Opinion

Aspire Power Ventures, LP v. Public Utility Commission of Texas, Electric Reliability Council of Texas, Thomas Gleeson, Lori Cobos, Jimmy Glotfelty, Kathleen Jackson, and Courtney Hjaltman

Court
Texas Court of Appeals, 15th District
Filed
Mar 26, 2026
Status
Published
Nature of suit
Governmental Immunity
Cited by
0 cases
Authority
More cited than 39.8%

confirming that ultra vires suits proceed against government actors in their official capacity

How later courts described this case

  • confirming that ultra vires suits proceed against government actors in their official capacity
  • governmental immunity clearly waived when statutory provisions waive immunity without doubt

Written by the judges who cited it.

The opinion

Affirmed and Opinion filed March 26, 2026.

In The

Fifteenth Court of Appeals

NO. 15-24-00118-CV

ASPIRE POWER VENTURES, LP, Appellant

V.

PUBLIC UTILITY COMMISSION OF TEXAS, ELECTRIC RELIABILITY

COUNCIL OF TEXAS, THOMAS GLEESON, LORI COBOS, JIMMY

GLOTFELTY, KATHLEEN JACKSON, AND COURTNEY HJALTMAN,

Appellees

On Appeal from the 345th District Court

Travis County, Texas

Trial Court Cause No. D-1-GN-24-003384

OPINION

As part of its responsibility to ensure an adequate and reliable Texas electric

grid, the Legislature requires ERCOT to procure Ancillary Services aimed at

keeping electricity supply and demand balanced. ERCOT did just that when it

adopted protocols establishing and modifying the ERCOT Contingency Reserve

Service (ECRS), a program designed to complement other Ancillary Services

already in use.

When ERCOT adopted the ECRS protocols, it did so under authority

delegated to it by the Public Utility Commission of Texas (PUC), but outside of the

rule-making requirements of the Administrative Procedure Act (APA). This appeal

concerns whether ERCOT’s noncompliance with the APA renders the protocols

invalid and whether the PUC’s Commissioners exceeded their authority in relation

to ERCOT’s adoption of ECRS.

We hold that ERCOT protocols are not subject to the APA, the

Commissioners’ acts were well within their statutory authority, and the PUC has

exclusive jurisdiction over ERCOT protocols. We affirm the trial court’s orders

granting the PUC’s and ERCOT’s pleas to the jurisdiction.

BACKGROUND

A. ERCOT and its protocols

ERCOT is the PUC-certified “independent organization” charged with

operating the State’s competitive electric market and ensuring the “reliability and

adequacy” of the electric grid.1 Although ERCOT “is organized as a membership-

based nonprofit corporation,” it “is not a typical corporation.”2 ERCOT’s “business”

is “set forth by statute,” and it “operates under the direct control and oversight of the

PUC,” which “has complete authority to oversee and investigate” ERCOT’s

“operations” so as to ensure that ERCOT “adequately performs [its] functions and

duties.”3 This appeal concerns one of those duties: adopting protocols.

The PUC has delegated to ERCOT the authority to “adopt and enforce rules

1

TEX. UTIL. CODE § 39.151(a), (c); CPS Energy v. ERCOT, 671 S.W.3d 605, 626 (Tex.

2023).

2

CPS Energy, 671 S.W.3d at 626.

3

TEX. UTIL. CODE § 39.151(d); CPS Energy, 671 S.W.3d at 623, 626.

2

relating to the reliability of the regional electrical network.”4 ERCOT, in turn, “has

utilized this delegated rulemaking authority to establish operational rules known as

Nodal Protocols”—highly detailed rules that, along with other policies, guidelines,

and procedures, “provide the framework for the administration of the Texas

electricity market.”5

ERCOT’s process for adopting and revising protocols—referred to as the

Nodal Protocol Revision Request (NPRR) process—“has long been in effect.”6 It is

open to numerous entities, permits comment on an NPRR, involves committee

review before ERCOT’s board acts, and provides “a process for review … which

culminates in a suit for judicial review in district court.”7 In 2021, the Legislature

amended the Public Utility Regulatory Act (PURA) to require (1) that ERCOT

“establish and implement a formal process for adopting new protocols or revisions

to existing protocols,” and (2) that ERCOT-adopted protocols “may not take effect

before receiving [PUC] approval.”8 ERCOT “already had … in place” a formal

process for adopting and revising protocols (the NPRR process), but in response to

the 2021 legislation added a provision that “[a]ll Revision Requests require approval

4

PUC v. RWE Renewables Am., LLC, 691 S.W.3d 484, 486 (Tex. 2024) (quoting TEX. UTIL.

