Opinion

Raymond James & Associates, Inc. v. 50 North Front St. TN, LLC

Court
District Court, W.D. Tennessee
Filed
Mar 12, 2025
Cited by
0 cases
Authority
More cited than 34.4%

“The respondent cannot rely on the hope that the trier of fact will disbelieve the movant’s denial of a disputed fact but must present affirmative evidence in order to defeat a properly supported motion for summary judgment.”

How later courts described this case

  • “The respondent cannot rely on the hope that the trier of fact will disbelieve the movant’s denial of a disputed fact but must present affirmative evidence in order to defeat a properly supported motion for summary judgment.”

Written by the judges who cited it.

The opinion

IN THE UNITED STATES DISTRICT COURT

FOR THE WESTERN DISTRICT OF TENNESSEE

WESTERN DIVISION

RAYMOND JAMES & ASSOCS., INC., )

)

Plaintiff, )

)

v. ) Case No. 2:18-cv-02104-JTF-tmp

)

50 NORTH FRONT ST. TN, LLC, )

)

Defendant. )

ORDER DENYING MOTION FOR SUMMARY JUDGMENT

Before the Court is Defendant, Counter-Plaintiff 50 North Front St. TN, LLC’s (“50

North”) Motion for Summary Judgment and Statement of Undisputed Material Facts in Support

of Motion for Summary Judgment, filed on November 6, 2023. (ECF Nos. 471 & 471-1.) Plaintiff,

Counter-Defendant Raymond James & Associates (“Raymond James”) responded and filed a

counterstatement of undisputed material facts on December 4, 2023. (ECF Nos. 479-481.) 50

North replied and responded to Raymond James’ counterstatement of material facts on December

18, 2023. (ECF Nos. 483 & 484.) For the reasons set forth below, the Motion is DENIED.

I. FACTUAL BACKGROUND1

When this litigation began, Raymond James was renting office space in a Memphis

building that 50 North owns (“the Building”). (ECF No. 393, 2.) The dispute arises from facts that

predates both parties’ involvement with the Building.

1 The Court only discusses the facts pertinent to 50 North’s Motion. The facts are taken from the parties’

filings. Any disputes of fact are noted.

A. Dealings Between the Original Landlord and Tenant

The Building was completed in 1985. (ECF No. 480, 1.) Parkway Properties, L.P. was the

original owner, and Morgan Keegan and Co. (“Morgan Keegan”) was the original anchor tenant.

(Id.) On February 1, 2006, Morgan Keegan and Parkway agreed to a 10-year extension on the

lease, running from April 1, 2006 to March 31, 2016, in a document referred to as the “Eighth

Amendment.” (Id. at 1-2.) The Eighth Amendment required Parkway to make certain

improvements to the Building; an incorporated spreadsheet outlined major projects that Parkway

would have to undertake to achieve the “Class ‘A’” look and function for the Building. (ECF No.

471-3, 98.) That spreadsheet, internally referred to as “Exhibit E,” “establishe[d] a minimum basis

for mechanical and capital improvement to be performed by [Parkway] throughout the term of the

lease.” (Id.) It provides in relevant part that:

Over the term of the lease, Parkway will continue to make capital improvements in order

to maintain mechanical systems and building appearance in accordance with other class

"A" buildings in downtown Memphis. This exhibit outlines major projects: anticipated by

Parkway that will be necessary to achieve this level of commitment. While such list is fluid

and flexible depending on circumstances, it shall serve as a guide or basis for the term of

the lease.

(Id. at 100.) Exhibit E stated that modernization for the service elevator would be

completed in the first 5 years of the lease, whereas modernization for the passenger elevator would

be completed in the second 5 years. (Id.) Exhibit E also dictated that Parkway would “caulk

exterior granite and precast” by 2008 and would perform “[w]aterproofing at the Balconies”

immediately. (Id.) The parties dispute whether these instructions obligated Parkway to make the

specified capital improvements, or whether they were merely guidelines for Parkway to follow to

maintain the Building at a “Class A” standard. (ECF No. 480, 2-3.) Assuming the document’s

contents do amount to obligations, the parties also dispute whether the established deadlines were

firm, or whether the dates were only provided as estimates. (Id.)

