Opinion

Volvo Construction Equipment, LLC v. PacWest Machinery, LLC

Court
District Court, M.D. Pennsylvania
Filed
Jul 15, 2025
Cited by
0 cases
Authority
More cited than 37.8%

“[A] reviewing court will decline to sustain an award ‘only in the rarest case.’”

How later courts described this case

  • “[A] reviewing court will decline to sustain an award ‘only in the rarest case.’”
  • “[F]or the parol evidence rule to apply, there must be a writing that represents the ‘entire contract between the parties.’”
  • reading two contracts together despite an integration clause in the later-executed contract
  • “Whether a writing is an integrated agreement, and if so, whether the agreement is completely or partially integrated, are questions to be decided by the court prior to application of the parol evidence rule.”

Written by the judges who cited it.

The opinion

IN THE UNITED STATES DISTRICT COURT

FOR THE MIDDLE DISTRICT OF PENNSYLVANIA

VOLVO CONSTRUCTION : Civil No. 1:24-CV-01847

EQUIPMENT, LLC, :

:

Plaintiff, :

:

v. :

:

PACWEST MACHINERY, LLC, :

:

Defendant. : Judge Jennifer P. Wilson

MEMORANDUM

Plaintiff, Volvo Construction Equipment, LLC (“Volvo”), and Defendant,

PacWest Machinery, LLC (“PacWest”), have been engaged in a years-long

contract dispute. That dispute now comes before this court following an extensive

arbitration proceeding in which PacWest was awarded over $15,000,000. Volvo

asks this court to vacate the arbitration award pursuant to 9 U.S.C. § 10(a)(4).

Volvo makes myriad arguments as to why the award is fatally flawed. However, it

is clear that Volvo’s arguments reflect nothing more than disagreement with the

arbitrators’ rulings. Much more is required to vacate an arbitration award.

Accordingly, the court will confirm the award.

BACKGROUND

The court gleans the facts of this matter from the arbitrators’ findings of fact

and draws all reasonable inferences therefrom. See United Paperworkers Int’l

Union v. Misco, Inc., 484 U.S. 29, 38 (1987) (“[A]n arbitrator must find facts and a

court may not reject those findings simply because it disagrees with them.”); Citgo

Asphalt Ref. Co. v. Paper, Allied-Indus., Chem., & Energy Workers Int’l Union

Loc. No. 2-991, 385 F.3d 809, 816 (3d Cir. 2004) (explaining that “a reviewing

court must defer to the arbitrator's factual findings.”)1

Volvo manufactures heavy construction equipment. It sells this equipment

through a network of dealers, who each have rights to specific territories. (See

Doc. 19, p. 8; Doc. 25, pp. 10–11.)2 In 2015, Joshua Green Corporation (“JGC”)

acquired Volvo’s authorized dealer responsible for the Pacific Northwest though a

newly created subsidiary called PacWest.3 (Doc. 25, p. 10.) Subsequently, on

December 17, 2015, Volvo entered into three identical agreements that appointed

PacWest the exclusive authorized dealer in Washington, Idaho, and Oregon,

respectively (collectively, “Dealer Agreement”). (Doc. 25, p. 3 n.3; see Doc. 19-

5.) The Dealer Agreement was negotiated during the same time period as a letter

agreement between the two parties (“Side Letter”), which was executed 9 days

before the Dealer Agreement, on December 8, 2015. (Doc. 19-51.)

1 The court infers these findings primarily from the two salient orders issued by the arbitrators.

(Docs. 19-3 & 19-20.) The court also looks to the undisputed facts in the parties’ submissions

for additional background. (Docs. 19 & 25.)

2 For ease of reference, the court uses the page numbers from the CM/ECF header.

3 PacWest was originally known as JGC DealerCo LLC. (See Doc. 19-5, p. 2.)

The Side Letter’s purpose was “to grant PacWest an opportunity to expand

its territory” in the future. (Doc. 19-20, p. 7.) To this end, paragraph 3 of the Side

Letter stated that if a dealer outside PacWest’s territories became for sale, then

Volvo would “make an introduction for the parties and make reasonable efforts to

offer [PacWest] a first opportunity to acquire the additional territory,” so long as

two conditions precedent were satisfied. (Doc. 19-51, p. 1.) First, PacWest could

not account for more than 15% of Volvo’s “new machine and part sales in North

America over a rolling three-year period.” (Id.) Second, PacWest had to be

“meeting a majority of the mutually agreed key performance metrics in its current

Territory.” (Id.) Paragraph 3 further specified that “[a]ny new Territory assigned

will require a new Dealer Agreement for that Territory, which terms shall be

similar to [PacWest’s] current Dealer Agreement(s).” (Id.)

PacWest initially considered expansion in January 2020 when it sent a letter

of potential acquisition terms to Tri-State Truck and Equipment (“Tri-State”),

Volvo’s dealer for Montana and Wyoming. (Doc. 19-3, p. 26; Doc. 25, p. 15.)

Those negotiations lapsed for some time due to the COVID-19 pandemic, but

recontinued in 2021. (Doc. 19-3, p. 26.) By November 2021, PacWest and Tri-

State had drafted a contribution and purchase agreement, and by December 2021,

PacWest proposed the acquisition to Volvo. (Id.; Doc. 19-20, p. 9.) A Volvo

executive initially stated he would do his best to obtain approval for the

transaction, so long as both PacWest’s market share in its current territory

continued to improve and PacWest signed Volvo’s new form dealer agreement.

(Doc. 19-20, p. 9.) Volvo had required all dealers seeking territorial expansion to

sign this new dealer agreement since it was developed in 2017. (Doc. 19-20, p. 9.)

PacWest did not accept the new dealer agreement as written. Instead, the

parties negotiated its terms between January and March 2022. (See id.) On March

22, 2022, Volvo sent what turned out to be its last proposal. (Id.) This proposal

had materially less favorable terms than the Dealer Agreement. (Id. at 12–13.)

PacWest presumably rejected the proposal, because two days later, Volvo told

PacWest that the Side Letter was invalid and superseded by the later-executed

Dealer Agreement. (Id. at 9.)

Seemingly undeterred, PacWest was also trying to acquire another dealer

around this same time. In April 2022, JGC executed a non-binding letter of intent

with potential acquiree Construction Machinery Industrial (“CMI”), Volvo’s dealer

in Alaska. (Doc. 19-3, p. 28.)4 CMI’s controlling owner initially wanted JGC to

own CMI and operate it independently from PacWest, but he later agreed to

structure the acquisition so that PacWest owned CMI. (Id.) While the letter of

intent contemplated a two-step acquisition, a later proposal of the deal involved a

4 The arbitration panel’s partial final award states that this letter of intent was signed on April 28,

2002. (Doc. 19-3, p. 28.) This date is plainly a typographical error.

one-time transaction through which PacWest would acquire 100% of CMI. (Id. at

29.)

Despite initial openness to PacWest’s expansion, Volvo ultimately decided

to nix the deals. In May 2022, Volvo filed a short-lived lawsuit in this court,

seeking a declaratory judgment that the Side Letter was invalid. Volvo Constr.

