Opinion

Solis-Santos v. Lester

Court
Court of Appeals of North Carolina
Filed
Nov 5, 2025
Status
Published
Author
Judge Valerie Zachary
Cited by
0 cases
Authority
More cited than 36.6%

“The vital test is to be found in the fact that the employer has or has not retained the right of control or superintendence over the contractor or employee as to details.”

How later courts described this case

  • “The vital test is to be found in the fact that the employer has or has not retained the right of control or superintendence over the contractor or employee as to details.”
  • where the express contract stated that “temporary employees are not employees of the [special employer]”

Written by the judges who cited it.

The opinion

IN THE COURT OF APPEALS OF NORTH CAROLINA

No. COA25-7

Filed 5 November 2025

Forsyth County, No. 23CV002488-330

GUADALUPE SOLIS-SANTOS, Plaintiff,

v.

JAMES THOMAS LESTER III AND PRIME DEMOLITION AND CONTRACTING,

LLC, Defendants.

Appeal by plaintiff from order entered 6 September 2024 by Judge David L.

Hall in Forsyth County Superior Court. Heard in the Court of Appeals 12 August

2025.

A.G. Linett & Associates, PA, by Adam G. Linett and Eliu F. Mendez, and Hill,

Peterson, Carper, Bee & Deitzler, PLLC, by C. Michael Bee, pro hac vice, for

plaintiff-appellant.

McAngus Goudelock & Courie, PLLC, by Luke A. Dalton, for defendants-

appellees.

ZACHARY, Judge.

Plaintiff Guadalupe Solis-Santos appeals from the trial court’s order granting

Defendants James Thomas Lester, III, and Prime Demolition and Contracting, LLC’s

motion to dismiss Plaintiff’s amended complaint with prejudice pursuant to N.C. R.

Civ. P. 12(b)(1) for lack of subject-matter jurisdiction. We conclude that the trial court

properly determined that the Workers’ Compensation Act provided the exclusive

remedy for Plaintiff’s workplace injuries, thereby depriving the court of subject-

SOLIS-SANTOS V. LESTER

Opinion of the Court

matter jurisdiction over Plaintiff’s civil claims. However, the court erred by

dismissing Plaintiff’s amended complaint with prejudice. After careful review, we

affirm in part but vacate that portion of the trial court’s order dismissing Plaintiff’s

amended complaint with prejudice and remand for entry of an order dismissing

Plaintiff’s amended complaint without prejudice.

I. Background

Global Environmental Control III, Inc. (“Global”) is a staffing company that

provides temporary workers with skilled-labor specialties to other companies. Prime

Demolition and Contracting, LLC (“Prime Demolition”) is a company that focuses on

structural demolition and interior strip-outs.

In November 2019, Global and Prime Demolition entered into a General

Staffing Agreement (“the Staffing Agreement”) pursuant to which Global would

provide Prime Demolition with skilled temporary employees upon request. The

Staffing Agreement provided, inter alia, that Global would assign employees to Prime

Demolition; pay the assigned employees’ wages and provide benefits; and “handle

unemployment and workers’ compensation claims involving [a]ssigned [e]mployees.”

Prime Demolition would “[p]roperly supervise [a]ssigned [e]mployees performing its

work” and “[p]roperly supervise, control, and safeguard its premises, processes, or

systems.”

In 2021, a third party contracted with Prime Demolition for a project that

involved conducting an interior strip-out of a former skating rink in order to convert

-2-

SOLIS-SANTOS V. LESTER

Opinion of the Court

it to a school. To meet its labor needs, Prime Demolition requested temporary workers

from Global to assist in the requisite demolition work. In response to the request,

Global directed multiple employees—including Plaintiff—to the Prime Demolition

project site. Plaintiff is certified in demolition work and asbestos removal.

On 8 March 2021, while working at the job site, Plaintiff was instructed to

assist in transporting a tall metal light tower that an electrician had left on the

skating-rink floor. Prime Demolition employee James Thomas Lester, III, used a skid

steer to move the light tower while Plaintiff held the light tower steady. As Lester

slowly moved the light tower forward, Plaintiff released his grip on it to move some

cables on the floor. The light tower then toppled from the skid steer. The light tower

hit Plaintiff on his head and left side, knocking him to the ground. Plaintiff suffered

serious injuries and sought medical care.

