Opinion

Opinion

Court
Court of Appeals of Tennessee
Filed
Oct 19, 1995
Status
Published
On the bench
Judge Samuel L. Lewis
Cited by
0 cases
Authority
More cited than 30.2%

noting that the "crucial inquiry" is whether a landowner or a private purchaser could reasonably anticipate that he would be able to devote the property to its highest and best economic use without serious fear that the government would soon condemn the land

How later courts described this case

  • noting that the "crucial inquiry" is whether a landowner or a private purchaser could reasonably anticipate that he would be able to devote the property to its highest and best economic use without serious fear that the government would soon condemn the land
  • affirming the trial court's finding that interchange upgrade and road widening projects were distinct

Written by the judges who cited it.

The opinion

THE METROPOLITAN GOVERNMENT OF )

NASHVILLE and DAVIDSON COUNTY, )

TENNESSEE, and )

THE METROPOLITAN NASHVILLE )

AIRPORT AUTHORITY, )

)

Petitioners/Appellants, ) Appeal No.

) 01-A-01-9503-CV-00089

v. )

) Davidson Circuit

OVERNITE TRANSPORTATION ) No. 87C-181

COMPANY, a Virginia )

Corporation of Nashville and

Davidson County, Tennessee,

)

)

)

FILED

Respondent/Appellee. ) Oct. 19, 1995

Cecil Crowson, Jr.

Appellate Court Clerk

COURT OF APPEALS OF TENNESSEE

MIDDLE SECTION AT NASHVILLE

APPEAL FROM THE CIRCUIT COURT FOR DAVIDSON COUNTY

AT NASHVILLE, TENNESSEE

THE HONORABLE HAMILTON GAYDEN, JUDGE

CHARLES W. BURSON

Attorney General and Reporter

MICHAEL E. MOORE

Solicitor General

MICHAEL W. CATALANO

Associate Solicitor General

Office of the Attorney General and Reporter

Executive Offices

500 Charlotte Avenue

Nashville, Tennessee 37243-0497

ATTORNEYS FOR PETITIONERS/APPELLANTS

HARWELL HOWARD HYNE

Gabbert & Manner, P.C.

Jonathan Harwell

C. Mark Pickrell

1800 First American Center

Nashville, Tennessee 37238

ATTORNEYS FOR RESPONDENT/APPELLEE

VACATED AND REMANDED

SAMUEL L. LEWIS, JUDGE

O P I N I O N

This is an appeal by the petitioners/appellants, Tennessee

State Department of Transportation ("TDOT") and Metropolitan

Nashville Airport Authority ("MNAA"), from a jury verdict and

judgment valuing four acres of condemned property owned by the

respondent/appellee, Overnite Transportation Company ("Overnite"),

at $1,759,578.10.

ISSUES

The petitioners/appellants raise two issues on appeal:

1) Whether the evidence preponderates against

the trial court's finding that the petitioner's

property, which was condemned as part of the

discrete access road connecting Interstate 40 to

the new airport terminal complex of the

Metropolitan Nashville Airport, was not within the

scope of the project?

2) If so, whether the petitioner is entitled to

a new trial on the grounds that evidence was

introduced to the jury by the [respondent], which

included the enhanced value of the property taken

for the discrete access road, based upon the

relocation of the new terminal complex?

In April 1979, MNAA began the Metropolitan Airport Master

Plan Update, a study of the development of a new terminal complex

at the Metropolitan Nashville Airport. The Update included five

alternatives for the construction of a discrete access road to

serve the airport from Interstate 40. Of the alternatives, two

required the taking of Overnite's property and two did not. The

fifth alternative did not specifically mention Overnite's property,

but MNAA's Director of Planning and Programming testified that it

did not require the taking of Overnite's property. The Update

recommended the fifth alternative. MNAA's Board of Commissioners

approved the study and incorporated it into the Board's resolution

verbatim. In December 1980, the Board announced to the public its

plans to construct the new terminal.

