citing, e.g., City of Elsa, 226 S.W.3d at 392; Bouillion, 896 S.W.2d at 149
How later courts described this case
- citing, e.g., City of Elsa, 226 S.W.3d at 392; Bouillion, 896 S.W.2d at 149
- “The constitutional roots of justiciability doctrines such as ripeness, as well as standing and mootness, lie in the prohibition on advisory opinions, which in turn stems from the separation of powers doctrine.”
- “[T]he Special Commissioners are powerless to decide whether the condemnor possesses the right to condemn the property in the first place.”
- “If no party timely files an objection to the award, the trial court adopts the commissioners’ findings as the judgment of the court.”
Written by the judges who cited it.
The opinion
TEXAS COURT OF APPEALS, THIRD DISTRICT, AT AUSTIN
NO. 03-23-00063-CV
The City of Killeen, Appellant
v.
Oncor Electric Delivery Company LLC, Appellee
FROM THE 146TH DISTRICT COURT OF BELL COUNTY
NO. 23-DCV-336513, THE HONORABLE JACK WELDON JONES, JUDGE PRESIDING
OPINION
This appeal arises out of appellee Oncor Electric Delivery Company LLC’s suit
seeking a declaratory judgment and injunctive relief to prevent appellant the City of Killeen from
condemning the streetlight system that Oncor operates in the City. Oncor contends that the City
lacks constitutional authority to condemn the streetlight system, and thus, the City’s taking of the
system by condemnation would violate the Texas Constitution. See Tex. Const. art. I, § 17. The
City filed a plea to the jurisdiction, arguing that the trial court lacks subject-matter jurisdiction
over the suit on the bases of ripeness and governmental immunity. After the trial court denied the
City’s plea to the jurisdiction, the City filed this interlocutory appeal. See Tex. Civ. Prac. & Rem.
Code § 51.014(a)(8). For the reasons discussed below, we conclude that Oncor’s claims are ripe
and that the City’s governmental immunity is waived for Oncor’s claims for equitable relief
because Oncor has pleaded a viable claim that the City’s proposed taking violates the Texas
Constitution. Therefore, we affirm the trial court’s denial of the City’s plea to the jurisdiction.
BACKGROUND
Oncor Is a Regulated Utility
Oncor is the largest electric transmission-and-distribution utility (TDU) in Texas.
Oncor Elec. Delivery Co. LLC v. Public Util. Comm’n of Tex., 507 S.W.3d 706, 709 (Tex. 2017).
Oncor is regulated by the Public Utility Commission of Texas (PUC). Id. at 710. After the Texas
Legislature enacted legislation to establish a competitive retail market for electricity, the
incumbent vertically integrated electric utilities were required to unbundle their “business
activities into three separate units: a power generation company, a transmission and distribution
utility (TDU), and a retail electric provider (REP).” Id. at 708-09 (footnotes omitted). Oncor, as
a TDU, “own[s] the former[ly] [integrated] utility’s wires and deliver[s] power over them for
others as a rate-regulated monopoly, but [is] restricted from owning generation assets or buying or
selling electricity themselves.” AEP Tex. Com. & Indus. Retail Ltd. P’ship v. Public Util. Comm’n
of Tex., 436 S.W.3d 890, 895 (Tex. App.—Austin 2014, no pet.).
The Public Utility Regulatory Act (PURA), Tex. Util. Code §§ 11.001-66.016,
requires Oncor to provide continuous and adequate service to all customers in its certificated
service area. Id. § 37.151. According to its petition, as a TDU, Oncor constructs, operates, and
maintains a system of electric facilities across the state that includes “wires, utility poles,
transformers, substations, and more.” Oncor’s certificated area includes the City of Killeen, and
it is the City’s only TDU. See id. § 37.051(b). As the TDU for the City, Oncor delivers electricity
directly to the retail consumers’ meters and provides metering services, but the charges for Oncor’s
services are paid by retail electric providers, which in turn charge the consumer. See Oncor,
507 S.W.3d at 712.
2
Oncor’s Tariff Covers the City’s Streetlight System
As part of the PUC’s regulation of Oncor’s transmission rates and services, Oncor
is required to file with the PUC a tariff showing each rate for a utility service, product, or
commodity offered by Oncor (the “Tariff”). Tex. Util. Code § 32.101. The approved tariff has the
binding force of law and governs Oncor’s relationship with its customers. CenterPoint Energy
Res. Corp. v. Ramirez, 640 S.W.3d 205, 212 (Tex. 2022) (“An approved tariff carries the binding
force and effect of law until suspended or set aside and, while in effect, defines the terms under
which the utility’s services are provided.”); CenterPoint Energy Entex v. Railroad Comm’n of Tex.,
208 S.W.3d 608, 621 (Tex. App.—Austin 2006, pet. dism’d) (“[F]iled tariffs govern a utility’s
relationship with its customers and have the force and effect of law until suspended or set aside.”).
“By approving the tariff, the [PUC] . . . fixed the terms and conditions under which the utility’s
services are provided.” Ramirez, 640 S.W.3d at 217.
Oncor owns and operates streetlights in many cities, including the City of Killeen.
