Opinion

Transm Access Plcy v. FERC

  • 225 F.3d 667
Court
Court of Appeals for the D.C. Circuit
Filed
Jun 30, 2000
Status
Published
Cited by
0 cases
Authority
More cited than 9.7%

"Once we have determined a statute's clear meaning, we adhere to that determination under the doctrine of stare decisis, and we judge an agency's later interpretation of the statute against our prior determination of the statute's meaning."

How later courts described this case

  • "Once we have determined a statute's clear meaning, we adhere to that determination under the doctrine of stare decisis, and we judge an agency's later interpretation of the statute against our prior determination of the statute's meaning."
  • finding that transmission facilities used at wholesale are not "local distribution facilities"
  • rejecting the need for a federal liability standard for pipelines
  • concluding that agency regulations do not require EPA to review and approve or disapprove a state's decision to maintain existing water quality standards

Written by the judges who cited it.

The opinion

United States Court of Appeals

FOR THE DISTRICT OF COLUMBIA CIRCUIT

Argued November 3, 1999 Decided June 30, 2000

No. 97-1715

Transmission Access Policy Study Group, et al.

Petitioner

v.

Federal Energy Regulatory Commission,

Respondent

Vermont Department of Public Service, et al.,

Intervenors

Consolidated with

98-1111, 98-1112, 98-1113, 98-1114, 98-1115, 98-1118,

98-1119, 98-1120, 98-1122, 98-1124, 98-1125, 98-1126,

98-1127, 98-1128, 98-1129, 98-1131, 98-1132, 98-1134,

98-1136, 98-1137, 98-1139, 98-1140, 98-1141, 98-1142,

98-1143, 98-1145, 98-1147, 98-1148, 98-1149, 98-1150,

98-1152, 98-1153, 98-1154, 98-1155, 98-1156, 98-1159,

98-1162, 98-1163, 98-1166, 98-1168, 98-1169, 98-1170,

98-1171, 98-1172, 98-1173, 98-1174, 98-1175, 98-1176,

98-1178,98-1180

On Petitions for Review of Orders of the

Federal Energy Regulatory Commission

Sherilyn Peterson, John T. Miller, Jr., Robert C. McDiar-

mid, Stanley C. Fickle, Sara D. Schotland, Jeffrey L. Lands-

man, Lawrence G. Malone, Jeffery D. Watkiss, Richard M.

Lorenzo, Isaac D. Benkin, Wallace E. Brand, Daniel I.

Davidson, Cynthia S. Bogorad, Harvey L. Reiter and Ran-

dolph Lee Elliott argued the causes for petitioners. With

them on the briefs were William R. Maurer, Ben Finkel-

stein, David E. Pomper, Ronald N. Carroll, John Michael

Adragna, Sean T. Beeny, Wallace F. Tillman, Susan N.

Kelly, Craig W. Silverstein, A. Hewitt Rose, Bryan G. Tabler,

James D. Pembroke, David C. Vladeck, Robert F. Shapiro,

Lynn N. Hargis, Wallace L. Duncan, Richmond F. Allan,

Alan H. Richardson, Michael A. Mullett, C. Kirby Mullen,

Robert A. Jablon, Sara C. Weinberg, John F. Wickes, Jr.,

Todd A. Richardson, Brian A. Statz, John P. Cook, Charles

F. Wheatley, Jr., Christine C. Ryan, Robert S. Tongren,

Joseph P. Serio, Barry E. Cohen, Carrol S. Verosky, Jennifer

S. McGinnity, Jonathan D. Feinberg, Charles D. Gray, Rob-

ert Vandiver, Cynthia Miller, Helene S. Wallenstein, Wil-

liam H. Chambliss, C. Meade Browder, Jr., Mary W. Coch-

ran, Paul R. Hightower, Brad M. Purdy, Gisele L. Rankin,

Robert D. Cedarbaum, Edward H. Comer, Edward Berlin,

Robert V. Zener, Elizabeth W. Whittle, James H. McGrew,

Donald K. Dankner, Frederick J. Killion, Joseph L. Laksh-

manan, Stephen C. Palmer, Michael E. Ward, Steven J.

Ross, Marvin T. Griff and Thomas C. Trauger. Leja D.

Courter, Robert E. Glennon, Jr., Neil Butterklee, Zachary D.

Wilson, Sheila S. Hollis, Janice L. Lower and James B.

Ramsay entered appearances.

John H. Conway, Deputy Solicitor, Federal Energy Regu-

latory Commission, and Timm L. Abendroth and Larry D.

Gasteiger, Attorneys, argued the causes for respondent.

With them on the brief was Jay L. Witkin, Solicitor. Susan J.

Court, Special Counsel, and Edward S. Geldermann, Attor-

ney, entered appearances.

Edward Berlin argued the cause for intervenors. With

him on the briefs were J. Phillip Jordan, Robert V. Zener,

Edward H. Comer, William M. Lange, Deborah A. Moss,

James H. McGrew, Steven J. Ross, Elizabeth W. Whittle,

Richard M. Lorenzo, David M. Stahl, D. Cameron Findlay,

Peter Thornton, J. Phillip Jordan, Robert V. Zener, Robert C.

McDiarmid, Cynthia S. Bogorad, Ben Finkelstein, Peter J.

Hopkins, Margaret A. McGoldrick, Jeffery D. Watkiss, Ron-

ald N. Carroll, Sara D. Schotland, Alan H. Richardson,

Wallace L. Duncan, Richmond F. Allan, A. Hewitt Rose,

Wallace F. Tillman, Susan N. Kelly, John M. Adragna, Sean

T. Beeny and Randolph Lee Elliott. Edward J. Twomey,

Richard P. Bonnifield, Frederick H. Ritts, David L. Huard,

Dan H. McCrary, Mark A. Crosswhite, John N. Estes, III,

Kevin J. McIntyre, John S. Moot, Clark E. Downs, Martin V.

Kirkwood, Robert S. Waters, John T. Stough, Jr., Bruce L.

Richardson, Floyd L. Norton, IV, William S. Scherman,

Douglas F. John, Gary D. Bachman, Nicholas W. Fels,

Robert Weinberg, Robert A. Jablon, Peter G. Esposito, Chris-

tine C. Ryan, Sheila S. Hollis, Stephen L. Teichler, James K.

Mitchell, Gordon J. Smith, Edward J. Brady, Kevin F.

Duffy, Michael P. May, Barbara S. Brenner, Michael J.

Rustum, Sandra E. Rizzo, Kirk H. Betts, Pierre F. de Ravel

d'Esclapon, Glen L. Ortman and William D. DeGrandis

entered appearances.

Before: Sentelle, Randolph and Tatel, Circuit Judges.

Opinion for the Court filed Per Curiam1:

Table of Contents

I. Introduction 7

II. FERC's Authority to Require Open Access 11

A. Statutory Challenges: FPA ss 205 and

206 14

1. ss 205 and 206 and Otter Tail Power

Company 15

2. s 206(a) Procedural and Evidentiary

Requirements 18

3. Discriminatory Effect of Order 888 21

B. Constitutional Challenge: Fifth Amend-

ment Takings Clause 23

III. Federal versus State Jurisdiction over Trans-

mission Services 24

A. Bundled Retail Sales 26

B. Local Distribution Facilities 31

IV. Reciprocity 35

A. Indirect Regulation of Non-Jurisdictional

Utilities 36

B. Limitation on Reciprocity 37

V. Stranded Cost Recovery Provisions 39

A. Wholesale Stranded Costs 40

1. FERC's Authority to Provide for

Stranded Cost Recovery 44

a. Reasonable expectation of contin-

ued service 44

__________

1 Following our normal practice in complex cases, we shared the

writing of this opinion. Judge Sentelle wrote Section II, Section

III, and Section VII. Judge Randolph wrote Section IV, Section

VI, and Section VIII. Judge Tatel wrote Section I, Section V, and

Section IX.

b. Sections 206 and 212 of the FPA 46

c. Implications of Cajun 48

2. Natural Gas Precedent and Conform-

ance to Cost Causation Principles 49

a. Natural gas precedent: AGD, K

N Energy, and UDC 50

b. Conformance to cost causation

principles 54

3. FERC's Mobile-Sierra Findings 57

a. FERC's authority to make a ge-

neric public interest finding 59

b. FERC's stranded cost public in-

terest finding 61

c. FERC's public interest finding

regarding customers 62

4. Availability of Stranded Cost Recov-

ery to Nonjurisdictional Utilities

and G & T Cooperatives 63

5. Challenges to Technical Aspects of

Order 888's Stranded Cost Recov-

ery Provisions 65

a. POSCR's challenges to the

stranded cost formula 66

b. Inclusion of known and measura-

ble costs 68

c. Treatment of energy costs in the

market option 68

d. Rescission of notice of termi-

nation provision 70

e. Provision for benefits lost 71

B. Retail Stranded Costs 72

1. Stranded Costs Arising from Retail

Wheeling 72

a. FERC's jurisdiction over retail

stranded costs 73

b. FERC's refusal to assert jurisdict-

ion over all retail stranded

costs 76

2. Stranded Costs Relating to Retail-

Turned-Wholesale Customers 80

VI. Credits for Customer-Owned Facilities and

Behind-The-Meter Generation 85

.

VII. Liability, Interface Allocation, and Discount-

ing 90

A. Liability and Indemnification 90

B. Interface Allocation 94

C. Delivery-Point-Specific Discounting 96

VIII. Tariff Terms and Conditions 100

A. Headroom Allocation 100

B. Headroom Prioritization 101

C. Duplicative Charges 102

D. Multiple Control Areas 103

E. Right-of-First-Refusal 104

IX. National Environmental Policy Act and Regu-

latory Flexibility Act Compliance 105

A. NEPA Compliance 105

1. Adequacy of Base Case 105

2. Failure to Adopt Mitigation Measures 107

B. Regulatory Flexibility Act Compliance 108

----------

Following two notices of proposed rulemaking, the Federal

Energy Regulatory Commission issued Orders 888 and 889 on

April 24, 1996.2 Reflecting the Commission's effort to end

__________

2 Promoting Wholesale Competition Through Open Access Non-

discriminatory Transmission Services by Public Utilities; Recov-

ery of Stranded Costs by Public Utilities and Transmitting Utili-

ties, Order No. 888, FERC Stats. & Regs. p 31,036, 61 Fed. Reg.

21,540 (1996), clarified, 76 FERC p 61,009 and 76 FERC p 61,347

(1996) ("Order 888"), on reh'g, Order No. 888-A, FERC Stats. and

Regs. p 31,048, 62 Fed. Reg. 12,274, clarified, 79 FERC p 61,182

(1997), on reh'g, Order No. 888-B, 81 FERC p 61,248, 62 Fed. Reg.

64,688 (1997), on reh'g, Order No. 888-C, 82 FERC p 61,046 (1998);

discriminatory and anticompetitive practices in the national

electricity market and to ensure that electricity customers

pay the lowest prices possible, these orders represent, as the

Commission described in a later order not before us, "the

foundation necessary to develop competitive bulk power mar-

kets...." Regional Transmission Organizations, Order No.

2000, 65 Fed. Reg. 810, 812 (2000).

Open access is the essence of Orders 888 and 889. Under

these orders, utilities must now provide access to their trans-

mission lines to anyone purchasing or selling electricity in the

interstate market on the same terms and conditions as they

use their own lines. By requiring utilities to transmit com-

petitors' electricity, open access transmission is expected to

increase competition from alternative power suppliers, giving

consumers the benefit of a competitive market. Most funda-

mentally, FERC's open access policies, combined with paral-

lel action now occurring on the state level, are intended to

create a market in which customers may purchase power

from any of a number of suppliers. A municipality or factory

in Florida, for example, will no longer have to purchase power

from its local utility but instead may seek cheaper power

anywhere in the country. A customer in Vermont may

purchase electricity from an environmentally friendly power

producer in California or a cogeneration facility in Oklahoma.

All key players in the electricity market have challenged

various provisions of Orders 888 and 889. Their claims range

from the hypertechnical to arguments that FERC lacks au-

thority to order open access transmission at all. Finding few

defects in the orders, we uphold them in nearly all respects.

I. Introduction

Historically, vertically integrated utilities owned genera-

tion, transmission, and distribution facilities. They sold gen-

__________

Open Access Same-Time Information System and Standards of

Conduct, Order No. 889, FERC Stats. & Regs. p 31,035, 61 Fed.

Reg. 21,737 (1996) ("Order 889"), on reh'g, Order No. 889-A, FERC

Stats. & Regs. p 31,049, 62 Fed. Reg. 12,484 (1997), on reh'g, Order

No. 889-B, 81 FERC p 61,253 (1997).

eration, transmission, and distribution services as part of a

"bundled" package. Due to technological limitations on the

distance over which electricity could be transmitted, each

utility served only customers in a limited geographic area.

And because of their natural monopoly characteristics, utili-

ties have been heavily regulated at both the federal and state

levels.

Since enactment of the Federal Power Act in 1935, the

electricity industry has undergone significant change, both

economically and technologically. Economies of scale have

justified the construction of large (greater than 500 MW)

generation facilities, such as nuclear power plants. Techno-

logical advances in the 1970s and 1980s have permitted small

plants to operate efficiently as well. See Notice of Proposed

Rulemaking, Promoting Wholesale Competition Through

Open Access Non-discriminatory Transmission Services by

Public Utilities; Recovery of Stranded Costs by Public Utili-

ties and Transmitting Utilities, FERC Stats. & Regs.

p 32,514 at 33,059-60, 60 Fed. Reg. 17,662 (1995) ("Open

Access NOPR"). Technological improvements also made

feasible the transmission of electric power over long distances

at high voltages. See id. p 32,514 at 33,060. Alternative

power suppliers, such as cogenerators, small power produc-

ers, and independent power producers emerged in response

to these developments. Constructing and operating genera-

tion capacity at prices lower than the embedded generation

costs of traditional utilities, these alternative suppliers have

created a wholesale market for low-cost power.

The growth of this new wholesale market faced a serious

obstacle. "As entry into wholesale power generation markets

increased," FERC explained, "the ability of customers to gain

access to the transmission services necessary to reach com-

peting suppliers became increasingly important." Id. at

33,062. Yet the owners of transmission lines, the traditional

utilities that had built the high-cost generation capacity,

denied alternative producers access to their transmission

lines on competitive terms and conditions. FERC therefore

began requiring utilities to file open access transmission

tariffs that permitted other suppliers to transmit power over

their lines under certain circumstances, such as when a utility

sought authorization to merge with another utility or to sell

power at market-based rather than cost-based rates.

Then, in 1992, Congress enacted the Energy Policy Act,

which amended sections 211 and 212 of the FPA to authorize

FERC to order utilities to "wheel" power--i.e., transmit

power for wholesale sellers of power over the utilities' trans-

mission lines--on a case-by-case basis. Pub. L. No. 102-486,

106 Stat. 2776, 2915-16 (1992) (codified at 16 U.S.C. ss 824j-

k). FERC "aggressively implemented" amended sections 211

and 212 to " 'facilitate the development of competitively

priced generation supply options, and to ensure that whole-

sale purchasers of electric energy can reach alternative power

suppliers and vice versa.' " Open Access NOPR, p 32,514 at

33,064 (quoting Notice of Proposed Rulemaking, Recovery of

Stranded Costs by Public Utilities and Transmitting Utili-

ties, FERC Stats. & Regs. p 32,507 at 32,866, 59 Fed. Reg.

35,274 (1994) ("Stranded Cost NOPR")).

Despite these efforts, a persistent barrier to the develop-

ment of a competitive wholesale power sale market remained.

The Commission found that "utilities owning or controlling

transmission facilities possess substantial market power;

that, as profit maximizing firms, they have and will continue

to exercise that market power in order to maintain and

increase market share, and will thus deny their wholesale

customers access to competitively priced electric generation;

and that these unduly discriminatory practices will deny

consumers the substantial benefits of lower electricity prices."

Open Access NOPR, p 32,514 at 33,052. Power generators

not permitted to use utilities' transmission lines on reasonable

terms have no way to transmit their power to customers.

Invoking its authority under sections 205 and 206 of the

FPA to remedy unduly discriminatory or preferential rules,

regulations, practices, or contracts affecting public utility

rates for transmission in interstate commerce, 16 U.S.C.

ss 824d-e, and building on its experience in restructuring the

natural gas industry, see Associated Gas Distribs. v. FERC,

824 F.2d 981 (D.C. Cir. 1987), the Commission issued Orders

888 and 889 to "prevent this discrimination by requiring all

public utilities owning and/or controlling transmission facili-

ties to offer non-discriminatory open access transmission

service." Open Access NOPR, p 32,514 at 33,052. Orders

888 and 889 mandate what FERC terms "functional unbun-

dling," i.e., separating utilities' wholesale transmission func-

tions from their wholesale electricity merchant functions.

