holding that “the critical issue is not ownership in the first instance, but rather the parties’ respective control over the disposal” of hazardous substances
How later courts described this case
- holding that “the critical issue is not ownership in the first instance, but rather the parties’ respective control over the disposal” of hazardous substances
- explaining court has “broad discretion” to make allocation determinations in CERCLA context and “the predominant concern in equity is the intent of the parties”
- “Lockheed indirectly recovered through U.S.-government contracts the lion’s share of its past response costs at the Sites, plus a profit.”
- “Even assuming that FMC remains good law in the wake of Bestfoods, this case does not present the pervasive levels of control exhibited in FMC and other World War II cases.”
Written by the judges who cited it.
The opinion
UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLUMBIA
__________________________________________
)
LOCKHEED MARTIN CORPORATION, )
)
Plaintiff, )
)
v. ) Civil Action No. 08-1160 (ESH)
) UNDER SEAL
UNITED STATES, )
)
Defendant. )
_______________________________________)
MEMORANDUM OPINION
Lockheed Martin Corporation brings this action against the United States under the
Comprehensive Environmental Response, Compensation, and Liability Act (“CERCLA”), 42
U.S.C. § 9601 et seq., for recovery of past and future response costs to remediate the
environmental contamination caused by its corporate predecessor’s operation of three rocket
motor-production facilities – Redlands, Potrero Canyon, and LaBorde Canyon – in California
from 1954 to 1975. Both parties admit to being liable as potentially responsible parties (“PRPs”)
for the contamination at the three facilities under CERCLA § 107(a). The Court held a twelve-
day bench trial from February 10 to March 14, 2014, to determine the equitable allocation of
response costs between the parties. Having considered the evidence, the controlling law, and all
relevant equitable factors, the Court has determined that an equitable allocation for the past
response costs for all three facilities is 0% liability to the United States and 100% liability to
Lockheed. In contrast, the Court will equitably allocate future response costs between the parties
differently for each facility: 29% to the United States and 71% to Lockheed for the Redlands
facility; 24% to the United States and 76% to Lockheed for the Potrero Canyon facility; and 19%
to the United States and 81% to Lockheed for the LaBorde Canyon facility.
1
TABLE OF CONTENTS
BACKGROUND .............................................................................................................................3
I. History of the Sites...................................................................................................3
A. Government contracts for solid propellant rockets at the Sites ...................3
B. Solid propellant rocket operations at the Sites .............................................7
C. General waste disposal practices at the Sites .............................................14
II. Cleanup of the Sites ...............................................................................................15
A. Redlands facility ........................................................................................15
1. Trichloroethylene ...........................................................................16
2. Perchlorate .....................................................................................18
B. Potrero Canyon facility ..............................................................................19
C. LaBorde Canyon facility ............................................................................21
III. Lockheed’s indirect recovery of response costs through U.S.-government
contracts .................................................................................................................22
A. The Federal Acquisition Regulations.........................................................23
B. The Discontinued Operations Settlement Agreement (“DOSA”) .............25
C. Lockheed’s treatment of response costs for the Sites under the DOSA ....27
IV. Procedural history ..................................................................................................29
A. Related actions while the CERCLA statute of limitations was tolled .......29
B. The government’s partial motion for summary judgment .........................33
C. Trial on equitable allocation ......................................................................36
LEGAL FRAMEWORK ...............................................................................................................40
FINDINGS OF FACTS AND CONCLUSIONS OF LAW ..........................................................46
I. Sources of contamination at the Sites ....................................................................47
A. Redlands facility ........................................................................................47
1. Perchlorate .....................................................................................47
2. Trichloroethylene ...........................................................................52
B. Potrero Canyon facility ..............................................................................56
C. LaBorde Canyon facility ............................................................................58
II. Traditional equitable allocation .............................................................................59
A. Limited value of certain equitable factors .................................................59
1. Waste attributable to each party .....................................................59
2. Parties’ relative benefits from waste disposal activities ................60
3. Degree of cooperation ....................................................................60
4. The government’s ownership of waste ..........................................62
5. The government’s ownership of facilities......................................64
6. Knowledge of risk of pollution from AP and TCE ........................65
7. Violation of California water quality laws.....................................68
8. Ability to pay .................................................................................74
9. Indemnification provisions ............................................................74
B. LPC exercised significantly more control than the government over the
day-to-day hazardous waste disposal operations at the Sites.....................79
C. The government acquiesced in many of LPC’s disposal operations at the
Sites ............................................................................................................88
2
D.
Some of LPC’s disposals at the Sites violated internal LPC rules or
government requirements...........................................................................90
E. Conclusion under traditional equitable allocation .....................................93
III. Effect of indirect recoveries on equitable allocation .............................................93
A. Lockheed’s recovery of past response costs would unfairly burden the
taxpayer. .....................................................................................................94
B. Lockheed’s recovery of future response costs would not unfairly burden
the taxpayer. .............................................................................................106
CONCLUSION ............................................................................................................................107
BACKGROUND1
I. HISTORY OF THE SITES
The environmental contamination that underlies this action arose from the operation of
solid propellant rocket production facilities by Lockheed Propulsion Company (“LPC”)2 at three
locations in Redlands and Beaumont, California – the Redlands facility, the Potrero Canyon
facility, and the LaBorde Canyon facility (collectively the “Sites”) – between 1954 and 1975.
A. Government contracts for solid propellant rockets at the Sites
LPC researched, developed, and manufactured state-of-the-art solid propellant rocket
technologies at the Sites in support of military and scientific programs critical to the United
States’ Cold War efforts. (Roman Decl. ¶¶ 21, 23.) Government interest in the development of
solid propellant rocket technologies grew significantly in the 1950s following the Soviet Union’s
successful nuclear tests in 1949 and the Sputnik launches in 1957. (Id. ¶¶ 19, 24-25.) Rocket
motors using solid propellants offered, at a lower cost, several benefits over their liquid-based
counterparts – greater safety, operational readiness, and reliability. (Id. ¶ 24, 27.) The
1
What follows in this section, although labeled “Background” and generally undisputed by the
parties, constitutes findings of fact in accordance with Fed. R. Civ. P. 52.
2
Grand Central Rocket operated the Sites from 1954 to 1963, when LPC purchased the company.
(USX88.0044.) For simplicity’s sake, the Court will refer to GCR and Lockheed Propulsion Company as
“LPC.” During its existence, LPC was an operating division of Lockheed Aircraft Corporation, which, in
1977, became the Lockheed Corporation. The Lockheed Corporation merged with the Martin Marietta
Corporation in 1995 to form the Lockheed Martin Corporation.
3
Eisenhower administration’s decision to initiate the development of several large missile
programs and to prioritize the research and development of solid propellants created the market
for a private solid propellant industry. (Id. ¶ 33.) As the only purchaser of advanced solid
propellant rockets at the time, the United States held monopsonistic control over the solid
propellant industry. (Trial Tr. 65-66 (Roman); Roman Decl. ¶¶ 5, 34.)
LPC was one of the largest participants in that industry, and as a contractor, it developed
or manufactured rockets for eight major Cold War programs: the Vanguard artificial satellite,
the Explorer artificial satellite, the Nike-Zeus anti-ballistic missile system, Project Mercury, the
Apollo Program, the Large Solid Propellant Motor Program, the TAGBOARD reconnaissance
drone, and the Short Range Attack Missile (“SRAM”) program. (Roman Decl. ¶¶ 7, 35.)
President Eisenhower designated four of these programs – Vanguard, Nike-Zeus, Mercury, and
Apollo – as of the “highest national priority.” (Id. ¶¶ 7, 23.)
As described by three aeronautics scholars, “[t]he brief life of the Lockheed Propulsion
Company was marked by rather modest, but notable historical and technical achievements in
solid rocket development.” (PX0088 at 14.) LPC contributed to four major Cold War space
programs both as a developer and manufacturer of solid propellant rocket motors. In the 1950s,
LPC developed and manufactured the third-stage motor for the Vanguard satellite program and
loaded solid propellants into motors for the Explorer satellite program. Following the first of
many successful launches into orbit in 1958, both Vanguard and Explorer were foundational
space race programs. (Roman Decl. ¶¶ 8, 36-37.) LPC later developed and manufactured
launch escape motors for Project Mercury, the United States’ first manned space program. The
escape motors – critical for the safety of the astronaut in the event of an emergency during a
launch – had a 100% reliability rate over numerous tests and missions. (Id. ¶¶ 10, 40-41.)
4
Finally, LPC developed and manufactured the launch escape and pitch control motors for the
Apollo manned lunar exploration program. The motors were part of the space capsule for eight
Apollo lunar missions, including Apollo 8, the first manned orbit of the moon in December 1968,
and Apollo 11, the first manned lunar landing in July 1969. (Id. ¶¶ 11, 42-43.)
From 1958 to 1974, LPC also researched, developed, and tested large solid propellant
motors for NASA and the Department of Defense (“DOD”). Large solid propellant motors were
necessary to generate enough thrust to lift large vehicles into space. Under the Large Solid
Propellant Motor Program, LPC designed, fabricated, and tested the first 120-inch and 156-inch
solid propellant motors and contributed to numerous technological advances later incorporated
by competitors in the Space Shuttle and ballistic missile programs. For instance, the “Lockseal”
device developed by LPC as a solution to solid propellant rocket thrust vector control became a
mainstay in the solid propellant rocket industry. (Id. ¶¶ 12-13, 44-45.)
LPC also contributed as a developer and manufacturer to the conventional Cold War
arms race. LPC developed the second-stage motor for the Nike-Zeus missile, a surface-to-air
missile designed to destroy incoming nuclear warheads. The Nike-Zeus missiles were
successfully tested in 1958 and 1959. (Id. ¶¶ 38-39.) LPC also developed and produced forty-
five motors for the then-highly classified TAGBOARD reconnaissance drone program in the late
1960s. LPC designed motors capable of allowing the unmanned drone to reach an altitude and
speed that would ignite the drone’s ramjet. Once the ramjet ignited, the drone could reach
speeds in excess of Mach 3 and photograph an area sixty miles wide and 3000 miles long in a
single flight. The government ultimately discontinued TAGBOARD in 1971 for technical and
political reasons. (Id. ¶¶ 49-50; see also PX0088 at 13.)
5
LPC’s largest contracts, however, were for the SRAM program. The SRAM was a
nuclear-armed air-to-ground missile designed for use on the aerial front lines in the case of an
American invasion into Soviet territory. (Roman Decl. ¶ 51.) LPC developed and manufactured
a revolutionary two-pulse solid propellant rocket motor, which enabled an individual SRAM to
shut down and then restart mid-flight. This innovation created the possibility for three distinct
flight profiles and an “omni-directional” striking capability for each missile. (Id. ¶¶ 51, 54, 70-
71; see also Trial Tr. at 68 (Roman).)
The Air Force developed the technical requirements for the SRAM program in the spring
of 1964. (Roman Decl. ¶ 53) The Air Force Rocket Propulsion Lab (“AFRPL”) initiated SRAM
research and development contracts with LPC, as well as several of its competitors, that same
year. (Trial Tr. at 1340-41 (Dull).) LPC was the only contractor to successfully demonstrate the
feasibility of a two-pulse motor during its research and development contracts. (Roman Decl. ¶
54.) In 1966, Boeing won the development contract for the SRAM program (Trial Tr. at 1339,
1341 (Dull)) and awarded the subcontract for the development of the propulsion system – i.e.,
the solid propellant rocket motor – to LPC. (Roman Decl. ¶ 55.)
Numerous technical difficulties and rocket failures plagued the SRAM program. (Trial
Tr. at 1341 (Dull); Roman Decl. ¶¶ 56-60.) The September 1969 initial qualification tests for the
SRAM motor were unsuccessful. (Roman Decl. ¶ 61.) Shortly thereafter, Boeing and LPC filed
a $54.2 million claim against the Air Force asserting that the SRAM propulsion system
requirements were “unattainable” and “grossly impracticable.” The Air Force settled the claim
for $20 million before it could be adjudicated. (Id. ¶ 63.)
Setbacks notwithstanding, the Air Force deemed the SRAM motor fit for production in
1971. The Air Force awarded Boeing the first production contract, and Boeing awarded LPC a
6
one-year production subcontract worth $27.6 million. (Id. ¶ 64.) The Air Force awarded Boeing
four more production contracts, and Boeing and LPC entered into four additional production
subcontracts between 1972 and 1975. During that period, LPC produced 1500 SRAM solid
propellant rocket motors and completed 107 consecutive successful test fires. (Trial Tr. at 1395-
96 (Dull); Roman Decl. ¶ 68.) Each SRAM was 150 inches long, nearly 18 inches in diameter
(see Trial Tr. at 1337 (Dull)), and carried a thermonuclear weapon with a yield of approximately
170 kilotons, roughly ten times the yield of the atomic bomb the United States dropped over
Hiroshima during World War II. (Roman Decl. ¶ 69.) Thus, a B-52 bomber with the capacity to
carry 20 SRAMs had a destructive power equivalent to 200 Hiroshima bombs. (Id.)
In light of decreased government focus on solid propellant rocketry for defense and space
exploration purposes, LPC ceased its operations in the summer of 1975 at the end of its fifth
SRAM subcontract. (Id. ¶ 68.) Nonetheless, SRAMs – all of which contained solid propellant
motors produced by LPC – remained a mainstay in the United States’ arsenal through the 1980s
and were considered critical to the deterrent effect of the United States’ strategic bomber force.
(Id. ¶¶ 70-72.) Even twenty years after the first successful SRAM test firing, the Soviet Union
had not developed an air defense system capable of neutralizing the omni-directional capabilities
of SRAMs provided by LPC’s two-pulse rocket system. (Id. ¶ 71.)
B. Solid propellant rocket operations at the Sites
While the parties dispute what happened on a day-to-day basis with respect to operations
at the Sites, particularly relating to the disposal of the hazardous substances, many of the
background facts are undisputed.
LPC began its rocket motor production operations at the nearly 500-acre Redlands
facility in 1954 when it leased the facility from the City of Redlands. (USX15; see also
7
USX11.0020-21.) Between 1958 and 1962, LPC acquired the parcels comprising the much-
larger 9,100-acre Potrero Canyon and 2,500-acre LaBorde Canyon facilities located near
Beaumont, California. (USX12.0044.)3 Lockheed researched and manufactured solid propellant
rockets at the Redlands facility from 1954 to 1975. (USX11.0018-20.) LPC used the Potrero
Canyon facility for manufacturing solid propellant rockets, testing rocket motors, and washing
out defective rocket motors for re-use from 1958 to 1974. (Sterrett Decl. ¶ 213; USX12.0046.)
LPC used the LaBorde Canyon facility for assembling small rocket motors, testing rocket
motors, and washing out defective motors for reuse from 1958 to 1974. (Sterrett Decl. ¶ 214;
USX13.0011-12.)
The design, testing, and production processes for LPC’s contracts followed a general
protocol. The government provided requirements regarding the performance, dimensions, and
interface points of the solid propellant rocket motor. (Trial Tr. at 78 (Oppliger).) From those
specifications, LPC’s engineering analysts manipulated the composition of the propellant and the
physical design of the propellant grain within the rocket casing to achieve desired rocket
performance. (Id. at 78-79.) LPC engineers then designed the rocket casing and casing
insulation based on the characteristics of the propellant grain design. (Id. at 80.) From there,
LPC began the iterative process of testing subscale (and eventually to-scale) rockets against the
government-provided specifications. (See id. at 80-83.)
Although LPC’s applications of solid propellant rocket technology were state-of-the-art,
solid propellant rocket motors themselves are “simple units” with “no moving parts.” (PX91 at
3
Today, the San Bernardino Valley Water Conservation District owns the majority of the
Redlands facility and uses portions of it for water spreading to recharge groundwater. Operators of an
industrial park own the remaining sixty-six acres of the Redlands facility. (USX11.0021.) California
owns and manages as a wildlife area all but nearly 600 acres of the Potrero Canyon facility. Lockheed
owns the remaining acreage under a conservation easement. (USX12.0047.) The County of Riverside
has owned the LaBorde Canyon facility since 2006. (USX13.0011.)
8
934.) A solid propellant rocket “motor consists of an encased energy supply, which is a
combustible mixture of all of the elements required for the generation of propulsive energy” – it
is self-contained and ready to fire when it leaves the factory. (Id.)
A solid propellant is composed of three basic components – an oxidizer and two fuels, a
“rubber-like binder” and powdered aluminum. (Id. at 935.) Because solid propellant
combustion occurs in the closed environment of a rocket’s core, a solid propellant requires much
more oxidizer than fuel. (Id. at 955.) The oxidizer used by LPC consisted of precise proportions
of ground and unground ammonium perchlorate (“AP”). LPC used several grinders at the Sites
to grind raw AP down from 200 microns in diameter (unground) to precise sizes of less than
eight microns in diameter. (Id.) LPC combined the ground and unground oxidizer with a fuel
slurry in a large mixing machine to produce a homogenous fluid propellant. (Id. at 958.)
