[Until this opinion appears in the Ohio Official Reports advance sheets, it may be cited as In

re Rev. of the Power-Purchase-Agreement Rider of Ohio Power Co. for 2018 and 2019, Slip

Opinion No. 2026-Ohio-1485.]

NOTICE

This slip opinion is subject to formal revision before it is published in an

advance sheet of the Ohio Official Reports. Readers are requested to

promptly notify the Reporter of Decisions, Supreme Court of Ohio, 65 South

Front Street, Columbus, Ohio 43215, of any typographical or other formal

errors in the opinion, in order that corrections may be made before the

opinion is published.

SLIP OPINION NO. 2026-OHIO-1485

IN RE REVIEW OF THE POWER-PURCHASE-AGREEMENT RIDER OF OHIO

POWER COMPANY FOR 2018 AND 2019; OFFICE OF THE OHIO CONSUMERS’

COUNSEL ET AL., APPELLANTS; PUBLIC UTILITIES COMMISSION OF OHIO,

APPELLEE; OHIO POWER COMPANY, INTERVENING APPELLEE.

[Until this opinion appears in the Ohio Official Reports advance sheets, it

may be cited as In re Rev. of the Power-Purchase-Agreement Rider of Ohio

Power Co. for 2018 and 2019, Slip Opinion No. 2026-Ohio-1485.]

Public utilities—Public Utilities Commission did not commit reversible error in

deciding to credit evidence showing that a must-run strategy for operating

two coal plants was prudent when the decision to utilize that strategy was

made—Commission did not violate procedural due process or Adm.Code

4901-1-28(E) in denying party’s motion for subpoena to compel

commission staff member to appear and testify at commission’s hearing,

because testimony presented by other witnesses covered the topic of

concern and the party had an opportunity to cross-examine those

witnesses—Commission did not err in failing to apply an appearance-of-

SUPREME COURT OF OHIO

impropriety standard when considering whether auditor was prevented

from conducting an independent audit—Orders affirmed.

(No. 2024-1735—Submitted December 10, 2025—Decided April 29, 2026.)

APPEAL from the Public Utilities Commission, Nos. 18-1004-EL-RDR and

18-1759-EL-RDR.

__________________

FISCHER, J., authored the opinion of the court, which KENNEDY, C.J., and

DEWINE, BRUNNER, HENSAL, HAWKINS, and SHANAHAN, JJ., joined. JENNIFER

HENSAL, J., of the Ninth District Court of Appeals, sat for DETERS, J.

FISCHER, J.

{¶ 1} Appellants, the Office of the Ohio Consumers’ Counsel (“OCC”) and

the Ohio Manufacturers’ Association Energy Group (“OMAEG”), appeal from

appellee Public Utilities Commission of Ohio’s decision to adopt the

recommendations provided by an independent auditor regarding the

implementation of a power-purchase-agreement rider (“the PPA Rider” or “the

rider”) by intervening appellee Ohio Power Company (“AEP Ohio”) for 2018 and

2019. Specifically, appellants challenge the commission’s conclusion that all costs

and sales flowing through the rider were prudent and in the best interest of AEP

Ohio’s retail customers.

{¶ 2} Appellants advance three propositions of law on appeal: (1) the

commission’s decision is against the manifest weight of the evidence, (2) the

commission violated due process and a commission rule by not issuing a subpoena

for the hearing testimony of a commission staff member, and (3) the commission

adopted the wrong standard for determining whether that staff member improperly

interfered with the audit. Although not denominated as a proposition of law,

appellants also seek a refund of charges paid by AEP Ohio’s customers under the

2

January Term, 2026

PPA Rider, and they ask us to overrule our precedent to the extent that it forbids

refunds.

{¶ 3} Because we find no merit in appellants’ three propositions of law, we

affirm the commission’s decision, obviating any need for us to address appellants’

refund-related arguments.

I. BACKGROUND

{¶ 4} Once again, we are asked to review AEP Ohio’s PPA Rider, which is

tied to AEP Ohio’s relationship with the Ohio Valley Electric Corporation

(“OVEC”). We have explained that

[t]he PPA Rider works as either a charge or a credit to [AEP Ohio’s]

retail customers, depending on how OVEC’s costs compare to the

market rate. PJM Interconnection (“PJM”) operates a competitive

wholesale-electricity market where rates are set.1 If the revenue

generated from sales to the PJM market is lower than the costs of

the power, [AEP Ohio’s] customers would pay a surcharge to [AEP

Ohio] through the PPA Rider to make up the difference. But if the

PJM market rates are higher than the power costs, customers would

receive a credit through the PPA Rider.

(Footnote in original.) In re Application of Ohio Power Co., 2018-Ohio-4698, ¶ 4.

{¶ 5} OVEC’s output comes from two coal plants that began operating in

the mid-1950s—the Kyger Creek plant, consisting of five generating units, is

located in Cheshire, Ohio, and the Clifty Creek plant, consisting of six generating

units, is located in Madison, Indiana. AEP Ohio is considered a sponsoring

1. PJM Interconnection is a multiutility regional transmission organization designated by the Federal

Energy Regulatory Commission to coordinate the movement of wholesale electricity in all or part

of 13 states—including Ohio—and the District of Columbia.