Specifically, the orders require utilities to (1) file open access

nondiscriminatory tariffs that contain the minimum terms and

conditions of nondiscriminatory services prescribed by FERC

through its pro forma tariff; (2) take transmission service for

their own new wholesale sales and purchases of electric

energy under the same terms and conditions as they offer

that service to others; (3) develop and maintain a same-time

information system that will give potential and existing trans-

mission users the same access to transmission information

that the utility enjoys (called the "Open Access Same-Time

Information System" or "OASIS"); and (4) state separate

rates for wholesale generation, transmission, and ancillary

services. See Order 888, p 31,036 at 31,635-36.

In requiring utilities to provide open access transmission,

FERC acknowledged the dramatic change the orders would

bring about, explaining that "[t]he most critical transition

issue that arises as a result of the Commission's actions in

this rulemaking is how to deal with the uneconomic sunk

costs that utilities prudently incurred under an industry

regime that rested on a regulatory framework and a set of

expectations that are being fundamentally altered." Order

888-A, p 31,048 at 30,346. Known as "stranded costs," these

"uneconomic sunk costs" are costs that utilities incurred not

only with regulatory approval, but with the expectation of

continuing to serve their current customers. These costs will

become "stranded" when customers take advantage of open

access transmission to purchase cheaper power from suppli-

ers other than their historic utilities. Order 888 affords

utilities an opportunity to recover stranded costs from their

wholesale requirements customers, but only from those cus-

tomers who use their utility's transmission service to pur-

chase power from new suppliers, and only if the utility can

prove that it had a reasonable expectation of continued ser-

vice to that customer.

After three rehearing orders, the Commission denied any

further rehearing. All petitions for review of Orders 888 and

889 were consolidated and transferred to this circuit. We

consider these petitions in this opinion. Section II considers

challenges to FERC's authority to require utilities to file

open access tariffs as a remedy for undue discrimination.

Section III evaluates FERC's conclusion that it lacked juris-

diction to order retail unbundling yet has jurisdiction over

transmission where state commissions have unbundled retail

sales. Section IV addresses FERC's authority to require

nonpublic utilities to provide reciprocal open access transmis-

sion service. Section V considers challenges to Order 888's

stranded cost recovery provisions. Section VI evaluates peti-

tioners' arguments relating to credits for customer-owned

facilities and behind-the-meter generation. Section VII ad-

dresses discounting, interface allocation, and liability. Sec-

tion VIII evaluates other arguments relating to the terms and

conditions of the pro forma tariff. Section IX assesses

FERC's compliance with the National Environmental Policy

Act and the Regulatory Flexibility Act.

In the end, we affirm the orders in all respects except two:

we remand for FERC to explain its treatment of energy costs

in the stranded cost market option (Section V.A.5.c) and to

provide a reasonable cap on contract extensions under exist-

ing customers' right-of-first-refusal (Section VIII.E).

II. FERC's Authority to Require Open Access

Although FERC asserts that "mounting claims of undue

discrimination in transmission access" prompted its move-

ment toward open access, the open access requirement of

Order 888 is premised not on individualized findings of dis-

crimination by specific transmission providers, but on

FERC's identification of a fundamental systemic problem in

the industry. Generally, those entities that own or control

interstate transmission facilities are vertically-integrated pub-

lic utilities that also generate and sell electricity. In its 1995

notice of proposed rulemaking, FERC observed that there

were at that time approximately 328 public utilities, market-

ers, and wholesale generation entities with transmission

needs, and that approximately 137 of those owned or con-

trolled the transmission facilities. See Open Access NOPR,

p 32,514 at 33,051. Entry into the transmission market is

difficult and restricted, so those utilities that already own

transmission facilities enjoy a natural monopoly over that

field. The transmission-owning utilities can use their position

to favor their own generated electricity and to exclude com-

petitors from the market, whether by denying transmission

access outright, or by providing transmission services to

competitors only at comparatively unfavorable rates, terms,

and conditions. Utilities that own or control transmission

facilities naturally wish to maximize profit. The transmis-

sion-owning utilities thus can be expected to act in their own

interest to maintain their monopoly and to use that position to

retain or expand the market share for their own generated

electricity, even if they do so at the expense of lower-cost

generation companies and consumers.

Even before Order 888, some transmission-owning utilities

voluntarily opened their transmission facilities to third party

suppliers and purchasers of electricity; and FPA s 211 ex-

plicitly gives FERC the authority to order involuntary wheel-

ing on a case-by-case basis. The Commission decided, howev-

er, that relying upon voluntary arrangements and s 211

orders would not remedy the fundamentally anti-competitive

structure of the transmission industry. Instead, the Commis-

sion concluded, such a piecemeal approach would result in an

inefficient "patchwork" of transmission systems nationwide.

"The ultimate loser in such a regime is the consumer." Open

Access NOPR, p 32,514 at 33,071.

As an alternative, the Commission interpreted the anti-

discrimination language of FPA ss 205 and 206, 16 U.S.C.

ss 824d, 824e (1994), as giving it the authority to impose open

access as a generic remedy for its findings of systemic anti-

competitive behavior. Invoking that broad authority, in Or-

der 888, FERC requires every transmission-owning public

utility within FERC's jurisdiction to file an Open Access

Transmission Tariff (OATT) containing minimum terms and

conditions for non-discriminatory service and to take trans-

mission service for their own wholesale sales and purchases of

electric energy under those filed OATTs. In other words,

this order requires the public utilities to provide the same

transmission services to anyone purchasing or selling whole-

sale power--other public utilities, federal power suppliers and

marketers, municipalities, cooperatives, independent power

producers, qualifying facilities, or power marketers--as they

provide to themselves. The Board of Water, Light and

Sinking Fund Commissioners of the City of Dalton (Dalton)

operates a municipally-owned utility system which provides

electric power to residential, commercial, and industrial con-

sumers in the city of Dalton, Georgia. Dalton obtains trans-

mission services from the Georgia Integrated Transmission

System (ITS), which it owns along with public utility Georgia

Power Company (GPC) and two other utilities that are not

subject to FERC's jurisdiction, and which GPC operates

according to the terms of various filed agreements. Puget

Sound Energy, Inc. (Puget) is a public utility in the Pacific

Northwest, where Bonneville Power Administration, which is

not a public utility subject to Order 888's requirements,3

__________

3 Bonneville Power Administration (BPA) "is a power marketing

agency in the Pacific Northwest that markets power from thirty

federal hydroelectric projects constructed and operated by the

Corps of Engineers and the Bureau of Reclamation." In re Bonne-

ville Power Administration, Power Sale and Transmission Rates,

54 F.E.R.C. p 62,143 (1991). In Order 888, FERC concluded that

BPA is not a public utility as defined by Federal Power Act (FPA)

s 201(e), and thus is not subject to Order 888's requirements.

Order 888, p 31,036 at 31,858. FERC admitted, however, to three

circumstances under which it might review BPA's transmission

access and pricing policies: (1) if BPA files an open access tariff for

review and confirmation under the Northwest Power Act and asks

FERC to find that the tariff meets FERC's open access policies;

(2) to the extent that BPA "is a transmitting utility subject to a

request for mandatory transmission services" under FPA s 211;

and (3) to the extent that BPA receives open access transmission

from a public utility and is thereby subject to the reciprocity

provision in that public utility's pro-forma tariff. Id.

dominates the electricity transmission market. These two

industry petitioners challenge the open access requirement of

Order 888 on various statutory, constitutional, and other

grounds.

Turning first to the FPA itself, Puget and Dalton argue

that ss 205 and 206 do not give the Commission the authority

to order open access as a generic remedy; and even if the

FPA does give the agency such authority, FERC has failed to

satisfy the statutory requirements for invoking it. Dalton

also argues that Order 888 itself violates the FPA by discrim-

inating against transmission facility owners who have invest-

ed in those assets. Shifting to constitutional concerns, Puget

and Dalton, along with amicus curiae Pacific Legal Founda-

tion, maintain that Order 888 violates the Takings Clause of

the Fifth Amendment. Finally, Dalton argues that the open

access requirements of the OATT interfere with the antitrust

conditions of outstanding nuclear licenses, and thus are un-

lawful. While we consider each of these challenges separate-

ly,4 we hold that Order 888's open access requirement is

authorized by and consistent with the FPA and the Takings

Clause. We conclude also that Dalton has not yet suffered

injury from the alleged conflict between open access and the

nuclear license antitrust conditions, and that its complaint on

that issue is therefore not yet ripe for judicial review.

A. Statutory Challenges: FPA ss 205 and 206

Section 205 of the FPA broadly precludes public utilities, in

any transmission or sale subject to FERC's jurisdiction, from

"mak[ing] or grant[ing] any undue preference or advantage to

__________

4 The Commission and various intervenors on its behalf argue

extensively against our jurisdiction over these issues on the grounds

that the petitioners failed, in various ways, adequately to raise their

concerns before the agency and to preserve the issues for judicial

review. Upon careful review of the record, we can safely conclude

without further elaboration that these jurisdictional arguments are

without merit, that the Commission has had ample notice and

opportunity to address all of the petitioners' various statutory,

constitutional, and other challenges to Order 888's open access

requirement, and that we have jurisdiction to consider these issues.

any person or subject[ing] any person to any undue prejudice

or disadvantage...." 16 U.S.C. s 824d(b). Section 206 of

the FPA further provides in relevant part that

[w]henever the Commission, after a hearing had upon its

own motion or upon complaint, shall find that any rate,

charge, or classification, demanded, observed, charged,

or collected by any public utility for any transmission or

sale subject to the jurisdiction of the Commission, or that

any rule, regulation, practice, or contract affecting such

rate, charge, or classification is unjust, unreasonable,

unduly discriminatory or preferential, the Commission

shall determine the just and reasonable rate, charge,

classification, rule, regulation, practice, or contract to be

thereafter observed and in force, and shall fix the same

by order.

16 U.S.C. s 824e(a). The statutory issues before us are

whether these provisions give FERC the authority to order

involuntary wheeling as a generic remedy, and if they do,

whether FERC satisfied the procedural and evidentiary re-

quirements imposed by these provisions.

1. ss 205 and 206 and Otter Tail Power Company

The Commission did not write on a blank slate when it

interpreted FPA ss 205 and 206 as giving it the authority to

order involuntary wheeling as a generic remedy for systemic

anti-competitive behavior. Puget and Dalton argue principal-

ly that the Supreme Court's decision in Otter Tail Power Co.

v. United States, 410 U.S. 366 (1973), controls the disposition

of this issue. Otter Tail was an antitrust case in which the

Supreme Court addressed whether the district court could

require Otter Tail Power Company to wheel power for its

competitors as a remedy for monopolistic practices. Con-

trary to the company's arguments, the Supreme Court con-

cluded that the district court's order did not impermissibly

conflict with the authority of the Federal Power Commission,

FERC's predecessor, because the agency did not have the

power itself to order involuntary wheeling under Part II of

the FPA, which includes ss 205 and 206. Puget and Dalton

cite various circuit court precedents, including one from this

circuit, as construing Otter Tail to prevent the Commission

from ordering involuntary wheeling as a generic remedy.

See, e.g., Florida Power & Light Co. v. FERC, 660 F.2d 668

(5th Cir. Unit B Nov. 1981); New York State Electric & Gas

Corp. v. FERC, 638 F.2d 388 (2d Cir. 1980); Richmond

Power & Light v. FERC, 574 F.2d 610 (D.C. Cir. 1978).

Finally, Puget and Dalton note that subsequent to Otter Tail,

Congress enacted FPA s 211, 16 U.S.C. s 824j, giving FERC

the authority to impose open access on a case-by-case basis to

remedy a broad range of problems. The petitioners argue

that, if FPA ss 205 and 206 authorize the Commission to

impose open access, and if Otter Tail does not prohibit such

action, then there was no reason for Congress to enact s 211.

In response, the Commission contends that we should not

read Otter Tail as limiting its authority under FPA s 206 to

remedy discriminatory behavior, since Otter Tail was an

antitrust case and not an undue discrimination case. The

Commission also maintains that the circuit court cases cited

by the petitioners are not on point and do not prohibit a

generic open access remedy. The Commission points instead

to our decision in Associated Gas Distributors v. FERC, 824

F.2d 981, 998 (D.C. Cir. 1987) (AGD), in which we upheld a

similar open access transportation requirement imposed by

FERC on natural gas transmission, as the controlling prece-

dent. Finally, FERC argues that Congress enacted FPA

s 211 to broaden its already existing authority to order

involuntary wheeling, as FPA ss 205 and 206 authorize such

action only as a remedy for undue discrimination.

We agree with FERC that our decision in AGD controls

the disposition of this issue. In AGD, we reviewed a FERC

order imposing open access conditions on pipelines transport-

ing natural gas. See 824 F.2d at 997-1001. Considering

arguments quite similar to those made by the petitioners

here, we concluded that Otter Tail does not constrain FERC

from mandating open access where it finds circumstances of

undue discrimination to exist. See id. at 998-99. Turning to

relevant circuit precedent, we construed Richmond Power &

Light as supporting only the proposition that a refusal to

provide transmission services to another utility was not per se

unduly discriminatory and we noted that the court in Florida

Power & Light expressly left open the question of whether

FERC could impose open access conditions as a remedy for

anti-competitive behavior. See id. at 999. Further, we point-

ed out that our reading of Richmond is consistent with other

precedent, specifically Central Iowa Power Coop. v. FERC,

606 F.2d 1156 (D.C. Cir. 1979), in which we upheld FERC's

use of its authority to prevent undue discrimination to condi-

tion its approval of a power-pooling agreement upon removal

of membership criteria which denied certain privileges to

some but not all participants. See AGD, 824 F.2d at 999.

Indeed, in AGD, we noted that open access relies upon the

very same principles that we upheld in Central Iowa. See id.

Although AGD addressed open access under the anti-

discrimination provisions of the Natural Gas Act (NGA) rath-

er than FPA ss 205 and 206, we have repeatedly recognized

the similarity of the two statutes and held that they should be

interpreted consistently. See Environmental Action v.

FERC, 996 F.2d 401, 410 (D.C. Cir. 1993); Tennessee Gas

Pipeline Co. v. FERC, 860 F.2d 446, 454 (D.C. Cir. 1988); see

also Arkansas La. Gas Co. v. Hall, 453 U.S. 571, 577 n.7

(1981). Thus, AGD counsels the conclusion that, while Otter

Tail may represent a general rule that FERC's authority to

order open access is limited, the FPA, like the NGA, makes

an exception to that rule where FERC finds undue discrimi-

nation.

Moreover, as in AGD, the deferential standard of Chevron

U.S.A. Inc. v. Natural Resources Defense Council, 467 U.S.

837 (1984), governs our review of FERC's interpretation of

FPA ss 205 and 206. See AGD, 824 F.2d at 1001. If we

agreed with Puget and Dalton that the Supreme Court's Otter

Tail opinion dictates a particular construction of ss 205 and

206, then the Commission's contrary interpretation would not

be entitled to Chevron deference. See Maislin Indus., U.S.,

Inc. v. Primary Steel, Inc., 497 U.S. 116, 131 (1990) ("Once

we have determined a statute's clear meaning, we adhere to

that determination under the doctrine of stare decisis, and we

judge an agency's later interpretation of the statute against

our prior determination of the statute's meaning."). But

having concluded that Otter Tail does not govern the disposi-

tion of this case, we are faced solely with considering the

validity of FERC's interpretation of the FPA, a statute that

the Commission administers. In AGD, we concluded that

FERC reasonably interpreted the NGA's ambiguous anti-

discrimination provisions as giving it broad authority to reme-

dy unduly discriminatory behavior through a generic open

access requirement. See AGD, 824 F.2d at 1001. Given the

FPA's similar language, we can only reach the same conclu-

sion with respect to Order 888. For all of these reasons, we

find that the Commission has the authority under FPA

ss 205 and 206 to require open access as a generic remedy to

prevent undue discrimination.

2. s 206(a) Procedural and Evidentiary Requirements

Puget and Dalton next argue that, even if FPA ss 205 and

206 authorize FERC to impose open access generically,

s 206(a) imposes certain procedural and evidentiary require-

ments for action which the Commission failed in two separate

but related ways to satisfy. First, the petitioners claim that

FPA s 206(a) requires substantial evidence of contemporane-

ous "unjust, unreasonable, unduly discriminatory or preferen-

tial" behavior before the Commission can act. The Commis-

sion made no finding of discrimination or monopoly control on

the part of Georgia Power Company or Puget. None of the

applications or complaints filed with the Commission accused

these petitioners of unduly discriminatory or anti-competitive

behavior. Instead, the Commission premised Order 888 on a

generic finding that public utility holders as a group have

sufficient monopoly power over the transmission of electricity

to engage in unduly discriminatory and anti-competitive prac-

tices, and that this condition will worsen in the future. To

support its finding, the Commission relied upon unsubstanti-

ated allegations of discriminatory conduct in public com-

ments, its own experience in reviewing applications and com-

plaints, and its own understanding of the incentives for

monopolists to behave discriminatorily.