LPC then “cast” the fluid propellant into the rocket motor case under vacuum conditions,
and “cured” the rocket by heating the cast for nearly a week to “stiffen[] it into a rubbery, shape-
retaining mass.” (Id. at 935, 961.) LPC produced these solid propellant motors in short,
cylindrical segments that could be joined to complete the rocket motor. (Id. at 940.) Once the
nozzle and igniter were added, the rockets were ready for either testing or shipment. (Id. at 938.)
Aside from providing the initial specifications for a particular solid propellant rocket
motor, the government played several additional roles in the design, testing, and production of a
rocket.4 First, as a government contractor or subcontractor, LPC had to comply with any military
and federal specifications incorporated in a particular contract. (PX1057 ¶¶ 13-14 (Speer
Decl.).) Deviation from government specifications required government review and approval.
(Id. ¶ 14.) Second, LPC’s contracts often incorporated by reference specific safety and
4
Because of the lack of contracts and documents from the LPC’s earlier years, this section
focuses primarily on LPC’s later – and biggest – subcontracts under the SRAM program.
9
production manuals. (See Trial Tr. at 941 (Nagle); see also, e.g., PX0001-0003, 0005, 0007,
0009.) The manuals provided guidance for best practices regarding safety and production
processes. Although LPC was not required to comply with all aspects of the referenced and
applicable manuals, LPC was required to comply with, or to seek a waiver or deviation from, any
directives in the manuals that used the words “shall” or “must.” (See Trial Tr. at 439 (Delaney);
id. at 941 (Nagle); PX0007 § 102). Waivers or deviations, however, were commonly sought and
granted. (Trial Tr. at 941 (Nagle); see, e.g., PX400.)
Specifications aside, the government had limited input into LPC’s technical development
of solid propellant rocket motors under government contracts. In the mid-1960s, the government
adopted the so-called Total System Performance Responsibility (“TSPR”) for the SRAM
contracts, meaning that the prime contractor – Boeing – and its subcontractor –LPC – had “total
system responsibility to build th[e SRAM] without any more direction from the Air Force.”
(Trial Tr. at 1338 (Dull); see USX222.0003.) “The Air Force provide[d] a statement of work,
what [it] want[ed] to be built, and a system spec that goes into technical details” regarding
performance, but it did not “dictate the design” of the rocket. (Trial Tr. at 1338 (Dull).)
Given the technical complexity of the SRAM program, LPC held daily early morning
meetings to discuss pertinent program details. (See Trial Tr. at 86 (Oppliger).) Government
representatives from the Air Force Systems Program Office (“SPO”)5 and the AFRPL attended
these meetings, as well as other technical interchange meetings scheduled by Boeing, only on
invitation by Boeing. (Id. at 1341, 1345-47 (Dull).) Although the frequency of these meetings
increased over time due to the repeated rocket motor failures that plagued SRAM, government
representatives at the meetings were instructed not to provide direction, but to only “observe,
5
The SPO, located at Wright-Patterson Air Force Base near Dayton, Ohio, was the Air Force
division responsible for procuring weapons systems, including SRAM. (Trial Tr. at 1335-36 (Dull).)
10
take notes, and report back to . . . supervisors.” (Id. at 1347-48.) Even at SRAM’s preliminary
design review, which included high-ranking officials from LPC, Boeing, and the Air Force, the
Air Force representatives attended only “as observers to witness the progress at [LPC] at that
time.” (Id. at 1349.) Waste disposal practices were not discussed at these technical meetings.
(Id. at 1352.)
At the beginning of its SRAM development subcontract, LPC formed the SRAM
Propulsion Program Review Committee to provide LPC monthly guidance on meeting the
SRAM program’s technical and schedule objectives. (PX0571 at 443.) The Committee was
initially comprised of Lockheed Aircraft Corporation employees who did not generally work for
LPC at the Sites. (Id.) In early 1968, pending the commencement of SRAM rocket motor test
firing, LPC , with the permission of Boeing, expanded the Committee to include several outside
experts, including Boeing engineers, scholars, and Donald Ross, “Mr. Solid Rocket,” from the
AFRPL. (Id. at 444, 446; see Trial Tr. at 1369-70 (Dull).) Although Mr. Ross was generally an
“observer” under the TSPR (Trial Tr. at 1370 (Dull)), he provided some technical input to LPC
through the Committee. (See PX0571 at 0439.) LPC promptly implemented many of the
improvements recommended by the expanded Committee. (See Roman Decl. ¶ 60.)
In 1970, at the request of the SPO, the AFRPL reviewed the design of the SRAM rocket
motor, the test firing results, and LPC’s tooling and manufacturing processes and internal
procedures, to ensure that LPC “w[as] ready for production” and to “document the things that
needed to be completed” before SRAM rocket motor production could begin. (Trial Tr. at 101,
104-05 (Oppliger); see also Trial Tr. at 1356 (Dull); PX0577 at 110.) Pursuant to this review,
the AFRPL provided eight recommendations to Boeing regarding LPC’s readiness for SRAM
rocket motor production. (See PX0577 at 115-18.) These recommendations ranged from the
11
procedural – recommending that Boeing conduct a First Article Contractual Inspection following
the eight test motor firings – to the prudent – suggesting that LPC’s engineering work force
could be reduced by fifty percent once development ended and production began. (Id. at 116,
118.) Although the government recommendations did not bind either Boeing or LPC (Trial Tr.
at 1376-77 (Dull)), LPC ultimately adopted many of them. (Id. at 106 (Oppliger).)
The government’s quality assurance presence at the Sites was much larger than its
technical development presence described above. Although LPC had its own safety and quality
control inspectors (id. at 128), both Boeing (as prime contractor for SRAM) and the Defense
Contract Administration Service (“DCAS”) had offices at the Redlands facility and had the
“right[]” to “roam the production floor and see anything they wanted to see and watch anything
they wanted to watch.” (Id. at 90-92, 94, 110-11.) DCAS officials, Boeing officials, and LPC
engineers reviewed the process specifications and manufacturing process standards before
production could begin and inspected the processes once underway. (Id. at 90.)6 DCAS officials
determined which steps in the production process they wanted to inspect and, in theory, a
production process could not proceed beyond a dedicated inspection point until a DCAS official
had inspected and “stamped off” the process. (Id. at 90-92.)
During the SRAM development and production contracts, DCAS had between four and
five full-time representatives and Boeing had around twenty full-time employees stationed at the
Redlands facility. (Trial Tr. at 111 (Oppliger); id. at 1346, 1357 (Dull).) By comparison, LPC
6
“Process specifications” identified the applicable government specifications for a contract and
provided a high-level description of the production process. (See PX1057 ¶¶ 16-17 (Speer Decl.); see,
e.g., PX328.) Manufacturing process standards, on the other hand, were “how-to” documents that
provided step-by-step instructions for the completion of certain processes in compliance with the process
specifications. (PX1057 ¶ 22; see, e.g., PX913.) That is, “[m]anufacturing process standards were used to
tell the operators how to do or how to use a certain piece of equipment or how to do a certain thing.”
(Trial Tr. at 117 (Oppliger).)
12
had around four hundred employees at the Redlands facility. (Trial Tr. at 139 (Oppliger);
PX1202 at 133.)
The frequency and quality of inspections at the Sites varied over time. “The amount and
kind of inspection to be performed by the Government [wa]s at the discretion of DCAS.”
(USX270.) In its 1970 review of the SRAM Rocket Motor, the AFRPL criticized all three
parties – LPC, Boeing, and DCAS – for practicing a laissez-faire “‘call us and we’ll come and
inspect’” approach to inspecting production processes. (PX577 at 117, 151-52; cf. PX576 at 48-
49, 81.) The AFRPL therefore concluded that that the SRAM program had “not been receiving
the on-station witnessing of work that the program has and continues to deserve” (PX577 at 151-
52) and suggested that SPO recommend to Boeing and DCAS to “re-evaluate their inspection
philosophy and inspection operations with a view to substantially increasing their on-station
witness of work operations besides work results.” (Id. at 117; see also Trial Tr. at 1375-76
(Dull).) After this review, both inspection points and the frequency of inspections increased at
the Sites as the first SRAM production contract got underway. (Trial Tr. at 138 (Oppliger).)
Nonetheless, DCAS continued to “lean[] on Boeing for engineering judgment and decisions
essential to the quality assurance function.” (USX221.0004.)
In addition to their daily quality assurance inspections, DCAS representatives also
occasionally undertook safety inspections at the Sites. (See, e.g., PX476-77, 482-84.)7
However, these inspections were limited to safety risks involving fires and explosions inherent in
the production, testing, and disposal of propellants and did not address safety risks regarding
environmental pollution. (See, e.g., Trial Tr. at 87 (Oppliger).)
7
Prior to the creation of DCAS in 1964, the Los Angeles Ordnance District undertook safety
inspections. (Trial Tr. at 960-61, 1013-14 (Nagle).)
13
C. General waste disposal practices at the Sites
Solid propellant rocket motor research, design, testing, and production processes produce
myriad and voluminous waste streams including waste propellant (used, unused, and defective),
waste solvents containing propellants, and scrap motors. (See PX457 at 801.) As a result,
disposal of waste was “regarded as an integral part of solid propellant rocket operations.”
(PX0009 § 7-1.1.)
During its operations of the Sites, LPC used several organic solvents – including
trichloroethylene (“TCE”) and 1,1,1-trichloroethane (“TCA”) – to clean the equipment used to
produce the solid propellant rocket motors. At the Redlands facility, AP and propellant-laden
wastewaters, AP and propellant-laden solvents, and solvents in general, were first piped,
pumped, or transported via drums to “evaporation pits.” (Trial Tr. at 669 (Feenstra); Feenstra
Decl. ¶¶ 50-51.) These shallow, concrete-lined basins allowed the organic solvents and water to
evaporate, leaving behind a residual sludge containing large amounts of AP. (See Trial Tr. at
700 (Feenstra).)
LPC ultimately disposed of most of its propellant wastes – including sludge taken from
evaporation pits – by burning them in earthen “burn pits” at the Redlands and Potrero Canyon
facilities. (Feenstra Decl. ¶¶ 51, 156.) In some instances, propellant wastes were disposed of
off-site at Camp Irwin – a military facility in the Mojave Desert (now Fort Irwin). (See id. ¶ 42;
PX431; PX440.)
An exception to disposal-by-burning existed, however, for defective rocket motor
casings. Rather than burning the entire rocket motor – and ruining the expensive metal casing –
LPC often attempted to reuse the motor casing by removing the propellant with water. In the
1950s, LPC did this by “soaking out” the scrapped rocket motors in evaporation pits at the
14
Redlands facility. (Feenstra Decl. ¶¶ 47, 152; see also PX429.) Later, LPC began “hogging out”
defective rocket motors at the Potrero Canyon facility using high-pressure water jets to remove
the propellant from the motor casing. (See Trial Tr. at 393 (Delaney); USX49.0068.)
II. CLEANUP OF THE SITES
As of the beginning of the trial, Lockheed had incurred environmental response costs for
the Sites totaling nearly $287 million. Lockheed estimates it will incur another $124 million in
future response costs for the Sites. (See Meyer Decl. ¶ 50 fig. 29.) Because each facility has a
distinct operational and cleanup history, the Court considers them separately below.
A. Redlands facility
TCE8 and perchlorate9 are the principal contaminants driving the cleanup costs relating to
the Redlands facility. Due to a combination of hydrogeologic factors around Redlands, the
majority of the TCE and AP disposed of during LPC’s operations is no longer located at the
facility. (Sterrett Decl. ¶ 44.) Rather, the substances percolated through the soil and into the
groundwater and have travelled downgradient to form the “Redlands plumes,” 10 approximately
four miles away. (See generally id. ¶¶ 29-45; see also Trial Tr. at 286-87 (Blackman).) Because
8
TCE is now recognized as a probable carcinogen for humans (PX1621 at 263) and the ingestion
of TCE-contaminated water has been associated with a wide variety of other health problems.
(USX826.0023, 0067-0111.)
9
During the trial, at the Court’s direction, the parties and witnesses did not distinguish between
“AP” and “perchlorate.” However, the Court must distinguish between the two in this Memorandum
Opinion: while AP is the oxidizer LPC used and disposed of at the Sites, perchlorate is the component of
AP that contaminates the soil and groundwater at the Sites.
AP is an inorganic salt that “dissociates” in water into its constituent cation and anion:
ammonium (NH4+) and perchlorate (ClO4-), respectfully. (See PX1224 at 1; PX1685 ¶ 3.) Perchlorate is
highly soluble and mobile in water and chemically stable. As a result, perchlorate forms persistent
contaminant plumes when it is released into surface or groundwaters. (PX1224 at 1.) Perchlorate is
harmful to human health because, even in the low µg/L range, it can interfere with iodide uptake by the
thyroid gland, thereby resulting in decreased thyroid hormone production. (PX1224 at 4, 35-36.)
10
Although substantially overlapping, the perchlorate and TCE plumes are distinct. (Sterrett
Decl. ¶ 46.)
15
the plumes are “detached” from the Redlands facility, environmental investigation of the facility
cannot demonstrate a “direct connection” between specific locations (and thus production
activities) at the facility and the plumes. (Sterrett Decl. ¶ 52.) That is, simply by looking at the
plumes and the facility, one cannot reliably discern where in the facility the TCE or perchlorate
originated.
1. Trichloroethylene
The California Department of Health Services first discovered the Redlands TCE plume
in 1980. (PX1677 ¶ 1.) Throughout the 1980s, several municipal wells were shut down after
testing revealed TCE concentrations above the California drinking water maximum contaminant
level of 5 µg/L. (Id. ¶ 3.)11 Lockheed began investigating the plume in the early-to-mid 1980s,
concluding in 1985 that a local airport, and not LPC’s activities at the Redlands site, was the
“most likely source” for the TCE. (Id. ¶ 12.) Notwithstanding that conclusion, the Santa Ana
Regional Water Quality Control Board instructed Lockheed to conduct further investigations into
its operations at the Redlands site. (Id.) Lockheed and the Board continued investigating the
Redlands facility as a potential source for the TCE plume into the early 1990s. (Id. ¶¶ 13-32.)
By October 1992, Lockheed argued that continued investigations into the Redlands
facility would be fruitless because whatever TCE might have been disposed of at the facility had
either volatized or dispersed through the porous soil and formed the detached Redlands TCE
plume. (Id. ¶ 33.) In November, the Board informed Lockheed that it had concluded the
Redlands facility was the source of the Redlands TCE plume and that it would order Lockheed to
investigate and cleanup the plume. (Id. ¶ 34.) Lockheed replied that it would consider proposing
11
As of 2008, the maximum TCE concentrations in the plume are in the mid-20 µg/L range.
(USX11.0032.)
16
to the Board a remediation plan that would negate the need for any order and thereafter
undertook a detailed study of the Redlands TCE plume. (Id. ¶¶ 34-35.)
On May 6, 1993, Lockheed denied responsibility for the plume, informing the Board that
“it was [its] position that there was not substantial evidence to indicate that Lockheed was the
source of the TCE contamination in the [Redlands plume], and that Lockheed, therefore, was not
in a position where they could justifiably utilize stockholders’ funds in conducting any additional
work.” (Id. ¶ 36.)12 The Board responded on January 28, 1994, by issuing its first Cleanup and
Abatement Order for the Redlands TCE plume. The Order required, inter alia, that Lockheed
submit a workplan for using groundwater monitoring wells to define the plume and based on
data gathered from those wells, submit and implement plans to first contain and then remediate
the plume. (Id. at 10-11; see also Trial Tr. at 286-87 (Blackman).) On that same day, the Board
also issued an “investigative order” requiring Lockheed to conduct groundwater and subsurface
soil investigations at the Redlands facility. (PX1678 at 10; see also Trial Tr. at 285 (Blackman).)
On April 22, 1994, after discussions with Lockheed, the Board modified its initial Cleanup and
Abatement Order by removing the requirement that Lockheed implement any remedial actions
for the plume while investigations were still ongoing. (PX1679 at 10-11; see also Trial Tr. at
295-96 (Blackman).) Lockheed continued to deny responsibility for the Redlands TCE plume
(see USX653 (January 1994 letter from Lockheed to Board)), but otherwise complied with the
1994 Orders and worked with the Board to develop an acceptable remediation plan. (Trial Tr. at
296-99 (Blackman).)
12
Mr. Blackman explained that Lockheed initially was unconvinced that the Redlands TCE
plume originated from LPC’s operations at the Redlands facility because testing of groundwater at the
facility had not revealed the presence of TCE. (Trial Tr. at 288 (Blackman).) That is, Lockheed was
unconvinced of its liability because the plume was “detached from” the facility. (See id.)