Equip. N. Am., LLC v. Pacwest Mach., LLC, No. 1:22-CV-00748 (M.D. Pa. filed

May 20, 2022). Volvo voluntarily dismissed the case only a couple of weeks after

filing it. Nevertheless, on August 29, 2022, Volvo sent letters to PacWest, Tri-

State, and CMI notifying each of them that Volvo was not approving either

acquisition. (Doc. 19-20, p. 10.) In its letter to PacWest, Volvo claimed that its

decision was justified by PacWest’s inability to maintain acceptable market share

in its territory and PacWest’s uncooperativeness with Volvo. (Id.)

Prolonged arbitration ensued before a panel of three arbitrators (“Panel”). A

majority of the Panel found that Volvo breached its obligations under the Side

Letter and consequently caused PacWest approximately $14.4 million in damages.

(Doc. 19-3, pp. 43–44.) The Panel’s reasoning for this ruling is contained in two

orders, “Order No. 3,” dated April 7, 2023 (Doc. 19-20), and the “Partial Final

Award,” dated September 25, 2024 (Doc. 19-3). After considering whether

PacWest was entitled to recover other costs, the Panel issued its final award on

January 30, 2025, which awarded PacWest a total award of $15,155,644.81. (Doc.

26-1, p. 14.)5 The final award adopted the holdings of Order No. 3 and the Partial

Final Award. (Id. at 13.)

Displeased with the Panel’s decisions, Volvo initiated the instant proceeding

on October 25, 2024, via a “petition for vacatur of arbitration award,” which

essentially takes the form of a complaint. (Doc. 1.)6 The court’s present task is to

resolve three motions: (1) Volvo’s amended motion to vacate the arbitration award

pursuant to 9 U.S.C. § 10(a)(4), Doc. 19; (2) PacWest’s cross-motion to confirm

the arbitration award, Doc. 24; and (3) PacWest’s motion for judgment on the final

arbitration award, Doc. 30.7 All motions are fully briefed and ripe for adjudication.

5 Volvo initiated this proceeding before the issuance of the final award because of ambiguity as

to whether the Partial Final Award triggered the three-month period within which Volvo would

have had to serve its motion to vacate. (Doc. 1, ¶ 2; Doc. 1-1, p. 3; see generally 9 U.S.C. § 12

(stating a motion to vacate must be served “within three months after the award is filed or

delivered).) Since the Panel has issued a final award, the court’s consideration of the parties’

motions at this time does not run afoul of the “‘complete arbitration rule,’ which mandates that

courts should not entertain a lawsuit challenging a[n] . . . arbitration award until it is final.”

Verizon Pa. LLC v. Commc’ns Workers of Am., 216 F. Supp. 3d 530, 531 (E.D. Pa. 2016).

6 The filing of this petition was procedurally improper. Proceedings under 9 U.S.C. § 10 are

“summary proceedings, which are shorn of certain formalities” otherwise present in civil

litigation, “such as pleadings.” PG Publ’g, Inc. v. Newspaper Guild of Pittsburgh, 19 F.4th 308,

313 (3d Cir. 2021). Accordingly, the Third Circuit has instructed that applications to vacate

made pursuant to 9 U.S.C. § 10 “are . . . to be made as motions.” Id. at 312. Accordingly, the

court need not consider Volvo’s “petition” in resolving this matter.

7 Volvo filed its initial motion to vacate and brief in support on October 25, 2024. (Doc. 5.)

Thereafter, the court permitted Volvo to file an amended motion to vacate and brief in support.

(Doc. 9.) Volvo filed its amended motion and brief in support on December 2, 2024. (Doc. 19.)

This amendment rendered the original motion inoperative, and the court considers it withdrawn.

See Rivera v. Dempsey, No. 22-CV-00233, 2024 WL 247070, at *2 (M.D. Pa. Jan. 23, 2024)

(“Because Plaintiff filed an amended motion, the Court treats his amended motion as the

operative motion and deems his original motion withdrawn.”).

JURISDICTION

This court has subject matter jurisdiction over Volvo’s motion to vacate

pursuant to 9 U.S.C. § 10.

STANDARD OF REVIEW

The Federal Arbitration Act permits a party to an arbitration to seek vacatur

of an arbitration award in federal court. 9 U.S.C. § 10. Vacatur of such an award,

however, is appropriate “only in very unusual circumstances.” Oxford Health

Plans LLC v. Sutter, 569 U.S. 564, 568 (2012) (quoting First Options of Chi., Inc.

v. Kaplan, 514 U.S. 938, 942 (1995)); accord Newark Morning Ledger Co. v.

Newark Typographical Union Loc. 103, 797 F.2d 162, 165 (3d Cir. 1986) (“[A]

reviewing court will decline to sustain an award ‘only in the rarest case.’”). The

exclusive grounds for vacating an award are enumerated in 9 U.S.C. § 10. Hall St.

Assocs., L.L.C. v. Mattel, Inc., 552 U.S. 576, 584 (2008). These grounds are:

(1) where the award was procured by corruption, fraud, or undue

means;

(2) where there was evident partiality or corruption in the arbitrators, or

either of them;

(3) where the arbitrators were guilty of misconduct in refusing to

postpone the hearing, upon sufficient cause shown, or in refusing to

hear evidence pertinent and material to the controversy; or of any other

misbehavior by which the rights of any party have been prejudiced; or

(4) where the arbitrators exceeded their powers, or so imperfectly

executed them that a mutual, final, and definite award upon the subject

matter submitted was not made.

9 U.S.C. § 10(a).

A party seeking vacatur under § 10(a)(4) “bears a heavy burden.” Oxford

Health Plans, 569 U.S. at 569. It must be shown that the arbitrators “stray[ed]

from interpretation and application of the agreement and effectively ‘dispense[d]

[their] own brand of industrial justice.’” Stolt-Nielsen S.A. v. AnimalFeeds Int’l

Corp., 559 U.S. 662, 671 (2010) (quoting Major League Baseball Players Ass’n v.

Garvey, 532 U.S. 504, 509 (2001)). Accordingly, this court will vacate an

arbitration award only when “there is no support in the record for its determination

or if it reflects manifest disregard of the agreement, totally unsupported by

principles of contract construction.” Brentwood Med. Assocs. v. United Mine

Workers of Am., 396 F.3d 237, 241 (3d Cir. 2005) (quoting Exxon Shipping Co. v.

Exxon Seamen’s Union, 993 F.2d 357, 360 (3d Cir. 1993)).

It is not enough to show that the arbitrators made legal or factual errors—

even if they were serious errors. Oxford Health Plans, 569 U.S. at 569. This

court’s role is not “to hear claims of factual or legal error by an arbitrator [like] an

appellate court” and decide whether the arbitrators correctly interpretated or

applied the parties’ contract. Major League Umpires Ass’n v. Am. League of Prof’l

Baseball Clubs, 357 F.3d 272, 280 (3d Cir. 2004) (quoting Tanoma Mining Co. v.

Loc. Union No. 1269, United Mine Workers of Am., 896 F.2d 745, 747 (3d Cir.

1990)). The court solely must determine whether the arbitrators were “even

arguably construing or applying the contract.” Oxford Health Plans, 569 U.S. at

569 (quoting E. Associated Coal Corp. v. United Mine Workers of Am., Dist. 17,

531 U.S. 57, 62 (2000)). So long as they were, their decision must stand

“regardless of [the] court’s view of its (de)merits.” Id.

This standard for confirming an arbitration award is “singularly

undemanding.” Ario v. Underwriting Members of Syndicate 53 at Lloyds for 1998

Year of Acct., 618 F.3d 277, 296 (3d Cir. 2010) (quoting United Transp. Union Loc.