3

SUPREME COURT OF OHIO

company of OVEC and by contract is entitled to 19.93 percent of OVEC’s output.

OVEC has an operating committee that establishes a framework for OVEC’s

management to conduct OVEC’s daily operations. Operational decisions require a

two-thirds vote by committee members. AEP Ohio has one committee vote on

behalf of itself and its affiliates.

A. The commission authorizes the PPA Rider on a placeholder basis

{¶ 6} In 2015, the commission authorized AEP Ohio to establish the PPA

Rider on a placeholder basis with a rate of zero. See In re Application of Ohio

Power Co., 2018-Ohio-4697, ¶ 3-4. We dismissed OCC and OMAEG’s appeal of

the commission’s decision in that case, observing that it was unclear how harm

could arise from a rider that did not recover money from customers. Id. at ¶ 1, 10-

18.

B. The commission authorizes cost recovery under the PPA Rider, subject to a

prudency review

{¶ 7} In 2016, the commission authorized AEP Ohio to begin collecting

money from its customers through the PPA Rider. See In re Application Seeking

Approval of Ohio Power Co.’s Proposal to Enter into an Affiliate Power Purchase

Agreement for Inclusion in the Power Purchase Agreement Rider, PUCO Nos. 14-

1693-EL-RDR and 14-1694-EL-AAM, 2016 WL 3482857, *91 (May 31, 2016).

In doing so, the commission emphasized that the rider would be subject to an annual

audit, and it explained that recovery of retail costs under the rider may be

disallowed “if the output from the units was not bid in a manner that is consistent

with participation in a broader competitive marketplace comprised of sellers

attempting to maximize revenues.” Id. at *75. The commission noted that AEP

Ohio would bear the burden of proving that its “bidding behavior [was] prudent and

in the best interest of retail ratepayers.” Id. We affirmed the commission’s decision

on appeal. See Ohio Power Co., 2018-Ohio-4698, at ¶ 1-2, 68.

4

January Term, 2026

C. The commission conducts a prudency review of the PPA Rider

{¶ 8} The present case began when the commission entered an order

directing its staff to issue a request for proposal (“RFP”) for the purpose of

obtaining audit services to assist in an audit of the PPA Rider. See 2020 WL

12813029, *1 (Jan. 15, 2020). The audit’s purpose was to “establish the prudency

of all costs and sales flowing through the PPA Rider and to demonstrate that [AEP

Ohio’s] actions were in the best interest of retail ratepayers . . . for the period

spanning January 1, 2018, through December 31, 2019.” Id. at *6. The

commission selected London Economics International, L.L.C. (“LEI” or “the

auditor”), to conduct the audit. OCC and OMAEG later intervened in the

commission proceedings. See 2021 WL 228925, *3 (Jan. 19, 2021) (granting

OCC’s motion to intervene); 2021 WL 4169349, *4 (Sept. 10, 2021) (granting

OMAEG’s motion to intervene).

{¶ 9} On September 16, 2020, LEI issued an audit report. LEI found that

the “processes, procedures, and oversight [employed by AEP Ohio] were mostly

adequate and consistent with good utility practice.” LEI did not make any findings

of imprudence, but it did find “that the OVEC plants cost customers more than the

cost of energy and capacity that could be bought on the PJM wholesale market.”

LEI recognized, however, that other considerations, such as the plants’

contributions to employment and fuel diversity in the State, could outweigh the

energy cost paid by AEP Ohio’s customers.

{¶ 10} LEI also found the following:

• The true-up process between forecasted PPA Rider charges and actual PPA

Rider charges were accurate but the lag in that process should be reduced from

two billing cycles (six months) to one billing cycle (three months);

• OVEC should reconsider its must-run offer strategy since markets can change

and at times a must-run strategy may not be optimal;

• The plants performed well with some “small exceptions”;

5

SUPREME COURT OF OHIO

• OVEC’s operating-committee meetings should be held more frequently to

discuss energy-offer strategies, which could help prevent the plants from

running when energy prices are too low to cover variable costs.

{¶ 11} While this case was pending before the commission, OCC filed a

public-records request with the commission, through which OCC received a copy

of an email exchange between commission staff member Mahila Christopher and

Dr. Marie Fagan, LEI’s chief economist. In the email exchange, Dr. Fagan

confirms that LEI shared a draft of its audit report with commission staff. After

reviewing the draft, Christopher responded to Dr. Fagan with what she described

as “Staff’s editorial suggestions” regarding the “overall tone of the draft report.”

Christopher informed Dr. Fagan that a “[m]ilder tone and intensity of language

would be recommended” for the following sentence in the report: “Therefore,

keeping the plants running does not seem to be in the best interests of the

ratepayers.” In a later version of the draft report that LEI shared with AEP Ohio,

that sentence was replaced with the following: “However, LEI’s analysis shows

that the OVEC contract overall is not in the best interest of AEP Ohio ratepayers.”