17
2. Perchlorate
In late April 1997, following a breakthrough in testing methodologies for perchlorate (see
Trial Tr. at 301-03 (Blackman)), the California Department of Health Services discovered
perchlorate levels in several wells within the Redlands TCE plume that exceeded California’s
provisional drinking water standard of 18 µg/L. (PX1685 ¶¶ 3-4.)13 The Board connected
LPC’s use of AP at the Redlands facility – and in particular the waste disposal practices – with
the Redlands perchlorate plume. (Id. ¶¶ 3, 5.) The Board accordingly issued a Cleanup and
Abatement Order requiring Lockheed to investigate and then develop and implement a remedial
action plan for the Redlands perchlorate plume. (Id. at 2.) Lockheed appealed the Order, but
complied during the appellate process. (Trial Tr. at 337 (Blackman).) Because the Redlands
facility was “the only source of [AP] in the” watershed, Lockheed eventually accepted
responsibility for the Redlands perchlorate plume. (See id. at 307.) Further, after the discovery
of the perchlorate plume, Lockheed “began to realize that the TCE, which was fully enveloped in
the perchlorate plume, must have also come from the” Redlands facility as well. (Id. at 308.)
Since that time Lockheed has complied with all orders of the Board regarding
investigation, containment, and remediation of the Redlands plumes, including working with
water purveyors (e.g., surrounding municipalities) to reduce TCE and perchlorate concentrations
to acceptable levels and to drill new wells for drinking water supplies. (Id. at 314-17;
USX11.0023-26.) Among other remedial steps, Lockheed treated from select wells TCE-laden
13
As of 2008, maximum perchlorate levels in the plume ranged from 60 to 90 µg/L.
(USX11.0031.)
18
groundwater with granular activated carbon and AP-laden groundwater with an ion exchange
resin. (See Trial Tr. at 319-20 (Blackman); USX11.0041-42.)14
Although Lockheed has removed large amounts of TCE and perchlorate from the
Redlands plumes, concentrations remain at levels that will require continued treatment that may
“go on for many decades.” (Trial Tr. at 321 (Blackman).) As of 2011, Lockheed had incurred
over $231 million in response costs for the Redlands plumes. 15 (See Meyer Decl. ¶ 50 fig. 29.)
Response costs for the Redlands plumes also make up the lion’s share of the more than $25
million in response costs at the Sites from January 1, 2012 to February 10, 2014, and are
expected to comprise the majority of the projected $125 million in future costs for the Sites.
(Trial Tr. at 1188 (Lockheed counsel); cf. Meyer Decl. ¶ 50 fig. 29.)
B. Potrero Canyon facility
Although TCE, TCA-related compounds,16 and polychlorinated biphenyls have been
found in the soil and groundwater at the Potrero Canyon facility, perchlorate is the principal
contaminant of concern at the facility. (Sterrett Decl. ¶¶ 22.) Unlike at the Redlands facility, the
contamination at the Potrero Canyon facility is not detached, so the perchlorate contamination is
traceable to specific locations at the facility. (Feenstra Decl. ¶ 155; Sterrett Decl. ¶ 216.)
14
Granular-activated carbon is a less costly technology than ion exchange, which was developed
specifically for perchlorate contamination. (Trial Tr. at 322 (Blackman).) While response costs for the
Redlands plume in the 1990s were primarily from the cleanup of TCE, the recent, current, and future
costs are perchlorate-driven. (Id. at 1188 (Lockheed counsel).)
15
Facility-specific data are unavailable for response costs incurred after 2011. (See Meyer Decl.
¶ 50 fig. 29; see also USX378; USX401-402.)
16
These compounds include 1,4-dioxane and 1,1-DCE. 1,4-dioxane is a chemical used to
“inhibit” – or stabilize – TCA. (Feenstra Decl. ¶ 155.) Similarly, TCA – once “uninhibited” by the
preferential removal of 1,4-dioxane in water – degrades in the presence of powdered aluminum (a fuel in
rocket propellant) to 1,1-DCE. (Trial Tr. at 674-75 (Feenstra).) Thus, the presence of 1,4-dioxane and
1,1-DCE can indicate the prior disposal of TCA.
19
The primary sources of perchlorate soil contamination at the Potrero Canyon facility are
the Large Motor Washout Area and the Burn Pit Area (Sterrett ¶¶ 220-21),17 with perchlorate
levels as high as 302,000 µg/kg and 171,000 µg/kg, respectively. (USX12.0229-30.) The
former Rocket Motor Production Area is a secondary source area, covering a much larger portion
of the facility but with lower perchlorate soil concentrations (20,400 µg/kg). (Id. at 0229, 0244-
45.) The Sanitary Landfill is also identified as a secondary source area, with soil perchlorate
levels as high as 67,300 µg/kg. (Sterrett Decl. ¶ 222; USX12.0233.)
The Burn Pit Area is the primary source of perchlorate groundwater contamination at the
facility. (Feenstra Decl. ¶ 155; Sterrett Decl. ¶¶ 226-27; USX12.0237-38.) Secondary sources at
the facility include the Rocket Motor Production Area and, to a lesser extent, the Large Motor
Washout Area. (Feenstra Decl. ¶ 165; USX12.0237-38.)
In 1986, Lockheed conducted a historical study of the Potrero Canyon facility (along with
the LaBorde Canyon facility) to better plan later investigations into environmental
contamination. (See USX49.0011.) Following that study and a 1989 Consent Order from the
California Department of Health Services, Lockheed has undertaken further remedial
investigations and some remedial actions at the facility, the most recent and relevant beginning
in 2002. (See USX12.0064-90.)
As of 2011, Lockheed had incurred nearly $21 million in response costs for the Potrero
Canyon facility. (See Meyer Decl. ¶ 50 fig. 29.) Further remedial actions are presently under
evaluation. (Feenstra Decl. ¶ 154; see generally USX699.144-300.) As of 2012, the preferred
remedial alternative for perchlorate-impacted soils at the facility is excavation and off-site
removal. The preferred remedial alternative for perchlorate-contaminated groundwater at the
17
The TCE-contaminated soils identified at the facility – located in the Burn Pit Area – were
remediated in the 1990s. (Sterrett ¶ 224; USX12.0233-35.)
20
facility hydraulic containment through the installation of a pump-and-treat system involving ex
situ treatment of the groundwater, with the discharge of remediated water back into the ground or
into local waterways. (USX699.0299-300.)
C. LaBorde Canyon facility
The soil and groundwater at the LaBorde Canyon facility are also contaminated with
perchlorate and, to a lesser extent, TCE. (Sterrett Decl. ¶¶ 25, 238.) As at the Potrero Canyon
facility, groundwater contamination at LaBorde Canyon is not detached and is therefore
traceable to specific locations of historic operations at the facility. (Id. ¶ 235.) The primary
sources of perchlorate at the facility are the Test Bay Canyons and the Waste Discharge Area.
(Feenstra Decl. ¶ 167; Sterrett Decl. ¶ 239.) Perchlorate has been detected in soil at
concentrations exceeding 100,000 µg/kg and in groundwater at concentrations exceeding
100,000 µg/L. (USX13.0236-38, .0241.)
As was the case at Potrero Canyon, Lockheed undertook a historical study of the
LaBorde Canyon facility in 1986. (See USX49.0011.) The California Department of Health
Services issued a Consent Order requiring cleanup of contamination at the facility in 1989.
(USX13.0012.) Lockheed completed remedial investigations and removal actions from 1990 to
1993, after which the California Department of Toxic Substances Control issued a “Report of
Completion of Removal Action” stating that no further remedial action was necessary. (Id.;
USX700.0037-38.) Groundwater perchlorate contamination was first detected at the facility in
the early 1990s. (Feenstra Decl. ¶ 174.) However, the California Department of Toxic
Substances Control did not reopen the facility for further assessment until 2003. (USX13.0012.)
Since then, Lockheed has engaged in nearly ten years of remedial investigations. (USX13.0027-
31.)
21
As of 2011, Lockheed had incurred over $10 million in response costs for the LaBorde
Canyon facility. (See Meyer Decl. ¶ 50 fig. 29.) Further remedial actions are currently under
evaluation. (USX700.0148-206.) As of 2012, the preferred remedial alternative for the facility
is limited shallow soil removal, plume containment, and institutional controls. (Id. at 0191,
0215.)
III. LOCKHEED’S INDIRECT RECOVERY OF RESPONSE COSTS THROUGH
U.S.-GOVERNMENT CONTRACTS
Lockheed has recovered and continues to recover its response costs for the Sites (and
others sites like them) from its customers by allocating its cleanup expenses to its contracts as
indirect costs. Because the U.S. government is by far Lockheed’s largest customer, to date
Lockheed has indirectly recovered18 $208 million – over 72% of its total past response costs for
the Sites – through indirect costs charged to U.S.-government (primarily DOD) contracts.19
Because the U.S.-government share of Lockheed’s business is larger than it was in the past, the
percentage of total response costs for the Sites that Lockheed has recovered through U.S.-
government contracts is expected to rise in the future.
This cost-recovery system has its foundation in the byzantine federal contracting
regulations and was formalized, as to environmental response costs in particular, by the
Discontinued Operations Settlement Agreement (“DOSA”) signed by Lockheed and the U.S.
18
In its public filings, Lockheed refers to its formalized recoupment of environmental response
costs through its contracts with the U.S. government as a “recovery.” (See USX397.0069 (Lockheed
2012 Annual Report).)
19
The vast majority of Lockheed’s U.S.-government contracts are with the DOD. (See
PX397.0017.) However, Lockheed also has contracts with NASA, the Federal Aviation Administration,
the Social Security Administration, the Department of Treasury, the Department of Justice, the
Department of Health and Human Services, the Environmental Protection Agency, and the U.S. Postal
Service. (Trial Tr. at 1654 (Gatchel); USX397.0016.)
22
Defense Contract Management Agency (“DCMA”)20 in 2000. As a result of these regulations
and the DOSA, the Court must decide, in determining the equitable allocation of response costs
between the parties under CERCLA, what weight, if any, should be given to the fact that a
government contractor (1) has already formally, though indirectly, “recovered” from the U.S.
government a significant portion of its response costs through the pricing of its goods and
services and (2) now seeks to directly recover from the U.S. government those same response
costs under CERCLA. As the parties agree, this is an issue of first impression.21 But before the
Court can address that question, it must explain the relevant regulations and the DOSA, both of
which complicate the resolution of this case.
A. The Federal Acquisition Regulations
Lockheed’s cost-recovery system has an established basis in the complex Federal
Acquisition Regulations (“FAR”) that govern government contracting. Pursuant to the FAR, the
government pays contractors both their “direct” and “indirect” costs, plus a profit. (Wright Decl.
¶ 84.) Direct costs are those costs related to a specific contract, such as materials and labor. See
48 C.F.R. § 31.202. Indirect costs are those costs not associated with a specific contract –
essentially overhead. See id. § 31.203. Profit factors are determined on a contract-by-contract
20
The DCMA is the component of the DOD that engages directly with defense contractors on
issues of contract compliance.
21
Although an issue of first impression, it is far from sui generis. Counsel for the parties
identified at least two other cases involving Lockheed and the government where the same issue will need
to be addressed. (Trial Tr. at 999-1000.) See Lockheed Martin Corp. v. United States, 06-cv-1032-RSL
(W.D. Wash. filed July 21, 2006) (“Seattle Shipyards”); Lockheed Martin v. United States, 06-cv-1438-
RJL (D.D.C. filed Aug. 15, 2006) (“Great Neck”). The issue was also raised in Raytheon Aircraft Co. v.
United States, 2007 WL 4300221 (D. Kan. Dec. 8, 2007), but that case settled before trial. Because
environmental contamination at defense contracting facilities is pervasive, the issue likely looms large in
any case where a major government contractor can sue the government for recovery of environmental
response costs under CERCLA. (Cf. Trial Tr. at 1996 (government closing).)
23
basis. (See Trial Tr. at 600-01 (Wright); id. at 1660-61 (Gatchel).) Across all contracts in 2013,
Lockheed’s operating margin (i.e., pre-tax profit) was over 9.9%.22
The government will only reimburse a contractor for “allowable” indirect costs. An
indirect cost is “allowable” if it is “reasonable,” i.e., “it does not exceed that which would be
incurred by a prudent person in the conduct of competitive business,” 48 C.F.R. § 31.201-3(a), is
“allocable,” complies applicable accounting standards, and is not otherwise disallowed by
regulation or contract. See id. §§ 31.201-2, -4. Although not specifically allowable under the
FAR, see generally id. § 31.205, environmental costs “are normal costs of doing business and are
generally allowable costs if reasonable and allocable.” (PX1862 § 7-2120.1 (Defense Contract
Audit Agency Contract Audit Manual).) 23 Environmental cleanup costs at facilities no longer in
operation are generally allocable as indirect costs. (Id. ¶ 7-7120.7.) Attorneys’ fees and legal
22
See Press Release, Lockheed Martin Corp., Lockheed Martin Reports Fourth Quarter and Full
Year 2013 Results (Jan. 23, 2014), available at http://www.lockheedmartin.com/us/news/press-
releases/2014/ january/0123hq-earnings.html.
23
There was a movement in the late 1980s to make environmental cleanup costs, except for those
at government-owned, contractor-operated facilities, unallowable; however, the proposal was ultimately
withdrawn in the face of industry resistance. See Cpt. Gerald P. Kohns et. al., A Primer on Contractor
Environmental Remediation and Compliance Costs, ARMY LAW., Nov. 1993, at 22, 28. In 1991, a
revised draft environmental cost principle – proposed FAR § 31.205-9 – was approved by Defense
Acquisition Regulation Council and by the Civilian Agency Acquisition Council. Cpt. Joshua H. Van
Eaton, A Not-So Equitable Allocation: The Need for an Environmental Cost Principle, 14 MO. ENVTL. L.
& POL’Y REV. 441, 459 (2007). The proposed principle would have disallowed environmental cleanup
costs except where the contractor could show that it was performing a government contract at the time of
the disposal that required cleanup and that performance of the government contract caused the disposal.
Id. at 460. Even in those instances, however, the contractor would also have to demonstrate
reasonableness of costs, due diligence, compliance with environmental standards of care and laws at the
time of disposal, and the exhaustion of legal remedies to defray cleanup costs. Id. at 473-74. The
regulation was never finalized, presumably because of the moratorium on new regulations in effect at the
time. Id. at 460. Even so, the U.S. Government Accountability Office continued to press for the
development of an environmental cost principle to address what it considered to be inconsistent – and
ultimately detrimental to the government – treatment of environmental costs by contractors. Id. at 461-
63. In 1997, after years of industry resistance, the DOD ultimately abandoned its efforts to develop an
environmental cost principle. Id. at 463-64.
24
costs incurred while pursuing a CERCLA action may also be treated as indirect costs. See 48
C.F.R. § 31.205-47.
For a fixed-price contract, contractors attempt to predict the incurrence of indirect costs
that will be allocated to that contract over its term. Because the price of the contract is fixed, the
contractor benefits from a relatively higher return on its contract if it overestimates the total
indirect costs; on the other hand, if the contractor underestimates the total indirect costs, it will
receive a relatively lower profit on that contract. In contrast, in cost-reimbursement contracts the
contractor is paid for all allowable direct and indirect costs allocated to the contract. Thus, over-
or under-estimating indirect costs with regard to a cost-reimbursement contract does not pose the
same potential for increased or reduced returns. (Cf. Trial Tr. at 1660, 1679 (Gatchel).)
Even after the contractor has allocated indirect costs to specific contracts and has been
paid for those costs pursuant to those contracts, the contractor must credit back to the
government “either as a cost reduction or by cash refund” any “applicable portion of any income,
rebate, allowance, or other credit relating to” those indirect costs “received by or accruing to the
contractor.” 48 U.S.C. § 31.201-5. For environmental cleanup costs in particular, this provision
requires a contractor to credit back to its indirect environmental cost pool any recoveries for
cleanup costs from insurance policies or other PRPs. (Wright Decl. ¶ 50.)
B. The Discontinued Operations Settlement Agreement (“DOSA”)
Lockheed and the DCMA recognized the allowability and appropriate accounting
treatment of environmental remediation expenses as indirect costs when they signed the DOSA
on September 6, 2000. (USX1033 at 10.) The DOSA formally allowed as indirect costs, inter
alia, environmental response costs incurred for “discontinued operations,” sites, or facilities that
25
Lockheed closed, abandoned, or sold prior to January 1, 2000, including all three Sites at issue in
this case. (Id. ¶¶ 1.7-.8.)
Under the DOSA, Lockheed collects its environmental response costs for discontinued
sites in an accounting pool at the corporate level – the Settled Discontinued Operations Pool
(“DiscOps Pool”).24 (Id. ¶ 2.4.) Environmental response costs in the DiscOps Pool are not
charged to contracts immediately upon incurrence; instead, the costs for a given year are
amortized over a five-year period. (USX407 at 5; Mateer Decl. ¶ 8.) Both parties benefit from
amortization because it smoothes costs over time, thereby increasing predictability in multi-year
contract prices and promoting uniformity and comparability in the measurements of contract
costs. (Mateer Decl. ¶ 9; see generally PX1859 at 3-4.)