CODE § 39.151(d)).

5

Id. at 486, 489.

6

Id. at 489, 491; see ERCOT, Nodal Protocols § 21, https://www.ercot.com/mktrules/

nprotocols/current.

7

RWE, 691 S.W.3d at 489–90 (“This painstaking procedure serves to leverage the expertise

of ERCOT members and industry stakeholders while maintaining transparency and affording

interested parties plentiful opportunities to weigh in.”), 492 n.11; see ERCOT, Nodal Protocols

§ 20.1 (ADR with ERCOT); 16 TEX. ADMIN. CODE §§ 22.251, 25.362(c)(5) (complaint with the

PUC); TEX. UTIL. CODE § 15.001 (suit for judicial review).

8

RWE, 691 S.W.3d at 487, 492; see Act of May 30, 2021, 87th Leg., R.S., ch. 425, § 3, sec.

39.151(d), (g-6), 2021 Tex. Gen. Laws 830, 830–32 (current version at TEX. UTIL. CODE

§ 39.151(g-6)).

3

by the PUCT prior to implementation.”9

B. Ancillary Services and ECRS

“For the ERCOT grid to remain functional, electricity supply and demand

must remain balanced at a frequency of 60 hertz.”10 Yet “consumption and

generation of electricity are not always equally matched,” as the PUC notes. So to

maintain a balanced grid and “reduce operational risks associated with variability

and uncertainty,”11 ERCOT is required to “procure[] ancillary or reliability

services.”12 ERCOT’s protocols list four Ancillary Services: Regulation Service,

Responsive Reserve Service (RRS), Non-Spinning Reserve Service, and the primary

target of this litigation: the ERCOT Contingency Reserve Service, or ECRS.13

ERCOT established ECRS in 2019 with the adoption of NPRR 863. ERCOT

modified ECRS over the next few years with the adoption of several other NPRRs,

and it implemented the service in 2023. According to ERCOT, ECRS is used “to

restore or maintain” a balanced grid “[i]n response to significant depletion of RRS,”

“[a]s a backup Regulation Service,” and “to avoid getting into or during an Energy

Emergency Alert.”14 In other words, ECRS is meant to “address certain reliability

risks that ERCOT’s other Ancillary Services do not adequately address,” including

risks related to “intermittent wind and solar generation resources” and “the ever-

present heightened reliability risks presented by ERCOT’s intrastate nature.”

9

ERCOT, Nodal Protocols § 21.4.11; see RWE, 691 S.W.3d at 492.

10

PUC v. Luminant Energy Co., 691 S.W.3d 448, 455 (Tex. 2024).

11

ERCOT, ERCOT ANCILLARY SERVICES STUDY 10 (2024), https://www.ercot.com/

files/docs/2024/10/07/ERCOT-Ancillary-Services-Study-Final-White-Paper.pdf.

12

TEX. UTIL. CODE §§ 39.159(b)(3), 39.159(d).

13

ERCOT, Nodal Protocols § 3.17.1–.4.

14

ERCOT ANCILLARY SERVICES STUDY 30; see id. at 7 (“ECRS is capacity that can respond

in 10 minutes and is used to recover frequency; cover intra-hour forecast uncertainties; address

load, wind, and solar variability/ramps; and replace deployed reserves.”).

4

C. Aspire’s lawsuit

Aspire is a Qualified Scheduling Entity (QSE) that “buys and sells wholesale

electricity in ERCOT’s real-time electricity market, serving as a conduit between

companies that generate electricity and companies that sell electricity on a retail

basis.” Aspire’s view of ECRS does not align with ERCOT’s and the PUC’s.

Describing it as a “costly, market-distorting attempt to bolster reliability,” Aspire

claims that ECRS “unnecessarily increases the price of electricity” because

participating generators are paid “to withhold part of their generating capacity,”

which “decrease[s] the supply of electricity available to the grid.” The resulting

“artificial fluctuations in prices,” Aspire says, expose QSEs like Aspire to a risk of

financial loss because they contract in advance to buy and sell electricity at specific

prices before the wholesale price is determined. Flaws aside, Aspire also believes

that ECRS is illegal. This appeal is part of Aspire’s efforts to establish so.