-2-

In August 1981, the original grading plans for the new

terminal project showed that MNAA might need a small portion of

Overnite's property to build the discreet access road. In 1982,

the Metropolitan Planning Commission approved MNAA's plans for the

construction of the new terminal, including the construction of the

discreet access road. The project required that MNAA obtain a

zoning variance. The Metropolitan Board of Zoning Appeals sent

hearing notices to all neighboring and affected property owners,

including Overnite, and approved the variance in June 1982. Also

in 1982, the Department of Public Works issued a letter approving

the grading, drainage, and erosion control plans for the entire

project. Those plans showed the discrete access road crossing

through Overnite's property. The trial record, however, is unclear

as to whether the grading plans showing the taking of Overnite’s

property became part of the public record through the zoning appeal

or through the letter issued by the Department of Public Works.

Despite the grading plans, evidence presented at trial

indicated that in 1982 and for some years thereafter MNAA had not

decided the exact location of the discrete access road. In 1983,

TDOT agreed to purchase the right-of-way for the discrete access

road in exchange for a conveyance of airport property. MNAA asked

TDOT to acquire property for the discrete access road because MNAA

did not have the power to exercise eminent domain. Though ultimate

design questions had not been answered, by 1986, TDOT was

appraising Overnite's property so it could make an offer to

purchase land for the discrete access road. TDOT based its

appraisals of Overnite's property on the property's proximity to

the airport and reported that in the rapidly expanding airport

commercial area the highest and best use of the property was

intense hotel/motel commercial development. TDOT hired another

appraiser in 1993 who also considered the location of the new

terminal in valuing Overnite's property.

-3-

In January 1987, TDOT filed a petition for condemnation of

4.257 acres of Overnite's land and tendered $741,980.00 to the

Davidson County Circuit Court Clerk. This amount represented

TDOT's estimation of Overnite's damages. The Davidson County

Circuit Court entered an order of possession in February 1987.

Overnite filed an answer denying that $741,980.00 represented the

fair market value of the property TDOT sought to condemn. In

answer to interrogatories from Overnite concerning the valuation of

the property, TDOT provided Overnite with the appraisals conducted

in 1986 which valued the property based on its proximity to the new

terminal. TDOT never updated its answers to these interrogatories.

The case was originally set for trial on 6 December 1993,

but the court continued the case and eventually set it for 20 June

1994. On 6 May 1994, TDOT filed a motion requesting that the

court not allow Overnite to introduce evidence of the value of its

property based on its proximity to the new terminal. On 26 May

1994, TDOT filed a notice that its appraisers could present a

valuation of the property excluding the effect of the new terminal

before trial. TDOT also said that it would submit the valuation

and its basis to Overnite; however, Overnite never received such a

submission.

On 4 June 1994, the trial judge denied TDOT's motion. The

judge found that TDOT's request to change its legal theory of just

compensation came "too late" and that TDOT failed to show that the

taking of Overnite's property was probably necessary in 1980.

Consequently, the judge held that Overnite could offer evidence of

the value of its property based on its proximity to the new

terminal, and at trial, he issued instructions to the jury

reflecting that holding.

Regarding the valuation of the property, the jury returned

-4-

a verdict of $1,759,578.10. The trial judge entered a judgment to

that effect which also provided for the payment of interest on

$1,017,778.10, the difference between the jury award and the amount

deposited with the court clerk. The trial court denied a motion

filed by TDOT requesting a judgment not withstanding the verdict

and a new trial. On 28 November 1994, TDOT filed a notice of

appeal.

We will address appellants' issues together by discussing

the proper formulation of the scope of the project rule and its

application to the case at bar.

(I)

Under the most recent formulation of the scope

of the project rule, the state need not compensate

condemnees for any enhancement in the value of

their property caused by the project which makes

condemnation necessary if, at the time the state

committed to the project, it was reasonably

foreseeable that the government might take the

condemnees' property.

The United States Constitution and the Tennessee

Constitution mandate that landowners be paid "just compensation"

when their property is taken for public use. U.S. Const. amend. V;

Tenn. Const. art. I, § 21. Traditionally, just compensation was

the market value of the property to be taken. United States v.

Reynolds, 397 U.S. 14, 16-17, 90 S.Ct. 803, 805, 25 L. Ed. 2d 12,

16 (1970). When the market value of the property rises solely

because of governmental demand for the property, however, it is not

just to require the public to pay the above normal market value.1

1.

