Opinion

Lake Whatcom Railway Company, App. v. Karl Alar And Jeanine Alar, Res.

Court
Court of Appeals of Washington
Filed
Feb 3, 2014
Status
Unpublished
Cited by
0 cases
Authority
More cited than 31.1%

The opinion

IN THE COURT OF APPEALS OF THE STATE OF WASHINGTON

LAKE WHATCOM RAILWAY NO. 68913-4-1

COMPANY, a Washington corporation,

DIVISION ONE

Appellant,

m

CO

v.

UNPUBLISHED OPINION

t n p 'i

KARL ALAR and JEANINE ALAR, ^ ZT.-Z.-

husband and wife, and the marital

community composed thereof, and all tV3

persons claiming any right, title or

interest through them, and STEVEN

M. SCOTT and JANE DOE SCOTT,

husband and wife, and the marital

community composed thereof, and all

persons claiming any right, title or

interest through them,

Respondents. FILED: February 3, 2014

Leach, C.J. — In this chapter of a property rights dispute that has

continued for decades, Lake Whatcom Railway Company appeals a series of trial

court orders.1 It claims the court imposed limitations on its activities that

conflicted with the railroad's duties under federal law. It also contends that the

court erred by applying res judicata to bar its claims about the legal effect of the

1 On June 26, 2012, the parties satisfied the judgment contemplated by

the court's supplemental findings of fact, conclusions of law, and order entered

on May 18, 2012. But the record does not show that the trial court entered this

final judgment before it was satisfied.

NO. 68913-4-1/2

1901 deed, interpreting a 1931 deed, and by granting a motion to substitute

parties. Lake Whatcom Railway also asserts that we have discretion under RAP

2.5(c)(2) to revisit our Supreme Court's decision in Veach v. Culp,2 which held

that the 1901 deed conveyed an easement interest in a railroad right-of-way.

Because we disagree with the trial court's conclusion that the 1931 deed

conveyed an easement interest rather than a fee simple, but otherwise find no

error, we reverse in part and remand for further proceedings.

FACTS

Lake Whatcom Railway operates a seasonal excursion train along the

shore of Lake Whatcom. Frank Culp is its president. Karl and Jean Alar,

Stephen and Cindy Scott, and Roger and Ardis Wens (collectively Alar) own

three parcels of land abutting the lake that the railway track bisects. This lawsuit

involves the nature of the railway's property interest created by two conveyances,

one in 1901 and one in 1931.

In 1901, Alar's predecessors in interest, Fred and Mattie Zobrist,

conveyed a railroad right-of-way to Bellingham Bay & Eastern Railroad Company

(Zobrist deed).3 In 1931, Alar's predecessors in interest, Joseph and Minnie

Byron, conveyed an adjoining strip of land to Northern Pacific Railway Company

2 92 Wn.2d 570, 574, 599 P.2d 526 (1979).

3See Veach v. Culp, 21 Wn. App. 454, 455, 585 P.2d 818 (1978).

NO. 68913-4-1/3

(Byron deed).4 Burlington Northern Railroad, Northern Pacific Railway's

successor, operated a branch line running from Wickersham to Bellingham,

Washington, until 1970.5 This line crossed the Alar property through the right-of-

way described in the 1901 deed.

In 1972, Burlington Northern conveyed to Cascade Recreation Inc. all of

the property rights created by the 1901 and 1931 deeds. Cascade Recreation

also acquired a portion of Burlington Northern's branch line, which ran from

Wickersham to Blue Canyon, and began to run a weekend and summer

excursion train.6 In 1989, Cascade Recreation conveyed these rights to Lake

Whatcom Railway.7 Lake Whatcom Railway operates a small propane-powered

engine that pulls a miniature car that holds approximately four to ten passengers.

This train operates twice a week between Memorial Day and Labor Day.

4See Veach, 21 Wn. App. at 455.

5 See Zobrist v. Culp. 18 Wn. App. 622, 625, 570 P.2d 147 (1977); Zobrist

v. Culp. 95 Wn.2d 556, 557, 627 P.2d 1308 (1981). The Interstate Commerce

Commission approved Burlington Northern's abandonment of this branch line,

effective July 21, 1971. After this time, Burlington Northern dismantled some of

the tracks . Zobrist. 95 Wn.2d at 557. In 1981, the court held that one-half mile of

track on the railroad right-of-way reverted to the Zobrists after the railroad failed

to meet conditions of the original grant requiring that it not fail to operate a

railroad for a period of more than 12 consecutive months. Zobrist. 95 Wn.2d at

557.