On 25 October 2021, the North Carolina Industrial Commission approved the

settlement agreement resolving Plaintiff’s workers’ compensation claim against

Global for $67,500.

On 17 May 2023, Plaintiff filed a complaint against Prime Demolition and

Defendant Johnny Welker alleging negligence; gross negligence; negligent hiring,

supervision, or retention; and a Pleasant claim. On 27 July 2023, Johnny Welker and

Prime Demolition each filed an answer. In September 2023, Plaintiff filed a motion

for leave to amend his complaint to name James Thomas Lester, III, as a defendant,

to remove Johnny Welker as a defendant, and to correct the address at which the

-3-

SOLIS-SANTOS V. LESTER

Opinion of the Court

incident occurred. The trial court entered a consent order on 28 September 2023

granting Plaintiff’s motion and Plaintiff filed his amended complaint the next day.

Prime Demolition and Defendant James Thomas Lester, III, each filed an

answer to Plaintiff’s amended complaint on 8 November 2023. On 21 December 2023,

Plaintiff voluntarily dismissed his complaint against Johnny Welker.

On 13 August 2024, Defendants filed a motion to dismiss Plaintiff’s amended

complaint pursuant to N.C. R. Civ. P. 12(b)(1) for lack of subject-matter jurisdiction

“due to the exclusivity of the North Carolina Workers Compensation Act.” The motion

to dismiss came on for hearing in Forsyth County Superior Court on 19 August 2024.

On 6 September 2024, the trial court entered an order granting Defendants’ motion

to dismiss and dismissing Plaintiff’s amended complaint with prejudice.

Plaintiff timely filed notice of appeal.

II. Discussion

Plaintiff argues that the trial court erred by granting Defendants’ Rule 12(b)(1)

motion to dismiss for lack of subject-matter jurisdiction. Plaintiff contends that his

claims are not barred by the exclusivity provision of the Workers’ Compensation Act

in that he was not an employee of Prime Demolition; he was not a coworker of Lester;

and even if he were, Lester engaged in willful, wanton, or reckless conduct at the job

site, causing Plaintiff’s injuries and entitling him to pursue his Pleasant claim. We

disagree.

A. Standard of Review

-4-

SOLIS-SANTOS V. LESTER

Opinion of the Court

“An appellate court’s review of an order of the trial court denying or allowing

a Rule 12(b)(1) motion is de novo, except to the extent the trial court resolve[d] issues

of fact, and those findings are binding on the appellate court if supported by

competent evidence in the record.” Cunningham v. Selman, 201 N.C. App. 270, 280,

689 S.E.2d 517, 524 (2009) (cleaned up).

“Unlike a Rule 12(b)(6) dismissal, the court need not confine its evaluation of

a Rule 12(b)(1) motion to the face of the pleadings, but may review or accept any

evidence, such as affidavits, or it may hold an evidentiary hearing.” Bassiri v. Pilling,

287 N.C. App. 538, 543, 884 S.E.2d 165, 169 (2023) (citation omitted). “Also, unlike a

Rule 12(b)(6) motion, consideration of matters outside the pleadings does not convert

the Rule 12(b)(1) motion to one for summary judgment.” Id. at 543–44, 884 S.E.2d at

169 (cleaned up).

B. Special-Employee Doctrine

Plaintiff first argues that “the trial court erred in granting Defendants’ motion

to dismiss for lack of subject[-]matter jurisdiction in finding that [he] was an

employee of Defendant Prime Demolition,” thereby limiting Plaintiff’s remedies to

those provided under the Workers’ Compensation Act.