The streetlight system that Oncor owns and operates in the City consists of approximately 4,600
streetlights (“Streetlight System”). The Streetlight System is connected to the power lines that
Oncor operates as part of its electric-distribution facilities. The Streetlight System includes various
fixtures, such as poles, streetlight arms, lamps, and wiring. About 2,200 streetlights
(approximately half of the system) are co-located on poles with other types of Oncor’s distribution
facilities.
Oncor’s Tariff includes, among other things, rates and service obligations for
streetlights. The Tariff imposes specific obligations on Oncor to repair and maintain the Streetlight
System. These obligations include making repairs within 15 calendar days of a repair request,
removing lights at a customer’s request, and maintaining all facilities incidental to providing
3
streetlight service. Oncor’s Tariff also contains a form agreement for streetlighting service that
further governs the terms of its provision of that service. Under that agreement, the charges
associated with Oncor’s provision of streetlight service are included on the bill or invoice that the
city receives from its designated competitive retailer.
The Tariff also prohibits Oncor from owning, operating, and maintaining any
facilities behind the customer’s “Point of Delivery,” which is defined as “[t]he point at which
Electric Power and Energy leaves the Delivery System.” The Tariff defines the “Retail Customer’s
Electrical Installation” as all equipment “of any kind on Retail Customer’s side of the Point of
Delivery except the Meter and Metering Equipment, used by or on behalf of Retail Customer in
taking and consuming Electric Power and Energy delivered by Company.” “Retail Customer is
responsible for the design, installation, operation, protection and maintenance of electric facilities
beyond the Point of Delivery, and [Oncor] shall have no responsibility therefore[.]”
The PUC periodically reviews Oncor’s Tariff. The most recent review of the Tariff
was a comprehensive base rate case filed in May 2022. See Application of Oncor Electric Delivery
Company LLC for Authority to Change Rates, PUC Docket No. 53601-1 (filed May 13, 2022).
The City intervened and participated in the rate case as a member of the Steering Committee of
Cities Served by Oncor. The administrative trial in the rate case occurred in September to October
2022, and the State Office of Administrative Hearings Administrative Law Judges issued a
Proposal for Decision on December 28, 2022. The PUC issued an order approving revisions to
Oncor’s Tariff on April 6, 2023, and an order on rehearing on June 30, 2023. The City did not
raise any relevant issues relating to Oncor’s rates, services, or operations relating to the Streetlight
System in this Tariff review case even though it had begun exploring the possibility of taking over
the Streetlight System before the rate case commenced.
4
The City Takes Steps to Condemn the Streetlight System
In 2021, the City hired a third-party consultant, Tanko Streetlighting, Inc., to
investigate the costs and benefits of a plan by which the City would obtain ownership of the
Streetlight System and take over operations of Oncor’s streetlight business. After receiving
Tanko’s report and appraisal of the value of the Streetlight System in May 2021, the City began
the process under the Property Code to condemn Oncor’s Streetlight System in 2022.
At a meeting on February 15, 2022, the City Council unanimously voted to send an
offer to purchase the Streetlight System. On December 2, 2022, the City sent Oncor an Initial
Offer Letter, stating that “[t]he City is vested with the authority of eminent domain under Chapter
251 of the Texas Local Government Code and by its home-rule charter” and that “the City, as a
condemning authority, is required to follow certain procedural requirements” under Chapter 21 of
the Property Code. The City stated that it seeks to acquire “the streetlight system currently owned
by Oncor,” specifically “all streetlights located on any type of pole within the boundaries of the
City,” including “the streetlight fixture, the arm, base (if applicable), any and all wiring above the
ground feeding the streetlight from Oncor and the pole (if a standalone pole).” The Initial Offer
Letter enclosed Tanko’s appraisal report. See Tex. Prop. Code § 21.011(a) (requiring disclosure of
any appraisal reports when an offer is made to purchase or lease property by “[a]n entity with
eminent domain authority that wants to acquire real property for a public use”). The City informed
Oncor that the letter served as the initial offer letter required by Chapter 21 of the Property Code.
The Initial Offer Letter identified the 4,539 streetlights valued by Tanko and
proposed to purchase them for $701,110. The letter requested that Oncor respond to the offer no
later than January 1, 2023, after which the offer was to be deemed withdrawn. The Initial Offer
Letter stated that the offer was conditional and subject to the City’s final review and approval by
5
the City Council, among other things, and that “nothing in this letter is intended to pre-commit the
City to any particular action with respect to the proposed acquisition of this Property.” The Initial
Offer Letter also stated, “It is necessary for the City to acquire this Property. Therefore, the City
will proceed to file a condemnation suit under state law should an agreement not be reached.”
The City next sent the Landowner’s Bill of Rights to Oncor on December 23, 2022,
with a cover letter indicating that the City sought to purchase the Streetlight System. It also stated,
“This correspondence serves as the required submission and notice of the Landowner’s Bill of
Rights and has been provided at least seven (7) days prior to any potential Final Offer, as required
by Chapter 21 of the Texas Property Code.” See id. § 21.0112(a).