Aspire first challenged ECRS in February 2024 when it pursued a direct

appeal in the Third Court of Appeals of three PUC orders approving ERCOT-

adopted protocols relating to ECRS.15 Aspire filed the appeal under a PURA

provision that permits judicial review of “competition rules adopted by” the PUC.16

Several months later, however, the Texas Supreme Court held in the RWE

Renewables case that a PUC order approving an ERCOT-adopted protocol is not a

competition rule subject to direct appeal.17 After transfer to this Court, we granted

dismissal of that direct appeal.18

15

ERCOT NPRRs 1096, 1148, and 1178. See Aspire Power Ventures, LP v. PUC, No. 03-

24-00102-CV, 2024 WL 1942445, at *1 (Tex. App.—Austin May 3, 2024).

16

TEX. UTIL. CODE § 39.001(e), (f).

17

See 691 S.W.3d at 486, 492.

18

See Aspire Power Ventures, LP v. PUC, No. 15-24-00035-CV, 2024 WL 4293602, at *1

(Tex. App.—15th Dist. Sept. 26, 2024, no pet.).

5

Before RWE issued, Aspire filed a separate lawsuit against the PUC in Travis

County District Court. Aspire sought a declaration under § 2001.038 of the APA that

the same three PUC orders approving ERCOT-adopted protocols are invalid because

they are “rules” within the meaning of the APA and yet the PUC “did not

substantially comply with the mandatory requirements of the APA when adopting”

them.19 Aspire amended its petition twice after the Texas Supreme Court issued

RWE. Taken together, Aspire:

• added ERCOT as a defendant;

• sought a declaration under both the APA’s § 2001.038 and the UDJA that ten

ERCOT-adopted, ECRS-related protocols20 and six PUC approval orders21

are invalid and void because, although they are “rules” within the meaning of

the APA, neither ERCOT nor the PUC substantially complied with the

mandatory rulemaking requirements of the APA, including the public

participation and reasoned justification requirements, when adopting and

approving them, respectively;

• sought a declaration, also under § 2001.038 and the UDJA, that Chapter 21 of

ERCOT’s Nodal Protocols (the NPRR process) does not comply with the

APA; and

• alleged that the PUC’s Commissioners acted ultra vires by authorizing

ERCOT to adopt (1) rules creating an Ancillary Service in the form of ECRS

and (2) ECRS protocols that constitute PURA-prohibited “market-power

abuse.”

Relevant to the allegation that ERCOT’s protocols are APA rules, Aspire observed

that ERCOT adopted them “under rulemaking authority originally given to the PUC

and then delegated to ERCOT.”

The PUC and ERCOT each filed a plea to the jurisdiction. They argued that

19

Aspire also sought a declaration to the same effect under the Uniform Declaratory

Judgments Act (UDJA). See TEX. CIV. PRAC. & REM. CODE § 37.006(b).

20

ERCOT NPRRs 863, 992, 1015, 1079, 1096, 1148, 1178, 1196, 1213, and 1224.

21

PUC Orders Approving NPRRs 1079, 1096, 1148, 1178, 1196, and 1213.

6

Aspire failed to allege either a valid claim within § 2001.038’s limited waiver of

sovereign immunity or a valid ultra vires claim. The trial court conducted a hearing

before granting both pleas and dismissing all of Aspire’s claims. Aspire appeals the

dismissal of its requested declarations against the PUC and ERCOT and its ultra

vires claims against the PUC’s Commissioners.

DISCUSSION

Absent an express waiver or exception, the PUC, its Commissioners, and

ERCOT generally enjoy sovereign immunity.22 Sovereign immunity from suit

defeats a trial court’s subject-matter jurisdiction and is properly raised in a plea to

the jurisdiction.23 When, as here, a plea to the jurisdiction challenges the pleadings,

we determine if the pleader alleged facts that affirmatively demonstrate the court’s

jurisdiction to hear the case.24 We construe the pleadings liberally in favor of the

plaintiff while looking to the pleader’s intent.25 We review the trial court’s order de

novo.26

Over the life of this litigation, Aspire has asserted three grounds for waiver:

PURA § 39.001(e), Texas Government Code § 2001.038, and ultra vires. For the

reasons stated below, we hold that none of them waive the PUC’s or ERCOT’s

immunity. And in any event, the PUC has exclusive jurisdiction but Aspire failed to

exhaust administrative remedies.