“The issue of whether [a] plaintiff’s claim is barred by the Workers’

Compensation Act is a question of subject[-]matter jurisdiction.” McAllister v. Cone

Mills Corp., 88 N.C. App. 577, 579, 364 S.E.2d 186, 188 (1988). As our Supreme Court

has noted, “[t]he [s]uperior [c]ourt is a court of general jurisdiction and has

-5-

SOLIS-SANTOS V. LESTER

Opinion of the Court

jurisdiction in all actions for personal injuries caused by negligence, except where its

jurisdiction is divested by statute.” Morse v. Curtis, 276 N.C. 371, 374–75, 172 S.E.2d

495, 498 (1970); see also N.C. Gen. Stat. § 7A-240 (2023). “By statute the [s]uperior

[c]ourt is divested of original jurisdiction of all actions which come within the

provisions of the [Workers’] Compensation Act.” Morse, 276 N.C. at 375, 172 S.E.2d

at 498. Thus, “[i]n general, the provisions of the Workers’ Compensation Act are the

exclusive remedy in the event of an employee’s injury by accident in connection with

his or her employment.” Fagundes v. Ammons Dev. Grp., Inc., 251 N.C. App. 735, 737,

796 S.E.2d 529, 532 (cleaned up), disc. review denied, 370 N.C. 66, 803 S.E.2d 626

(2017); see also N.C. Gen. Stat. § 97-10.1.

The Act defines the term “employee” as including “every person engaged in an

employment under any appointment or contract of hire or apprenticeship, express or

implied, oral or written.” N.C. Gen. Stat. § 97-2(2). Our Court has determined that

“special employees” may be treated the same as workers who meet the Act’s definition

of “employee.” Collins v. James Paul Edwards, Inc., 21 N.C. App. 455, 459, 204 S.E.2d

873, 876–77, cert. denied, 285 N.C. 589, 206 S.E.2d 862 (1974). As such, special

employees and employees are similarly subject to the jurisdictional limitations of the

Act’s exclusivity provision. Id.

Under the special-employee doctrine, “a general employee of one [employer]

can also be the special employee of another [employer] while doing the latter’s work

and under his control.” Brown v. Friday Servs., Inc., 119 N.C. App. 753, 759, 460

-6-

SOLIS-SANTOS V. LESTER

Opinion of the Court

S.E.2d 356, 360 (citation omitted), disc. review denied, 342 N.C. 191, 463 S.E.2d 234

(1995). The employer and special employer then have joint liability under the Act,

which “provides the plaintiff-employee with two separate potential sources of

workers’ compensation benefits. However, under the special employment doctrine,

the employee’s receipt of workers’ compensation benefits from either employer bars

the employee from proceeding at common law against either of the employers.” Taft

v. Brinley’s Grading Servs., Inc., 225 N.C. App. 502, 506, 738 S.E.2d 741, 744 (2013)

(citations omitted).

Our Court has applied the three-prong Collins test for determining whether a

worker is a special employee under the employ of a special employer:

(a) the employee has made a contract of hire, express or

implied, with the special employer;

(b) the work being done is essentially that of the special

employer; and

(c) the special employer has the right to control the

details of the work.

Whicker v. Compass Grp. USA, Inc., 246 N.C. App. 791, 797, 784 S.E.2d 564, 569,

disc. review denied, 369 N.C. 69, 793 S.E.2d 228 (2016); see also Collins, 21 N.C. App.

at 459, 204 S.E.2d at 876.

In the present case, Plaintiff asserts that “[u]nder the facts of this particular

case, particularly in light of the detailed [Staffing Agreement], it is clear that Prime

[Demolition] cannot claim the exclusivity provisions of the [Workers’ Compensation]

-7-

SOLIS-SANTOS V. LESTER

Opinion of the Court

Act as [Plaintiff’s] ‘special employer.’ ” We disagree.

1. First Prong of the Collins Test: Express or Implied Contract

“As our Supreme Court has observed, employment . . . is a matter of contract.”

Shelton v. Steelcase, Inc., 197 N.C. App. 404, 413, 677 S.E.2d 485, 493 (cleaned up),

disc. review denied, 363 N.C. 583, 682 S.E.2d 389 (2009). In the case at bar, it is

undisputed that there was no express contract of hire between Plaintiff and Prime

Demolition. Accordingly, the issue is limited at this juncture to whether there was an

implied contract of hire between Plaintiff and Prime Demolition.

“An implied contract refers to an actual contract inferred from the

circumstances, conduct, acts or relations of the parties, showing a tacit

understanding.” Whicker, 246 N.C. App. at 798, 784 S.E.2d at 570 (citation omitted).

This Court has concluded that an implied contract existed between an employee and

a special employer where the employee “accepted the assignment from [the temporary

employment agency] and performed the work at the direction and under the

supervision of [the special employer].” Brown, 119 N.C. App. at 760, 460 S.E.2d at

360.