Puget and Dalton additionally assert that FPA s 206(a)

requires that the requisite findings of undue discrimination be

made in the context of a hearing. Although they concede

that a rulemaking proceeding can satisfy the statute's hearing

requirement, Puget and Dalton maintain that the rulemaking

proceeding nevertheless must clearly identify the challenged

activities and actors, and give the accused actors the opportu-

nity to demonstrate that their activities were not unlawful.

The petitioners protest that the Commission's notice-and-

comment rulemaking process did not afford them such oppor-

tunity.

FERC claims the discretion under NLRB v. Bell Aerospace

Co., 416 U.S. 267, 293 (1974), to choose between rulemaking

and case-by-case adjudication; and FERC contends that its

generic rulemaking process fully satisfied the requirements of

FPA s 206(a). FERC concedes that it relied upon general

findings of systemic monopoly conditions and the resulting

potential for anti-competitive behavior, rather than evidence

of monopoly and undue discrimination on the part of individu-

al utilities. Citing our opinion in Wisconsin Gas Co. v.

FERC, 770 F.2d 1144, 1166 (D.C. Cir. 1985), however, FERC

maintains that such findings are sufficient to substantiate its

decision to impose the open access requirement. Finally,

FERC observes that we rejected these same arguments in

AGD. See 824 F.2d at 1008 (citing Wisconsin Gas, 770 F.2d

at 1165-68).

Again, we must agree with the Commission. In American

Public Gas Ass'n v. FPC, we held that the Commission could

exercise its authority under NGA s 5(a), the provision paral-

lel to FPA s 206, through rulemaking as well as adjudication.

See 567 F.2d 1016, 1064-67 (D.C. Cir. 1977); see also Wiscon-

sin Gas, 770 F.2d at 1153 (articulating the American Public

Gas holding). Congress subsequently ratified the American

Public Gas holding when it enacted the Department of Ener-

gy Organization Act, 42 U.S.C. s 7173(c) (1994). See Wiscon-

sin Gas, 770 F.2d at 1153 n.8 (acknowledging the Act). That

statute provides that "the establishment of rates and charges

under the Federal Power Act [16 U.S.C. 791a et seq.] or the

Natural Gas Act [15 U.S.C. 717 et seq.], may be conducted by

rulemaking procedures." 42 U.S.C. s 7173(c) (brackets in

original). By passing a statute adopting the holding of

American Public Gas, and explicitly applying that rule to the

FPA as well as the NGA, Congress signaled its intent that

the hearing requirements of NGA s 5(a) and FPA s 206(a)

be interpreted similarly.

Interpreting the hearing requirement of NGA s 5(a), we

have said that, while the Commission cannot rely solely on

"unsupported or abstract allegations," the agency is also not

required to make "specific findings," so long as the agency's

factual determinations are reasonable. See Wisconsin Gas,

770 F.2d at 1158. In AGD, we applied Wisconsin Gas in

holding that the Commission was not required to make

specific findings that individual rates charged by individual

pipelines were unlawful, or to offer empirical proof for all the

propositions upon which its order depended, before promul-

gating a generic rule to eliminate undue discrimination. See

AGD, 824 F.2d at 1008-09. Upon comparison of the order

considered in AGD with Order 888, if anything, FERC more

thoroughly documented the reasons for its actions in Order

888 than in the earlier natural gas order.

Puget claims that AGD and Wisconsin Gas are distinguish-

able, and that this case is governed by Electricity Consumers

Resource Council v. FERC, 747 F.2d 1511 (D.C. Cir. 1984), in

which we reversed FERC's adoption of a rate based on an

economic theory in the absence of a discussion of the practical

applications of that theory. See 747 F.2d at 1514. As the

AGD court recognized, however, the court in Electricity

Consumers was persuaded that the Commission had distorted

the economic theory it claimed to apply. See AGD, 824 F.2d

at 1008. Just as the pipelines in AGD did, Puget has failed to

articulate exactly how FERC has distorted the theories on

which it relies in Order 888. Additionally, the AGD court

rejected the idea that "Electricity Consumer's reference to

'economic theory' was intended to invalidate agency reliance

on generic factual predictions merely because they are typi-

cally studied in the field called economics." Id. Following

the rationale of Wisconsin Gas and AGD, we conclude that

FERC has satisfied the requirements for invoking its authori-

ty under FPA s 206(a).

3. Discriminatory Effect of Order 888

Dalton charges that, even if the FPA permits FERC to

impose involuntary wheeling generally, the open access re-

quirement of Order 888 causes rather than remedies discrimi-

nation, and therefore violates FPA s 206(a)'s express re-

quirement that FERC act against undue discrimination.

Specifically, Dalton and the other non-jurisdictional owners of

the Georgia ITS facilities invested millions of dollars in those

facilities in order to use the facilities each owns and receive

reciprocal open access transmission services from the other

owners. Under the Open Access Transmission Tariff

(OATT), other customers do not have to make such invest-

ments to use the Georgia ITS facilities. FERC responds

that Order 888 does not unduly discriminate between old and

new customers of integrated transmission systems like the

Georgia ITS; and that if Dalton has evidence that the tariff

results in undue discrimination in its individual circum-

stances, Dalton remains free to file a petition under FPA

s 206 for redress, and FERC will consider its claim.

FERC's conclusion that its open access requirement is not

unduly discriminatory is subject only to arbitrary and capri-

cious review. See 5 U.S.C. s 706(2)(A) (1994); Sithe/

Independence Power Partners, LP v. FERC, 165 F.3d 944,

948 (D.C. Cir. 1999); Union Pacific Fuels, Inc. v. FERC, 129

F.3d 157, 161 (D.C. Cir. 1997). We conclude that FERC has

adequately explained why its open access requirement is not

unduly discriminatory. Relying upon extensive commentary

as well as its own experiences, FERC concluded that, as a

general matter, transmission industry conditions were condu-

cive to discriminatory practices and anti-competitive behavior,

such that case-by-case adjudication could not adequately ad-

dress the problem. FERC also recognized that its generic

findings may have exceptions, and thus that Order 888 may in

individual circumstances have a different result than that

intended. Therefore, Order 888 does not preclude facilities

owners the opportunity to argue their particular circum-

stances in their OATT filings or, as with Dalton, in their own

petitions for relief under FPA s 206(a). Rather, Order 888

merely shifts from a regulatory norm in which a user of

transmission services must demonstrate to FERC an individ-

ualized need for open access to one in which a provider of

transmission services must present to FERC individualized

circumstances requiring relief from open access. As the

petitioners have a mechanism by which they can seek relief

for their particular concerns, we find nothing arbitrary or

capricious about FERC's conclusion that its approach to open

access is not unduly discriminatory.

In another stab at demonstrating the discriminatory effect

of Order 888's open access requirement, Dalton alerts us to

an agreement entered into between it and Georgia Power

Company (GPC) in partial implementation of antitrust condi-

tions contained in operating licenses issued by the Nuclear

Regulatory Commission for jointly owned nuclear facilities

connected to the Georgia ITS. Those antitrust conditions

require GPC to provide Dalton with transmission services

until the nuclear licenses expire, long after the ITS Agree-

ment terminates. Dalton alleges that limitations imposed by

Order 888 on Dalton's rights upon termination of the ITS

Agreement are inconsistent with GPC's obligations under the

nuclear licenses, and that the interference will result in

discrimination against Dalton. FERC maintains that it

agreed in addressing GPC's Order 888 compliance filing to

treat the ITS Agreements separately.

Ultimately, Dalton has offered no present injury from the

alleged conflict, so this issue is not ripe for review. Dalton

will only be injured if, upon termination of the ITS Agree-

ment, Order 888 interferes with Dalton's right to transmis-

sion services. Dalton's own argument suggests as much,

observing that FERC "left to GPC the decision whether it

'must, but cannot, comply with separate orders' of NRC and

FERC and whether it will present evidence of such conflict to

either Commission," and complaining that even if GPC does

act, "the orders under review provide no assurance that the

competitive transmission and other service rights provided by

the nuclear licenses will be respected under the OATT." Br.

of Petitioner Dalton at 23 (quoting Order 888-A, p 31,048 at

30,452). In short, GPC and FERC are still in the process of

determining whether the antitrust provisions even conflict

with Order 888, as well as how to deal with any such

inconsistency.5 Accordingly, this issue is not appropriate for

judicial review at this time.

B. Constitutional Challenge: Fifth Amendment Takings

Clause

Puget and amicus curiae Pacific Legal Foundation (Pacific)

contend that Order 888 violates the Takings Clause of the

Fifth Amendment. These petitioners maintain that Order

888's open access requirement engineers a "taking" in two

ways: First, that FERC's open access requirement effects a

regulatory taking by arbitrarily changing pricing methodolo-

gy in a way that excessively deprives transmission owners of

their investments in facilities; and, second, that the open

access requirement allows a physical invasion, a permanent

physical occupation, by taking away the transmission owners'

right to exclude competitors from their transmission proper-

ty. We cannot grant relief on either ground.

When the action of the federal government effects a "tak-

ing" for Fifth Amendment purposes, there is no inherent

constitutional defect, provided just compensation is available.

At bottom, both of the petitioners' Fifth Amendment claims

turn not on whether open access effects a taking, but whether

FERC's cost-based transmission pricing policies in the end

provide just compensation. The remedy of just compensation

is not within our jurisdiction but that of the United States

Court of Federal Claims, under the Tucker Act, 28 U.S.C.

s 1491. See Bell Atlantic Tel. Cos. v. Federal Communica-

tions Comm'n, 24 F.3d 1441, 1444 n.1 (D.C. Cir. 1994);

Railway Labor Executives' Ass'n v. United States, 987 F.2d

806, 815-16 (D.C. Cir. 1993).

We recognize that our jurisdiction to review an agency's

construction of a statute necessarily involves an exercise of

__________

5 GPC's management of the Georgia ITS is subject to the di-

rection of a committee that includes Dalton representatives.

the policy of avoiding constitutional issues where possible,

even though the issues may concern arguable takings amena-

ble to Tucker Act remedy, "when 'there is an identifiable

class of cases in which application of a statute will necessarily

constitute a taking.' " Bell Atlantic, 24 F.3d at 1445 (D.C.

Cir. 1994) (quoting United States v. Riverside Bayview

Homes, Inc., 474 U.S. 121, 128 n.5 (1985)). We need not

decide whether this case falls within that category, however,

because even if it did, any takings problem created by Order

888 does not raise such significant constitutional doubt as to

require us to construe the FPA to prohibit FERC from

ordering open access. If there is a taking, and a claim for

just compensation, then that is a Tucker Act matter to be

pursued in the Court of Federal Claims, and not before us.

III. Federal versus State Jurisdiction

over Transmission Services

Vertically integrated utilities use their own facilities to

generate, transmit, and distribute electricity to their custom-

ers. Traditionally, the customer paid one combined rate for

both the power and its delivery, thus the industry refers to

such sales as "bundled." To the extent that bundled sales are

made directly to the end user of the electricity, they are also

recognized as retail sales. Utilities may also sell the electrici-

ty they generate at wholesale to other utilities or other

resellers of power, which then resell that power to their own

customers. Thus, the same utility may use its facilities to

serve both retail and wholesale customers. Vertically inte-

grated utilities use their transmission facilities to move elec-

tricity over long distances, and use local distribution lines to

deliver the electricity to the end user.

Even before Congress enacted the FPA, the Supreme

Court held that states could not regulate wholesale sales of

electricity. See Public Utils. Comm'n of R.I. v. Attleboro

Steam & Elec. Co., 273 U.S. 83 (1927). A few years later in

1935, Congress included in the FPA a provision giving the

Federal Power Commission, FERC's predecessor agency, the

authority to regulate "the sale of [electric] energy at whole-

sale," as well as "the transmission of electric energy in

interstate commerce." FPA s 201(a), 16 U.S.C. s 824(a)

(1994). FERC also limited federal regulation "to those mat-

ters which are not subject to regulation by the States," id.,

and reserved to the states "jurisdiction ... over facilities

used for the generation of electric energy or over facilities

used in local distribution or only for the transmission of

electric energy in intrastate commerce...." FPA s 201(b),

16 U.S.C. s 824(b). Pursuant to these provisions, FERC has

regulated wholesale power sales and interstate transmissions,

and state agencies have retained jurisdiction over bundled

retail transactions, including service issues and the intrastate

sale and distribution of electricity through local distribution

facilities.

Initially, as most transactions involved either a wholesale or

a retail sale, and correspondingly transmission or local distri-

bution facilities, this regulatory division of labor was straight-

forward in application. Indeed, in 1935, when Congress

enacted the FPA, the networks of high-voltage, long-distance

transmission lines which today crisscross the United States

did not exist. Instead, vertically integrated utilities individu-

ally built facilities sufficient to meet the power needs of their

customers. Over time, however, the landscape of the electric

industry changed.

Utilities decided to cover demand spikes by sharing power,

rather than by building more generation capacity. The trans-

mission grid developed from these arrangements. Eventual-

ly, nonutility generators started producing electricity; and

power marketers began to buy and resell electricity to other

power marketers, utilities, or even directly to consumers.

These industry participants do not own transmission lines, so

they rely upon the utilities that own such facilities to provide

transmission services. In addition to their traditional bun-

dled sales activity, vertically integrated utilities started "un-

bundling" their own services and developing their own power

marketing units to buy and sell electricity at wholesale.

Some states even mandate unbundling of retail services. As

a result of these changes, facilities once used solely for local

distribution of bundled retail sales now engage regularly in

unbundled wholesale transmissions and retail delivery as well.

Thus, while the electricity world once neatly divided into

spheres of retail versus wholesale sales, and local distribution

versus transmission facilities, such is no longer the case.

In Order 888, FERC reinterpreted FPA s 201 to accom-

modate the new industry practices and conditions. FERC

left the regulation of bundled retail transmissions to the

states, concluding that "when transmission is sold at retail as

part and parcel of the delivered product called electric ener-

gy, the transaction is a sale of electric energy at retail."

Order 888, p 31,036 at 31,781. Nevertheless, FERC asserted

jurisdiction over all unbundled retail transmissions, and left

to the states only the sales portion of unbundled retail

transactions, on the ground that FPA s 201 gives it jurisdic-

tion without qualification over all transmission by public

utilities in interstate commerce. See id. Also, while ac-

knowledging that FPA s 201(b) explicitly places retail trans-

missions by "facilities used in local distribution" beyond the

Commission's jurisdiction, FERC adopted a seven factor jur-

isdictional test for determining which facilities fall within that

category, and claimed exclusive authority over those that do

not. See id. at 31,780, 31,784. In the present litigation, each

of these changes is challenged, with some petitioners claiming

that FERC went too far, and others contending that the

Commission did not go far enough in asserting jurisdiction.

A. Bundled Retail Sales

Several state regulatory commissions complain that FERC

exceeded the boundaries of its statutory authority by assert-

ing jurisdiction over unbundled retail transmissions. These

state petitioners argue that the plain meaning and history of

FPA s 201(a) gives FERC the authority to regulate only

transmissions of electricity consumed in a state other than

that in which the electricity was generated, if the transmis-

sion was not otherwise subject to state regulation. The

states historically have regulated retail transmissions as part

of bundled retail sales of electricity, while FERC has regulat-

ed wholesale transmissions; and the division of regulatory

jurisdiction should not change merely because those transac-

tions have now been unbundled into separate generation,

transmission, and sales components.

Two groups of transmission dependent utilities, TAPS and

TDU Systems, and the nation's largest power wholesaler,

Enron Power Marketing (collectively the "unbundling and

discounting" or "U&D" petitioners), both intervene on the

side of FERC with respect to the states' claim, and separate-

ly challenge FERC's interpretation of its jurisdiction on

different grounds. The U&D petitioners contend that FERC

impermissibly limited its jurisdiction by leaving the regulation

of bundled retail transmissions to the states. These parties

maintain that FERC has the authority to regulate both

bundled and unbundled retail transmissions, and that FERC

violates FPA s 206 by limiting the scope of Order 888 to the

latter. To establish that bulk transmission by utilities is

transmission in interstate commerce regardless of whether

the power is sold at wholesale or retail, the U&D petitioners

cite particularly FPC v. Florida Power & Light Co., 404 U.S.