B. Raymond James’ Assumption of the Lease and the Building’s Condition

Raymond James acquired Morgan Keegan, assumed the lease to the Building by

assignment, and began working there in 2012. (Id. at 3.) Raymond James occupied the 21st floor

of Building. (Id. at 7.) Audrey Davis, the Building’s Property Administrator from 2012 to 2014,

recounted that the Building had several ongoing issues with its elevators and water infiltration at

this time. (ECF No. 471-7, 2-4.) She also stated that Raymond James was aware of these issues.

(Id.) Indeed, the “Infrastructure Audit of Raymond James Memphis Tower” that Raymond James

commissioned in 2013 confirms that it knew of the elevators’ condition.2 (ECF No. 480, 3.) The

Report’s Executive Summary noted that “[t]he elevator control cabinets [were] building original

and were observed to make an unsettling amount of noise, as well as continuing to level to a floor

with the doors opening, making it a potential safety issue. The tenants in the building have come

to expect this from the system and have become accustomed to the issues.” (ECF No. 471-4, 2.)

The Report was shared with several Raymond James executives. (ECF No. 480, 4.)

The Building’s elevator and water infiltration issues during this time are well documented.

A list of work orders for the 2013 calendar year reflects that 81 service calls were placed regarding

the Building’s elevators. (ECF No. 480, 5.) That list also indicates that there were 18 reported

instances of mis-leveling in 2013 alone.3 Further, between September 11, 2013 and September 17,

2014, there were 12 elevator entrapments. (Id. at 4.) As for the water infiltration issues, an email

chain beginning in August of 2014 documents a number of leaks on the Building’s 4th, 16th, and

2 50 North contends that Raymond James commissioned the Report while evaluating the potential purchase

of the Building, but Raymond James disputes this. (Id.)

3 The parties do not explain what “mis-leveling” is. For the purposes of this order, the Court understands

mis-leveling to mean an event where “the floor of the elevator [is] not flush with the floor of the building.” Krueger

v. Otis Elevator Co., 925 F.2d 1464 (6th Cir. 1991).

18th floors. (ECF No. 471-4, 29-36.) The parties dispute whether these leaks were isolated

incidents, or evidence of a systemic problem within the Building. (ECF No. 480, 6.)

To resolve the water infiltration issue, Parkway constructed a “series of tarps and garden

hoses set up inside the ceiling of the 21st floor of the building to capture water infiltration from

several areas of the building’s roof.” (Id.) The parties dispute whether Raymond James was aware

of this remedial measure. (Id.)

C. Raymond James’ Negotiations and the 2014 Lease Extension

In February 2014, Raymond James elected to renew its lease at the Building. (ECF No.

471-9, 3.) Raymond James held an internal board meeting on May 22, 2014, where the board

considered the terms of such a transaction. (Id. at 2-3.) A slide deck from that meeting reflects

Raymond James’ belief that although it had “negotiated a strong position [with Parkway],

significant risk exist[ed] that service levels/quality [would] not meet reasonable expectations.”

(Id. at 3.) In a section covering the Building’s issues at the time of these negotiations, Raymond

James identified multiple elevator entrapments, window seal leaks, and water pipes bursting,

among other issues. (Id. at 4.) The presentation also compared the price difference for extending

the lease at the Building and pursuing a lease at the then-newly constructed Carlisle Building. (Id.

at 8.) That comparison revealed that as things stood between Raymond James and the two

buildings’ landlords, a lease at the Carlisle Building would have cost $11 million more than

extending the lease at the Building. (Id.)

Internal e-mails reflect that Raymond James prioritized elevator replacement and/or

modernization when negotiating the lease extension with Parkway. (ECF No. 480, 8.) On June 26,

2014, Parkway and Raymond James agreed to a new 10-year commercial lease. (Id.) Parkway

ultimately offered Raymond James 33 months of free rent, valued at $8.8 million, and agreed to

operate the Building at a level similar to that of other comparable buildings in the downtown

Memphis market. (Id. at 9.) Under this new lease, Parkway was obligated to maintain and operate

the Building according to two different standards: the “Current Standard” and the “Comparable

Building Standard.” (ECF No. 484, 3.) The parties dispute whether either standard anticipated less

than perfection in the operation and performance of the Building and its systems. (Id. at 4.)

