Opinion

Advanced Energy United v. FERC

Court
Court of Appeals for the D.C. Circuit
Filed
Jul 31, 2026
Status
Published
Cited by
0 cases

The opinion

United States Court of Appeals

FOR THE DISTRICT OF COLUMBIA CIRCUIT

Argued September 26, 2025 Decided July 31, 2026

No. 23-1282

ADVANCED ENERGY UNITED, ET AL.,

PETITIONERS

v.

FEDERAL ENERGY REGULATORY COMMISSION,

RESPONDENT

CONSUMERS ENERGY COMPANY, ET AL.,

INTERVENORS

Consolidated with 23-1284, 23-1289, 23-1297, 23-1299,

23-1305, 23-1310, 23-1312, 23-1313, 23-1320, 23-1327,

23-1330, 23-1346, 24-1093, 24-1106, 24-1112, 24-1136,

24-1137, 24-1139, 24-1140, 24-1141

On Petitions for Review of Orders

of the Federal Energy Regulatory Commission

John Lee Shepherd Jr. and Elbert Lin argued the causes

for Transmission Provider Petitioners. With them on the briefs

were Catherine P. McCarthy, Joshua Kirstein, Paul A. Colbert,

2

Blake Grow, Sara Weinberg, Lisa B. Luftig, Christopher D.

Supino, Ilia Levitine, Ted Murphy, Andrew W. Tunnell, Wendy

N. Reed, Matthew J. Binette, Abraham F. Johns, III, Lyle D.

Larson, Abigail C. Fox, Robert V. Eckenrod, Christopher R.

Jones, Antonia M. Douglas, Adrienne Thompson, Wendy B.

Warren, David S. Berman, Elizabeth P. Trinkle, and Priyanka

Vashisht. Ryan J. Collins, Kevin M. Leroy, Jason Tompkins,

Misha Tseytlin, and Susan J. LoFrumento, entered

appearances.

Melissa Alfano argued the causes for Association

Petitioners. With her on the briefs were Ben Norris, Gabriel

Tabak, Jeremy McDiarmid, Nicholas M. Gladd, and Kelsey C.

Catina.

Robert H. Solomon, Solicitor, Federal Energy Regulatory

Commission, argued the cause for respondent. With him on

the brief were David L. Morenoff, Acting General Counsel, and

Susanna Y. Chu and J. Houston Shaner, Attorneys.

Alexander L. Tom argued the cause for intervenors. With

him on the brief were Christine A. Powell, Ada Statler, Nick

Lawton, Linnet Davis-Stermitz, John Moore, Caroline Reiser,

Gregory E. Wannier, Justin Vickers, Adam Kurland, Ben

Norris, Melissa Alfano, Gabriel Tabak, and Jeremy

McDiarmid. Danielle Fidler entered an appearance.

Before: MILLETT, WALKER, and CHILDS, Circuit Judges.

Opinion for the Court filed PER CURIAM.

PER CURIAM: The on-ramps to our nation’s power grid are

in the middle of a decades-long traffic jam. At the end of 2023,

roughly 2,600 gigawatts of proposed generating and storage

capacity were stuck in interconnection queues, waiting years

3

for the completion of the studies needed before they can

connect to the transmission system. Solar, wind, and energy

storage accounted for about 95 percent of that capacity.1 That

0F

backlog represents more than twice the country’s installed

generation capacity, which stood at roughly 1,200 gigawatts in

2023. 2 The Federal Energy Regulatory Commission (“FERC”)

1F

concluded that the existing process could not keep up with the

“unprecedented” volume of interconnection requests and that

the resulting delays were producing unjust and unreasonable

conditions in wholesale markets.

Order 2023 is FERC’s attempt to clear that traffic. Acting

under its remedial authority, FERC directed every transmission

provider under its jurisdiction to overhaul how it processes

interconnection requests—moving from a serial, project-by-

project model to clustered studies, requiring substantial

deposits, imposing withdrawal fines, setting firm study

deadlines, and backing those deadlines with automatic late

fees.

Those reforms drew fire from several directions.

Transmission providers and system operators argue that FERC

exceeded its authority under the Federal Power Act, violated

due process, and ran afoul of the Administrative Procedure Act

by layering “strict-liability penalties” on top of already-revised

tariffs. Clean-energy developers challenge the rule from the

opposite flank, attacking what they see as an arbitrary safe

harbor that shields transmission providers from penalties when

1

Joseph Rand et al., Queued Up: 2024 Edition, Characteristics

of Power Plants Seeking Transmission Interconnection As of the End

of 2023, Lawrence Berkeley Nat’l Lab’y, 14 (Apr. 2024),

https://perma.cc/Y6KF-KX55.

2

Electricity explained, U.S. Energy Info. Admin. (July 16,

2024), https://perma.cc/RFE7-LE2A.

4

their cost estimates prove wildly wrong. FERC and supporting

intervenors defend the rule as a measured response to a

systemic breakdown in the interconnection process.

These petitions ask whether FERC lawfully adopted that

nationwide interconnection regime and whether FERC

reasonably explained how the rule balances the interests of

transmission providers, interconnection customers, and

ultimate consumers.

We conclude that FERC acted within its authority and

reasonably explained its order. Accordingly, we deny the

petitions.

I. Background

A

Under the Federal Power Act, FERC regulates the

transmission of electric energy in interstate commerce and

wholesale sales of that energy. See 16 U.S.C. § 824(b)(1). The

Act requires that “all rates and charges” for those services, and

the rules and practices that affect them, remain “just and

reasonable” and not unduly discriminatory or preferential. Id.

§§ 824d(a), 824e(a). That mandate extends to the terms on

which new generators connect to the transmission grid because

interconnection procedures and costs directly affect wholesale

rates and competition. See Improvements to Generator

Interconnection Procedures and Agreements, Order

Addressing Arguments Raised on Rehearing, Setting Aside

Prior Order, in Part, and Granting Clarification, Order No.

2023-A, 186 FERC ¶ 61,199, at P 315 (2024) (“Order 2023-

A”) (“queue backlogs are causing unjust and unreasonable

rates and . . . must, therefore, be remedied pursuant to our

statutory mandate”).

5

Before a new generating facility can inject power into the

grid, the transmission provider must complete technical studies

to determine whether the system can safely accommodate the

new resource and what network upgrades would be needed.

Those studies often involve not only the transmission owner

whose facilities the project will connect to, but also

neighboring “affected systems” that may be affected when the

new resource comes online. Improvements to Generator

Interconnection Procedures and Agreements, Order No. 2023,

184 FERC ¶ 61,054, at P 13 n.22 (2023) (“Order 2023”).

Under FERC’s standard interconnection procedures, the

generator enters the queue, posts deposits, undergoes

successive studies, and eventually receives an interconnection

agreement that identifies any required upgrades and assigns

their costs.

Over the last decade, that process has strained under the

volume of new projects. FERC found that the combined

capacity of projects sitting in interconnection queues across the

country was nearly equal to the entire existing United States

generation fleet. Order 2023 at P 30. 3 It noted, too, that more

2F

than seventy percent of the interconnection requests submitted

between 2000 and 2017 were eventually withdrawn. Id. at

P 49. FERC explained that late-stage withdrawals were

increasing and could require transmission providers to redo

studies, raising costs and further delaying projects behind them

in the queue. Id.

FERC concluded that these backlogs, delays, and repeated

restudies were hampering the timely development of new

generation and “stifl[ing] competition” in wholesale markets,

3

And now surpasses it. See notes 1 & 2, supra, and

accompanying text.

6

producing unjust and unreasonable conditions under the

Federal Power Act. Order 2023 at PP 37, 44. Order 2023 is

FERC’s response to those findings.

B

1

Federal Power Act—Section 205. The Federal Power

Act sets out two major avenues through which FERC can

regulate rates and related aspects of our energy grid: Sections

205 and 206. Section 205 governs utility-initiated changes to

rates and practices. As relevant here, it provides:

All rates and charges made, demanded, or received by

any public utility for or in connection with the

transmission or sale of electric energy subject to the

jurisdiction of the Commission, and all rules and

regulations affecting or pertaining to such rates or

charges shall be just and reasonable, and any such rate

or charge that is not just and reasonable is hereby

declared to be unlawful.

16 U.S.C. § 824d(a). Under Section 205, a utility files

proposed tariff changes, and FERC may reject them only if the

utility fails to show they are just and reasonable.

Federal Power Act—Section 206. Section 206 gives

FERC remedial authority to replace existing rates or practices

that have become unlawful. It is the “related but distinct” tool

that allows FERC to act on its own initiative or on complaint.

Emera Maine v. FERC, 854 F.3d 9, 21 (D.C. Cir. 2017)

(quoting FirstEnergy Serv. Co. v. FERC, 758 F.3d 346, 348

(D.C. Cir. 2014)). The statute provides, in relevant part:

7

Whenever the Commission, after a hearing held upon

its own motion or upon complaint, shall find that any

rate, charge, or classification, demanded, observed,

charged, or collected by any public utility for any

transmission or sale subject to the jurisdiction of the

Commission, or that any rule, regulation, practice, or

contract affecting such rate, charge, or classification

is unjust, unreasonable, unduly discriminatory or

preferential, the Commission shall determine the just

and reasonable rate, charge, classification, rule,

regulation, practice, or contract to be thereafter

observed and in force, and shall fix the same by order.

16 U.S.C. § 824e(a) (emphasis added). In a Section 206

proceeding, FERC bears the burden to show that existing rates

or practices are unlawful and then to identify a replacement that

is itself just and reasonable and not unduly discriminatory.

Emera Maine, 854 F.3d at 21, 24–25.

Administrative Procedure Act. Judicial review is

governed by 5 U.S.C. § 706. As relevant here, the reviewing

court must “hold unlawful and set aside agency action,

findings, and conclusions found to be . . . arbitrary, capricious,

an abuse of discretion, or otherwise not in accordance with

law” or “unsupported by substantial evidence.” 5 U.S.C.

§ 706(2)(A), (E).

The parties agree that Order 2023 is subject to those

standards.

2

Order 888: open-access transmission. Until the mid-

1990s, vertically integrated utilities controlled generation,

transmission, and distribution within their territories and could

8

use their transmission facilities to favor their own generation.

See NextEra Energy Res., LLC v. FERC, 118 F.4th 361, 365

(D.C. Cir. 2024). In 1996, FERC issued Order 888, which

required transmission owners to offer non-discriminatory

open-access transmission service under a standard tariff and to

“unbundl[e]” transmission from generation. Id. at 365–66.

This court largely upheld that regime, and the Supreme Court

confirmed FERC’s authority to impose open-access

requirements on interstate transmission. See Transmission

Access Pol’y Study Grp. v. FERC, 225 F.3d 667, 681 (D.C. Cir.

2000), aff’d sub nom. New York v. FERC, 535 U.S. 1, 16–24

(2002).

Order 2000: regional transmission organizations.

FERC then turned to who operates the power grid. In Order

2000, FERC encouraged utilities to place operational control

of transmission facilities in regional transmission organizations

and independent system operators—entities that manage the

grid over multi-state regions and administer competitive

markets. Regional Transmission Organizations, Order No.

2000, 65 Fed. Reg. 810, 811 (Jan. 6, 2000). FERC and this

court understood that regional operators could reduce

opportunities for discriminatory transmission practices and

improve coordination across the network. See id.; Pub. Util.

Dist. No. 1 of Snohomish Cnty. v. FERC, 272 F.3d 607, 611

(D.C. Cir. 2001).

Order 2003: standardized interconnection procedures.

In 2003, FERC addressed how new generators connect to the

grid. Order 2003 required all public utilities that own, control,

or operate interstate transmission facilities to adopt standard

Large Generator Interconnection Procedures and a standard

Large Generator Interconnection Agreement for facilities

larger than 20 megawatts. See Standardization of Generator

9

Interconnection Agreements & Procedures, Order No. 2003,

104 FERC ¶ 61,103, at PP 1–2 (2003) (“Order 2003”).

Order 2003 adopted a serial “first-come, first-served”

approach. Transmission providers studied each new request

individually in the order received. Generators entered the

queue with a modest refundable deposit and proceeded through

successive feasibility, system-impact, and facilities studies.

See Order 2003 at PP 34–38. Transmission providers were

obligated only to use “reasonable efforts” to complete those

studies within target timeframes. Id., pro forma Large

Generator Interconnection Procedures §§ 1, 6.3, 7.4, 8.3. They

effectively set their own schedules under that flexible standard.

As markets evolved, FERC observed that the serial,

reasonable-efforts model was contributing to delays and

backlogs. In technical conferences and later rulemakings,

FERC identified surges in new generation development,

especially from smaller renewable projects, and noted that

many interconnection requests were speculative entries that

would eventually withdraw—often late in the process—forcing

restudies and increasing uncertainty for projects deeper in the

queue. Interconnection Queuing Practices, Order on

Technical Conference, 122 FERC ¶ 61,252, at P 18 (2008);

Reform of Generator Interconnection Procedures and

Agreements, Order No. 845, 163 FERC ¶ 61,043, at P 24 &

n.21 (2018).

FERC adopted incremental reforms, see, e.g., Order 845,

but it ultimately concluded that piecemeal adjustments did not

solve the core problems with queue management, study

timelines, and cost certainty. See Order 2023 at PP 17–19.

10

3

Advance notice and proposed rule. In July 2021, FERC

issued an Advance Notice of Proposed Rulemaking that

flagged potential reforms to transmission planning, cost

allocation, and generator interconnection. Building for the

Future Through Electric Regional Transmission Planning and

Cost Allocation and Generator Interconnection, Advance

Notice of Proposed Rulemaking, 176 FERC ¶ 61,024 (2021).

After receiving extensive comments, FERC split those topics

into separate dockets and, in June 2022, issued a notice of

proposed rulemaking focused on generator interconnection

reforms. Improvements to Generator Interconnection

Procedures and Agreements, Notice of Proposed Rulemaking,

179 FERC ¶ 61,194 (2022) (“NPRM”).

Commenters—including transmission providers, system

operators, state regulators, consumer advocates, and

environmental groups—largely agreed that queue backlogs and

cost uncertainty warranted significant changes to the existing

interconnection regime. See Order 2023 at P 30.

Order 2023’s core reforms. In July 2023, FERC issued

Order 2023. Based on the rulemaking record, FERC found that

its existing pro forma interconnection procedures and

agreements were “insufficient” to ensure that customers can

interconnect in a “reliable, efficient, transparent, and timely

manner” and that, without reform, existing backlogs and delays

would continue to hinder new generation and undermine just

and reasonable rates. Order 2023 at PP 37, 44.

Acting under Section 206, FERC directed jurisdictional

transmission providers—that is, those that are governed by

FERC—to make a series of nationwide changes.

11

First, Order 2023 replaces the serial, first-come, first-

served model with a “first-ready, first-served” cluster-study

process. Transmission providers must study groups of

interconnection requests together in defined cluster windows,

rather than one by one, to improve efficiency and better

allocate network upgrade costs. Order 2023 at PP 177–83.

Next, the rule requires interconnection customers to post

substantial study deposits at the outset of the process, calibrated

to project size and stage, to ensure that only commercially

ready projects enter and stay in the queue. Order 2023 at

PP 502–07.

The order then adopts a tiered schedule of withdrawal fines

that increase as a project advances through the interconnection

stages, while allowing limited opportunities for fine-free

withdrawal when specified conditions are met. Order 2023 at

PP 780–813.

With the cluster study process and deposit system in place,

the order establishes firm deadlines for transmission providers

to complete cluster studies. It includes a 150-day deadline for

the main cluster study and eliminates the “reasonable efforts”

standard. Order 2023 at PP 324–31, 962. If a transmission

provider misses a study deadline, the rule requires it to pay late

fees to interconnection customers, subject to certain limits. Id.

at PP 962–1007. To protect against undue exposure to fees and

account for unusual circumstances, Order 2023 caps annual

late-fee amounts and creates an appeals process under which

transmission providers can seek relief from late fees in

specified situations. Id. at PP 981–89.

Finally, the order standardizes how affected-system

transmission providers study and allocate costs for impacts on

their systems, and adopts Energy Resource Interconnection

12

Service (“energy service”) as the default standard for such

studies. Order 2023 at PP 1110–80, 1276–93.

FERC received thirty-two timely rehearing and

clarification requests challenging various aspects of these

reforms. See Order 2023-A at P 5.