453 (1972), and Jersey Central Power & Light Co. v. FPC, 319

U.S. 61 (1943), two of the cases relied upon by FERC in the

Notice of Proposed Rulemaking, p 32,514 at 33,135-42. As

further support that FERC's jurisdiction extends to all inter-

state transmissions, the U&D petitioners offer NGA prece-

dent recognizing FERC's authority over all interstate gas

transportation, if not the gas being transported. See, e.g.,

FPC v. Louisiana Power & Light Co., 406 U.S. 621, 636

(1972); United Distribution Cos. v. FERC, 88 F.3d 1105, 1153

(D.C. Cir. 1996) (UDC); Mississippi River Transmission

Corp. v. FERC, 969 F.2d 1215 (D.C. Cir. 1992). These

petitioners contend that excluding bundled retail transmis-

sions from the OATT will permit discrimination and give

owners a competitive advantage, contrary to the mandate of

FPA s 206(a) that FERC eliminate undue discrimination.

Accordingly, the U&D petitioners claim that FERC erred

when it declined to mandate functional unbundling for an

owner's transmissions to bundled retail customers of (1) its

own generated power or (2) power purchased at wholesale.

In response to these challenges, FERC maintains that the

plain meaning of FPA s 201 gives the Commission jurisdic-

tion over all interstate transmissions without qualification,

while at the same time limiting jurisdiction over sales to

wholesale sales. Relying particularly on Florida Power &

Light and Jersey Central Power & Light, FERC asserts

broad jurisdiction over all transmission activities in interstate

commerce. As for bundled retail sales, FERC's position is

that once the transmission service is bundled with generation

and local distribution, it becomes merely a component of the

retail sale itself, over which FERC has no jurisdiction.

FERC maintains that natural gas jurisprudence is inapplica-

ble because the language of the NGA and FPA differ on this

issue, and the natural gas cases turned on the existence of a

regulatory gap that does not exist in the electricity field.

FERC also asserts that its interpretation of the FPA's juris-

dictional grant is entitled to deference under Chevron U.S.A.

Inc. v. Natural Resources Defense Council, 467 U.S. 837

(1984).

Both FPA s 201(a) and (b) clearly and unambiguously

confer upon FERC jurisdiction over the "transmission of

electric energy in interstate commerce." FPA s 201(c) fur-

ther provides that "electric energy shall be held to be trans-

mitted in interstate commerce if transmitted from a State and

consumed at any point outside thereof." 16 U.S.C. s 824(c).

In both Florida Power & Light and Jersey Central Power &

Light, the Supreme Court considered whether certain indirect

transmissions of electrical power across state lines represent-

ed transmissions in interstate commerce.

Jersey Central Power & Light involved the transmission of

energy generated by Jersey Central in New Jersey. Jersey

Central transmitted electricity to the New Jersey transmis-

sion facilities of another company, Public Service, which then

transmitted the power first to another of its New Jersey

facilities, and then on to a facility owned by yet a third

company and located in the middle of a body of water

separating New Jersey from Staten Island, New York. The

third company in the chain then transmitted the energy first

to its own facilities in New York, then finally and ultimately

to consumers in New York. Jersey Central's own transmis-

sion facilities were located solely in New Jersey, and as were

the facilities used by Public Service to receive the transmis-

sions from Jersey Central.

The Supreme Court recognized that Jersey Central had no

control over the transmissions' destination once the electricity

was delivered to Public Service, see Jersey Central, 319 U.S.

at 65, and that the total flow of electricity from Jersey

Central to New York was small. See id. at 66. Nevertheless,

because some electricity generated by Jersey Central in New

Jersey was consumed in New York, the Court upheld

FERC's jurisdiction under FPA s 201 over Jersey Central's

transmission facilities as utilized for transmissions in inter-

state commerce. See id. at 67. The Court said that, under

FPA s 201(a) and (b), FERC's power extends over all facili-

ties "which transmit energy actually moving in interstate

commerce." Id. at 72. The Court emphasized, however, that

"mere connection" of one utility's transmission facilities to

those of another transmitting in interstate commerce was

insufficient for jurisdiction under FPA s 201. Id.

The Court revisited the issue in Florida Power & Light,

which involved certain Florida and Georgia utilities who

voluntarily connected their transmission facilities to coordi-

nate their activities and exchange power as required to meet

temporary needs. Like Jersey Central, FP&L's transmission

facilities were confined to Florida, and none of FP&L's

transmission lines directly connected with those of out-of-

state companies. Nevertheless, because FP&L was a mem-

ber of a group of interconnected utilities, its transmission

lines connected with those of other Florida utilities; and the

lines of one of those other utilities, Florida Power Corp.,

interconnected just short of Florida's northern border with

those of Georgia Power Co. Records indicated that power

transfers between FP&L and Florida Power coincided with

transfers between Florida Power and Georgia Power.

In Jersey Central, logs of the relevant companies demon-

strated at least a dozen occasions when facilities in New York

drew power from certain lines at times when Jersey Central

was the only supplier of electricity to those lines. See

Florida Power & Light, 404 U.S. at 459. By way of contrast,

there was no similar evidence that power generated by FP&L

specifically passed through Florida Power to Georgia Power,

with Florida Power serving as a mere conduit. See id. At

best, company records demonstrated instances when trans-

fers between FP&L and Florida Power occurred at or about

the same time as transfers between Florida Power and

Georgia Power. See id. at 457.

Instead, the Court considered two theories by which

FP&L's power could be deemed transmitted across state

lines. The first posited a cause and effect relationship by

which every flick of a light switch would cause every genera-

tor on a multi-state interconnected system to produce some

quantity of additional electricity to maintain the system's

balance, and thus to transmit electric energy throughout the

system and across state lines. The second theory suggested

that where the transmission lines of two utilities interconnect,

their energy commingles, such that inevitably some energy

transmitted by FP&L to Florida Power was then transmitted

to Georgia Power and across state lines.

Despite its statement in Jersey Central that "mere connec-

tion determines nothing," 319 U.S. at 72, the Court relied on

the second of these theories to conclude that FP&L's facilities

were transmitting energy in interstate commerce, and left

open the possible validity of the cause and effect theory. See

404 U.S. at 462-63. Writing in dissent, Justice Douglas

characterized the Court's opinion as "mean[ing] that every

privately owned interconnected facility in the United States

... is within the [Federal Power Commission's] jurisdiction,"

such that otherwise local utilities would now be subject to the

mandates of the federal bureaucracy. Id. at 471 (Douglas, J.,

dissenting).

The Supreme Court has interpreted the language in FPA

s 201 regarding FERC's jurisdiction over transmissions in

interstate commerce. We are bound by the High Court's

dictates to conclude that the FPA gives FERC the authority

to regulate the transmissions at issue here, whether retail or

wholesale. Even if the Court had not so spoken, however,

and even if we independently concluded that the statute's text

was less than clear, it is the law of this circuit that the

deferential standard of Chevron U.S.A. Inc. v. Natural Re-

sources Defense Council, 467 U.S. 837 (1984), applies to an

agency's interpretation of its own statutory jurisdiction. See

Oklahoma Natural Gas Co. v. FERC, 28 F.3d 1281, 1283-84

(D.C. Cir. 1994). As guided by Chevron, unless Congress has

directly spoken to the contrary, or FERC has unreasonably

or impermissibly interpreted the statute, we must defer to

the Commission's construction of ambiguous provisions of the

FPA. See Chevron, 467 U.S. at 842-43. In this age of

interconnected transmission grids, and given the accompany-

ing technological complexities, we would be hard pressed to

conclude that FERC's interpretation of s 201(c) as giving it

jurisdiction over both wholesale and retail transmissions is

unreasonable or impermissible.

Nevertheless, we are not persuaded that this conclusion

requires FERC to mandate unbundling and assert jurisdic-

tion over all retail transmissions. Just as FPA s 201 gives

FERC jurisdiction over transmissions in interstate commerce

and sales at wholesale, the statute also clearly contemplates

state jurisdiction over local distribution facilities and retail

sales. The statute is much less clear about exactly where the

lines between those activities are to be drawn. A regulator

could reasonably construe transmissions bundled with genera-

tion and delivery services and sold to a consumer for a single

charge as either transmission services in interstate commerce

or as an integral component of a retail sale. Yet FERC has

jurisdiction over one, while the states have jurisdiction over

the other. FERC's decision to characterize bundled trans-

missions as part of retail sales subject to state jurisdiction

therefore represents a statutorily permissible policy choice to

which we must also defer under Chevron. Accordingly, we

affirm FERC's decisions in Order 888 to assert jurisdiction

over unbundled retail transmissions while leaving regulation

of bundled retail transmissions to the states.

B. Local Distribution Facilities

FPA s 201(b) explicitly excludes from FERC jurisdiction

"facilities used in local distribution or only for the transmis-

sion of electric energy in intrastate commerce." 16 U.S.C.

s 824(b)(1). Historically, wholesale sales have not for the

most part involved local distribution facilities. FERC claims

that increased unbundling gives resellers the opportunity to

reconfigure the wholesale sales so that they might now occur

on those facilities which traditionally have been treated as

local distribution facilities. Moreover, FERC's assertion of

jurisdiction over the transmission component of unbundled

retail sales blurred the line between local distribution facili-

ties and facilities used for transmission in interstate com-

merce.

In Order 888, FERC claimed exclusive authority over the

regulation of facilities which sell and transmit electricity at

wholesale to customers who will resell the electricity to end

users. With respect to unbundled retail sales, FERC ac-

knowledged that transmissions by "facilities used in local

distribution" are beyond the Commission's jurisdiction, while

facilities engaged in interstate transmission are subject to

FERC jurisdiction under FPA s 201(a). Thus FERC

adopted a seven factor jurisdictional test to identify whether a

facility is a local distribution facility subject to state jurisdic-

tion or a facility engaged in interstate transmission subject to

FERC jurisdiction.6 In short, under Order 888, when a

__________

6 The Commission's seven factor test involves evaluating on a

case-by-case basis whether the activities of the facilities in question

correspond with seven specific indicators of local distribution:

(1) Local distribution facilities are normally in close proximity

to retail customers.

(2) Local distribution facilities are primarily radial in charac-

ter.

(3) Power flows into local distribution systems; it rarely, if

ever, flows out.

(4) When power enters a local distribution system, it is not

reconsigned or transported on to some other market.

(5) Power entering a local distribution system is consumed in a

comparatively restricted geographical area.

(6) Meters are based at the transmission/local distribution

public utility is engaged in wholesale transmission, FERC has

jurisdiction regardless of the nature of the facility; but when

the public utility is engaged in unbundled retail transmission,

the facts and circumstances will determine whether the facili-

ties are subject to FERC or state jurisdiction.

The state petitioners argue that FERC's dual approach

radically expands its jurisdiction and violates Congress' ex-

plicit directive in FPA s 201(b) that regulation of local distri-

bution facilities be left to the states. The states contend that

Congress clearly intended to preserve state jurisdiction over

local distribution facilities, regardless of whether the energy

comes from out of state or the sale is a wholesale sale. The

states maintain that, by claiming jurisdiction over any facility

transporting energy for resale, regardless of whether the

facility might otherwise be a local distribution facility under

the seven factor test, FERC has adopted the circular reason-

ing that wholesale sales do not occur on local distribution

facilities, so any facility that engages in wholesale activities is

not a local distribution facility. The states contend further

that FERC offers no reasoned analysis of why local distribu-

tion should be defined differently for wholesale versus retail

sales. The states finally charge that, under Order 888, nearly

identical facilities would be under federal jurisdiction and

state jurisdiction for different customers receiving indistin-

guishable service. Such a situation, they contend, will only

encourage energy marketers to choose their regulator by

using middlemen to shift the point at which title to the power

transfers, and thus undermine the jurisdictional certainty that

Order 888 states is necessary for competition.

FERC responds that it is not asserting jurisdiction over

local distribution facilities, but asserts that when a public

utility delivers unbundled energy at wholesale to a supplier

for the purpose of resale to an end user, FPA s 201 gives

FERC unqualified authority to assert jurisdiction over the

facility used to effect that transaction. When the public

utility is engaged in unbundled retail transmission, however,

__________

interface to measure flows into the local distribution system.

(7) Local distribution systems will be of reduced voltage.

Order 888, p 31,036 at 31,981.

the circumstances of a specific case will determine whether

the facilities used are subject to FERC or state jurisdiction.

The arguments by the states do no more than raise policy

concerns which are for FERC and not the court. See Arent

v. Shalala, 70 F.3d 610 (D.C. Cir. 1995).

Intervening again on FERC's behalf on this issue, the

U&D petitioners add that FERC's use of different tests is

appropriate given the differences in the two separate jurisdic-

tional grants of FPA s 201. The intervenors argue that,

given the statute's clear grant to FERC of jurisdiction over

all aspects of wholesale sales, FERC is fully justified in

employing a functional test to identify wholesale transmis-

sions. In contrast, because FERC's jurisdiction over retail

sales is limited to transmissions in interstate commerce, the

seven factor test is more appropriate.

We agree that FERC's dual approach to assessing its

jurisdiction stems from the fact that FPA s 201 contains

more than one jurisdictional grant. FPA s 201(b) denies

FERC jurisdiction over local distribution facilities "except as

specifically provided in this subchapter and subchapter III."

16 U.S.C. s 824(b)(1) (emphasis added). FPA s 201(a)

makes clear that all aspects of wholesale sales are subject to

federal regulation, regardless of the facilities used. FERC's

assertion of jurisdiction over all wholesale transmissions,

regardless of the nature of the facility, is clearly within the

scope of its statutory authority. Moreover, various cases

support the proposition that FERC regulates all aspects of

wholesale transactions. See, e.g., Duke Power Co. v. FPC,

401 F.2d 930, 935-36 (D.C. Cir. 1968) (noting that the FPC

regulates public utility facilities used in wholesale transmis-

sions or sales in interstate commerce); Arkansas Power &

Light Co. v. FPC, 368 F.2d 376, 383 (8th Cir. 1966) (stating

that the functional use of the transmission lines--wholesale

versus retail--controls); Wisconsin-Michigan Power Co. v.

FPC, 197 F.2d 472, 477 (7th Cir. 1952) (finding that transmis-

sion facilities used at wholesale are not "local distribution

facilities").

The seven factor test applies only to unbundled retail sales,

where FERC seeks to regulate pursuant to the separate

grant of jurisdictional authority over transmissions in inter-

state commerce. In this context, the definition of "facilities

used in local distribution" becomes relevant. The statute

does not define "facilities used in local distribution," but

instead leaves that task to FERC. As Chevron counsels us,

FERC's interpretation of undefined and ambiguous statutory

terms is entitled to deference. See Chevron, 467 U.S. at 842-

43.

FERC has adopted a multi-factor test to determine the

nature of transmission facilities. In a footnote, Order 888

says that distribution-only facilities which sell only at retail

will still be considered local distribution facilities. See Order

888, p 31,036 at 31,981 n.99. This is consistent with the fact

that states historically have regulated bundled retail sales to

end users. However, Order 888 implicitly recognizes the

current reality that many primarily retail utilities engage in

both local distribution and interstate transmissions, and seeks

through the seven factors to discern each facility's primary

function. We cannot agree with the state petitioners that this

approach is unreasonable or otherwise impermissible.

IV. Reciprocity

Section 6 of the Tariff contains a reciprocity provision

resting on the principle that any public utility offering "non-

discriminatory open access transmission for the benefit of

customers should be able to obtain the same non-

discriminatory access in return." Order 888, p 31,036 at

31,760. Non-public utilities--those outside the Commission's

jurisdiction because, for instance, they are state-owned, see 16

U.S.C. s 824(f)--would otherwise not have to offer open-

access. Under the Tariff, a public utility does not have to

offer them access unless they reciprocate. In order to avoid

controversies between public and non-public utilities regard-

ing reciprocal service, the Commission adopted a voluntary

"safe harbor" provision pursuant to which non-public utilities

could submit a transmission tariff to the Commission for a

determination whether it satisfied the reciprocity condition.

If it did, the public utility would have to offer service; if it did

not, the public utility could refuse service (although it had the

option of waiving the reciprocity condition, as did the Com-

mission itself).

A. Indirect Regulation of Non-Jurisdictional Utilities

Nebraska Public Power District (NPPD), a state entity,

provides electrical generation, transmission and distribution

service to wholesale and retail customers throughout Nebras-

ka.7 It claims that the Commission, through the reciprocity

provision, has reached beyond its statutory authority and is

illegally attempting to regulate entities, including NPPD, over

which the Commission has no jurisdiction, in violation of the

Federal Power Act and the Tenth Amendment to the Consti-

tution. NPPD admits that pursuant to Nebraska law, all

state power districts are obligated to provide open access

transmission service. They have been doing so for years.