Then on January 3, 2023, the City sent Oncor a Final Offer seeking to purchase the
Streetlight System under the same terms as the Initial Offer Letter had offered. The Final Offer
identified the same 4,539 streetlights and offered the same $701,110 purchase price. The City
included the same conveyance documents and appraisals that had been sent with the Initial Offer
Letter. The City’s Final Offer satisfied the Property Code’s timing requirements for
condemnation—it was submitted 30 days after the initial offer, see id. § 21.0113(b)(3), and it gave
Oncor 14 days to respond, see id. § 21.0113(b)(7).
The City placed the condemnation proceeding on the City Council’s agenda for its
meeting exactly 14 days later, on January 17, 2023.
Oncor Files this Suit in the Trial Court
Oncor filed this lawsuit on January 13, 2023, before the 14-day deadline in the Final
Offer and the Property Code expired. Oncor seeks declaratory and injunctive relief to prevent the
City from initiating a condemnation proceeding. See Tex. Civ. Prac. & Rem. Code §§ 37.001-
6
.011, Uniform Declaratory Judgments Act (UDJA); id. §§ 65.001-.045. Oncor alleges that the
City’s attempt to condemn the Streetlight System is unconstitutional and illegal. It asserts that
“[t]he City lacks the authority to condemn the Streetlight System because: (1) no Texas law
provides a mechanism for the City to compensate Oncor for the value of its Streetlight System as
a going concern, and thus the City’s condemnation of the Streetlight System would violate the
Texas Constitution; (2) the City’s condemnation of the Streetlight System provides no public
benefit and therefore the taking would violate the Texas Constitution; and (3) the paramount public
importance doctrine precludes the City’s taking.”
Oncor sought a temporary restraining order (TRO) and temporary injunction to
prevent the City from condemning the Streetlight System while Oncor’s suit is pending. The trial
court granted Oncor’s TRO application after a hearing on January 20, 2023, restraining the City
from filing a condemnation proceeding relating to the Streetlight System. The trial court set the
hearing on the temporary injunction for February 17, 2023.
Also on January 20, 2023, the City filed its plea to the jurisdiction, arguing that the
trial court lacked subject-matter jurisdiction because Oncor’s claims are not ripe and because
governmental immunity was not waived for Oncor’s suit. The trial court signed the order denying
the plea to the jurisdiction on February 3, 2023. It also extended the TRO through February 17,
2023, the date that the temporary-injunction hearing was set.
The City immediately filed its notice of interlocutory appeal on February 3, 2023.
See id. The parties entered into a Rule 11 agreement under which the City agreed not to initiate
condemnation proceedings for 60 days. After agreeing to several extensions of the agreement,
when the agreement was set to lapse on June 13, 2023, the City declined to agree to a further
extension. Consequently, Oncor filed an emergency motion for temporary relief in this Court in
7
early June 2023, requesting that we preserve the status quo by restraining the City from filing a
condemnation proceeding relating to the Streetlight System during the pendency of this appeal.
We granted the motion and ordered the City to be so restrained.
STATUTORY FRAMEWORK
Before turning to the issues raised by the City on appeal, we will provide some
relevant background information about condemnation proceedings. Texas Local Government
Code Section 251.001(a) provides that “[w]hen the governing body of a municipality considers it
necessary, the municipality may exercise the right of eminent domain for a public use to acquire
public or private property, whether located inside or outside the municipality, for any of” an
enumerated list of public uses. “A municipality exercises its power of eminent domain through
the process referred to as condemnation.” Villarreal v. Harris County, 226 S.W.3d 537, 542 (Tex.
App.—Houston [1st Dist.] 2006, no pet.). “Condemnation is the procedure by which the sovereign
exercises its right to take property of a private owner for public use, without consent, upon the
payment of just compensation.” Id.
“The eminent domain statute is designed to provide a speedy and fair assessment
of damages.” Gulf Energy Pipeline Co. v. Garcia, 884 S.W.2d 821, 823 (Tex. App.—San Antonio
1994, orig. proceeding); see also In re State, 85 S.W.3d 871, 876 (Tex. App.—Tyler 2002, orig.
proceeding) (op. on reh’g). To achieve that goal, the Texas Legislature has established a two-part
procedure for condemnation proceedings.
Under the Property Code, the first phase of a condemnation proceeding is an
administrative proceeding; then, if necessary, a judicial proceeding follows. Amason v. Natural
Gas Pipeline Co., 682 S.W.2d 240, 241 (Tex. 1984). When a party with eminent-domain authority
8
desires to condemn land for public use but cannot agree on settlement terms with the property
owner, the condemning party must file a petition in a proper court in the county in which the land
is located. Id. (citing Tex. Prop. Code §§ 21.001, .003, .013); see also Tex. Prop. Code § 21.012
(establishing requirements for condemnation petition). After a petition is filed, the trial court
appoints three special commissioners who “assess the damages of the owner of the property being
condemned” after a properly noticed evidentiary hearing. Tex. Prop. Code §§ 21.014-.016, .042.
The special commissioners “then file an award which, in their opinion, reflects the value of the
sought-after land.” Amason, 682 S.W.2d at 242. The special commissioners’ power is limited to
filing in the proper court an award of fair compensation for the condemnation—they have no power
to determine any other issues, including whether the condemning party has the right to condemn
the property. Id. (“[T]he Special Commissioners are powerless to decide whether the condemnor
possesses the right to condemn the property in the first place.”).