Order 2023-A. In March 2024, FERC issued Order 2023-

A, addressing those rehearing arguments. As relevant here,

FERC reaffirmed its findings that existing interconnection

procedures and agreements had become unjust and

unreasonable, declined to abandon the late-fee framework for

study delays, and defended the chosen thresholds for fine-free

withdrawal as part of a broader effort to balance cost certainty

against the need to deter speculative queue entries. Order

2023-A at PP 35, 280–303, 413–15.

C

The petitions challenge three portions of the rule: (1) the

fines on interconnection customers for withdrawing from the

queue, (2) the firm deadlines for interconnection studies,

backed by late fees on transmission providers, and (3) the

requirement that all affected-system studies use Energy Service

Modeling.

Challenges to the Thresholds for Withdrawal Fees

Clean Energy Petitioners challenge Order 2023’s rule that

allows an interconnection customer to withdraw without a fine

between the final cluster study and the individual facilities

study stages only if the customer’s assigned network upgrade

costs increase by 100 percent or more over earlier estimates.

13

They argue that allowing host-system cost estimates to

double before a customer may withdraw without a fine is

arbitrary and capricious and results in unjust and unreasonable

rates. Specifically, they argue that the 100-percent threshold

for fine-free withdrawal is unsupported by the record,

inconsistent with FERC’s own findings that cost uncertainty is

a major barrier to project financing, and, as a result, at odds

with FERC’s obligation under Section 206 to ensure just and

reasonable practices. They contend that the same problems

undermine FERC’s decision not to adopt any fine-free-

withdrawal threshold for cost estimates from affected-system

studies.

FERC defends the 100-percent threshold as a reasonable

exercise of its ratemaking discretion: It says the threshold

discourages speculative queue entries and late withdrawals

while still providing an escape hatch in cases of severe cost

shocks. FERC likewise defends its decision not to create a

withdrawal threshold for affected-system studies as a judgment

call needed to balance the interests of various customers in the

queue.

Challenges to the Study-Delay Incentive Scheme

Transmission providers and system operators focus on the

other side of the balance. They contend that Order 2023’s

financial incentive scheme for missed study deadlines exceeds

FERC’s remedial authority under Section 206, violates due

process, and is arbitrary and capricious.

To start, they argue that Order 2023 effectively punishes

them for delays without any finding that they caused those

delays or acted unreasonably, and that the rule leaves key

questions about cost recovery—especially for regional system

operators that lack shareholders—unresolved.

14

FERC, in response, characterizes the late fees as part of its

Section 206 remedy for unjust and unreasonable

interconnection practices, not as punitive sanctions, and points

to the late-fee caps and appeals process as safeguards that

mitigate the risk of unfair liability.

Next, these petitioners argue that the scheme is arbitrary

and capricious on a variety of grounds. They maintain, for

instance, that FERC failed to grapple with evidence that delays

often stem from factors outside the transmission providers’

control, including interconnection customer behavior, third-

party studies, and regional reliability requirements, and that

FERC did not meaningfully respond to their rehearing

arguments on that point.

FERC responds that the late fees, coupled with the appeals

process, reflect a reasonable balance between encouraging

timely performance and recognizing exceptional

circumstances. FERC stated that it needed a uniform,

enforceable mechanism to ensure timely completion of studies

in light of nationwide backlogs and the failure of the

“reasonable efforts” standard. Order 2023-A at PP 1–3.

Challenges to the Energy Service Modeling Requirements

Finally, a subgroup of transmission providers argues that

FERC acted arbitrarily and capriciously in requiring energy

service modeling for all affected-system studies. The

transmission providers complain that the requirement prevents

affected systems from fully assessing the scope of the

customer’s impact on their system if the host transmission

system ultimately provides the customer a higher level of

service, known as Network Resource Interconnection Service

(“firm service”).

15

FERC responds that it chose the energy service standard

to promote consistency and transparency, reduce late queue

withdrawals, and ensure that interconnection customers are not

charged for a service they do not receive or for significant

upgrades on a system they may never use.

All of the petitioners’ arguments fail.

II. Standing

A

FERC argues that the Clean Energy Petitioners lack

associational standing because they “have failed to

demonstrate that any of their members have suffered ‘imminent

or concrete’ harm as a result” of those orders. FERC Br. 88

(quoting Indus. Energy Consumers of Am. v. FERC, 125 F.4th

1156, 1161 (D.C. Cir. 2025)). FERC adds that the Clean

Energy Petitioners’ opening brief did not “identify members

who have suffered the requisite harm.” Id. at 86–87 (citing

Chamber of Com. v. EPA, 642 F.3d 192, 199 (D.C. Cir. 2011)).

And it faults them for failing to submit “member affidavits with

their opening brief.” Id. at 86 (citation modified). We consider

whether the Clean Energy Petitioners have carried their burden

on the record before us.

Standing is “a constitutional prerequisite to the exercise of

our jurisdiction.” Healthy Gulf v. Dep’t of the Interior, 152

F.4th 180, 189 (D.C. Cir. 2025) (citing Spokeo, Inc. v. Robins,

578 U.S. 330, 338 (2016)). Once an organization establishes

that one member has standing, it need go no further, because

when the standing of additional members or organizations

“makes no difference to the merits of the case,” “the standing

of one member of one of the organizations bringing suit

16

suffices.” Ctr. for Biological Diversity v. EPA, 56 F.4th 55, 66

(D.C. Cir. 2022) (citation modified). An organization, under

our standing doctrine, “can assert standing in one of two ways”:

“on its own behalf, as an organization,” or “on behalf of its

members, as associational standing.” Elec. Priv. Info. Ctr. v.

Dep’t of Com., 928 F.3d 95, 100 (D.C. Cir. 2019) (citation

modified). The Clean Energy Petitioners invoke the latter. To

establish associational standing, they must show that “(1) at

least one of their members would have standing to sue in their

own right, (2) the interests the members seek to protect are

germane to their organizations’ purposes, and (3) neither the

claim asserted, nor the relief requested requires the members to

participate individually in the lawsuit.” Healthy Gulf, 152

F.4th at 189 (citation modified). The Clean Energy Petitioners

satisfy each requirement.

1

Before an organization may invoke associational standing,

it must first establish that at least one of its members would

have Article III standing in its own right. See Sierra Club v.

FERC, 827 F.3d 59, 65 (D.C. Cir. 2016). That showing

requires an injury “fairly traceable” to the challenged action

and “likely”—not “merely speculatively”—redressable “by a

favorable decision.” See Friends of the Earth, Inc. v. Laidlaw

Env’t Servs. (TOC), Inc., 528 U.S. 167, 180–81 (2000) (citation

modified). The association must make that showing with

“substantial probability.” Sierra Club v. EPA, 292 F.3d 895,

898–99 (D.C. Cir. 2002).

When the Clean Energy Petitioners filed their opening

brief, Circuit Rule 28(a)(7) required evidence of standing only

when standing was not “apparent” from the administrative

record. D.C. Cir. R. 28(a)(7) (2024); see SSM Litig. Grp. v.

17

EPA, 150 F.4th 593, 596 (D.C. Cir. 2025) (applying the version

of Rule 28(a)(7) in effect when the opening brief was filed). 4 3F

Here, the administrative record shows that these

petitioners have standing. The Clean Energy Petitioners’

corporate disclosure statements and administrative comments

establish that their members participate in the interconnection

queue as customers and so face the withdrawal fines imposed

by the challenged orders. See J.A. 1021 (Pine Gate

Renewables, a member of Solar Energy Industries Association

(“SEIA”) and American Clean Power Association that operates

clean-energy generation projects, describing its continuing role

as an interconnection customer); id. at 1489 (Order 2023

identifying solar projects as among the fastest-growing sources

of energy generation); see also Clean Energy Petitioners Br., at

iii (corporate disclosures stating that “SEIA represents the

entire solar industry, including installers, project developers,

manufacturers, contractors, financiers and non-profits”). And

Pine Gate Renewables explained that the “voluntary

withdrawal of an interconnection customer from the queue or

an interconnection customer’s removal from the queue . . .

often trigger a restudy of the entire cluster regardless of the

minimal effect of the change on most of the previous study

results.” J.A. 1027. “[T]here is ordinarily little question that a

regulated individual or entity has standing to challenge an

allegedly illegal statute or rule under which it is regulated.”

Bonacci v. TSA, 909 F.3d 1155, 1159 (D.C. Cir. 2018) (citation

modified).

4

In August 2025, the court revised Circuit Rule 28(a)(7) to

require every petitioner to “include arguments and cite evidence

establishing by a ‘substantial probability’ the claim of standing” in

its opening brief. D.C. Cir. R. 28(a)(7).

18

What’s more, while Clean Energy Petitioners did not

submit a declaration with their opening brief, they did submit

one with their reply brief, “in an abundance of caution.” Decl.

of Brett White, Senior Vice President of Regulatory and

Government Affairs at Pine Gate Renewables (Attach. A to

Clean Energy Petitioners Reply Br.). That timing poses no

problem. Although it is disfavored, we have allowed

“petitioners to support their standing in their reply brief [and]

in affidavits submitted along with the reply brief.” Am. Libr.

Ass’n v. FCC, 401 F.3d 489, 494 (D.C. Cir. 2005).

White explains in his declaration how Order 2023 affects

several Pine Gate Renewables projects. Pine Gate Renewables

“has 3.5 GWs of solar and energy storage assets under contract,

under construction, or in operation in the Southeast, the

Electric Reliability Council of Texas . . . region, the PJM

Interconnection, LLC . . . region, Oregon, and Rhode Island,”

representing “over seven billion dollars in completed

transactions.” White Decl. ¶ 8. White further declares that

Pine Gate Renewables “is currently developing projects in

several FERC-jurisdictional markets that will be subject to the

requirements of Order 2023, including the rules governing cost

increases and withdrawal fines at the facilities study and

affected systems study phases of the interconnection process.”

Id. That is enough to show injury-in-fact because Pine Gate

Renewables develops projects in markets governed by Order

2023, and those projects face the very withdrawal-fine rules

challenged here, and their attendant financial consequences.

See Bonacci, 909 F.3d at 1159.

With injury-in-fact established, we turn next to causation

and redressability. Causation asks whether it is “substantially

probable that the challenged acts of the defendant, not of some

absent third party, will cause the particularized injury of the

plaintiff.” Orangeburg v. FERC, 862 F.3d 1071, 1080 (D.C.

19

Cir. 2017) (citation modified). Redressability requires an

injury “capable of resolution and likely to be redressed by

judicial decision.” W. Coal Traffic League v. Surface Transp.

Bd., 998 F.3d 945, 950 (D.C. Cir. 2021) (citation modified).

The Clean Energy Petitioners satisfy both requirements.

Their members face a substantial risk of injuries because

FERC has subjected them to the withdrawal fines in Order

2023, and they challenge those fines as “arbitrary and

capricious and unsupported by substantial evidence, in

violation of the Administrative Procedure Act, 5 U.S.C.

§§ 706(2)(A), (E), and [as] result[ing] in unjust and

unreasonable rates to Petitioners’ member companies.” Clean

Energy Petitioners Br. 14. That injury is fairly traceable to

FERC because the challenged orders create the policy Pine

Gate Renewables says will govern its projects. And Clean

Energy Petitioners’ injury is redressable by a favorable ruling.

Cf. Ctr. for Energy & Econ. Dev. v. EPA, 398 F.3d 653, 657

(D.C. Cir. 2005) (“[T]he redressability requirement may be

satisfied by vacating the challenged rule and giving the

aggrieved party the opportunity to participate in a new

rulemaking the results of which might be more favorable to it.”

(citation modified)).

The Clean Energy Petitioners therefore have shown that at

least one of their members would have standing to sue,

satisfying the first element of associational standing.

2

Likewise, the Clean Energy Petitioners have shown that

the interests of their members are germane to their purpose,

satisfying the second element of associational standing. That

element ensures that “the association’s litigators will

themselves have a stake in the resolution of the dispute, and

20

thus be in a position to serve as the defendant’s natural

adversary.” United Food & Com. Workers Union Loc. 751 v.

Brown Grp., Inc., 517 U.S. 544, 555–56 (1996); see also Ctr.

for Sustainable Econ. v. Jewell, 779 F.3d 588, 597 (D.C. Cir.

2015) (similar).

Here, in its corporate disclosure, the American Clean

Power Association (one of the Clean Energy Petitioners)

maintains that the organization “represents over 100 member

companies and has a mission to achieve 100% clean power and

transportation electrification across the United States.” Clean

Energy Petitioners Br., at i. Additionally, the SEIA’s “member

companies develop, manufacture, finance and build solar

projects both domestically and abroad.” Id. at iii. This case

sits comfortably within those missions. The Clean Energy

Petitioners challenge interconnection rules that burden clean-

energy development by exposing their members, in their view,

to unlawful withdrawal fines. The connection between the suit

and the organization’s purpose is therefore not strained but

direct. The interests these petitioners seek to protect are

therefore “germane to [their] purpose.” Ctr. for Biological

Diversity, 56 F.4th at 66 (citation modified).

3

The Clean Energy Petitioners also satisfy the third element

of associational standing. “Member participation is not

required where a suit raises a pure question of law and neither

the claims pursued, nor the relief sought require the

consideration of the individual circumstances of any aggrieved

member of the organization.” Healthy Gulf, 152 F.4th at 191

(citation modified).

Here, the Clean Energy Petitioners’ challenges against

Order 2023 concern pure questions of law. See Marshall Cnty.

21

Health Care Auth. v. Shalala, 988 F.2d 1221, 1226 (D.C. Cir.

1993) (“[W]hen an agency action is challenged[] . . . [t]he

entire case on review is a question of law, and only a question

of law.”). And purely legal challenges, like this one, do not

“depend[] on individualized evidence from their members,” or

any individualized remedies. Healthy Gulf, 152 F.4th at 191.

For these reasons, the Clean Energy Petitioners satisfy all

three elements of associational standing.

B

Staying with standing, we also consider whether the

respondent-intervenors—the Clean Energy Advocates—have

associational standing to advocate in support of Order 2023’s

study-delay fees. Neither set of petitioners argues against their

standing. Article III, however, does not depend on party

presentation since we must assure ourselves of our jurisdiction,

“sua sponte if necessary.” Flytenow, Inc. v. FAA, 808 F.3d

882, 888 (D.C. Cir. 2015). We therefore address the issue and

hold that the Clean Energy Advocates have standing.

An intervenor has a “sufficient injury in fact where,” for

example, “[it] benefits from agency action, the action is then

challenged in court, and an unfavorable decision would remove

[its] benefits.” Crossroads Grassroots Pol’y Strategies v. FEC,

788 F.3d 312, 317 (D.C. Cir. 2015). This rule even applies

when the challenged agency action benefits the intervenor only

“tangentially” or “indirectly.” Id. at 318. What matters is the

practical effect. In those circumstances, the only question is

whether another party “seeks relief, which, if granted, would

injure the prospective intervenor.” Id. (citation modified).

The Clean Energy Advocates satisfy that standard. They

say their members benefit from the challenged orders because

22

they address widespread interconnection queue delays. And

those delays, in their view, cause higher energy bills and slow

the integration of cheaper, cleaner energy, including wind,

solar, and battery storage. On their telling, vacating the study-

delay incentive scheme in Order 2023 would undo those

improvements and likely increase electricity costs for their

members.

The record bears out that point. The Environmental

Defense Fund, one of the Clean Energy Advocates, has

318,225 members in forty-seven states where most or all

customers are served by Regional Transmission Organizations

or electric utilities subject to Order 2023. Those members use

electricity in markets affected by the challenged orders.

Vacating the rule’s study-delay incentive scheme would likely

expose them to higher electricity costs caused by renewed

interconnection delays. See Goodman v. Pub. Serv. Comm’n,

467 F.2d 375, 378 (D.C. Cir. 1972) (holding that consumers

have standing to challenge or defend agency action that affects

the prices they pay for electricity). Thus, by showing that their

members would benefit if the challenged orders remain in

place, the Clean Energy Advocates have shown that at least one

member would be injured if we set aside Order 2023. These

same facts also establish causation and redressability. See

Healthy Gulf, 152 F.4th at 191. 54F

5

The Clean Energy Advocates advance a fallback argument.