This is doubtless why, after Order No. 888 issued, another

Nebraska public power district so easily obtained a safe

harbor declaration. See Omaha Pub. Power Dist., 81

F.E.R.C. p 61,054 (1997). In light of this, the Commission

argues--and we agree--that NPPD's petition is unripe.

Since NPPD already offers open access transmission, it is far

from certain that the reciprocity provision will have any effect

on it.8 It certainly has not demonstrated any particular

hardship that it would suffer if we refused to engage in pre-

enforcement judicial review. See AT&T Corp. v. Iowa Utils.

Bd., 525 U.S. 366, 386 (1999). From all that appears, no

public utility has refused, or even threatened to refuse, to

give NPPD access to its transmission system in the wake of

__________

7 "Nebraska is unique among the States in the Union in that all

generation, transmission and distribution service is provided by

public entities, municipalities and cooperatives whose governing

boards are responsible to, and serve at the voting pleasure of, the

rate-payers they serve." NPPD Brief at 2.

8 The Commission made clear that existing contracts will not be

affected. See Order 888-A, p 31,048 at 30,181.

Order No. 888.9 Given the fact that public utilities may waive

the reciprocity provision anyway, and that NPPD has the

same option of obtaining a safe harbor as did the Omaha

Public Power District, we are not persuaded that the provi-

sion is currently altering NPPD's conduct of its affairs or that

withholding judicial review will cause it any hardship whatev-

er. "Unlike the drug manufacturers in Abbott Laboratories

[v. Gardner, 387 U.S. 136 (1967)], but like the cosmetics

companies in Toilet Goods Ass'n v. Gardner, 387 U.S." 158,

164 (1967), NPPD need not change its "behavior or risk costly

sanctions." Clean Air Implementation Project v. EPA, 150

F.3d 1200, 1205 (D.C. Cir. 1998). Furthermore, exactly how

the Commission will fill in the contours of the reciprocity

provision remains to be seen. That it may defer to state

commissions, as it indicated in Houston Lighting & Power

Co., 81 F.E.R.C. p 61,015 (1997), order on reh'g, 83 F.E.R.C.

p 61,181 (1998), affects NPPD's contention that the Commis-

sion is seeking to bring about nationwide uniformity by

forcing non-public utilities to comply with its "detailed man-

dates." NPPD Brief at 5. We therefore believe the issues

raised would benefit from a more concrete setting in which

NPPD can demonstrate exactly how the reciprocity provision

has affected its primary conduct. See Clean Air Implemen-

tation Project, 150 F.3d at 1204. For all these reasons,

NPPD's challenge to the reciprocity provision is not ripe for

judicial review.

B. Limitation on Reciprocity

The Investor Owned Utilities (IOUs) challenge the follow-

ing limitation on reciprocity: non-public utilities owe recipro-

cal open access only to the public utility from which they take

open access service--not to all utilities. See IOU Brief at 40-

44; IOU Reply Brief at 18-20. These petitioners argue that

the Commission has left open the door for non-public utilities

__________

9 For this reason we find unpersuasive NPPD's claim that the

Tariff's reciprocity provision places it at a disadvantage in negotia-

tions because a public utility may simply refuse to provide service

without any fear of a Commission enforcement action. See NPPD

Reply Brief at 4-5.

to discriminate against all other utilities and that it has done

so solely because of tax considerations that no longer apply.

We agree with Commission counsel that tax considerations

were not the only basis on which the Commission's limitation

rested. The Commission stated that "the reciprocity require-

ment strikes an appropriate balance by limiting its application

to circumstances in which the non-public utility seeks to take

advantage of open access on a public utility's system." Order

888, p 31,036 at 31,762. The Commission also explained that

it "do[es] not have the authority to require non-public utilities

to make their systems generally available." Id. at 31,761.

The Commission stated also that it did not want broad open

access reciprocity to jeopardize the tax-exempt financing non-

public utilities enjoy,10 that the IRS was then reexamining the

question, id. at 31,762, and that if the tax issue is favorably

resolved, it will reconsider the matter. Order 888-A,

p 31,048 at 30,287. The IRS has now acted. See Temporary

Regulations s 1.141-7T(f), in 63 Fed. Reg. 3256 (1998). The

IOUs argue that we must therefore remand for reconsidera-

tion. See IOU Brief at 44 (citing Panhandle Eastern Pipe-

line v. FERC, 890 F.2d 435, 439 (D.C. Cir. 1989); National

Fuel Gas Supply Corp. v. FERC, 899 F.2d 1244, 1249-50

(D.C. Cir. 1990); Ciba-Geigy v. EPA, 46 F.3d 1208 (D.C. Cir.

1995)).

We think not. So far as we know, the IRS has not finalized

its temporary and proposed regulations. The IRS acknowl-

edges that its temporary regulations "raise[ ] a number of

complex technical issues" many of which "may need to be

addressed legislatively" and it anticipates that the finalization

process will take three years to accomplish. 63 Fed. Reg. at

3258-59. Second, as the Commission indicates, the possible

tax consequences of requiring open access from non-

jurisdictional utilities was its secondary concern. The Com-

mission's greater concern was its lack of jurisdiction to do

what the IOUs ask. And lastly the Commission should be

__________

10 See 26 U.S.C. ss 141, 142 (permitting "private activity" bonds

and "local furnishing" bonds, respectively).

taken at its word that it will reconsider the scope of reciproci-

ty when and if the temporary tax regulations are finalized.

V. Stranded Cost Recovery Provisions

Ordering open access transmission, Order 888-A explains

that "[t]he most critical transition issue that arises as a result

of the Commission's actions in this rulemaking is how to deal

with the uneconomic sunk costs that utilities prudently in-

curred under an industry regime that rested on a regulatory

framework and a set of expectations that are being funda-

mentally altered." Order 888-A, p 31,048 at 30,346. "If a

former wholesale requirements customer or a former retail

customer uses the new open access to reach a new supplier,"

FERC said, "we believe that the utility is entitled to recover

legitimate, prudent and verifiable costs that it incurred under

the prior regulatory regime...." Order 888, p 31,036 at

31,789.

According to FERC, these "stranded" costs consist pre-

dominantly of costs of building generation capacity, which

utilities incurred with the expectation that they would use the

additional capacity to serve existing customers. See Notice of

Proposed Rulemaking, Recovery of Stranded Costs by Public

Utilities and Transmitting Utilities, FERC Stats. & Regs.

p 32,507 at 32,863-64, 59 Fed. Reg. 35,274 (1994) ("Stranded

Cost NOPR"). Because of the increased competition in the

generation market that will result from open access, this

capacity may become underutilized or uneconomical, i.e.,

"stranded." Stranded costs also include nonrecurring costs

approved by regulators that, in order to avoid rate increases,

were recovered over a period of years instead of at the time

the expenditures were made. Known as "regulatory assets,"

these costs include deferred income taxes, deferred pension

and other employee benefit and retirement costs, research

and development, extraordinary property losses, and the

phase-in of new plant costs. Nuclear decommissioning costs

and costs to buy out high-priced fuel and power contracts

may also become stranded as a result of open access.

Exercising its exclusive jurisdiction over wholesale power

sales, FERC through Order 888 gave utilities the opportunity

to recover their stranded costs from former wholesale cus-

tomers who take advantage of open access transmission to

purchase power from other suppliers. Order 888, p 31,036 at

31,810. With respect to stranded costs resulting from state-

ordered retail wheeling, Order 888 provides that FERC will

consider stranded cost claims only when state regulatory

agencies lack authority to do so. Id. at 31,824-25. Order 888

also designated FERC as the primary forum for stranded

cost claims stemming from what are known as new municipal-

izations and municipal annexations. See Order 888-A,

p 31,048 at 30,404; Order 888-B, 81 FERC at 62,104.

Stranded costs in these situations result from retail (as

opposed to wholesale) power sales.

Petitioners challenge nearly every aspect of FERC's

stranded cost policy as set forth in Order 888, from the

mechanics of calculating customers' stranded cost obligations

to whether FERC has authority to address stranded costs at

all. We begin with those challenges that relate to the recov-

ery of wholesale stranded costs (Section V.A), then turn to

challenges to Order 888's treatment of retail stranded costs

(Section V.B). We affirm FERC's stranded cost policy in all

respects, except we vacate that portion of the orders dealing

with the treatment of energy costs in the market option and

remand to FERC for further explanation. See Section

V.A.5.c.

A. Wholesale Stranded Costs

In requiring nondiscriminatory open access transmission as

a remedy for undue discrimination, FERC recognized that it

"cannot change the rules of the game without providing a

mechanism for recovery of the costs caused by such

regulatory-mandated change." Order 888-A, p 31,048 at

30,346. Under the pre-open access regulatory regime, utili-

ties entered into long-term contracts to make wholesale pow-

er sales to municipal, cooperative, and investor-owned utili-

ties. See Stranded Cost NOPR, p 32,507 at 32,862. Because

these customers had no source of power supply other than

their historic utility, these contracts were typically extended

at the end of their term. This produced an implicit obligation

by the utilities to continue satisfying their customers' power

needs, as well as a reciprocal expectation by customers of

continued service. See id. at 32,863-64. To satisfy expected

customer demand, utilities invested money, built facilities, and

entered into long-term fuel or power contracts, relying on the

"regulatory compact" under which utility shareholders accept-

ed lower rates of return on their investment in exchange for

the certainty of regulated rates and resulting ability to recov-

er prudently incurred costs. See Notice of Proposed Rule-

making, Promoting Wholesale Competition Through Open

Access Non-discriminatory Transmission Services by Public

Utilities; Recovery of Stranded Costs by Public Utilities and

Transmitting Utilities, FERC Stats. & Regs. p 32,514 at

33,049, 60 Fed. Reg. 17,662 (1995).

Order 888 fundamentally undermines utilities' expectation

of continued service and cost recovery. A utility's require-

ments customers may now use the utility's open access trans-

mission service to purchase power from other suppliers at the

end of their contract terms. If customers leave before paying

their share of costs the historic utility incurred on their

behalf, the utility will be left with stranded costs, which it will

either absorb or shift to remaining customers.

Unless utilities are able to recover stranded costs, FERC

reasoned, their ability to compete and attract investor capital

in a deregulated market may be seriously impaired. FERC

therefore decided that it had to "address recovery of the

transition costs of moving from a monopoly-regulated regime

to one in which all sellers can compete on a fair basis and in

which electricity is more competitively priced." Order 888,

p 31,036 at 31,635. In reaching this conclusion, FERC relied

on its experience in restructuring the natural gas industry,

where this court faulted it for failing to provide transitional

mechanisms such as stranded cost recovery. FERC ex-

plained: "We have learned from our experience in the natural

gas area the importance of addressing competitive transition

issues early and with as much certainty to market partici-

pants as possible." Id.

In shaping its stranded cost recovery mechanism, FERC

had to balance two competing interests: speeding the transi-

tion to competition versus protecting utilities that had in-

curred costs with the expectation that their customers would

remain and eventually pay those costs through electricity

rates. Allowing recovery of stranded costs, FERC acknowl-

edged, would delay full realization of the benefits of open

access--lower electricity rates--because customers facing

stranded cost liability might continue purchasing power from

their historic utility even though competitors are selling

power at lower rates. See Order 888-A, p 31,048 at 30,355.

Indeed, a customer would only switch suppliers if the compet-

itor offered a rate less than the historic utility's rate plus the

customer's stranded cost liability. But given the highly regu-

lated nature of the electricity industry, in which utilities

incurred costs with the expectation of recouping them, FERC

concluded that the delay was a necessary component of its

open access program. See id. Mindful of its ultimate goal of

converting the electricity industry into a competitive market,

however, FERC fashioned the stranded cost recovery provi-

sions to be transitional, allowing utilities to recover stranded

costs only in connection with wholesale requirements con-

tracts entered into on or before July 11, 1994 (the date of the

stranded cost notice of proposed rulemaking). See 18 C.F.R.

s 35.26(b)(8), 35.26(c)(1)(v)-(vi).

As to precisely who should pay for stranded costs, utilities

and customers not surprisingly had dramatically different

positions. Customers argued that utilities should absorb

most, if not all, stranded costs. Utilities (and their investors)

argued that customers should pay.

Facing an enormously difficult task in balancing these

sharply conflicting positions, FERC crafted a rule that re-

quires customers to pay stranded costs but only in certain

circumstances. Most important, in order to recover stranded

costs from a customer, the historic utility must prove that it

had a reasonable expectation of continued service to that

particular customer for a certain number of years beyond the

end of the contract term; a utility unable to prove such an

expectation may not recover stranded costs under Order 888.

See 18 C.F.R. s 35.26(c)(2)(i). Moreover, a utility able to

demonstrate a reasonable expectation of continued service

may recover stranded costs only if its wholesale customer

actually takes advantage of the utility's open access tariff to

obtain access to a new generation supplier at the end of its

contract term (i.e., the former customer continues to use the

historic utility's transmission service but no longer purchases

power from it). See 18 C.F.R. s 35.26(b)(1)(i). Through

these two limitations, FERC balanced the interests of utilities

and customers by allowing utilities to recover their stranded

costs only if they can demonstrate a reasonable expectation of

continued service and requiring customers to pay those costs

only if they take advantage of their historic utility's open

access transmission to reach cheaper sources of power. And

of course, no customer will have to pay stranded costs at all if

it continues purchasing power from its historic utility

throughout the period during which the utility has a reason-

able expectation of continued service--precisely what the

customer would have done in the absence of Order 888's open

access requirement.

Under Order 888, stranded costs are calculated on a "reve-

nues lost" basis. A departing customer's stranded cost obli-

gation equals the estimated revenue it would have paid had it

continued to purchase power from the historic utility minus

the current market value of the power it would have pur-

chased, calculated over the period the utility is determined to

have a reasonable expectation of continued service to that

customer. See 18 C.F.R. s 35.26(c)(2)(iii). In other words,

the stranded cost formula is not tied to particular stranded

assets or contractual commitments, but rather awards utilities

the difference between the pre-open access cost-based rate

and the post-open access market rate. Once a customer's

stranded cost liability is calculated, it may pay through a

lump-sum payment, installment payments, or a surcharge to

the transmission rate charged by the historic utility. See

Order 888, p 31,036 at 31,799.

Before turning to petitioners' arguments, we emphasize

what should be obvious from the foregoing summary of Order

888: Order 888 awards stranded costs to no one. It does

nothing more than establish a mechanism by which utilities

may seek to recover stranded costs. To recover stranded

costs, a utility must demonstrate its continued expectation of

service at an evidentiary hearing. The customer may appear

at that hearing and, through evidentiary submissions of its

own, attempt to demonstrate that the utility had no such

expectation. Only after such a hearing may FERC decide

whether a utility can recover stranded costs and, if so, how

much.

Petitioners mount many challenges to Order 888's stranded

cost recovery provisions. For purposes of analysis, we group

these challenges into five categories: (1) challenges to

FERC's authority to provide for stranded cost recovery

(section V.A.1); (2) claims that Order 888 conflicts with cost

causation principles and case law developed under the Natu-

ral Gas Act (section V.A.2); (3) challenges to FERC's Mobile-

Sierra findings (section V.A.3); (4) claims that FERC arbi-

trarily and capriciously failed to provide for stranded cost

recovery by certain entities, such as transmission dependent

utilities and generation and transmission cooperatives (section

V.A.4); and (5) challenges to various technical aspects of

Order 888's stranded cost recovery provisions (section V.A.5).

1. FERC's Authority to Provide for Stranded Cost Recovery

A group called Petitioners Opposing Stranded Cost Recov-

ery ("POSCR") advances three challenges to FERC's authori-

ty to provide for stranded cost recovery: (1) as a factual

matter, utilities could never have had a reasonable expecta-

tion of continued service to wholesale customers beyond the

contract term; (2) sections 206 and 212 of the Federal Power

Act ("FPA") forbid stranded cost recovery; and (3) our

decision in Cajun Elec. Power Coop., Inc. v. FERC, 28 F.3d

173 (D.C. Cir. 1994), holds that stranded cost recovery is

anticompetitive. We consider each argument in turn.

a. Reasonable expectation of continued service

To recover stranded costs relating to a specific departing

wholesale requirements customer, a utility must show that it

had a reasonable expectation of service to that customer

beyond the term of its existing contract. See 18 C.F.R.

s 35.26(c)(2)(i). Pointing out that contracts define the extent

of the parties' obligations and that customers have long

exercised their rights to purchase power from other suppliers

at the end of their contract terms, POSCR contends that

utilities could never have had an expectation of service be-

yond their contract terms. In considering this argument it is

important to remember that Order 888 does not itself award

stranded costs; it merely establishes a procedure by which

utilities may petition FERC in individual proceedings to

recover stranded costs from a specific customer based on a

specific evidentiary showing. Utilities failing to show an

expectation of continued service will be unable to recover

stranded costs. POSCR's challenge thus amounts to a claim

that no utility could ever, under any circumstances, have had

a reasonable expectation to serve a wholesale customer be-

yond the term of its contract. We review this claim under

the APA's familiar arbitrary and capricious standard. See 5

U.S.C. s 706(2)(A); Williams Field Services Group, Inc. v.