Lockheed “flows down” the allocable costs for a given year from the DiscOps Pool to its
business units using a three-factor formula typically used in government contracting. (USX1033
¶ 2.8; Wright Decl. ¶ 45.) It is the business units that then develop indirect rates, based partially
on the DiscOps Pool, to use when bidding on and billing government contracts. (Wright Decl. ¶
45; Mateer Decl. ¶¶ 10-12.) The percentage of Lockheed’s indirect costs passed on to U.S.-
government contracts roughly correlates with the U.S. government’s share of Lockheed’s
business for a given year. (Wright Decl. ¶ 74.)
Thus, under DOSA, if Lockheed spent $10 million on environmental response costs at
discontinued operations in the year 2005, it would amortize those costs over the next five years,
and $2 million per year would flow down to its business units from 2006 to 2010. Assuming that
U.S.-government contracts make up 80% of Lockheed’s business, Lockheed would recover $1.6
24
The DOSA also settled disputes between the parties as to the allowability of past response costs
allocated as indirect costs through the DiscOps Pool from 1991 onward. (See USX1033 ¶¶ 2.9-.11.)
Importantly, the DOSA merely formalized past practice and did not materially affect how Lockheed had
treated or would continue to treat the recovery of response costs for the Sites.
26
million per year – or $8 million total – of the response costs through its government contracts. In
addition, Lockheed would recover the remaining $400,000 per year – or $2 million total – in an
identical manner from non-U.S. government contracts.25
The DOSA also provides that Lockheed “shall not realize a double recovery with regard
to any Settled Discontinued Operations Costs,” and to the extent that it does, it “will reimburse
the United States for any such double recovery . . . under government contracts.” (USX1033 ¶
4.7.) Pursuant to this provision, and as required under 48 C.F.R. § 31.201-5, Lockheed credits to
the DiscOps Pool any direct payment it receives for environmental remediation costs at its
discontinued operations, whether in the form of insurance proceeds, settlements, or other
recoveries. (Wright Decl. ¶ 50; Mateer Decl. ¶ 14.) Credits are treated the same as costs and are
amortized over the five years following receipt of the payment. (Wright Decl. ¶ 51.) Therefore,
credits represent a bottom line reduction to the DiscOps Pool, lowering the total indirect costs
passed on to Lockheed’s clients. Thus, again assuming that U.S.-government contracts make up
80% of Lockheed’s business, the U.S. government would receive 80% of the benefit of any
credits allocated to the DiscOps Pool in the form of reduced contract costs. (See Wright ¶ 73-74;
USX1009 at 154-55 (Reese Dep.).)
C. Lockheed’s treatment of response costs for the Sites under the DOSA
To date, the DOSA and DiscOps Pool have functioned as intended. As to the three
discontinued Sites in this case, Lockheed has incurred environmental response costs related to
those Sites, allocated them to the DiscOps Pool, amortized them over five years, and passed them
down to its business units for bidding and billing purposes. Because once individual costs enter
the DiscOps Pool, they are not “tracked” or “followed” (as individual costs) down through the
25
Beyond the U.S. government, Lockheed provides goods and services to other governmental and
some commercial entities, including foreign governments, state governments, municipalities, institutions
of higher education, and the United Parcel Service. (Trial Tr. at 1653-56 (Gatchel).)
27
business unit or specific contracts, it is impossible to identify or trace response costs for the Sites
to any particular government contract. (See Mateer Decl. ¶ 13.) Nonetheless, it is clear that
Lockheed has indirectly recovered, and continues to indirectly recover, response costs for the
Sites from the U.S. government through the indirect costs charged to U.S.-government contracts.
(Wright Decl. ¶ 57-59; USX407 at 4-5.) Indeed, Lockheed boasts that its “underlying tenet in
pricing [its] contracts with the U.S. government” is its “ability to recover [its] costs . . .
regardless of the type of contract.” (USX407 at 4-5.)
As of December 31, 2013, Lockheed had indirectly recovered through its U.S.-
government contracts more than $208 million – or 72% – of its estimated $287 million in total
nominal response costs at the Sites. (Meyer Decl. ¶ 29 & fig. 5.)26 In the future, this “effective
government share” of response costs at the site is expected to rise because U.S.-government
contracts will make up an even higher percentage of Lockheed’s business than in the past. (See
Trial Tr. 581 (Wright); Meyer Decl. ¶ 82 & fig. 30; USX 402.0002.) Indeed, in the past few
years, Lockheed’s recovery rate through U.S.-government contracts has been approximately 87%
(Wright Decl. ¶ 66), and it is predicted that this recovery rate will continue to fluctuate around
that percentage in the near future. (See Trial Tr. 591-93 (Wright); USX 402.0002.) Accounting
for the increase in Lockheed’s U.S.-government contract base, and considering the projected
future cleanup costs for the Sites, the government’s expert economist estimates that Lockheed
will ultimately indirectly recover through U.S.-government contracts nearly 83% of its total
nominal response costs at the Sites. (Meyer Decl. ¶ 30 & fig. 6.)
26
Lockheed also earned, and continues to earn, a profit factor on every dollar of response costs
passed through to its contracts, U.S.-government or otherwise. (See Meyer Decl. ¶ 39; Wright Decl. ¶¶
77, 83.) Thus, the higher the indirect costs charged to the DiscOps Pool, the more profit Lockheed earns
from its clients. (See Wright Decl. ¶ 84.)
28
Aside from its indirect recovery of over 72% of its response costs for the Sites through
U.S.-government contracts to date, Lockheed has also allocated as an indirect cost and
subsequently recovered (though not through the DiscOps Pool) a substantial portion of its legal
fees and costs associated with bringing this action. The government’s expert economist
estimates that Lockheed indirectly recovered through government contracts, in nominal dollars,
over 85% of the $7.35 million in legal fees and costs it incurred between 2007 and 2012. (Meyer
Decl. ¶¶ 163-75.) Lockheed incurred an additional $3.2 million in legal fees and costs through
November 2013 (Gov’t Closing Presentation [Dkt. No. 144] at 245), and undoubtedly, it has
incurred several million dollars more in fees and costs for the extensive pretrial preparation and
trial briefing since December 2013, the expert fees for the six experts who provided testimony at
trial, and the fees and costs associated with the five counsel who attended a twelve-day trial.
According to the government’s expert economist, Lockheed will indirectly recover over 85% of
its total legal fees and costs (presumably at least $10 million) through U.S.-government
contracts. (See Meyer Decl. ¶ 172.)
IV. PROCEDURAL HISTORY
A. Related actions while the CERCLA statute of limitations was tolled
Lockheed did not bring this action for recovery of response costs under CERCLA until
2008, fourteen years after it began remediation efforts at the Redlands facility. The parties,
through Lockheed’s in-house counsel and attorneys within the Environmental and Natural
Resources Division of the Department of Justice, agreed to a tolling of the CERCLA statute of
limitations, see 42 U.S.C. § 9613(g)(2), beginning in 1997. (See PX1788, 1823, 1838, 1849,
2078.) These tolling agreements, specifically for the Redlands site, were in effect from January
27, 1997 to November 1, 2003. (PX 1788, 2078.) The parties renegotiated the agreements on a
29
semi-annual basis during this time period, including negotiating a one-year extension of the
tolling agreement on July 10, 2000 (PX1849), less than two months before Lockheed and the
DCMA entered into the DOSA on September 6, 2000. (USX1033 at 10.)
Although the DOSA addressed environmental cleanup costs, it did not purport to settle
CERCLA liabilities between Lockheed and the government. To the contrary, the DOSA
explicitly provides that it “does not settle any claims, if any, arising under CERCLA.” (Id. ¶
4.18.) Indeed, the DOSA implicitly recognized the potential coexistence of direct recoveries
from the government under CERCLA and indirect recoveries from the government through costs
charged to U.S.-government contracts. In particular, the parties devoted an entire section of the
DOSA to the treatment of the January 20, 2000 Consent Decree signed by Lockheed and the
Department of Justice in the Burbank CERCLA litigation.27 (USX1033 ¶¶ 3.1-.5.) In the
Burbank Consent Decree, the United States agreed to pay Lockheed directly for over forty-four
percent of past response costs and for fifty percent of most future response costs for the site.
(PX1844 ¶¶ 3.1-.6, 4.1-.3.) While the Burbank Consent Decree acknowledged that Lockheed
was already allocating “certain environmental remediation costs” to its discontinued operations
pool, it did not purport to “resolve[]” the “allowability and allocability of these costs.” (Id. ¶
2.14.) Nonetheless, the Consent Decree did specify that under no circumstance could the United
States determine that the agreed-upon past costs were “not properly subject to payment under the
terms of the Decree because the costs were previously reimbursed by the United States or
27
The Burbank case arose when, in 1991, the United States sued Lockheed, among others, under
CERCLA § 107(a) for the recovery of response costs associated with the cleanup of TCE at a former
Lockheed aircraft and aeronautic production facility in Burbank, California. (PX1844 ¶¶ 2.1, 2.5.) The
parties signed an initial consent decree in 1992 requiring Lockheed to operate a groundwater treatment
plant at the Burbank facility and to reimburse the government for response costs it had incurred. (Id. ¶
2.5.) In 1997, Lockheed filed a counterclaim against the government under CERCLA § 113(f), seeking
contribution for its past and future response costs at the Burbank facility. (Id. ¶ 2.9.) The 2000 Burbank
Consent Decree settled Lockheed’s counterclaim against the United States.
30
another party through an overhead pool” like the discontinued operations pool. (Id. ¶ 3.16.) To
counterbalance that provision, the Consent Decree required that “Lockheed Martin shall not
realize a double recovery with regard to any” response costs and “shall credit its continued
operations pool with amounts received from the United States pursuant to this Decree in
accordance with an agreement of Lockheed Martin and the United States.” (Id. ¶ 3.25.) The
“agreement” encompassed the DOSA, wherein the parties agreed to disallow $80.6 million in
costs related to the Burbank site and disallow $29 million in credits paid to Lockheed by the
United States pursuant to the Burbank Consent Decree. (USX1033 ¶¶ 3.1-.3.)
During the tolling period, Lockheed was involved in several related matters. In 1993, a
group of insurers sued Lockheed in state court in California, seeking a declaration that they were
not required to defend or indemnify Lockheed for the costs of environmental remediation at
multiple sites, including the Redlands facility. Procter v. Lockheed Corp., Case No. 731752,
Complaint (Cal. Sup. Ct. May 27, 1993) (PX2070). The trial court ruled for the insurers,
holding, inter alia, that Lockheed’s indirect recovery of response costs through government
contracts triggered the “government reimbursement exclusion” contained in the policies, and
thus, the insurers were not required to defend or indemnify Lockheed. Procter v. Lockheed
Corp., Case No. 731752, Statement of Decision Re: Phase II at 65-79 (Cal. Sup. Ct. Oct. 27,
2003) (PX2073). Prior to the entry of judgment, Lockheed sought declaratory relief in federal
court to enjoin the state court’s preliminary ruling. In that action, the government filed an
application to intervene in support of Lockheed’s position that indirect payments for response
costs through government contracts does not reduce or eliminate insurance coverage under the
government reimbursement exclusion. (PX2069 ¶¶ 25-26 (Porterfield Decl.).) The federal court
dismissed Lockheed’s action for lack of subject matter jurisdiction, and the state court entered
31
final judgment on October 22, 2003. (Id. ¶¶ 27-28.) Lockheed immediately appealed, and on
November 22, 2005, the California Court of Appeal affirmed the trial court’s decision. See
Lockheed Corp. v. Cont’l Ins. Co., 35 Cal. Rptr. 3d 799 (Cal. Ct. App. 2005). The Supreme
Court of California denied Lockheed’s petition for review on March 22, 2006, and the parties
subsequently entered into a confidential settlement agreement whereby the insurers “bought
back” the disputed policies. (Trial Tr. at 479 (Lockheed counsel); PX2069 ¶ 31 (Porterfield
Decl.); PX2075-76.) The proceeds from that agreement were credited to the DiscOps Pool.
(Trial Tr. at 1455-56 (Lockheed counsel).)
In 1995, Lockheed sued Seven W Enterprises, which at the time operated a
manufacturing facility on a portion of the Redlands facility, for recovery of response costs
incurred for the Redlands TCE plume. See Lockheed Martin Corp. v. Seven W Enterprises, 95-
cv-6153, Complaint (C.D. Cal. Sept. 14, 1995). Pursuant to a confidential settlement in late
1996, Lockheed indemnified Seven W from future liability in exchange for a lump sum payment.
Lockheed credited the amount recovered under this confidential agreement to the DiscOps Pool.
(Trial Tr. at 476-77 (Lockheed counsel).)
That same year, a group of plaintiffs filed a toxic tort class action suit against Lockheed
seeking medical monitoring costs and punitive damages based on the contamination of drinking
water from the Redlands TCE plume. See Lockheed Martin Corp. v. Superior Court, 63 P.3d
913, 916 (2003). The California Court of Appeal reversed the trial court’s class certification and,
in 2003, the Supreme Court of California affirmed. Id. at 922. The case settled some ten years
later, while the second bellwether group of plaintiffs was seeking class certification. (Trial Tr. at
372-73 (Lockheed counsel).) Under the DOSA, Lockheed’s payments pursuant to its
32
confidential settlement of the toxic tort action are specifically allowable as indirect costs charged
to the DiscOps Pool. (USX1033 ¶1.8.)
Finally, in 2004, Lockheed – sponsored by The Boeing Company – pursued an appeal
under the Contracts Dispute Act, 41 U.S.C. § 7101 et seq., to the Armed Services Board of
Contract Appeals (“ASBCA”) seeking indemnification from the government for response costs
and toxic tort liabilities at the Sites arising out of LPC’s performance of SRAM production
contracts from 1971 to 1975. See generally In re Boeing Co., ASBCA No. 54853, 06-1 BCA ¶
33,270 (Apr. 12, 2006).28 Lockheed sought indemnification under provisions in its SRAM
production subcontracts that provided for government indemnification for certain claims or
losses resulting from “unusually hazardous” risks. See id. After several rulings on cross-
motions for partial summary judgment, see, e.g., Appeal of the Boeing Co., ASBCA No. 54853,
11-2 B.C.A. ¶ 34,813 (July 28, 2011), the parties filed summary judgment briefs on whether
environmental response costs arising out of LPC’s solid propellant rocket motor production were
“unusually hazardous risks.” (Trial Tr. at 374-75 (government counsel).) On April 15, 2013,
after the toxic tort settlement and before the ASBCA could rule on those motions, Lockheed
(through Boeing) voluntarily dismissed its appeal with prejudice. (USX74.)
B. The government’s partial motion for summary judgment
Meanwhile, after over fourteen years of cleanup actions at the Redlands facility, on July
1, 2008, Lockheed brought this action against the United States under CERCLA § 107(a). The
government filed a counterclaim against Lockheed under CERCLA § 113(f) seeking, to the
extent it was a PRP, equitable allocation of response costs between the parties.
28
Boeing sponsored LPC’s claim because Boeing was the prime contractor for the SRAM
production contracts. (Trial Tr. at 371 (Lockheed counsel).)
33
Several months later, the government moved for a partial summary judgment on the
ground that Lockheed could not recover under CERCLA § 107(a) those response costs for the
Sites that it had already recovered through indirect costs charged to the DiscOps and passed
through to government contracts. (Mot. for Partial Summ. J., Jan. 9, 2009 [Dkt. No. 25-2] at 10.)
The government contended that Lockheed’s recovery of costs under CERCLA, for which the
government-as-client (primarily the DOD) had already indirectly paid pursuant to the DOSA,
would result in a double recovery – a violation of both the DOSA and CERCLA. See 42 U.S.C.
§ 9614(b).
On September 29, 2009, Judge Robertson rejected the government’s legal arguments on
several grounds. See Lockheed Martin Corp. v. United States, 664 F. Supp. 2d 14 (D.D.C.
2009). Judge Robertson first distinguished the bar on double recovery in CERCLA § 114(b)
from the present case. Section 114(b) states that “[a]ny person who receives compensation for
removal costs or damages or claims pursuant to any other Federal or State law shall be precluded
from receiving compensation for the same removal costs or damages or claims as provided in
[CERCLA].” 42 U.S.C. § 9614(b). Judge Robertson faulted the government’s argument for
failing appreciate the distinction between the “government-as-client” and the “government-as-
PRP.” To Judge Robertson, the government-as-client’s indirect cost payments under
government contracts were not “compensation” for the government’s liability in the same
manner as direct payments from an insurer, private PRP, or government PRP. Lockheed Martin
Corp., 664 F. Supp. 2d at 19. Judge Robertson further noted that the DOSA “explicitly states
that it ‘does not settle claims, if any, arising under CERCLA.’” Id.
Judge Robertson also distinguished the double recovery cases cited by the government.