United States v. Reynolds, 397 U.S. 14, 16-17, 90 S. Ct. 803, 805, 25 L.

Ed. 2d 12, 16 (1970). Three considerations support this proposition. United

States v. 320.0 Acres of Land, 605 F.2d 762, 782 (5th Cir. 1979). First, by

entering the market as a purchaser with a unique and pressing demand, the

Government has distorted the market. Thus, the selling price is not the actual

fair market value. Second, forcing "the Government to pay ... a premium over

that which the property would bring on the open market absent the Government's

demand would increase the cost of public projects and perhaps frustrate some

public objectives." Id. Third, permitting "recovery of value that is not

created by fair, open market conditions would be to award a few private

-5-

Consequently, courts created the scope of the project rule. Lands

situated near public improvement projects tend to increase in

value. United States v. Miller, 317 U.S. 369, 376, 63 S.Ct. 276,

281, 87 L. Ed. 336, 344 (1943). Courts designed the scope of the

project rule to allow landowners to benefit from enhancement in the

market value of their land caused by its being close to a public

improvement. Simultaneously, the rule prevents speculation on the

government's activities at the public's expense by landowners or

prospective purchasers. See Layne v. Speight, 529 S.W.2d 209, 212

(Tenn. 1975) (quoting Miller, 317 U.S. at 376-77).

The scope of the project rule, formulated by the United

States Supreme Court in Miller and later adopted by the Tennessee

Supreme Court in Layne, is easy to state: If the property being

condemned was "probably within the scope of the governmental

project from the time the Government was committed to it," the

landowner is not entitled to compensation for any increase in value

caused by the project. Miller, 317 U.S. at 376-77. The rule,

however, is not so easy to apply. United States v. 320.0 Acres of

Land, 605 F.2d 762, 782 (5th Cir. 1979) [hereinafter Monroe

County]. Consequently, the Court clarified the federal scope of

the project rule in United States v. Reynolds. Although dicta, the

Court restated Miller's rule and noted the following:

As with any test that deals in probabilities, its

application to any particular set of facts requires

discriminating judgment. The rule does not require

a showing that the land ultimately taken was

actually specified in the original plans for the

project. It need only be shown that during the

course of the planning or original construction it

became evident that land so situated would probably

be needed for the public use.

Reynolds, 397 U.S. at 21 (footnote omitted).

propertyholders windfall gains solely because of public needs and exigencies."

Id.

-6-

The Tennessee Supreme Court has cited the Reynolds'

clarification of the federal scope of the project rule. Layne, 529

S.W.2d at 212-13. In Layne, the court noted that Reynolds had

"merely restated the crux of Miller," but the court also seemed to

cite with approval the additional Reynolds' clarification quoted

above. Id. In a later case, the Court of Appeals of Tennessee,

Eastern Section, adopted the Reynolds' clarification. State v.

Hodges, 552 S.W.2d 400, 402 (Tenn. App. 1977). In Hodges, the

State condemned 57 acres of the defendant landowner's property for

a highway construction project in 1971. Three years later, after

the State had completed part of the project, the State discovered

that it would need an additional 1.75 acres of the defendant

landowner's property to maintain a stable slope. Id. at 400. The

trial judge, relying on Miller, held that the additional 1.75 acres

was outside the scope of the original project. Id. at 401. In

light of Reynolds, the court reversed the trial court, but limited

its holding to the particular facts of the case. Id. at 402.

Since Layne and Hodges, only one other case in Tennessee has dealt

with a scope of the project rule issue. State Ex rel. Comm'r,

Dep't of Transp. v. Veglio, 786 S.W.2d 944 (Tenn. App. 1989)

(affirming the trial court's finding that interchange upgrade and

road widening projects were distinct). Veglio did not explicitly

adopt, renounce, or mention the Reynolds' clarification.

Nevertheless, based on Layne and Hodges, the Reynolds'

clarification seems to be part of the scope of the project rule as

adopted in Tennessee.

Since Reynolds, courts have refined the federal scope of the

project rule to reflect landowners' and prospective purchasers'

reasonable expectations as to whether a piece of property will be

-7-

taken.2

In anticipation of a proposed project, real

property adjacent to or near land to be taken

frequently increases in value; however, the land

which is expected to be taken does not legitimately

share in this enhancement because its inclusion in

the project will make it unavailable for private

development. Any enhancement in the value of the

land necessarily would result from speculation that

the Government might be compelled to pay an

artificially inflated price.