FERC, 194 F.3d 110, 115 (D.C. Cir. 1999).

Responding to this same challenge in Order 888-A, FERC

explained that utilities historically had an implicit obligation

to serve customers beyond the contract term for a simple

reason: Customers had no means of reaching alternative

suppliers. See Order 888-A, p 31,048 at 30,354. As part of

that obligation to serve, FERC found, a local utility "had a

concomitant obligation to plan to supply [its] customers'

continuing needs, and planned its system taking account of

the wholesale load. In many cases the wholesale customers

participated by supplying load forecasts." Id. In making

capital decisions and predicting future demand, utilities fre-

quently consulted with their wholesale requirements custom-

ers. For these reasons, FERC concluded, utilities may have

a reasonable expectation of continued service to particular

customers. See id. at 30,354-55.

Not only is FERC's judgment about utilities' reasonable

expectations precisely the type of policy assessment to which

we owe great deference, but POSCR points to nothing sug-

gesting that FERC's reasoning is arbitrary and capricious.

In fact, POSCR's argument completely ignores the highly

regulated nature of the electricity industry prior to Order

888. Unlike competitive markets, where buyers may freely

purchase from many sellers, the monopolistic character of the

electricity industry, combined with the congressionally im-

posed regulatory structure, left requirements customers high-

ly dependent on a single supplier--their historic utility. In-

deed, as intervenors point out, utilities were even unable to

choose not to renew an expiring wholesale requirements

contract without first notifying FERC. See 18 C.F.R. s 35.15

(1995) (repealed by Order 888). Although it may well be

true, as POSCR argues, that some wholesale customers have

long been able to purchase unbundled transmission service,

we think such evidence is best reserved for individual pro-

ceedings, where a departing customer can attempt to refute

the utility's claim that it had an expectation of continued

service.

b. Sections 206 and 212 of the FPA

Section 206(a) of the FPA gives FERC authority to "deter-

mine the just and reasonable rate, charge, classification, rule,

regulation, practice, or contract to be thereafter observed and

in force" if it finds that any existing arrangement "is unjust,

unreasonable, unduly discriminatory or preferential." 16

U.S.C. s 824e(a). Relying on section 206(a) as the basis for

Order 888, FERC found that utilities had used their monopo-

ly transmission power to discriminate against potential com-

petitors and that such practices would increase as competitive

pressures in the industry increased. Order 888, p 31,036 at

31,676, 31,682.

POSCR contends that Order 888's stranded cost recovery

provisions themselves violate FERC's own construction of

section 206, the construction FERC relied on as the basis for

the open access rule. According to POSCR, "[t]he stranded

cost rule perpetuates the very 'discrimination' FERC found

unlawful, and subjects the same victims--customers held

hostage to uneconomic electric generation by transmission

monopolists--to continued abuse."

In challenging FERC's policy decision to provide for

stranded cost recovery, POSCR conflates the violation

(FERC's generic determination that utilities' practice of pro-

hibiting access to their transmission lines on reasonable terms

was unduly discriminatory) with the remedy (FERC's more

limited finding that recovery of stranded costs in particular

circumstances would not be unduly discriminatory). FERC

has not, as POSCR contends, given "unduly discriminatory"

different meanings; rather, it has applied the term in differ-

ent contexts.

POSCR's argument thus boils down to a challenge to

FERC's conclusion that the stranded cost recovery pre-

scribed in Order 888 is not unduly discriminatory, a challenge

meriting arbitrary and capricious review. Viewed through

this lens, we think FERC more than adequately explained

why it concluded that stranded cost recovery is not unduly

discriminatory--stranded cost recovery, FERC said, is transi-

tional only, follows cost causation principles, and requires

utilities to prove that they had a reasonable expectation of

continued service. FERC faced an enormously difficult task.

It had to balance the transition to competitive markets

against the need to maintain the competitiveness of utilities

that had incurred costs based on a reasonable expectation

that they would recoup them. We find nothing either arbi-

trary or capricious in how FERC struck this balance.

POSCR next contends that stranded cost recovery violates

section 212 of the FPA, which governs the rates for transmis-

sion ordered by FERC pursuant to section 211. 16 U.S.C.

ss 824j-k. Because FERC-jurisdictional utilities are no long-

er subject to sections 211 and 212, this argument relates only

to those situations in which FERC orders nonjurisdictional

transmitting utilities to wheel under section 211 and these

utilities then seek to recover stranded costs in their transmis-

sion rates. See 18 C.F.R. s 35.26(c)(1)(vi)-(vii). Section 212

allows FERC to order "rates, charges, terms, and conditions

which permit the recovery by [a transmitting] utility of all the

costs incurred in connection with the transmission services

and necessary associated services, including, but not limited

to, an appropriate share, if any, of legitimate, verifiable and

economic costs, including taking into account any benefits to

the transmission system of providing the transmission ser-

vice, and the costs of any enlargement of transmission facili-

ties." 16 U.S.C. s 824k(a). Contending that "economic

costs" cannot be read to include payment of stranded costs,

which by definition relate to generation (not transmission)

services, POSCR reads section 212 to preclude stranded cost

recovery.

Straightforward application of the Chevron doctrine demon-

strates the lack of merit in this argument. See Chevron,

U.S.A., Inc. v. Natural Resources Defense Council, 467 U.S.

837 (1984). Because Congress has not "directly spoken to the

precise question at issue"--do "economic costs" include

stranded costs?--and because nothing in the statute pre-

cludes recovering through transmission rates costs that were

traditionally recovered through generation rates, the term

"economic costs" is ambiguous. Id. at 842.

Proceeding to Chevron's second step, we ask whether

FERC has reasonably interpreted the term "economic costs."

See id. at 843. We have no doubt that it has. As FERC

explained, but for section 211 wheeling orders, there would be

no stranded costs. Stranded costs, according to FERC, are

therefore economic costs of section 211 wheeling. See Order

888-A, p 31,048 at 30,390. POSCR offers nothing to under-

mine this eminently reasonable interpretation of the statute.

c. Implications of Cajun

Next, POSCR contends that our decision in Cajun Elec.

Power Coop., Inc. v. FERC, 28 F.3d 173 (D.C. Cir. 1994),

condemns stranded cost recovery as anticompetitive. A pre-

Order 888 decision, Cajun reviewed two tariffs allowing a

utility, Entergy Corporation, to sell power at market rates,

and a third tariff providing for open access to Entergy's

transmission services at cost-based rates. The third tariff

gave Entergy an opportunity to recover stranded costs from

customers who no longer purchase power from Entergy but

use its transmission lines to reach other suppliers--exactly

the circumstances in which Order 888 provides for stranded

cost recovery. Under the tariff, the stranded cost charge was

included in Entergy's transmission rate. See id. at 175-77.

Characterizing the stranded cost provision as a "tying

arrangement" under antitrust law, Cajun explained that un-

der the tariff, Entergy could charge a former customer for

the cost of generation services when the customer wished to

purchase only transmission services; because Entergy has a

monopoly over transmission, customers would have no choice

but to pay costs relating to generation they no longer wanted

from Entergy. Id. at 177-78. Thus, because "Entergy could

use its monopoly over transmission services to eliminate

competition in the market for generation services," the net

effect of the tariffs may be anticompetitive. Id. at 176.

Of significance to this case, however, we did not strike

down the tariffs. Instead, we remanded the case for FERC

to determine "how much competition in fact is dampened" by

the stranded cost provision. Id. at 178. Thus, contrary to

POSCR's suggestion, Cajun does not represent a blanket

condemnation of stranded cost recovery; rather, recognizing

that such recovery could be anticompetitive, Cajun directed

FERC to evaluate and justify the potential anticompetitive

impact. This is precisely what FERC has done in Order 888.

It expressly considered the anticompetitive effects of strand-

ed cost recovery. See Order 888-A, p 31,048 at 30,372-74.

Then, stressing the transitional nature of the recovery and

the fact that recovery was compelled by the open access

requirement, which utilities could not have anticipated, FERC

concluded that the limited anticompetitive effects of stranded

cost recovery were both a necessary and acceptable conse-

quence of the transition to competition. See id. Not only

has POSCR offered no evidence that would lead us to ques-

tion FERC's conclusion, but such judgments about anticom-

petitive effects are "the kind of reasonable agency prediction

about the future impact of its own regulatory policies to which

we ordinarily defer." Louisiana Energy and Power Auth. v.

FERC, 141 F.3d 364, 370 (D.C. Cir. 1998).

2. Natural Gas Precedent and Conformance to Cost Causa-

tion Principles

Having rejected POSCR's arguments that FERC lacks

authority to authorize stranded cost recovery, we turn to its

argument that FERC has failed adequately to explain why

Order 888 requires departing customers to pay one-hundred

percent of stranded costs. In support of this argument,

POSCR claims that our decisions reviewing FERC's restruc-

turing of the natural gas industry require cost sharing; it also

argues that Order 888's stranded cost recovery conflicts with

the cost causation principles that traditionally govern alloca-

tion of costs.

a. Natural gas precedent: AGD, K N Energy, and UDC

In introducing competition into the electricity industry,

FERC has taken essentially the same path that it took in

restructuring the natural gas industry, although what FERC

has done in a single order in the electricity industry (Order

888) it did in a series of orders in the natural gas industry.

Because POSCR relies so heavily on FERC's natural gas

orders and our decisions reviewing them, we begin by sum-

marizing them in some detail.

Finding practices in the natural gas industry "unduly dis-

criminatory" in violation of the Natural Gas Act, FERC

began by issuing Order 436, which "unbundled" pipeline

transportation and merchant functions. Regulation of Natu-

ral Gas Pipelines After Partial Wellhead Decontrol, Order

No. 436, FERC Stats. & Regs. p 30,665, 50 Fed. Reg. 42,408

(1985) (rehearing orders omitted). At the time of Order 436,

pipelines were facing enormous liabilities under long-term

"take-or-pay" contracts. Entered into when gas prices were

expected to rise, these contracts obligated pipelines to pur-

chase minimum quantities of gas from wellhead producers at

fixed prices that turned out to be well in excess of market

prices. See Associated Gas Distributors v. FERC, 824 F.2d

981, 1021 (D.C. Cir. 1987) ("AGD"). Although FERC esti-

mated take-or-pay liabilities at billions of dollars, and al-

though Order 436 would exacerbate the take-or-pay problem

by providing incentives to pipeline customers to purchase gas

from cheaper suppliers, FERC declined to take any action

with respect to the contracts. In AGD, we found that

FERC's decision to do nothing failed to meet the require-

ments of reasoned decisionmaking, citing FERC's "seeming

blindness to the possible impact of Order No. 436 on take-or-

pay liability" and permanent market distortions that may

result from FERC's inaction. Id. at 1021-23, 1025. Specifi-

cally, we noted, in words echoed by FERC years later in

Order 888, that consumers who purchased from the "least

nimble" local distribution companies would "be stuck with the

burden of the overpriced gas." Id. at 1023.

In response to AGD, FERC issued Order 500. Regulation

of Natural Gas Pipelines After Partial Wellhead Decontrol,

Order No. 500, FERC Stats. & Regs. p 30,761, 52 Fed. Reg.

30,334 (1987) (rehearing orders omitted). Recognizing that

no one segment of the gas industry was wholly responsible

for the take-or-pay problem, Order 500 allowed pipelines to

recover take-or-pay costs through "equitable sharing." Pipe-

lines that willingly absorbed twenty-five to fifty percent of

their costs could require sales customers to match that

amount through a fixed charge. Pipelines could recover any

balance through commodity rates or volumetric surcharges,

borne by both sales and transportation customers. For an

overview of these components of Order 500, see K N Energy,

Inc. v. FERC, 968 F.2d 1295, 1297-98 (D.C. Cir. 1992). We

sustained this approach in K N Energy, holding that even

though Order 500 replaced traditional "cost causation" princi-

ples with cost spreading and value-of-service concepts, it did

not violate Natural Gas Act section 4's requirement that rates

be just and reasonable. Id. at 1301-02. Citing statements in

AGD that "all actors in the natural gas industry" are "candi-

dates" for absorbing take-or-pay liability, we relied on "the

unusual circumstances surrounding the take-or-pay problem,

and the limited nature--both in time and scope--of the

Commission's departure from the cost-causation principle."

Id. at 1301.

Concluding that Order 436 had been only partially success-

ful in introducing competition into the natural gas industry,

FERC issued its third major restructuring order, Order 636.

Pipeline Service Obligations and Revisions to Regulations

Governing Self-Implementing Transportation; and Regula-

tion of Natural Gas Pipelines After Partial Wellhead Decon-

trol, Order No. 636, FERC Stats. & Regs. p 30,939, 57 Fed.

Reg. 13,267 (1992) (rehearing orders omitted). That order

imposed mandatory unbundling of sales and transportation

services and allowed sales customers to reduce the amount of

gas they had to purchase pursuant to existing contracts.

When customers took advantage of this option and purchased

gas from sources other than the pipelines, the pipelines were

once again left with substantial take-or-pay liabilities. Label-

ing the costs of reducing these liabilities gas supply realign-

ment or GSR costs, Order 636 authorized pipelines to bill

current transportation customers for one-hundred percent of

their GSR costs by charging either a negotiated exit fee or

reservation fee surcharge. Order 636 also authorized pipe-

lines to recover all stranded costs in rate filings. In the

natural gas industry, stranded costs represented the costs of

pipeline assets (such as storage facilities) used to provide

bundled sales services that were not directly assignable to

transportation customers. For an overview of these compo-

nents of Order 636, see United Distribution Cos. v. FERC, 88

F.3d 1105, 1125-27, 1176-78 (D.C. Cir. 1996) ("UDC").

In UDC, we affirmed FERC's determination that pipelines

could recover all stranded costs through filed rates, so long as

FERC "adequately balanced the interests of investors and

ratepayers." Id. at 1180. Reaffirming the appropriateness

of the cost spreading and value-of-service principles approved

in K N Energy, we found that FERC's allocation of GSR

costs to pipeline transportation customers, as opposed to the

pipelines themselves, properly applied those principles. Id.

at 1182. Although recognizing that GSR costs stemmed from

pipeline sales customers, not transportation customers, we

found that FERC appropriately imposed the costs on trans-

portation customers because these customers benefitted from

the availability of lower-priced transportation and also be-

cause FERC could not spread costs to the pre-Order 636

sales customers since those customers no longer purchased

gas from the pipelines. Id. at 1185-86. We remanded for

FERC to explain more fully why pipelines should not have to

pay some of the costs, noting an inconsistency in the Commis-

sion's analysis: While FERC applied cost spreading princi-

ples to justify imposing costs on transportation customers, it

invoked cost causation principles in concluding that pipelines

should not have to pay any of these costs. Id. at 1188-89.

We explicitly stated, however, that we were not saying that

"it is impossible, or even improbable, that the Commission on

remand can establish a convincing rationale for exempting the

pipelines." Id. at 1189.

POSCR reads this history to require FERC to order cost

sharing, but it ignores Order 888's explanation of the differ-

ence between natural gas restructuring and the situation in

the electricity industry. Most fundamentally, Order 888 ex-

plains, stranded cost recovery in the electricity industry

conforms to cost causation principles, which normally govern

the allocation of costs and require customers to pay the costs

they caused. See Order 888, p 31,036 at 31,798. Cost causa-

tion principles could not be applied in natural gas restructur-

ing, Order 888 explains, because many customers had already

begun purchasing gas from other suppliers before FERC had

addressed the take-or-pay problem on remand from AGD,

and because the filed rate doctrine prohibits assessing

charges against former customers. Id. at 31,800-01. Order

888 also explains that unlike stranded costs in the electricity

industry, the take-or-pay liabilities in the gas industry were

extraordinary. The billions of dollars of take-or-pay liabilities

resulted not from Order 636, but from earlier regulatory

policies that had encouraged pipelines to enter into long-term,

fixed-price gas purchase contracts, combined with declining

gas prices that made those contracts uneconomical. See

Order 888-A, p 31,048 at 30,380. Under all of these circum-

stances, "[t]o have allocated these costs solely to any one

segment of the industry would have imposed a crushing new

burden on that segment." Id. at 30,380-81.