6 Zobrist. 95 Wn.2d at 557.

7 Lake Whatcom Railway is the successor in title to Cascade Recreation

Inc.

-3-

NO. 68913-4-1/4

In 1976, Alar's predecessors in interest, Richard Veach, Mary Veach, and

Forrest Solem (collectively Veach) sued Culp after he constructed a fence along

the northerly edge of the right-of-way. Veach claimed that he owned a fee

interest in the right-of-way, that the railroad had only an easement, and that the

fence restricted his riparian rights and access to his waterfront property

unlawfully.8 The trial court held that both deeds conveyed a fee simple title to the

railroad. On appeal, although Veach raised the issue of the 1931 deed in his

brief, we did not decide this deed's legal effect and affirmed the trial court's

interpretation ofthe 1901 deed.9 In Veach v. Culp. our Supreme Court reversed,

holding that the 1901 deed conveyed an easement interest in the right-of-way to

the railroad.10 In 1980, on remand, the trial court entered a decree stating that

the 1901 deed conveyed an easement to the railroad.

In 2008, Lake Whatcom Railway filed a complaint to quiet title and for

damages against Alar, alleging that Alar stood on the rails, blocked maintenance,

dumped dirt on the right-of-way, burying the tracks, created safety hazards,

erected confusing signs, and harassed Lake Whatcom Railway's customers. On

February 13, 2009, the court consolidated this action with Veach v. Culp. The

court's order stated,

8Veach. 21 Wn. App. at 456.

9Veach. 21 Wn. App. at 454.

10 Veach. 92 Wn.2d at 575-76.

-4-

NO. 68913-4-1/5

ORDERED ADJUDGED AND DECREED Veach v. Culp. Whatcom

County Superior Court Cause No. 51720 is re-opened;

ORDERED ADJUDGED AND DECREED that Lake Whatcom

Railway Company v. Alar et. al.. Whatcom County Superior Court

Cause No. 08-2-02034-3 and Veach v. Culp, Whatcom County

Superior Court Cause No. 51720 shall be consolidated for all

purposes for the duration of the proceedings in both matters.

On March 27, 2009, the court granted Alar's motion to substitute parties,

substituting Alar as plaintiff in this case in place of Veach and substituting Lake

Whatcom Railway as a defendant in place of Cascade Recreation Inc.

On June 24, 2009, the trial court granted Alar's motion for partial summary

judgment, ruling that under res judicata, the court's decision in Veach controlled

the 1901 deed's legal effect. The court dismissed Lake Whatcom Railway's

claims that did not arise out of the 1931 deed. On August 21, 2009, the trial

court entered an interim order pending trial that limited Lake Whatcom Railway's

actions. The court modified this order orally on September 16.11 On October 27,

Alar filed counterclaims against Lake Whatcom Railway. On November 12,

2009, our court commissioner denied Lake Whatcom Railway's request for

discretionary review of the court's order denying Lake Whatcom Railway's motion

11 The court denied Lake Whatcom Railway's motion to vacate the interim

order but modified the order orally during a hearing on Lake Whatcom Railway's

motion to allow ongoing railroad maintenance and repairs. On the court's order

denying the motion to vacate the interim order, the judge wrote, "May present an

order consistent with Sept. 16 2009 oral ruling on Plaintiff motion." The court

entered no written order reflecting the modification.

-5-

NO. 68913-4-1/6

for partial summary judgment, its order granting Alar's motion for partial summary

judgment, and its August 21 interim order.12

The trial court bifurcated the case for trial. On September 24, 2010,

following the first phase of the trial, the court entered partial findings of fact and

partial conclusions of law. It held that the 1901 and 1931 deeds each conveyed

an easement and quieted title in Alar, subject to Lake Whatcom Railway's

easement. It also ruled that Lake Whatcom Railway was subject to the court's

1980 decree in Veach. Our court commissioner denied Lake Whatcom Railway's

request for discretionary review of this decision.

On May 18, 2012, following the damage phase of the trial, the court

entered supplemental findings of fact and conclusions of law. The court awarded

damages against Alar to Lake Whatcom Railway but offset these damages with

damages awarded against Lake Whatcom Railway.