22

CPS Energy, 671 S.W.3d at 628 (ERCOT); Matzen v. McLane, 659 S.W.3d 381, 387–88

(Tex. 2021) (agencies and officials).

23

Tex. Dep’t of Parks & Wildlife v. Miranda, 133 S.W.3d 217, 225–26 (Tex. 2004).

24

Id. at 226.

25

Id.

26

Matzen, 659 S.W.3d at 388.

7

I. PURA § 39.001

Aspire first challenged ECRS when it pursued in the Third Court of Appeals

a direct appeal of ERCOT-adopted protocols relating to ECRS.27 Aspire sought to

invoke direct appellate review under PURA § 39.001(e), which permits judicial

review of “competition rules adopted by the [PUC].”28 But whether a PUC order

approving an ERCOT protocol was a “competition rule” subject to judicial review

under § 39.001(e) was an issue the Texas Supreme Court had agreed to hear in

different case: PUC v. RWE Renewables Americas, LLC.29 After oral argument in

RWE, the PUC asked the Third Court to abate its appeal and await the Texas

Supreme Court’s review of the same type of order under the same statutory

authority.30 The Third Court agreed to abate the appeal.31

The next month, the Texas Supreme Court held in RWE that a PUC order

approving an ERCOT-adopted protocol is not a “competition rule[] adopted by the

PUC” under § 39.001(e).32 For two primary reasons, the Texas Supreme Court

rejected the argument that PUC approval of protocols adopted by ERCOT served to

“effectively convert ERCOT protocols into PUC rules subject to the same review

procedures.”33

27

See Aspire Power Ventures, LP v. PUC, No. 03-24-00102-CV, 2024 WL 1942445, at *1

(Tex. App.—Austin May 3, 2024); ERCOT NPRRs 1096, 1148, and 1178.

28

TEX. UTIL. CODE § 39.001(e), (f); see Hillman v. Nueces Cnty., 579 S.W.3d 354, 360 (Tex.

2019) (governmental immunity clearly waived when statutory provisions waive immunity without

doubt).

29

See PUC Brief on the Merits, PUC v. RWE Renewables Americas, LLC, No. 23-0555 (Tex.

Jan. 18, 2024).

30

See Motion to Abate, Aspire Power Ventures, LP v. PUC, No. 03-24-00102-CV (Tex.

App.—Austin Apr. 12, 2024).

31

See Aspire Power Ventures, LP, 2024 WL 1942445, at *1.

32

See 691 S.W.3d at 486, 492.

33

Id. at 491.

8

First, PURA makes clear that ERCOT is the entity that adopts new or revised

protocols while the PUC approves them.34 The distinction between adoption and

approval is “deceptively significant,” the RWE Court explained, because “the APA’s

requirements … are exclusively and repeatedly directed at rules ‘adopted’ by a ‘state

agency.’”35 Given “the Legislature’s deliberate decision not to designate the PUC as

the entity that ‘adopts’ ERCOT protocols,” the PUC’s approval order was only a

“ratification decision that simply allowed protocol revisions … already … adopted

by ERCOT” to become effective, not “an agency-adopted ‘rule’ under the [APA].”36

Consequently, the approval order was not a competition rule adopted by the PUC

subject to direct appeal under § 39.001(e).37

Second, the Court held that “ERCOT rulemaking and PUC rulemaking” are

entirely “distinct,” “separate,” “independent endeavors.”38 Whereas ERCOT

protocols are adopted and revised via delegated authority using the NPRR process,

the PUC is subject to the rulemaking requirements of the APA.39 When the

Legislature provided that competition rules adopted by the PUC “shall be conducted

under [the APA], except as otherwise provided by this chapter,” the latter clause

recognized that ERCOT’s distinct review process under Subchapter D of Chapter 39

was not included in the PUC’s review processes governed by the APA.40 The Court

34

Id.; see TEX. UTIL. CODE § 39.151(g-6) (“Protocols adopted by [ERCOT] …. The [PUC]

may approve ….”).