Here, Plaintiff maintains that the Staffing Agreement supports his contention

that he was not a special employee of Prime Demolition. However, in the cases cited

by Plaintiff, the contracts expressly provided that the worker in question was

employed solely by the general employer. See Taft, 225 N.C. App. at 508, 738 S.E.2d

at 745–46 (where the express contract stated that “all of the personnel assigned by

-8-

SOLIS-SANTOS V. LESTER

Opinion of the Court

[the general employer] to [the special employer]’s business in order to fill the relevant

job positions are employees of [the general employer] and only [the general employer]”

and the president of the special employer “conceded that, pursuant to the [express

contract], [the plaintiff] was solely an employee of [the general employer]”); Gregory

v. Pearson, 224 N.C. App. 580, 586, 736 S.E.2d 577, 581 (2012) (where the express

contract stated that “temporary employees are not employees of the [special

employer]”), aff’d and ordered not precedential, 367 N.C. 315, 754 S.E.2d 416 (2014)1;

and Shelton, 197 N.C. App. at 412, 677 S.E.2d at 492 (where the express contract

between the general employer and special employer stated that workers “will be

employees of the [general employer]” and the “record contain[ed] extensive evidence

from various witnesses, including [the special employer]’s Human Resources

Manager, identifying [the plaintiff] as an employee of [the general employer] and not

an employee of [the special employer]”).

In the instant case, there is no contractual provision declaring that Plaintiff

was solely the employee of Global. The Staffing Agreement did not expressly retain

the temporary employees as Global’s employees or preclude them from also being

employed by Prime Demolition. Plaintiff accepted an assignment to work for and

under the supervision of Prime Demolition. Consequently, there was competent

1 We note that, in addition to Gregory’s factual inapplicability to the case before us, our

Supreme Court has held that the decision in Gregory “stands without precedential value.” Gregory v.

Pearson, 367 N.C. 315, 316, 754 S.E.2d 416, 416 (2014). Plaintiff’s reliance upon Gregory is thus wholly

inapposite.

-9-

SOLIS-SANTOS V. LESTER

Opinion of the Court

evidence supporting the trial court’s finding that an implied contract existed between

Plaintiff and Prime Demolition.

Moreover, the record contains ample other evidence that Plaintiff and Prime

Demolition had an implied employment contract. The owner/managing member of

Prime Demolition provided an affidavit in which he stated: “On March 8, 2021,

Plaintiff was performing work for Prime [Demolition] at the Project pursuant to an

implied contract with Prime” Demolition. Additionally, in a deposition, Prime

Demolition’s owner/managing member answered affirmatively when asked: “Did you

have any type of implied contract with [Plaintiff]?” and again confirmed that “Prime

[Demolition] had [an] implied contract with [P]laintiff . . . on those days for that

work.”

Accordingly, we conclude that there was competent evidence to support the

trial court’s finding that “Plaintiff performed work for Prime [Demolition] at the

Project pursuant to an implied contract with Prime” Demolition.

2. Second Prong of the Collins Test: Type of Work

The second prong of the Collins test requires that “the work being done is

essentially that of the special employer.” Collins, 21 N.C. App. at 459, 204 S.E.2d at

876 (citation omitted). Here, it is uncontested that Plaintiff was injured while

working for Prime Demolition at the Prime Demolition job site. Thus, the second

prong of the Collins test was satisfied as regards Plaintiff’s special-employee status.

3. Third Prong of the Collins Test: Control Over Work

- 10 -

SOLIS-SANTOS V. LESTER

Opinion of the Court

Plaintiff next contends that Prime Demolition’s “limited supervision” of him

was “insufficient” to meet the third prong of the Collins test.

As stated above, the third prong of the Collins test is whether “the special

employer has the right to control the details of the work.” Whicker, 246 N.C. App. at

797, 784 S.E.2d at 569 (citation omitted). “This Court has stressed that the third

prong, control of the detail of the work, may be the most significant.” Shelton, 197

N.C. App. at 412, 677 S.E.2d at 492 (cleaned up); see also Hayes v. Bd. of Trs. of Elon

College, 224 N.C. 11, 15, 29 S.E.2d 137, 140 (1944) (“The vital test is to be found in

the fact that the employer has or has not retained the right of control or

superintendence over the contractor or employee as to details.”).