The administrative phase is designed to provide “a means to quickly award
damages . . . without the delays that occur in court proceedings.” In re State, 85 S.W.3d at 876;
see also PR Invs. v. State, 251 S.W.3d 472, 478 (Tex. 2008) (explaining that administrative phase
provides parties with opportunity to present their case in “a relatively streamlined fashion and to
resolve their differences” without “the burdens of a trial”). The Texas Supreme Court has observed
that “the parties often accept the commissioners’ decision or settle their differences shortly after
the award is made,” bringing the eminent-domain proceedings “to a prompt and reasonably
satisfactory conclusion with a minimum of expense and inconvenience to the parties.” State
v. Nelson, 334 S.W.2d 788, 791 (Tex. 1960). During this phase, the trial court only has
“jurisdiction to appoint the commissioners, receive their opinion as to value, and render judgment
based upon the commissioners’ award,” Gulf Energy Pipeline Co., 884 S.W.2d at 822, and to
9
consider its own jurisdiction to appoint special commissioners, In re Lazy W Dist. No. 1,
493 S.W.3d 538, 543-44 (Tex. 2016) (orig. proceeding). If the trial court abuses its discretion by
acting outside its jurisdiction during this phase of the proceedings, mandamus relief is proper. In re
John G. & Marie Stella Kenedy Mem’l Found., 315 S.W.3d 519, 522 (Tex. 2010) (orig.
proceeding); see also Gulf Energy Pipeline Co., 884 S.W.2d at 824 (explaining that “[i]t is well
settled that a court is not to enjoin or otherwise hinder or delay the special commissioners from
proceeding with the condemnation hearing”).
After the special commissioners file their award, if any party is dissatisfied with the
commissioners’ award, it may file objections to the commissioners’ findings in the trial court, thus
invoking the trial court’s jurisdiction and initiating the judicial phase, which is the second phase
of the condemnation proceeding. Tex. Prop. Code § 21.018; see also Gulf Energy Pipeline Co.,
884 S.W.2d at 823. Once timely objections have been filed and citation is served, the
commissioners’ award is vacated and may not be reinstated. Amason, 682 S.W.2d at 242; In re
State, 85 S.W.3d at 877. The proceeding becomes a civil case, and the trial court has jurisdiction
to determine all issues in the suit in a trial de novo. Gulf Energy Pipeline Co., 884 S.W.2d at 823;
see also Tex. Prop. Code § 21.018(b) (establishing that after objection, trial court shall cite adverse
party and “try the case in the same manner as other civil causes”). Without a timely filed objection,
an eminent-domain proceeding never becomes a civil case. Gulf Energy Pipeline Co., 884 S.W.2d
at 823; see In re Lazy W Dist. No. 1, 493 S.W.3d at 542 (“If no party timely files an objection to
the award, the trial court adopts the commissioners’ findings as the judgment of the court.”).
Here, Oncor seeks to enjoin the City from initiating the condemnation proceeding
because it asserts that the City lacks legal authority to bring the condemnation proceeding. It
alleges that once the City obtains a special commissioners’ award in the administrative phase of
10
the condemnation proceeding, under Section 21.021, the City would have the right to immediately
take possession of the Streetlight System before the second phase of the condemnation proceedings
began if it deposited the amount of the award in the registry of the trial court. See Tex. Prop. Code
§ 21.021. Oncor alleges that it would suffer irreparable harm from transferring possession of the
Streetlight System to the City, “given the myriad operational impacts to the streetlight and
distribution systems that would result.” Oncor further alleges that even if a court later determined
a transfer of possession to the City should not have occurred, “uncertainty would persist regarding
how Oncor would accomplish re-obtaining possession of the Streetlight System following the
operational impacts to Oncor’s facilities that the City’s taking would cause.” In addition, Oncor
alleges that the City’s proposed taking jeopardizes Oncor’s ability to comply with its statutory duty
to provide continuous service to all customers in its certificated service area within the City as
PURA requires, both because of the operational impacts arising from such a taking and because of
“the Tariff restrictions that prohibit Oncor from owning facilities behind the individual points of
delivery at issue—which would encompass each streetlight in the Streetlight System under the
City’s proposal.”
ANALYSIS
The City’s plea to the jurisdiction challenged Oncor’s pleadings, asserting that the
trial court lacked subject-matter jurisdiction because the suit was not ripe and there is no legislative
waiver of the City’s governmental immunity for Oncor’s suit. Whether Oncor has alleged facts
that affirmatively demonstrate the trial court’s subject-matter jurisdiction is a question of law that
we review de novo. See Texas Dep’t of Parks & Wildlife v. Miranda, 133 S.W.3d 217, 226 (Tex.
2004). Likewise, whether undisputed evidence of jurisdictional facts establishes a trial court’s
jurisdiction is also a question of law. Id. When a plea to the jurisdiction challenges the pleadings,
11
“we construe the pleadings liberally in favor of the plaintiff[]” and determine whether the
pleadings, liberally construed, “allege[] facts that affirmatively demonstrate the court’s
jurisdiction.” Id.