Lake Whatcom Railway appeals.

12 The commissioner reasoned that the notice was untimely as to the

court's orders denying Lake Whatcom Railway's motion for partial summary

judgment and granting Alar's motion for partial summary judgment and that the

court changed the August 21 interim order, rendering review moot. The

commissioner also noted that Lake Whatcom Railway failed to satisfy all of the

criteria in RAP 2.3(b) for discretionary review of the August 21 order, even if the

court did not amend this order.

-6-

NO. 68913-4-1/7

ANALYSIS

Lake Whatcom Railway raises four issues. First, it claims that the trial

court's interim order pending trial imposing limitations conflicted with applicable

federal law. Second, it asserts res judicata does not bar its claims arising out of

the 1931 deed. Third, it contends that the court had no authority to substitute

parties. Finally, it alleges that we have discretion under RAP 2.5(c) to review the

propriety of our Supreme Court's ruling in Veach.

Lake Whatcom Railway alleges that its "duties and obligations as to the

operation and maintenance of the right of way are governed by federal law." It

then claims, "A state superior court is preempted from regulating railroad

operations" because "[t]he Surface Transportation Board . .. has exclusive

jurisdiction over matters regarding Lake Whatcom Railway."

Lake Whatcom Railway challenges the court's interim order pending trial,

which prohibited it "from undertaking any destruction, construction, and/or

maintenance upon or to any aspect of the [Alar] property whether within or

outside of the easement area without prior order of the Court." On September

16, 2009, the court modified this order orally, stating,

[l]n full recognition of all parties' rights ... I believe Lake Whatcom

Railroad can undergo its maintenance plan in any way that it

deems to be reasonable.

If the defendants believe that there is a problem with that,

whether it is directly in violation of their rights, or whether they think

-7-

NO. 68913-4-1/8

that simply something is not going as it should in terms of

compliance with all the regulations set forth by state, county,

federal authorities and anybody else, that they can, of course, not

only report the claimed or alleged violation to the agencies, but they

can come marching back in here.

Lake Whatcom Railway also challenges three conclusions of law in the court's

May 18, 2012, order:

2.12 Pursuant to the 1980 Decree, the court enters the

following as clarification of the 1980 Decree .. .

• Plaintiff has the right to operate a railroad and run a train up

and down the track;

• Defendants may not materially interfere with such

operations;

• Defendants have the right to exercise the littoral rights on

their property, including in the easement areas—right to

access the shoreline and the exclusive right to swim, boat,

fish, and do water related activities;

• Defendants have the right to use the property within and

without the railroad right of way and construct facilities down

by the beach and along the shore, as long as they are not

within 8 and VS feet from the edge of the track;

• Defendants may not prevent Plaintiff from having access by

the water to bridges and banks for Plaintiff's access to tracks

for inspection, maintenance and repair. The foregoing is

relevant to the small portion of the property which is at the

east side of Defendant Alar's lot right next to the trestle. The

intent of the 1980 Decree was for access if needed to work

on that part of the track and trestle;

• Defendants may cross the railroad right of way wherever

they may choose. They may establish paths, roads, steps,

etc. as needed to access the beach without interfering with

the railroad's activity or that prevents the train from coming

back and forth on the track;

• Plaintiff, and their passengers, may not interfere with

Defendant's use of the area south of the tracks which is the

beach area;

• Plaintiff may enter the area to the south of the tracks for

purposes of inspection and repairs. Passengers may

-8-

NO. 68913-4-1/9

embark and disembark on the south side of the tracks. The

passengers may not go beyond embarking, disembarking or

standing immediately next to the railroad south of the tracks;

• Plaintiffs shall designate with signs facing the railroad tracks

the appropriate picnic area for that north portion of the

easement they wish to use for such picnic area. The size of

the picnic area must be reasonable—it cannot encompass

the entire area from the trestle to the end of Defendant

Scott's property. The picnic area needs to be reasonable in

light of the number of people that travel on the train. It is the

Plaintiff's duty to undertake the designation of the picnic

area;

• Defendants may not interfere with the passengers in the

picnic area in anyway [sic]. Defendants may go back and

forth, but they cannot obstruct the train movements or

interfere with the passengers;

• Signs shall be erected by the Defendants, facing the track,

indicating that the area to the south of the tracks is private

beach area;

• Plaintiff is restrained from erecting any fences in the

easement areas;

• Defendants may use their property in any way as long as

that does not materially interfere with the railroad use,

provided that the construction of a privacy fence cannot

block the view of the lake from the railroad tracks or the

picnic area.