1589 v. Suburban Transit Corp., 51 F.3d 376, 379 (3d Cir. 1995)); accord Citgo

Asphalt Ref., 385 F.3d at 816 (instructing that arbitration awards are “subject to a

standard of only minimal rationality.”) It is so for an important reason. A “limited

judicial review” of arbitration awards “‘maintain[s] arbitration’s essential virtue of

resolving disputes straightaway’ and prevents arbitrations from becoming ‘merely

a prelude to a more cumbersome and time-consuming judicial review process.’”

Oxford Health Plans, 569 U.S. at 568–69 (quoting Hall St., 552 U.S. at 588.)

Parties to an arbitration assume the risk that an arbitrator may err as “the price of

agreeing to arbitration.” Id. at 572–73.8

8 Many of Volvo’s arguments contend that vacatur is warranted because the Panel displayed

“manifest disregard” for the law. Volvo simply assumes the validity of the “manifest disregard”

standard. In reality, it is unsettled whether this standard for vacatur survived the Supreme

Court’s decision in Hall Street, which held that 9 U.S.C. § 10 contains the exclusive grounds for

vacating an arbitration award. 552 U.S. at 584. The Third Circuit has frequently declined to

weigh in on the circuit split that has developed on this issue. Facta Health Inc. v. Pharmadent

LLC, No. 23-2224, 2024 WL 4345299, at *6 n.5 (3d Cir. Sept. 30, 2024); Sabre GLBL, Inc. v.

Shan, 779 F. App’x 843, 849 (3d Cir. 2019); Whitehead v. Pullman Grp., LLC, 811 F.3d 116,

MOTION TO VACATE THE ARBITRATION AWARD

Volvo presents several arguments as to why the arbitration award should be

vacated. Generally, Volvo’s arguments target the Panel’s rulings concerning: (1)

the validity and enforceability of the Side Letter; (2) the interpretation and

application of the Side Letter; and (3) the damages caused by Volvo’s breach of

the Side Letter. The court addresses each in turn.

A. Validity and Enforceability of the Side Letter

Volvo’s position throughout this dispute is that it had no duty to fulfill any

obligations contained in the Side Letter, because the Side Letter was terminated by

operation of the integration clause contained in the later-executed Dealer

Agreement. The Dealer Agreement’s integration clause states in relevant part:

This Agreement, including all of the Addenda and Volvo Policies and

Procedures referred to herein (which are incorporated herein by

reference), constitutes the entire Agreement between the Parties

relating to the subject matter hereof. This Agreement supersedes all

existing agreements or arrangements (except for any written

confidentiality, formulation, trademark license, or patent license

agreements) by and between Volvo and [PacWest] relating to the

subject matter hereof, whether written or oral, and all such prior

120–21 (3d Cir. 2016). This court need not weigh in either, because this standard does nothing to

help Volvo. The “manifest disregard” standard is “extremely deferential” to arbitrators.

Whitehead, 811 F.3d at 121. Like § 10(a)(4), it requires more than a purported legal error. Id.

An award “must fly in the face of clearly established legal precedent.” Id. (quoting Merrill

Lynch, Pierce, Fenner & Smith, Inc. v. Jaros, 70 F.3d 418, 421 (6th Cir. 1995)). For instance,

arbitrators might show manifest disregard for the law if they “appreciate[] the existence of a

clearly governing legal principle but decide[] to ignore or pay no attention to it.” Id. (quoting

Merrill Lynch, Pierce, Fenner & Smith, Inc. v. Bobker, 808 F.2d 930, 933 (2d Cir. 1986)). Even

under this standard—assuming, without deciding, that it applies here—Volvo has failed to meet

its burden for the reasons below.

agreements or arrangements are hereby deemed terminated by mutual

consent of the Parties.

(Doc. 19-5, p. 13.) Volvo believes this clause definitively rendered the earlier-

executed Side Letter unenforceable. (Doc. 19, p. 13.)

The Panel unanimously disagreed with Volvo. The Panel recognized that

under Pennsylvania law, “where several instruments are made as part of one

transaction they will be read together, and each will be construed with reference to

the other; and this is so although the instruments may have been executed at

different times and do not in terms refer to each other.” (Doc. 19-20, p. 2.) In

support of this proposition, the Panel cited Wilson v. Viking Corp., 3 A.2d 180 (Pa.

Super. Ct. 1938) and Landreth v. First National Bank of Philadelphia, 31 A.2d 161

(Pa. 1943). (Doc. 19-20, p. 2.)

The Panel then applied this principle to the evidence before them, focusing

on several key facts. First, the parties negotiated the agreements at the same

time—between August and December 2015—and executed them within nine days

of each other. (Id. at 2.) This nine-day delay was necessary, Volvo admitted,

because Volvo’s dealer agreement with the selling dealership did not expire until

eight days after the parties executed the Side Letter. (Id. at 3.) Second, the two

agreements explicitly reference each other. (Id. at 2–3.) Section 3.5 of the Dealer

Agreement states, “[e]xcept as set forth in the side letter dated December 8, 2015,

[PacWest] does not obtain by virtue of this Agreement any right to acquire

additional dealerships.” (Doc. 19-5, p. 3.) Paragraph 7 of the Side Letter states

that its terms and conditions were “subject to and contingent upon . . . [PacWest]

executing Volvo[’s] . . . Dealer Agreement.” (Doc. 19-51, p. 2.) Third, PacWest

wanted to modify section 3.5 of the Dealer Agreement to provide for territorial

expansion rights, but Volvo suggested that such terms should be moved to the Side

Letter. (Doc. 19-20, p. 3.) This evidence led the Panel to conclude that the Side

Letter was valid and enforceable because the parties had intended for the Side

Letter and Dealer Agreement to be two instruments of the same contractual

undertaking. (Id. at 3.)

Volvo now argues that this finding warrants vacatur of the arbitration award.

Volvo claims that the Panel “rewrote” the integration clause by finding that it

specifically incorporated the Side Letter. (Doc. 19, pp. 12–15.) The Panel came to

this conclusion, according to Volvo, by not strictly construing the integration

clause and by considering parol evidence, both in excess of their authority and in

manifest disregard for Pennsylvania law. (Id.) Volvo’s position is unpersuasive

for several reasons. First and foremost, Volvo’s premise is wrong. The Panel

never held that the integration clause itself incorporated the Side Letter. The Panel

simply observed that the “the Side Letter and Dealer Agreement refer to and

incorporate each other and thus are two parts of a single contractual undertaking.”

(Doc. 19-20, p. 3.) The Panel did not read into the integration clause something

that was not there.

Putting aside this faulty premise, the rest of Volvo’s argument relies on an

equally faulty assumption that an integration clause per se transforms a writing

into a fully integrated agreement regardless of whatever contrary evidence exists.

That proposition is impossible to square with Pennsylvania law. It has long been

settled in Pennsylvania that when “two agreements are made as part of one

transaction they will be read together to express the essential elements of the

parties’ undertaking, notwithstanding the presence of an integration clause in the

second agreement.” Haywood v. Univ. of Pittsburgh, 976 F. Supp. 2d 606, 639

(W.D. Pa. 2013); accord Amin v. Lammers, Civil No. 94-5980, 1995 WL 231048,

at *4 (E.D. Pa. Apr. 18, 1995) (“But the presence of integration clauses in the

separate agreements is not a bar to the agreements being construed together when

the agreements are part of the same business transaction.”); Huegel v. Mifflin

Const. Co., 796 A.2d 350, 356–57 (Pa. Super Ct. 2002) (reading two contracts

together despite an integration clause in the later-executed contract); Neville v.