Because they intervened in support of FERC, the respondent here,

they say they do not invoke our jurisdiction in their own right, and

so need not establish standing for themselves. We need not resolve

that question because the Clean Energy Advocates have Article III

standing regardless. See United States v. Waksberg, 112 F.3d 1225,

1227 (D.C. Cir. 1997) (explaining that courts “should not decide a

constitutional issue unless it is necessary to do so”).

23

Turning to the second and third elements of associational

standing, we hold that the Clean Energy Advocates satisfy

them as well. Their members’ interests are germane to the

organizations’ purposes—helping move the country toward a

clean, affordable, and reliable electric grid. This suit fits that

purpose. The Clean Energy Advocates seek to defend the

study-delay incentive scheme because, in their view, it reduces

interconnection delays and lowers the costs of bringing clean

energy onto the electric grid. Nor is individual member

participation required considering that the Clean Energy

Advocates’ challenges raise purely legal issues and seek

common relief. See Marshall Cnty. Health Care Auth., 988

F.2d at 1226. Given that point, they seek relief that does not

“depend[] on individualized evidence from their members.”

Healthy Gulf, 152 F.4th at 191. For those reasons, the Clean

Energy Advocates have satisfied the latter two elements of

associational standing. 65F

*****

With Article III standing established, we turn to the merits.

III. Challenges to the Thresholds for Withdrawal Fees

The Clean Energy Petitioners argue that (1) the threshold

for fine-free withdrawal from a host transmission system is

arbitrary and capricious; (2) FERC arbitrarily declined to adopt

a comparable threshold for withdrawals based on affected-

systems upgrade costs; and (3) the fine-free withdrawal

6

The Transmission Petitioners plainly have Article III standing.

Order 2023 regulates them directly, compelling compliance filings,

requiring a cluster-study interconnection process, and imposing new

study deadlines backed by fines. See Bonacci, 909 F.3d at 1159;

Transmission Petitioners Br. 18.

24

thresholds depart from precedent without adequate

explanation. We address these arguments in turn.

A

We start with whether FERC reasonably set the threshold

for avoiding withdrawal fines at the facilities-study stage. The

Clean Energy Petitioners challenge the third and final

exemption from those fines. That exemption provides that an

interconnection customer will not incur withdrawal fines when,

by the time it receives its individual facilities study, its

estimated network-upgrade costs have increased by more than

100 percent from the last cluster study. The Clean Energy

Petitioners say that threshold is too high—so high, in fact, that

it frustrates Order 2023’s stated goal of giving interconnection

customers better cost certainty. They also contend, for much

the same reason, that the 100-percent threshold is not “just and

reasonable.” Clean Energy Petitioners Br. 19. We disagree.

An agency must “give adequate reasons for its decisions.”

Montrois v. United States, 916 F.3d 1056, 1067 (D.C. Cir.

2019) (quoting Encino Motorcars, LLC v. Navarro, 579 U.S.

211, 221 (2016)). That requirement “is meant to ensure that

agencies offer genuine justifications for important decisions,

reasons that can be scrutinized by courts and the interested

public.” Dep’t of Com. v. New York, 588 U.S. 752, 785 (2019).

It is satisfied when the agency’s explanation is “clear enough

that its path may reasonably be discerned.” Montrois, 916 F.3d

at 1067. So while the agency sometimes need only offer a

“brief statement,” it must still “explain why it chose to do what

it did.” Tourus Records, Inc. v. DEA, 259 F.3d 731, 737 (D.C.

Cir. 2001) (quoting Henry J. Friendly, Chenery Revisited:

Reflections on Reversal and Remand of Administrative Orders,

1969 Duke L.J. 199, 222).

25

In determining whether an agency’s final rule is arbitrary

and capricious, “we may consider only the regulatory rationale

actually offered by the agency during the development of the

regulation.” Grand Canyon Air Tour Coal. v. FAA, 154 F.3d

455, 469 (D.C. Cir. 1998). We do not “accept as evidence of

reasoned decisionmaking a post hoc rationalization for agency

action.” City of Kansas City v. Dep’t of Hous. & Urb. Dev.,

923 F.2d 188, 194 (D.C. Cir. 1991).

Considering those principles, we address whether FERC’s

decision to set the fine-free withdrawal threshold at a 100-

percent cost increase was arbitrary and capricious. FERC

found, and no party disputes, that withdrawal fines are “needed

to remedy the issues regarding speculative interconnection

requests,” and the “harms to the function of the interconnection

queue that occur when” nonviable projects withdraw. Order

2023 at P 781. FERC further explained that fines discourage

speculative requests by “encourag[ing] interconnection

customers to ensure that their proposed generating facilities are

likely commercially viable when they” enter the queue. Id.

That explanation is reasonable. A project that enters the queue

without a realistic path to completion can consume study

resources, distort cost estimates, and shift the resulting burdens

to others.

FERC also found that withdrawals become more harmful

the later they occur. Order 2023 at P 781. “[L]ate-stage

withdrawals,” after all, “cause the greatest disruption to

interconnection queue processing via restudies and delays.” Id.

at P 790. And the problem is not only delay. A withdrawal

“after the facilities study” can shift network-upgrade costs onto

the customers that remain in the queue. Id. at P 808. In support

of that position, FERC, “[b]y way of example,” explained how

one late withdrawal could reallocate $9 million in costs to other

26

interconnection customers, even after crediting those

customers a proportional amount of the withdrawal fine. Id.

In response to those findings, FERC adopted a graduated

structure. It set “the thresholds for [fine]-free withdrawal . . .

higher at later stages of the interconnection study process,”

including the facilities-study stage, “given the greater harms of

late-stage withdrawals and the importance of incentivizing

earlier withdrawal of non-viable interconnection requests.”

Order 2023-A at P 232; see also Order 2023 at P 792. That

structure followed FERC’s straightforward premise that the

later the withdrawal, the greater the disruption; and the greater

the disruption, the stronger the incentive needed to avoid it.

The Clean Energy Petitioners do not dispute that premise.

They acknowledge that a higher exemption threshold is

appropriate at the facilities-study stage; they just would have

set it at some lower percentage. See Order 2023-A at P 223

(“Clean Energy Associations submit that the Commission

should lower this threshold to a 50% cost increase post-study

for a [fine]-free withdrawal.”). They make the same point by

citing other project developers that preferred lower thresholds,

including at the facilities study stage. Hence, these petitioners

dispute not the rationale of a graduated fine structure but rather

FERC’s decision to draw the line at a 100-percent withdrawal

threshold instead of some lower percentage.

FERC, however, did not pick the 100-percent withdrawal

threshold out of thin air. In its Notice of Proposed Rulemaking,

FERC supported its proposed thresholds by pointing to prior

orders applying to individual transmission providers that had

adopted the same 25-percent and 100-percent fine-free

withdrawal thresholds. NPRM at P 139 n.209 (citing

PacifiCorp, 171 FERC ¶ 61,112 (2020); Pub. Serv. Co. of

Colo., 169 FERC ¶ 61,182 (2019); Tri-State Generation &

27

Transmission Ass’n, 174 FERC ¶ 61,021 (2021)); see also id.

at P 139 n.210 (citing PacifiCorp, 171 FERC ¶ 61,112, at

P 112). Those real-world examples give FERC three concrete

models of successful implementation of the 100-percent fine-

free withdrawal threshold. And FERC did not stand alone

considering that at least one commenter supported the 100-

percent threshold. See Order 2023 at P 743 (citing Comments

of the National Rural Electric Coop. Association at 30 (Oct. 13,

2022)).

The Clean Energy Petitioners counter that FERC’s

reliance on its precedent and the Notice of Proposed

Rulemaking is merely the “post hoc salvage operations of

counsel” that “cannot overcome the inadequacy of the

Commission’s explanation.” Clean Energy Petitioners Reply

Br. 9 (quoting KeySpan-Ravenswood, LLC v. FERC, 348 F.3d

1053, 1059 (D.C. Cir. 2003)). But they misread KeySpan.

In KeySpan, FERC’s counsel defended its order with a

rationale that FERC had never adopted. 348 F.3d at 1059. The

order contained only a “cryptic statement” about consistency.

Id. It did not explain that the twelve-month outage-rate

measure was justified because the same twelve-month period

governed another party’s sales, thereby offsetting any price-cap

effect. Id. That rationale first appeared in litigation. So we

treated it for what it was: the “post hoc salvage operations of

counsel.” Id. But this case differs from that one.

FERC does not urge us to accept a new rationale invented

by counsel after the fact. FERC cited the relevant precedent in

the Notice of Proposed Rulemaking, received comments

addressing the relevant thresholds, and then adopted the same

basic approach in the final rule. Its reliance on that precedent

therefore does not invoke new, independent reasons. It instead

elaborates on reasoning already present in the record, providing

28

an “amplified articulation.” Concert Inv., LLC v. Small Bus.

Admin., 100 F.4th 215, 220 (D.C. Cir. 2024). More, FERC’s

reliance on the relevant precedent occurred “during the

development of the regulation,” which we may consider.

Grand Canyon Air, 154 F.3d at 469.

For those reasons, we hold that FERC’s decision to set the

fine-free withdrawal threshold at a 100-percent cost increase

was not arbitrary and capricious.

B

The Clean Energy Petitioners also argue that FERC acted

arbitrarily and capriciously in declining to set a fine-free

withdrawal option related to non-jurisdictional affected-system

studies. We reject that argument too.

Generally, “FERC enjoys broad discretion to invoke its

expertise in balancing competing interests and drawing

administrative lines.” Minisink Residents for Env’t Pres. &

Safety v. FERC, 762 F.3d 97, 111 (D.C. Cir. 2014) (citation

modified). That discretion matters here because FERC’s job is

not to maximize one interest at the expense of all others. It

must “balance competing equities against the backdrop of the

public interest.” Colum. Gas Transmission Corp. v. FERC, 750

F.2d 105, 112 (D.C. Cir. 1984). Those equities often include

“practical challenges” and “divergent interests.” New England

Power Generators Ass’n v. FERC, 881 F.3d 202, 210 (D.C.

Cir. 2018). So when FERC draws a line in an area committed

to its technical judgment, we do not ask whether we would have

drawn the same one. See FERC v. Elec. Power Supply Ass’n,

577 U.S. 260, 292 (2016), as revised (Jan. 28, 2016) (“[W]e

may not substitute our own judgment for that of the

Commission.”). And we defer to its “reasonable balancing of

divergent considerations on a matter within [its] expertise.”

29

Xcel Energy Servs. Inc. v. FERC, 41 F.4th 548, 562 (D.C. Cir.

2022) (citation modified).

To that end, FERC reasonably balanced the interests of the

queue as a whole against the interests of the smaller group of

customers awaiting affected-system studies. No party disputes

that an interconnection customer may receive an affected-

system study at different points in the interconnection

process—anywhere from the cluster-study stage through

execution of the generator interconnection agreement. Timing

matters because network-upgrade costs identified in an

affected-system study received before the individual facilities

study stage count toward the 25-percent and 100-percent fine-

free withdrawal thresholds. See Order 2023-A at P 503. The

rule thus reduces the likelihood that an affected-system study

will expose a customer to withdrawal fines.

FERC tried to increase the chance that the existing

exemptions would capture affected-system upgrade costs. It

adopted reforms to “ensure that the affected system study

process moves along expediently, providing clarity, cost

certainty, and increased transparency throughout the study

process.” Order 2023 at P 1110. Those reforms also reduced

the risks that affected-system studies pose to interconnection

customers more generally. For example, FERC standardized

the methods used to conduct affected-system studies. And by

requiring energy-service modeling for those studies, FERC

found that “affected system network upgrade costs will likely

be lower” for customers in the queue. Id. at P 1279.

FERC, however, could not guarantee the timing of every

affected-system study. Some potentially affected neighboring

transmission providers conduct those studies, and not all of

them fall within FERC’s jurisdiction. And even for affected

systems within FERC’s jurisdiction, FERC “recognize[d] that

30

an affected system impact may not be identified until a [cluster]

restudy occurs.” Order 2023 at P 1119. So some affected-

system study reports may arrive after the facilities-study stage,

even though “other interconnection customers in the same

cluster who are not awaiting affected system studies” must

already execute their own generator interconnection

agreements. Order 2023-A at P 502. FERC further found that

even the possibility of that scenario creates uncertainty for the

remaining customers. See id. And that uncertainty, if left

unchecked, could produce “cascading withdrawals and

restudies.” Id.

That was of course the tradeoff. A fine exemption for

customers awaiting late affected-system studies “would give

greater weight to [the] cost certainty of a few interconnection

customers who are awaiting affected system study results than

to the many interconnection customers who did not impact an

affected system and had to finalize their” interconnection

agreements. Order 2023 at P 502. FERC chose the broader

interest of the interconnection queue. It found it “more

important for all interconnection customers in a cluster to have

greater certainty . . . than for one or [a] few interconnection

customers in a cluster to have cost estimate certainty inclusive

of affected system study results.” Id. That is a decision about

how to allocate risk in a congested queue. It is also the kind of

decision FERC is best positioned to make. See Vistra Corp. v.

FERC, 80 F.4th 302, 313 (D.C. Cir. 2023) (“As an expert in

energy regulation, the Commission has the technical

understanding necessary to carry out its congressionally

delegated duties.” (citation modified)).

Order 2023 also includes safeguards when the affected

system falls within FERC’s jurisdiction. Interconnection

customers, for example, need not sign Large Generator

Interconnection Agreements before receiving an affected-

31

system study. See Order 2023 at P 1123 (mandating that a host

transmission provider “at the interconnection customer’s

request, delay the deadline” for executing the agreement until

thirty days after receipt of the affected-system study). And at

oral argument, FERC confirmed that many non-jurisdictional

affected systems will voluntarily sign on to the same rules as

this order “because they also get the advantages of

nondiscriminatory open access transmission tariff[s].” Oral

Arg. Tr. 138:20–22. As a result, most interconnection

customers will be able to add affected-system upgrade costs to

their host-transmission-facility costs and thereby qualify for a

fine-free withdrawal. And in those rare cases, FERC could

reasonably require a withdrawing customer to pay a 20-percent

fine, particularly because the fine helps offset costs stomached

by the other members of the cluster.

The Clean Energy Petitioners respond with several

critiques of FERC’s balancing. None succeeds.

They first argue that FERC policy forbids penalizing

customers that cannot avoid the fine. See Clean Energy

Petitioners Br. 7, 21–22 (citing, e.g., El Paso Nat. Gas Co., 125

FERC ¶ 61,309, at P 105 (2008)). But they forfeited that

argument. The Clean Energy Petitioners’ rehearing application

raised it, if at all, only by implication—through one brief

citation parenthetical tucked into a footnote. That is not

enough to preserve a claim. See Ctr. for Biological Diversity

v. FERC, 67 F.4th 1176, 1184–85 (D.C. Cir. 2023) (explaining

that one “see, e.g.,” citation cannot exhaust a claim).

The Clean Energy Petitioners say next that FERC ignored

“record evidence” showing that affected-system studies can

drive large increases in upgrade costs. Clean Energy

Petitioners Br. 23. Not so. FERC understood the problem and

directly addressed it. Indeed, the existing exemptions already

32

account for affected-system-study costs through the facilities-

study stage. And as explained above, FERC adopted reforms

to reduce the risk that affected-system studies would surprise

interconnection customers with higher upgrade costs. FERC,

nevertheless, declined to create a separate late-stage exemption

because that exemption would favor the “cost certainty of a few

interconnection customers . . . awaiting affected system

stud[ies]” over greater certainty for “the many interconnection

customers who did not impact an affected system and had to

finalize their” agreement. Order 2023-A at P 502. Therefore,

FERC did not ignore the record; it weighed the evidence

differently than these petitioners preferred. See Level the

Playing Field v. FEC, 961 F.3d 462, 465 (D.C. Cir. 2020)

(“[T]hat plaintiffs may disagree with the Commission’s

weighing of the evidence presented to it is not enough for the

courts to overturn the Commission’s decisions as arbitrary,

capricious, or contrary to law.” (citation modified)).

The Clean Energy Petitioners also dispute how much the

energy-service standard will reduce upgrade-cost increases

from affected-system studies. But that objection misses the

point. FERC did not represent that the energy-service standard

would eliminate those increases. FERC merely determined

that “affected systems network upgrade costs will likely be

lower” under that standard, and that interconnection customers

“assigned” those network upgrades will be “less likely to

withdraw at a later stage.” Order 2023 at P 1279 (emphasis

added).