Stranded costs in the electricity industry, Order 888 ex-

plains, are quite different. Resulting directly from Order

888, they represent "ordinary costs that have always been,

and are currently, included in the utility's rates for electric

generation approved by the Commission." Id. at 30,382.

Moreover, wholesale customers may avoid stranded cost lia-

bility by continuing to purchase power from their historic

utility, precisely what they probably would have done in the

absence of Order 888. In other words, in contrast to the

natural gas industry, where customers would have faced

enormous new burdens had FERC forced them to pay take-

or-pay costs, customers in the electricity industry face no new

burdens; instead, Order 888 requires them to pay nothing

more than costs they would have had to pay in the absence of

Order 888. In the electricity industry, the only effect of

stranded cost recovery is delayed realization of the full bene-

fits of a competitive market.

In light of these differences between the natural gas and

electricity industries and FERC's exhaustive treatment of the

natural gas restructuring in Order 888, POSCR's contention

that FERC has failed "to offer a coherent rationale, rising to

the level of reasoned decisionmaking" for not imposing cost

sharing is wholly without merit. Equally without merit is

POSCR's assertion that UDC "teaches that, where customers

and utilities benefit from an open access rule/order that leads

to early contract termination and where anticompetitive con-

duct by utilities has given rise to the need for the open access

order, utilities must share transition costs." POSCR ignores

three important points. First, FERC, not this court, deter-

mined that cost sharing was appropriate with respect to take-

or-pay liabilities. UDC merely affirmed FERC's decision.

Second, K N Energy recognized that cost sharing in the

natural gas industry was a departure from the cost causation

principles that normally apply, a departure justified by ex-

traordinary circumstances in the natural gas industry. K N

Energy, 968 F.2d at 1301-02. And finally, as to stranded

costs that more closely resemble those at issue in this case--

for example, pipeline assets that would no longer be fully

employed when customers took advantage of unbundling to

purchase gas from alternative suppliers--FERC ordered, and

UDC affirmed, that pipelines recover one-hundred percent of

those costs.

b. Conformance to cost causation principles

Having established that the natural gas cases impose no

obligation on FERC to order cost sharing, we next consider

POSCR's argument that the inclusion of stranded costs in

transmission rates does not conform to cost causation princi-

ples. This is so, POSCR asserts, because Order 888's strand-

ed cost provisions require customers to pay through transmis-

sion rates for costs the utility previously incurred to provide

generation services.

As an initial matter, we note that payment through trans-

mission rates is only one of three ways that a departing

customer may pay its stranded cost obligation; the customer

also has the option of making a lump-sum payment or install-

ment payments. Thus POSCR's challenge seems aimed only

at the method of payment, not at the fact that payment is

required. But even viewing POSCR's challenge more broad-

ly, as a claim that stranded cost recovery no matter what the

method of payment violates cost causation principles, we

think it lacks merit.

We have explained the cost causation principle as follows:

"Simply put, it has been traditionally required that all ap-

proved rates reflect to some degree the costs actually caused

by the customer who must pay them." K N Energy, 968 F.2d

at 1300. Given this definition, we are puzzled by POSCR's

claim that because inclusion of stranded costs in transmission

rates requires customers to pay currently for costs incurred

in the past, it violates cost causation principles. To some

degree, all utility rates reflect past costs; utilities typically

expend funds today (for example, constructing generation

facilities), fully expecting to recover those costs through

future rates. In fact, current rates often include past costs

that utilities deferred in order to avoid rate increases. Cost

causation requires not that costs be incurred at the same time

they are included in rates, but that the rates "reflect to some

degree the costs actually caused by the customer who must

pay them." Id.

In fashioning Order 888's stranded cost recovery provi-

sions, FERC went to great lengths to ensure that customers

would be responsible for only those costs they caused.

[T]he Rule is consistent with the traditional cost causa-

tion principle because it recognizes the link between the

incurrence of the stranded costs and the decision of a

particular generation customer to use open-access trans-

mission on the utility's system to leave the utility's

generation system and shop for power, and bases the

utility's ability to recover stranded costs on its ability to

demonstrate that it incurred costs with the reasonable

expectation that the customer would remain on its gener-

ation system beyond the term of the contract.

Order 888-A, p 31,048 at 30,382.

We cannot see how including stranded costs in transmission

rates instead of lump sum payments changes this analysis.

To the extent POSCR is arguing that including in a transmis-

sion rate costs incurred to provide generation services vio-

lates cost causation principles, we reiterate that stranded

costs are not costs of providing the physical transmission

services but, as Order 888-A explains, they are utilities' cost

of open access transmission. See Order 888-A, p 31,048 at

30,389 & n.634. More generally, given the fundamental

changes wrought by Order 888 and the unprecedented oppor-

tunity for customers to purchase power from alternative

suppliers, we are quite comfortable deferring to FERC's

judgment that stranded cost recovery--through transmission

rates or otherwise--conforms to cost causation principles. In

fact, FERC may have violated cost causation principles had it

failed to assign stranded costs to customers who caused them.

POSCR next argues that Order 888 is unduly discriminato-

ry because including stranded costs in transmission rates

forces transmission customers who previously used a utility's

generation capacity to pay higher costs than new transmis-

sion customers. Disagreeing, FERC determined that requir-

ing customers receiving similar services to pay different rates

is necessitated by Order 888's open access requirement. See

Order 888-A, p 31,048 at 30,388-90. Cf. AGD, 824 F.2d at

1009 ("[T]he mere fact of a rate disparity is not enough to

constitute unlawful discrimination.") (internal quotation

marks omitted). Moreover, FERC concluded, the application

of cost causation principles justifies this different treatment.

See Order 888-A, p 31,048 at 30,379, 30,388-90. Seeing noth-

ing unreasonable (let alone arbitrary or capricious) in

FERC's policy judgment, we reject POSCR's challenge.

Nor do we agree with POSCR's argument that stranded

cost recovery violates the filed rate doctrine, which "forbids a

regulated entity to charge rates for its services other than

those properly filed with the appropriate federal regulatory

authority." Western Resources, Inc. v. FERC, 72 F.3d 147,

149 (D.C. Cir. 1995). In Western Resources, we held that

FERC's assignment to current customers of costs relating to

take-or-pay liabilities did not violate the filed rate doctrine.

Recognizing that "a central purpose of the doctrine is to

enable purchasers to know in advance the consequences of

the purchasing decisions they make," we determined that the

doctrine was satisfied where customers received "adequate

notice of a rate in advance of the service to which it relates."

Id. at 149-50 (internal quotation marks omitted). Order 888's

stranded cost policy satisfies this requirement because cus-

tomers electing to purchase power generation from a source

other than the transmitting utility from which they had

purchased power in the past will be aware of the costs when

making that decision.

3. FERC's Mobile-Sierra Findings

Under the Supreme Court's Mobile-Sierra doctrine, where

parties have negotiated a contract that sets firm prices or

dictates a specific method of computing charges and includes

a clause denying either party the right to change such prices

or charges unilaterally, "FERC may abrogate or modify the

contract only if the public interest so requires." Texaco, Inc.

v. FERC, 148 F.3d 1091, 1095 (D.C. Cir. 1998); see also FPC

v. Sierra Pacific Power Co., 350 U.S. 348, 353-55 (1956);

United Gas Pipe Line Co. v. Mobile Gas Serv. Corp., 350 U.S.

332, 344-45 (1956). We have recognized that "the 'public

interest' that permits FERC to modify private contracts is

different from and more exacting than the 'public interest'

that FERC seeks to serve when it promulgates its rules."

Texaco, 148 F.3d at 1097.

FERC usually makes Mobile-Sierra determinations on a

case-by-case basis. A party seeking to modify a contract

containing a Mobile-Sierra clause petitions FERC. That

party bears the burden of convincing FERC that the modifi-

cation is in the public interest.

Order 888 departs from this normal case-by-case practice

by making two generic public interest findings, one focused

on utilities, the other on customers. These generic findings

relieve utilities and customers of the burden of demonstrating

in individual proceedings that the proposed modifications are

in the public interest. As to utilities, Order 888 ruled that it

was in the public interest to allow them to add stranded cost

amendments to their contracts if they could demonstrate, in

accordance with Order 888, that they had a reasonable expec-

tation of continued service. See Order 888-A, p 31,048 at

30,394-95. This finding rested on two considerations: that

the burden of unrecoverable stranded costs could impair

utilities' access to capital markets, which could in turn precip-

itate the departure of other customers, thus worsening the

utilities' financial condition and threatening its ability to

provide reliable service; and that allowing customers to leave

a utility without paying their share of costs would shift those

costs to other customers who lack alternative power sources.

See Order 888, p 31,036 at 31,811. For its second generic

finding, FERC concluded that it was in the public interest to

allow customers to modify their wholesale requirements con-

tracts in any way upon a showing that the terms are no

longer just and reasonable. See Order 888-A, p 31,048 at

30,189. Observing that the contracts in question "were en-

tered into during an era in which transmission providers

exercised monopoly control over access to their transmission

facilities," FERC based this finding on the unequal bargain-

ing power between utilities and customers. Id. at 30,193.

Because "[m]any of these contracts were the result of uneven

bargaining power between customers and monopolist trans-

mission providers," FERC reasoned, "the unprecedented

competitive changes that have occurred (and are continuing to

occur) in the industry may render their contracts to be no

longer in the public interest or just and reasonable." Id.

Challenging the first finding, POSCR argues that FERC

lacks authority to make a generic public interest finding that

allows for contract modification in an entire class of cases.

POSCR insists that FERC can only proceed on a case-by-

case basis, determining in each case whether a particular

contract modification is in the public interest. Even if FERC

has authority to make generic findings, POSCR goes on to

argue, FERC's Order 888 finding is unsupported by substan-

tial evidence. The investor owned utilities ("IOUs") challenge

the second finding, arguing that allowing customers to seek

modification of all contract terms, while limiting utilities to

stranded cost provisions, fails adequately to balance compet-

ing interests.

a. FERC's authority to make a generic public interest find-

ing

POSCR correctly observes that FERC has pointed to no

case in which a court affirmed a generic Mobile-Sierra find-

ing. At the same time, POSCR has cited no case prohibiting

FERC from making a generic finding, nor have we found one.

In the absence of definitive authority in either direction, and

given the unique circumstances of this case and our tradition-

al deference to FERC's expertise, we find no fault with

FERC's generic determination.

The Mobile-Sierra doctrine "represents the Supreme

Court's attempt to strike a balance between private contrac-

tual rights and the regulatory power to modify contracts

when necessary to protect the public interest." Northeast

Utilities Serv. Co. v. FERC, 55 F.3d 686, 689 (1st Cir. 1995).

In Mobile, the Supreme Court recognized that intervening

circumstances may create a situation in which contractual

terms and conditions that were just and reasonable at the

time the contract was executed are no longer just and reason-

able. 350 U.S. at 344-45. But concluding that a utility is not

typically "entitled to be relieved of its improvident bargain,"

the Sierra Court required that FERC's predecessor, the

Federal Power Commission, show more than that the con-

tract was unjust and unreasonable--the Commission had to

find that contract modification was in the public interest. 350

U.S. at 355.

In most cases, intervening circumstances are unique to the

relationship between contracting parties. See, e.g., Northeast

Utilities, 55 F.3d 686 (affirming FERC's modification to the

rate schedule of a contract as a condition for approval of a

merger between two parties to the contract). But where

intervening circumstances--in this instance, FERC-mandated

open access transmission--affect an entire class of contracts

in an identical manner, we find nothing in the Mobile-Sierra

doctrine to prohibit FERC from responding with a public

interest finding applicable to all contracts of that class.

Moreover, in providing for stranded cost recovery, FERC has

not relieved utilities of "improvident bargains," the concern of

the Sierra Court; rather, it has recognized that open access

affects all utilities in the same manner, namely, leaving them

vulnerable to potentially unrecoverable stranded costs. In

fact, to deny FERC authority to make generic findings in

such a case would simply impose on it and the parties the

repetitive burden of proving the public interest in each and

every case.

In sustaining FERC's generic finding, we are influenced by

the fact that before recovering stranded costs, a utility must

prove that it had a reasonable expectation of continued ser-

vice to a particular customer. As the IOUs invervening on

behalf of FERC explain, the need to make this showing adds

a particularized element to FERC's generic public interest

finding. Viewed this way, Order 888's generic finding is more

precisely stated as follows: It is in the public interest to allow

utilities to recover stranded costs if they can prove that they

had a reasonable expectation of continued service to particu-

lar customers. If a utility can demonstrate that it had a

reasonable expectation of continued service to a particular

customer, and incurred costs based on that expectation, then

it would be against the public interest to require other

customers or shareholders to bear those costs. As Order 888

explains, "the case-by-case findings that some commenters

seek will, in effect, be made when the Commission determines

whether to approve a proposed stranded cost amendment to a

particular contract." Order 888, p 31,036 at 31,813.

We stress that generic Mobile-Sierra findings are appro-

priate only in rare circumstances. Order 888 is just such a

circumstance. It fundamentally changes the regulatory envi-

ronment in which utilities operate, introducing meaningful

competition into an industry that since its inception has been

highly regulated and affecting all utilities in a similar way.

b. FERC's stranded cost public interest finding

Having concluded that the Mobile-Sierra doctrine permits

a generic finding in this case, we turn to POSCR's claim that

the finding was unsupported by substantial evidence.

POSCR faults FERC for failing to adduce evidence to sup-

port its conclusion that denying stranded cost recovery would

put particular utilities in financial peril. POSCR also thinks

that the impact on customers of failing to provide for strand-

ed cost recovery is insufficient to support a public interest

finding.

With respect to POSCR's first point, it is certainly true

that Sierra identified impairment of "the financial ability of

the public utility to continue its service" as one factor sup-

porting a public interest finding. Sierra, 350 U.S. at 355.

Relying on this, POSCR challenges FERC's public interest

finding on the ground that the record contains no individual

assessments of the financial condition of public utilities.

Although public interest findings made on a case-by-case

basis necessarily evaluate the harm to the particular utility

seeking modification, that is not true where, as here, FERC

implements a generic change in the industry. Just as that

change can support a generic public interest finding, that

generic finding can be supported by generic industry-wide

evidence. FERC has produced such evidence. The record

contains estimates of stranded costs amounting to $200 billion

or more. See Stranded Cost NOPR, p 32,507 at 32,866. It

also includes comments from representatives of the financial

community stating that "the prospect of not recovering

stranded costs could erode a utility's ability to attract capi-

tal."

POSCR points out that eighty-five to ninety percent of the

estimated $200 billion of stranded costs relates to retail sales,

not wholesale sales. True enough, but we find no basis for

questioning FERC's conclusion that unrecovered stranded

costs of even ten percent of $200 billion--the low end of the

wholesale stranded cost estimate--could have serious conse-

quences for utilities. See Order 888, p 31,036 at 31,790. In

any event, if POSCR turns out to be correct about the

absence of a wholesale stranded cost problem, few utilities

will avail themselves of Order 888's stranded cost recovery

provisions.

POSCR's second argument focuses on FERC's finding that

"if some customers are permitted to leave their suppliers

without paying for stranded costs, this may cause an exces-

sive burden on the remaining customers who, for whatever

reason, cannot leave and therefore may have to bear those

costs." Order 888, p 31,036 at 31,811. POSCR does not

agree with FERC that the failure to recover stranded costs

will create an "undue burden" on remaining customers. But

disagreeing with FERC is not enough. To prevail in this

court, POSCR must demonstrate that FERC's prediction that

failure to recover stranded costs will create an undue burden

on remaining customers is unsupported by substantial evi-

dence, see 16 U.S.C. s 825l(b), which is another way of saying

it is arbitrary and capricious. See Michigan Consolidated

Gas Co. v. FERC, 883 F.2d 117, 124 (D.C. Cir. 1989) ("[M]ak-

ing ... predictions is clearly within the Commission's exper-

tise and will be upheld if rationally based on record evi-

dence.") (internal quotation marks omitted). This POSCR

has failed to do.

c. FERC's public interest finding regarding customers

The IOUs mount two challenges to FERC's second public

interest finding--that it was in the public interest to allow

customers to seek modification of their wholesale require-

ments contracts. Unlike POSCR, the IOUs make no claim

that the finding lacks substantial evidence; rather, they

contend that FERC's decision to allow customers to seek

modification of all contract terms, while limiting utilities to

adding stranded cost provisions, fails to balance FERC's

competing concerns: respecting existing contractual commit-

ments and accelerating the transition to competition. They

also complain that FERC has failed adequately to explain

why affording customers this broad ability to modify their

contracts is in the public interest.