United States v. 2,353.28 Acres of Land, 414 F.2d 965, 967-68 (5th

Cir. 1969) [hereinafter Brevard County].

As a result, land is within the scope of the project when a buyer

in the real estate market could reasonably expect that the property

in question might become part of the project and when the increase

in value of the property is attributable to speculation on the

government's activities. See Monroe County, 605 F.2d at 791.

(II)

To apply the scope of the project rule to the case at bar,

the court must decide two issues. The first is when did MNAA

commit to the new terminal project. The second is whether, on that

date, Overnite or a prospective purchaser could have reasonably

expected that Overnite's property might become part of the new

terminal project. The burden of proving whether the condemned

property was probably within the scope of the project is on the

State. Layne, 529 S.W.2d at 213. We review the trial court's

2.

See, e.g., United States v. 49.01 Acres of Land, 669 F.2d 1364, 1367

(10th Cir. 1982) (holding that the scope of the project rule, as enunciated by

Miller and Reynolds, requires the Government to pay the enhanced value of the

land if "the landowner reasonably believed that subsequent government action

removed the property from the project's scope." United States v. 320.0 Acres of

Land, 605 F.2d 762, 793 (5th Cir. 1979) (noting that the "crucial inquiry" is

whether a landowner or a private purchaser could reasonably anticipate that he

would be able to devote the property to its highest and best economic use without

serious fear that the government would soon condemn the land); United States v.

31.43 Acres of Land, 547 F.2d 479, 481-82 (9th Cir. 1976) (finding no error in

the trial court's finding that property lay within the scope of the project where

no public information existed that could lead a property owner to believe that

his land would not be a probable object of condemnation); United States v. 172.80

Acres of Land, 350 F.2d 957, 959 (3rd Cir. 1965) (holding that a landowner was

entitled to the enhanced value of his property because a purchaser contemplating

acquisition and development of the property could have reasonably anticipated

that, at the time the Government committed to the project, he would be able to

devote that land to its highest economic use without serious apprehension of

condemnation); United States v. Eastman, 528 F. Supp. 1177, 1182 (holding that

the Fifth Circuit's reasonable-expectations test requires that the enhanced value

be an element of a landowner's condemnation award).

-8-

finding on the scope of the project de novo accompanied by a

presumption that the finding is correct unless the preponderance of

the evidence is otherwise. Tenn. R. App. P. 13(d).

(A)

As of 1980, after the State funded and

announced the project to the public, the prospect

of the project becoming a reality became

sufficiently definite such that, at that time,

MNAA can be said to have committed to the new

terminal.

According to the reasonable expectations formulation of the

scope of the project rule, the commitment date is the date on which

the prospect of imminent condemnation becomes "sufficiently

definite" or, in other words, when the prospect of imminent

condemnation would be a "major factor in the decision of any

reasonable person to buy or develop the property." Baylin v. State

Roads Comm’n, 475 A.2d 1155, 1161 (Md. 1984) (quoting Monroe

County, 605 F.2d at 807). In Baylin, the State Roads Commission

developed a plan for the construction of an expressway in 1948.

The State budgeted funds for the project as of 1954. Id. at 1156.

Nevertheless, construction on the expressway did not begin as

planned because the State transferred the funds to another highway

project. In the early 1970s, the State proposed a plan to combine

the expressway project with a mass transit project. The addition

of the mass transit project required the taking of additional acres

of the appellant landowner’s property. Id. at 1157. In 1981, the

State commenced condemnation proceedings against 137 acres of the

appellant landowner’s property, 118 acres more than originally

planned. Id. at 1158.

On appeal, the court cited the trial court’s finding that

the State committed to the project in 1954 with approval. The

court found that the State announced the project to the public and

-9-

funded it in 1954. As of this time, people were familiar with the

expressway's planned location and its general path. Consequently,

the court found that as of 1954 landowners and prospective

purchasers could not expect to devote their property to its highest

and best use. Id. at 1161.

