Opinion

City of Idaho Falls v. Federal Energy Regulatory Commission

  • 629 F.3d 222
  • 393 U.S. App. D.C. 424
  • 2011 U.S. App. LEXIS 13
  • 2011 WL 9326
Court
Court of Appeals for the D.C. Circuit
Filed
Jan 4, 2011
Status
Published
Author
Tatel
On the bench
Tatel, Garland, Williams
Cited by
9 cases
Authority
More cited than 65.0%

holding that an agency’s new “rental fees” were a substantive rule because the agency calculated them using a new methodology

How later courts described this case

  • holding that an agency’s new “rental fees” were a substantive rule because the agency calculated them using a new methodology

Written by the judges who cited it.

The opinion

United States Court of Appeals

FOR THE DISTRICT OF COLUMBIA CIRCUIT

Argued November 4, 2010 Decided January 4, 2011

No. 09-1120

CITY OF IDAHO FALLS, IDAHO, ET AL.,

PETITIONERS

v.

FEDERAL ENERGY REGULATORY COMMISSION,

RESPONDENT

Consolidated with 09-1315

On Petition for Review of Orders

of the Federal Energy Regulatory Commission

Charles R. Sensiba argued the cause for petitioners. With

him on the briefs were Sam Kalen and John H. Clements.

Beth G. Pacella, Attorney, Federal Energy Regulatory

Commission, argued the cause for respondent. On the brief

were Thomas R. Sheets, General Counsel, Robert H. Solomon,

Solicitor, and Judith A. Albert, Senior Attorney.

Before: TATEL and GARLAND, Circuit Judges, and

WILLIAMS, Senior Circuit Judge.

2

Opinion for the Court filed by Circuit Judge TATEL.

TATEL, Circuit Judge: In 1987, the Federal Energy

Regulatory Commission issued a regulation that used a United

States Forest Service rental fee schedule to set annual charges

for hydropower projects occupying federal land. Since then,

FERC has issued annual updates to reflect the Forest

Service’s revised fee schedule. In 2008, however, the Forest

Service began using a significantly different valuation

methodology than the one FERC had reviewed and endorsed

in its 1987 regulation. FERC nonetheless used the revised

Forest Service schedule when it issued its 2009 update—

resulting in substantially higher rates to many licensees.

Petitioners and intervenors in this case, a group of

hydropower licensees who pay FERC’s annual rental fees,

challenge the Commission’s 2009 update, arguing that it was

required to go through notice and comment before it could

impose charges according to the revised Forest Service

methodology. For the reasons set forth in this opinion, we

grant the petition and vacate FERC’s 2009 rental fee update.

I.

Under section 10(e)(1) of the Federal Power Act (FPA),

16 U.S.C. § 803(e)(1), licensees of hydropower projects

regulated by FERC must “pay to the United States reasonable

annual charges in an amount to be fixed by the Commission”

to, among other things, “recompens[e] [the federal

government] for the use, occupancy, and enjoyment of its

lands or other property.” FERC and its predecessor, the

Federal Power Commission, have utilized various

methodologies to set these land use charges. Originally, the

Federal Power Commission calculated annual fees through

individual project appraisals. See Update of the Federal

Energy Regulatory Commission’s Fees Schedule for Annual

Charges for the Use of Government Lands (“Rehearing

3

Order”), 129 FERC ¶ 61,095, at 61,430 (2009). When such

appraisals proved inefficient, FERC adopted national per acre

land values, which it used in combination with an annual rate

of return to set land use fees. Id. at 61,430–31.

In 1985, the Department of Energy’s Inspector General

issued a report finding that FERC’s methodology led to

significant under-collection because it relied on outdated land

value averages. See id. at 61,431. The Report recommended

that FERC revise its regulations so that its fees would reflect

current fair market value and also suggested that the

Commission cease using a national average that failed to

account for land value variations. See id. Responding to

these and other recommendations and following notice and

comment rulemaking, FERC issued Order No. 469, which

established a new methodology for assessing annual rental

fees. See Revision of the Billing Procedures for Annual

Charges for Administering Part I of the Federal Power Act

and to the Methodology for Assessing Federal Land Use

Charges, Order No. 469, 52 Fed. Reg. 18,201 (May 14, 1987).