Scott, 127 A.2d 755, 757 (Pa. Super Ct. 1956) (explaining that an integration

clause in a second agreement was “not controlling, since the second agreement did

not fully express the essential elements of the parties’ undertaking”). Thus, the

Dealer Agreement’s integration clause did not in and of itself preclude the Panel

from finding that the Side Letter and Dealer Agreement together constituted the

parties’ contractual undertaking.

The three cases upon which Volvo relies do nothing to undermine this well

settled law. Those cases involved instances where evidence of an earlier

agreement was barred because the court found a later agreement with an

integration clause constituted the parties’ entire contract. Yocca v. Pittsburgh

Steelers Sports, Inc., 854 A.2d 425, 437–38 (Pa. 2004); M. O’Herron Co. v.

Columbia Gas of Pa., Inc., No. 595 WDA 2021, 2021 WL 6069662, at *3–4 (Pa.

Super. Ct. Dec. 23, 2021); McGuire v. Schneider, Inc., 534 A.2d 115, 118 (Pa.

Super. Ct. 1987). None of these cases state that an integration clause alone

transforms an otherwise non-integrated writing into a fully integrated writing.

These cases simply make clear that an integration clause is important in

determining if a writing constitutes the parties’ entire agreement. Yocca, 854 A.2d

at 436; M. O’Herron, 2021 WL 6069662, at *3–4; McGuire, 534 A.2d at 117.

Volvo’s argument concerning parol evidence further exposes the flaws of its

position. Volvo insists that the Panel should have only looked to parol evidence in

discerning what constituted the parties’ entire agreement if the integration clause

was ambiguous. (Doc. 19, p. 14.) Volvo is wrong as a matter of Pennsylvania

law. Parol evidence is always admissible “to determine whether the parties

intended [a] writing to be a complete embodiment of their agreement.” Murray v.

Univ. of Phila. Hosp., 490 A.2d 839, 844 (Pa. Super. Ct. 1985); accord Yocca, 854

A.2d at 436 (“[F]or the parol evidence rule to apply, there must be a writing that

represents the ‘entire contract between the parties.’”); Int’l Milling Co. v.

Hachmeister, Inc., 110 A.2d 186, 191 (Pa. 1955) (“[W]here it can be shown by

competent evidence that no single writing embodied or was intended to embody

the whole of the parties' understanding, the parol evidence rule has no

application.”); McGuire, 534 A.2d at 118 (“Whether a writing is an integrated

agreement, and if so, whether the agreement is completely or partially integrated,

are questions to be decided by the court prior to application of the parol evidence

rule.”). The Panel’s consideration of parol evidence to determine what constituted

the parties’ entire agreement, was, therefore, completely appropriate, regardless of

whether the integration clause existed or was ambiguous.

Ultimately, the Panel weighed the evidence in this case and found that the

Dealer Agreement did not represent the entire agreement between Volvo and

PacWest. As detailed above, this decision was supported by evidence and

grounded in the language of the Side Letter and Dealer Agreement. The court sees

no error at all in the Panel’s decision, let alone error so severe as to warrant

vacatur. Thus, Volvo has fallen well short of meeting its burden on this issue.

B. Interpretation and Application of the Side Letter

Volvo next contends that the Panel’s interpretation and application of the

Side Letter warrants vacatur. Volvo’s arguments center mostly around two

provisions of paragraph 3: the condition precedent that PacWest must be “meeting

a majority of the mutually agreed key performance metrics in its current Territory”

and the provision that states Volvo would “make reasonable efforts to offer

[PacWest] a first opportunity to acquire the additional territory.” (Doc. 19-51, p.

1.) Specifically, Volvo takes exception with the Panel’s (1) interpretation of the

phrase “key performance metrics”; (2) determination that PacWest met a majority

of these metrics; and (3) holding that Volvo breached its obligations under

paragraph 3.

1. Interpretation of “Key Performance Metrics”

The Side Letter does not define “key performance metrics.” The Panel

discerned the phrase’s meaning by reference to section 6.2 of the Dealer

Agreement. (Doc. 19-20, p.5.) Section 6.2 states:

The quantity of Volvo Machines ordered and paid for by [PacWest]

from time-to-time hereunder and the market share of the Volvo

Products within the Territory will be key performance metrics in

Volvo's evaluation of [PacWest’s] performance. Market share will be

measured on a rolling twelve month basis. Additional key performance

metrics will also initially include [PacWest’s] customer service levels,

profitability, safety performance, staff training and readiness, and

potentially other measurements as may be agreed from time to time.

(Doc. 19-5, p. 4.) Although the Side Letter does not explicitly reference this

provision, the Panel ruled that “key performance metrics” should be understood to

mean the metrics enumerated in section 6.2. (Doc. 19-20, p. 5.) The Panel

reasoned that such interpretation was appropriate given its ruling that the Side

Letter and Dealer Agreement are “two parts of a single contractual arrangement.”

(Id.)

Volvo contends that the Panel improperly imported the terms of section 6.2

into the Side Letter. (Doc. 19, pp. 15–16.) This argument cannot carry the day for

Volvo, as it reflects nothing more than a disagreement with the Panel’s

interpretation of the Side Letter. Volvo cites no authority to support its position

that the Panel committed a vacatur-worthy misjudgment. Indeed, the decision was

a product of construing the language of the Dealer Agreement and Side Letter, and

naturally follows from the appropriate conclusion that those two documents should

be read together. Beyond that, the court will not scrutinize the Panel’s

interpretation given the standard the court applies in this context.

2. Determination that PacWest Satisfied a Majority of the “Key

Performance Metrics”

The Panel convened “an evidentiary hearing on whether PacWest satisfied

the key performance metrics, with PacWest bearing the burden of proof.” (Doc.

19-3, p. 4.) Following the evidentiary hearing, the Panel held in PacWest’s favor

on this issue for two independent reasons.

First, the Panel held that Volvo’s breach of the Side Letter estopped Volvo

from arguing that PacWest did not satisfy a majority of the key performance

metrics. (Id. at 7–8 (citing LJL Transp., Inc. v. Pilot Air Freight Corp., 962 A.2d

639, 648 (Pa. 2009)).) Specifically, the Panel determined that Volvo breached the

Side Letter by only considering PacWest’s market share and refusing to consider

whether PacWest satisfied any other key performance metric in deciding to reject

PacWest’s desired expansions. (Id. at 8.)

Second, the Panel determined that PacWest proved it had in fact satisfied a

majority of the key performance metrics.9 In doing so, the Panel had to determine

each metric’s meaning and what was required for each to be met. Neither the Side

Letter nor the Dealer Agreement provide this information. Section 6.2 of the

Dealer Agreement simply states that the metrics are: (1) quantity of machines

purchased; (2) market share; (3) customer service levels; (4) profitability; (5)

safety performance; and (6) staff training and readiness. (Doc. 19-5, p. 4.)