I. Oncor’s Claims Are Ripe
The City argues that Oncor’s suit seeks an advisory opinion in a case that is not yet
ripe. See Patterson v. Planned Parenthood of Hous. & Se. Tex., 971 S.W.2d 439, 442 (Tex. 1998)
(“The constitutional roots of justiciability doctrines such as ripeness, as well as standing and
mootness, lie in the prohibition on advisory opinions, which in turn stems from the separation of
powers doctrine.”). Ripeness “is a threshold issue that implicates subject matter jurisdiction,” and
it “emphasizes the need for a concrete injury for a justiciable claim to be presented.” Id. “Ripeness
examines when that action may be brought.” Id. When evaluating ripeness, we consider whether
“the facts have developed sufficiently so that an injury has occurred or is likely to occur, rather
than being contingent or remote.” Id. “By focusing on whether the plaintiff has a concrete injury,
the ripeness doctrine allows courts to avoid premature adjudication, and serves the constitutional
interests in prohibiting advisory opinions.” Waco Indep. Sch. Dist. v. Gibson, 22 S.W.3d 849, 852
(Tex. 2000). In a more recent case addressing ripeness, the Texas Supreme Court held that claims
for declaratory and injunctive relief were ripe when litigation by the State against the plaintiffs
was sufficiently likely to occur. See Patel v. Texas Dep’t of Licensing & Regul., 469 S.W.3d 69,
78 (Tex. 2015) (concluding that plaintiffs “were subject to a real threat of likely civil and criminal
proceedings, as well as administrative proceedings that could result in penalties and sanctions,”
even though State had not yet begun administrative proceedings against them).
12
In this case, the City argues that Oncor’s suit is not ripe because it depends on
hypothetical or contingent facts, specifically, the outcome of a vote by the City Council to file a
condemnation suit, which it asserts is required by Texas Local Government Code Section
251.001(b). See Tex. Loc. Gov’t Code § 251.001(b) (“A municipality condemning land under this
section may take a fee simple title to the property if the governing body expresses the intention to
do so.”).1 The City also contends that what property would be condemned and what findings the
City Council would make as to the necessity and purpose for condemnation are still unknown,
hypothetical facts. 2 The City asserts that the case therefore is not ripe because it depends on
“hypothetical events that have not come to pass.” The City argues that Oncor’s claim that the City
lacks the necessary legal authority to condemn the Streetlight System may ripen if the City Council
votes to file a condemnation proceeding and then initiates it. The City further argues that Oncor
can assert its defense that the City lacks the necessary legal authority to condemn the Streetlight
System only after such a proceeding is initiated. We disagree.
The City has taken every step required under the Property Code that is a prerequisite
to filing a condemnation proceeding. As it followed each step, it informed Oncor that it was
following the Chapter 21 procedural requirements for condemnation and that it intended to file a
condemnation suit if the parties could not reach an agreement. First, on December 2, 2022, it made
an initial offer to purchase the 4,539 streetlights valued by Tanko, proposing to purchase them for
1
We note that by its express terms, Section 251.001(b) applies to the condemnation of
land, not to either fixtures or an integrated system of fixtures like the Streetlight System. See Tex.
Loc. Gov’t Code § 251.001(b).
2
We note that the City argues elsewhere in its brief that “[t]he public purpose of operation
and cost-effective streetlights is obvious and well-established,” citing, e.g., County of Cameron
v. Brown, 80 S.W.3d 549, 557 (Tex. 2002).
13
$701,110. That Initial Offer Letter stated, “It is necessary for the City to acquire this Property.” It
also disclosed the City’s appraisal report as required by the Property Code. See Tex. Prop. Code
§ 21.011(a). Second, it provided the Landowner’s Bill of Rights on December 23, 2022. See id.
§ 21.0112 (requiring provision of Landowner’s Bill of Rights no later than seven days before final
offer). Third, on January 3, 2023, the City made a Final Offer to purchase the 4,539 streetlights
for $701,110, which satisfied the requirements under Property Code Section 21.0113 to be a bona
fide offer. See id. § 21.0113 (requiring final offer be made on or after 30th day after initial offer
and that property owner be provided with 14 days to respond).
The City had set the condemnation proceeding on the City Council’s agenda for its
meeting exactly 14 days later, on January 17, 2023. See Tex. Gov’t Code § 2206.053 (requiring
governmental entity to “authorize the initiation of the condemnation proceeding at a public
meeting by a record vote” before initiating condemnation proceeding under Property Code Section
21.012). After a City Council vote to initiate a condemnation proceeding, the only step remaining
was for the City to file a condemnation petition. See Tex. Prop. Code § 21.012 (establishing that
“[i]f an entity with eminent domain authority wants to acquire real property for public use but is
unable to agree with the owner of the property on the amount of damages, the entity may begin a
condemnation proceeding by filing a petition in the proper court” and setting forth requirements
for petition).