In that Order, FERC explained that it would use the schedule

published by the Forest Service to determine rental fees for

so-called linear rights-of-way across National Forest System

lands. Id. at 18,202. A “linear right-of-way” is a “right-of-

way for a linear facility, such as a road, trail, pipeline,

electronic transmission line, fence, water transmission

facility, or fiber optic cable.” 36 C.F.R. § 251.51.

As described in Order No. 469, the Forest Service

methodology was based on a survey conducted jointly by the

Forest Service and the Bureau of Land Management (BLM)

of market values for the types of land those agencies allowed

linear rights-of-way to occupy. See Order No. 469, 52 Fed.

Reg. at 18,205. Using the survey data, the Forest Service and

BLM assigned each county in the United States (excluding

4

counties in Hawaii and Alaska) to one of eight different fee

zones based on the county’s “raw land values,” with values

ranging from $50 per acre for Zone One to $1,000 per acre for

Zone Eight. See Linear Rights-of-Way Fees, 51 Fed. Reg.

44,014, 44,017 (Dec. 5, 1986). To determine rental fees, the

Forest Service multiplied the applicable zone values in its

index by two additional factors designed respectively to

account for the land use impact of different rights-of-way and

to provide the government with a reasonable rate of return for

using its land. See id. at 44,014–16. The Forest Service also

included an annual adjustment to account for inflation. See

id. at 44,017.

In adopting the Forest Service fee schedule, FERC

acknowledged that the BLM-Forest Service valuation

methodology was “not precisely fitted to hydroelectric

projects.” Order No. 469, 52 Fed. Reg. at 18,205. FERC

nonetheless concluded that the linear rights-of-way zone

values were “the best approximation available,” and it noted

that “[m]ost commenters” shared its view that the Forest

Service index “would be more representative of the fair

market value of the type of land most often used for

hydroelectric projects than any of the other . . .

methodologies” proposed in the Commission’s initial

rulemaking notice. Id. Among the alternative methodologies

FERC considered and rejected was a proposal to use a land

value index published by the United States Department of

Agriculture that provided state-by-state per acre averages for

the value of farm land and buildings. According to FERC,

“[c]ommenters almost unanimously object[ed] to the use of

[this] agricultural land value index,” arguing that farm land

values were typically much higher than the values of federal

land used for hydropower projects and that substantial

adjustments to the index would have been needed to account

for the value of farm buildings, arable land, and private

5

ownership. Id. at 18,206. FERC agreed, concluding that

“[t]he agricultural index would require . . . major

adjustments” and so would be an inefficient metric for the

value of land used by hydropower projects. Id.

At the end of Order No. 469, FERC promulgated

Regulation 11.2, which implemented the order by amending

the Commission’s FPA regulations. The provision relevant to

this case, section 11.2(b), provides that “[p]ending further

order of the Commission and subject to adjustments as

conditions may warrant, annual charges for the use of

government lands . . . will be set on the basis of the schedule

of rental fees for linear rights-of-way”—an appendix that

reproduced the Forest Service schedule. 18 C.F.R. § 11.2(b).

The provision added that “[t]he Commission, by its designee

the Executive Director, will update its fees schedule to reflect

changes in land values established by the Forest Service. The

Executive Director will publish the updated fee schedule in

the Federal Register.” Id.

For over twenty years from 1987 to 2008, BLM and the

Forest Service made no changes to their linear rights-of-way

fee schedule except for the annual inflation adjustment.

Despite generally recognized increases in land value in most

areas, the agencies’ zone values remained static. See

Rehearing Order, 129 FERC at 61,432. In accordance with

Regulation 11.2, FERC’s Executive Director published annual

fee schedule updates to reflect the Forest Service’s most

recent inflation-adjusted schedule. See id. at 61,432 & n.19.

In 2005, Congress, concerned that zone values for linear

rights-of-way had become outdated, directed both the Forest

Service and BLM to revise their per acre rental fee zone

values “to reflect current values of land in each zone.” 42

U.S.C. § 15925. Following notice and comment, BLM issued

6

the required update in October 2008. See Update of Linear

Right-of-Way Rent Schedule (“BLM Order”), 73 Fed. Reg.