The foregoing is not a modification or vacation of the 1980 Decree,

but a clarification of the same. The foregoing shall be applicable to

both the Zobrist and Byron Easement Areas.

2.16 .... The judgment against defendants Alar in favor of

Lake Whatcom Railway should be offset by the total damages for

plaintiff Lake Whatcom Railway's trespass of $2,001.28, for a final

judgment of $546.67 against plaintiff and in favor of defendants

Alar.

2.17 Defendants Alar have established that plaintiff Lake

Whatcom Railway's actions as regards the fence constitute

trespass and/or interference to the damage of defendants Alar.

NO. 68913-4-1/10

We review de novo questions of law and the trial court's conclusions of

law.13 We treat unchallenged findings of fact as verities on appeal.14

Lake Whatcom Railway argues that 49 C.F.R. § 213, which defines track

safety standards, and 49 U.S.C. § 10501, which defines the Federal Surface

Transportation Board's jurisdiction, govern its "duties and obligations as to the

operation and maintenance of the right of way." 49 C.F.R. § 213 does not apply

to track "[l]ocated inside an installation which is not part of the general railroad

system of transportation,"15 and 49 U.S.C. § 10501 applies only to transportation

that forms part of the interstate rail network.16 Lake Whatcom Railway owns and

operates approximately four miles of track in Washington. Culp testified that as

of 1981, the section of the track at issue, the Blue Canyon track, is three-quarters

of a mile long, is separate from other railroad tracks, runs between no two

stations, and does not run between states. In Veach. our Supreme Court noted,

Here this railroad had been reduced to operation as an

excursion operation. It has never made any freight deliveries. It

has no paid employees. It has a very limited amount of equipment.

Its single locomotive is owned by approximately 30 persons. It

13 McClearv v. State. 173 Wn.2d 477, 514, 269 P.3d 227 (2012) (citing

Sunnvside Valley Irrigation Dist. v. Dickie. 149 Wn.2d 873, 880, 73 P.3d 369

(2003)).

14 State v. W.S.. 176 Wn. App. 231, 232 n.1, 309 P.3d 589 (2013) (citing

State v. Hill, 123 Wn.2d 641, 644, 870 P.2d 313 (1994)).

15 49 C.F.R. § 213.3(b)(1).

16 49 U.S.C. § 10501(2)(A) ("Jurisdiction . . . applies only to transportation

in the United States between a place in ... a State and a place in the same or

another State as part of the interstate rail network.").

-10-

NO. 68913-4-1/11

makes three round trips on Saturdays and two on Sundays. It is at

the disputed site approximately only 15 minutes each trip. This

regular usage is only on weekends during the summer for

approximately 3 months. The other 9 months of the year it

operates only on charter, admitting that in some months it has no

charters at all. Thus the average use by the railroad of this

disputed track area would be approximately 1 hour and 15 minutes

during the weekends and then only during the summer.[17]

Lake Whatcom Railway bases its assertions on Culp's testimony that he

believed federal law applies. Culp testified, "In the case of the railroad, the CFR

in our opinion was the most applicable guideline for track construction." He also

told the court, when asked if the federal maintenance standards apply, "We—

presently they have chosen not to—we were regulated. They have chosen not to

inspect us at this time." In 2009, Lake Whatcom Railway reported no interstate

revenue to Washington.18

17 Veach. 92 Wn.2d at 575.

18 Counsel for Lake Whatcom Railway told the court,

From the documents, I could not determine if it's [federal] class

two or three. My client says two. ... My client believes it is a

class two but we could not find a document that says class two

or three. So I attached the documents that indicate that our

reports are under class two and class three.

49 C.F.R. § 1201.1-1 groups railroad carriers into three classes "[f]or purposes of

accounting and reporting." Class II carriers have "annual carrier operating

revenues of less than $250 million but in excess of $20 million after applying the

railroad revenue deflator formula shown in Note A." 49 C.F.R. § 1201.1-1(a).

Class III carriers have "annual carrier operating revenues of $20 million or less

after applying the railroad revenue deflator formula shown in Note A." 49 C.F.R.

§ 1201.1-1 (a). Culp testified that the train "makes about forty thousand a year."

