226 does not require fish

farmers and vendors to engage in any affirmative conduct, it will detrimentally affect

them. Implementing BIO-226 will likely eliminate a number of water bodies from the

Fishing in the City program to the detriment of the farmers’ businesses and the citizens

who enjoy participating in the program -- an impact more detrimental than the impact

some may have experienced by the prioritization policy at issue in Pesticide Reform, or,

by analogy, a rule that merely prioritized when the Department would evaluate certain

water bodies.

“A major aim of the APA was to provide a procedure whereby people to be

affected may be heard on the merits of proposed rules.” (Armistead, supra, 22 Cal.3d at

p. 204.) Where the challenged policy goes beyond merely prioritizing or allocating

internal resources and may significantly affect others outside the agency, a fact situation

Pesticide Reform did not encounter, such a policy goes beyond the agency’s internal

management and is subject to adoption as a regulation under the APA. The Department

51

should hear from the general public, as well as the citizens who operate fish stocking

businesses and those who participate in the Fishing in the City program who will be

affected by BIO-226, before it adopts and implements the measure.

2. BIO-229

The Department claims BIO-229, the measure requiring private fish vendors

participating in the Fishing in the City program to monitor and report any invasive

species, is exempt from the APA as the only legally tenable interpretation of a law.

Section 2301 of the Fish and Game Code and other regulations prohibit the possession or

transfer of New Zealand mudsnails and dreissenid mussels, a term which includes the

species of quagga mussels and zebra mussels. (Fish & G. Code, § 2301, subd. (a)(1);

Cal. Code Regs., tit. 14, § 671, subds. (a), (c)(9)(A), (c)(10).) Any entity that discovers

dreissenid mussels must report the discovery immediately to the Department. (Fish & G.

Code, § 2301, subd. (e).) The Department argues BIO-229 is exempt from the APA

because it merely applies these existing statutes and regulations to a particular situation.

The Department overstates the exception. Any rule that implements, interprets, or

makes specific the law being enforced is a regulation subject to the APA unless the rule is

the only legally tenable interpretation of the law. This exception is narrow. “[A]n

agency interpretation of a statute is not subject to the APA if it is ‘the only legally tenable

interpretation’ of the statute. (Gov. Code, § 11340.9, subd. (f).) That phrase has been

construed to apply only if the interpretation is ‘patently compelled by . . . the statute’s

plain language.’ (Morning Star, supra, at p. 337.) An interpretation is ‘patently

compelled’ when it ‘ “can reasonably be read only one way” [citation], such that the

agency’s actions or decisions, in applying the law are essentially rote, ministerial, or . . .

repetitive of . . . the statute’s plain language.’ (Id. at pp. 336-337.) By contrast,

‘interpretations that arise in the course of case-specific adjudication are not

regulations . . . .’ (Tidewater, supra, 14 Cal.4th at p. 571.)” (California Grocers Assn. v.

Department of Alcoholic Beverage Control (2013) 219 Cal.App.4th 1065, 1074.)

52

“Under the ‘only legally tenable interpretation’ exception, the state agency need

not promulgate [a regulation] pursuant to the APA if the regulation essentially reiterates

the law. If the regulation departs from or embellishes upon the law, the state agency must

comply with the APA. [Citation.]” (Bollay, supra, 193 Cal.App.4th at p. 107.)

BIO-229 goes beyond simply reiterating the law or applying the law in a rote or

ministerial manner. It imposes on a class of persons a new affirmative duty to monitor

and report on a quarterly basis the existence of invasive species in their waters if they bid

for, and receive, a contract to supply fish for the Fishing in the City program. This new

duty is not a new duty patently compelled by Fish and Game Code section 2301. That

statute requires entities to report the discovery of invasive species, but it does not require

entities to monitor and report on a quarterly basis. In fact, the statute authorizes the

Department also to take a number of actions to stop dreissenid mussels from entering

state waters, including inspecting any containers or trailers that may carry dreissenid

mussels. If the Department can inspect for dreissenid mussels before a container of fish

is brought to a participating water site, it is not patently apparent from Fish and Game

Code section 2301 that requiring private parties to monitor and report on a regular basis

the existence of invasive species in their waters is the only legally tenable interpretation

of that statute. If the Department wants to adopt such a rule for its Fishing in the City

program, it needs to do so by regulation. (Fish & G. Code,. § 2301, subd. (g).)

3. BIO-233b

The Department argues BIO-233b, the measure effectively prohibiting the

issuance of private stocking permits if a Department biologist concludes the proposed

stocking would substantially and adversely affect any decision species, is exempt from

APA requirements as the only legally tenable interpretation of a provision of law.

Specifically, Department regulations prohibit any person from stocking any species of

fish in any water where such stocking is contrary to the Department’s fisheries

management programs. All applicants will be advised upon request of those management

53

programs. (Cal. Code Regs., tit. 14, § 238.5.) The Department claims the requirement

for Department biologists to use an evaluation protocol before granting a private stocking

permit is the only tenable interpretation of its regulation.

We disagree. The Department’s interpretation is not the only interpretation it

could apply to the regulation, nor does its interpretation essentially repeat the regulation.

The regulation is silent regarding how it should be enforced. Another possible

interpretation the Department could reach would be to require the permit applicant to

submit a report from a qualified biologist certifying the nonexistence of any decision

species or that stocking would not have a significant adverse effect on decision species.

Because the Department’s interpretation is not the only reasonably tenable interpretation

of California Code of Regulations, title 14, section 238.5, it is a regulation that must be

adopted according to the APA’s procedures.

DISPOSITION

The judgments in case Nos. C072486 and C073011, appealed by the Center for

Biological Diversity and Californians for Alternatives to Toxics et al., are affirmed. The

Department is awarded its costs on appeal in these cases. (Cal. Rules of Court, rule

8.278(a).)

The judgment in case No. C072790, appealed by the California Association for

Recreational Fishing, is reversed. The Association is awarded its costs on appeal. (Cal.

Rules of Court, rule 8.278(a).)

NICHOLSON , Acting P. J.

We concur:

DUARTE , J.

HOCH , J.

54