But neither sentence is in the final audit report.

{¶ 12} To understand why these sentences were removed from the final

audit report, OCC filed with the commission a motion for a subpoena to compel

Christopher to appear and testify at the commission’s hearing. An attorney

examiner held the motion in abeyance, pending the questioning of Rodney Windle,

who was Christopher’s supervisor, and Dr. Fagan at the commission’s hearing.

{¶ 13} At the commission’s hearing, Dr. Fagan testified that commission

staff had asked LEI to make revisions to its audit report and that LEI had agreed to

do so. She added that LEI does not make revisions that it does not agree with and

that the revisions that LEI agreed to make in this case did not change its material

findings from the audit. Near the conclusion of the commission’s hearing, the

attorney examiner denied OCC’s motion for a subpoena.

6

January Term, 2026

{¶ 14} In its opinion and order, the commission affirmed the denial of

OCC’s motion for a subpoena, observing that the parties had been granted

“considerable leeway” to question Dr. Fagan about the language in the draft audit

reports. 2024 WL 4039778, *12 (Aug. 21, 2024). It further found no evidence that

undue influence had prevented LEI from conducting an independent audit of the

PPA Rider. Id. at *22. Regarding the merits of the prudency review, the

commission determined that all costs and sales flowing through the rider were

prudent; it affirmed the findings as stated in LEI’s audit report and adopted LEI’s

recommendations as its own. Id.

{¶ 15} According to the commission, the “dominant” issue to be determined

was whether it was prudent for the OVEC plants to operate under a must-run

strategy. Id. at *23. Under a must-run strategy, an operator determines when to

schedule a generating unit to run, regardless of wholesale-energy prices. Thus,

even if the market price of energy falls below a unit’s operating costs, the unit will

remain on, thus incurring losses. In contrast to a must-run strategy, a plant may

commit its output under an economic strategy, whereby the plant’s units will run

only if it is the least costly option available to the market. The commission

determined that OVEC’s decision to employ a must-run strategy in 2018 and 2019

was prudent when viewed as of the time OVEC made its decision. Id. However,

in hindsight, the commission recognized that an economic strategy may have been

prudent for OVEC to adopt in some months; therefore, the commission adopted

LEI’s recommendation that AEP Ohio and OVEC revisit the soundness of the must-

run strategy. Id.

{¶ 16} The commission denied appellants’ first and second rehearing

applications and, in doing so, clarified that the actions taken by AEP Ohio were in

the best interests of its customers. 2024 WL 4581311, *1, 4, 25 (Oct. 15, 2024);

2024 WL 5009879, *1, 3-4 (Dec. 4, 2024).

7

SUPREME COURT OF OHIO

{¶ 17} This appeal followed. Appellants challenge the commission’s

decision as set forth in its opinion and order, as well as the commission’s entry on

rehearing and second entry on rehearing. We granted AEP Ohio’s motion to

intervene as an appellee. 2025-Ohio-86.

II. ANALYSIS

{¶ 18} “R.C. 4903.13 provides that a [commission] order shall be reversed,

vacated, or modified by this court only when, upon consideration of the record, the

court finds the order to be unlawful or unreasonable.” Constellation NewEnergy,

Inc. v. Pub. Util. Comm., 2004-Ohio-6767, ¶ 50. We have “complete and

independent power of review as to all questions of law.” Canton Storage &

Transfer Co. v. Pub. Util. Comm., 1995-Ohio-282, ¶ 16. But we do not “reweigh

the evidence or second-guess the [commission] on questions of fact.” In re

Complaints of Lycourt-Donovan v. Columbia Gas of Ohio, Inc., 2017-Ohio-7566,

¶ 35.

A. Whether the commission’s orders are against the manifest weight of the

evidence

{¶ 19} In their first proposition of law, appellants contend that the

commission’s determination regarding the prudency of the costs and sales flowing

through the PPA Rider for 2018 and 2019 was against the manifest weight of the

evidence. In their view, the commission overlooked evidence of imprudence and

failed to account for language in the draft audit reports that cast doubt on the

wisdom of OVEC’s strategy for running the plants. Before analyzing this

argument, we clarify two concepts: the standard of review applicable to our review

of commission decisions and what constitutes a prudent decision.

{¶ 20} Under the standard applicable to our review of commission

decisions, we will not disturb the commission’s factual determinations when the

record contains sufficient probative evidence showing that the commission’s

decision was not manifestly against the weight of the evidence and was not so

8

January Term, 2026

clearly unsupported by the record as to show misapprehension, mistake, or willful

disregard of duty. Monongahela Power Co. v. Pub. Util. Comm., 2004-Ohio-6896,

¶ 29; see also R.C. 4903.13 (this court shall modify a commission order only if, on

consideration of the record, the order is found to be unlawful or unreasonable). To

this end, we will not second-guess the commission on questions of fact unless the

appellants have shown that the commission’s findings are manifestly against the

weight of the evidence. Ohio Consumers’ Counsel v. Pub. Util. Comm., 2007-

Ohio-4276, ¶ 29. In conducting a manifest-weight-of-the-evidence review, we

determine whether, in view of the conflicting evidence, the fact-finder (here, the

commission) clearly lost its way, resulting in a miscarriage of justice. See In re

Z.C., 2023-Ohio-4703, ¶ 14.