The City followed all the necessary statutory steps under Chapter 21 to file a
condemnation petition and had informed Oncor multiple times of its intent to file a condemnation
suit if an agreement for the City to purchase the Streetlight System could not be reached. The City
was poised to take the vote required by Government Code Section 2206.053 and to file its Chapter
14
21 condemnation petition when Oncor filed its suit and application for a TRO. 3 As explained
above, once the City files a condemnation petition, the first phase of the condemnation proceeding
would begin, and the City could potentially take possession of the Streetlight System before Oncor
was ever able to present its argument to the trial court that the City’s proposed taking is
unconstitutional. We conclude that Oncor’s claims are ripe because it has shown a threat of
litigation in the immediate future that could lead to the concrete injury of the loss of possession of
the Streetlight System and the concomitant inability of Oncor to comply with its statutory duty
under PURA and the operational difficulties that would occur during a transfer of possession. This
“threat of harm is more than conjectural, hypothetical, or remote.” See Patel, 469 S.W.3d at 78;
see also Perry v. Del Rio, 66 S.W.3d 239, 253 (Tex. 2001) (stating that ripeness analysis “requires
that we ‘evaluate both the fitness of the issues for judicial decision and the hardship to the parties
3
But see Texas Mun. Power Agency v. Johnston, 405 S.W.3d 776, 784 (Tex. App.—
Houston [1st Dist.] 2013, no pet.) (holding property owner’s suit for injunctive relief against
agency’s entry onto his property and attempt to condemn land not ripe because agency’s board had
not voted to authorize initiation of condemnation proceeding). Although the City urges us to
follow our sister court’s holding in Johnston, we do not find that case’s pre-Patel analysis
persuasive. In addition, Johnston is factually distinguishable because the agency had not yet
completed Chapter 21’s statutory requirements for filing a condemnation proceeding. See id. at
778-780. Although the agency had sent Johnston an initial offer to purchase and an appraisal and
a copy of the Landowners’ Bill of Rights in January 2012, negotiations between the parties
continued and the agency’s counsel sent Johnston a letter requesting entry on the property to
conduct surveys in April 2012, or a meeting to negotiate to do so, noting that “should TMPA elect
to resort to legal proceedings,” it would likely seek injunctive relief to enter the property in
conjunction with its eminent-domain powers—not that it would file a condemnation suit. This
letter prompted Johnston to file his suit. In contrast, here, the City completed every prerequisite
to filing a Chapter 21 condemnation petition and put the matter on the City Council’s agenda 14
days after sending its bona fide final offer.
15
of withholding court consideration’” (quoting Abbott Labs. v. Gardner, 387 U.S. 136, 149
(1967))). 4
We overrule the City’s first issue.
II. The City’s Immunity Is Waived for Oncor’s Viable Constitutional Claim
In its second issue, the City contends that even if Oncor’s suit is ripe, it is barred
by the City’s governmental immunity, and the district court therefore erred by denying the City’s
plea to the jurisdiction. The City makes three arguments in support of its contention that its
immunity has not been waived. The City contends there has been no waiver of immunity because
(1) Property Code Section 21.003 does not waive its immunity to Oncor’s claims even though that
Section waives immunity in certain cases; (2) the UDJA does not provide a general waiver of
immunity, and Oncor does not challenge the validity of any statute or ordinance; and (3) Oncor
has not pleaded an immunity waiver through an alleged violation of the Texas Constitution because
it has identified no unconstitutional action that the City has taken.
Oncor asserts in response that the Texas Supreme Court has held that a city can be
enjoined from a threatened unconstitutional condemnation. See Lone Star Gas Co. v. City of Fort
4
See also Richardson v. Republic Title of Tex., Inc., No. 05-22-00026-CV, 2022 WL
17843594, at *3 (Tex. App.—Dallas Dec. 22, 2022, pet. denied) (mem. op.) (holding title
company’s suit against real-estate developer for declaratory judgment that deed had validly
transferred ownership of property was ripe where petition’s allegations and summary-judgment
evidence were “indicative of threatened litigation in the immediate future with respect to the
ownership of the Property and Republic Title’s obligations under its policy”); Cosmopolitan
Condo. Owners Ass’n v. Class A Inv’rs Post Oak, LP, No. 01-16-00769-CV, 2017 WL 1520448,
at *5 (Tex. App.—Houston [1st Dist.] Apr. 27, 2017, pet. denied) (mem. op.) (concluding that
evidence “manifested the presence of ‘ripening seeds of a controversy’” sufficient to establish
ripeness when homeowners’ association sent a letter to a developer, contending that development
agreement was “notably vague[,] indefinite and unenforceable,” and that if developer did not
change its position, parties would “certainly [end up] in the courthouse” (quoting Texas Dep’t of
Pub. Safety v. Moore, 985 S.W.2d 149, 154 (Tex. App.—Austin 1998, no pet.))).
16
Worth, 98 S.W.2d 799, 801 (Tex. [Comm’n Op.] 1936) (“It is universally recognized that an
attempt, or threatened attempt, to take private property for public use by virtue of eminent domain
may be restrained by injunction when the proceeding is for any reason void.”). It also argues that
more modern cases confirm that the holding in Lone Star Gas remains good law. Oncor further
contends that it has presented a viable constitutional claim that the City’s threatened taking would
be void because no appropriate procedure exists to ascertain and compensate it for the value of the
Streetlight System as a “going concern,” see id. at 803-05, and thus, the City’s immunity is waived.