65,040 (Oct. 31, 2008). Days later, the Forest Service

published its own notice, formally adopting BLM’s revisions

to the linear rights-of-way fee schedule. See Fee Schedule for

Linear Rights-of-Way Authorized on National Forest System

Lands, 73 Fed. Reg. 66,591 (Nov. 10, 2008).

The methodology BLM and the Forest Service used to set

rates in this revised schedule differed in several significant

ways from their previous methodology, with each input in the

agencies’ calculation formula changing in some respect. The

most significant change, and the one the parties focus on here,

related to zone values. Responding to Congress’s command

to use up-to-date data, the two agencies chose to replace their

internally-generated 1986 index with a new index called the

Census of Agriculture, which the National Agricultural

Statistics Service (NASS) publishes every five years. The

NASS Census reports average per acre land and building

values by county (or other relevant geographical unit) for

each state and lists individual values for cropland, woodland,

pastureland, rangeland, and a broad “other” category that

includes non-commercial, non-residential building lots,

wasteland, and land with roads and ponds. BLM Order, 73

Fed. Reg. at 65,043. BLM and the Forest Service determined

not only that the NASS Census is a reliable data source, but

also that the land types measured in the census are

comparable to land they administer. Id. To set zone values

for each county using this data, the agencies employed the

average per acre land and building values from the NASS

Census and then reduced them by twenty percent to eliminate

the added value of irrigated cropland and land encumbered by

buildings. Id. at 65,043–44. In addition, because the land

values contained in the NASS Census exceeded those in the

1986 BLM-Forest Service survey, the agencies increased the

7

number of zones from eight to twelve, with zone values

ranging from $250 per acre for Zone One to $100,000 per

acre for Zone Twelve. See id. at 65,045–46, 65,049.

In January 2009, and setting the stage for the issue before

us, FERC sent letters to all hydropower licensees apprising

them of the Forest Service’s revised fee schedule and

explaining that the new schedule would cause annual federal

land use charges to “increase substantially” for “many

projects.” Acting pursuant to Regulation 11.2, FERC’s

Executive Director subsequently issued the Commission’s

annual fee update notice on February 17, which incorporated

the Forest Service’s new rate schedule. Update of the Federal

Energy Regulatory Commission’s Fees Schedule for Annual

Charges for the Use of Government Lands,” (“2009 Update”),

74 Fed. Reg. 8,184 (Feb. 24, 2009) (codified at 18 C.F.R.

pt. 11, app. A). Like all previous updates issued by the

Executive Director, the notice was published in both the

Federal Register and the Code of Federal Regulations.

A group of licensees, including petitioners and

intervenors in this case, filed a timely rehearing request. The

group contended that the 2009 Update amounted to a

rulemaking that FERC improperly issued without notice and

an opportunity for comment. They also argued that by

adopting the new Forest Service land valuations without any

independent inquiry, FERC unlawfully delegated to that

agency its FPA section 10(e)(1) responsibility to set

“reasonable annual charges” for hydropower licensees. 16

U.S.C. § 803(e)(1).

Denying the rehearing petition, FERC first stated that the

petition was procedurally improper because the licensees

were either effectively challenging the final actions of other

agencies (the Forest Service and BLM) or collaterally

8

attacking Regulation 11.2. See Rehearing Order, 129 FERC

at 61,433–34. Notwithstanding these purported procedural

failings, FERC addressed the merits and concluded that no

notice and comment was required prior to the 2009 Update

because the update did not qualify as a legislative rule. FERC

explained that the 2009 Update was not a rulemaking of any

kind, but was instead a procedural action required by

Regulation 11.2. Alternatively, FERC determined that even if

the 2009 Update were a rulemaking, it was an interpretive

rule rather than a legislative rule because it “did not create

new law, rights, or duties” but rather “simply informed

licensees of the updated fees” according to the procedure the

Commission had followed since 1987. Id. at 61,434–35.