In those cases, plaintiffs sought to recover response costs which they had already recovered from
34
other PRPs (through settlement or state-law versions of CERCLA) or response costs which their
insurers had paid for directly. Id. The courts in those cases applied CERCLA section 114(b) in
order to prevent plaintiffs from receiving “a windfall from its environmental cleanup.” Id.
Judge Robertson concluded that there would be “no windfall” in this case because Lockheed was
required under both the DOSA and the FAR to credit any CERCLA recovery from the
government to the DiscOps Pool. Id. at 19-20. Thus, “any CERCLA recovery from the
government would lead to a commensurate reduction in the [DiscOps Pool] that Lockheed could
charge as indirect costs on its government contracts. From a monetary standpoint, Lockheed
would be back where it started.” Id. at 19.
Judge Robertson also emphasized the “important implications for both parties” –
Lockheed would “improve its competitive position” and the government-as-client would benefit
from decreased contract prices. Id. at 20. Accordingly, Judge Robertson concluded:
If Lockheed is only partially liable for the response costs it is incurring at the Site,
it should not have to include all its response costs in the [DiscOps] Pool. The
ruling on the instant motions ensures that Lockheed may recover separately under
CERCLA from the government-as-PRP (if the suit ends with a recovery),
burdened in its dealings with the government-as-client only by those costs for
which it is actually liable.
Id.
On October 22, 2009, the government moved for reconsideration, inter alia, on the
grounds that Judge Robertson improperly imported requirements, such as the potential for
“windfall,” into the language of CERCLA § 114(b) and failed to address the argument that
Lockheed’s indirect recovery of response costs through government contracts could be
considered as an equitable factor during allocation of response costs under CERCLA § 113(f)(1).
(Mot. for Reconsideration, Oct. 22, 2009 [Dkt. No. 39] at 2-3.)
35
Judge Robertson denied the motion on February 18, 2010. (Mem. Order, Feb. 18, 2010
[Dkt. No. 43] at 2-3.) While remaining steadfast in his denial of summary judgment, Judge
Robertson acknowledged that some of the government’s positions, “including those about the
equitable considerations under Section 113(f)(1) and burden to taxpayers, may be relevant to
allocation determinations that might lie ahead in this litigation.” (Id. at 3.)29 Judge Robertson
therefore left open the door to the equitable double recovery and taxpayer burden arguments that
are now at the center of the allocation phase of the case.30
C. Trial on equitable allocation
The parties engaged in extensive factual and expert discovery over the next four years.
On September 26, 2013, the Court bifurcated the pending trial into two phases: (1) the parties’
liability as PRPs under CERCLA § 107(a) and the equitable allocation of response costs under
CERCLA § 113(f); and (2) the “accurate accounting” of response costs. (Order, Sept. 26, 2013
[Dkt. No. 97] at 2.) The Court scheduled a two-week bench trial for Phase I to begin on
February 10, 2014. (Id.)
Leading up to the trial, the parties stipulated that they were both PRPs liable under
CERCLA § 107(a) for the response costs that Lockheed had incurred at the Sites and that the
Court should allocate liability for the response costs between them according to equitable
principles under CERCLA § 113(f)(1). (Stipulation on Liability, Dec. 20, 2013 [Dkt. No. 103] at
2-3.) The parties also stipulated that, as required under CERCLA, Lockheed had incurred at
least one dollar of “necessary costs of response” at the Sites in a manner “consistent with the
29
In Raytheon (cited supra n. 21), the government raised an affirmative defense analogous to that
rejected by Judge Robertson in this case. 2007 WL 4300221, at *2-3. As Judge Robertson did, the judge
in Raytheon concluded that Raytheon’s indirect recovery of response costs through U.S.-government
contracts could be considered as an equitable matter. Id. at *3. However, as noted, the Raytheon case
settled before the issue of allocation was reached.
30
Following Judge Robertson’s retirement, the case was reassigned to this Court on June 3, 2010.
36
National Contingency Plan.” (Stipulation on Response Costs, Dec. 20, 2013 [Dkt. No. 104] at 1-
2 (quoting 42 U.S.C. § 9607(a)(4)(B)).)
Given the stipulations on liability, the Phase I bench trial concerned only the equitable
allocation of liability under CERCLA § 113(f)(1). The Court presided over the Phase I bench
trial over twelve days beginning February 10 and ending on March 14, 2014. Through no fault
of the parties or their counsel, the evidence at the trial was both voluminous and inconclusive in
many significant respects. Arguably, the most useful testimony came from the only two
witnesses who had been on the ground during LPC’s operations at the Sites, but even those
witnesses had limited recollections. (See, e.g., Trial Tr. at 95 (Oppliger); id. at 1374 (Dull).)
Otherwise, the record suffered from the many shortcomings inherent in CERCLA actions:
hundreds of missing contracts31 and significant gaps in the documents; a lack of
contemporaneous accounts of waste disposal operations at the Sites; almost no fact witnesses,
thus requiring extensive reliance on “historic” depositions, themselves taken some twenty to
thirty years after operations at the Sites; and contamination that, at least at the Redlands facility,
had migrated miles from the location of original disposals. In view of these evidentiary
constraints, the parties understandably relied almost exclusively on experts. The experts, who
provided direct testimony by declaration and were subject to cross examination and redirect at
trial, predictably presented diametrically opposed opinions regarding almost every important
subject, often relying on assumptions that were not sufficiently provable for the Court to draw
any reliable conclusions.
31
Out of the estimated hundreds or thousands of contracts relevant to this action, Lockheed’s
contracting expert had reviewed “perhaps three” and could not confirm that any contract he had reviewed
was actually complete. (Trial Tr. at 148-49 (Johnson).) Without contracts themselves, the experts had to
rely on Master Project Orders and documentation of contract revisions to attempt to piece together the
“very limited database” of contracts available in this case. (Id. at 149.)
37
The testimony and evidence presented at trial addressed five somewhat-overlapping
issues, and as could be expected, on each issue save one, the Court had a battle of the experts.
First, Dr. Peter Roman, Lockheed’s expert historian, provided a mostly undisputed account of
the history of the solid rocket propellant industry and LPC’s government contracts. Second, the
parties presented evidence of the degree of government activity at and control over the Sites with
respect to government specifications, safety manuals, project reviews, and safety inspections.
Each party also called a fact witness to describe the government’s presence at the Sites. Mr.
Gerald Oppliger testified about his experiences working as an engineering analyst for LPC
designing rockets for several government contracts, including SRAM, from 1962 to 1971. (Trial
Tr. at 74-77 (Oppliger).) Mr. Peter Dull testified about his work on SRAM as a propulsion
engineer for the SPO from the program’s inception to Lockheed’s delivery of the rockets. (Id. at
1337-38 (Dull).) Third, the parties put on dueling experts relating to the subject of government
contracting – Mr. Richard Johnson (for Lockheed) and Mr. James Nagel (for the government) –
who provided opinions on whether and to what extent the government, through contracting
regulations, owned the TCE and AP at the Sites.
Fourth, the parties spent an excessively large amount of trial time on the issues of
contamination and, in particular, which of LPC’s activities caused it. Lockheed called Thomas
Blackman to provide foundational testimony regarding the contamination and response actions at
the Redlands facility. Both parties then put on multiple experts. Lockheed’s primary expert, Dr.
Stanley Feenstra, a hydrogeologist, opined on the probable sources of TCE (vapor degreaser) and
perchlorate contamination (burn pits) at the Sites and the level of care with which LPC handled
its solvent and propellant wastes. Dr. Tod Delaney, an environmental engineer, provided a
rebuttal opinion to the government expert opinion from Thomas Cain, a chemical and process
38
engineer, regarding the sources of perchlorate contamination from the southern half of the
Redlands facility. The government’s primary expert, Dr. Robert Sterrett, a hydrogeologist,
opined primarily on probable sources of TCE (employee dumping) and perchlorate
contamination (burn pits and grinder part washing) at the Sites, while Mr. David Bauer, a
chemist, opined on the level of care with which LPC handled its solvent and propellant wastes.
The government also called Ms. Mary Sitton as an aerial photography expert who analyzed
historical aerial photographs of the Sites for evidence of sources of pollution. Of the myriad,
though incomplete, sources available to them, the experts relied primarily on LPC’s process
specifications, engineering diagrams of buildings and equipment, and the historic deposition
testimony of dozens of former LPC workers. The experts also relied on their own personal
experiences and general industrial and military practices at the time. Nonetheless, the ultimate
expert opinions often amounted to no more than exercises in reasoned speculation.
Finally, the parties spent a significant amount of trial on the accounting and economic
issues that make this case unique. Lockheed called Mr. Robert Gatchel, Lockheed’s current vice
president of government finance, to describe the implementation of the DOSA and Lockheed’s
government contracting procedures. Each party also called two experts to address the DOSA,
double recovery, and Lockheed’s economic benefit from a CERCLA recovery in this case. For
the government, Mr. Wiley Wright opined on the general function of DOSA, and Dr. Joan Meyer
presented an economic model demonstrating the benefit to Lockheed from various CERCLA
recovery scenarios. Lockheed’s experts, Mr. Mark Kiefer and Mr. Rodney Mateer, criticized the
assumptions and methodologies of the government experts, but provided no competing economic
model to substantiate their position that Lockheed would not economically benefit from a
CERCLA recovery in this case.
39
The difficulty of an incomplete record and heavy reliance on expert testimony was
compounded by the lack of analogous CERCLA cases.32 While many CERCLA actions have
been brought by government contractors against the U.S. government, only a few appear to have
reached the allocation stage. And none of those address the key issue in this case: whether the
fact that the government contractor has been indirectly recovering its response costs from the
U.S. government-as-client through U.S.-government contracts should, as an equitable
consideration, reduce its recovery from the U.S. government-as-PRP under CERCLA.
LEGAL FRAMEWORK
Congress enacted CERCLA “in response to the serious environmental and health risks
posed by industrial pollution.” United States v. Bestfoods, 524 U.S. 51, 55 (1998). The statute
“was designed to promote the timely cleanup of hazardous waste sites and to ensure that the
costs of such cleanup efforts were borne by those responsible for the contamination.” Burlington
N. & Santa Fe Ry. Co. v. United States, 556 U.S. 599, 602 (2009) (internal quotation marks
omitted). By requiring responsible parties to pay for cleanup efforts, CERCLA also ensures that
“the taxpayers [are] not required to shoulder the financial burden of a nationwide cleanup.” B.F.
Goodrich Co. v. Murtha, 958 F.2d 1192, 1198 (2d Cir. 1992).
In furtherance of these goals, CERCLA allows private parties to recover the costs of
cleaning up hazardous wastes from several broad categories of PRPs. 42 U.S.C. § 9607(a)(1)-
(4).33 Liability under these provisions is strict and, by default, joint and several. PCS Nitrogen
32
At the Court’s request, the parties filed several helpful memoranda on legal issues, including
operator and arranger liability, equitable indemnification, double recovery, and prejudgment interest.
33
A private-party plaintiff establishes a prima facie case for cost recovery under CERCLA by
establishing that (1) the defendant is a PRP; (2) the site constitutes a “facility”; (3) a “release” or a
threatened release of hazardous substances exists at the “facility”; (4) the plaintiff has incurred costs
responding to the release or threatened release of hazardous substances (“response costs”); and (5) the
response costs conform to the National Contingency Plan. PCS Nitrogen Inc. v. Ashley II of Charleston
40
Inc. v. Ashley II of Charleston LLC, 714 F.3d 161, 168 (4th Cir. 2013). Relevant to this action,
PRPs include any past “owner” or “operator” and any “arranger.” See 42 U.S.C. § 9607(a)(2)-
(3).34
Under CERCLA, a person is liable as a past “owner” or “operator” if he “at the time of
disposal of any hazardous substance owned or operated any facility at which such hazardous
substances were disposed of.” Id. § 9607(a)(2). The phrase “owner or operator” is unhelpfully
defined “only by tautology . . . as ‘any person owning or operating’ a facility.” Bestfoods, 524
U.S. at 56 (quoting 42 U.S.C. § 9601(20)(A)(ii)). Courts consider “owner” and “operator”
liabilities in the disjunctive. Commander Oil Corp. v. Barlo Equip. Corp., 215 F.3d 321, 328 (2d
Cir. 2000); cf. Bestfoods, 524 U.S. at 64. In this regard, past owner liability is fairly simple, and
premised on the ownership, whether de facto or de jure, of a “‘facility’ at the time of the disposal
of a hazardous substance.” PCS Nitrogen, 714 F.3d at 172 (citing 42 U.S.C. § 9607(a)(2)); see
Commander Oil, 215 F.3d at 331-32.35 Notably, the ownership of the hazardous substances
disposed of at a given facility is irrelevant to ownership liability. See 42 U.S.C. § 9607(a)(2).
LLC, 714 F.3d 161, 167-68 (4th Cir. 2013); see also 42 U.S.C. §§ 9601(9), (22), 9607(a). Each of these
requirements is stipulated to or otherwise undisputed in this case. (See Stipulation on Liability, Dec. 20,
2013 [Dkt. No. 103]; Stipulation on Response Costs, Dec. 20, 2013 [Dkt. No. 104].)
34
Because both parties have stipulated to liability under CERCLA § 107(a), the Court need not
determine under which provision(s) each party falls. Nonetheless, the Court does find it useful to
consider the breadth (and limits) of types of PRP liability when balancing the equities under CERCLA §
113(f).
35
Under CERCLA, the term “facility” has two meanings. First, the term “facility” serves as a
catch-all for almost any original source from which a disposal might have occurred. See 42 U.S.C. §
9601(9)(A) (defining “facility” as “any building, structure, installation, equipment, pipe or pipeline
(including any pipe into a sewer or publicly owned treatment works), well, pit, pond, lagoon,
impoundment, ditch, landfill, storage container, motor vehicle, rolling stock, or aircraft”). Second, the
term “facility” includes “any site or area where a hazardous substance has been deposited, stored,
disposed of, or placed, or otherwise come to be located.” Id. § 9601(9)(B). Courts have interpreted this
second meaning to cover, at a minimum, “‘the bounds of the contamination.’” See PCS Nitrogen, 714
F.3d at 178 (quoting United States v. Twp. of Brighton, 153 F.3d 307, 313 (6th Cir. 1998)). Thus, “[t]here
may be several ‘facilities’ at a site for purposes of CERCLA, including separately owned ‘equipment’
41
Operator liability is more nuanced, but Bestfoods provides some helpful guidance. There,
the Supreme Court clarified that when defining “operator” liability under CERCLA, Congress
“obviously meant something more than mere mechanical activation of pumps and valves” and
intended liability to extend to those who “exercise . . . direction over the facility’s activities.”
524 U.S. at 71. On this basis, the Court concluded that an operator under CERCLA must
“manage, direct, or conduct operations specifically related to pollution, that is, operations having
to do with the leakage or disposal of hazardous waste, or decisions about compliance with
environmental regulations.” Id. at 66-67. The definition of “operator” in Bestfoods “clearly
requires actual participation, not merely the potential to do so.” City of Wichita, Kansas v.
Trustees of APCO Oil Corp. Liquidating Trust, 306 F. Supp. 2d 1040, 1054 (D. Kan. 2003); see
also United States v. Twp. of Brighton, 153 F.3d 307, 314 (6th Cir. 1998) (describing Bestfoods
as “highlight[ing] the importance of establishing some actual control by a putative operator”).
Although “actual participation” in this sense “does not require a finding that the [defendant]
directly participated in the day-to-day activities” at the facility, see United States v. Kayser-Roth
Corp., 103 F. Supp. 2d 74, 82 (D.R.I. 2000), Bestfoods requires that an operator “make the
relevant decisions” regarding the disposal of hazardous wastes “on a frequent, typically day-to-
day basis.” City of Wichita, 306 F. Supp. 2d at 1055 (collecting cases).
Arranger liability generally “prevents owners of hazardous waste from avoiding liability
under CERCLA by transferring ownership of the waste to another party for the purposes of
disposal.” Wilson Rd. Dev. Corp. v. Fronabarger Concreters, Inc., -- F. Supp. 2d. ---, 2013 WL
4875071, at *6 (E.D. Mo. Sept. 11, 2013). CERCLA defines “arranger” as “any person who by
within a larger facility,” Am. Int’l Specialty Lines Ins. Co. v. United States, 2010 WL 2635768, at *21
(C.D. Cal. June 30, 2010), as well as the location where the contamination has migrated over time. In this
regard, the “facilities” in this case include not only any historic sources of contamination at the Redlands,
Potrero Canyon, and LaBorde Canyon properties, but also the area of the Redlands TCE and perchlorate
plumes.
42
contract, agreement, or otherwise arranged for disposal or treatment, or arranged with a
transporter for transport for disposal or treatment, of hazardous substances owned or possessed
by such person, by any other party or entity, at any facility or incineration vessel owned or
operated by another party or entity and containing such hazardous substances.” 42 U.S.C. §
9607(a)(3).