{¶ 21} Regarding prudency, a prudent decision “contemplates a

retrospective, factual inquiry, without the use of hindsight judgment, into the

decision-making process of the utility’s management,” Cincinnati v. Pub. Util.

Comm., 1993-Ohio-79, ¶ 13; see also In re Application of Suburban Natural Gas

Co., 2021-Ohio-3224, ¶ 32 (“the prudent-investment test is backward-looking,”

asking whether the investment was “prudent when it was made”).

1. OVEC’s method of running the plants

{¶ 22} Appellants begin their manifest-weight-of-the-evidence challenge

by claiming that the OVEC plants were run imprudently, leading to $74.5 million

in charges for AEP Ohio’s customers. They point to evidence in the record that

shows a reasonable plant operator in a competitive marketplace would have

conducted a daily financial analysis to determine whether a plant should be

operated under an economic or must-run strategy. Such an analysis would account

for the plant’s operating costs and the expected revenues that would be gained from

participating in the wholesale market. If the analysis shows that expected revenues

will cover a plant’s variable operating costs, the operator could commit the plant’s

output to the market. But if the analysis shows that the plant’s variable operating

9

SUPREME COURT OF OHIO

and other costs would exceed expected revenues, the operator should either operate

the plant under an economic strategy or shut it down and await more favorable

market conditions. Although AEP Ohio generally performs this type of analysis

for its non-OVEC plants, OVEC failed to perform this analysis for 10 of its 11 units

at the Kyger Creek and Clifty Creek plants. Appellants stress that instead of cycling

the units on and off based on this type of daily analysis, OVEC kept the plants

online in a must-run status for the vast majority of 2018 and 2019, leading to

significant net-revenue losses.

{¶ 23} If this were the only record evidence bearing on the question whether

the plants were prudently run, appellants’ manifest-weight argument might have

some merit. But the evidence presented at the commission’s hearing ran in both

directions, and the commission credited the evidence before it as establishing that

AEP Ohio “prudently handled its OVEC entitlement,” 2024 WL 4039778 at *23.

{¶ 24} The commission determined that it is “typical and common” for coal

plants, such as the OVEC plants at issue here, to operate under a must-run strategy

whereby they stay “essentially always online,” but the commission added that some

utilities and other stakeholders had begun to revisit this conventional wisdom. Id.

Jason M. Stegall, manager of regulatory and pricing analysis for American Electric

Power Service Corporation, testified on behalf of AEP Ohio. He explained that a

must-run strategy was reasonable because the plants were designed to operate for

baseload generation. A plant that operates for baseload generation is “normally

operated to take all or part of the minimum load of a system, and . . . consequently

produces electricity at an essentially constant rate and runs continuously.” United

States Energy Information Administration, Glossary,

https://www.eia.gov/tools/glossary/?id=B (accessed Mar. 18, 2026)

[https://perma.cc/8SWT-9326] (defining “base load plant”); see also Merriam-

Webster’s Collegiate Dictionary (12th Ed. 2026) (defining “baseload” as “the

amount of power made available by an energy producer (such as a power plant) to

10

January Term, 2026

meet fundamental demands by consumers”). Stegall explained that “OVEC’s units,

as coal-fired generating units designed for baseload generation, are not capable of

instantaneous startup and shutdown and, as wet-bottom coal units, are not designed

to be cycled on and off frequently.” He testified that frequently cycling the units

on and off would introduce greater risks and costs, such as through wear and tear

of the facilities due to thermal cycles or other cycling issues. He opined that

because shutting down, restarting, and then ramping up a unit to a higher level of

output comes with these risks and significant costs, “it may be more economical in

the long run to keep the [OVEC] units on even if they lose money in the short run.”

{¶ 25} The Natural Resources Defense Council (“NRDC”), which

intervened in the proceedings below, see 2021 WL 4169349 at *10, also recognized

that it may be true that keeping units online can be more economical because of

cycling costs. Yet, NRDC criticized that process, noting that if the OVEC units

were unable to cycle in accordance with profitability timelines, then the question

was really whether they should run at all.

{¶ 26} But even despite the perceived shortcomings of the OVEC units, the

commission relied on evidence, like Stegall’s testimony, showing that AEP Ohio

earned about $32 million in net revenue (i.e., revenues less variable costs) from

selling its share of energy produced by the OVEC plants in the wholesale market

during the audit period. While the commission noted that the net revenue was

overcome by fixed costs, resulting in a net charge to AEP Ohio’s customers, it

observed that the charges would have been higher absent the net revenue.

{¶ 27} In view of the evidence outlined above, the commission concluded

that AEP Ohio had deployed a prudent strategy with regard to operation of the

OVEC plants during the audit period. 2024 WL 4039778 at *23. The commission

recognized that in retrospect, it may have been more prudent in some months to

favor an economic strategy over a must-run strategy, but it noted that a prudency

inquiry assesses the soundness of a decision as of the time that it was made. Id.