In determining what performance these metrics required, the Panel

considered the facts surrounding how the metrics came to be included in the Dealer

Agreement. Volvo’s standard dealer agreement in 2015 had only included quantity

9 One Panel member dissented, finding it was “doubtful” that PacWest carried its burden. (Doc.

19-3, p. 52.) That arbitrator stated, “at best PacWest succeeded in arguably proving only three of

the six [key performance metrics].” (Id.)

of machines purchased and market share. (Doc. 19-3, p. 5). Andrew Wold

(“Wold”), PacWest’s chief executive officer, requested that the other four metrics

be added to the Dealer Agreement. (Id.) Volvo did not object, and the parties had

no discussions about what the metrics meant, even after the execution of the Dealer

Agreement and Side Letter. (Id. at 5–6.) As the Panel put it, “[n]either party

sought to more specifically define the metrics or reach an understanding of how

they would be measured.” (Id. at 6.)

Despite this lack of subjective agreement, the Panel determined that the key

performance metrics—which the Panel observed are “terms customarily used in

industry generally and in distribution relationships in particular”—have meanings

that were ascertainable through the parties’ course of performance. (Id. at 8–10.)

The Panel found that “the metrics selected were, in general terms, well known to

Volvo, which regularly provided its dealers with a stream of data on numerous

aspects of dealer performance.” (Id. at 9.) Volvo continued to develop this

information and regularly provided it to PacWest after execution of the Side Letter

and Dealer Agreement. (Id.) This information “clearly relate[d]” to the key

performance metrics, even though it did not use the metrics’ precise terms.10 (Id.)

10 The dissenting arbitrator did not find this information relevant in determining whether

PacWest satisfied the key performance metrics, which were bespoke to the Dealer Agreement.

(Doc. 19-3, p. 52 n.7.) He opined that “[d]ata relevant to Volvo dealers generally had no

necessary relationship to the particular terms” of the Dealer Agreement. (Id.)

The Panel then analyzed evidence pertaining to each metric. In doing so, the

Panel mostly relied on the expert testimony of Neil Beaton (“Beaton”), PacWest’s

expert witness. (Id. at 12–18.) The Panel determined that PacWest satisfied all but

one metric, i.e., the “market share” metric. (Id. at 15, 18.)

PacWest satisfied the “quantity of machines purchased” metric, based on

evidence that PacWest was “entitled to benefits associated with . . . the highest

level[] of Volvo’s machine ordering policy.” (Id. at 13.) Testimony at the

evidentiary hearing suggested that this ordering policy was concerned with the

quantity of the machines ordered and not just the process of ordering, as Volvo

argued. (Id.)

PacWest’s financial performance in 2021 and 2022 satisfied the profitability

metric. (Id. at 16.) Beaton opined in his report that PacWest was a profitable

dealer based on its gross profit margin, pre-tax margin, and return on equity in

2021 and 2022.11 (Id.) On cross-examination, Beaton testified as to PacWest’s

financial performance compared to other Volvo dealers. (Id.) In some areas, like

gross profit and earnings before interest, taxes, depreciation, and amortization,

PacWest met “Volvo’s Excellence Target.” (Id.) In others, like pre-tax profit, it

11 The Panel discredited Beaton’s opinion that PacWest was profitable based on the “credit limits

and related pricing that Volvo Financial Services . . . provided to PacWest from 2015 to 2022.”

(Id. at 15–16.)

did not. (Id.) Beaton’s opinion went unrebutted, as Volvo did not provide any

affirmative evidence that PacWest was not profitable. (Id. at 16–17.)

PacWest satisfied the “customer service” metric based on its performance in

Volvo’s “Customer Service Index,” which is derived from surveys of the dealer’s

customers conducted “by Volvo or its agents.” (Id. at 17.) Volvo uses the Index as

“an element of an optional incentive program.” (Id.) Each year between 2018 and

2022, PacWest achieved a score above Volvo’s target score. (Id.)

PacWest satisfied the “safety performance” metric, based on its scores in

Volvo’s “Safety Campaigns.” (Id.) These scores “track[] dealer effectiveness in

completing safety-related product replacements and modifications within a

specified time frame.” (Id.) Volvo also uses these scores for incentive programs.

(Id.) In 2021 and 2022, PacWest met Volvo’s target of 100%. (Id.)

Finally, PacWest satisfied the “staff training and readiness” metric, based

on its performance in “Competence Development” for Volvo’s “Iron Mark”

incentive program. (Id. at 18.) The Panel explained that “Competence

Development” is satisfied if “the dealer had . . . all employees enrolled in at least

one competence development program.” (Id.) In 2021 and 2022, PacWest’s score

for Competence Development was 100%, presumably meaning that all of its

employees were enrolled in one qualifying program each year. (Id.)

Volvo believes that the Panel committed several vacatur-worthy errors in

reaching a decision on this issue. First, Volvo contends that the Panel should have

made the legal conclusion that there was no “meeting of the minds,” since it made

the factual finding that the parties did not share a common understanding of what

the key performance metrics meant or how they were to be applied. (Doc. 19, p.

17–18.) According to Volvo, the Panel ignored Pennsylvania law by not making

such a legal conclusion. Next, Volvo argues that the Panel exceeded its authority

by finding, without any evidence, that the key performance metrics were

customary industry terms. (Id. at 16–17; Doc. 27, pp. 17–18.) Volvo then argues

that the Panel’s reliance on the parties’ course of performance was done in

manifest disregard for Pennsylvania law. (Doc. 19, p. 20.) Finally, Volvo argues

that it was improper for the Panel to apply estoppel and waiver principles. (Id. at

20–22.) Volvo’s argument fails at every step.

i. Meeting of the Minds

Volvo insists that it is an “obvious truth” that the parties lacked a “meeting

of the minds” with respect to the key performance metrics. (Id. at 16.) The truth

of that proposition is obvious only to Volvo. Volvo seemingly thinks that a

“meeting of the minds” occurs only when the parties share the same subjective

understanding of all contractual provisions. Volvo is mistaken. Courts interpret

contracts “based on the parties' outward and objective actions,” not their subjective

intent. Nicholas v. Hofmann, 158 A.3d 675, 693 (Pa. Super. Ct. 2017). Therefore,

contract formation does not require “a subjective, or ‘true and actual,’ meeting of

the minds.” Id. If it did, any interpretive ambiguity would render a contract

unenforceable. That is not what Pennsylvania law provides. See Am. Eagle

Outfitters v. Lyle & Scott Ltd., 584 F.3d 575, 586 (3d Cir. 2009) (“[A]ny ambiguity

that flows from the language [the parties] used to craft the terms of their agreement

is more properly seen as a dispute over the interpretation of the contract, not the

definiteness (and thus enforceability) of the contract.”); see also Nicholas, 158

A.3d at 693 (quoting Simeone v. Simeone, 581 A.2d 162, 165 (Pa. 1990)) (“Once a

person enters into a written agreement[,] he builds around himself a stone wall,

from which he cannot escape by merely asserting he had not understood what he

was signing.”)