We defer to that sort of predictive judgment. FERC may

“base its findings on basic economic theory, including relying

on generic factual predictions,” so long as it “explains and

applies the relevant economic principles in a reasonable

manner.” Xcel Energy Servs., 41 F.4th at 560–61 (citation

modified). FERC did so here. After considering comments on

33

both sides, FERC reasonably made the energy-service standard

the default. The network-service standard “will likely” require

“more network upgrades to accommodate the interconnection

of a generating facility[,]” driving costs beyond what the

requested service demands. Order 2023 at PP 1256, 1279. By

tying upgrades to the service provided, FERC also sought to

“help prevent the cascading restudies” and queue withdrawals

that had burdened the interconnection process. Id. at P 1279;

see also Section V, infra. That saves money for affected

customers and those remaining in the queue.

And tellingly, neither set of petitioners seriously disputes

that the energy-service standard benefits interconnection

customers. The Clean Energy Petitioners describe projects

facing large affected-system study cost increases as “unlucky,”

Clean Energy Petitioners Br. 25, suggesting that such outcomes

will not be the norm. The Transmission Petitioners go further,

calling it “obvious” that the energy-service standard “will

result in lower cost assignments to generators.” Transmission

Petitioners Br. 84.

The Clean Energy Petitioners next argue that FERC

wrongly assumed that “allowing [fine]-free withdrawal . . .

would result in more withdrawals . . . than if interconnection

customers faced a withdrawal [fine].” Clean Energy

Petitioners Br. 28. But FERC made a simple economic

determination that fines make late withdrawal less attractive,

and so they “incentivize[]” customers “to withdraw non-viable

interconnection requests earlier in the process.” Order 2023 at

PP 786–87. And as discussed above, FERC may rely on “basic

economic theory” to make “generic factual predictions.” Xcel

Energy Servs., 41 F.4th at 561 (citation modified).

Clean Energy Petitioners also argue that denying penalty-

free withdrawal could “adversely incentivize affected system

34

transmission providers to delay” a study and thereby sabotage

interconnection customers. Clean Energy Petitioners Br. 31–

32. But Petitioners did not raise that argument on rehearing.

See J.A. 3113–17. We therefore lack jurisdiction to consider

it. See Citadel FNGE Ltd. v. FERC, 77 F.4th 842, 861 (D.C.

Cir. 2023).

Finally, the Clean Energy Petitioners say that withdrawal

fines will not prevent every customer awaiting an affected-

system study from withdrawing. Some affected-system

studies, they say, will reveal upgrade costs so high that

customers will withdraw anyway—even after other customers

in the queue have executed interconnection agreements. That

may be true. But it does not make the rule unreasonable. FERC

never claimed that fines would prevent every late-stage

withdrawal. It expected only that the fines would reduce some

late withdrawals and soften the harm from others. And when

withdrawals do occur, the fines collected can help cover costs

imposed on the customers left behind. See Order 2023 at

PP 798–799. FERC reasoned that better cost certainty “for all

interconnection customers” mattered more than fuller

protection for the few customers still awaiting affected-system-

study results. Order 2023-A at P 502. That tradeoff falls

comfortably within FERC’s expertise. “Such a reasonable

balancing of divergent considerations on a matter within the

Commission’s expertise merits deference.” Xcel Energy

Servs., 41 F.4th at 562.

We therefore hold that FERC’s decision declining to

create a separate fine-free withdrawal option for late-arriving

affected-system studies was not arbitrary and capricious.

35

C

Trying another route, the Clean Energy Petitioners

contend that FERC offered no reasonable explanation for

departing from prior precedent and policy. Their argument

rests mainly on several FERC orders involving the regulation

of individual Regional Transmission Organizations—the

Midcontinent Independent System Operator (“MISO”) and

Southwest Power Pool, Inc. (“Southwest”). Those orders,

these petitioners say, establish that an interconnection customer

must be exempt from fines whenever it “faces significant and

unanticipated cost increases.” Clean Energy Petitioners Br. 32.

But whatever force that argument might have, it comes too late.

The Clean Energy Petitioners did not preserve it, and we

therefore do not reach it.

Our jurisdiction to review a FERC order is “strictly limited

by the specific arguments a petitioner makes in its application

for rehearing.” Citadel FNGE, 77 F.4th at 861 (citation

modified); see also 16 U.S.C. § 825l(b). A petitioner does not

satisfy that requirement by “merely refer[ring] to an argument

generally” or “simply allud[ing] to the argument in a single

statement.” Citadel FNGE, 77 F.4th at 861. Nor may a

petitioner raise an argument “indirectly” or “implicitly” and

expect us to decide it. Ameren Servs. Co. v. FERC, 893 F.3d

786, 793 (D.C. Cir. 2018) (citation modified). And when the

objection is that the order conflicts with precedent, the

petitioner must identify the specific authorities FERC allegedly

disregarded. See City of Port Isabel v. FERC, 111 F.4th 1198,

1217–18 (D.C. Cir. 2024) (holding that a petitioner failed to

raise noncompliance with a specific regulation on rehearing).

The Clean Energy Petitioners failed to clearly raise this

argument in their rehearing request. Their rehearing

application cited no MISO or Southwest orders with which the

36

challenged orders supposedly conflict. Indeed, they did not

argue on rehearing that the exemption thresholds conflicted

with any precedent, much less the particular precedent they

now invoke. See Citadel FNGE, 77 F.4th at 861–62

(explaining that a petitioner must specifically raise an argument

in its rehearing request to exhaust a claim).

To be sure, we may hear an argument not raised in a

petitioner’s application for rehearing if “there is reasonable

ground” for the petitioner’s “failure” to raise the argument.

16 U.S.C. § 825l(b). But we reserve that exception for an

“extraordinary situation, such as when a Commission practice

is admitted or adjudged to be unlawful.” New England Power

Generators Ass’n v. FERC, 879 F.3d 1192, 1199 (D.C. Cir.

2018) (citation modified). We have also reserved that

exception when new evidence first arises after the rehearing

request. See Wabash Valley Power Ass’n v. FERC, 268 F.3d

1105, 1114 (D.C. Cir. 2001) (considering a claim that was not

raised below because it was based on a report issued several

months after the rehearing request).

This case presents no such circumstance. The Clean

Energy Petitioners failed to make this argument in their petition

for rehearing. FERC issued the MISO and Southwest orders

before the Clean Energy Petitioners filed their petition for

rehearing. Because the Clean Energy Petitioners had the

opportunity to raise these claims before FERC but failed to do

so, the “reasonable ground” exception in 16 U.S.C. § 825l(b)

does not apply.

We therefore lack jurisdiction to consider the Clean

Energy Petitioners’ argument concerning the MISO and

Southwest orders. See Consol. Edison Co. of N.Y. v. FERC, 45

F.4th 265, 289 (D.C. Cir. 2022) (per curiam) (“Under 16

U.S.C. § 825l(b), no objection to an order of the Commission

37

shall be considered by the court unless such objection shall

have been urged before the Commission in the application for

rehearing.” (citation modified)); United Power, Inc. v. FERC,

49 F.4th 554, 559 (D.C. Cir. 2022) (“We therefore have no

jurisdiction over an objection the petitioner fails to raise with

specificity.”).

For all these reasons, we deny the Clean Energy

Petitioners’ petition in full.

IV. Interconnection Study Incentive System

Transmission Petitioners take aim at Order 2023’s

incentive system for the timely completion of interconnection

studies. Order 2023 replaced the prior reasonable-efforts

standard for evaluating interconnection-study delays, which

had proven ineffectual, with a new, uniform fee schedule that

enforces firm deadlines by “reduc[ing] what transmission

providers can charge [customers] for interconnection studies

that fail to meet . . . performance standards.” Order 2023-A at

P 358.

Transmission Petitioners raise four challenges to the new

incentive system. First, they contend that the scheme exceeds

FERC’s statutory authority. Second, they argue that the fees

violate the Takings and Due Process Clauses of the Fifth

Amendment. Third, they insist that FERC lacked substantial

evidence to abandon the reasonable-efforts standard and

impose a uniform, industry-wide incentive system. Finally,

they claim that FERC failed to respond adequately to concerns

that the rule would unduly discriminate against certain classes

of transmission providers. None of these challenges succeeds.

38

A

The reasonable-efforts standard for undertaking timely

interconnection studies first emerged in FERC Order 2003.

That order established deadlines for each interconnection-

study phase: 45 calendar days for the Interconnection

Feasibility Study, 60 calendar days for the Interconnection

System Impact Study, and 90–180 calendar days for the

Interconnection Facilities Study. Order 2003 at P 36. FERC

charged transmission providers with exerting “[r]easonable

[e]fforts” to meet those deadlines, and it then defined

“[r]easonable [e]fforts” as “actions that are timely and

consistent with Good Utility Practice and are substantially

equivalent to those a Party would use to protect its own

interests.” Id. at PP 67, 69. Order 2003, however, imposed “no

explicit consequences . . . for transmission providers that

fail[ed] to meet their study deadlines.” Order 2023 at P 872.

In the 2010s, interconnection delays began to accumulate,

causing “longer development timelines[] and increased

uncertainty regarding the cost and timing of interconnecting to

the transmission system.” Order 2023 at P 37 (citation

modified). Those problems inhibited energy developers’

ability to get their power on the transmission system in an

economically timely manner. See NPRM at P 19. Concerned

that a sluggish interconnection process could generate “higher

costs to customers, more uncertainty in the process, and less

competition in the [wholesale] market” for electricity, FERC

began to identify and address the key drivers of delay. Reform

of Generator Interconnection Procedures and Agreements, 163

FERC ¶ 61,043, at P 37. During the rulemaking for Order 845,

an early interconnection reform in 2018, several commenters

urged FERC to implement a firm deadline for interconnection

studies. See id. at P 315. While, at that time, FERC did not

believe that the record supported abandoning the reasonable-

39

efforts standard, FERC instituted study-delay reporting

requirements to “encourage timely processing of

interconnection studies” and to “help inform” whether “any

future action should be considered.” Id. at P 323.

Five years later, FERC reviewed the collected data and

concluded that “[d]elays in the interconnection study process

are an important contributor to interconnection queue backlogs

nationwide.” Order 2023 at P 40. In formulating a

comprehensive remedial plan to tackle these backlogs, FERC

adopted measures that both discourage interconnection

customers from withdrawing from the interconnection queue,

see Section III, supra, and incentivize transmission providers

to reduce their study delays.

Specifically, Order 2023 adjusts the study deadlines to

accommodate the new cluster-study regime. Transmission

providers have 150 days to complete the initial cluster study,

plus 150 days to conduct any necessary restudy. Order 2023-

A at P 317. The Order gives those deadlines bite by imposing

late fees for delayed studies: $1,000 per business day for

delayed cluster studies; $2,000 per business day for delayed

cluster restudies; $2,000 per business day for delayed affected-

system studies; and $2,500 per business day for delayed

facilities studies. Id. at P 454.

FERC explained that the escalating fee structure “reflects

the progressively greater harm to interconnection customers of

delayed studies at those later stages[,]” Order 2023 at P 977, as

well as the reduced burden on transmission providers to

conduct studies at later stages, when the volume of

interconnection requests commonly will be lower, see id. at

P 978. When studies run late, transmission providers must

distribute those late fees “to interconnection customers in the

relevant study on a pro rata per interconnection request basis to

40

offset” what they paid for the study to be done on the prescribed

timeline. Id. at P 963.

Order 2023 also provides a variety of safeguards to ensure

that the scheme will not unduly burden transmission providers.

First, a given transmission provider is not subject to fees until

the third study cycle after FERC approves that provider’s Order

2023 compliance filing. Order 2023 at P 980. Second, Order

2023 gives transmission providers an automatic grace period of

ten business days after each study deadline, id. at P 981, which

can be extended to thirty days upon the approval of all

interconnection customers in the study, id. at P 982. Third,

total fees per study are capped at 100 percent of the initial study

deposit paid by customers. Id. at P 984. “By tying the study

delay penalty cap to the study deposits,” FERC explained, the

Order “ensure[s] that the maximum penalty bears a relationship

to the costs of the study that was late.” Id.

Finally, transmission providers can challenge any fees

they believe were unreasonably incurred before FERC, which

may grant relief if it finds “good cause.” Order 2023 at P 987.

In evaluating whether “good cause” exists, FERC “may

consider, among other factors:”

(1) extenuating circumstances outside the

transmission provider’s control, such as delays in

affected system study results;

(2) efforts of the transmission provider to mitigate

delays; and

(3) the extent to which the transmission provider has

proposed process enhancements either in the

stakeholder process or at the Commission to

prevent future delays.

41

Id. (citation modified). Evidence that an interconnection

customer generated the delay supplies “a potentially

compelling basis” to find good cause. Id. at P 993.

B

The Transmission Petitioners argue that the study-delay

fees are civil penalties under Kokesh v. SEC, 581 U.S. 455

(2017), and that FERC could impose such penalties only under

Federal Power Act Section 316A, 16 U.S.C. § 825o-1. The

Transmission Petitioners also argue that the late fees are a

confiscatory taking and that the framework for imposing them

violates due-process principles.

We disagree. FERC acted under Section 206, which

authorizes it to revise unjust or unreasonable rules, practices,

or rates and to replace them with just and reasonable ones. The

study-delay fees function as part of that ratemaking remedy,

and the framework provides adequate process for transmission

providers to appeal the late fees. Challenges to the procedures

to be provided in a particular appeal are unripe, as is the takings

claim.

1

In Order 2023-A, FERC describes the study-delay fees as

part of its “regulation of the interaction between

[interconnection] parties,” designed “to serve a compensatory

function.” P 308. The interconnection customer prepays

deposits to fund the transmission provider’s study work. When

a study is completed after the required deadline, the customer

receives a refund of part or all of that deposit. Id. at P 358

(explaining that the late fee “reduces what transmission

providers can charge for interconnection studies that fail to

42

meet the performance standards set forth in Order No. 2023”);

id. at P 389 (providing transmission providers an opportunity

for full cost recovery when they meet “relevant standards of

performance” and avoid contributing to interconnection queue

backlogs that “result[] in unjust and unreasonable rates to

customers”). That refund compensates the customer for the

diminished value of a late study. In turn, the transmission

provider must absorb some of the economic consequence of the

delay. Id. at P 358. Framed this way, the mechanism operates

as a performance-based adjustment to the terms under which

the study is provided. See id. FERC has therefore permissibly

determined under its Section 206 authority that transmission

providers’ compensation for conducting a study is justly and

reasonably decreased when that study is delayed.

The study-delay refund is not a civil penalty. It differs in

kind from the sanction addressed in Kokesh. There, the

Supreme Court’s analysis rested on three features: the

monetary remedy was imposed for violations of public law; it

was imposed for punitive purposes; and the proceeds were paid

to the government. Kokesh, 581 U.S. at 463–65. Regardless

of whether this fee is imposed for punitive purposes—an issue

the parties dispute—the other two features are absent here. The

study-delay refunds go only to the customers who provided the

deposits, and the rule identifies no violation of the Federal

Power Act, no breach of a tariff obligation, and no enforcement

consequence. Order 2023 at P 990 (payment to interconnection

customers); Order 2023-A at P 308 (fees not imposed for

public-law violations). The mechanism thus reallocates study

costs between transmission providers and interconnection

customers; it does not impose a fine payable to the

Government. That the refunds may influence providers’

incentives does not convert what is otherwise a compensatory

43

adjustment into a “civil penalty” that FERC can impose only

under Section 316A.

Nor does the framework’s failure to match refund amounts

to individualized delay costs transform the refund into a civil

penalty. On this record, the cost of study delays to the

interconnection customers waiting in the queue likely exceeds

the deposit-based refunds Order 2023 affords. See Order 2023

at P 976 & n.1900 (citing Comments of Pine Gate Renewables,

LLC at 39–40 (Oct. 13, 2022); Comments of Cypress Creek

Renewables, LLC at 24 (Oct. 13, 2022)). In other words, there

is reason to think that fees calculated based on the actual cost

of delay would be even greater than they are. Rather than

accounting for the exact cost of delay, the refund framework

“effectively adjusts what transmission providers can charge”

given the diminished value of a late study. Order 2023-A at

P 289. FERC reasonably chose a uniform, administrable

method that likely undercharges transmission providers and

undercompensates interconnection customers relative to actual

delay-related harms. Indeed, FERC rejected arguments for fee

amounts that more closely approximate actual study-delay

costs and for higher uniform late fees as “overly punitive.”