“Political subdivisions of the state, including cities, are entitled to immunity—
referred to as governmental immunity—unless it has been waived.” Reata Constr. Corp. v. City of
Dallas, 197 S.W.3d 371, 374 (Tex. 2006). Governmental immunity “deprives a trial court of
subject-matter jurisdiction.” Id. (citing Miranda, 133 S.W.3d at 224). Courts “generally defer[]
to the Legislature to waive immunity because the Legislature is better suited to address the
conflicting policy issues involved.” Id. at 375. Thus, when construing a particular statute to
determine whether it waives governmental immunity, we consider whether a waiver has been
established through “clear and unambiguous” language. Tooke v. City of Mexia, 197 S.W.3d 325,
332 (Tex. 2006); see also Tex. Gov’t Code § 311.034. “However, [b]ecause sovereign immunity,
and by extension governmental immunity, is first and foremost a common-law doctrine, the [Texas
Supreme Court] ha[s] recognized that the judiciary is responsible for defining the doctrine’s
boundaries and determining whether it applies in the first instance.” Hidalgo Cnty. Water
Improvement Dist. No. 3 v. Hidalgo Cnty. Irrigation Dist. No. 1, 669 S.W.3d 178, 183 (Tex. 2023)
(addressing whether governmental entity could assert sovereign immunity as defense to another
governmental entity’s suit against it).
17
A. Governmental Immunity Is Waived Under Chapter 21 for Issues Related to
the Authority to Condemn Property
We first address the City’s contention that Property Code Section 21.003 does not
apply to waive its immunity to Oncor’s suit. Property Code Section 21.003, which is found in
Subchapter A, Jurisdiction, of the eminent-domain chapter, establishes the following:
A district court may determine all issues, including the authority to condemn
property and the assessment of damages, in any suit:
(1) in which this state, a political subdivision of this state, a person, an association
of persons, or a corporation is a party; and
(2) that involves a claim for property or for damages to property occupied by the
party under the party’s eminent domain authority or for an injunction to prevent
the party from entering or using the property under the party’s eminent domain
authority.
Tex. Prop. Code § 21.003 (emphasis added).
The City argues that Section 21.003 “does not establish a separate basis for
jurisdiction.” It contends that Section 21.003 instead only grants “ancillary jurisdiction to
determine issues” arising from a condemnor’s eminent-domain authority, relying on Doan
v. TransCanada Keystone Pipeline, LP, 542 S.W.3d 794, 803 (Tex. App.—Houston [14th Dist.]
2018, no pet.). The City argues that because no condemnation proceeding has yet been filed, there
is no condemnor, and thus, there can be no ancillary jurisdiction, so Section 21.003 is not a
statutory waiver of the City’s immunity.
We disagree with the conclusions that the City draws from Doan. In Doan, the
court was considering whether to apply the general law found in Section 21.003, which provides
jurisdiction to district courts, or a later, more specific statute granting exclusive jurisdiction over
condemnation and takings claims in Harris County to the county civil courts at law. Id. at 800.
18
The court held that the later, more specific statute applied, meaning that the district court lacked
jurisdiction over the condemnor’s condemnation counterclaim that it brought in the condemnee’s
trespass suit. Id. at 801. No condemnation proceeding had been filed by the condemnor (who was
the party arguing in favor of the district court’s jurisdiction), but that was not the court’s reason for
not applying Section 21.003. See id. In the course of addressing the condemnor’s arguments in
support of the district court’s jurisdiction, the court explained Section 21.003 and its interaction
with Section 21.017(a). Section 21.017(a) allows a political subdivision that is a party to a suit
covered by Section 21.003 “by petition, cross-bill, or plea in intervention [to] assert a claim to the
property or, alternatively, seek to condemn the property.”
In other words, Section 21.003 does not contemplate that only in suits that begin as
condemnation proceedings does the district court have jurisdiction over “all issues, including the
authority to condemn property,” as the City argues. Instead,
Texas Property Code Section 21.003 is the general rule granting a district court
ancillary jurisdiction to determine issues such as condemnation of property in cases
involving “a claim for property or for damages to property occupied by the party
under the party’s eminent domain authority or for an injunction to prevent the party
from entering or using the property under the party’s eminent domain authority.”
Tex. Prop. Code § 21.003. Thus, Texas Property Code section 21.017 allows a party
to a suit that already is within the district court’s ancillary jurisdiction under section
21.003 to raise a condemnation claim against another by petition, cross-bill, or plea
of intervention.
Id. at 803 (emphases added). Accordingly, Chapter 21 expressly waives immunity and grants the
district court jurisdiction to consider all issues, including the entity’s condemnation authority, in
suits brought against governmental entities for various property-related claims, such as inverse
condemnation and trespass—not only in suits that begin as condemnation proceedings brought by
an entity with eminent-domain authority. Here, Oncor’s suit seeks declaratory and injunctive relief
19
from the City’s threatened exercise of its eminent-domain authority to condemn Oncor’s property.
Because the City has invoked its eminent-domain authority by taking all the steps required under
Chapter 21 for a condemnation suit, and Oncor’s claims against the City’s threatened exercise of
that authority are ripe, we conclude that Chapter 21 waives governmental immunity for Oncor’s
equitable claims challenging the City’s authority to condemn the Streetlight System.