Arranger liability requires ownership or possession of hazardous substances, but “cannot
be imposed on that basis alone.” Morton Int’l, Inc. v. A.E. Staley Mfg. Co., 343 F.3d 669, 679
(3d Cir. 2003).36 Instead, as the Supreme Court clarified in Burlington Northern, “whether an
entity is an arranger requires a fact-intensive inquiry that looks beyond the parties’
characterization of the transaction as a ‘disposal’ or a ‘sale’ and seeks to discern whether the
arrangement was one Congress intended to fall within the scope of CERCLA’s strict-liability
provisions.” 556 U.S. at 610. Under the plain language of the statute, a person is only an
arranger if he “plans for” or “takes intentional steps to dispose of a hazardous substance” he
owned or possessed. Id. at 611. Accordingly, although knowledge that a hazardous substance
will be disposed of “may provide evidence of the entity’s intent to dispose of its hazardous
wastes, knowledge alone is insufficient to prove that an entity ‘planned for’ the disposal,
particularly when the disposal occurs as a peripheral result of a legitimate” transaction, such as
the sale of a useful product. Id. at 612. Courts oftentimes consider – as with operator liability –
a party’s exercise of control over the disposal of hazardous substances as “a crucial element of
the [fact-specific] determination of whether a party is an arranger.” See United States v. Shell
Oil Co., 294 F.3d 1045, 1055 (9th Cir. 2002).
36
But see United States v. Iron Mountain Mines, Inc., 881 F. Supp. 1432, 1451 (E.D. Cal. 1995)
(collecting cases where courts “impose[d] arranger liability on parties who did not literally own or
physically possess hazardous wastes,” but noting that “in each of these cases the party either was the
source of the pollution or managed its disposal by the arranger.”).
43
A plaintiff who is also a PRP theoretically may avoid CERCLA liability altogether by
imposing joint and several liability on a PRP-defendant under CERCLA § 107(a). However, the
PRP-defendant can “blunt any inequitable distribution of costs by filing a § 113(f) counterclaim”
against the PRP-plaintiff. United States v. Atl. Research Corp., 551 U.S. 128, 140 (2007). In
such instances – as here – a court must determine the allocation of liabilities between the PRPs
pursuant to CERCLA § 113(f)(1).
CERCLA § 113(f)(1) states that “[i]n resolving contribution claims, the court may
allocate response costs among liable parties using such equitable factors as the court determines
are appropriate.” 42 U.S.C. § 9613(f)(1). Courts have universally held that “[t]his plain
language grants a court significant discretion to choose which factors to consider in determining
equitable allocation of liability.” PCS Nitrogen Inc., 714 F.3d at 186; see also Boeing Co. v.
Cascade Corp., 207 F.3d 1177, 1187 (9th Cir. 2000). “[I]n any given case, a court may consider
several factors, a few factors, or only one determining factor . . . depending on the totality of
circumstances presented to the court.” Envtl. Transp. Sys., Inc. v. ENSCO, Inc., 969 F.2d 503,
509 (7th Cir. 1992).
“Courts generally trot out two lists of factors when considering allocation under
CERCLA.” Yankee Gas Servs. Co. v. UGI Utilities, Inc., 852 F. Supp. 2d 229, 247 (D. Conn.
2012). The first, the so-called “Gore Factors,” find their source in the legislative history (and
unsuccessful amendment) of CERCLA by then-Representative Al Gore. See Boeing, 207 F.3d at
1187. The “Gore Factors” include:
[1.] the ability of the parties to demonstrate that their contribution to a discharge, release
or disposal of a hazardous waste can be distinguished;
[2.] the amount of the hazardous waste involved;
[3.] the degree of toxicity of the hazardous waste involved;
44
[4.] the degree of involvement by the parties in the generation, transportation, treatment,
storage, or disposal of the hazardous waste;
[5.] the degree of care exercised by the parties with respect to the hazardous waste
concerned, taking into account the characteristics of such hazardous waste; and
[6.] the degree of cooperation by the parties with Federal, State or local officials to
prevent any harm to the public health or the environment.
Envtl. Transp. Sys., 969 F.2d at 508 (quoting United States v. A & F Materials Co., 578 F. Supp.
1249, 1256 (S.D. Ill. 1984)).
Courts also often invoke the so-called “Torres Factors,” named after the “critical factors”
enumerated by then-Judge Torres:
1. The extent to which cleanup costs are attributable to wastes for which a party
is responsible.
2. The party’s level of culpability.
3. The degree to which the party benefitted from disposal of the waste.
4. The party’s ability to pay its share of the cost.
United States v. Davis, 31 F.Supp.2d 45, 63 (D.R.I. 1998).37
Given the broad discretion granted in CERCLA § 113(f)(1), courts also look beyond the
Gore and Torres factors when equitably allocating response costs. See, e.g., Am. Int’l Specialty
Lines Ins. Co. v. United States (AISLIC II), 2013 WL 135405, at *9 (C.D. Cal. Jan. 9, 2013). Of
relevance to this case, courts have also considered the following factors under CERCLA §
113(f)(1):
37
Some scholars have argued that while “[t]he Gore factors are most relevant in academic and
theoretical analysis of the way Superfund liabilities should be allocated. . . . in the real world Judge
Torres’ list of four critical factors often provides the basis upon which Superfund allocations are made.”
Robert P. Dahlquist, Making Sense of Superfund Allocation Decisions: The Rough Justice of Negotiated
and Litigated Allocations, 31 ENVTL. L. REP. 11098, 11099 (2001) (emphasis added); see also Yankee
Gas, 852 F. Supp. 2d at 247.
45
1. The “knowledge and/or acquiescence of the parties in the contaminating
activities.” Weyerhaeuser Co. v. Koppers Co., 771 F.Supp. 1420, 1426 (D. Md.
1991).
2. The value of the contamination-causing activities to furthering the
government’s national defense efforts. Cadillac Fairview/Cal., Inc. v. Dow
Chemical Co., 299 F.3d 1019, 1026 (9th Cir. 2002); Shell Oil, 294 F.3d at 1060.
3. The existence of an indemnification agreement demonstrating “the parties’
parties’ intent to allocate liability among themselves.” Halliburton Energy Servs.,
Inc. v. NL Indus., 648 F. Supp. 2d 840, 863 (S.D. Tex. 2009); see also Beazer E.,
Inc. v. Mead Corp., 412 F.3d 429, 447 (3d Cir. 2005).
4. “The financial benefit that a party may gain from remediation of a site.” Litgo
New Jersey, Inc. v. Martin, 2011 WL 65933, at *9 (D.N.J. Jan. 7, 2011); see also
City of Wichita, 306 F. Supp. 2d at 1101.
5. The potential for windfall “double recoveries” by a plaintiff. See, e.g., Litgo
N.J. Inc. v. Comm’r N.J. Dep’t of Envtl. Prot., 725 F.3d 369, 391 (3d Cir. 2013);
Friedland v. TIC-The Indus. Co., 566 F.3d 1203, 1207 (10th Cir. 2009).
6. The potential that a plaintiff might “make a profit on the contamination” at the
expense of another PRP. See Vine St., LLC v. Keeling ex rel. Estate of Keeling,
460 F. Supp. 2d 728, 765 (E.D. Tex. 2006).
7. CERCLA’s intent that “‘responsible parties, rather than taxpayers, bear the
costs’” of cleanup. Yankee Gas, 852 F. Supp. 2d at 256 (quoting Marsh v.
Rosenbloom, 499 F.3d 165, 182 (2d Cir. 2007) (emphasis added)).
With these factors in mind, the Court now turns to the ultimate question before it: the equitable
allocation between Lockheed and the government of past and future response costs at the Sites.
FINDINGS OF FACT AND CONCLUSIONS OF LAW
To reach an equitable allocation for the Sites, the Court proceeds in three steps. First, the
Court determines, to the extent possible, the sources of contamination at the Sites. From there,
the Court bifurcates its equitable allocation analysis to consider (1) the familiar exercise of
allocating response costs among parties and (2) the novel issue of whether Lockheed’s indirect
46
recovery of those response costs through U.S-government contracts should affect the otherwise-
equitable allocation.
I. SOURCES OF CONTAMINATION AT THE SITES
Although in many cases courts can find that a particular facility, party, or disposal action
was responsible for a specific proportion of contamination at a site, see, e.g., AlliedSignal, Inc. v.
Amcast Int’l Corp., 177 F. Supp. 2d 713, 724 (S.D. Ohio 2001), the Court is unable to do so here
given the gaping holes in the record. Instead, the Court must limit itself to determining the
probable sources of perchlorate and TCE contamination at the three Sites.
A. Redlands facility
1. Perchlorate
The parties agree that a significant proportion of the perchlorate contamination in the
Redlands perchlorate plume originated from the burning of propellant wastes in the burn pits in
the northern portion of the Redlands facility. (Feenstra Decl. ¶¶ 123, 127; Sterrett Decl. ¶¶ 17,
136-41.) As described by Dr. Sterrett, the “burn pits were essentially trenches dug in the bare
ground.” (Sterrett Decl. ¶ 136.) LPC employees burned propellant wastes, containing waste AP
in liquid and solid form, on a daily basis. (USX963.0086 (Speer Decl.).)
The operation of the burn pits contributed perchlorate to the Redlands perchlorate plume
because, unbeknownst to anyone at the time, the AP disposed of in the pits was not completely
destroyed by burning. (Trial Tr. at 730 (Feenstra); see PX1224 at 10.) Any AP residue
remaining in the pits after burning could dissolve in a solvent (including water) and infiltrate
through the porous soil down into the groundwater. (See Feenstra Decl. ¶ 126; PX1224 at 10).
Dissolution of residue AP occurred during rainfall events (Feenstra Decl. ¶ 126) and when LPC
47
operators “thoroughly soaked with water” the burn pits when used multiple times in a day. (See
PX0007 § 1505(d) (1968 DOD Safety Manual).)
The presence of perchlorate in groundwater wells in the southern portion of the Redlands
facility also suggests the existence of perchlorate sources unassociated with the burn pits.
(Feenstra Decl. ¶¶ 122, 148, 153.) The parties vigorously dispute the southern source of the
perchlorate at the facility. The Court finds that there were three probable sources.38
First, beginning as early as November 1958, liquid solvent and AP wastes drained onto
the ground outside of Building 52, where LPC mixed propellants.39 (Sterrett Decl. ¶¶ 146-47.)
At that time, a pipe intended to connect Building 52 to Evaporation Pit 61 only “drained toward”
the pit, even though LPC recognized that it “should be piped right into [the] pit.” (USX43.0002
(emphasis in original).) An October 16, 1959 aerial photograph showed staining and liquid
38
Contrary to Dr. Feenstra’s opinion (Feenstra Decl. ¶¶ 148-49), neither fugitive dust from AP
handling and processing nor leakage from evaporation pits were probable sources of perchlorate in the
Redlands plume. While some fugitive dust inevitably escaped the grinding buildings at the Redlands
facility – particularly in the 1950s (see USX1160.0006, .0012-14) prior to the installation of advanced
baghouse technologies (see USX1117) – prevailing winds would have spread the light, small AP dust
particles far and wide before they settled onto the ground. (Cain Decl. ¶¶ 45-47.) Spread so far, it is
unlikely the AP dust, once settled and dissolved by rainfall, could develop a wetted pathway necessary to
migrate through the soil to the groundwater. Similarly, there is no evidence that the evaporation pits at
the Redlands facility ever leaked (Feenstra Decl. ¶ 150; see also Trial Tr. at 1252-53 (Sterrett)), nor any
evidence that AP-laden wastewater from the “soaking out” of rocket motors in the evaporation pits was
disposed of on the ground. (See Feenstra Decl. ¶ 152.)
Nor, contrary to Dr. Sterrett and Mr. Cain’s opinion (Sterrett Decl. ¶¶ 142-44; Cain Decl. ¶¶ 108-
15), was Building 114’s settling basin a probable source of perchlorate in the Redlands plume. LPC used
Building 114 as a propellant research laboratory from which it discharged approximately 2500 gallons of
wastewater into a dedicated settling basin. (USX781.0001.) Each week during dry weather, LPC
pumped the water out of the settling basin “to an underground drain (storm sewer) catch basin” that
“traverse[d] . . . into an open swale.” (Id.) From that point, the water ran “on open ground” and
infiltrated “due to the great percolation ability of the soil.” (Id.) Although LPC’s research laboratory
used AP (Trial Tr. at 1282-83 (Cain)), the effluent pumped from the settling basin was actually lower in
total dissolved solids (which would include AP) than the average groundwater in the area. (See id. at
1256-58, 1261 (Sterrett).) Based on this conflicting evidence, the Court cannot conclude that Building
114 was a probable source of perchlorate for the Redlands plume.
39
Because LPC used cyclohexane, and not TCE, as a solvent in Building 52 in the late 1950s
(USX43.0002), there is no evidence that this unconnected pipe was a source of the Redlands TCE plume.
48
within a drainage channel consistent with drainage from Building 52 toward rather than into
Evaporation Pit 61. (Sitton Decl. ¶ 34; USX670.) Although it is unclear precisely when LPC
addressed the problem it first recognized in late 1958,40 aerial photography confirms by at least
April 1963 a pipe did connect Building 52 to Evaporation Pit 61. (See Trial Tr. at 1434 (Sitton).)
Second, AP-laden wastewater percolated into the ground outside of several buildings
when LPC employees washed down the interiors of those buildings with hoses and failed to
collect the water or otherwise direct it to evaporation pits. (Sterrett Decl. ¶¶ 148-53; Cain Decl.
¶ 102; see Feenstra Decl. ¶ 151.) LPC employees washed down the interiors of grinding
buildings at the Redlands facility on a weekly basis. (See USX808.0022 (Building 77 Process
Specification); USX873 at 126-27 (Caldwell Dep.); USX973 at 157-58 (Spencer Dep.).) LPC
employees also washed down the interiors of the mixing buildings, although with less frequency.
(USX895 at 103-05 (Eastman Dep.).) For the portions of those buildings that did not have
drains, the AP-laden wastewater “ran out of the building” (id. at 101) and onto the ground
(USX994 at 115-16 (White Dep.), where it percolated into the soil and ultimately into the
groundwater. (Sterrett Decl. ¶ 153.)
The final – and most significant – source of perchlorate from the southern portion of the
Redlands facility was the washing of AP off of grinder parts and dust collection bags into the
south sump outside of Building 77. LPC operated Building 77 as an AP grinding facility. In
1962, LPC issued a manufacturing process standard – Standard 00COO5 – addressing cleanup
procedures for oxidizer grinding operations at Building 77. (USX32.) The Process Standard
instructed LPC employees after each grind to “flush[] with water” certain parts of the grinder “to
remove contamination.” (Id. at .0003.) The standard further specified that “[t]he flushing will
40
A July 11, 1960 letter from LPC to the Los Angeles Ordnance District suggests that the
unconnected pipe probably was addressed by that point. (See PX1046 at 2.)
49
be performed at the faucet and sump outside the lower level of Bldg. 77. Do not use water inside
the building.” (Id. (emphasis in original).) The same process was mandated for the washing of
the AP dust collection bags. (Id.; see also USX807.0031-33.)
Based on this process standard, both parties agree that after 1962, LPC washed AP dust
off of the grinder parts and bags outside of Building 77. However, the parties dispute into which
of the sumps on the west side of Building 77 the AP-contaminated washwater flowed. Mr. Cain
opined that LPC employees washed the grinder parts and bags on the concrete slab outside of
Building 77 and the washwater flowed naturally into the south sump, where it then percolated
into the ground through a drain or was pumped to the south to drain naturally on the bare ground
downhill and away from Building 77. (Cain Decl. ¶¶ 50-59, 79; see also Sterrett Decl. ¶¶ 125-
35.) In rebuttal, Mr. Delaney, Lockheed’s expert, opined that LPC employees washed the parts
directly over and into the north sump, which pumped the washwater to an evaporation pit.
(Delaney Decl. ¶¶ 38-50; see also Feenstra Decl. ¶¶ 109-21.)
The Court credits Mr. Cain’s opinion that the washwater from cleaning the grinder parts
and bags flowed to the south sump and ultimately percolated into the soil and migrated to the
groundwater. LPC’s process standards provided no clear instructions on precisely how to wash
the grinder parts and bags at the “at the faucet and sump” outside of Building 77 (see USX32 §
1.3),41 and the record lacks any evidence on how the workers actually performed the task. Mr.
Delaney opined that LPC employees must have washed the parts and bags directly over the 3-
foot by 3-foot north sump because they would have known that washing the parts over concrete
would have presented a fire and explosion hazard if the AP recrystallized before reaching the
south sump. (Delaney Decl. ¶¶ 28, 43-44.) Although Mr. Delaney’s concern has a scientific
41
Generally, wastewater containing AP was to be treated the same as waste propellant. (See, e.g.,
PX1023 § 6.31.1; PX1043 §100.6.5.)
50
basis (cf. Cain Decl. ¶ 49), he vastly overstates the safety consciousness of LPC’s employees.