In the instant case, the trial court found that MNAA

committed to the new terminal project in 1980. Appellants argue

that MNAA had not committed to the project until 7 June 1982 when

the Metropolitan Board of Zoning Appeals granted MNAA a conditional

use permit. Without such approval, appellants argue, MNAA could

not have built the new terminal project. The date of commitment,

however, is not the date on which the occurrence of the project

becomes a legal certainty, but is the date on which the probability

that the project will occur becomes a major factor in a person's

decision to buy or develop the property. Id. (quoting Monroe

County, 605 F.2d at 807).

Here, MNAA announced the new terminal project to the public

in December 1980. In some condemnation cases, a just commitment

date is the date the state announced the project. Monroe County,

605 F.2d at 806; Baylin, 475 A.2d at 1161. Once the State

announces the project, the probability of condemnation will affect

the decisions of ordinary investors in the real estate market.

See United States v. Miller, 317 U.S. 369, 377 (1943). Further,

MNAA approved funding for the new terminal project in December

1980. Money approved is usually spent, and thus, the likelihood

that a prospective project will become a reality is far greater.

In the face of a public announcement and approved funding, the need

for a zoning permit does not create sufficient uncertainty to

compel this court to hold that the trial court erred in finding

that MNAA committed to the new terminal project in 1980.

-10-

(B)

At the time the MNAA committed to the new

terminal project, the possibility of condemnation

of Overnite's property was sufficiently serious

such that the property can be said to be within

the scope of the project.

Knowing the commitment date, the court must decide

whether, on that date, the owner of the land to be taken could

reasonably expect to be able to devote his land to its highest

economic use without serious apprehension that the State would

soon condemn the property. See Monroe County, 605 F.2d 762, 793

& n.44 (5th Cir. 1979). Several courts consider the following

three factors to determine if the taking was reasonably

foreseeable: (1) the foreseeability that the government would

change the original plans to include the property, (2) the

length of time between the commencement of the project and the

taking in question, and (3) the Government's representations

concerning the finality of the original plans. See, e.g., United

States v. 62.17 Acres of Land, 538 F.2d 670, 680 (5th Cir. 1976)

[hereinafter Jasper City]; Baylin, 475 A.2d at 1162-64; State

Dep't of Transp. v. Montgomery Ward Dev. Corp., 719 P.2d 507, 513

(Or. App. 1986).

(i)

The foreseeability that MNAA would change the

1980 Master Plan Update, a continuing planning

document, to include Overnite’s property weighs in

favor of a finding that the property was within

the scope of the new terminal project.

The application of the scope of the project rule calls for

"discriminating judgment." Jasper City, 538 F.2d at 678. The

Government need not actually specify the land ultimately taken in

the original project for the land to come within its scope; it

need only be evident that the Government might take the given tract

-11-

for the project. Id. In Jasper City, the Government did not

specify the landowner’s property in the original plans.

Nevertheless, the Government's representations that it would take

all of the property within the five year flood line and the

probability of mistakes in surveying made it reasonably foreseeable

that the Government would take the landowner’s property. Id. at

681.

The court in United States v. Crance, 341 F.2d 161 (8th Cir.

1965), reached a similar result. In 1958, the Government purchased

five acres from a landowner for a dam and reservoir project.

Crance, 341 F.2d at 162. From its inception, the project called

for recreational facilities around the reservoir, but neither a

1956 preliminary design memorandum nor a 1960 public proposal of

sites approved by the Chief of Engineers included taking any of the

remainder of the landowner’s tract. Id. at 162-63. After persons

protested the lack of recreational facilities on the landowner’s

side of the reservoir, the engineers inspected additional sites

including the landowner’s tract. Id. at 163. After public

meeting, the Government took the remaining 35 acres of the

landowner’s tract for the creation of a public use area. Id. The

district court found that the property was not within the scope of

the project. Thus, it allowed evidence concerning the enhanced

value of the property. Id. at 162.