11

SUPREME COURT OF OHIO

{¶ 28} Based on the record evidence, we conclude that the commission did

not clearly lose its way in reaching its determination. The commission was

presented with conflicting evidence concerning the prudence of the must-run

strategy, and it decided to credit the evidence showing that the strategy was prudent

when the decision to utilize that strategy was made. That decision does not

constitute reversible error. See Ohio Power Co., 2018-Ohio-4698, at ¶ 45 (“the

mere fact that evidence before the commission points both ways does not justify

reversal”).

2. Removal of language from the draft audit reports

{¶ 29} Appellants’ arguments concerning LEI’s removal of language from

its draft audit reports do not alter the analysis. The auditor wrote in its initial draft

report that “keeping the plants running does not seem to be in the best interests of

ratepayers,” but after receiving input from commission staff, the auditor replaced

that language in a subsequent draft report with a statement that its analysis “shows

that the OVEC contract overall is not in the best interest of AEP Ohio ratepayers.”

The auditor omitted this language from its final report. In its opinion and order, the

commission disregarded the language in the draft reports because “rely[ing] upon

draft language that was not included in the final audit report would be

irresponsible.” 2024 WL 4039778 at *22.

{¶ 30} According to appellants, “[o]nly by ignoring the draft audit reports

and Staff’s actions was the [commission] able to reach the exact opposite

conclusion”: that continuously running the OVEC plants was in the best interest of

ratepayers. But appellants do not develop their argument much beyond this

assertion. They seem to imply that commission staff thwarted an independent audit

by improperly interfering with the auditor’s work and that because staff’s conduct

was improper, the commission erred by not accounting for the draft-audit-report

language that predated staff’s interference.

12

January Term, 2026

{¶ 31} If appellants’ depiction of the facts were all that the commission had

before it, this might be a closer call. But the evidence is not so one-sided.

{¶ 32} On one hand, the RFP provided that the auditor must render an

“independent audit.” 2020 WL 12813029 at *6. The RFP did not flesh out what

the commission meant by “independent audit,” but that phrase commonly means

“an audit made by usu[ally] professional auditors who are wholly independent of

the company where the audit is being made,” Webster’s Third New International

Dictionary (2002).2 On the other hand, even if the phrase were broadened to

include the auditor’s independence from commission staff, the RFP specifically

required the auditor to send “[t]wo copies of a draft” of the audit report to staff at

least ten days before the final audit report was due, 2020 WL 12813029 at *9. It

appears that this is a routine practice before the commission. See In re Rev. of Duke

Energy Ohio, Inc.’s Distrib. Capital Invest. Rider, PUCO No. 23-549-EL-RDR,

2025 WL 71755, *12 (Jan. 8, 2025) (“it is routine and reasonable in third-party

audits of utility rider cases before the Commission for the Auditor, utility, and Staff

to meet or exchange correspondence when a draft audit [report] is circulated in

order for the utility to identify portions of the audit that contain confidential

information and to correct factual errors like typographical mistakes as well as

verify calculated figures”).

{¶ 33} In reaching its decision to adopt the audit report and the auditor’s

recommendations in this case, the commission disregarded the draft audit reports’

language, because it “[did] not find any evidence of undue influence in the creation

of the audit report or any reason to consider that LEI was prevented from

conducting an independent review,” 2024 WL 4039778 at *22. This determination

2. Since rendering its opinion and order in this matter, the commission has criticized a public utility’s

attempt to meddle in the audit process. See In re Rev. of Duke Energy Ohio, Inc’s. Distrib. Capital

Invest. Rider, PUCO No. 23-549-EL-RDR, 2025 WL 71755, *12-13 (Jan. 8, 2025) (chastising the

public utility for engaging in “improper” conduct by attempting to sway an independent auditor’s

view of a legal issue that arose during an audit).

13

SUPREME COURT OF OHIO

is supported by evidence in the record. Dr. Fagan testified that commission staff

had asked her to make revisions to the final report based on its submission of the

draft reports as required by the RFP; she testified that “upon reflection and getting

the reaction back from [the] client,” LEI agreed to make the requested revisions

because the draft language had been “overly broad.” But she added that LEI does

not make revisions to a final audit report that it does not agree with and that the

revisions LEI agreed to make in this case did not change the material findings of

the audit. In other words, staff made suggestions about the draft reports, but Dr.

Fagan retained the prerogative to decline those suggestions, which shows that LEI

retained its independence from commission staff. In view of the totality of the

record, we fail to see how the commission lost its way in declining to consider the

draft audit reports’ language.