Central to FERC’s reasoning was its insistence that

although the Forest Service and BLM concededly modified

their land valuation methodology prior to the 2009 Update,

the Commission’s own methodology—issuing updates based

on the Forest Service rental fee schedule for linear rights-of-

way—remained constant. FERC acknowledged that changes

the Forest Service and BLM made to their fee schedules

“might be cause for the Commission to reexamine the

propriety of using the BLM-Forest Service calculations,” but

it nonetheless contended that the Executive Director’s

ministerial act of issuing the 2009 Update “cannot be

considered a change in Commission regulation.” Id. at

61,436. FERC explained that although Order No. 469

“discuss[ed] various methodologies,” Regulation 11.2 itself

adopted the BLM-Forest Service index as the basis for

determining its land use fees without recognizing any

“exception for changes in the underlying methodology of

BLM and the Forest Service.” Id. at 61,434–35. Indeed,

FERC observed, the regulation “specifically contemplates”

that the Forest Service’s land values might change and that

the Commission would continue to use them. Id. at 61,435.

9

Responding to the licensees’ criticism that the new Forest

Service zone value index was based on agricultural land

values and that FERC had expressly rejected the use of

another agricultural land value index in Order No. 469, the

Commission insisted that the data now being used by the

Forest Service and BLM differed from the index at issue in

Order No. 469. Therefore, although FERC took no position

on “whether the new BLM-Forest Service methodology

results in a reasonably accurate valuation of federal land used

for hydropower purposes” because it believed the question

was not properly presented, it found no conflict between the

methodological change by the Forest Service and BLM and

the Commission’s own prior conclusions in Order No. 469.

Id. at 61,436.

FERC also rejected the licensees’ argument that by

issuing the 2009 Update, it improperly delegated to other

agencies its section 10(e)(1) responsibility to fix reasonable

land use charges. Noting that it adopted the BLM-Forest

Service linear rights-of-way fee schedule in Order No. 469

after full review, FERC asserted that its decision to rely on

other agencies for data updates was consistent with its

statutory responsibilities. See id. at 61,436–37.

One Commissioner dissented on the ground that FERC

“ha[d] not assessed” the new BLM-Forest Service

methodology to determine whether it was appropriate for

arriving at reasonable annual charges for hydropower

licensees. Id. at 61,437. Lamenting that the decision to forgo

public comment “reduces confidence in the fairness of

government process,” the dissent argued that the majority

“should have opened a notice of inquiry or other public

rulemaking process” before accepting the new methodology

and the higher rates it produced. Id.

10

This petition for review followed. Urging us to vacate

the 2009 Update, the licensees argue that FERC failed to

provide notice and an opportunity for public comment as

required by section 553 of the Administrative Procedure Act

(APA), 5 U.S.C. § 553. They also contend that the 2009

Update violates FPA section 10(e)(1) and that FERC acted

arbitrarily and capriciously in denying the rehearing request.

II.

The key issue before us is this: in promulgating the 2009

Update, did FERC change its methodology for setting rental

fees charged to hydropower licensees from the methodology it

had adopted in Order No. 469 and Regulation 11.2? If the

answer is yes, then FERC violated APA section 553. Having

established through public rulemaking in Regulation 11.2 a

legally-binding methodology for setting future rates for

licensees, FERC may modify that methodology only after

notice and comment. See Alaska Prof’l Hunters Ass’n, Inc. v.

FAA, 177 F.3d 1030, 1034 (D.C Cir. 1999) (“ ‘Rule making,’

as defined in the APA, includes not only the agency’s process

of formulating a rule, but also the agency’s process of

modifying a rule.” (citing 5 U.S.C. § 551(5)); Batterton v.

Marshall, 648 F.2d 694, 705–09 (D.C. Cir. 1980) (holding

that the Department of Labor’s adoption of a new

methodology for collecting and computing employment

statistics was a rule requiring notice and comment where

those statistics were used as part of a statutory formula for

allocating job program funds between states). Conversely, if

the answer is no—that is, if as FERC held in its Rehearing

Order, the 2009 Update was mandated by Regulation 11.2 and

was issued in accordance with the Commission’s long-

standing interpretation of that regulation—then it is equally

clear that notice and comment rulemaking was unnecessary.