35

RWE, 691 S.W.3d at 491. Aspire acknowledges, and both the PUC and ERCOT observe,

that ERCOT is not a state agency, but instead an organ of government. See CPS Energy, 671

S.W.3d at 614–17.

36

RWE, 691 S.W.3d at 491–92 (emphasis added).

37

Id. at 492.

38

Id. at 491–92.

39

Id. at 489–91.

40

TEX. UTIL. CODE § 39.001(e) (emphasis added).

9

held that blurring that important distinction by treating ERCOT-adopted rules the

same as PUC rules would disrupt the “legislative and regulatory schemes [that]

have … envisioned separate, complementary purposes of and procedures for PUC

rules and ERCOT protocols.”41

After Aspire’s direct appeal was transferred to this Court, we granted the

PUC’s unopposed motion and dismissed the appeal for lack of jurisdiction based on

the Texas Supreme Court’s decision in RWE.42

II. Declarations under APA § 2001.038

Meanwhile, Aspire had filed a separate lawsuit against the PUC and ERCOT

in Travis County District Court asserting a waiver of jurisdiction under § 2001.038

of the APA. Under § 2001.038, the “validity … of a rule … may be determined in

an action for declaratory judgment if it is alleged that the rule or its threatened

application interferes with or impairs … a legal right or privilege of the plaintiff.”43

“The state agency must be made a party to the action.”44

There is no question that § 2001.038 expressly waives sovereign immunity.45

The issue presented here is whether Aspire pleaded a valid claim that comes within

§ 2001.038’s waiver.46 Aspire sought declarations that ERCOT’s ECRS protocols

and the PUC’s approval orders are invalid because, although they are “rules” within

41

RWE, 691 S.W.3d at 491.

42

See Aspire Power Ventures, LP v. PUC, No. 15-24-00035-CV, 2024 WL 4293602, at *1

(Tex. App.—15th Dist. Sept. 26, 2024, no pet.).

43

TEX. GOV’T CODE § 2001.038(a). Aspire alleged that the challenged protocols and approval

orders interfere with and impair its legal rights and privileges.

44

Id. § 2001.038(c).

45

See Kensington Title-Nevada, LLC v. TDSHS, 710 S.W.3d 225, 230 (Tex. 2025).

46

See Matzen, 659 S.W.3d at 389 (pleaded facts must affirmatively demonstrate that waiver

applies); Trinity Settlement Servs., LLC v. Tex. State Sec. Bd., 417 S.W.3d 494, 501 (Tex. App.—

Austin 2013, pet. denied) (§ 2001.038 waives immunity only for a valid claim).

10

the meaning of the APA, the PUC failed to substantially comply with the APA’s

requirements when adopting them. As Aspire acknowledges, and the PUC and

ERCOT agree, that “boils down” to whether ERCOT’s protocols adopting and

modifying ECRS are agency “rules” under the APA.47

RWE decidedly answers that question “No.” ERCOT protocols are not “rules

adopted by a state agency” subject to the APA because they are adopted by ERCOT

(which is not a state agency but a “private, nonprofit corporation”), rather than the

PUC (which is an agency but merely approves them).48 The “Legislature deliberately

uses the term ‘adopt’ throughout the APA—no reference is made to an agency’s

‘approval’ of a rule.”49 Indeed, if PUC approval orders do not “convert” ERCOT

protocols into PUC rules subject to the APA,50 as RWE decided, then ERCOT

protocols cannot be rules subject to the APA.

Aspire tries to distinguish RWE on several grounds, but none are convincing.

First, Aspire argues that the PUC “would be subject to and constrained by the

APA” had it adopted the ECRS protocols. But the PUC did not adopt them; ERCOT

did, and RWE repeatedly stressed that ERCOT and PUC rulemaking are distinct,

separate, and independent processes.51

Second, relying on the Legislature’s use of the word “delegate” in PURA

§ 39.151(d), Aspire contends that the PUC cannot delegate its rulemaking

responsibilities to ERCOT shorn of the APA’s requirements, and thus ERCOT

necessarily “stands in the shoes” of the PUC when it adopts protocols. But as the

47

See TEX. GOV’T CODE § 2001.038(a) (declaratory judgment to determine validity of a

“rule”).