{¶ 34} Finally, in their merit brief, appellants point to the Michigan Public

Service Commission’s decision in In re Application of Indiana Michigan Power

Co., Mich.Pub.Serv.Comm. No. U-20530, 2023 WL 1816183 (Feb. 2, 2023), as a

decision “disallow[ing] costs from the same OVEC plants, involving the same

‘must-run’ bidding strategy, for [AEP Ohio’s] affiliated Indiana/Michigan utility

company.” The problem with appellants’ reliance on that decision is that they have

asked us to determine whether the commission’s decision in this case is against the

manifest weight of the evidence. To answer that question, we must confine our

review to the evidence that was presented below. Whatever evidence may have

been presented to the Michigan Public Service Commission, and whatever

conclusion that agency reached based on that evidence, is not germane to the fact-

bound analysis required in this case.

{¶ 35} For these reasons, we reject appellants’ first proposition of law.

14

January Term, 2026

B. Whether the commission erred in denying OCC’s request to issue a subpoena

for the testimony of a commission staff member

{¶ 36} Appellants divide their second proposition of law into two parts,

both of which focus on the commission’s denial of OCC’s motion for a subpoena

to compel Christopher to appear and testify at the commission’s hearing. First,

appellants claim that in denying the motion, the commission violated their due-

process rights under both the United States and Ohio Constitutions. Second,

appellants contend that in denying the motion, the commission violated its own rule

governing the issuance of subpoenas. See Adm.Code 4901-1-28(E). Both

arguments fail.

1. Due process

{¶ 37} Appellants contend that in denying OCC’s motion for a subpoena,

the commission violated appellants’ right to a fair hearing under the Fourteenth

Amendment to the United States Constitution, which provides that no State shall

“deprive any person of life, liberty, or property, without due process of law.” U.S.

Const., amend. XIV, § 1. They also contend that in denying OCC’s motion for a

subpoena, the commission violated the Ohio Constitution’s Due Course of Law

Clause, which provides that “every person, for an injury done him in his land,

goods, person, or reputation, shall have remedy by due course of law.” Ohio Const.,

art. 1, § 16. This court has construed the Ohio Constitution’s Due Course of Law

Clause as the functional equivalent of the United States Constitution’s Due Process

Clause. See Arbino v. Johnson & Johnson, 2007-Ohio-6948, ¶ 48. However, the

Ohio Constitution remains a document of independent force. See State ex rel.

Cincinnati Enquirer v. Bloom, 2024-Ohio-5029, ¶ 19. Therefore, since appellants

do not ask us to interpret the state Constitution’s Due Course of Law Clause

differently from the federal Constitution’s Due Process Clause, we are constrained

to review their argument under the federal clause. See State v. Carter, 2024-Ohio-

1247, ¶ 34.

15

SUPREME COURT OF OHIO

{¶ 38} The Due Process Clause “centrally concerns the fundamental

fairness of governmental activity.” (Cleaned up.) North Carolina Dept. of Revenue

v. Kimberley Rice Kaestner 1992 Family Trust, 588 U.S. 262, 268 (2019).

Appellants’ concern here is with the clause’s guarantee of procedural fairness,

which provides the “opportunity to be heard at a meaningful time and in a

meaningful manner.” (Cleaned up.) Lyle Constr., Inc. v. Dept. of Natural

Resources, Div. of Reclamation, 34 Ohio St.3d 22, 25 (1987). Appellants rely on a

passage from the United States Supreme Court’s decision in West Ohio Gas Co. v.

Pub. Util. Comm., a case that involved an appeal from this court’s affirmance of a

commission order in which the Supreme Court observed that to comply with the

federal due-process clause, a commission proceeding must afford parties a “suitable

opportunity through evidence and argument to challenge the result” (citation

omitted), 294 U.S. 63, 70 (1935). Appellants maintain that without Christopher’s

testimony at the commission’s hearing, they were prevented from challenging the

result in this case.

{¶ 39} However, appellants fail to locate these broad precepts in the

caselaw addressing due-process challenges to an agency’s denial of a motion for a

subpoena. Without attempting an exhaustive treatment of the relevant caselaw, we

note that federal courts have held that a party’s inability to subpoena a witness to

testify at an administrative hearing does not constitute a per se violation of

procedural due process. See, e.g., Foxy Lady, Inc. v. Atlanta, 347 F.3d 1232, 1237

(11th Cir. 2003); Amundsen v. Chicago Park Dist., 218 F.3d 712, 717 (7th Cir.

2000); Yancey v. Apfel, 145 F.3d 106, 111 (2d Cir. 1998); United States v. Woods,

931 F.Supp. 433, 442 (E.D.Va. 1996). “As with other due process violations, to

secure a reversal on the basis that the administrative agency failed to issue a

requested subpoena, a party must demonstrate that the failure resulted in prejudice.”

(Cleaned up.) Flynn v. State Med. Bd., 2016-Ohio-5903, ¶ 58 (10th Dist.).

16

January Term, 2026

{¶ 40} Here, appellants were not prejudiced by the commission’s denial of

OCC’s motion for a subpoena. Dr. Fagan testified at the commission’s hearing and

was subject to cross-examination. Christopher’s supervisor, Windle, also testified

at the hearing and was subject to cross-examination. Windle testified that it was

his decision—not Christopher’s—to approach the auditor with concerns about

language in the draft audit reports: he explained that his concern was that the

language used in the draft reports arguably could have been viewed as criticizing

the commission’s decision to approve the PPA Rider in the first place.