On appeal, the circuit court reversed the judgment of the

district court. Id. at 167. The circuit court noted that none of

the plans that excluded the landowner's additional property were

final plans. Id. at 164. The circuit court found the significant

factor to be that "the project contemplated recreational areas from

its very inception." It stated as follows:

-12-

[C]ertainly property lying beyond a perimeter of

the reservoir would probably be incorporated for

recreational purposes if the land acquired for the

reservoir alone was not also sufficient for

recreational utilization. Since the [landowner’s]

property abutted the reservoir line, it was within

the sphere of probable acquisition for recreational

use.

Id. at 165.

Another court reached a different result on similar facts.

United States v. 172.80 Acres of Land, 350 F.2d 957 (3d Cir. 1965)

[hereinafter Mercer County]. In this case, the Government

purchased 20 acres of a landowner’s 100 acre tract for a dam and

reservoir project. Id. at 958. During negotiations, the

Government representative assured the landowner that the Government

would not need other parts of his land for the project. Though the

original project did not call for the creation of recreational

areas, a change in the Government's policy concerning public

developments and the use of reservoir areas prompted a decision to

acquire the remainder of the landowner’s property for recreational

use. Id. The circuit court affirmed the holding of the district

court that the enhanced value of the property was includable in the

condemnation award. Id. at 959. Noting that the possibility of

project expansion to include the property in question might have

occurred to a perceptive landowner or prospective purchaser, the

circuit court distinguished Mercer County from Crance based on the

differences between the Government’s representations and the

original plans of the projects.

In the instant case, the discrete access road was part of

the project from the time MNAA committed to it. The Airport Master

Plan Update specifically called for the construction of a discrete

access road to the new terminal. Overnite argues that it had no

notice that appellants required its land for the discrete access

-13-

road. However, MNAA’s resolution adopting the Update incorporated

it as if MNAA had copied it verbatim. The Update included two

discrete access road alternatives which required the taking of

Overnite’s property. That MNAA considered Overnite's property for

use in the construction of the planned discrete access road would

likely have put Overnite on notice that MNAA might need its

property for the project.

Also, because the alternative chosen by MNAA did not

require the taking of Overnite’s property, Overnite argues it was

reasonable for it to expect that MNAA would not take its property.

As noted in Reynolds, the Government does not have to specify the

land to be taken in the original plans for the land to be within

the scope of the project. United States v. Reynolds, 397 U.S. 14,

21 (1970). "It need only be shown that during the course of the

planning or original construction it became evident that the land

so situated would probably be needed for the public use." Id. "We

cannot straightjacket the government in defining scope of the

project, but on the other hand, we cannot permit global meanderings

to enclave areas not reasonably to have been conceived as included

at inception." Jasper City, 538 F.2d 670, 678 (5th Cir. 1976).

From its inception, the new terminal project contemplated

a discrete access road. Further, the Master Plan Update, a

"continuing planning document" considered Overnite’s property for

public use. According to early plans for the new terminal project,

the discrete access road was a small part of a much larger project,

and the plans did not schedule it for construction until MNAA had

almost the entire project completed. As in Jasper City, the

possibility that MNAA would need to make some adjustments to allow

the discrete access road to accommodate the rest of the new

terminal construction was reasonably forseeable. Once the court

-14-

accepts the possibility of adjustment as reasonably foreseeable,

the taking of Overnite’s property, property that the State had

already publicly considered for taking, is reasonably foreseeable

as well. Thus, a holding that the 1980 Update was a final

expression of the project for the purposes of defining the

project’s scope is unrealistic and would unnecessarily

"straightjacket" the State in the construction of public projects.

See Jasper City, 538 F.2d at 678. Further, a narrow interpretation

of the scope of the project rule would encourage the State, when

acquiring property, to obtain more land than it felt was absolutely

necessary to avoid the risk of having to acquire additional

property at an enhanced value. State v. Hodges, 552 S.W.2d 400,

402 (Tenn. App. 1977).

Overnite also argues that because TDOT, and not MNAA, took

Overnite’s property to build the discrete access road, the discrete

access road and the new terminal construction were separate

projects. In John L. Roper Lumber Company v. United States, 150

F.2d 329 (4th Cir. 1945), the court addressed a similar question.

There, the Government authorized the Secretary of the Navy to

establish a Marine Corps Training Area. Roper, 150 F.2d at 330.