Former employee Donald Eastman stated in a deposition that, when the workers washed AP-
laden wastewater out of grinding buildings, there was no effort to contain the water because “it
wasn’t considered a problem.” (USX895 at 101 (Eastman Dep.).) Likewise, the numerous other
instances of employees ignoring LPC-established safety protocols (see infra I.A.2) undermine
Mr. Delaney’s suggestion that those same employees would develop at Building 77 their own,
more burdensome, cleaning protocols in the name of safety. Ultimately, there is little evidence
to support the conclusion that the workers would on a near-daily basis spend the time and effort
to remove the heavy lid over the north sump and wash the parts and bags directly over that sump
when they had available the much easier process of washing the parts and bags over the concrete
pad and allowing the wastewater to flow naturally into the south sump. (See Trial Tr. at 1298-99
(Cain).)42
Moreover, two pieces of evidence support Mr. Cain’s opinion that washwater from
cleaning the grinder parts and bags flowed into the south sump. First, George Nelson White, a
maintenance mechanic at LPC from 1961 to 1975, stated that when the south sump reached
capacity, “it pumped the water up to the top of the dike out into the rocks. They’re all oxidizers
there.” (USX994 at 116 (White Dep.).) Second, and perhaps most persuasively, an April 16,
1966 aerial photograph shows an area of staining or standing liquid at the end of the drainage
channel down-gradient from the south sump fallout. (See Trial Tr. at 1412-13 (Sitton); Sitton
42
When Building 77 and its sumps were constructed, the washing of grinder parts occurred inside
the building. Because the top floor had an internal drain to the north sump and, ultimately, to an
evaporation pit, releases of AP-laden washwater onto the ground were minimal in the early years. (See
Trial Tr. at 1301 (Cain).) It was not until 1962, when, due to humidity concerns, LPC changed its process
specification to disallow washing inside Building 77. (Trial Tr. at 1300 (Cain); see also USX32 § 1.3).)
51
Decl. ¶ 41; USX672.)43 Because there had been no precipitation in the fifteen days prior to the
photograph (Sitton Decl. ¶ 42), the south sump would have only filled up and pumped water to
the outfall if LPC employees were washing grinder parts and bags into the south sump.
Based on this evidence, the Court finds that AP-laden washwater from LPC employees’
regular washing of grinder parts and bags outside of a Building 77 flowed into the south sump
and contributed significantly to the Redlands perchlorate plume.44
2. Trichloroethylene
The parties disagree vehemently as to the identity of the source of the Redlands TCE
plume. The government argues that the TCE originated primarily from LPC employees’
intentional dumping of solvents onto the bare ground at various locations at the Redlands
facility. (Trial Tr. at 897-98 (gov’t opening); Sterrett Decl. ¶¶ 54-75.) In contrast, Lockheed
asserts that the TCE primarily originated from discharges from a solvent-water separator
attached to the vapor degreaser in Building 91. (Trial Tr. at 42-43 (Lockheed opening); Feenstra
Decl. ¶¶ 63-95.)45 Having considered the evidence on these sources, the Court finds that both
probably contributed substantially to the Redlands TCE plume.
43
Lockheed suggested, based on an engineering drawing of Building 77 (PX837), that the water
from the south sump flowed northeast, rather than southwest, and thus the staining or standing liquid Ms.
Sitton identified could not have originated in the south sump. (See Trial Tr. at 1410 (Sitton).) However,
close inspection of the engineering drawing reveals that the “existing drainage” flowing to the northeast
had been “close[d] off” by the construction of a dyke. (PX837.) With the “existing drainage” to the
northeast closed off, the “sump drains over [the] dyke” (id.) to the southwest, consistent with Ms. Sitton’s
analysis of the aerial photography and the general topography at the Redlands facility.
44
Mr. Cain estimated that up to 20,000 pounds of the between 40,000 and 60,000 pounds of
perchlorate in the Redlands plume may have originated from the washing of AP dust collection bags at
Building 77. (Cain Decl. ¶ 92; see Sterrett Decl. ¶ 51.) The Court finds it unnecessary to decide on the
validity of his estimations; it suffices to say that the washing of grinder parts and bags outside of Building
77 contributed significantly to the Redlands perchlorate plume and thus cleanup costs at the Redlands
facility.
45
Although in his declaration Dr. Sterrett opined that TCE could have leaked into the ground
through cracks in the evaporation pits (Sterrett Decl. ¶ 78), he admitted on cross-examination that he had
52
First, the Court finds ample evidence that LPC employees poured TCE on the bare
ground and that those actions were a probable source of the Redlands TCE plume. (See Sterrett
Decl. ¶ 54.) Repeated pouring of small amounts of a liquid onto a porous and permeable soil can
create a “wetted pathway” by which a liquid’s chance of evaporation in the soil strata decreases
and newly dumped liquids move quickly and easily to groundwater. (Trial Tr. at 829 (Feenstra);
Sterrett Decl. ¶ 60.) The record is replete with credible historic depositions from LPC employees
admitting to frequently pouring TCE and other solvents on the bare ground in contravention of
company policy. (See PX961.) For example, Earl Wessman, a maintenance mechanic at the
Redlands facility from 1963 to 1975, testified that he dumped a quart to two gallons of TCE
daily at the same “very porous” bed of gravel north of Building 119, where the TCE would “sink
right in.” (USX989 at 188-90 (Wessman Dep.); USX990 at 419-420 (Wessman Dep.); see also
USX987 at 15-17 (Wessman Test.).) Likewise, Christian Mulder, a night shift operator at the
Redlands facility from 1956 to 1965, testified that he and his colleagues dumped one to two
gallons of TCE on the ground outside Buildings 8 and 12 “just about every night.” (USX941 at
34-35, 46-47 (Mulder Dep.).) Although Mulder and his colleagues knew of the availability of a
nearby evaporation pit for solvent disposal, they refused to walk there at night for fear of the
“rattlesnakes and tarantulas.” Instead, they poured the waste TCE on the ground. (Id. at 86-87.)
no evidence that cracks existed in the evaporation pits at the Redlands facility. (See Trial Tr. at 1252-53
(Sterrett).)
The parties’ experts also dispute whether burn pits were a minor source for the Redlands TCE
plume. (Compare Feenstra Decl. ¶¶ 40-46, with Sterrett Decl. ¶¶ 70-73.) Although LPC employees
poured small amounts of TCE directly into the burn pit at the Redlands facility (see USX944A.0002
(Nunes Decl.)), there is no evidence of TCE in the soil gas surrounding the burn pits. (See USX818.)
Thus, the Court credits Dr. Feenstra’s conclusion that the burn pits at the Redlands facility were not a
probable source of any sizable amount of TCE in the Redlands plume.
53
Several other LPC employees also admitted to intermittent pouring of TCE on the bare ground at
Redlands. (See Sterrett Decl. ¶¶ 68-72; USX944A.0002 (Nunes Decl.).)46
However, recognizing that some of the TCE poured onto the ground would have
evaporated before it could percolate into the soil (Trial Tr. at 820 (Feenstra)) and that LPC
shifted from using TCE to TCA as its preferred solvent in the mid-1960s (USX847 at 246-49
(Borgelt Dep.)), the Court concludes that it is improbable that LPC employee’s pouring of TCE
on the ground could account for the entirety of the Redlands TCE plume.
Instead, some portion of the TCE in the Redlands plume probably originated in the vapor
degreaser in Building 91. Vapor degreasers are used to clean grease and oil off of metal
instruments. Heating elements in the bottom of a vapor degreaser boil a “solvent liquid to
produce a zone of hot solvent vapor.” (Feenstra Decl. ¶ 64.) When degreaser operators place
cold metal parts into the vapor zone, either in a basket or on a chain, the vaporized solvent
condenses on and cleans the part. The “soiled” liquid solvent drips back down into the degreaser
sump, where it is reheated into a vapor. (Id. ¶ 65.) Solvent vapors that do not condense on the
metal parts are condensed by cooling coils on the perimeter of the degreaser tank. This
condensed liquid collects and is directed to a solvent-water separator. When functioning
properly, the solvent-water separator separates water that had condensed with the solvent from
the solvent and directs the solvent back into the main degreaser tank to revaporize. (Id. ¶¶ 64,
81.) Any condensed water will float and, once it reaches a certain level, it is released via a drain
onto the floor. (Trial Tr. at 833 (Feenstra).)
46
Dr. Feenstra questioned whether the employees could recall which solvent they had poured on
the ground decades before, or if, at the time of disposal, they could have distinguished between TCE and
TCA. (See Feenstra Decl. ¶ 32.) The Court finds Dr. Feenstra’s opinion in tension with Mr. Oppliger’s
testimony that LPC was a “very unique company” with a “lot of highly educated” and “attentive [and]
detail-oriented type people” (Trial Tr. at 85-86 (Oppliger)), and therefore, it credits the LPC employees’
identification of the solvents they dumped on the bare ground. (See Sterrett ¶¶ 58, 66.)
54
LPC operated the vapor degreaser in Building 91 to degrease rocket motor casings and
other large components. (See Feenstra Decl. ¶ 23.) Dr. Feenstra opined that the solvent-water
separator in the degreaser functioned improperly and released one-to-two gallons of watered-
downed or even pure TCE per day onto the floor of Building 91, which then flowed through a
drain directly into the subsurface soils. (Id. ¶¶ 76, 85-87; Trial Tr. at 817 (Feenstra); PX841
(diagram showing drain below vapor degreaser).).
The Court credits Dr. Feenstra’s theory. Vapor degreasers (and their solvent-water
separators) are common sources of solvent contamination at industrial and dry cleaning sites and
can release pure solvent into the environment. (Feenstra Decl. ¶ 84.) That there is no evidence
that any LPC employees noticed releases of small amounts of TCE from the solvent-water
separator is not surprising, considering the substantial TCE odor associated with the operation of
the degreaser, which was capable of boiling 120 gallons of TCE at a time, and the fact that
solvent-water separators release water onto the floor when functioning properly. (Trial Tr. at
685 (Feenstra).)
However, there is little evidence to support Dr. Feenstra’s opinion that the vapor
degreaser was the sole source of TCE in the Redlands plume. First, Dr. Feenstra’s opinion that
the solvent-water separator released exclusively pure TCE throughout LPC’s operations at the
Redlands facility lacks convincing support in the record. (Trial Tr. at 1185 (Sterrett); Sterrett
Decl. ¶ 109.) Second, the evidence indicates that LPC did not operate the vapor degreaser every
day or “with any great frequency.” (USX951 at 61 (Rodgers Dep.); USX995 at 117 (White
Dep.).) And finally, contrary to Dr. Feenstra’s opinion and Lockheed’s arguments, the Court
finds, based on Lockheed’s sworn statements in prior legal and administrative actions, that LPC
55
switched from using TCE to TCA in the vapor degreaser “about late 1966 or early 1967.”47
(USX22.0012-13 (Lockheed interrogatory responses in Seven W litigation); see also
USX120.0007-09 (response to request for information from California Department of Toxic
Substances Control).) Thus, while the Court credits Dr. Feenstra’s opinion that the solvent-water
separator on the vapor degreaser in Building 91 is a probable source of a significant portion of
the Redlands TCE plume, it is improbable that, as Dr. Feenstra opines, the vapor degreaser was
the only source. (See Feenstra Decl. ¶ 92.)48
B. Potrero Canyon facility
As described above, the sources of perchlorate contamination in the soil and groundwater
at the Potrero Canyon facility are undisputed. (See Trial Tr. at 1238-39 (Lockheed and
government counsel).) A primary source of contamination for both soil and groundwater is the
Burn Pit Area. (Sterrett ¶¶ 220-21, 226-27.) Some of the perchlorate contamination at the
Potrero Canyon Burn Pit Area, like at the Redlands facility, resulted from the fact that a burn
event would not completely destroy all of the AP, and some of the remaining AP residue
47
Lockheed attempted to disassociate itself from its prior sworn representations by arguing that
the representations were made “very early in [its] fact development.” (Trial Tr. at 1731-32 (Lockheed
closing).) The Court rejects Lockheed’s attempt to play fast-and-loose with its prior and at-the-time-
advantageous sworn representations regarding the switch from TCE to TCA in the vapor degreaser,
especially since Lockheed’s past position is corroborated by Larry Borgelt, who was a safety engineer for
LPC from 1966 to 1974. (See USX841 at 251-52 (Borgelt Dep.).)
48
The Court also concludes that the contribution, if any, of TCE from the Norton Air Force Base
TCE plume into the Redlands TCE plume is of no consequence. The map relied on by Dr. Feenstra that
showed the Norton and Redlands TCE plumes overlapping (see PX1972) demarcated the plumes using
TCE concentrations of 0.5 µg/L, ten times lower than California’s current maximum contaminant level
for TCE of 5 µg/L. (Sterrett Decl. ¶¶ 165, 209; see also Trial Tr. at 648-50 (Feenstra).) The two plumes
do not currently overlap at TCE concentration levels requiring cleanup, and to the extent that they
overlap, the commingling will not cause the TCE concentration in the Redlands TCE plume to increase
above the maximum contaminant level. (Trial Tr. at 653-54 (Feenstra).) Moreover, Lockheed failed to
demonstrate that contributions from the Norton Air Force Base TCE plume has caused in the past or
would cause in the future increased response costs for the Redlands TCE plume. (Id. at 655-56; Sterrett
Decl. ¶¶ 20-21, 209-10.)
56
dissolved in the rain and percolated into the soil and eventually the groundwater. (Cf. Trial Tr. at
730 (Feenstra); Sterrett Decl. ¶ 141; PX1224 at 10.)
However, the Court also finds that some of the perchlorate contamination at the Burn Pit
Area probably originated pre-burn. LPC operated the Burn Pit Area at Potrero Canyon much
differently than its burn pits at the Redlands facility. Rather than burning propellant wastes on a
daily basis, mere minutes after putting the wastes into the pit (see USX910 at 183-84 (Heeseman
Dep.); USX963 at 86 (Speer Dep.)), at the Potrero Canyon facility LPC accumulated wastes
(propellant, solvent, etc.) over months and burned them only a few times per year. (See
USX49.0074-75; USX53.)49 The pits were deeper than those at Redlands and the burns much
larger – each containing up to 250,000 pounds of wastes. (USX49.0074-76.)
Larry Borgelt, a safety engineer at LPC from 1966 to 1974, explicitly contrasted the
Redlands and Potrero Canyon burn pits (USX842 at 432-33 (Borgelt Dep.)), referring to the
latter as a “disposal area.” (USX841 at 318 (Borgelt Dep.).) In anticipation of a burn event, LPC
stored some wastes in drums on a concrete pad (USX49.0077), but also accumulated wastes
directly in the burn pits. (See Sterrett Decl. ¶ 228.) Some of the barrels accumulated in the pits
were leaking and some were emptied directly onto the ground. (USX841 at 318-19 (Borgelt
Dep.); USX842 at 432 (Borgelt Dep.).) These pre-burn event practices contributed to the
perchlorate contamination associated with the Burn Pit Area. Liquid wastes containing AP,
either poured directly into the burn pit or leaking out of barrels, percolated into the soil and
groundwater. Likewise, solid AP dumped into the burn pit weeks or months before a burn would
dissolve in the rain and infiltrate into the soil and groundwater. (Sterrett Decl. ¶ 230.)
49
This was only the case following the termination of the Large Solid Propellant Motor Program
in 1966. Prior to 1966, LPC burned materials on a daily or weekly basis. (Feenstra Decl. ¶ 156;
USX49.0076.)
57
LPC’s “hog out” procedures caused the perchlorate soil and groundwater contamination
associated with the Large Motor Washout Area and the Rocket Motor Production Area. (Sterrett
Decl. ¶¶ 220-21.) As described above, LPC washed propellant out of defective rocket motors
using high-pressure water jets to allow the reuse of the expensive metal rocket casings. (Feenstra
Decl. ¶ 164; USX49.0068; USX12.0050, .0055-56.) The propellant was hogged out onto the
bare ground where the AP leached out of the propellant, dissolved in the water, and percolated
into the soil and groundwater. (Sterrett ¶ 221; USX49.0068; cf. PX1067 at 4.) Today, hog out
procedures are a recognized source of perchlorate groundwater and soil contamination. (See
PX1224 at 10.) As Mr. Bauer testified, “if they hogged out on the ground, then it’s a source.”
(Trial Tr. at 1160 (Bauer).)
C. LaBorde Canyon facility
As with the Potrero Canyon facility, the parties do not dispute the sources of perchlorate
contamination at the LaBorde Canyon facility. (See Trial Tr. at 1238-39 (Lockheed and
government counsel).) Perchlorate contamination associated with the Test Bay Canyons
originated, as the name suggests, from rocket motor testing and firing operations. (Feenstra
Decl. ¶ 169; Sterrett Decl. ¶ 240.) Although it is unclear precisely by what mechanism AP from
the test-fired rocket motors ended up on the ground, the levels of perchlorate contamination
associated with the Test Bay Canyon indicate that the ground surface was “flood[ed]” with
“perchlorate-bearing water.” (Feenstra Decl. ¶ 169; see also Sterrett Decl. ¶ 240.) Dr. Feenstra
hypothesized that LPC may have “hogged-out” defective motors at the Test Bay Canyon.