Moreover, the parties dispute how these standards relate to this case’s facts. (Id.)

D. 50 North’s Purchase of the Building

On November 21, 2014, 50 North submitted a Letter of Intent to purchase the Building.

(Id. at 10.) 50 North and Parkway entered into a Purchase and Sale Agreement (“PSA”) on

December 18, 2014. (Id.) The PSA provided for a period where 50 North was to inspect the

Building and review the tenant leases, among other things. (Id.) The parties dispute whether 50

North performed routine due diligence during the inspection period. (Id.) 50 North contends that

it took care to look for obligations it would be assuming as the new owner, such as upcoming rent

abatements, outstanding tenant improvements or capital improvements. (Id.)

50 North received a Property Condition Assessment (“PCA”) from Parkway. (ECF No.

484, 9.) The PCA showed that although the Building’s systems were functional, they would need

significant upgrades and replacements in the future. (Id.) The Assessment included the elevator

system, whose condition was described as “fair.” (Id.) According to Parkway’s inspector, the

elevators had only three years left until they were beyond their remaining useful life and would

require over $1 million in capital expenditures to modernize. (Id.) Joel Friedman, acting on behalf

of 50 North, told Parkway’s real estate agent that 50 North had received the PCA. (Id.) He also

conveyed that 50 North understood that the Building would need capital improvements, and

factored this into its purchase price. (Id.)

Also relevant here is one clause in the PSA that required Parkway to secure a document

from each of the Building’s tenants certifying that Parkway was not in default on the lease. (ECF

No. 471-3, 24.) This document is referred to as the “Estoppel Certificate.” (Id.) In more specific

terms, the Estoppel Certificate required each tenant’s certification that:

Landlord is not in default under any of the provisions of the Lease, and no event has

occurred and no circumstance exists which, with the passage of time or the giving of notice

by Tenant, or both, would constitute such a default. . . All construction to be performed

and the improvements to be installed by Landlord on the Premises as a condition to

Tenant’s acceptance of the Premises, if any, have been completed and fully accepted by

Tenant.

(Id. at 54.) On December 24, 2014, Parkway requested that Raymond James provide an

Estoppel Certificate. (ECF No. 480, 11.) Raymond James circulated news of the request internally

via e-mail to seven individuals, including Sue Hometchko and Derek Recer. (Id.) In response to

that e-mail, Recer stated that he did not believe that Raymond James had received credit from

Parkway for the water damage earlier in the year or that the elevator issues had been addressed.

(ECF No. 471-11, 2.) He also stated that he was unsure if the language on security was

encompassing or whether Parkway had any other obligations because Raymond James was self-

funding much of the work. (Id.)

Recer indicated that Raymond James did not list the elevators or water intrusions in the

Estoppel Certificate because he and the others involved did not believe the performance of the

elevators or roof constituted a breach of the performance standards set forth in the Lease at that

point in time since some tolerance of performance issues was built into the Lease. (ECF No. 481-

1, 3.) He explains that Raymond James’ gloss on the Estoppel Certificate’s requirement to disclose

any event or circumstance that would constitute a default with the passage of time was due to his

prior experience with estoppel certificates, and his belief that such an expansive reading would be

unreasonable. (Id. at 3-4.)

Raymond James executed the Estoppel Certificate on January 13, 2015. (ECF No. 480,

11.) As relevant here, Raymond James’ Estoppel Certificate reflected that:

Landlord is not in default under any of the provisions of the Lease, and no event has

occurred and no circumstance exists which, with the passage of time or the giving of notice

by Tenant, or both, would constitute such a default. Notwithstanding the foregoing, Tenant

is currently waiting for Landlord to satisfy Landlord’s obligations as described in the

following Lease terms: (a) Section 5, Addendum of Special Stipulations, Food Service;

and (b) Section 11(d) (Access Control); and Tenant hereby reserves its rights available

under the Lease as any performance or non-performance of the aforementioned

obligations.