-11-

NO. 68913-4-1/12

Lake Whatcom Railway does not demonstrate that the federal provisions it

cites apply to its operation. Even if these provisions apply, in light of the court's

oral modification to its written order permitting Lake Whatcom Railway to

"undergo its maintenance plan in any way that it deems to be reasonable," Lake

Whatcom Railway fails to show that the court interfered with any applicable legal

rights or obligations.

Lake Whatcom Railway also asserts that res judicata does not bar its

claims about the parties' ownership interests in the property, except those claims

arising out of the 1931 deed. Lake Whatcom Railway argues, "When the trial

court reopened the Veach v. Culp litigation, it was no longer a final judgment

subject to res judicata." Following the first part of the trial, the court entered

conclusion of law 2.5, which stated, "Plaintiff LWRR's claim of fee ownership of

the Zobrist ROW is barred by res judicata."

The application of res judicata presents an issue of law that we review de

novo.19 Res judicata, also known as claim preclusion, prohibits litigating a claim

that either was, or should have been, raised and litigated in a former action.20

When the parties to two successive proceedings are the same and the prior

proceeding culminated in a final judgment, a matter "'may not be relitigated, or

19 Martin v. Wilbert. 162 Wn. App. 90, 94, 253 P.3d 108 (2011).

20 Loveridae v. Fred Meyer. Inc.. 125 Wn.2d 759, 763, 887 P.2d 898

(1995).

-12-

NO. 68913-4-1/13

even litigated for the first time, if it could have been raised, and in the exercise of

reasonable diligence should have been raised, in the prior proceeding.'"21

Washington courts apply a four-part test to determine if a claim has already been

decided: "There must be identity of (1) subject matter; (2) cause of action; (3)

persons and parties; and (4) the quality of the persons for or against whom the

claim is made.'"22

Nothing in the record indicates that the trial court vacated the 1980

judgment entered in Veach. Accordingly, this judgment in Veach remained final.

Lake Whatcom Railway contends only that the cases do not have the same

subject matter, arguing, "Lake Whatcom Railway's previous neighbors did not

place a trailer on the property, build a fence, fill a drainage ditch, or obstruct the

train," and that Veach "did not discuss or decide the effect of the reversion rights

granted to the railroad in the 1901 deed." Here, the court properly applied res

judicata to the court's interpretation in Veach of the 1901 deed's legal effect.

Notably, the court awarded damages to Lake Whatcom Railway based upon

Alar's "trespass and/or material interference to the damage of plaintiff."

21 Sound Built Homes. Inc. v. Windermere Real Estate/South. Inc.. 118

Wn. App. 617, 627-28, 72 P.3d 788 (2003) (quoting Kellv-Hansen v. Kellv-

Hansen. 87 Wn. App. 320, 328, 941 P.2d 1108 (1997)).

2"2 Hilltop Terrace Homeowner's Ass'n v. Island County. 126 Wn.2d 22, 32,

891 P.2d 29 (1995) (quoting Rains v. State. 100 Wn.2d 660, 663, 674 P.2d 165

(1983)).

-13-

NO. 68913-4-1/14

Therefore, the court here addressed the railway's claims about Alar's

interference with its property rights not litigated in Veach.

Lake Whatcom Railway also challenges the trial court's determination that

the 1931 deed conveyed an easement. In this case, because the original parties

utilized the statutory warranty form deed and the granting clause conveys a

definite strip of land, we hold that the grantors intended to convey fee simple title

unless additional language in the deed clearly and expressly limits or qualifies

the interest conveyed.23 The 1931 deed contains no language clearly and

expressly limiting or qualifying the interest conveyed. Therefore, we hold that the

1931 deed conveyed a fee simple interest.

Lake Whatcom Railway also challenges the superior court's 2009 order

granting Alar's motion to substitute parties, arguing, "The trial court lacked

personal jurisdiction over both Veach and Solem and therefore had no power to

enter the [o]rder." It asserts that the Whatcom County Superior Court's 1980

decree was a "consent decree" that "operates as a contract between the parties

only." Lake Whatcom Railway claims that we should apply principles of contract

interpretation and "interpret the provisions addressing 'plaintiff' and 'defendant'

differently than the relevant provisions addressing 'plaintiff, and those claiming

under them' and 'defendant, and those claiming under them.'" It contends, "The

23 Brown v. State. 130 Wn.2d 430, 437, 924 P.2d 908 (1996).

-14-

NO. 68913-4-1/15

parties, when they used the language 'plaintiff' and 'defendant,' were intending

only the actual plaintiffs (Veach and Solem) and only the actual defendants (Culp

and Cascade Recreation)."