Whether characterized as an interpretive rule or just a

procedural action, a notice doing no more than faithfully

11

implementing established regulations does not require

renewed notice and comment. Cf. Paralyzed Veterans of Am.

v. D.C. Arena L.P., 117 F.3d 579, 588 (D.C. Cir. 1997)

(concluding that the Department of Justice’s interpretation of

its regulation in a manual supplement was “not sufficiently

distinct or additive to the regulation to require notice and

comment”). Moreover, if FERC’s understanding of the 2009

Update is correct, then the licensees’ only remedy for the

significant rate increase caused by the new Forest Service

rental fee schedule would be the one FERC suggests:

petitioning for a new rulemaking on the grounds that the

factual premises underlying the Commission’s adoption of

Regulation 11.2 have “fundamental[ly] change[d].” Midwest

Indep. Transmission Sys. Operator v. FERC, 388 F.3d 903,

911 (D.C. Cir. 2004) (describing the standard of review for an

agency’s decision not to initiate a rulemaking).

FERC argues that it has reasonably interpreted

Regulation 11.2 to permit it to use the Forest Service’s 2008

land values without first allowing for notice and comment.

Recall that section 11.2(b) of the regulation adopts the Forest

Service’s linear rights-of-way fee schedule as the basis for

setting hydropower land use fees and also instructs FERC’s

Executive Director to “update [the Commission’s] fees

schedule to reflect changes in land values established by the

Forest Service.” 18 C.F.R. § 11.2(b). According to FERC,

the Executive Director followed this command exactly when

he issued the 2009 Update implementing the Forest Service’s

revised zone valuations. Rehearing Order, 129 FERC

at 61,435. True, in “chang[ing]” its land values, the Forest

Service, in conjunction with BLM, jettisoned its prior

valuation methodology by replacing its own survey with an

index produced by another agency for different land

categories. According to FERC, however, Regulation 11.2

“does not specify any underlying methodology as a condition

12

for the Commission’s continued use” of the Forest Service’s

figures. Id. Because of this, and because “[t]he new

methodology utilized by BLM and the Forest Service still

leads to a valuation of rental fees for linear rights-of-way,”

FERC contends that Regulation 11.2 compelled the 2009

Update. Id.

Of course, we owe an agency’s interpretation of its own

regulation substantial deference, giving the interpretation

“ ‘controlling weight’ ” unless it is “ ‘plainly erroneous or

inconsistent with the regulation.’ ” St. Luke’s Hosp. v.

Sebelius, 611 F.3d 900, 904–05 (D.C. Cir. 2010) (quoting

Thomas Jefferson Univ. v. Shalala, 512 U.S. 504, 512

(1994)). But even under this highly deferential standard, we

are unable to accept FERC’s interpretation.

FERC claims that when it adopted the Forest Service’s

rental fee schedule for linear rights-of-way in Regulation

11.2, it did so independently of the Service’s then-existing

land valuation methodology. But the rulemaking process tells

a different story. In its initial notice of proposed rulemaking,

FERC requested that commenters “[i]dentify the benefits and

detriments of each index” that it proposed. See Revisions to

the Billing Procedures for Annual Charges for Administering

Part I of the Federal Power Act and to the Methodology for

Assessing Federal Land Use Charges, 51 Fed. Reg. 211, 213

(Jan. 3, 1986). After BLM and the Forest Service finalized

their zone value index, FERC issued a supplemental request

for comments, asking whether it “should apply [the Forest

Service’s] methodology.” Notice Requesting Supplemental

Comments, 52 Fed. Reg. 82, 83 (Jan. 2, 1987) (emphasis

added). It issued the supplemental request, FERC explained,

to give the public an opportunity to provide “specific

comments” on the BLM-Forest Service index now that its

details were known. Id. Having requested these comments,

13

FERC then issued Order No. 469, in which it evaluated

proposed methodologies and explained that “the zone values

established by the Forest Service for linear rights-of-way are

the best approximation available of the value of lands” that

the Commission administered, whereas the alternative

agricultural index it had also proposed was “not an efficient

measure of land value for hydropower projects.” Order No.