The Federal Works agency condemned Roper’s property, which was

across the highway from the training area, to house defense

personnel. Id. The original plans for the Marine Corp Training

area contemplated a housing project. Id. at 331. The court

rejected Roper’s contention that because a different government

agency condemned the property, the property was outside the scope

of the project:

We cannot believe that the rule set forth in the

Miller case should be nullified by the mere chance

that an agency of the Government different from the

one for whose use the land is taken, should, by

reason of the fact that it holds available funds,

be directed to institute condemnation proceedings.

-15-

Id.

Roper stands for the proposition that as long as the

property in question is part of the project, the fact that the

condemning authority is a different government agency is not

relevant. As a result, the fact that TDOT condemned Overnite’s

property for MNAA does not render the discrete access road outside

the scope of the new terminal project.

(ii)

Six years, during which the project was

continuously under construction, is a relatively

short amount of time between the commencement of

the terminal project and the taking of Overnite’s

property such that it weighs in favor of finding

that Overnite could not reasonably expect to be

able to devote its property to its highest

economic use without serious apprehension of

condemnation.

Even where a condemnee's land is within the scope of the

project at the time the state becomes committed to it, there comes

a point in time when it would no longer be just to apply the scope

of the project rule in the government's favor. Monroe County, 605

F.2d at 797. At that time, the government's delay has removed the

specter of condemnation created by the project's original scope.

See Jasper City, 538 F.2d at 680. Because of additional factors in

Monroe County, the court did not define the "just" limits on the

temporal reach of the scope of the project rule, but it did warn

the Government that eighteen years might exceed those limits.

Monroe County, 605 F.2d at 797.

However, other courts have directly addressed the temporal

reach of the scope of the project rule. In Jasper City, the

Government delayed the taking for ten years. Jasper City, 538 F.2d

at 680. For the first five years, the Government was not aware

-16-

that an additional taking was necessary. Id. at 673. For the

last five years, a lack of funding delayed the taking. Id. The

circuit court noted that the delay in taking in the first five

years was acceptable because there was a high probability of the

need for adjustment given the nature of the project and because the

need for adjustment would not reveal itself for five years. Id. at

680. Regarding the second five years, the circuit court remanded

the case to the district court to determine if the delay in the

second five years constituted a representation to the landowner

that additional adjustments would not be necessary. Id.

In addition, the court in Baylin addressed the temporal

reach of the scope of the project rule. Baylin v. State Roads

Comm'n, 475 A.2d 1155 (Md. 1981). As previously discussed, in

Baylin, the State committed to a highway project in 1954, but did

not take the appellant landowner’s property until twenty-seven

years later. Id. at 1163. Plans for the project in the late

1950's showed that the State would require nineteen acres of the

appellant landowner’s property. Id. at 1156. The final plan,

accepted in 1976, called for significantly more than nineteen acres

of the appellant landowner’s property. Id. at 1158.

At trial, the appellant landowner prayed for the enhanced

value of the land above the original nineteen acres. Id. The

trial judge found that the property was part of the scope of the

project, and the appellate court reversed. Id. at 1165. The court

noted that the length of time between the commencement of the

project and the condemnation was an important factor because of the

protracted time involved. Id. at 1163. The court found that it

would be "incompatible with the principles underlying just

compensation for the Government ... to announce a project and then,

27 years later, build a substantially enlarged project and say that

-17-

this is one project and one taking." Id. at 1164.

The case at bar is unlike either Jasper City or Baylin.

First, in the present case, only six years elapsed from the

commencement of the project to the taking while in Jasper City and

Baylin it was eleven and twenty-seven years respectively. Second,

here, the delay between the commencement of the project and the

taking was not the result of an intervening event such as a

surveying error or a loss of funding. Instead, it was part of the

ongoing process of construction. As noted in Jasper City,

"gradualism in acquisition is oft times fact and not fiction."

Jasper City, 538 F.2d at 680. That the delay was part of the

normal process of construction makes the eventual taking more

foreseeable. Third, in Jasper City and Baylin, the plans that did

not require the landowner’s property were in place for several

years. Here, MNAA changed the plan for the discrete access road

requiring no taking of Overnite’s property in 1981, eight months

after MNAA announced it.