Order 2023 at P 976.

Because the study-delay refunds compensate

interconnection customers for the reduced value of untimely

studies, direct all payments to the affected parties rather than

the government, and operate within the terms of the tariffed

service, they are not civil penalties. They fall within FERC’s

authority under Section 206 to establish just and reasonable

practices governing the provision of interconnection studies. 7 6F

7

The transmission providers also contend that FERC exceeded

its Section 206 authority because it failed to demonstrate that study-

44

2

Petitioners argue that the study-delay fees are confiscatory

because the rule may require a transmission provider to refund

study deposits even when the provider has already incurred the

costs of completing the study. That argument is premature.

Under the Federal Power Act and the governing constitutional

standard, a limit on a utility’s rates is confiscatory if it is “so

unjust as to destroy the value of the property for all the

purposes for which it was acquired” and thereby “practically

deprives the owner of property without due process of law.”

Duquesne Light Co. v. Barasch, 488 U.S. 299, 307–08 (1989)

(quoting Covington & Lexington Tpk. Rd. Co. v. Sandford, 164

U.S. 578, 597 (1896)). That standard does not require advance

assurance that a utility will recover each expense associated

with providing service, or that any particular cost will be

recoverable in all circumstances. To the contrary, the Supreme

Court has upheld rate orders that disallowed recovery of

substantial costs so long as the overall regulatory scheme

permitted the utility “to maintain its financial integrity.” Fed.

Power Comm’n v. Hope Nat. Gas Co., 320 U.S. 591, 605

(1944); see Jersey Cent. Power & Light Co. v. FERC, 810 F.2d

1168, 1175, 1178 (D.C. Cir. 1987) (en banc).

Petitioners have not shown that Order 2023 produces such

an end result. The penalties they fear have not yet been

imposed, and the rule provides multiple avenues for mitigating

or avoiding uncompensated costs. Order 2023 establishes a

delay fees will “directly affect” electric rates. Transmission

Petitioners Br. 54–56. But FERC’s jurisdiction extends to “both

wholesale rates and the panoply of rules and practices affecting

them.” FERC v. Elec. Power Supply Ass’n, 577 U.S. 260, 277–78

(2016). Because the study-delay fees regulate a critical part of the

interconnection process, they fall squarely within FERC’s

jurisdiction.

45

good-cause process through which a provider may seek waiver

of a late fee by showing that the delay was beyond its control.

See Order 2023-A at P 387 (explaining that providers may

argue on appeal that good cause exists, including on

confiscation grounds). The rule also permits tariff filings that

seek to recover specific late-fee costs or to establish a default

recovery structure. See id. at P 266. Nothing in the record

suggests that these procedures are illusory or incapable of

preventing the speculative confiscation.

A challenge framed in the abstract cannot substitute for the

concrete factual showing the Hope end-result test requires.

Petitioners speculate that providers will incur unrecoverable

costs when a study deadline is missed. But no such penalty has

yet been assessed, and the administrative process for seeking

waiver or recovery has not yet operated in any particular case,

so Petitioners have not shown that the overall effect of Order

2023 will deprive any transmission provider of a just and

reasonable opportunity to recover its costs or to maintain

financial integrity.

The claim is therefore unripe. FERC’s orders do not

require Petitioners to incur penalties before seeking relief. See

Order 2023 at P 987 (appeal filing stays obligation to pay late

fee). They simply require that challenges to the consequences

of a specific late fee await the factual context necessary to

apply the Hope standard.

3

Petitioners further argue that the study-delay mechanism

violates due process because penalties attach automatically

when a deadline is missed and because the relief process is not

defined with sufficient specificity. We disagree. FERC has

provided procedures adequate to the nature of the regulatory

46

scheme, and Petitioners’ concerns about how those procedures

might operate in future cases are premature.

The orders give transmission providers clear notice of the

circumstances that will trigger a refund obligation and set out

a sufficiently defined formula for calculating the amount owed.

After FERC issues a late-fee determination, providers may

seek relief through a good-cause showing, including on the

ground that the delay resulted from factors beyond their

control, and then through judicial review of the agency’s good-

cause determination. See Order 2023 at P 987 (outlining non-

exhaustive factors for consideration under the good-cause

standard); Order 2023-A at PP 359, 362 (providing process for

appeals, rehearing, and petition for judicial review). Order

2023-A further states that providers “will have the opportunity

to argue on appeal that there is good cause to grant relief,” and

specifically acknowledges that fairness considerations—

including constitutional limits—may be raised in that process.

P 387. These procedures provide the core constitutional

protection: an “opportunity to be heard at a meaningful time

and in a meaningful manner.” Mathews v. Eldridge, 424 U.S.

319, 333 (1976) (cleaned up).

Petitioners’ objections to the sufficiency of the good-cause

process are, at this stage, speculative. They identify no

instance in which a provider has been denied relief, no

application of the process that has produced an arbitrary result,

and no example showing that FERC would refuse to consider

circumstances that fairly excuse delay. Their challenge

therefore rests on predictions about how FERC might apply its

process in the future. Those concerns are unripe. Due process

requires fair notice of the conduct that triggers regulatory

consequences; it does not oblige an agency to catalogue in

advance every circumstance in which relief may be granted or

denied. See Sprint Corp. v. FCC, 151 F.4th 347, 367 (D.C. Cir.

47

2025) (rejecting a fair-notice challenge because agencies need

not “give advance warning of a statute’s every possible

application”). Where, as here, the validity of the procedure

turns on its future application rather than any defect in its facial

structure, judicial review can await a concrete dispute. Cf.,

e.g., Tennessee Gas Pipeline Co. v. FERC, 972 F.2d 376, 381

(D.C. Cir. 1992); Nat’l Ass’n of Regul. Util. Comm’rs v. FERC,

964 F.3d 1177, 1185–90 (D.C. Cir. 2020).

Nor does the timing of the good-cause process render it

facially unconstitutional. We discern no due process violation

where the regulatory scheme permits the transmission

providers to opt in to receiving process before any deprivation

is effected. See Order 2023 at P 987 (filing of appeal stays

obligation to pay fee); see, e.g., Statewide Bonding, Inc. v.

Dep’t of Homeland Sec., 980 F.3d 109, 118–19 (D.C. Cir.

2020) (no due process violation where an agency makes a

bond-breach determination but stays collection of the bond

until the end of the appeal process); cf. Myersville Citizens for

a Rural Cmty., Inc. v. FERC, 783 F.3d 1301, 1327 (D.C. Cir.

2015) (“The demands of due process do not require a hearing,

at the initial stage or at any particular point or at more than one

point in an administrative proceeding so long as the requisite

hearing is held before the final order becomes effective.”

(quoting Opp Cotton Mills, Inc. v. Adm’r of Wage & Hour Div.,

312 U.S. 126, 152–53 (1941))). 8 7F

In sum, the rule supplies clear notice of the obligations

imposed, establishes a mechanism for seeking individualized

relief, and preserves review to ensure fairness in particular

8

Transmission Petitioners argue that penalties may be assessed

only “after notice and opportunity for public hearing” under Section

316A(b) of the Federal Power Act. But because that provision

governs only civil penalties, it is inapposite here.

48

cases. Petitioners’ speculation about future applications of that

process does not establish a present due-process violation. The

study-delay framework is consistent with constitutional

requirements.

C

All but one of the Transmission Petitioners challenge

FERC’s imposition of a study-delay incentive system as

arbitrary and capricious. 98F

When, as here, FERC regulates under its Section 206

authority, 16 U.S.C. § 824e, it must make two findings: first,

that the existing practice or rule is unjust, unreasonable, or

unduly discriminatory; and second, that FERC’s replacement

scheme is just, reasonable, and not unduly discriminatory, id.

§ 824e(a); see Emera Maine, 854 F.3d at 24–25. FERC must

support both conclusions with substantial evidence. See Emera

Maine, 854 F.3d at 24–25 (“[S]ection 206 mandates a two-step

procedure that requires FERC to make an explicit finding that

the existing rate is unlawful before setting a new rate.”). To

satisfy that standard, FERC must supply “such relevant

evidence as a reasonable mind might accept as adequate to

support [each] conclusion.” Kentucky Mun. Energy Agency v.

FERC, 45 F.4th 162, 174 (D.C. Cir. 2022) (quoting South

Carolina Pub. Serv. Auth. v. FERC, 762 F.3d 41, 54 (D.C. Cir.

2014) (per curiam)); see also LSP Transmission Holdings II,

LLC v. FERC, 45 F.4th 979, 991 (D.C. Cir. 2022) (holding that

to survive arbitrary and capricious review, an agency must have

“examined the relevant considerations and articulated a

satisfactory explanation for its action, including a rational

connection between the facts found and the choice made”

9

Long Island Power Authority does not join this challenge.

49

(quoting Old Dominion Elec. Coop. v. FERC, 898 F.3d 1254,

1260 (D.C. Cir. 2018))).

Transmission Petitioners attack FERC’s reasoning at each

step. They assert that FERC’s decision to dispose of the

existing reasonable-efforts standard for study delays was

unsupported by substantial evidence. They also insist that

FERC acted arbitrarily and capriciously in replacing the

reasonable-efforts standard with firm deadlines and late fees,

especially when many transmission providers had already

implemented their own reforms.

These arguments fail. FERC reasonably determined a

need both for (1) departing from the reasonable-efforts

standard, and (2) imposing a fee system, with a safety valve for

needed exceptions, to promote timely study completion and

compensate customers for delays.

1

FERC marshaled substantial evidence to support its

finding that the reasonable-efforts regime was unjust and

unreasonable.

First, the data collected under Order 845 revealed

widespread interconnection-study delays. As FERC explained,

most transmission providers that completed studies in 2022

reported ongoing and delayed studies at the end of the year.

See Order 2023 at P 1012, app. B tbls. 2–5. In addition, 68

percent of the 2,179 interconnection studies completed in 2022

were late. See id. at P 1012.

Second, FERC connected these delays to a glaring flaw in

the existing regime: “[T]he reasonable efforts standard does

not provide an adequate incentive for transmission providers to

50

complete interconnection studies on time.” Order 2023 at

P 966; see id. at P 878 & n.1650 (citing more than two dozen

comments supporting the elimination of reasonable efforts and

imposition of late study fees).

FERC’s conclusion is rooted in the multiple comments

pointing out that the reasonable-efforts standard had proven

toothless. Over two decades, commenters explained, FERC

“ha[d] never concluded that a transmission provider has failed

to use Reasonable Efforts, even when the average processing

time for interconnection requests has nearly doubled.” Joint

Comments of the Affected Interconnection Customers to the

Commission’s Notice of Proposed Rulemaking on Generator

Interconnection Agreements and Procedures at 23 (Oct. 13,

2022) (emphasis added); see also Initial Comments of the New

Jersey Board of Public Utilities at 12 (Oct. 13, 2022) (“Despite

the near 1,900 interconnection studies delayed across the

country by the end of 2021, the Commission has never ruled

that a transmission provider has violated [the reasonable-

efforts] standard.”).

Similarly, a group of renewable-energy developers from

across the country explained that “many transmission providers

simply lack the incentive to timely process interconnection

studies, and independent [system operators] seem to have

different goals and interests than their interconnection

customers.” Joint Comments of the Affected Interconnection

Customers to the Commission’s Notice of Proposed

Rulemaking on Generator Interconnection Agreements and

Procedures at 23 (Oct. 13, 2022). The Electric Power Supply

Association, meanwhile, observed that “there have . . . been

vast failures by Transmission Providers to process

interconnection studies and provide necessary information to

prospective and existing interconnection customers in a timely

manner.” Initial Comments of the Electric Power Supply

51

Association at 10 (Oct. 13, 2022); see also J.A. 1248–49 (initial

comments of the American Clean Power Association and

RENEW Northeast) (“At present, there is no specific incentive

for delivering on-time and accurate studies, and late or

inaccurate studies bring few if any consequences.”).

FERC also relied on record evidence documenting an

asymmetry between the stringent demands placed on

interconnection customers and the feeble reasonable-efforts

standard for transmission providers. See Order 2023 at P 881

(“Some commenters point out that the . . . proposal resolves an

imbalance between interconnection customers, which are held

to strict deadlines, and transmission providers, which are

currently not required to meet study deadlines.”). As SEIA put

it, “[u]nder the current interconnection paradigm . . . only

interconnection customers bear the burden of compliance.”

J.A. 1312. While an interconnection customer could “lose[] its

queue position” and thus “much of the investment it made” for

failing to satisfy FERC requirements, transmission providers

did “not face any penalties” for “fail[ing] to meet a tariff

deadline.” Id.; see also Comments and Protest of the

Community Renewable Energy Association and Newsun

Energy LLC on Notice of Proposed Rulemaking at 83–84 (Oct.

13, 2022) (similar). Implementing a balanced set of reforms

that evenhandedly incentivizes timely conduct by both

customers and transmission providers, another commenter

explained, would “help bring certainty to the interconnection

process, turning the vicious cycle of delays, withdrawals, and

further delays into a virtuous one, in which projects have

certainty in timelines and financing, leading to more finalized

projects.” J.A. 1315 (comments of SEIA).

Third, faced with rampant study delays in transmission

systems nationwide, FERC reasonably found unjust and

unreasonable a system that, in practice, imposed no constraints

52

on the very entities responsible for running those studies. See

Order 2023-A at P 300 (“[U]nwarranted flexibility to the

detriment of timely study completion represents a defect in the

reasonable efforts standard in light of the record demonstrating

such backlogs: [I]t allows transmission providers too much

discretion to extend their own study deadlines.”).

Transmission Petitioners insist that FERC overstated the

severity of study delays. They point to a perceived

inconsistency in FERC’s data analysis. Specifically, FERC

excluded data from one system operator, Southwest, because

Southwest was transitioning to a new interconnection process

and so was “not clearly comparable to the other [system

operators].” Order 2023 at app. B tbl. 4 n.5. But, Petitioners

emphasize, FERC initially failed to exclude PJM, which also

was transitioning from a serial study process to a cluster study

process starting at “the end of 2020/beginning of 2021.” J.A.

3310 n.50 (PJM rehearing request); see Order 2023 at app. B

tbl. 4 (Order 2023 table including PJM data). That objection

does not hold up.

To be sure, PJM’s inclusion increased FERC’s first-round

estimate of the number of studies delayed at the end of 2022.

In Order 2023, FERC noted that “an additional 2,544 studies

were delayed (i.e., ongoing and past their deadline)” at the end

of 2022, and acknowledged that the “vast majority of these

studies (2,211) were in PJM[,]” Order 2023 at P 40 & n.116.

But FERC’s analysis ultimately did not depend on PJM’s

2021–2022 data. See Food & Water Watch v. FERC, 104 F.4th

336, 347 (D.C. Cir. 2024). For instance, the asserted error did

not disturb FERC’s findings that most non-system operator

transmission providers (i.e., “non-RTO/ISO” transmission

providers) had pending delayed studies at the end of 2022. See

Order 2023-A at P 292. As for the system operators, FERC

excluded PJM from its data analysis on rehearing and found

53

that its bottom-line conclusion remained the same. See id.

Even excluding both PJM and Southwest, FERC found that

three out of the four remaining system operators (i.e.,

“RTOs/ISOs”) had delayed studies at the end of 2022. Id.

Overall, then, the data continued to support FERC’s finding

that the study-delay problem extended well beyond “isolated

pockets” of the market. Associated Gas Distribs. v. FERC, 824

F.2d 981, 1019 (D.C. Cir. 1987); Order 2023-A at P 292.

Trying a different tack, Transmission Petitioners suggest

that Section 206 requires FERC to find that “a single

transmission provider’s interconnection process was unjust and

unreasonable,” in addition to finding a structural problem

nationwide. Transmission Petitioners Br. 49.

Not at all. “[T]he Commission ha[s] authority under

Section 206” to impose “generic remed[ies] for systemic”

problems. South Carolina, 762 F.3d at 49–50 (citation

modified). When it wields that power, FERC is “not required

to make specific findings that individual rates charged by

individual [market participants] [are] unlawful, or to offer

empirical proof for all the propositions upon which its order

depend[s], before promulgating a generic rule.” Transmission

Access Pol’y Study Grp. v. FERC, 225 F.3d 667, 688 (D.C. Cir.