(ECF No. 471-3, 84.) Although it is undisputed that Raymond James provided this

response based upon their knowledge, the parties dispute whether the Estoppel Certificate only

required disclosure of current breaches and/or defaults under the lease’s terms. (ECF No. 484, 1-

2.) The parties also dispute Raymond James’ reasons for not including anything about the

elevators or water intrusions in the Estoppel Certificate. (Id. at 2.)

50 North proceeded to purchase the Building on January 15, 2015. (ECF No. 480, 12.) It

is undisputed that 50 North explicitly disclaimed reliance upon any statements or information

furnished by Parkway via the Purchase and Sale Agreement (“PSA”). The parties dispute whether

50 North purchased the Building in reliance on Raymond James’ Estoppel Certificate, whether

such reliance was appropriate under the PSA’s terms, and whether 50 North pursued and/or

received a downward price adjustment to account for elevator modernization and other capital

expenditures. (Id. at 12-13.)

E. Post-Acquisition Disputes Between 50 North and Raymond James

Raymond James started complaining about issues with the Building soon after 50 North

completed the purchase. (ECF No. 471-2, 4.) Raymond James requested a meeting on the matter.

(Id.) That meeting took place on April 23, 2015, 3 months after 50 North completed its purchase.

(Id.) The parties held another meeting on August 26, 2015 to address 50 North’s progress on a

number of capital improvements related to the elevators and the Building’s various water systems.

(ECF No. 132-5, 1-2.) Later in 2015, Raymond James requested that 50 North establish a schedule

for the elevators’ modernization. (ECF No. 480, 15.) Around this time, Raymond James also

requested that 50 North address the water leaks, including those that were coming from the

Building’s exterior windows and walls. (ECF No. 480, 14.) At some unspecified time, 50 North

received additional water intrusion complaints pertaining to the 15th, 17th, and 19th floors. (Id.) 50

North then discovered that the entire deck and planter areas above those floors had failed. (Id.) At

another unspecified time, 50 North replaced the entire main roof of the building, as well as the

deck and planter areas on the 16th, 18th, and 20th floors. (Id.)

On May 5, 2017, Raymond James provided 50 North with a “Notice of Breach.” (Id. at

14.) The Notice of Breach states that “[50 North’s] breach includes, but is not limited to, the list

of items attached hereto as Exhibit A. A number of such items constitute Critical Failures.” (ECF

No. 471-3, 87.) Exhibit A described 8 issues, which included water leaks, the Building’s aging

elevators, and general problems with the Building’s condition. (Id. at 89-91.) Raymond James

believed 50 North was obligated to modernize the elevators pursuant to the lease’s terms. (ECF

No. 480, 15.)

II. PROCEDURAL HISTORY AND SUMMARY OF CLAIMS

A. Procedural History4

On February 2, 2018, Raymond James sued 50 North in Tennessee state court. (ECF No.

1, 1.) 50 North removed the action to federal court on February 16, 2018. (Id.) Raymond James

filed their First Amended Complaint on May 29, 2018. (ECF No. 41-1.) 50 North filed their sealed

Answer and Counter-Complaint on December 19, 2019. (ECF No. 286 (sealed).) The Court

4 The Court provides only a brief sketch of this case’s procedural history because a full recitation of the 497

docket entries spanning over 9000 pages would be unnecessary.

entered an Order adopting the Magistrate Judge’s Report and Recommendation and granting 50

North’s Motion to Dismiss Raymond James’ First Amended Complaint on July 30, 2020. (ECF

No. 339.) The Court adopted the Magistrate Judge’s Report and Recommendation and denied

Raymond James’ Motion to Dismiss 50 North’s Counter-Complaint on November 13, 2020. (ECF

No. 360.) On January 28, 2022, the Court entered an Order adopting the Magistrate Judge’s Report

and Recommendation and granting in part Raymond James’ Motion for Leave to File a Second

Amended Complaint. (ECF No. 391.) On April 22, 2024, the Court entered an Order adopting in

part the Magistrate Judge’s Report and Recommendation and denying 50 North’s Motion to

Dismiss Raymond James’ Second Amended Complaint and granting in part 50 North’s Motion to

Strike allegations in the Second Amended Complaint that were immaterial to Raymond James’

fraud claim. (ECF No. 491.)

Consistent with the Court’s Order striking certain allegations from their Second Amended

Complaint, Raymond James filed their Revised Second Amended Complaint on May 16, 2024.