Aconsent decree is "[a] court decree that all parties agree to."24 Adecree

is "[traditionally, a judicial decision in a court of equity, admiralty, divorce, or

probate—similar to a judgment of a court of law."25 Culp testified that he never

discussed the document's language, terms, or conditions with Veach's lawyer or

with the Veaches personally. The trial court stated, "I also think it is important for

the Court to state that it is this Court's belief that the 1980 decree is not a

consent decree." No evidence shows that the court's 1980 decree was an

agreement among the parties, as opposed to a judicial decision following remand

that resolved disputed issues.

CR 25(c) states, "In case of any transfer of interest, the action may be

continued by or against the original party unless the court upon motion directs

the person to whom the interest is transferred to be substituted in the action or

joined with the original party." This rule does not require substitution following a

transfer of interest.26 "'Whether or not the transferee is made a party, it will be

bound by an adverse judgment for its rights are no better than those of its

24 Black's Law Dictionary 471 (9th ed. 2009).

25 Black's Law Dictionary 471 (9th ed. 2009).

26 Stella Sales. Inc. v. Johnson. 97 Wn. App. 11, 17, 985 P.2d 391 (1999)

(citing CR 25(c)).

-15-

NO. 68913-4-1/16

transferor's.'"27 Lake Whatcom Railway does not dispute that it is a successor in

interest to Cascade Recreation or that Alar is a successor in interest to Veach,

Veach, and Solem.28 Accordingly, it fails to demonstrate that the trial court

abused its discretion when it granted Alar's motion to substitute parties.

Finally, Lake Whatcom Railway claims, "This [c]ourt should exercise its

discretion to re-examine the 1901 deed at issue in the Veach v. Culp litigation,

which has been reopened and consolidated with the pending matter by the

Whatcom County Superior Court, in light of the subsequent Washington case

law." Under the law of the case doctrine, "once there is an appellate court ruling,

its holding must be followed in all of the subsequent stages of the same

litigation."29 RAP 2.5(c)(2) limits this doctrine. RAP 2.5(c)(2) provides that if the

same case is again before the appellate court after a remand,

[t]he appellate court may at the instance of a party review the

propriety of an earlier decision of the appellate court in the same

case and, where justice would best be served, decide the case on

the basis of the appellate court's opinion of the law at the time of

the later review.

27 Stella Sales, 97 Wn. App. at 17-18 (quoting Anderson & Middleton

Lumber Co. v. Quinault Indian Nation, 79 Wn. App. 221, 227, 901 P.2d 1060

(1995)).

28 Culp formerly owned Cascade Recreation.

29 State v. Schwab, 163 Wn.2d 664, 672, 185 P.3d 1151 (2008) (citing

Roberson v. Perez, 156 Wn.2d 33, 41, 123 P.3d 844 (2005); Lutheran Day Care

v. Snohomish County. 119 Wn.2d 91, 113, 829 P.2d 746 (1992)).

-16-

NO. 68913-4-1/17

The appellate court may reconsider an earlier decision in the same case "where

there has been an intervening change in the law."30 It has discretion to apply this

exception to the law ofthe case doctrine.31 This rule does not purport to give this

court any authority to modify a decision of our Supreme Court. We do not have

that authority. We are obliged to follow a decision of the Supreme Court.

CONCLUSION

Lake Whatcom Railway fails to establish that the trial court's decisions

violated federal law. The court properly determined that res judicata barred Lake

Whatcom Railway from relitigating the legal effect of the 1901 deed, but we

disagree with its interpretation of the 1931 deed. The trial court appropriately

substituted parties. We have no authority under RAP 2.5(c)(2) to revise our

Supreme Court's decision in Veach. For these reasons, we reverse in part and

remand for further proceedings consistent with this opinion.

U~4t e./

WE CONCUR:

30 Schwab. 163 Wn.2d at 672-73 (citing Roberson. 156 Wn.2d at 42).

31 Schwab. 163 Wn.2d at 672 (citing Roberson. 156 Wn.2d at 42).

-17-

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.