469, 52 Fed. Reg. at 18,205–06. Given this focus, we think it

entirely implausible that FERC adopted the Forest Service

linear rights-of-way index without regard to the methodology

the Service uses to generate it.

FERC’s interpretation of Regulation 11.2 is especially

dubious given that it would compel the Commission to accept,

without notice and comment, any new methodology adopted

by the Forest Service—including even one that the

Commission itself had expressly rejected. Indeed, FERC

candidly concedes as much. As discussed above, FERC held

in its order denying rehearing that so long as the Forest

Service’s methodology leads to the valuation of rental fees for

linear rights-of-way, the Commission must use the Forest

Service’s updated values regardless of how the Service sets

those figures. See Rehearing Order, 129 FERC at 61,435.

Therefore, as FERC counsel acknowledged at oral argument,

Recording of Oral Arg. 24:33–25:17, unless the Commission

promulgated new rules, its interpretation of Regulation 11.2

would require it to use the Forest Service’s updated rate

schedule for linear rights-of-way even if the Forest Service

amended its methodology to use the very same agricultural

land value index that the Commission rejected when it issued

Order No. 469. This is absurd. Whatever ambiguity may

exist in Order No. 469 and Regulation 11.2, FERC clearly

decided against using the Department of Agriculture land

value index. Any interpretation of Regulation 11.2 that fails

to rule out subsequent use of this index by way of an “update”

14

cannot possibly stand. To hold otherwise would allow FERC

to detach Regulation 11.2’s meaning from the public

rulemaking that produced it, undermining the values of public

participation, fairness, and informed agency decisionmaking

that the notice-and-comment process is designed to foster.

See Nat’l Elec. Mfrs. Ass’n v. EPA, 99 F.3d 1170, 1174 (D.C.

Cir. 1996) (discussing the purposes of the APA’s notice-and-

comment requirements).

FERC insists that there is no conflict between the Forest

Service’s current methodology and Order No. 469 because the

NASS Census data, as adjusted by BLM and the Forest

Service, differ significantly from the agricultural land value

index that the Commission previously disapproved. See

Rehearing Order, 129 FERC at 61,436. Even if that is true,

the problem with FERC’s interpretation of Regulation 11.2 is

that nothing turns on these differences. Simply put, FERC

cannot escape the absurd implications of its interpretation by

assuring us that the facts of this case are not quite so extreme.

FERC’s interpretation of Regulation 11.2 suffers from a

second fatal defect: if the regulation obliges the Commission

to adopt any change the Forest Service makes to its rental fee

schedule, then it conflicts with the Commission’s

responsibilities under FPA section 10(e)(1), which requires

FERC to “fix[] . . . reasonable annual charges” for the use of

federal lands by hydropower projects, as well as to “seek to

avoid increasing the price to the consumers of power by such

charges.” 16 U.S.C. § 803(e)(1). Interpreting this provision,

we have held that FERC’s power to set charges is exclusive

and that its duty to ensure that rates are reasonable is both

mandatory and non-delegable. See City of Tacoma v. FERC,

331 F.3d 106, 115 (D.C. Cir. 2003) (“[T]he authority to assess

charges under section 10(e)(1) of the FPA is FERC’s

exclusive responsibility.”); E. Columbia Basin Irrigation Dist.

15

v. FERC, 946 F.2d 1550, 1557 (D.C. Cir. 1991) (“[O]nly the

Commission has authority to administer Section 10(e).”).

Although nothing in section 10(e)(1) prevents FERC from

using externally generated information to set appropriate

rates, the statute does prohibit the Commission from relying

on outside cost assessments without engaging in its own

independent review to ensure that, in its judgment, the

resulting rates are reasonable. See City of Tacoma, 331 F.3d

at 115–16 (holding that FERC acted contrary to the FPA by

failing to review cost reports submitted by other agencies as

part of its fee assessment for hydropower licensees).

When FERC issued Order No. 469, it evaluated the 1986

BLM-Forest Service linear rights-of-way index and concluded

that it represented the best available methodology for

assessing the fair market value of the type of land used for

hydropower projects. Order No. 469, 52 Fed. Reg. at 18,205.