(ECF No. 495.) 50 North filed their Answer and Affirmative Defenses to the Revised Second

Amended Complaint on June 17, 2024. (ECF No. 496.)

50 North filed their Motion for Summary Judgment and Statement of Undisputed Material

Facts in Support of Motion for Summary Judgment on November 6, 2023. (ECF Nos. 471 & 471-

1.) Raymond James responded and filed their counterstatement of undisputed material facts on

December 4, 2023. (ECF Nos. 479-481.) 50 North replied and responded to Raymond James’

counterstatement of material facts on December 18, 2023. (ECF Nos. 483 & 484.)

B. Summary of Claims, Counterclaims, and Arguments Presented

After the many rounds of Rule 12(b)(6) motions described above, Raymond James

proceeds with just one claim: that 50 North had been fraudulently assessing operating expenses by

“charging Raymond James for illegitimate expenses and by withholding credits that Raymond

James could have received due to reductions in the Tower’s property tax assessment.” (ECF No.

495, 5.)

50 North’s counterclaims (1) that it is entitled to declaratory judgment establishing that

Raymond James’ claims are barred based on the estoppel certificate; (2) that Raymond James

committed four different kinds of fraud related to the estoppel certificate; and (3) that Raymond

James breached its contract with 50 North by suing after executing the estoppel certificate. (ECF

No. 286, 75-80.)

50 North now moves for partial summary judgment, arguing that it is entitled to judgement

as a matter of law on their claim that Raymond James is liable for breach of contract, and its

declaratory judgment claim. (ECF No. 471, 20.) Raymond James contends that 50 North’s Motion

for Summary Judgment should be denied because (1) discovery on the counterclaims has not

occurred; (2) whether Raymond James believed Parkway was in default at the time it completed

the Estoppel Certificate is a disputed question of fact; (3) the Estoppel Certificate only addressed

whether Parkway was in default at the moment of the Certificate’s execution; and (4) there is a

genuine dispute of material fact as to whether 50 North’s reliance on the Estoppel Certificate was

reasonable. (ECF No. 479, 4-18.)

III. LEGAL STANDARD

Summary judgment is proper “if the movant shows that there is no genuine dispute as to

any material fact and the movant is entitled to judgment as a matter of law.” Fed. R. Civ. P. 56(a).

In reviewing a motion for summary judgment, the Court must view the facts in the record and

reasonable inferences that can be drawn from those facts in the light most favorable to the

nonmoving party. Matsushita Elec. Indus. Co. v. Zenith Radio Corp., 475 U.S. 574, 587 (1986).

The court’s role is not to weigh evidence or assess the credibility of witnesses, but simply to

determine “whether the evidence presents a sufficient disagreement to require submission to a jury

or whether it is so one-sided that one party must prevail as a matter of law.” Kroll v. White Lake

Ambulance Auth., 763 F.3d 619, 623 (6th Cir. 2014) (citation omitted).

Once a properly supported motion for summary judgment has been filed, the party

opposing summary judgment must show that there is a genuine dispute of material fact by pointing

to evidence in the record or arguing that the moving party is not entitled to judgment as a matter

of law. Fed. R. Civ. P. 56(a), (c)(1). “When confronted with a properly supported Motion for

Summary Judgment, the party with the burden of proof at trial is obligated to provide concrete

evidence supporting its claims and establishing the existence of a genuine issue of fact.”

Cloverdale Equipment Co. v. Simon Aerials, Inc., 869 F.2d 934, 937 (6th Cir. 1989) (citing Celotex

Corp. v. Catrett, 477 U.S. 317 (1986)). A genuine issue of fact for trial exists if the evidence would

permit a reasonable jury to return a verdict for the nonmoving party; thus, a plaintiff must produce

probative evidence to create a material factual doubt. Anderson v. Liberty Lobby, Inc., 477 U.S.

242, 248 and 250 (1986). See also Street v. J.C. Bradford & Co., 886 F.2d 1472, 1479 (6th Cir.