The Staffing Agreement provided that Prime Demolition would:

a. Properly supervise [a]ssigned [e]mployees performing

its work and be responsible for its business operations,

products, services, and intellectual property;

b. Properly supervise, control, and safeguard its premises,

processes, or systems, and not permit [a]ssigned

[e]mployees to operate any vehicle or mobile equipment,

or entrust them with unattended premises, cash,

checks, keys, credit cards, merchandise, confidential or

trade secret information, negotiable instruments, or

other valuables without [Global]’s express prior written

approval or as strictly required by the job description

provided to [Global];

c. Provide [a]ssigned [e]mployees with a safe work site

and provide appropriate information, training, and

safety equipment with respect to any hazardous

substances or conditions to which they may be exposed

at the work site.

- 11 -

SOLIS-SANTOS V. LESTER

Opinion of the Court

A former Global office manager explained that Prime Demolition had control

over Plaintiff while he was at Prime Demolition’s job site:

Q. Once a worker is sent to the client, to the job site, does

that -- let’s talk about Prime [Demolition]. Does Prime

[Demolition] then have control in managing that worker,

dictating what work is done, directing that worker to do

certain job responsibilities?

....

[A.] Yes, sir.

Q. Does Global have any say in what work is done at a

specific job site?

....

[A.] No.

Q. Okay. So, to be clear, [Plaintiff] was sent to the job site

where Prime [Demolition] was working to do demo work,

correct?

A. Yes, sir.

Q. Okay. When he was sent, did Global direct [Plaintiff] to

do any specific demo work that day?

A. No, sir.

Q. Did Global direct [Plaintiff] to do any type of demo work

anywhere on that job site?

A. No, sir.

Q. The direction, control, and supervision would have been

by Prime [Demolition] to do that demo work at the job site?

- 12 -

SOLIS-SANTOS V. LESTER

Opinion of the Court

A. Yes, sir.

....

Q. Was it Global’s understanding that once the worker was

sent to a job site that the client, such as Prime

[Demolition], would have direct control and supervision

over that employee while that worker was doing the

specific type of work they were looking for?

....

[A.] Yes, sir.

....

Q. Since you had worked with Prime [Demolition] before

while at Global, did you trust that Prime [Demolition] was

properly supervising, controlling, directing the employees

to do the proper work that they were retained to do or

staffed to do?

....

[A.] Yes, sir.

(Emphases added).

The owner/managing member of Prime Demolition testified at a deposition

that Plaintiff “was just sent from Global as a laborer that we could use at our control

or direction” and clarified that while Prime Demolition could not fire Plaintiff from

Global, it “had the authority to control [its] particular job sites.” (Emphases added).

When asked whether “Prime [Demolition] had the ability to control the details of

[Plaintiff]’s work,” the owner/managing member responded: “Correct.” (Emphasis

added). The owner/managing member of Prime Demolition also stated in an affidavit

- 13 -

SOLIS-SANTOS V. LESTER

Opinion of the Court

that Plaintiff was loaned to Prime Demolition “to perform demolition work for Prime

[Demolition] at the Project under [Prime Demolition]’s direction and control.”

(Emphasis added). At her deposition, Plaintiff’s wife confirmed that she and her

husband were “acting under the supervision and control of Prime Demolition” on 8

March 2021. (Emphasis added).

Here, there was plentiful evidence that the third prong of the Collins test was

satisfied—that Prime Demolition had “the right to control the details of the work”

that Plaintiff performed. Whicker, 246 N.C. App. at 797, 784 S.E.2d at 569 (citation

omitted). Accordingly, we conclude that the third prong of the Collins test was

satisfied, and the trial court did not err in its findings that Plaintiff performed his

work on 8 March 2021 under Prime Demolition’s control.

Having satisfied the three prongs of the Collins test, we conclude that the

court’s findings of fact as to Prime Demolition’s special-employer status are supported

by competent evidence of record. The trial court did not err in determining that

“Prime [Demolition] was Plaintiff’s special employer,” or that Plaintiff’s remedies

were limited to those provided by the Workers’ Compensation Act. Therefore, the trial

court lacked subject-matter jurisdiction over Plaintiff’s claims against Prime

Demolition.