Instead, the “meeting of the minds” requirement goes to the definiteness of

the contract. A contract is definite when it is “certain about ‘the nature and extent

of its obligation[s].’” Shell’s Disposal & Recycling, Inc. v. City of Lancaster, 504

F. App’x 194, 202 (3d Cir. 2012) (quoting Am. Eagle Outfitters, 584 F.3d at 585).

A contract would fail for indefiniteness “when it is ‘impossible to understand’

what the parties agreed to because the essential terms are ambiguous or poorly

defined.” Id. (quoting Am. Eagle Outfitters, 584 F.3d at 586). For example, “an

agreement was [found to be] unenforceable when the parties failed to even discuss

terms like price and matter of performance.” Id. (citing Lombardo v. Gasparini

Excavating Co., 123 A.2d 663, 666 (Pa. 1956)). “The definiteness requirement,

however, does not mean that the presence of any interpretive ambiguity renders an

agreement unenforceable,” so long as the ambiguity “goes to details of the

performance,” rather than the “nature and extent of [the] obligation[s].” Teva

Pharm. Indus., Ltd. v. UnitedHealthcare Servs., Inc., Civil No. 16-4870, 2018 WL

1898911, at *11 (Apr. 20, 2018) (quoting Shell’s Disposal, 504 F. App’x at 202).

Volvo’s argument is clearly more concerned with ambiguity as to

performance, rather than ambiguity as to the nature of its obligations. The fact that

the parties did not share a subjective understanding of the definition of the key

performance metrics and how they were to be measured only suggests uncertainty

as to how Volvo would perform its obligations, not what its obligations were.

Indeed, Volvo cannot now argue that its obligations were impossible to know when

the Panel found that Volvo agreed to the inclusion of the additional key

performance metrics and “specifically negotiated the wording” of those metrics.

(Doc. 19-3, pp. 5–6.) Ultimately, Volvo’s insistence that a meeting of the minds

cannot occur in the face of this type of ambiguity is unpersuasive. Thus, the court

sees no reason for vacatur on this argument.

ii. Customary Industry Usage

Volvo’s contention that the Panel determined, without evidence, that the key

performance metrics were customary industry terms is similarly unpersuasive. As

noted above, the Panel stated that the key performance metrics were “terms

customarily used in industry generally and in distribution relationships in

particular.” (Doc. 19-3, pp. 8–9.) The Panel provided no further elaboration on

this finding. Volvo seemingly thinks that the Panel made a finding that the metrics

have a specific trade usage that differs from the plain meaning of the words. (See

Doc. 27, p. 17.) As a general matter, considering evidence that a word or phrase

has a particular trade usage is appropriate when interpreting contracts. Sunbeam

Corp. v. Liberty Mut. Ins. Co., 781 A.2d 1189, 1193 (Pa. 2001). But, that is not

what the Panel did here. The Panel merely noted that terms like “customer service

levels, profitability, [and] safety performance” are commonly used in industry and

distribution relationships. (See Doc. 19-3, pp. 8–9.) Nothing suggests that the

Panel interpreted the key performance metrics to have specialized meanings or to

be terms of art. Rather, the Panel seems to have assigned to these terms their

ordinary meaning, as is entirely appropriate. See Wert v. Manorcare of Carlisle

PA, LLC, 124 A.3d 1248, 1259 (Pa. 2015) (“Unless otherwise specified, a

contract's language shall be given its plain and ordinary meaning.”)

This conclusion is strongly implied by the fact that the Panel analyzed data

that was “clearly related” to the plain meaning of the key performance metrics. In

considering “profitability,” for example, the Panel considered PacWest’s gross

profit margin; earnings before interest, taxes, depreciation, and amortization; pre-

tax margin; and return on equity, thus strongly implying that it interpreted

“profitability” to mean how well PacWest generated profits. (See Doc. 19-3, p.

16.) In considering “customer service levels,” the Panel considered survey results

of PacWest’s customers, thus strongly implying that it interpreted that metric to

mean how satisfied customers were with the service PacWest provided. (See id. at

17.) There is no indication that the Panel’s interpretation of the key performance

metrics arbitrarily departed from the plain meaning of the metrics’ language.

Therefore, Volvo’s argument to the contrary is not persuasive.

iii. Course of Performance

Next, Volvo argues that the Panel improperly considered course-of-

performance evidence in determining how the key performance metrics should be

measured. (Doc. 19, p. 20.) Volvo argues that the Panel should have only

considered the parties’ course of performance if such evidence showed a common

understanding of the key performance metrics. (Id.) Since the Panel determined

that no common understanding ever materialized, Volvo believes the Panel should

never have considered course of performance evidence. (Id.) In support of its

position, Volvo cites Vanett v. Vanett, No. 1792 EDA 2015, 2016 WL 5344129

(Pa. Super. Ct. July 21, 2016). The Vanett court affirmed a trial court’s decision to

not consider extrinsic evidence that only reflected one party’s “unique

understanding” of a contract. Id. at *4. It reasoned that course of performance is

appropriate to consider, “so long as the conduct/performance evidence manifests a

common understanding of the agreement at issue.” Id. (emphasis in original).

Here, the Panel considered data “clearly related” to the key performance

metrics that Volvo routinely developed and shared with PacWest. This is not the

type of evidence that reflects one party’s unique understanding of the key

performance metrics. In other words, it was fair to infer from this evidence what

Volvo and PacWest together intended the metrics to mean and how they should be

measured. Accordingly, the court does not see Vanett as an exception applicable

here to the general principle of Pennsylvania law that “course of performance may

always be considered as evidence of the intent of the parties.” Gen. Refractories

Co. v. First State Ins. Co., 94 F. Supp. 3d 649, 663 (E.D. Pa. 2015) (quoting In re

Old Summit Mfg., LLC, 523 F.3d 134, 137–38 (3d Cir. 2008)). Since the Panel

appropriately considered course-of-performance evidence in interpreting the

language of the key performance metrics, the court need not consider the issue

further.

iv. Estoppel

The court need not dwell on Volvo’s argument concerning the Panel’s

application of estoppel principles. The award is enforceable on the independent

basis that the Panel appropriately determined that PacWest had satisfied in fact the

key performance metrics. Accordingly, the propriety of the Panel’s estoppel

decision is irrelevant for present purposes. See Bear, Stearns & Co. v. 1109580

Ont., Inc., 409 F.3d 87, 91 (2d Cir. 2005) (quoting Willemijn

Houdstermaatschappij, BV v. Standard Microsys. Corp., 103 F.3d 9, 13 (2d

Cir.1997)) (explaining that a court must uphold an arbitration award “[i]f there is

even a barely colorable justification for the outcome reached”); Popkave v. John

Hancock Distribs. LLC, 768 F. Supp. 2d 785, 790 (E.D. Pa. 2011) (same).

3. Volvo’s Breach of the Side Letter

Volvo’s next argument concerns the Panel’s determination that it breached

the Side Letter. The Panel found that Volvo breached the Side Letter for at least

two independent reasons. First, Volvo rejected PacWest’s expansion bid “based on

the single metric of market share,” even though paragraph 3 of the Side Letter

required Volvo to consider whether PacWest was meeting a majority of the key

performance metrics. (Doc. 19-20, pp. 8–9, 13.) Second, Volvo rejected

PacWest’s expansion because PacWest refused to accept a new dealer agreement

that was materially different than the Dealer Agreement, even though the Side

Letter guaranteed PacWest a dealer agreement similar to its current one. (Id. at

11–13.)

Volvo seriously challenges only the first of these findings. (Doc. 19, pp. 22–

25.) Volvo argues that the Panel conflated the condition precedent that PacWest

meet a majority of the key performance metrics with Volvo’s obligation to make

“reasonable efforts.” (Id. at 22–23.) Volvo claims that making “reasonable

efforts” did not require it to consider every key performance metric in exercising

its discretion whether to approve PacWest’s expansion. (Id. at 23.) The Panel

exceeded its authority, Volvo’s argument goes, by imposing upon Volvo the

“extracontractual obligation” of considering every key performance metric. (Id.)