{¶ 41} In view of the cross-examinations of Dr. Fagan and Windle, it is

unclear whether Christopher’s testimony would have added anything meaningful

to the record. And appellants offer no more than speculation in claiming that her

testimony was needed for them to challenge the commission’s decision in this case.

Appellants “presume” that Christopher knew more than anyone else about what

transpired between commission staff and the auditor regarding changes made to the

draft audit reports. But that presumption is dubious in view of Windle’s testimony.

And in any event, testimony by Dr. Fagan and Windle adequately covered the topic

of appellants’ concern.

{¶ 42} Accordingly, appellants have not shown that the commission

committed a procedural due-process violation by denying OCC’s motion for a

subpoena to compel Christopher to appear and testify at the commission’s hearing.

2. Adm.Code 4901-1-28(E)

{¶ 43} In addition to their due-process argument, appellants claim that in

denying OCC’s motion for a subpoena, the commission violated Adm.Code 4901-

1-28(E). That rule provides that “any person making or contributing to the report

[of an investigation into rate proceedings] may be subpoenaed to testify at the

hearing,” if a hearing is scheduled in the case in which the report is filed. In

appellants’ view, Christopher contributed to the final audit report by way of her

17

SUPREME COURT OF OHIO

email to the auditor, which led to the removal of certain language that had been

contained in the draft reports.

{¶ 44} Even if Christopher’s conduct falls within the meaning of

“contributing,” as that term is used in Adm.Code 4901-1-28(E), the rule says that

any person “may”—rather than “shall”—be subpoenaed to testify at a commission

hearing. As the attorney examiner observed in initially holding the motion for a

subpoena in abeyance—which she later denied at the hearing—the rule’s use of

“may” conveys that no party is automatically entitled to the issuance of a subpoena.

See 2022 WL 94394 at *3. That observation squares with the axiom that the word

“may” generally signifies the grant of discretionary authority unless the context

shows otherwise. See State v. Stutler, 2022-Ohio-2792, ¶ 15; Renacci v. Testa,

2016-Ohio-3394, ¶ 31. Here, appellants have not pointed to anything in the context

of Adm.Code 4901-1-28(E) that suggests its use of the word “may” should be

understood according to anything other than that axiom.

{¶ 45} In upholding the attorney examiner’s denial of OCC’s motion for a

subpoena, the commission observed that the attorney examiner struck the proper

balance between permitting latitude in questioning witnesses and keeping the

hearing moving in an orderly and expeditious manner. See 2024 WL 4039778

at *12. The commission did not abuse its discretion in reaching this conclusion.

See In re Application of Champaign Wind, L.L.C., 2016-Ohio-1513, ¶ 16 (applying

an abuse-of-discretion standard to the Power Siting Board’s decision to quash a

third-party subpoena). The record here establishes that appellants had a full

opportunity to cross-examine Dr. Fagan and Windle at the commission’s hearing,

during which they could have asked about the reasons underlying the removal of

certain language from the final version of the audit report. Appellants have failed

to advance a cogent argument explaining why, after several days of hearing, it was

essential to plow this same ground with Christopher.

18

January Term, 2026

{¶ 46} Consequently, appellants have not shown that the commission

violated Adm.Code 4901-1-28(E) in denying OCC’s motion for a subpoena.

C. Whether the commission erred in applying an undue-influence standard to its

determination whether LEI was prevented from conducting an independent audit

{¶ 47} In their third proposition of law, appellants contend that the

commission erred in applying an undue-influence standard to its determination

whether commission staff or AEP Ohio prevented LEI from conducting an

independent audit. Appellants assert in their merit brief that the correct legal

standard to be applied in such cases is found in the American Institute of Certified

Public Accountants’ Code of Professional Conduct, which provides that a member

of the institute “in public practice should be independent in fact and appearance

when providing auditing and other attestation services” and that “[i]ndependence

precludes relationships that may appear to impair a member’s objectivity in

rendering attestation services,” AICPA Code of Professional Conduct 0.300.500.01

and 0.300.50.02 (Dec. 15, 2014),

https://pub.aicpa.org/codeofconduct/ethicsresources/et-cod.pdf (accessed

Mar. 20, 2026) [https://perma.cc/X47B-M7JQ]. Appellants characterize this as an

appearance-of-impropriety standard.

{¶ 48} We first consider whether appellants properly preserved this

argument. In its first rehearing entry, the commission cited In re Buckeye Wind,

L.L.C., 2016-Ohio-5664, ¶ 14, in support of its determination that appellants failed

to preserve their appearance-of-impropriety argument because they asserted that

argument for the first time in their initial applications for rehearing. See 2024 WL

4581311 at *5. In Buckeye Wind, we held that opponents of a wind-farm project

forfeited their objection to the Power Siting Board’s decision limiting the scope of

its hearing by failing to object to an administrative-law judge’s determination in a

prehearing entry that certain issues fell outside the scope of the hearing. See

Buckeye Wind at ¶ 3, 7, 15, 18-19. We rejected the opponents’ argument that they

19

SUPREME COURT OF OHIO

had preserved their objection by advancing it in their rehearing application,

observing that the “availability of [the rehearing] process does not mean that a party

may sit idly and withhold all objections before and during a board hearing and then

belatedly raise them in a rehearing application.” Id. at ¶ 18.