C. Claims Against Coworker

Plaintiff also argues that “the trial court erred in dismissing [his] claims

- 14 -

SOLIS-SANTOS V. LESTER

Opinion of the Court

against Defendant James Thomas Lester III.”2 Plaintiff first contends that because

Prime Demolition was not his employer, Lester was not his co-employee and hence,

Plaintiff’s “negligence claims against . . . Lester were improperly dismissed.” In the

alternative, Plaintiff contends that if he and Lester were co-employees, the court

erred by dismissing Plaintiff’s Pleasant claim against Lester. We disagree.

To begin, the trial court properly determined that Prime Demolition was

Plaintiff’s special employer. There is no dispute that Lester was an employee of Prime

Demolition. Thus, Plaintiff and Lester were co-employees when Plaintiff was injured

at the Prime Demolition job site and Plaintiff’s remedies were limited to those

provided by the Workers’ Compensation Act unless he could sufficiently allege a

Pleasant claim.

Generally, the Workers’ Compensation Act provides the exclusive remedy for

an injured worker’s workplace injuries. Fagundes, 251 N.C. App. at 737, 796 S.E.2d

at 532. One “exception arises when a co-employee acts in a willful, wanton, and

reckless manner”; in such cases, “an injured plaintiff [may] seek recovery from the

co-employee in a common law action.” Trivette v. Yount, 366 N.C. 303, 306, 735 S.E.2d

306, 308 (2012) (citing Pleasant v. Johnson, 312 N.C. 710, 716–17, 325 S.E.2d 244,

2 In his amended complaint, Plaintiff also brought a Pleasant claim against Prime Demolition,

asserting that Lester “engaged in willful, wanton, and reckless conduct” and that “his actions are

therefore imputed to Defendant [Prime Demolition] under the principles of agency and the theory of

respondeat superior.” However, Plaintiff does not challenge the trial court’s dismissal of his Pleasant

claim against Prime Demolition on appeal. Accordingly, any Pleasant claim against Prime Demolition

is abandoned and will not be addressed. See N.C.R. App. P. 28(b)(6) (“Issues not presented in a party’s

brief, or in support of which no reason or argument is stated, will be taken as abandoned.”).

- 15 -

SOLIS-SANTOS V. LESTER

Opinion of the Court

249–50 (1985)). However, a plaintiff “must clear a high bar in alleging and proving

such a claim.” Est. of Baker v. Reinhardt, 288 N.C. App. 529, 536, 887 S.E.2d 437, 444

(2023) (cleaned up).

In Pleasant, the plaintiff and the defendant were employees of the same

company. 312 N.C. at 711, 325 S.E.2d at 246. One day, as the plaintiff was walking

across a parking lot toward the employer’s job site, a truck driven by the defendant

struck the plaintiff and seriously injured his right knee. Id. The plaintiff received

disability benefits under the Workers’ Compensation Act and then filed an action

against the defendant, claiming that his co-employee was “willfully, recklessly and

wantonly negligent” in causing the plaintiff’s injuries. Id. Our Supreme Court held:

“[T]he Workers’ Compensation Act does not shield a co-employee from liability for

injury caused by his willful, wanton and reckless negligence.” Id. at 717, 325 S.E.2d

at 249. The Court defined “wanton” and “reckless” conduct as that which “manifest[s]

a reckless disregard for the rights and safety of others” and “willful negligence” as

“the intentional failure to carry out some duty imposed by law or contract which is

necessary to the safety of the person or property to which it is owed.” Id. at 714, 325

S.E.2d at 248.

“The burden of proof is heavy on a plaintiff who seeks to recover under

Pleasant. Even unquestionably negligent behavior rarely meets the high standard of

‘willful, wanton and reckless’ negligence established in Pleasant.” Fagundes, 251 N.C.

App. at 740, 796 S.E.2d at 534 (cleaned up). “In short, the negligence exhibited must

- 16 -

SOLIS-SANTOS V. LESTER

Opinion of the Court

be so gross as to be ‘equivalent in spirit to actual intent.’ ” Baker, 288 N.C. App. at

536, 887 S.E.2d at 443 (cleaned up).