Volvo hardly contests the other finding, as it buries a half-hearted challenge

to it in a footnote. (Doc. 19, p. 25. n.5.)12 Volvo has plainly failed to satisfy its

burden as to this second basis for the Panel’s breach ruling. Accordingly, Volvo

would not be entitled to relief even if its argument concerning the first basis were

12 In that footnote, Volvo simply argues that it is irrelevant whether the proposed new dealer

agreement was sufficiently similar to the Dealer Agreement, because Volvo’s obligation to

provide a similar dealer agreement “has nothing to do with” its obligation to make “reasonable

efforts” and there is no evidence that PacWest’s respective deals with Tri-State and CMI would

close. (See Doc. 19, p. 25. n.5.) Such an argument does nothing to help Volvo. As noted below,

there was evidence that the Tri-State and CMI deals would have both closed but for Volvo’s

breach. Moreover, the Panel explained how Volvo’s proposed new dealer agreement was

materially different than the Dealer Agreement, cited evidence that suggests PacWest’s refusal to

sign the new dealer agreement was a primary reason Volvo rejected PacWest’s expansions, and

interpreted the Side Letter to prohibit such a rationale for disapproving the expansions. (Doc.

19-20, pp. 10–13.) Volvo’s disagreement with this ruling is no basis for vacatur.

meritorious. See Bear, Stearns & Co., 409 F.3d at 91; Popkave, 768 F. Supp. 2d at

790. Therefore, the court need not consider the merits of that argument.

C. Lost-Profit Damages involving Tri-State and CMI Deals

Volvo next argues that the court must vacate the arbitration award based on

the Panel’s calculation of damages. The Panel found that PacWest was entitled to

lost-profit damages, because it was more likely than not that PacWest would have

closed the deals with Tri-State and CMI but for Volvo’s breach. (Doc. 19-3, pp.

22–31.) The Panel then determined that PacWest’s lost profits totaled $2,895,133

with respect to the Tri-State deal and $11,534,630 with respect to the CMI deal.

(Id. at 38.) Volvo argues that the Panel exceeded its authority in making these

findings. It contends that the Panel should not have found that it was more likely

than not that either deal would have closed but for Volvo’s breach. (Doc. 19, pp.

26–31, 35–37.) It also contends that the Panel’s award of damages for both deals

was unsupported by evidence. (Id. at 31–34, 37–38.) Neither of these are winning

arguments.

1. Likelihood of Tri-State Deal

In finding that the Tri-State deal would have closed but for Volvo’s breach,

the Panel relied on documentary evidence and the testimony of Thomas Zimmer

(“Zimmer”), Tri-State’s president. (See Doc. 19-3, pp. 26–28.) Zimmer testified

that the PacWest deal was attractive to him, because “[i]t allowed him to exit the

business, take some money off the table, and invest in the new dealer.” (Id. at 26.)

Zimmer also testified that he was not talking to “other potential acquirers.” (Id.)

From this testimony, the Panel determined that Zimmer “wanted and intended to

proceed with the deal.” (Id. at 27.) Moreover, the Panel determined that no

evidence showed “any significant impediment” to closing the deal. (Id.) At

arbitration, Volvo argued that Pac-West and Tri-State would not have been able to

obtain the third-party approvals from other companies that were necessary for the

deal to close. (Id. at 27–28.) The Panel discredited Volvo’s proffered testimony

on this issue and “strongly doubt[ed] that the [third parties] would have presented

any problem” to the Tri-State deal. (Id. at 28.) Instead, it credited Zimmer’s

testimony that he assumed the third parties would have consented “given

consolidation in the industry, the necessity for scale, and the prospect of fresh

money . . . coming in.” (Id. at 27.) It also credited Zimmer’s testimony that he had

not experienced any issue with third-party approvals in connection with a previous

transfer of interest in 2006. (Id.)

Volvo now contends that the Panel, in making this ruling, ignored

Pennsylvania law and exceeded its authority by excusing PacWest from proving

(1) that it had a binding contract with Tri-State and (2) that it could satisfy the

condition precedent of obtaining the third-party approvals. (Doc. 19, pp. 26–31.)

This argument simply goes to the weight of the evidence supporting the Panel’s

decision. Volvo does not contest the well-settled principle that lost profits are

recoverable under Pennsylvania law. See Delahanty v. First Pa. Bank, N.A., 464

A.2d 1243, 1258 (Pa. Super. Ct. 1983) (finding that lost profits are recoverable if

they can be established (1) with reasonable certainty; (2) to be the “proximate

consequence of the wrong”; and (3) as reasonably foreseeable). Nor does Volvo

persuasively argue that lost profits are legally unrecoverable in this case. No

authority that Volvo cites suggests that a binding contract with Tri-State was

necessary for PacWest to recover lost profits. Volvo’s proffered authority has

nothing to do with lost-profit damages and, instead, involves failed breach-of-

contract claims premised on non-binding agreements. White Winston Select Asset

Funds, LLC v. Good Times Rests., Inc., No. 23-1297, 2024 WL 2745174, at *1 (3d

Cir. Mar. 1, 2024) (finding that under Delaware law the parties’ non-binding

agreement to negotiate did not create a binding agreement to close a deal); Lazer &

Lazer Corp. v. Agronomed Pharm. LLC, 618 F. Supp. 3d 186, 198–202 (E.D. Pa.

2022) (determining that a contract never existed between the parties); Philmar

Mid-Atl., Inc. v. York St. Assocs. II, 566 A.2d 1253, 1255 (Pa. Super. Ct. 1989)

(finding that a non-binding letter of intent could not give rise to a breach-of-

contract claim). These cases are inapposite here. With no legal authority

suggesting lost profits were irrecoverable in the absence of a binding contract,

Volvo’s position reduces to a disagreement with the Panel as to what the evidence

proves.

Similarly, Volvo proffers no authority that suggests recovery of lost profits

was per se barred by PacWest and Tri-State not obtaining the approvals from third

parties in the face of Volvo’s disapproval. Volvo’s argument is simply that

PacWest and Tri-State could never have shown that it would have received

approval from the third parties because they did not in fact receive such approval.

This again represents nothing more than a disagreement about whether the weight

of the evidence favors PacWest.

As detailed above, the Panel weighed evidence and determined that PacWest

had satisfied its burden to recover lost profits even in the absence of a binding

contract with Tri-State and pre-obtained approval from third parties. The court

will not reweigh the evidence now. See Mut. Fire, Marine & Inland Ins. Co. v.

Norad Reinsurance Co., 868 F.2d 52, 56 (3d Cir. 1989) (explaining that it is not a

court’s role “to sit as the panel did and reexamine the evidence under the guise of

determining whether the arbitrators exceeded their powers”).

2. Likelihood of CMI Deal

Like with the Tri-State deal, the Panel relied on documentary evidence and

testimony from a key stakeholder in deciding that the CMI deal would have closed

but for Volvo’s breach. (See Doc. 19-3, pp. 28–29.) JGC and CMI signed a non-

binding letter of intent, which contemplated JGC acquiring CMI over two years.