1989) (“The respondent cannot rely on the hope that the trier of fact will disbelieve the movant’s

denial of a disputed fact but must present affirmative evidence in order to defeat a properly

supported motion for summary judgment.”) (internal quotation marks omitted). The opposing

party “cannot rest solely on the allegations made in [his] pleadings.” Everson v. Leis, 556 F.3d

484, 496 (6th Cir. 2009) (quoting Skousen v. Brighton High Sch., 305 F.3d 520, 527 (6th Cir.

2002)).

IV. ANALYSIS

As noted, 50 North moves for summary judgment on two of its counterclaims. The Court

finds that 50 North is not entitled to summary judgment on its breach of contract counterclaim.

Because 50 North’s declaratory judgment counterclaim depends on the success of its breach of

contract counterclaim, it is not entitled to summary judgment on this ground either.

Under Tennessee law, a “plaintiff alleging breach of contract must prove: (1) the existence

of an enforceable contract, (2) the non-performance amounting to a breach of the contract, and (3)

damages caused by the breached contract.” Franklin Am. Mort. Co. v. University Natl. Bank of

Lawrence, 910 F.3d 270, 281 (6th Cir. 2018) (quoting Nw. Tenn. Motorsports Park, LLC v. Tenn.

Asphalt Co., 410 S.W.3d 810, 816-817 (Tenn. Ct. App. 2011)).

50 North argues that it is entitled to judgment as a matter of law on its breach of contract

claim because Raymond James was contractually obligated to disclose whether it had actual

knowledge that Parkway was in default under any provision of the lease, or would be in default

with the passage of time, but failed to do so. (ECF No. 471, 16-17.)

Raymond James advances four arguments in response. First, it argues that 50 North’s

Motion for Summary Judgment should be denied because it is premature given that the parties

have not conducted discovery on the counterclaims. (ECF No. 479, 4.) Second, Raymond James

contends that 50 North is not entitled to judgment as a matter of law because whether Raymond

James actually believed Parkway was in default at the time it signed the Estoppel Certificate goes

to its state of mind, which is a disputed question of fact. (Id. at 6.) Third, Raymond James urges

that the Estoppel Certificate only required it to disclose whether Parkway was in default at the

moment the Certificate was executed, not whether certain conditions could eventually result in a

default. (Id. at 9.) Fourth, it argues that there is a genuine dispute of material fact as to whether 50

North’s reliance on the Estoppel Certificate was reasonable. (Id. at 15.)

The Court ultimately determines that the Motion should be denied in full due to the

inapplicability of the judicial admissions doctrine, and the existence of a genuine dispute of

material fact as to Raymond James’ state of mind at the time it executed the Estoppel Certificate.

Hence, the Court declines to address the parties’ other arguments.

A. Judicial Admissions

“Factual assertions in pleadings ..., unless amended, are considered judicial admissions

conclusively binding on the party who made them.” Kay v. Minacs Grp. (USA), Inc., 580 F. App'x

327, 331 (6th Cir. 2014) (internal quotation marks and citations omitted) (emphasis added). In its

reply, 50 North argues that the Court need not wade through Raymond James’ arguments about

the elevators’ deteriorating condition and its state of mind because treating Raymond James’

previous statements about the Lease’s requirements as binding judicial admissions is sufficient to

establish that Raymond James’ Estoppel Certificate breached the Lease. (ECF No. 483, 3-5.) In

simpler terms, 50 North’s argument is that:

(1) Throughout this litigation, Raymond James has claimed that the Lease required 50 North

to modernize the elevators.

a. Raymond James is bound by its prior statements that the Lease required elevator

modernization.

(2) The elevators had not been modernized at the time that Raymond James executed the

Estoppel Certificate.

(3) Because the Lease required modernization, and such modernization had not occurred at the

time that Raymond James executed the Estoppel Certificate (see (2)), Parkway was

breaching the Lease. [(1)(a) & (2) → (3)]

(4) Raymond James knew that modernization was required under the Lease.

(5) Raymond James also knew that the elevators had not been modernized at the time it

executed the Estoppel Certificate.

(6) Raymond James knew that Parkway was breaching the Lease. [(4) & (5) → (6)]

(7) Raymond James knew about a breach of the Lease but did not disclose it in its Estoppel

Certificate.

(8) By bringing suit against 50 North for breaching the Lease despite effectively informing 50

North that such a breach did not exist, Raymond James breached the Lease.