48

RWE, 691 S.W.3d at 491; see CPS Energy, 671 S.W.3d at 617 (“ERCOT is an ‘organ of

government.’”).

49

RWE, 691 S.W.3d at 491.

50

Id.

51

See id. at 490–92.

11

Texas Supreme Court held in RWE, the two entities stand in entirely separate and

distinct shoes: ERCOT adopts protocols under one set of rules, and the PUC adopts

rules under another.52 That leaves no room for Aspire’s delegation theory that

ERCOT protocols are really just PUC rules in disguise.

Third, Aspire argues that when the Legislature amended PURA in 2021 to

require ERCOT to establish a formal process for adopting and revising protocols, it

did not expressly exempt that process from the APA.53 But express exemption was

unnecessary because, as RWE explained in great detail, the Legislature achieved the

same result through other statutory means.54

Finally, Aspire directs us to several authorities that it says “reflect the

fundamental principle that a delegor like the PUC here can delegate only the

authority it has, subject to all the same constraints to which it is subject.” But even

assuming that is a universal common-law rule, such rules “may be abrogated by

statute” so long as a statute does so “either expressly or by necessary implication.”55

It is impossible to read RWE as falling short of doing precisely that here.

Aspire failed to allege facts affirmatively demonstrating jurisdiction over its

claims seeking a declaration that ERCOT-adopted and PUC-approved ECRS

protocols are invalid and void.

III. Ultra Vires

Aspire also alleged that the PUC’s Commissioners acted ultra vires by

allowing ERCOT to adopt protocols that (1) pay generators to withhold part of their

capacity as reserves, and (2) authorize ERCOT to adopt a new “ancillary service” in

52

Id.

53

See TEX. UTIL. CODE § 39.151(g-6).

54

See 691 S.W.3d at 490–92.

55

Taylor v. Tolbert, 644 S.W.3d 637, 649 (Tex. 2022).

12

the form of ECRS. “Plaintiffs who seek to bypass sovereign immunity using an ultra

vires claim must plead, and ultimately prove, that the defendant government official

acted without legal authority or failed to perform a ministerial act.”56 Aspire alleged

the former. “An officer acts without legal authority if he exceeds the bounds of his

granted authority or if his acts conflict with the law itself.”57 But if “the actions

alleged to be ultra vires were not truly outside the officer’s authority or in conflict

with the law, the plaintiff has not stated a valid ultra vires claim and therefore has

not bypassed sovereign immunity.”58

For twenty years PURA § 39.151 has required the PUC to “adopt and enforce

rules relating to the reliability of the regional electrical network,” and in its

discretion to “delegate those responsibilities to an independent organization” like

ERCOT.59 Doing precisely what PURA authorized the PUC to do cannot be ultra

vires.

Aspire specifically complains that the PUC’s Commissioners acted ultra vires

because ECRS allows market participants to withhold power in violation of PURA

§ 39.157(a), which defines “market power abuses” to include “predatory pricing,

withholding of production, precluding entry, and collusion.60 But PURA also

requires the PUC to ensure that ERCOT meets the reliability needs of the power

56

Matzen v. McLane, 659 S.W.3d 381, 388 (Tex. 2021); City of El Paso v. Heinrich, 284

S.W.3d 366, 373 (Tex. 2009) (confirming that ultra vires suits proceed against government actors

in their official capacity).

57

Matzen, 659 S.W.3d at 388.

58

Id.

59

See Act of May 29, 2005, 79th Leg., R.S., ch. 797, § 8, 2005 Tex. Gen. Laws 2728, 2729–

30.

60

TEX. UTIL. CODE § 39.157(a) (emphasis added). Section 39.157(a) directs the PUC to

“monitor market power associated with the generation, transmission, distribution, and sale of

electricity” and, upon finding that “market power abuses” are occurring, to “require reasonable

mitigation” and pursue appropriate remedies. Id.