FERC gave two justifications for affording customers a

broader opportunity than utilities to modify their contracts,

both of which seem perfectly rational to us. First, Order

888-A explains, "these contracts were entered into during an

era in which transmission providers exercised monopoly con-

trol over access to their transmission facilities." Order

888-A, p 31,048 at 30,193. Also, the "unprecedented competi-

tive changes.... may affect whether such contracts continue

to be just and reasonable or not unduly discriminatory both

as to the direct customers of the contracts, as well as to

indirect, third-party consumers...." Id. at 30,193-94. In

fact, Order 888 rests on the very premise that by denying

competitors access to their transmission lines, utilities en-

gaged in undue discrimination. Confined to purchasing pow-

er from their local utilities, customers suffered from this lack

of access. In the natural gas restructuring, we affirmed

FERC's decision to allow customers to seek to modify their

sales contracts because those contracts "necessarily reflect

the pipelines' monopoly power." AGD, 824 F.2d at 1017.

The same reasons call for affirming FERC's decision here.

In addition, as FERC has explained, the harm to third parties

(i.e., customers of the wholesale requirements customers) that

may result from adherence to uneconomical contracts further

justifies its conclusion. See Order 888-A, p 31,048 at 30,194.

Remedying potential unfairness to utilities by allowing them

to seek stranded cost recovery if a customer shortens the

term of a contract, FERC struck a balance between custom-

ers and utilities that can hardly be characterized as arbitrary

or capricious.

4. Availability of Stranded Cost Recovery to Nonjurisdic-

tional Utilities and G&T Cooperatives

Section 201 of the FPA gives FERC jurisdiction over

"public utilities" but not over federal and state utilities. 16

U.S.C. s 824. Although FERC required utilities not subject

to its jurisdiction ("nonjurisdictional utilities") to provide re-

ciprocal open access transmission when they use a jurisdic-

tional utility's open access tariff, it declined to provide a

mechanism for them to recover stranded costs. Explaining

that it promulgated its reciprocity provision pursuant to

fairness concerns, not statutory authority, FERC reasoned

that it lacked jurisdiction to provide stranded cost recovery

for nonjurisdictional utilities. See Order 888-A, p 31,048 at

30,364. FERC recommended that these utilities include

stranded cost provisions in their open access tariffs; those

tariffs would be reviewed not by FERC but by the appropri-

ate regulatory authority. See id.

Dairyland petitioners contend that FERC acted arbitrarily

and capriciously in denying nonjurisdictional utilities stranded

cost recovery, arguing that the same "fairness" concerns

invoked by FERC to require reciprocal open access transmis-

sion require the award of stranded costs. To be sure, FERC

may have had authority to include stranded cost recovery as a

provision of Dairyland's open access tariff. But Dairyland

has offered no reason for thinking that FERC's refusal to do

so was arbitrary and capricious. Given the limited scope of

FERC's stranded cost provisions, its lack of jurisdiction over

entities like Dairyland, and the ability of nonjurisdictional

utilities to include stranded cost provisions in their open

access tariffs, we see no reason to question FERC's judgment

on this issue.

The same is true with respect to the transmission-

dependent utilities ("TDUs"). Like the Dairyland petitioners,

they claim that FERC acted arbitrarily and capriciously by

failing to provide a mechanism for them to recover stranded

costs. Owning few or no transmission facilities, TDUs serve

their loads using other utilities' transmission systems. Not

only are TDUs nonjurisdictional utilities, but, as Order 888-A

explains, open access does not cause their costs to become

stranded--their customers have always had an option to use

other utilities' transmission services to purchase power. See

Order 888-A, p 31,048 at 30,365.

Dairyland also contends that FERC acted arbitrarily and

capriciously when it declined to treat a generation and trans-

mission ("G&T") cooperative and its member distribution

cooperatives as a single economic unit for stranded cost

purposes. G&T cooperatives provide bundled wholesale pow-

er to their member distribution cooperatives, who in turn sell

the power to the members' retail customers. Observing that

cooperatives, unlike traditional utilities, are not vertically

integrated but instead function as single economic units,

Dairyland claims that G&T cooperatives have reasonable

expectations of continued service to retail customers of their

member cooperatives that differ substantially from the expec-

tations public utilities have with respect to retail customers of

their wholesale customers. This difference, Dairyland ar-

gues, requires FERC to allow G&T cooperatives to recover

stranded costs from their member cooperatives' customers.

Rejecting Dairyland's petition for rehearing on this point,

FERC noted that treating a G&T cooperative and its mem-

bers as a single economic unit for purposes of stranded cost

recovery would conflict with its treatment of these same

cooperatives as distinct entities in its reciprocity provisions.

Order 888-A, p 31,048 at 30,366. There, FERC agreed with

Dairyland's proposal that if a G&T cooperative seeks open

access transmission from a public utility, "then only the G&T

cooperative, and not its member distribution cooperatives,

would be required to offer [reciprocal] transmission service."

Order 888, p 31,036 at 31,763. Moreover, FERC reasoned,

recovering from a retail customer of a member cooperative is,

in effect, recovering from an indirect customer, a situation

that FERC declined to include in its stranded cost rule. See

Order 888-A, p 31,048 at 30,366.

It is true that FERC could have treated G&T cooperatives

and their members as single economic units for stranded cost

purposes. But FERC's explanation of why it chose not to do

so, particularly the fact that G&T cooperatives and their

members were treated as distinct entities for reciprocity

purposes, is entirely reasonable.

5. Challenges to Technical Aspects of Order 888's Stranded

Cost Recovery Provisions

Several petitioners mount challenges to various technical

aspects of the stranded cost recovery provisions. Before

addressing these challenges, we emphasize the very limited

scope of our review. For us to undo what FERC has done,

petitioners must persuade us that FERC's actions were arbi-

trary or capricious. "Highly deferential," the arbitrary and

capricious standard "presumes the validity of agency action."

National Mining Ass'n v. Mine Safety and Health Admin.,

116 F.3d 520, 536 (1997). Where, as here, the issue before us

"requires a high level of technical expertise, we must defer to

the informed discretion of the responsible federal agencies."

Marsh v. Oregon Natural Resources Council, 490 U.S. 360,

377 (1989) (internal quotation marks omitted). It is not

enough for petitioners to convince us of the reasonableness of

their views, see UDC, 88 F.3d at 1169 ("The existence of a

second reasonable course of action does not invalidate an

agency's determination."); those arguments should be pre-

sented to FERC, whose commissioners are appointed by the

President and confirmed by the Senate with the expectation

that they, not Article III courts, will make policy judgments.

To prevail in this court, petitioners must demonstrate that

FERC's policy judgments are arbitrary or capricious, a heavy

burden indeed. See National Treasury Employees Union v.

Hefler, 53 F.3d 1289, 1292 (D.C. Cir. 1995) ("The 'scope of

review under the "arbitrary and capricious" standard is nar-

row and a court is not to substitute its judgment for that of

the agency.' ") (quoting Motor Vehicles Mfrs. Ass'n v. State

Farm Mut. Auto. Ins. Co., 463 U.S. 29, 43 (1983)). With this

very deferential scope of review in mind, we turn to petition-

ers' arguments.

a. POSCR's challenges to the stranded cost formula

Reasoning that it would be burdensome to identify each

and every asset that would become underutilized as a result

of Order 888, FERC adopted a "revenues lost" formula to

determine a departing customer's stranded cost obligation.

Order 888, p 31,036 at 31,839. For each year a utility can

prove that it had a reasonable expectation of continued ser-

vice to a particular customer, the formula calculates the

customer's stranded cost obligation by subtracting the com-

petitive market value of the power the customer would have

purchased from the utility (as estimated by the utility) from

the amount the customer would have paid had it remained a

generation customer of the utility (based on FERC-approved

rates that the customer paid the prior three years). Id. at

31,839-40.

POSCR claims that this formula gives utilities no incentive

to mitigate their stranded costs. Not so. The formula

automatically provides such an incentive by subtracting from

utilities' recovery the market price of the power--utilities

that fail to sell the power at market prices will not recover

their full costs. POSCR also claims that the formula fails

accurately to measure stranded costs because it is based on

an estimate of those costs at one point in time. Responding,

FERC explained why it rejected a "true-up" provision that

would have made adjustments to the amount the customer

owed to reflect market conditions over the reasonable expec-

tation period. According to FERC, such an approach would

have created enormous uncertainty, outweighing any poten-

tial increase in accuracy. See Order 888-A, p 31,048 at

30,427-28. POSCR has offered no basis for us to question

this reasoning.

POSCR's claim that the formula gives utilities an incentive

to minimize their estimate of the market value of the power

the customer would have purchased is similarly groundless.

To avoid precisely this result, Order 888 gives customers an

option to either market or broker the capacity and associated

energy they would have purchased from their historic utility,

effectively reducing their stranded cost obligations by the

difference between the actual market value of the power and

the utility's estimate of the market value. See Order 888,

p 31,036 at 31,844. Order 888 also gives customers an option

to substitute the price of power under the customer's contract

with a new supplier for the utility's estimate of the market

value. See id.

One final point. Throughout its brief and at oral argument,

POSCR consistently referred to stranded costs as "impru-

dently incurred costs." Although it never developed this

argument, we think it worth noting that all costs included in

customers' stranded cost obligations are based on FERC-

approved rates and were included in utility rate bases as

assignable to particular customers. To us, this means that

these costs are legitimate, prudent, and verifiable.

b. Inclusion of known and measurable costs

The IOUs take issue with Order 888's stranded cost recov-

ery formula because the estimate of the price the customer

would have paid for the power is based on rates for the prior

three years; according to the IOUs, this approach fails to

consider known and measurable costs resulting from regula-

tory mandates that may have been deferred pursuant to filed

rate schedules and FERC-approved settlements. The costs

they cite include deferred costs of generation that have

already been approved for inclusion in the rate base, costs

relating to approved qualifying facility contracts, and govern-

ment-imposed costs such as deferred taxes and nuclear de-

commissioning.

Although it is true that the revenue calculation measures

only current rates and not deferred costs, Order 888 allows

customers and utilities to file for a change in the rates before

the customer's requirements contract terminates; in such

cases, FERC will calculate the customer's stranded cost

obligation based on those new rates. See Order 888-A,

p 31,048 at 30,427. While seeking to avoid detailed listings of

specific costs that may become stranded, FERC has ade-

quately preserved utilities' ability to include known, measura-

ble costs in revenue estimates through a ratemaking proceed-

ing.

c. Treatment of energy costs in the market option

The IOUs challenge FERC's treatment of energy costs in

the market option. To mitigate utilities' incentives to mini-

mize their estimates of the market value of the power (the

competitive market value estimate or "CMVE"), Order 888

affords customers an option to buy the power stranded by

their departure from the utility and resell it. Order 888,

p 31,036 at 31,844. Customers would purchase generation

capacity at the utility's estimated market value of the capacity

and associated energy at average system variable cost. Id. at

31,845. Thus if a customer believes that a utility is underesti-

mating the price at which it could sell the power, the custom-

er can buy the power and then resell it. While customers

exercising this option would still have to pay their stranded

cost obligation as calculated under the formula, they would

effectively offset the obligation by keeping the profit on the

resale of the power. Id. at 31,845 n.879.

The IOUs contend that allowing customers to pay average

variable cost for the associated energy is inconsistent with

Order 888's definition of the CMVE, which equals the market

value of both the generation capacity and associated energy.

See id. at 31,839 (defining CMVE as "the utility's estimate of

the average annual revenues ... that it can receive by selling

the released capacity and associated energy, based on a

market analysis performed by the utility"). Customers could

receive a windfall, the IOUs claim, by exercising the market

option--although they will pay average variable cost for the

associated energy, they will be able to resell it at the presum-

ably higher market price. At the same time, utilities will be

unable to recover the full market value of the power because

they will be forced to sell the associated energy at cost.

Responding to this argument in Order 888-A, FERC of-

fered two justifications for allowing customers to purchase

the associated energy at average variable cost. First, be-

cause the capacity being marketed would not generally be

associated with a single asset, customers exercising this op-

tion are purchasing a "slice of the system" and thus should

pay average variable cost. Second, customers should be able

to purchase energy at the price they currently pay, typically

average variable cost. See Order 888-A, p 31,048 at 30,433.

But neither explanation responds to the IOUs' argument that

defining CMVE as the market price of both the capacity and

associated energy is inconsistent with allowing customers

exercising the market option to purchase associated energy at

average variable cost. In its brief in this court, FERC

continues to misapprehend the IOUs' argument, largely reit-

erating the same arguments and failing to address the incon-

sistency.

The market option's stated intention is to reduce a utility's

incentive to understate the CMVE. See Order 888, p 31,036

at 31,842. If it did understate the CMVE, then customers

could buy the power from the utility and resell it, keeping the

difference. But FERC's policy of allowing customers to

purchase the associated energy at cost gives customers an

incentive to exercise the market option even when a utility

has appropriately estimated CMVE because they can buy the

energy at cost and resell it at the presumably higher market

price. FERC's failure to explain whether it intended this

result and if so, the justification for permitting customers to

receive a windfall while undercompensating utilities consti-

tutes a failure of reasoned decisionmaking. See AGD, 824

F.2d at 1030 ("We do not require that FERC reach any

particular conclusion; we merely mandate that it reach its

conclusion by reasoned decisionmaking."). We therefore va-

cate this portion of the orders and remand the issue to FERC

for further consideration.

d. Rescission of notice of termination provision

Until FERC issued Orders 888 and 889, it had required

parties to power sales contracts to notify it sixty days prior to

cancellation of a contract or termination of a contract by its

own terms. See 18 C.F.R. s 35.15 (repealed by Order 888).

Orders 888 and 889 eliminate the requirement that parties

notify FERC in advance when a contract terminates by its

own terms, but only with respect to contracts executed after

July 9, 1996; in other cases of contract cancellation or

termination, parties must still notify FERC in advance. See

18 C.F.R. s 35.15 (1999). TDU petitioners claim that in

rescinding the notice requirement, FERC ignored the fact

that utilities still have substantial market power. That some

utilities retain market power in generation, however, does not

undermine Orders 888 and 889. Through these orders,

FERC sought to move the electricity industry toward compe-

tition; by providing an open access mechanism through which

buyers may purchase power from suppliers other than trans-

mitting utilities, FERC substantially reduced utilities' market

power. Eliminating the notice requirement furthered that

policy. Moreover, customers who believe termination of their

contracts is unjust can seek relief from FERC pursuant to

section 206 of the FPA. See Order 888-A, p 31,048 at 30,393.

e. Provision for benefits lost

The TDU petitioners claim that FERC acted arbitrarily

and capriciously by failing to provide a mechanism for cus-

tomers purchasing power at below-market rates to preserve

those rates at the termination of their contract with their

historic utility. Just as utilities may have expectations of

continued service to particular customers, the TDU petition-

ers contend, customers may have reasonable expectations of

continuing to receive wholesale requirements service from

their historic utility at cost-based rates. Order 888-A says

that the Commission does "not have a sufficient basis on

which to make generic findings that customers under such

contracts may be entitled to extend a contract at the existing

rate." Order 888-A, p 31,048 at 30,393 (emphasis removed).

Moreover, the order explains, "the consequences of custom-

ers' expectations as a general matter would not have the

potential to shift significant costs to other customers," where-

as utilities' failure to recover stranded costs could potentially

shift the costs to other customers. Id.

We think that FERC has adequately explained why it

chose not to provide for benefits-lost recovery in Order 888.

Most important, FERC has not foreclosed customers in this

situation from seeking relief: As Order 888-A explains, a

customer may "exercise its procedural rights under section

206 to show that the contract should be extended at the

existing contract rate, or [ ] make such a showing in the

context of a utility's proposed termination of a contract

pursuant to the section 35.15 notice of termination (approval)

requirement." Id. (footnote omitted). Given that agencies

"enjoy[ ] broad discretion in determining how best to handle

related, yet discrete, issues in terms of procedures ... and

priorities," we think FERC's refusal to promulgate a generic

rule on this issue was entirely reasonable. Mobil Oil Explo-

ration & Producing Southeast, Inc. v. United Distrib. Cos.,

498 U.S. 211, 230 (1990).

B. Retail Stranded Costs

Recognizing state agency authority to address stranded

costs that relate to retail power sales, Order 888 limits

FERC's role as a forum for the recovery of these costs to two

situations: when customers take advantage of state-ordered

wheeling to reach new power suppliers and when former

retail customers become wholesale customers through what is

known as municipalization or municipal annexation. See Or-

der 888-A, p 31,048 at 30,402, 30,410. In the former scenario,

FERC will consider proposals for the recovery of stranded

costs only when the appropriate state regulatory commission

lacks authority to do so; in the latter situation, FERC will

serve as the primary forum for resolution of

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.