(See id.)

In support of (1), 50 North points to three sections in Raymond James’ First Amended

Complaint where Raymond James said something similar. (ECF No. 483, 3-4 (quoting ECF No.

41-1, 17-18).) In the quoted passages, Raymond James sought a declaration from the Court that

the Lease’s requirement that “‘Landlord shall make such improvements, repairs or replacements

as may be necessary to the maintain the Building Systems serving the Premises… in accordance

with Current Standards and the standards applicable for maintaining such items in Comparable

Buildings’, required Landlord to modernize, in whole or part, the current elevator system” among

other things. (See ECF No. 41-1, 17-18.)

50 North asserts that it was Raymond James’ position that elevator modernization was an

explicit term of the Lease as it existed at the time the Estoppel Certificate was executed. However,

that is a mischaracterization of Raymond James’ statements. These passages instead reflect

Raymond James’ position that at the time it filed the First Amended Complaint in 2018, the Lease’s

requirement that the landlord maintain the building’s systems, in turn, required the modernization

of the elevator. The difference is subtle, but significant. If the Lease explicitly required

modernization, then Parkway’s failure to modernize was an outright breach of the Lease. If the

Lease instead required that the Building’s systems (here, the elevators) be maintained, then

Parkway’s failure to modernize would only be a breach if modernization was the only means of

maintaining the Building’s systems. 50 North refers to passages that undisputably evidence

Raymond James belief in the latter formulation.

That said, a different passage in Raymond James’ First Amended Complaint is problematic. In

Paragraph 29, Raymond James alleged that:

Upon information and belief, the only way for Landlord to provide elevator service that is both

reliable and safe – and which complies with the Lease – is to modernize, upgrade, overhaul

and/or replace the elevator system in whole or part. Landlord has known of the need for

modernization for years (or has been grossly negligent in not so knowing), due to among other

things, its pre-purchase due diligence, through the work/inspections of various elevator

companies and others involved with the system, and through simple adherence to industry

norms and standards.

(ECF No. 41-1, 8.)

This paragraph is consistent with the previously cited passages because it makes clear that

Raymond James believed that Landlord’s obligation to maintain the premises required it to

modernize the elevators. (See id.) The difference is that here, Raymond James went further and

stated that Landlord’s obligations could only be satisfied via modernization before 50 North

became the Landlord. (See id.) Thus, according to Raymond James, Parkway breached the Lease

by failing to modernize. Given Raymond James’ knowledge that the elevators had not been

modernized at the time it executed the Estoppel Certificate, and its demonstrated belief that

modernization was the only way Parkway could fulfill its obligations (i.e., not breach the Lease),

it would be required to disclose that information.

More importantly, with regard to summary judgment, this line of argument presumes that

Raymond James’ prior statements constitute judicial admissions. They do not. Relevant here is the

fact that Raymond James’ purported judicial admission—that it believed that Landlord was

contractually obligated to modernize the elevators before it executed the Estoppel Certificate—

was made in its First Amended Complaint. That Complaint was superseded by Raymond James’

Second Amended Complaint, which was in turn superseded by its Revised Second Amended

Complaint. (ECF Nos. 393 & 495.) Because Raymond James did not incorporate factual assertions

from its First Amended Complaint or reassert the factual matter at issue, the purported judicial

admission was effectively eliminated and nullified twice. Thus, the factual statements can no

longer constitute judicial admissions. See 580 F. App'x at 331.

Although factual allegations from a superseded pleading cannot be considered judicial

admissions, they may still be advanced at the summary judgment stage as evidence rebutting a

subsequent contrary assertion. See W. Run Student Hous. Assocs., LLC v. Huntington Nat. Bank,

712 F.3d 165, 172–73 (3d Cir. 2013) (collecting cases). As relevant here, 50 North cannot prevail

on summary judgment in sole reliance on Raymond James’ allegations from a complaint that has

now been superseded twice over.

Problems also arise when treating Raymond James’ allegations from its First Amended

Complaint as evidence rebutting Raymond James’ latest assertions. The next paragraph of

Raymond James’ First Amended Complaint suggests that Raymond James’ belief that Landlord

was required to modernize the elevators is based upon a 2014 report Landlord commissioned but

did not provide to Raymond James until a third-party subpoena required it to. (ECF No. 41-1, 9.)