2000) (per curiam); see also South Carolina, 762 F.3d at 67

(“[T]he Commission may rely on ‘generic’ or ‘general’

findings of a systemic problem to support imposition of an

industry-wide solution.” (alterations in original) (quoting

Interstate Nat. Gas Ass’n of Am. v. FERC, 285 F.3d 18, 37

(D.C. Cir. 2002))). Accordingly, in crafting Order 2023, FERC

appropriately relied on industry-wide trends in study delays in

concluding that the reasonable-efforts standard produces unjust

and unreasonable results.

54

2

Substantial evidence supports FERC’s second finding that

its new system of firm study deadlines backed by fines was just

and reasonable.

FERC found that putting the onus on transmission

providers to ensure the timeliness of their studies makes sense

because transmission providers “have the most complete

knowledge as to what actions to better ensure study timeliness

will be most effective as to their specific processes.” Order

2023-A at P 301. “As the entity that conducts the study,”

FERC explained, transmission providers “have control over

(among other things): the resources allocated to the study

process; the actual conduct of the study, e.g., the use of

advanced computing or other methods to improve efficiency;

coordination with interconnection customers and consultants;

and providing the conclusions of the study.” Id. at P 284.

Based on those findings, FERC reasonably adopted

financial incentives for timely compliance that would induce

transmission providers to act on the information they possess

and control, while refunding interconnection customers for

studies for which they had paid but did not receive on time. In

doing so, FERC avoided prescribing a top-down, wooden

approach to ensuring timeliness in favor of a system that left

individual transmission providers with “flexibility . . . as to

how they achieve those standards, along with appropriate

safeguards.” Order 2023-A at P 301.

At the same time, FERC acknowledged several ways in

which transmission providers might streamline studies, ranging

from “exploring administrative efficiencies and innovative

study approaches,” Order 2023 at P 967, to “hiring additional

personnel or investing in new software[,]” id. at P 975; see also

55

Order 2023-A at P 284 (“[T]ransmission providers have

significant authority to help ensure that other entities do not

unduly delay the results of the interconnection study, including

by deeming withdrawn the requests of interconnection

customers that fail to adhere to [FERC rules].”).

Commenters, too, pointed to potential levers, including

improved computing processes and “providing better

information to reduce the complexity of individual requests.”

Reply Comments of Public Interest Organizations at 4 (Dec.

15, 2022); see also id. at 3–4 (“[T]here are a number of process

and policy improvements available to transmission providers

who are regularly falling behind in their interconnection

studies, which are not yet implemented . . . . [A]ny claim that

an individual provider has done absolutely everything in its

power to improve the processing rate of interconnection

requests at this point almost certainly comes from a lack of

imagination.”); Comments of the Northwest & Intermountain

Power Producers Coalition at 14 (Sept. 14, 2022) (“Many

[Northwest and Intermountain Power Producers Coalition]

members believe that at least some of the problem is a result of

transmission providers failing . . . to dedicate sufficient

resources to complete studies on time. Eliminating the

reasonable efforts standard and imposing penalties for delays

will encourage transmission providers to complete their studies

on time.”); Comments of the Interwest Energy Alliance at 8

(Oct. 13, 2022) (“[I]mposing penalties for delays will

encourage this investment [in study resources] . . . and

potentially lead to more training for the expertise needed

among a shrinking pool of engineering experts.”).

FERC’s analysis was reasonable on the record before it.

“The idea that firms respond to financial incentives is . . .

hardly revolutionary . . . .” Connecticut Dep’t of Pub. Util.

Control v. FERC, 593 F.3d 30, 35 (D.C. Cir. 2010). The study-

56

delay incentive system operates on the core economic theory

that firms make decisions after rationally weighing costs and

benefits—and the intuitive corollary that late fees increase

transmission providers’ incentive to meet study deadlines. See,

e.g., Order 2023 at P 966 (“[W]e find that the elimination of

the reasonable efforts standard and the adoption of penalties for

late studies are needed to create an incentive for transmission

providers.”); id. at P 977 (“We find it appropriate that

transmission providers face study-delay penalties structured in

a similar manner to provide adequate incentives to complete

interconnection studies on time.”); Order 2023-A at P 289

(“This incentive will help ensure that transmission providers

exercise the control they have over the interconnection process

as to the timely conduct of those studies . . . .”); see also Xcel

Energy Servs. Inc., 41 F.4th at 561 (holding that an agency can

rely on “‘basic economic theory,’ including relying on ‘generic

factual predictions[,]’ as long as the agency ‘explain[s] and

applie[s] the relevant economic principles in a reasonable

manner’” (alteration in original) (quoting Sacramento Mun.

Util. Dist. v. FERC, 616 F.3d 520, 531 (D.C. Cir. 2010) (per

curiam))).

Transmission Petitioners throw out a variety of attacks on

the sufficiency of FERC’s analysis. The spaghetti does not

stick.

First, Transmission Petitioners fault FERC for failing to

prove that “transmission providers are at least partially

responsible for study delays.” Transmission Petitioners Br. 44.

To be sure, FERC acknowledged that forces outside

transmission providers’ control might contribute to study

delays. See Order 2023 at P 43 (“[T]ransmission providers

may face uncertainty regarding the size and makeup of the

interconnection queue and the commercial viability of the

project in the interconnection queue, creating inefficiencies in

57

the study process, increasing interconnection study costs, and

delayed study results.”).

That is precisely why Order 2023 contains multiple

reforms aimed at preventing other market participants, like

interconnection customers, from dragging out the

interconnection process. See Order 2023-A at P 287 (“Order

No. 2023 recognized that study delays are caused by a number

of factors, and adopted a comprehensive package of reforms

aimed at alleviating many of those factors from various

angles.”). Beyond that, it defies credulity to suggest that the

transmission providers—the entities that “control and are

responsible for the conduct of [interconnection] studies,” id. at

P 372—do not bear even partial responsibility for delays in

their own studies. In implementing the study-delay incentive

system, then, FERC reasonably shifted the burden to the party

with the most information about and control over the study

process. At the same time, FERC provided transmission

providers with an avenue for relief on a case-by-case basis if

delay is caused by circumstances beyond their control. See id.

at P 289.

Second, Transmission Petitioners contend that FERC did

not adequately respond to arguments that the incentive scheme

would generate perverse incentives for (1) transmission

providers to cut corners to meet study deadlines, and

(2) interconnection customers to prolong delays to receive a

payout.

FERC reasonably explained why neither concern

undercuts its determination that Order 2023 was just and

reasonable.

With respect to the incentives for transmission providers,

FERC disagreed that the new incentive system would reduce

58

study “accuracy” and “system reliability.” Order 2023 at

P 1007. The agency again pointed to various reasonable

administrative measures transmission providers could take to

avoid late fees, “such as hiring additional staff[] to efficiently

process interconnection queues without sacrificing accuracy,

flexibility, or reliability.” Id. And to the extent such measures

ultimately drive up the costs of studies, FERC explained, those

“costs will be passed on to interconnection customers,” who

“ultimately bear the costs of . . . studies.” Id. In addition,

Order 2023 provides “safeguards . . . that allow transmission

providers avenues of relief from the strict application of study

deadlines[,]” including an appeals process for transmission

providers that find themselves against a wall through no fault

of their own. Order 2023-A at P 375; see Order 2023 at P 979–

87 (describing safeguards including delayed implementation,

grace periods, a cap on fees at 100 percent of the initial study

deposits, and an appeals process). Transmission Petitioners

apparently agree that accuracy will not suffer because they

strenuously disavow any intent to “consciously sacrifice

reliability to avoid penalties.” Transmission Petitioners Br. 57.

FERC also assuaged transmission providers’ concerns

about interconnection customers’ incentives, explaining that

“the economic harms to the interconnection customer of

delayed study completion significantly outweigh any incentive

to delay the interconnection process.” Order 2023-A at P 373.

Further, any incentive to delay the process would be low-

powered because any delay fees would be divided among “all

the interconnection customers included in the relevant study

that did not withdraw.” Id.

Third, Transmission Petitioners insist that nationwide

rulemaking was unwarranted because the majority of

transmission providers had already shifted to a cluster-study

approach. But cluster studies are just one of the many

59

interlocking tools that Order 2023 adopts to streamline the

interconnection process. Incentivizing timely studies is

another. Imposing a tiered fee schedule for queue withdrawals

is one more still. So some transmission providers’ adoption of

piecemeal reforms does nothing to undermine FERC’s decision

to adopt a uniform and comprehensive scheme, the challenged

elements of which no transmission provider had previously

implemented. See Order 2023-A at P 380 (“The Commission

has found that adoption of a cluster study approach is such a

just and reasonable reform, but that additional reforms are also

necessary.”); see also South Carolina, 762 F.3d at 67

(upholding Section 206 rulemaking even when “some current

practices in some regions may have already been satisfying a

minimum set of requirements that must be met under the Final

Rule” (citation modified)). Nor does the industry-wide shift to

cluster studies alter FERC’s factual basis for imposing its

package of reforms since FERC found that even transmission

providers that use cluster studies “still often fail to meet

interconnection study deadlines.” NPRM at P 166. 10 9F

10

On the flip side, it is of no moment that FERC had recently

approved transmission rate schemes that did not include any study-

delay fees. Contra Transmission Petitioners Br. 51–52. When

FERC considers individual rate filings under Section 205, it must act

in “an essentially passive and reactive role[;] [it] may accept or reject

the proposal, but it may not suggest modifications that result in an

entirely different rate design than the utility’s original proposal or the

utility’s prior rate scheme.” Hecate Energy LLC v. FERC, 126 F.4th

660, 662 (D.C. Cir. 2025) (citation modified). As a result, FERC

lacked authority in those Section 205 proceedings to impose sua

sponte a novel incentive scheme. Instead, FERC formulated Order

2023 through a thoroughgoing Section 206 rulemaking, where it

could weigh the industry-wide implications of a shift away from the

prior reasonable-efforts standard, and elicit comments from a range

of industry participants on how to combat interconnection-study

delays most effectively.

60

Fourth, a subset of Transmission Petitioners complains

that Order 2023 unreasonably upends PJM’s recently adopted

reforms. 11 FERC explained, however, that PJM’s reforms

10F

were still in their “early stages,” so the “record d[id] not contain

any information regarding the effects of such reforms,

including whether PJM [was] meeting all study deadlines on

time.” Order 2023-A at P 40. Instead of creating a carveout,

FERC provided system operators like PJM the opportunity to

preserve just and reasonable reforms through “independent

entity variations.” Id. at P 453 n.884. To that point, FERC has

since allowed PJM to preserve the three-stage structure of its

cluster process. Order on Compliance, 192 FERC ¶ 61,077, at

P 66 (2025).

Fifth, a different group of Transmission Petitioners

contend that FERC was arbitrary and capricious in imposing

on system operators a uniform 150-day deadline for cluster

studies. 12 That argument has no purchase. FERC clarified that

1F

Order 2023 does “not preempt transmission providers from

proposing tariff-defined study deadlines that may differ from

the . . . 150-day schedule.” Order 2023-A at P 156. FERC has

practiced what it promised. When FERC approved PJM’s

three-stage cluster studies, it also sanctioned an individualized

study timeline: 120 days for phase I, 180 days for phase II, and

180 days for phase III. Order on Compliance, 192 FERC

¶ 61,077, at PP 67–68 (finding that “PJM’s cluster study

timeline is just and reasonable and not unduly discriminatory

11

The MISO Transmission Owners and PacifiCorp do not join

this portion of the brief.

12

Avangrid, Inc., New York State Electric & Gas Corp.,

Rochester Gas and Electric Corp., Long Island Power Authority, the

MISO Transmission Owners, and PacifiCorp do not join this

challenge.

61

or preferential and accomplishes the purposes” of Order 2023);

id. at P 211 n.415.

Of course, Order 2023 will not satisfy all transmission

providers (or interconnection customers) all the time. But

FERC has “considerable latitude in drawing th[ese] types of

lines.” LSP Transmission Holdings II, 45 F.4th at 993. Here,

FERC reasonably concluded, using “the most recent data set

available” when it issued Order 2023 in July 2023, that

transmission providers were generally able to “complete

system impact studies in an average of fewer than 150 days[,]”

even “for clusters containing significant numbers of

interconnection requests.” Order 2023-A at P 322. While it

acknowledged that some studies exceeded 150 days, FERC

explained that the timeline for those studies had been examined

under the lax reasonable-efforts regime, and that Order 2023

would incentivize providers to streamline their studies. See id.

Sixth, that same group of Transmission Petitioners accuses

FERC of “present[ing] a false dichotomy between subjecting

System Operators to, or ‘categorically exempt[ing]’ them from,

the strict liability penalty scheme.” Transmission Petitioners

Br. 74 (quoting Order 2023-A at P 400). But Transmission

Petitioners point to no comments or rehearing requests

proposing an alternative systemic reform. What few proposals

Transmission Petitioners did proffer were throwaways that

would perpetuate the very interconnection-delay problems

FERC sought to combat. See J.A. 3018 (New York

Independent System Operator (“NYISO”) rehearing request

suggesting allowing individual System Operators “to propose”

their own “alternative rules as independent entity variations,”

while sending FERC back to the drawing board to “updat[e]

and enhanc[e] its reporting requirements”); id. at 3084 (MISO

rehearing request insisting that, in its multi-phase study

process, “[i]t is the ultimate result that matters and there should

62

be no penalties for any delays of preliminary or revised studies

if the final study is delivered within a reasonable combined

timeline”).

Anyhow, even if these Transmission Petitioners had

proposed an alternative approach that would also address the

problem of late interconnection studies contributing to queue

backlogs and, ultimately, unjust and unreasonable rates, that

would say nothing about whether Order 2023’s chosen

deadline and penalty structure is itself just and reasonable. See

Entergy Arkansas, LLC v. FERC, 109 F.4th 583, 594 (D.C. Cir.

2024) (“FERC is not required to choose the best solution, only

a reasonable one.” (quoting Petal Gas Storage, LLC v. FERC,

596 F.3d 695, 703 (D.C. Cir. 2007))).

Nor did FERC ignore the variations among system

operators. While FERC set a new default in Order 2023, it has

allowed system operators to seek variations during the

compliance process upon an appropriate showing that Order

2023’s baseline will still be met. Order 2023-A at P 453 (“On

compliance, transmission providers can propose deviations

from the [Order 2023] requirements . . . and demonstrate how

those deviations meet the relevant standard.”); see also Order

on Compliance, 191 FERC ¶ 61,229, at P 181 (2025) (denying

MISO’s requested variation for late fees to trigger only at the

end of its three-phase study process).

*****

In sum, FERC calibrated its study-delay incentives to spur

transmission providers to act in a timely manner and to

compensate interconnection customers for the decreased value

of delayed studies, while not imposing excessive fees. It heard

from all interested parties and responded to their objections.

FERC confronted the “trade-off[s] inherent” in the study-delay

63

scheme and “determined that ‘the trade-off[s] w[ere] worth

it.’” Affirmed Energy, LLC v. FERC, 166 F.4th 1070, 1086

(D.C. Cir. 2026) (quoting Competitive Enter. Inst. v. Nat’l

Highway Traffic Safety Admin., 956 F.2d 321, 324 (D.C. Cir.

1992)). For all of those reasons, Transmission Petitioners’

arbitrary and capricious challenges fail.

D

Transmission Petitioners next argue that FERC failed to

adequately respond to comments raising concerns that the

study-delay incentive scheme would be unduly discriminatory

within the meaning of 16 U.S.C. § 824e(a). They are incorrect.

Under the Federal Power Act, a rate or practice is unduly

discriminatory when it treats “similarly situated” entities

differently “for no good reason.” Tenaska Clear Creek Wind,

LLC v. FERC, 108 F.4th 858, 868 (D.C. Cir. 2024) (quoting

Consol. Edison Co. of N.Y., Inc., 45 F.4th at 282). In contrast,

“[n]o undue discrimination exists where there is a ‘rational

basis for treating [two entities] differently’ and such

differential treatment is ‘based on relevant, significant facts

which are explained.’” BP Energy Co. v. FERC, 828 F.3d 959,

967 (D.C. Cir. 2016) (second alteration in original) (quoting

“Complex” Consol. Edison Co. of N.Y. v. FERC, 165 F.3d 992,

1012–13 (D.C. Cir. 1999) (per curiam)).