{¶ 49} This case, however, presents a different situation. The commission

first applied the undue-influence standard in its opinion and order. See 2024 WL

4039778 at *22; 2024 WL 4581311 at *5. Therefore, unlike in Buckeye Wind,

appellants’ first opportunity to challenge the commission’s application of the

undue-influence standard in this case was by way of their initial rehearing

applications.

{¶ 50} Although appellants preserved their argument concerning an

appearance-of-impropriety standard, we need not dwell long on the argument’s

merits, because appellants fail to support their argument with any authority that

binds the commission to use that standard. Moreover, the commission has

previously applied the undue-influence standard when deciding whether to approve

an independent audit report. See In re Rev. of the Reconciliation Rider of Duke

Energy Ohio, Inc., PUCO No. 20-167-EL-RDR, 2023 WL 5880399, *13

(Sept. 6, 2023) (“The Commission . . . does not find any evidence of undue

influence in the creation of the audit report or any reason to consider that LEI was

prevented from conducting an independent review.”). And we have observed that

the commission should respect its own precedents to ensure predictability. See In

re Application of Ohio Power Co., 2025-Ohio-3034, ¶ 36. If, as a matter of policy,

it would be sensible to require the commission to apply an appearance-of-

impropriety standard in cases involving independent-audit reports prepared for the

commission’s benefit, then the General Assembly, not this court, must be the one

to require such a standard. See Kaminski v. Metal & Wire Prods. Co., 2010-Ohio-

1027, ¶ 61 (the General Assembly is responsible for weighing policy concerns and

making policy decisions; the courts are charged with evaluating the legality of the

20

January Term, 2026

General Assembly’s legislative choices, not second-guessing those choices);

Arbino, 2007-Ohio-6948, at ¶ 71 (same); Weidman v. Hildebrant, 2024-Ohio-2931,

¶ 61 (Kennedy, C.J., dissenting) (“The General Assembly is the final arbiter of

public policy in Ohio.”).

{¶ 51} The United States Supreme Court’s decision in United States v.

Arthur Young & Co., 465 U.S. 805 (1984), which appellants cite, is not to the

contrary. The question in that case was whether tax-accrual workpapers prepared

by an independent auditor for a corporate client should be excepted from disclosure

to the Internal Revenue Service under a federal statute based on a form of work-

product immunity. See id. at 815. In answering that question, the Court adverted

to an auditor’s role as a “public watchdog” who demands total independence from

the client. Id. at 818. Missing from the Court’s analysis is any reference to an

appearance-of-impropriety standard.

{¶ 52} Appellants next advance an argument under this proposition of law

that is unrelated to the appearance-of-impropriety standard: they insist that the

commission ran afoul of this court’s precedent in Tongren v. Pub. Util. Comm.,

1999-Ohio-206. In Tongren, the commission issued an order in which it relied on

numerous references to “findings” of its staff. Id. at ¶ 10. Yet nothing in the record

contained those “findings.” Id. We held that the commission committed reversible

error by rendering a decision on an issue without disclosing the facts on which it

relied. Id. at ¶ 19-20.

{¶ 53} In contrast to Tongren, it is clear here which evidence the

commission relied on in determining that LEI did not sacrifice its independence in

the audit process: the commission pointed to the testimony of Dr. Fagan, who had

testified that LEI takes responsibility for the contents of its audit reports and that

notwithstanding any comments that LEI received from commission staff or AEP

Ohio regarding the draft audit reports in this case, the final report reflects her “own

view of what ought to be in there.” See 2024 WL 4039778 at *22.

21

SUPREME COURT OF OHIO

{¶ 54} For these reasons, we reject appellants’ third proposition of law.

III. CONCLUSION

{¶ 55} The orders of the Public Utilities Commission are affirmed. Because

we reject appellants’ three propositions of law, we do not reach their refund-related

arguments.

Orders affirmed.

__________________

Maureen R. Willis, Ohio Consumers’ Counsel, and John Finnigan, John R.

Varanese, and William J. Michael, Assistant Consumers’ Counsel, for appellant

Office of the Ohio Consumers’ Counsel.

Carpenter Lipps, L.L.P., Kimberly W. Bojko, and Emma Y. Easley, for

appellant Ohio Manufacturers’ Association Energy Group.

Dave Yost, Attorney General, John H. Jones, Public Utilities Section Chief,

and Julian P. Johnson and Thomas G. Lindgren, Assistant Attorneys General, for

appellee.

Steven T. Nourse and Michael J. Schuler; and Porter, Wright, Morris &

Arthur, L.L.P., L. Bradfield Hughes, and Eric B. Gallon, for intervening appellee.

________________________

22