This clarification makes it unclear if Raymond James believed at that time that Landlord was

required to modernize the elevators, or if the assertion was made with the benefit of hindsight.

In sum, 50 North’s reliance on “judicial admissions” is misplaced. The Court next considers

whether there exists a genuine dispute of material fact as to Raymond James’ state of mind at the

time it executed the Estoppel Certificate.

B. Raymond James’ State of Mind at the Time it Executed the Estoppel Certificate

Raymond James urges that its state of mind at the time it executed the Estoppel Certificate

constitutes a genuine dispute of material fact that warrants the denial of 50 North’s Motion for

Summary Judgment. (ECF No. 479, 6.) It contends that this is the case because 50 North’s Motion

“turns on its unsupported contention that this omission was intentional and that Raymond James

in fact believed that the condition of the elevators and roof breached the Lease.” (Id.) Thus,

Raymond James insists that whether it believed Parkway was in default at the time it executed the

Certificate turns on its subjective belief about the condition of the elevators and roof on January

13, 2015. (Id. at 7.) In support, Raymond James points to Recer’s remarks that at the time of the

Estoppel Certificate’s execution, he and the others involved did not believe the performance of

the elevators or condition of the roof constituted a breach of the performance standards set forth

in the Lease since some tolerance of performance issues was built into the Lease. (ECF No. 481-

1, 3.) 50 North attempts to sidestep this via the judicial admissions argument that the Court

considered in the prior section. (ECF No. 483, 3-5.) 50 North urges that the elevators’ condition

at the time Raymond James’ executed the lease is irrelevant because of Raymond James’ prior

assertion that the contract required Landlord to modernize the elevators. (Id. at 5.) To reiterate,

this argument is incorrect because (1) Raymond James’ prior assertion that the Lease required

modernization is not binding on the Court because it was raised in a superseded complaint; and

(2) that assertion carries little persuasive force because it appears to be expressly conditioned on

findings from a report commissioned by Landlord but only provided to Raymond James in the

course of this litigation. See supra Part IV.A.

Raymond James has demonstrated the existence of a genuine dispute of material fact as to

whether it believed that Parkway was in default at the time it executed the Estoppel Certificate.

This factual dispute lies at the heart of 50 North’s counterclaim for breach of contract. Summary

judgment must therefore be DENIED.

C. Miscellaneous Arguments

In their briefings, the parties argue over a handful of other matters that the Court declines

to address here. These disputes pertain to whether (1) additional discovery is needed; (2) future

events are within Estoppel Certificate’s scope; (3) 50 North’s reliance on the Estoppel Certificate

was reasonable; and (4) Raymond James’ reasons for not disclosing issues pertaining to the

elevators and water infiltration are relevant. The Court finds the previously identified factual

dispute sufficient to deny the Motion for Summary Judgment in full. Also, the Court cautions the

parties against treating any part of this Order as a ruling on any of these matters.

V. CONCLUSION

In considering 50 North’s Motion for Summary Judgment, the Court had the opportunity

to review the parties many filings and numerous court rulings. Both the undersigned and the Chief

Magistrate Judge have devoted significant judicial resources to this dispute. The lack of

meaningful progress in this case demonstrates that those resources have essentially gone to waste.

Following that review, the Court drew several obvious conclusions. First, this case presents little

more than a straightforward contractual dispute that the parties have unnecessarily complicated.

Second, after seven years, around 10,000 pages spanning nearly 500 docket entries and significant

motion practice, this dispute is no closer to being resolved than it was when the case began in

2018. Third, it appears that the parties are not invested in resolving this dispute in a timely fashion.

Thus, at the soon to be set status conference, the parties should be ready to discuss whether

additional discovery is truly needed and appropriate, and to determinate a date for any additional

dispositive motions and a date for trial.

Consistent with the foregoing, 50 North’s Motion for Summary Judgment is DENIED.

IT IS SO ORDERED, this 12th day of March 2025.

s/John T. Fowlkes, Jr.

JOHN T. FOWLKES, JR.

UNITED STATES DISTRICT JUDGE