Transmission Petitioners lay out two theories of undue

discrimination. First, they argue that transmission providers in

regions with substantial renewable development will be more

likely to face study-delay fees due to higher volumes of

interconnection requests. Second, they argue that system

operators’ inability to pass costs on to shareholders unfairly

increases their costs of complying with Order 2023 compared

to traditional transmission providers. FERC adequately

64

considered and reasonably responded to both of those

concerns. 1312F

1

Transmission Petitioners worry that regions with large

numbers of renewable interconnection requests will be more

likely to face study-delay fees. See J.A. 3235 (PJM Rehearing

Request) (“Zones and regions with long queues will experience

a greater risk of incurring penalties than those that do not due

to factors that transmission owners cannot control.”). 14 13F

FERC acknowledged that concern and then explained why

it was premature:

[G]iven the structure of Order No. 2023—under

which we have imposed deadlines that should be

reasonably achievable, replaced the serial study

process with cluster studies, and afforded several

safeguards, including the appeals process—it is not

necessarily the case that some transmission providers

will be more likely to have to pay penalties than others

13

To the extent Transmission Petitioners claim that Order 2023

itself unreasonably causes undue discrimination, that claim is not yet

ripe for judicial resolution. The Order on its face does not exhibit

undue discrimination, and because the incentive scheme has not yet

taken effect, “no . . . discrimination ha[s] as yet been documented.”

Tennessee Gas Pipeline Co. v. FERC, 972 F.2d 376, 381 (D.C. Cir.

1992). Plus, FERC has “promised to address case-by-case such

complaints of discrimination as [parties] might later raise.” Id. So

the only question before us is whether the rulemaking record

discloses a procedural deficiency by FERC in addressing the asserted

risks of discrimination identified by the Transmission Petitioners.

14

Long Island Power Authority does not join this challenge.

65

based on the uneven distribution of interconnection

requests.

Order 2023-A at P 384 (citation modified).

FERC also provided several avenues for any over-

burdened parties to obtain relief, including the appeals process

and individual Section 205 filings. See Order 2023-A at P 384

(“[T]ransmission providers may propose variations from the

requirements of Order No. 2023, under the applicable standard,

which provides a further vehicle to ensure that the late study

deadline and penalty structure does not unduly burden certain

transmission providers as compared to others.”); id. at P 384

n.715 (“That the Commission can consider the individualized

factors in a particular case to determine whether to grant relief

from penalties is another avenue to ensure that undue

discrimination does not occur.”); id. at P 324 (“[T]o the extent

that transmission providers assert that factors allegedly outside

of their control may render it difficult or infeasible to meet the

interconnection study deadlines, this appeals process is the

avenue to raise those considerations in particular cases and

seek relief.”).

Our precedent confirms the point. In Transmission Access

Policy Study Group v. FERC, 225 F.3d 667 (D.C. Cir. 2000)

(per curiam), a variety of market participants leveled

challenges to FERC Order 888, which required transmission

providers to allow open and equal access to their services, id.

at 682–83. Before FERC promulgated the rule, vertically

integrated transmission owners in Georgia had invested heavily

in forming a transmission system and establishing reciprocal

open access. See id. at 689. One of those vertically integrated

entities, which operated both as a transmission provider and as

a customer utility, claimed that the rule unduly discriminated

against old customers of integrated transmission systems

66

because it gave new customers access to the system without

requiring any investment in the transmission system. See id.

This court rejected that argument. We explained that

FERC “recognized that its generic findings may have

exceptions, and thus that Order 888 may in individual

circumstances have a different result than that intended.”

Transmission Access, 225 F.3d at 689. But, as with Order

2023, market participants could “argue their particular

circumstances” and seek relief from FERC on a case-by-case

basis. Id. Order 888 “merely shift[ed] from a regulatory norm

in which a user of transmission services must demonstrate to

FERC an individualized need for open access to one in which

a provider of transmission services must present to FERC

individualized circumstances requiring relief from open

access.” Id.

So too here. Order 2023 simply shifts the default rule from

individual customers having to try to obtain relief from

transmission providers’ study delays to a background norm of

timeliness from which individual transmission providers can

seek individualized relief.

Transmission Petitioners try to distinguish Transmission

Access on the ground that FERC there relied on “extensive

commentary as well as its own experiences” to “conclude[]

that, as a general matter, transmission industry conditions were

conducive to discriminatory practices and anti-competitive

behavior, such that case-by-case adjudication could not

adequately address the problem,” and a nationwide rule was

needed. Transmission Petitioners Reply Br. 29 (second and

third alterations in original) (quoting Transmission Access, 225

F.3d at 688–89). So too here. In crafting Order 2023, FERC

came forth with substantial evidence showing that study delays

67

were a serious, recurring, and nationwide problem. See Section

IV.C, supra.

2

Lastly, some Transmission Petitioners argue that Order

2023 failed to address system operators’ restricted funding

opportunities. Unlike other transmission providers, system

operators are generally not-for-profit entities that cannot pass

the cost of late fees through to their shareholders. 1514F

FERC squarely addressed that concern. To start, FERC

provided a special exemption in Order 2023 to accommodate

system operators’ different funding structure. While Order

2023 generally prohibits transmission providers from

recovering study-delay fees through increased rates, see Order

2023 at P 992, the rule permits system operators to submit a

“[S]ection 205 filing to propose a default structure for

recovering study delay penalties and/or make individual

[Section] 205 filings to recover the costs of any specific study

delay penalties,” id. at P 994. 16

15F

FERC also pointed the system operators to several

additional safety valves. In particular, FERC found that system

operators could fund study-delay fees using administrative fees

collected from market participants. Order 2023 at P 998. In

15

Avangrid, Inc., New York State Electric & Gas Corp.,

Rochester Gas and Electric Corp., Long Island Power Authority, the

MISO Transmission Owners, and PacifiCorp do not join this

challenge.

16

FERC also explained that system operators like NYISO that

might require majority stakeholder approval for such filings could

alternatively file a complaint under Section 206 to unilaterally alter

their tariffs. See Order 2023-A at P 464.

68

addition, FERC noted that Order 2023 assigns study-delay fees

to the party that conducts the study. See id. at P 995. That is,

when a transmission-owning member of a system operator

performs a study, that member—not the system operator—is

responsible for paying any study-delay fees. See id. This

assignment rule, FERC explained, “aligns the incentive created

by the study delay penalty with the entity most in control of the

study timeline.” Id.

Finally, FERC concluded that any lingering disparate

impact would not be undue given the costs to the nationwide

energy system from delays in bringing new generation online.

“[A]ny residual uncertainty as to [a system operator’s] ability

to recover penalty costs,” FERC found, “is outweighed by the

critical need for all transmission providers, including [system

operators], to process interconnection studies in a timely

manner.” Order 2023-A at P 401.

In short, FERC directly addressed those transmission

providers’ concerns and provided a reasoned explanation for

its decision accompanied by tailored accommodations. Having

done so, FERC’s decision to incentivize uniformly all

transmission providers, including system operators, to meet

study deadlines is “the type of policy judgment to which we

afford deference, and that deference is justified by the record”

in this case. Advanced Energy Mgmt. All. v. FERC, 860 F.3d

656, 670 (D.C. Cir. 2017) (per curiam); see also id. (“The law

provides no basis to claim the Commission cannot approve

uniform performance requirements simply because those

requirements will be easier to satisfy for some generators than

for others.”).

69

*****

FERC reasonably explained that the potential

discriminatory impact of Order 2023 has not been

demonstrated on this record, and that the Order provides

avenues for individualized relief as needed. Should FERC fail

in the future to adequately address a pattern of discriminatory

impact, affected parties can seek relief from FERC and, if

necessary, the court.

V. Energy-Service Modeling

Certain Transmission Petitioners also challenge as

arbitrary and capricious Order 2023’s requirement that all

affected-system studies be conducted using the Energy

Resource Interconnection Service modeling standard. That

argument fails. 17

16F

By way of background, interconnection customers are new

energy-generating facilities, such as solar farms, wind turbines,

or natural gas plants. See Tenaska Clear Creek Wind, 108 F.4th

at 863. These energy generators seek to connect to a

transmission provider, which is an entity that both operates

transmission equipment like power lines and manages regional

energy movement on the grid. See Green Dev., LLC v. FERC,

77 F.4th 997, 1001 (D.C. Cir. 2023). New energy generators

must connect to a transmission provider to move their newly

generated energy onto the larger energy grid and, eventually,

to consumers of their energy. Id.

17

Avangrid, Inc., New York State Electric & Gas Corp.,

Rochester Gas and Electric Corp., Midcontinent Independent System

Operator Transmission Owners, the Midcontinent Independent

System Operator, Inc., and PacifiCorp do not join this challenge.

70

When a prospective customer seeks to connect to a

transmission provider, the transmission provider initiates a

study of the new generator’s impact on its transmission system

to determine whether any system updates are required to add

the new energy generation. Before that study goes forward, a

customer must select one of two types of service for the

delivery of its power.

The first option, Network Resource Interconnection

Service, also known as “firm service,” provides a high level of

connectivity that permits customers to “demand power or

transmission at any time.” Tenaska Clear Creek Wind, 108

F.4th at 864 (quoting Fort Pierce Utils. Auth. v. FERC, 730

F.2d 778, 785–86 (D.C. Cir. 1984)); Order 2023 at P 1277 &

n.2413. When an interconnection customer selects firm

service, it is given priority access to transmit its power over the

grid even when the transmission provider is overloaded and has

to curtail or cut off service to some energy-generation sources.

See Advanced Energy United, Inc. v. FERC, 82 F.4th 1095,

1104 (D.C. Cir. 2023). Put another way, firm service ensures

that the energy output of the interconnection customer “will not

be ‘bottled up’ during peak load conditions” on the host

transmission system, allowing that customer to keep supplying

energy to the grid and thus to profit from sales to consumers.

NPRM at P 209 n.290 (quoting Order 2003-A, 106 FERC

¶ 61,220, at P 531 (2004)).

The second option, known as Energy Resource

Interconnection Service (“energy service”), is a lower-level

service that means that the transmission provider can “shut off

[service] at any point” if its capacity to provide service falls

below what is needed “to guarantee the needs of the

[transmission service’s] firm [service] customers.” Tenaska

Clear Creek Wind, 108 F.4th at 864 (quoting Fort Pierce, 730

F.2d at 786). Because energy service is less flexible and those

71

customers are the first to have the energy they are putting into

the grid curtailed, energy service “is typically offered at a

significant discount” compared to firm service. Id. (quoting

Fort Pierce, 730 F.2d at 786).

Once the customer designates the level of service desired,

the host transmission system uses that type of service to model

the impacts on its system if the customer were to connect and

demand that level of transmission capacity full-time.

Another issue that arises with new customer

interconnection is that the provision of service to a new

customer may occasionally impact a neighboring “affected

system.” NPRM at PP 213–14; Order 2023 at P 1284. That is

because a host system may share transmission lines with a

nearby system to increase overall efficiency. But at certain

times, such as peak energy production, higher inputs of energy

from generators on the host system could cause the excess

energy to spill over into the affected system. See NPRM at

PP 213–14; Order 2023-A at P 511. That is, energy pumped

into one transmission system could end up adding to the energy

level on an affected system. See Indiana Michigan Power Co.

and Ohio Power Co., 64 FERC ¶ 61,184, at 2 (1993) (“[I]n

reality power flows are rarely confined to a designated contract

path. Rather, power flows over multiple parallel paths that may

be owned by several utilities that are not on the contract path.”).

If that affected system were already overloaded with excess

energy, the injection of energy from the host system could

cause the affected system to have to curtail its transmission

service for its regular customers that contracted for firm

service. See NPRM at PP 213–14.

Because of the potential for such repercussive effects

when new generation is added to a transmission system,

interconnection studies often include an analysis of the impact

72

that the new interconnection could have on an affected system.

See NPRM at PP 174–75, 214–15. Interconnection customers

are then required to pay for any system upgrades for affected

systems that the host’s provision of service could occasion. Id.

at PP 191–92, 210.

The prior FERC order, Order 2003, required host systems

to coordinate any needed affected-systems studies with their

neighboring systems. See Order 2003 at P 121; NPRM at

P 175. But FERC did not regulate how the affected system

would conduct those studies. FERC instead left it to the

affected system to choose whether to run its studies using firm-

or energy-service modeling. See Order 2003, at P 121; NPRM

at P 175.

Due to the lack of oversight for the affected-systems study

process, significant problems arose, including a lack of

transparency in how the studies were conducted and

unpredictability as to how expensive the identified upgrades

would be. See Order 2023 at PP 1278–80. For example, a

prospective customer could be charged for first-class upgrades

needed to support firm service on the affected system even if

the customer would never receive firm service from the

affected system. Id. at P 1278. That is because, although a

customer’s host system is contractually obliged to enable firm

service if its customer has paid for it, an affected system owes

no such duty to its neighbor’s customer. Id. So if there is an

overload of energy on the affected system, it has no obligation

to prioritize the energy generation of its neighboring system’s

customer even if that customer paid for upgrades needed to

provide firm service, and the customer may well lose out to the

affected system’s own energy generators that are benefiting

from those paid-for upgrades. Id. at P 1279–80.

73

Order 2023 changed that. Instead of allowing the affected

system to select whether it wanted to study the customer’s

impact on its system using firm or energy service, the affected

system is now required to use an energy-service model at the

interconnection-study stage. Order 2023 at P 1276.

Transmission Petitioners challenge this requirement,

arguing that it (i) is not supported by substantial evidence,

(ii) fails to address the problems identified by commenters, and

(iii) departs from prior precedent without adequate

explanation.

Because substantial evidence and reasoned analysis by

FERC support the newly required energy-service baseline for

interconnection studies on affected systems, this challenge

fails.

A

FERC’s adoption of energy-service modeling is grounded

in substantial evidence demonstrating both the problems with

the prior system and the benefits of adopting energy-service

modeling as the default for interconnection studies of affected

systems. As FERC noted, sixteen commenters urged it to adopt

such a rule based on their own difficult experiences with the

prior regime. Order 2023 at P 1263 & nn.2373, 2377. FERC

also accorded weight to a case study of the energy-service

modeling approach that was used successfully by a Regional

Transmission Organization for the midcontinental region of the

United States for “many years.” NPRM at P 213; see Order

2023 at P 1285 (citing J.A. 922); see also EDF Renewable

Energy, Inc. v. MISO, 168 FERC ¶ 61,173, at PP 71–72, 80–81

(discussing the organization’s practice of using energy-service

modeling for affected-system studies).

74

Substantial evidence is “such relevant evidence as a

reasonable mind might accept as adequate to support a

conclusion, and requires less than a preponderance of

evidence.” Kentucky Mun. Energy Agency, 45 F.4th at 174

(formatting modified). In crafting a nationwide rule, FERC

“may rely on generic or general findings of a systemic problem

to support imposition of an industry-wide solution.” South

Carolina, 762 F.3d at 67 (citation modified); see Transmission

Access, 225 F.3d at 710–11 (same).

In adopting Order 2023, FERC credited over a dozen

comments that explained the benefits of adopting energy-

service modeling as a uniform standard for affected-system

studies and illustrated the adverse effects of the prior regime.

See, e.g., Order 2023 at P 1263 nn.2373–78. For example,

Shell Energy North America (US), L.P., and its related entities

urged FERC to “require the lowest cost solution with

‘guardrails’ to ensure that transmission is not being overbuilt.”

J.A. 1065. Shell also explained that “if the study is

implemented reasonably, a traditional [energy-service]

analysis will identify power flow, short-circuit, and stability

impacts on the affected system.” Id. at 1066.

NextEra Energy, Inc., echoed Shell’s concerns about firm-

service modeling leading to affected systems overbuilding their

transmission systems on the financial backs of their neighbor’s

customers. NextEra explained that its “subsidiaries have

experience with excessive network upgrades being identified

in affected system studies based on [firm-service] analysis.”

J.A. 817. NextEra complained that “[t]here is no rational

basis” for permitting affected systems to use firm-service

modeling “because the [new] project’s output is not supposed

to be delivered to the affected system,” but rather to the host

transmission provider. Id. In NextEra’s view, only in rare

75

cases would a customer’s energy input have an impact on an

affected system. See id.

Enel North America, Inc., also supported the energy-

service modeling rule because, “based on its experience in

interconnection queues, many Transmission Owners push for

more stringent study criteria and minimum impact thresholds

which will result in more network upgrades being assigned to

Interconnection Customers.” J.A. 751.