This is exactly what section 10(e)(1) requires: even though

FERC relied on Forest Service and BLM data, it was the

Commission, not those two agencies, that determined this

schedule would produce reasonable rates. But if, as FERC

now claims, Regulation 11.2 commits it to using the Forest

Service’s current schedule regardless of how that agency

decides to value the land it administers, then the Commission

has violated section 10(e)(1) by allowing the Forest Service to

determine the market value of land used by hydropower

licensees and by extension to establish the rates for use of that

land. Indeed, FERC itself illustrates this delegation by

faulting the licensees for failing to object to the new BLM-

Forest Service methodology in the rulemaking conducted by

those agencies. See Rehearing Order, 129 FERC at 61,433;

see also Resp’t’s Br. 33 (repeating this argument). But

neither BLM nor the Forest Service had any authority to

consider whether their new methodology for valuing linear

rights-of-way accurately reflected the value of land used for

16

hydropower projects. Under section 10(e)(1), that evaluation

is for FERC alone to make.

FERC contends that if its reliance on the Forest Service’s

updated land valuations violates section 10(e)(1), then

Regulation 11.2 is the source of the problem, and the

licensees may no longer challenge that regulation because

they failed to do so when it was issued in 1987 and the

limitations period has long since run. See 16 U.S.C.

§ 825l(b). We disagree. For this collateral attack argument to

have any merit, we would have to conclude that FERC’s

interpretation of Regulation 11.2 is reasonable

notwithstanding the unlawful delegation resulting from that

interpretation. Doing so would require us to assume that

affected parties should have anticipated in 1987 that the

Commission might someday interpret Regulation 11.2 as

requiring it to accept major changes in the Forest Service’s

land valuation methodology without further review. In other

words, displaying a surprisingly cynical view of the

administrative process, FERC believes that the licensees

should have realized that the Commission might sometime in

the future interpret the regulation so broadly as to subvert its

section 10(e)(1) responsibilities by delegating its rate-setting

authority to the Forest Service, and it asks us to shield this

unlawful action from review on the grounds that the

Commission’s broad interpretation reasonably follows from

the unqualified language of its existing rule. It is certainly

true, as FERC counsel pointed out at oral argument,

Recording of Oral Arg. 30:48-30:52, that petitioners and

intervenors here are sophisticated actors who can be expected

to parse Commission rules closely to protect their interests.

Even so, it is entirely unreasonable to think that anyone,

including seasoned licensees, would ever have interpreted

Regulation 11.2 as compelling the Commission to set future

rates based on whatever BLM and the Forest Service

17

considered fair market value for lands those agencies oversee.

In short, we may not defer to an agency interpretation that

would cause a regulation to violate the very statute the agency

administers. See Stinson v. United States, 508 U.S. 36, 45

(1993) (explaining that deference to an agency’s

interpretation of its own regulations is only owed where that

interpretation “does not violate the Constitution or a federal

statute”).

To sum up, FERC’s interpretation of Regulation 11.2

improperly divorces the regulation’s text from both the

rulemaking process from which it emerged and the underlying

statutory scheme pursuant to which it was issued, making it

“plainly erroneous” and “inconsistent with the regulation.”

See St. Luke’s Hosp., 611 F.3d at 904–05. In reaching this

conclusion, we by no means suggest that FERC forever bound

itself in Order No. 469 to the land values in the 1986 BLM-

Forest Service index. To the contrary, section 11.2(b)

expressly allows updates to account for land value changes

made by the Forest Service. The Executive Director’s

updating authority, however, is necessarily confined to Forest

Service changes produced according to the original

methodology FERC reviewed and approved.

Having rejected FERC’s interpretation of Regulation

11.2, we can easily complete our task. FERC nowhere

disputes the fact that the rental fees listed in its 2009 Update

are the product of significant changes in the Forest Service’s

methodology for valuing linear rights-of-way. Because FERC

previously approved and used the old Forest Service

methodology, its implicit acceptance of the new methodology

in the 2009 Update marked a change in its own regulations.

For FERC to make such a change, APA section 553 required

notice-and-comment rulemaking. See Alaska Prof’l Hunters

Ass’n, Inc., 177 F.3d at 1034.

18

We grant the petition for review and vacate the 2009

Update.

So ordered.