13

region, and to prepare for extreme weather conditions by procuring “ancillary or

reliability services,” such as “standby power” and “backup power” as needed.61 To

the extent system reliability requires standby or backup power for such emergencies,

such power must be withheld as standby or backup; as the Supreme Court recognized

in 2024, deciding when circumstances require withholding power to ensure

reliability “is the Commission’s job, not the judiciary’s.”62

Finally, Aspire also alleged that the PUC’s Commissioners acted ultra vires

by authorizing ERCOT to create ECRS because PURA § 35.004(e) authorizes only

the PUC to establish new Ancillary Services. But § 35.004(e) is merely a

nonexclusive definition of “ancillary services” that allows the PUC to add by rule

“any other services [it] may determine” should be included in the meaning of that

term.63 The provision does not prohibit the PUC from delegating to ERCOT the

responsibility to adopt rules for additional Ancillary Services programs.64 Ancillary

Services are a tool used to ensure grid reliability, and PURA expressly directs

ERCOT to procure them.65

IV. PUC Exclusive Jurisdiction

Even if neither the PUC nor ERCOT were protected by sovereign immunity,

the district court would have no jurisdiction for an additional reason: the PUC’s

jurisdiction is exclusive and Aspire failed to exhaust its administrative remedies.

“A statute may grant an agency exclusive jurisdiction … by establishing a

pervasive regulatory scheme that impliedly indicates that the Legislature intended

61

Id. § 39.159(b); see id. § 35.004(e).

62

PUC v. Luminant Energy Co., 691 S.W.3d 448, 463 (Tex. 2024).

63

TEX. UTIL. CODE § 35.004(e).

64

See id. §§ 39.151(d), 39.159(d).

65

See id. § 39.159(b)(3), (d).

14

for the regulatory process to be the exclusive means of remedying the problem to

which the regulation is addressed.”66 If exclusive jurisdiction is established, “the

claimant must pursue and exhaust all available administrative remedies before

turning to the courts.”67

“Section 39.151’s grant of extensive authority to the PUC over ERCOT and

its detailed regulation of the particulars of ERCOT’s functions constitute a pervasive

regulatory scheme.”68 The PUC therefore has exclusive jurisdiction so long as

Aspire’s declaratory and ultra vires claims “fall within that jurisdictional scope.”69

Aspire’s claims do because they are directed at ERCOT’s protocols relating to its

statutory obligations to ensure a reliable grid through the development and

implementation of Ancillary Services.70 It was therefore incumbent upon Aspire to

follow the “process for review of ERCOT protocols” contained in the PUC’s rules:

pursing alternative dispute resolution with ERCOT,71 then filing a complaint with

the PUC,72 and then filing a suit for judicial review under the substantial evidence

rule.73 RWE, 691 S.W.3d at 492 n.11. But Aspire “did not engage in that process,”

id., and so it failed to exhaust its administrative remedies, depriving the district court

66

CPS Energy, 671 S.W.3d at 617.

67

Id. at 617–18; see Hensley v. State Comm’n on Jud. Conduct, 692 S.W.3d 184, 194 (Tex.

2024) (“If the agency has exclusive jurisdiction over a particular issue, a trial court lacks

jurisdiction over a claim involving that issue until the claimant has exhausted all available

administrative remedies.”).

68

CPS Energy, 671 S.W.3d at 618.

69

Id. at 617.

70

See TEX. UTIL. CODE § 39.159(b), (d).

71

See 16 TEX. ADMIN. CODE §§ 22.251(d) (“An affected entity must attempt to challenge or

modify ERCOT conduct using the Applicable ERCOT Procedures before filing a complaint with

the [PUC].”); ERCOT, Nodal Protocols § 20.1 (Alternative Dispute Resolution).

72

See 16 TEX. ADMIN. CODE §§ 22.251, 25.362(c)(5).

73

See TEX. UTIL. CODE § 15.001.

15

of jurisdiction.

Aspire argues that it did not have to follow the procedure for reviewing

ERCOT protocols because APA § 2001.038(d) dispenses with the exhaustion

requirement when a plaintiff seeks a declaration challenging the validity of a rule.74

But we held above that the ERCOT-adopted protocols establishing ECRS are not

PUC-adopted rules under the APA. Therefore, § 2001.038(d)’s exception does not

apply here.

CONCLUSION

We affirm the trial court’s orders granting the PUC’s and ERCOT’s pleas to

the jurisdiction.

/s/ Scott A. Brister

Scott A. Brister

Chief Justice

Before Chief Justice Brister and Justices Field and Farris.

74

See TEX. GOV’T CODE § 2001.038(d) (“A court may render a declaratory judgment without

regard to whether the plaintiff requested the state agency to rule on the validity or applicability of

the rule in question.”).

16