(Feenstra Decl. ¶ 169.)
Perchlorate contamination associated with the Waste Discharge Area was caused, at least
in part, by LPC’s disposal of propellant wastes from its burn pits. (Feenstra Decl. ¶ 170; Sterrett
58
Decl. ¶ 241.) In 1962, the Santa Ana Regional Water Pollution Control Board issued a
Resolution to LPC to direct its operation of the Waste Discharge Area. (See PX1116.) Under
that Resolution, LPC was allowed to dispose of approximately 5000 gallons per year of
propellant waste that remained after burning in a burn pit. (PX1116 at 1-2.) As described above,
burning did not completely destroy all of the AP in propellant wastes. Thus, some of the AP
residue remaining in the wastes disposed of at the Waste Discharge Area dissolved in rainwater
and percolated into the soil and groundwater. (See Trial Tr. at 730 (Feenstra); Feenstra Decl. ¶
171; PX1224 at 10.)
II. TRADITIONAL EQUITABLE ALLOCATION
Because the parties have stipulated to liability, and substantially all of LPC’s operations
at the Sites were in performance of government contracts or subcontracts, the Court begins its
analysis by invoking the per capita approach: a fifty-fifty split between Lockheed and the
government. Cf. Davis, 31 F. Supp. 2d at 63-64 (describing the proper and improper times to
begin with a per capita approach). (See also Trial Tr. at 29-30 (Lockheed counsel advocating a
per capita approach); id. at 1931, 1941 (Lockheed closing).) From there, the Court adjusts the
equitable allocation based on its findings, keeping in mind that “[m]athematical precision in this
process is not realistically achievable or desirable.” United States v. Consolidation Coal Co.,
184 F. Supp. 2d 723, 744 (S.D. Ohio 2002).
A. Limited value of certain equitable factors
1. Waste attributable to each party
In many cases, “the dominant factor in determining each party’s equitable share of
liability is the extent to which the response costs are attributable to waste for which that party is
directly responsible.” Davis, 31 F. Supp. 2d at 64. This consideration, reflected in the first three
59
Gore Factors and the first Torres factor, is inapplicable here, for all of the perchlorate and TCE
contamination originated from LPC’s operation of the Sites in the performance of its government
contracts. It is therefore impossible to attribute even rough quantities of the perchlorate and TCE
contamination between the parties without delving into issues regarding the extent of the
government’s involvement in and control over waste disposal practices at the Sites. (See infra
Section II.B.-C.)
2. Parties’ relative benefits from waste disposal activities
“Fairness suggests that parties deriving greater benefit from disposal of hazardous waste
should bear a greater portion of the responsibility for mitigating its adverse effects.” Davis, 31
F. Supp. 2d at 66; see also Weyerhaeuser, 771 F. Supp. at 1426. The economic benefits to the
parties from LPC’s operations at the Sites were “roughly equal.” See AISLIC II, 2013 WL
135405, at *9. The government benefitted from LPC’s research and development and received
rockets supporting eight major Cold War-era programs, and LPC received payments for these
services and products. See id. Although LPC may not have reaped large profits from its
contracts with the government, it helped its parent corporation Lockheed Aircraft Corporation
establish a foothold in the rocket propulsion field, a position that Lockheed retains to this day.50
3. Degree of cooperation.
The sixth and final Gore factor considers “the degree of cooperation by the parties with
Federal, State or local officials to prevent any harm to the public health or the environment.”
Envtl. Transp. Sys., 969 F.2d at 508. Because non-cooperating parties can undermine
CERCLA’s goal of promoting quick and efficient cleanups, see Consolidation Coal, 184 F.
Supp. 2d at 751, “[t]he degree of cooperation with government officials to prevent any harm to
50
See Lockheed’s Memo. on the Benefit Received by Lockheed Propulsion Company, Feb. 20,
2014 [Dkt. No. 124] at 3-6; U.S. Memo. on the Benefit Received by Lockheed Propulsion Company, Feb.
23, 2014 [Dkt. No. 134] at 1-2.
60
the public health or the environment is very important in the contribution analysis.” Cent. Maine
Power, Co. v. F.J. O’Connor Co., 838 F. Supp. 641, 646 (D. Me. 1993). Lockheed argues that
because it has cooperated with California cleanup authorities since before remediation efforts
began, and the government did not admit liability until the eve of this trial, the “cooperation”
factor should favor Lockheed and disfavor the government. (Trial Tr. at 1939 (Lockheed
closing).)
However, Lockheed proceeds on a somewhat distorted view of the facts. Although
Lockheed has cooperated with the state authorities regarding cleanup at the Sites, it cooperation
can hardly be considered voluntarily. Lockheed denied liability for the Redlands TCE plume for
years (PX1677 ¶¶ 12, 36; Trial Tr. at 332 (Blackman)) and initiated cleanup efforts only after
ordered to do so by the Santa Ana Regional Water Quality Control Board. (Trial Tr. at 331-32
(Blackman).) For the government’s part, there is no evidence that any California state agency
ever asked the government to undertake response efforts, and neither Lockheed nor any other
party sought reimbursement from the government under CERCLA until this suit was filed in
2008. And while the government has not directly paid for any response costs yet, see
Consolidation Coal, 184 F. Supp. 2d at 751 (finding that a failure to pay for response costs or
actions prior to CERCLA suit relevant to whether the PRP meaningfully cooperated), its protests
against doing so are grounded primarily on the fact that it has already indirectly paid for the
majority of Lockheed’s response costs at the Sites. (See Meyer Decl. ¶ 29 fig. 5.).
In short, Lockheed was forced by cleanup and abatement orders to undertake its
remediation efforts, and the government has (albeit indirectly) footed most of the bill.51 On these
51
The fact that Lockheed has indirectly recovered through government contracts over 72% of its
past response costs for the Sites distinguishes this case from AISLIC II, in which that court concluded the
plaintiff’s cooperation with state regulatory authorities over a twenty-year period, without assistance from
61
facts, the Court cannot conclude that the government has been meaningfully uncooperative such
that it should receive an upward adjustment in its equitable allocation for the Sites.
4. The government’s ownership of waste
Pursuant to the government property clauses in its contracts with LPC, the government
owned an unknown, but undoubtedly sizable, amount of the AP and TCE that was disposed of at
the Sites. Under government contracting provisions, title will vest in the government for certain
property – including chemicals and other raw materials – purchased and used by a government
contractor. When title vests in the government generally depends on the type of contract and
whether contractor charges the property as a direct or indirect cost.
Under LPC’s cost-reimbursement contracts, such as the Apollo subcontract (PX104), title
vested in the government for property charged as a direct cost as soon as the property was
delivered to LPC, and title vested for property charged as indirect costs at the earliest of three
events, including LPC’s use of property in performance of the contract or the government’s
reimbursement of the cost to LPC. (Johnson Decl. ¶ 8.) For LPC’s fixed-price contracts with
progress payments, such as the SRAM production subcontracts, title vested in the government
for property charged as both direct and indirect costs upon the issuance of a progress payment to
LPC. However, title reverted back to LPC at the termination of the contract. (Id. ¶ 9; Nagle
Decl. ¶¶ 98, 103-105.)52
the federal government, necessitated a 5% increase in the government’s equitable share. See AISLIC II,
2013 WL 135405, at *5-6.
52
Government regulations did not require fixed-price contracts without a progress payment
clause (e.g., USX188) to include a government property clause. (Nagle Decl. ¶ 100-01.) Thus, LPC
owned and retained ownership of all AP and TCE used in its performance of those contracts. (See id. ¶
102.) Due to the limited record in this case (see supra n. 31), it is impossible to determine what
percentage of LPC’s contracts were fixed-price without a progress payment clause or what percentage of
AP and TCE wastes those contracts represented. (See Trial Tr. at 151-52, 156-57 (Johnson).)
62
LPC most likely charged most, if not all, AP as a direct cost and TCE as an indirect cost
to government contracts. (Johnson Decl. ¶ 20; Nagle Decl. ¶ 135.) Thus, title vested in the
government for both materials during some point in the manufacturing processes and, depending
on the contract type, remained vested in the government indefinitely (cost-reimbursement) or
until the end of the contract (fixed-price with progress payments). In either event, the
government retained title over at least some of the AP and TCE at the time of their disposal at
the Sites.53 Lockheed argues that the government’s ownership of the AP and TCE ultimately
disposed of at the Site should result in a higher equitable allocation for the government. (E.g.,
Trial Tr. at 33 (Lockheed opening).)
Merely owning the hazardous substances that caused response costs is, however,
insufficient for liability under CERCLA. See Morton Int’l, 343 F.3d at 679. Instead, a non-
disposing owner of a hazardous substance is generally liable only if he arranges for its disposal
or treatment by a third party. 42 U.S.C. § 9607(a)(3); see also Burlington N., 556 U.S. at 610-
11. The Court considers this distinction to be an important signal that, in passing CERCLA,
Congress was more interested in holding liable, where distinguishable, those who disposed of
and controlled the disposal of hazardous substances rather than those who owned them.
In its exercise of equitable discretion, the Court applies this distinction here. It is unclear
how much of the AP or TCE used (and disposed of) at the Sites the government actually owned.
While the government ownership was likely significant in absolute terms (e.g., pounds of AP or
53
Mr. Nagle, the government’s contracting expert, opined that “any title to materials acquired by
the government pursuant to a title vesting clause[] would not survive the consumption of the material in
the manufacturing process and, therefore, the government did not ‘retain’ title to waste generated by
[LPC] during contract performance.” (Nagle Decl. ¶ 143.) The Court is sympathetic to Mr. Nagle’s
pragmatic opinion that the title vesting clauses were not meant to extend to waste and shares his
reluctance to engage in a debate over the metaphysical question of who owns waste at the molecular level.
(See Trial Tr. at 1058 (Nagle).) However, from a textual standpoint, the contract clauses do not provide
automatic title reversion or automatic government abandonment for “waste” property. Thus, the Court
concludes that the government’s title in AP and TCE survives even after each becomes “waste.”
63
gallons of TCE), Lockheed’s government contracts expert could not conclude with a reasonable
degree of certainty that the government owned more than fifty percent of either AP or TCE used
at the Sites. (Trial Tr. at 157 (Johnson).) Moreover, regardless of the government’s ownership,
Lockheed possessed the waste at all times up to and including the time of disposal. And, for
fixed price contracts with progress payments (like SRAM), the waste – even if already disposed
of – reverted back to Lockheed upon the termination of the contracts. See AISLIC II, 2013 WL
135405, at *8.
Thus, while ownership of the TCE and AP may be an important factor in establishing
arranger liability under CERCLA § 107(a)(3), this is not the issue before the Court. Rather, as to
the allocation analysis, the Court finds the ownership of the substances to be of limited value.
Cf. AISLIC II, 2013 WL 135405, at *8. The critical issue is not ownership in the first instance,
but rather the parties’ respective control over the disposal of TCE and AP at the Sites. (See infra
Section II.B.-C.)
5. The government’s ownership of facilities
Owning a facility at the time hazardous substances were disposed of at that facility results
in liability under CERCLA. See 42 U.S.C. § 9607(a)(2). From this statutory hook, courts
frequently allocate an “owner’s share” of liability to parties “simply by virtue of being the
landowner,” United States v. R.W. Meyer, Inc., 932 F.2d 568, 571 (6th Cir. 1991), or owning the
leaking or faulty equipment at a site. E.g., AISLIC II, 2013 WL 135405, at *4-5.
Both parties owned equipment at the Sites. (See, e.g., USX26.0018-28; USX27;
USX28.0025-27.) Indeed, the government stipulated to its liability under CERCLA because it
owned and furnished some of the major pieces of equipment for LPC’s operations. (See Trial Tr.
at 899 (government counsel).) Lockheed argues that government ownership of this equipment –
64
including the vapor degreaser in Building 91 and the hogged-out rocket casings at the Potrero
and LaBorde Canyon facilities – should weigh in Lockheed’s equitable favor because those
pieces of equipment were sources of TCE and perchlorate contamination (i.e., “facilities”) at the
Sites. (E.g., Trial Tr. at 33 (Lockheed opening); id. at 1946 (Lockheed closing.)
Lockheed is correct that both the government-owned vapor degreaser and hogged-out
rocket casings are “facilities” under CERCLA § 101(9). See Am. Int’l Specialty Lines Ins. Co. v.
United States (AISLIC I), 2010 WL 2635768, at *23-24 (C.D. Cal. June 30, 2010). The Court,
however, does not consider the government’s mere ownership of certain pieces of equipment to
have much importance in determining an equitable allocation. Instead, just as with the
ownership of the waste, the Court considers “[f]actors additional to the simple fact of ownership”
of facilities – in particular the parties’ respective control over the disposal operations – to be the
paramount equitable consideration. See Yankee Gas, 852 F. Supp. 2d at 248. Thus, the Court
does not adjust the per capita equitable allocation on account of either party’s ownership of
equipment or facilities at the Sites.
6. Knowledge of risk of pollution from AP and TCE
The fifth Gore Factor considers “the degree of care exercised by the parties with respect
to the hazardous waste concerned.” Envtl. Transp. Sys., 969 F.2d at 508. As the Court
concluded above, the contamination at the Sites originated, inter alia, from pouring TCE and AP
wastewaters, and burning solid propellant wastes, on the bare ground. Mr. Bauer, a government
expert, opined these disposal practices violated the standard of care in existence at the time of
LPC’s operations. (Trial Tr. at 1086-87 (Bauer); Bauer Decl. ¶¶ 11(b), 11(e), 138(b).) The
Court does not credit Mr. Bauer’s testimony for two reasons.
65
First, although LPC knew that the Sites were located in areas with sensitive groundwater
supplies (see, e.g.,USX15.0002-03; USX43.0002; USX50.0002; USX970 at 140-41 (Speer
Dep.); USX977 at 35-36, 43 (Stickney Dep.)), neither TCE nor perchlorate were known
groundwater contaminants at the time LPC operated the Sites. “[T]here was generally no
recognition that TCE posed a danger to the environment until the mid 1970’s.” Bolinder Real
Estate, L.L.C. v. United States, 2002 WL 732155, at *8 (D. Utah Apr. 24, 2002). Indeed, TCE
groundwater contamination was first discovered in California only in 1979 (PX1537 at 12), and
the EPA did not regulate TCE as a drinking water contaminant until 1989. (PX2060 at 18.)
Similarly, according to the U.S. Government Accountability Office, perchlorate “was initially
identified by EPA as a potential [groundwater] contaminant in 1995” (PX1229 at 3), and,
according to the DOD, did not “emerge[] as an environmental issue of national interest [until]
1997,” when new testing processes decreased the detection threshold from 400 to 4 µg/L.
(PX1223 at 5; see also PX1229 at 3-4.)54 Although LPC knew when it operated the Sites that
AP was a dangerous material, their safety concerns were limited to fires and explosions and did
not extend to environmental contamination. (See, e.g., Trial Tr. at 87, 94-95 (Oppliger).)
Second, both pouring TCE and AP wastewaters and burning solid propellant wastes on
bare ground were entirely consistent with the general standards of care in existence at that time.
For TCE, the Court need look no further than the government’s position in a prior case:
54
Accordingly, the Court does not credit Mr. Bauer’s testimony that members of scientific
community knew that pouring TCE or AP wastewaters or burning propellants on the bare ground would
cause groundwater contamination. (Trial Tr. at 1081-87 (Bauer).) Mr. Bauer’s reliance on “personal
experience and knowledge and chemical research” (id. at 1083), as well as a single, ambiguous scholarly
article from 1953 that concluded “[s]olvents and soluble chemicals contained in industrial wastes . . .
remain in solution in the liquid phase . . . and percolate downward to the underlying groundwater”
(USX810.0006) is countered by the vast weight of the evidence that neither TCE nor perchlorate were
considered groundwater pollutants at the time LPC operated the Sites. (See Feenstra Decl. ¶¶ 96-102
(TCE), 175-91 (AP/perchlorate); PX2020-2024 (summary tables of historic published literature on
groundwater contamination re: TCE); PX2025-2028 (summary tables of historic published literature on
groundwater contamination re: AP/perchlorate).)
66
It is undisputed that the plaintiff’s allegations of negligence, in particular,
‘pouring the solvents onto the ground . . . ,’ even if true, could not have violated
any standard of care in existence prior to, or during . . . the early 1970s.
Snyder et al. v. United States, 04-cv-627, Gov’t Memo. in Support of Mot. for Summ. J. at 3-4,
(Feb. 22, 2006 S.D. Miss.) (PX2060). In Snyder, the government adopted its expert’s opinion
that the disposal of TCE on the bare gro
This text is long and has been trimmed here. Open the source document for the complete record.