(Id. at 28.) Initially, Ken Gerondale (“Gerondale”), CMI’s controlling owner, did

not want PacWest and CMI to be under the same management team. (Id.) Thus,

the deal was structured so that CMI would become a subsidiary of JGC that was

independent of PacWest. (Id.) Gerondale, however, relented and agreed to a new

deal structure. (Id.) That structure involved PacWest acquiring 100% ownership

of CMI in a single closing. (Id. at 29.) The Panel determined that the revised

terms of the transaction structure and communications between CMI and PacWest

made it “amply clear . . that it was JGC’s intention to acquire CMI through its

affiliate, PacWest.” (Id. at 25.) As to the likelihood of the CMI deal occurring,

Gerondale testified that “there’s no doubt” the CMI deal would have closed. (Id. at

29.) He was so sure the deal was going to close that he announced it to his senior

management team. (Id.) Moreover, he testified that CMI would have obtained the

necessary third-party approvals given that none of the third parties voiced any

objections when he broached the deal with them. (Id.)

Volvo cites no authority to suggest the Panel’s decision warrants vacatur.

Instead, it again asks this court to reweigh the evidence to vacate the award. Volvo

argues that it cannot be liable to PacWest for lost profits, because PacWest was not

going to obtain ownership of CMI. (Doc. 19, pp. 35–36.) According to Volvo,

only JGC was going to obtain an ownership interest in CMI, because JGC executed

the non-binding letter of intent with CMI. (Id.) Yet, the Panel credited evidence

that JGC intended for PacWest to own CMI and that Gerondale agreed to such a

deal. Since there is some evidence to support the Panel’s decision, the court must

reject Volvo’s arguments.

Volvo further claims that PacWest cannot recover lost profits even if

PacWest were the party that would have acquired CMI, because PacWest had no

binding contract with CMI and those parties had not in fact obtained third-party

approvals for the deal. This recycled argument fails for the same reason it failed

with respect to the Tri-State deal.

3. Calculation of Lost Profits

Finally, Volvo contends that the Panel’s calculation of the lost profits

awarded to PacWest warrants vacatur. For both deals, the Panel relied upon

Beaton’s estimation of PacWest’s lost profits. (See Doc. 19-3, pp. 33–35; Doc. 19-

46.) Generally, Beaton estimated Tri-State’s annual profits between 2022 and

2041 by utilizing PacWest’s projections of Tri-State’s potential net income

between 2022 and 2027—which PacWest used to evaluate Tri-State’s purchase

price—and then extrapolating from the projected income in 2027. (Doc. 19-3, p.

34.) Beaton estimated CMI’s annual profits for the same 20-year period by

utilizing CMI’s actual net income in 2022 and 2023, and then, beginning in 2024,

extrapolating from CMI’s 10-year average annual net income. (Id. at 33.) For

both deals, Beaton’s extrapolations assumed a 3% annual growth rate, which the

Panel determined was reasonable. (Id. at 33, 35.) From there, Beaton calculated a

cumulative total of lost profits for each deal: $28,739,205 for the Tri-State deal and

$73,414,753 for the CMI deal. (Id.) Beaton then adjusted these cumulative totals

for present value while “applying a 15% discount,” which brought the totals to

$4,264,900 for the Tri-State deal and $18,918,100 for the CMI deal. (Id.) The

Panel then determined that these totals had to be reduced to reflect PacWest’s duty

to mitigate its damages. (Id. at 37.) Relying on Volvo’s expert’s calculations, the

Panel reduced the totals by the amount that PacWest could have obtained if it had

invested the purchasing funds in “a conservative, low-risk, low rate of return

investment.” (Id.) These calculations used a “3.5%, 20-year Treasury bond

investment rate.” (Id.) The final result of the Panel’s methodology resulted in

total lost-profits damages equaling $2,895,133 for the Tri-State deal and

$11,534,630 for the CMI deal. (Id. at 38.) Volvo does not challenge the Panel’s

methodology for arriving at these figures. Instead, Volvo challenges certain

factual assumptions used in the methodology.

With respect to the Tri-State deal, Volvo argues that the Panel’s calculations

baselessly included an assumption that PacWest would have obtained another

dealership in its hypothetical post-deal territory. (Doc. 19, pp. 31–34.) Volvo

correctly points out that PacWest’s projections of Tri-State’s 2022–2027 income

assumed it would acquire another dealership and that Beaton used PacWest’s

projection without adjustment. (Doc. 19-3, p. 34; Doc. 19-47, p. 10.)

Nevertheless, the Panel determined that the projected income would not have

materially changed if PacWest did not acquire this additional dealership. (Doc. 19-

3, p. 34.) It reasoned that “there would be significant costs associated with the

additional acquisitions . . . which would offset additional projected net income.”

(Id.) Thus, this hypothetical acquisition was entirely immaterial to the Panel’s

calculation of lost profits for the Tri-State deal. The Panel cited to testimony from

Beaton in support of its ruling. (Doc. 19-3, p. 34.) When asked if his calculation

would be incorrect if PacWest never acquired the additional dealership, Beaton

testified, “[i]t would not be incorrect.” (Doc. 19-47, p. 10.) Although this

testimony does not discuss additional costs of acquiring a dealership, the court

cannot say that there is “absolutely no support at all in the record justifying the”

Panel’s ruling. United Transp. Union Loc. 1589, 51 F.3d at 379. Therefore, that

ruling must stand.

With respect to the CMI deal, Volvo argues that the Panel impermissibly

awarded lost profits as if PacWest would have obtained 100% ownership of CMI,

even though there was no binding agreement with such terms. (Doc. 19, p. 37–38.)

As noted above, there is evidence in the record to support the determination that

PacWest would have acquired 100% of CMI. (Doc. 19-3, p. 29.) The existence of

such evidence defeats Volvo’s argument. See United Transp. Union Loc. 1589, 51

F.3d at 379.

D. Volvo’s Motion to Vacate will be Denied.

Volvo has failed to carry its burden of showing that the arbitration award

should be vacated. Accordingly, the court will deny its motion to vacate.

MOTION TO CONFIRM THE AWARD AND MOTION FOR JUDGMENT

The court next turns to PacWest’s motion to confirm the arbitration award

and its motion for judgment on the award. Having determined that Volvo is not

entitled to vacatur, the court must rule that PacWest is entitled to confirmation of

the award and judgment on it. Indeed, “confirmation and vacatur of an arbitration

award are simply opposite sides of the same FAA coin.” PG Publ’g, 19 F.4th at

313. This court is bound by statute to confirm an arbitration award “unless the

award is vacated, modified, or corrected as prescribed in [9 U.S.C. §§ 10 & 11].”

9 U.S.C. § 9; accord Hall St., 552 U.S. at 582; PG Publ’g, 19 F.4th at 313. Having

not vacated the award here, the court will confirm it.13

13 At the request of the parties, the court scheduled oral argument for this matter. That argument

will be canceled in light of the court’s determination that such a proceeding is unnecessary to

resolve the motions at hand. See PG Publ’g, 19 F.4th at 314 (“A court can, within its discretion,

decide an FAA motion without conducting a full hearing or taking additional evidence.”)

CONCLUSION

For the foregoing reasons, the court will deny Volvo’s motion to vacate the

arbitration award and will grant PacWest’s cross-motion to confirm the award and

its motion to enter judgment thereon. An appropriate order will issue.

s/Jennifer P. Wilson

JENNIFER P. WILSON

United States District Judge

Middle District of Pennsylvania

Dated: July 15, 2025