Overnite argues that until 1986 it had no knowledge that

MNAA had changed the plans to include Overnite’s property, and

thus, the changes could not have affected Overnite’s reasonable

expectations. The trial record is ambiguous as to whether the

public record included MNAA’s new plans which showed that

Overnite’s property might be taken. Unlike Baylin, however, there

is no evidence in the trial record that after the commencement of

the project Overnite received representations from MNAA or TDOT

that they would not take its property.

In other cases, courts have found delays of much longer than

six years insufficient to remove the condemned property from the

scope of the project. An Oregon appellate court found that a 14

-18-

year delay was insufficient to render the property outside the

scope of the project. State Dep't Of Transp. v. Montgomery Ward

Dev. Corp., 719 P.2d 507, 514 (Ore. App. 1986). One reason for the

courts decision was that "[a]lthough the plans changed frequently

during the 14 years before the actual taking, most plans called for

some kind of taking similar to that which occurred." Id. at 514.

Also, the court relied on the fact that "[t]here was no evidence of

government representations which misled defendants or caused them

any prejudice." Id. Similarly, the Utah Supreme Court held that

an 11 year delay between the first and second condemnation was not

so lengthy as to "constitute two separate projects." Board of

County Comm'rs v. Ferrebee, 844 P.2d 308, 311 (Utah 1992).

Specifically, the Utah Supreme Court stated that "[w]hile the

County deserves no praise for speed, we cannot say that its actions

constitute two separate projects, especially when it consistently

and openly contemplated acquiring all of Ferrebee’s property." Id.

at 311.

(iii)

MNAA's representations as to the finality of

the 1980 Master Update Plan were not so definite

as to lead Overnite to believe that it could

devote its property to its highest use without

serious apprehension of condemnation.

Courts give crucial consideration to the government's

representations when determining scope of the project cases.

Monroe County, 605 F. 2d at 792. If the government unequivocally

represents to the landowner or the public that it will not need a

certain parcel of property for a project, the government, in

effect, assures the landowner that any enhancement in the value of

that parcel will be based on its proximity to the government

project. Id. at 793; see also Mercer County, 350 F.2d 957, 958 (3d

Cir. 1965).

-19-

In Brevard County, 414 F.2d 965 (5th Cir. 1969), the court

considered the effects of the Government's representations. In

that case, NASA condemned over 72,000 acres of land in August 1961.

Id. at 967. The Government did not include the appellant

landowner's property in the original condemnation nor was there any

evidence at that time that the Government intended to acquire the

property. In September 1961, before a Senate committee, a public

official testified that NASA would not need any additional lands

for the project. Id. at 969. Subsequently in 1962, the need for

additional launch pads necessitated the acquisition of an

additional 14,800 acres including 654.43 from the appellant

landowner. Id. at 966, 969-70 & n. 12. The court reversed the

judgment of the trial court which excluded evidence of the enhanced

value of the appellant landowner's property. Id. at 972. The

court found that the public officials testimony in 1961 destroyed

the persuasiveness of the Government's argument that its 1961

plans were not conclusive. Id. at 971.

The instant case is distinguishable from both Mercer County

and Brevard County. In both of those cases, after the Government

committed to the project, it made definitive representations that

its plans were final and that the Government would not require the

landowner's property. Here, no such statements were made.

Further, as previously noted, the nature of the document which

marked the State’s commitment to the new terminal project, the

importance of the discrete access road in relation to the entire

project, and the scheduling of the construction of the discrete

access road after MNAA completed most of the remainder of the

project indicated that one could not reasonably expect the 1980

Master Plan Update to be MNAA’s final expression of its plans for

the discrete access road.

-20-

Consequently, the foreseeability that the State would take

Overnite’s property, the length of time from the date the State

committed to the new terminal project to the date of the taking,

and the State’s representations as to the finality of the original

plans all support a finding that Overnite's property was within the

scope of the new terminal project. It therefore results that the

judgment of the trial court is vacated and the case is remanded to

the trial court for a new trial and any further necessary

proceedings. Costs on appeal are taxed to appellee.

___________________________________

SAMUEL L. LEWIS, JUDGE

CONCUR:

_____________________________

HENRY F. TODD, P.J., M.S.

_____________________________

BEN H. CANTRELL, J.

-21-