In the case before us, Plaintiff and Lester were both working for Prime

Demolition at the job site on 8 March 2021. Plaintiff was directed to assist in moving

a metal light tower. While Plaintiff steadied the light tower, Lester used a skid steer

to lift it. As Lester slowly moved the light tower forward, Plaintiff released his hold

on the tower to move some cables on the floor. The light tower then fell and struck

Plaintiff on his head and the left side of his body. Plaintiff was knocked to the ground

and suffered serious injuries.

Essentially, Plaintiff’s purported Pleasant claim sounds in negligence, and

thus fails to rise to the level of a Pleasant claim. Plaintiff presents the following as

evidence of Lester’s willful, wanton, and reckless negligence: 1) Lester admitted that

he had never read the operating manual for the skid steer, “he was not given any

instruction on its operation, and he had not watched any training videos regarding

its operation”; 2) “Lester stated that formal training classes in skid steer operations

are not required”; 3) the only training that Lester received for operating a skid steer

“was on-the-job training”; and 4) Lester was not provided guidelines or procedures on

securing a load to the skid steer and admitted that he did not secure the metal light

tower before moving it.

But “[e]ven if we take this evidence, accurately described, in the light most

favorable to Plaintiff, it falls short of showing negligence so egregious as to be

- 17 -

SOLIS-SANTOS V. LESTER

Opinion of the Court

equivalent in spirit to actual intent.” Id. at 541, 887 S.E.2d at 446 (cleaned up).

Plaintiff presents no evidence that Lester was aware of any danger posed by moving

the metal light tower with the skid steer, and even if he had presented such evidence,

“[k]nowledge of a dangerous hazard, standing alone, does not establish a viable claim

under Pleasant.” Id. at 542, 887 S.E.2d at 447. Hence, the Act provides the exclusive

remedy for Plaintiff’s civil claims, and “the trial court did not err by dismissing

Plaintiff’s claim[s] . . . for lack of subject[-]matter jurisdiction.” Cunningham, 201

N.C. App. at 288–89, 689 S.E.2d at 529.

D. Dismissal with Prejudice

The trial court properly dismissed Plaintiff’s amended complaint for lack of

subject-matter jurisdiction pursuant to Rule 12(b)(1). However, as our Supreme

Court has explained, “when a complaint is dismissed for lack of subject[-]matter

jurisdiction, that decision does not result in a final judgment on the merits and does

not bar further action by the plaintiff on the same claim.” United Daughters of the

Confederacy, N.C. Div. v. City of Winston-Salem, 383 N.C. 612, 650, 881 S.E.2d 32,

60 (2022). Accordingly, “a dismissal under Rule 12(b)(1) must be made without

prejudice, since a trial court without jurisdiction would lack authority to adjudicate

the matter.” Holton v. Holton, 258 N.C. App. 408, 415, 813 S.E.2d 649, 655 (2018).

In the present case, the trial court dismissed the amended complaint on the

basis of its determination that, because the Workers’ Compensation Act provided the

exclusive remedy for Plaintiff’s claims, the court lacked jurisdiction over the subject

- 18 -

SOLIS-SANTOS V. LESTER

Opinion of the Court

matter of Plaintiff's claims. “[H]aving properly determined that it lacked subject-

matter jurisdiction over the matter, the trial court should have dismissed the matter

without prejudice pursuant to Rule 12(b)(1).” Pugh v. Howard, 288 N.C. App. 576,

588, 887 S.E.2d 734, 744 (2023). “As a result, we vacate the portion of the trial court’s

order dismissing the amended complaint with prejudice and remand this case to

Superior Court, Forsyth County, with instructions to dismiss the amended complaint

without, rather than with, prejudice.” United Daughters of the Confederacy, 383 N.C.

at 650, 881 S.E.2d at 60.

III. Conclusion

For the foregoing reasons, we conclude that the trial court properly dismissed

Plaintiff’s amended complaint pursuant to Rule 12(b)(1) but erred by dismissing

Plaintiff’s amended complaint with prejudice. We therefore affirm in part but vacate

that portion of the trial court’s order dismissing the amended complaint with

prejudice and remand for entry of an order dismissing the amended complaint

without prejudice.

AFFIRMED IN PART; VACATED IN PART AND REMANDED.

Judges HAMPSON and MURRY concur.

- 19 -