Fervo Energy Company added that the lack of

“consistency in the use of modeling standards” leads to

affected systems’ “identification of a wider range of required

network upgrades,” and so “require[s] interconnection

customers to incur additional unjust and unreasonable costs

that are not related to the provision of transmission service for

the interconnection customer.” Initial Comments of Fervo

Energy Company on Commission Notice of Proposed

Rulemaking at 6 (Oct. 13, 2022); see also J.A. 1007 (Pine Gate

Renewables, LLC comment that “[e]nforcing [energy-service]

modeling standards—rather than [firm-service] modeling

standards—better aligns the modeling and network upgrade

identification with the intended operation of the resources.”);

Initial Comments of Utah Municipal Power Agency at 6 (Oct.

13, 2022) (similar).

Pattern Energy Group LP offered yet another perspective,

explaining that “interconnection studies are based on

‘snapshots’ of system conditions” including “peak load[s]” and

“very low load[s]” of energy that “only exist a few times per

year.” Initial Comments of Pattern Energy Group LP at 26

(Oct. 12, 2022). Pattern asserted that an energy-service

modeling requirement more closely approximates what the

average load on an affected system is throughout the year than

firm-service modeling, which focuses on “snapshot, simulated

76

conditions [that] are not the norm.” Id. That is, using a less

strict modeling standard would balance out the fact that these

studies generally overestimate possible impacts on affected

systems by focusing on peak energy production days.

The SEIA added that the high cost of affected-system

upgrades due to the use of firm-service modeling leads to the

“cascading withdrawals” of interconnection customers,

causing interconnection queue delays for more than just the

impacted customer. Initial Comments of The Solar Energy

Industries Association at 11 (Oct. 13, 2022).

Buttressing these comments was a study of MISO’s use of

energy-service modeling across the fifteen states it serves. See

J.A. 815; Order 2023 at P 1285 (citing MISO’s comments at

J.A. 922); Order 2023-A at P 510. FERC noted that MISO had

successfully employed energy-service modeling for “many

years” for its affected-system studies “without adverse

reliability impacts.” NPRM at P 213; Order 2023 at P 1285;

Order 2023-A at P 510. MISO also explained that its use of the

energy-service approach had proved “adequate to cover the

reliability needs of the MISO system.” J.A. 922. MISO’s past

experience, FERC noted, indicates that mandating an energy-

service modeling standard across the board “will not cause

unnecessary curtailment or redispatch on affected systems.”

Order 2023-A at P 510. That finding was critical because the

justification for having interconnection customers foot the bill

for expensive, firm-service upgrades to affected systems had

been the assumption that the new customers would cause

energy overloads on an affected system that would force that

system to curtail movement of the energy of its own customers.

See J.A. 1345–46; see also EDF Renewable Energy, 168 FERC

¶ 61,173, at P 80.

77

FERC’s consideration of the MISO case study—which

had successfully operated across a significant swath of the

country—as empirical evidence from which to predict the

impact of adopting a nationwide energy-service modeling

standard was reasonable. “It is . . . quite clear FERC may make

predictions[,]” and we uphold a rule based on such predictions

so long as it is “rationally based on record evidence.” Michigan

Consol. Gas Co. v. FERC, 883 F.2d 117, 124 (D.C. Cir. 1989)

(citation modified).

In sum, the adverse experiences of those with direct and

repeat involvement in the interconnection process over time, as

well as the proven track record in the MISO system of FERC’s

chosen remedy, provide substantial evidence supporting the

modeling rule.

B

The same Transmission Petitioners next challenge FERC’s

explanation for its adoption of the energy-service modeling

standard as arbitrary and capricious, arguing that FERC failed

to grapple with important aspects of the problem, including the

impact on Independent System Operators and Regional

Transmission Organizations (collectively “System

Operators”). Because FERC adequately explained its

reasoning for adopting the energy-service modeling standard

and directly addressed the concerns voiced by these

Transmission Petitioners, their arbitrary and capricious

challenge fails.

1

FERC provided three explanations for its decision to

require interconnection studies for affected systems to be

conducted under an energy-service framework, rather than

78

allowing the affected systems to choose whichever model they

preferred.

First, FERC reasoned that selecting the energy-service

model for affected-system studies will create a fairer

relationship between the prospective interconnection customer

and the affected system. See Order 2023 at PP 1277–78; Order

2023-A at PP 511–12. Unlike a host transmission provider, an

affected system “has no obligation to continually ensure

deliverability” on its transmission system even for an

“interconnection customer that has obtained [firm service] on

its host system.” Order 2023 at PP 1277–78. As a result,

modeling conducted by an affected system using firm service

caused the customer to pay for system upgrades aimed at

providing a level of service the customer had no guarantee of

ever receiving. Order 2023-A at PP 511–12. That is because

the affected system can prioritize deliverability to its own

customers over a neighboring system’s customers, and when

congestion or curtailment of energy flow occurs, the

neighboring customer that paid for the system upgrades must

take a back seat to the affected system’s primary customers.

See Order 2023 at P 1278; Order 2023-A at PP 507–11; see

also J.A. 751 (Fervo Energy comment that “many

Transmission Owners push for more stringent study criteria

and minimum impact thresholds which will result in more

network upgrades being assigned to Interconnection

Customers and thus not funded by” the affected system’s own

customers), id. at 817 (NextEra Resources comment that its

“subsidiaries have experience with excessive network

upgrades being identified in affected system studies based on

[firm-service] analysis”).

Put another way, allowing the affected system to impose

upgrade expenses on a prospective customer for service it will

rarely use and might never receive gave the affected system and

79

its customers an unreasonable windfall at the expense of new

energy generators. At the same time, the use of energy-service

modeling would bring upgrade expenses more in line with the

service guarantees a prospective customer would receive. See

Order 2023 at P 1280; Order 2023-A at P 511.

Second, after two decades of experience with allowing

affected systems to charge for firm-service upgrades, FERC

reasonably concluded that mandating one standard modeling

system across affected systems “will create consistency and

provide transparency for affected system interconnection

customers[,]” one of the major goals of Order 2023. Order

2023 at P 1280.

Similarly, because the previous order permitted affected

systems to use different modeling standards, it was harder for

customers seeking interconnection to predict what network

upgrades would be required and how much they would cost.

As Order 2023 explains, “interconnection customers could be

assigned dramatically different affected-system network

upgrade costs due to those varying modeling standards, without

any factual or service differences to justify the discriminatory

treatment.” Order 2023 at P 1280.

That inability to accurately predict the likely costs of

interconnection set up artificial barriers to the addition of new

energy generation on the grid. See Order 2023 at PP 1279–80;

Order 2023-A at P 511. FERC’s decision, by contrast,

facilitates the addition of new power source customers by

adopting a uniform modeling system that can reduce the

“‘sticker shock’ from affected system network upgrades.”

Order 2023 at P 1151.

Third, FERC found that using energy-service modeling

would result in lower upgrade costs for new energy generation

80

customers. That, in turn, would reduce the number of

prospective customers that are forced to withdraw from the

interconnection queue—the line of energy generators seeking

to connect to any given transmission system—after receiving

an unexpectedly high bill for affected-system upgrades. See

Order 2023 at PP 1279–80.

Reducing such late-stage withdrawals was a critical goal

of Order 2023 both because withdrawals keep new energy

sources off the grid and because those withdrawals can result

in cascading withdrawals and restudies as each prospective

customer in the queue either bows out when confronted with a

higher price tag for its interconnection (since the study costs

are shared among the remaining prospective customers), or

must face a whole new study of its impact on the grid if

interconnected. See Order 2023 at PP 49–50, 1279–80.

FERC, in short, identified a real problem in the energy

generation system, selected a reasonable alternative to the

status quo, and provided rational policy reasons for its decision.

Nothing more is required. See also South Carolina, 762 F.3d

at 55 (“[T]he Commission must have considerable latitude in

developing a methodology responsive to its regulatory

challenge . . . .” (citation modified)); Coal. of MISO

Transmission Customers v. FERC, 45 F.4th 1004, 1017 (D.C.

Cir. 2022) (“Arbitrary and capricious review is ‘narrow’—we

are ‘not to ask whether a regulatory decision is the best one

possible or even whether it is better than the alternatives.’”

(quoting Motor Vehicle Mfrs. Ass’n of the U.S. v. State Farm

Mut. Auto. Ins. Co., 463 U.S. 29, 93 (1983))).

2

Transmission Petitioners do not contest the accuracy of

these three reasons. Instead, they argue that FERC failed to

81

consider the negative impacts that the new modeling rule

would have on affected systems in regions managed by System

Operators. They also argue that the modeling rule violates

cost-causation principles and favors interconnection customers

over affected systems. Neither argument holds up.

Far from ignoring the effect of the new rule on System

Operators, FERC relied upon the success of an energy-service

modeling approach that had already been adopted and used “for

many years” across fifteen states by a Regional Transmission

Organization, MISO. NPRM at P 213; Order 2023-A at

PP 510–11. FERC noted, in particular, that MISO’s adoption

of energy-service modeling had “not result[ed] in reliability

issues and [has] not cause[d] unnecessary curtailment or

redispatch on affected systems,” contrary to the Transmission

Petitioners’ arguments. Order 2023-A at P 510. 18 17F

With respect to the subgroup’s concerns about affected

systems’ ability to preserve their transmission capacity for their

own customers, FERC found that, “in the majority of

circumstances, interconnection alone is unlikely to affect the

reliability of an affected system transmission provider’s

transmission system.” Order 2023 at P 1288; Order 2023-A at

18

The Transmission Petitioners have not argued that, for

purposes of their argument, there is any relevant difference between

Independent System Operators and Regional Transmission

Organizations such that FERC could not draw on the lessons gleaned

from MISO and apply them to Independent System Operators. See

Transmission Petitioners Br. 81–82 (arguing only that FERC ignored

the impact of the energy-service modeling rule on “System Operator

areas[,]” a term inclusive of both Independent System Operators and

Regional Transmission Organizations); see also Energy Markets,

FERC, https://www.ferc.gov/opp/energy-markets (explaining

similarities between Independent System Operators and Regional

Transmission Organizations).

82

P 507. In addition, FERC determined in Order 2003 that

“interconnection and delivery [are] separate aspects of

transmission service,” Order 2003 at P 118, and Order 2023

regulates affected-system studies at the interconnection stage

only, see Order 2023 at PP 1284–85. So any concerns about

the impact of interconnection customers on affected systems at

the deliverability stage are beyond the scope of Order 2023.

Further, at that later stage, other tariff requirements kick in,

such as a common tariff requirement that renders a new

customer “responsible for obtaining any necessary

engineering, permitting, and construction” on affected systems.

Id. at P 1284.

One Regional Transmission Organization, Southwest,

argues that the separate treatment of interconnection and

deliverability does not address its situation, which is that one

of its neighboring System Operators grants interconnection and

deliverability simultaneously. So that one single operator will

not have a second opportunity to address any needed

deliverability upgrades.

As a commenter noted, “this appears to be a problem of

[Southwest]’s own making, based on how it has implemented

[energy service] and [firm service] on its own system,” and

Southwest could fix the problem by “revising its own methods

for determining what is firm or deliverable” service. J.A. 1381.

In any event, FERC addressed Southwest’s situation and

reasonably concluded that its one-off problem did not

undermine FERC’s rationale for adopting the energy-service

modeling standard as a default rule nationwide. Order 2023-A

at P 507–08; cf. South Carolina, 762 F.3d at 67 (“[B]ecause

petitioners have not shown that the deficiencies identified by

the Commission exist only in isolated pockets, . . . the

Commission could reasonably proceed to address a systemic

83

problem with an industry-wide solution.”) (citation modified).

FERC added that Southwest could seek an “independent entity

variation” from aspects of Order 2023 when it files its

compliance paperwork. See Order 2023-A at P 508 n.944; see

also Order 2023 at P 1764 & n.3346. Alternatively, Southwest

has the right to submit a Federal Power Act “section 205 filing”

in which it could “request [to] use [a firm-service] modeling

standard in affected system studies.” Order 2023 at P 1293;

see Transmission Access, 225 F.3d at 710–11 (holding that

FERC may make generic nationwide rules if they are in the

“generic public interest” and address outliers on a “case-by-

case” basis when reviewing applications for individual

variations). 19

18F

Finally, contrary to these Transmission Petitioners’

argument, energy-service modeling comports with cost-

causation principles and does not impermissibly preference the

interests of interconnection customers over affected systems.

FERC found that the use of energy-service modeling will

reduce late-stage withdrawals of customers from the

interconnection queue, and that change will help transmission

providers as well as customers. That is because speculative

projects that progress through various studies before being

scrapped end up wasting transmission providers’ time, while

also delaying the interconnection of needed and viable

generation customers that are later in the queue. See NPRM at

P 14 (noting that the consequences of late-stage withdrawals

“can then impede the transmission provider’s ability to process

its interconnection queue in an efficient manner”).

19

Southwest is well aware that Section 205 filings can allow

for individual exceptions to FERC Orders since FERC granted

several of Southwest’s Section 205 filings over the past seventeen

years to override aspects of Order 2003. See Order 2003 at PP 4–5,

39–40.

84

In any event, FERC can “reasonably chang[e] its policies,

and implement[] the consequences of those changes to the

detriment of some parties and the benefit of others” as long as

the change reflects a reasoned exercise of FERC’s policy

judgment about the most efficient and effective approaches to

bringing more power to the grid for the Nation as a whole.

Union Pac. Fuels, Inc. v. FERC, 129 F.3d 157, 162 (D.C. Cir.

1997). After all, “[p]olicy changes sometimes have distributive

effects that may appear arbitrary from the perspective of their

corporate victims, but in fact proceed logically from the

reasoned premises underlying the changes.” Id.; see also

Belmont Mun. Light Dep’t v. FERC, 38 F.4th 173, 184 (D.C.

Cir. 2022) (“Due to practical challenges and myriad divergent

interests, FERC must be given the latitude to balance the

competing considerations and decide on the best resolution in

its regulation of electricity markets.” (quoting New England

Power Generators Ass’n, 881 F.3d at 210)).

As for the concerns about cost-causation principles,

nothing in Order 2023 requires affected systems to ever

provide service to a neighboring system’s customer. Plus, the

use of energy-service modeling to protect against customers

having to pay for expensive upgrades from which they might

never benefit fully aligns with cost-causation principles. See

Order 2023 at P 1278 (describing the prior regime as a

“mismatch between costs and services received” because,

while the customer had to pay for “significant network

upgrades” on the affected system, that system had “no

obligation” to provide firm service to the customer or prevent

curtailment of that customer’s energy); Order 2023-A at P 511

(same).

85

C

Finally, these Transmission Petitioners argue that FERC

acted arbitrarily and capriciously by changing its modeling

standard policy from previous orders without adequate

justification. But all that is required of an agency facing

arbitrary and capricious review to a policy change is to “display

awareness that it is changing position[,]” and to provide “good

reasons” for the change. FCC v. Fox Television Stations, Inc.,

556 U.S. 502, 515 (2009). FERC’s decision meets that mark.

FERC expressly acknowledged its change from its past

laissez-faire approach to modeling choices, stating that it had

“previously allowed affected system transmission providers to

justify their own approach to selecting the modeling standard

used to evaluate affected system impacts.” Order 2023-A at

P 511; see also Order 2023 at P 1292 (noting that the energy-

service modeling standard is different from “the status quo”).

FERC then provided sound reasoning for the changed

approach: The frequent use of firm-service modeling resulted

in customers having to undertake “significant” upgrades

“without a commensurate increase in service” and “would

result in unjust and unreasonable rates[,]” Order 2023-A at

P 511, which the Federal Power Act prohibits, 16 U.S.C.

§ 824e(a); see Transmission Access, 225 F.3d at 708 (“Simply

put, it has been traditionally required that all approved rates

reflect to some degree the costs actually caused by the customer

who must pay them.” (citation modified)).

FERC then reiterated its three specific reasons supporting

the adoption of energy-service modeling as the default rule:

avoiding the imposition of significant costs with no

commensurate effect on service; the acutely disruptive queue

withdrawals caused by high upgrade price tags; and the goal of

86

increasing transparency, consistency, and fairness in the

interconnection process. See Order 2023-A at P 511; Section

V.B, supra.

Because FERC explicitly acknowledged the change in

course from Order 2003, and its reasoning is logical and draws

on supportive evidence from involved parties, FERC has met

its burden to address its policy shift.

VI

For the foregoing reasons, the petitions for review are

denied.

So ordered.