This is an issue of first impression. Therefore, because of the unusual
circumstances here, where the City seeks not to condemn real property, but an entire streetlight
system currently owned and operated by a regulated utility company, we also address the parties’
arguments about whether Lone Star’s holding that a governmental entity may be enjoined from a
constitutional condemnation is still good law and whether Oncor has pleaded a viable
constitutional claim that the City’s threatened taking would be void because no appropriate
procedure exists to ascertain and compensate it for the value of the Streetlight System as a
“going concern.”
B. Governmental Immunity Is Waived for Oncor’s Claims for Equitable Relief
In Lone Star Gas, the Texas Supreme Court considered similar facts to those
presented here. 98 S.W.2d at 799. After the City of Fort Worth threatened to condemn a gas-utility
system that Lone Star owned and operated within the city, Lone Star filed suit to enjoin the
threatened condemnation. Id. Lone Star argued that the threatened taking by condemnation
proceedings was “without right or authority in law, and if permitted would violate its rights under
article 1, § 17 of the Constitution of the state of Texas.” Id. at 799-800. Similarly to the City in
this case, Fort Worth argued that the county court at law had exclusive jurisdiction over
condemnation proceedings, and thus, Lone Star could only challenge the threatened condemnation
20
as unconstitutional in a condemnation proceeding once Fort Worth filed one in the county court at
law. Id. at 800-01.
The supreme court rejected that argument, explaining that Lone Star’s challenge to
the condemnation proceedings “involves an inquiry as to the existence of legislative authority to
exercise the power to condemn, which, if absent, is such a limitation upon the county court’s power
to proceed as makes its action void if it does proceed.” Id. at 801. Moreover, the court explained
that “[i]t is universally recognized that an attempt, or threatened attempt, to take private property
for public use by virtue of eminent domain may be restrained by injunction when the proceeding
is for any reason void.” Id. (citing cases). The court held that “injunction is the appropriate
remedy, when there is a threatened taking in any proceeding which may be void for any reason.”
Id.; accord Brown v. Lower Colo. River Auth., 485 S.W.2d 369, 371 (Tex. App.—Austin 1972, no
writ) (noting that examples of void condemnation proceedings provided in Lone Star include
“those (1) conducted under an inapplicable statute, or (2) under a statute which is unconstitutional,
or (3) where the property sought to be taken is not within the area in which the condemning
authority has power of eminent domain” (emphasis added)).
More modern cases on governmental immunity in the context of injunctive relief
confirm that Lone Star’s holding remains good law. See, e.g., City of Elsa v. M.A.L., 226 S.W.3d
390, 392 (Tex. 2007) (per curiam). In City of Elsa, the Texas Supreme Court reaffirmed that
“governmental entities may be sued for injunctive relief under the Texas Constitution.” Id. at 391.
The plaintiffs there sought equitable and injunctive relief for alleged constitutional violations by
the city. Id. The city argued that governmental immunity barred the suit against the city, but the
Supreme Court disagreed, reiterating its decision in City of Beaumont v. Bouillion, 896 S.W.2d
21
143, 149 (Tex. 1995), “that ‘suits for injunctive relief’ may be maintained against governmental
entities to remedy violations of the Texas Constitution.” City of Elsa, 226 S.W.3d at 392.
Although the City acknowledges the supreme court’s holding in Bouillion allowing
a plaintiff to seek equitable remedies for an unconstitutional action, it contends that Oncor has not
identified any unconstitutional action by the City. The City contends that Oncor’s allegation that
the Streetlight System cannot be taken in a condemnation proceeding does not identify an
unconstitutional action by the City. The City urges that because Oncor would be able to assert a
claim for compensation for the taking of the Streetlight System in a condemnation proceeding, if
the City were to initiate one, no constitutional violation either has or could occur. See Tex. Const.
art. I, § 17 (establishing that “[n]o person’s property shall be taken, damaged, or destroyed for or
applied to public use without adequate compensation”). We disagree. Oncor alleges that the City’s
threatened condemnation violates the constitutional mandate in the takings clause by subjecting it
to a void process because a condemnation proceeding under Chapter 21 cannot adequately
compensate it for the taking of the Streetlight System, which is a “going concern.” See Lone Star,
98 S.W.2d at 801. Having determined that this concrete injury alleged by Oncor is sufficiently
imminent to present a ripe controversy, we conclude, under Bouillion and Lone Star, that the trial
court has jurisdiction to consider Oncor’s claims seeking to enjoin the City’s unconstitutional
action if Oncor has alleged a viable constitutional claim.
Before turning to the viability of Oncor’s constitutional claim, we address the City’s
argument that “Oncor’s claims rest solely on the [UDJA],” and the UDJA only waives
governmental immunity in a narrow set of cases in which the plaintiff challenges the validity of
statute or an ordinance. See Texas Dep’t of Transp. v. Sefzik, 355 S.W.3d 618, 622 & n.3 (Tex.
2011). In Sefzik, the Texas Supreme Court explains that the UDJA waives governmental immunity
22
for this type of validity challenge because the statute “expressly requires joinder of the
governmental unit.” Id. at 622 n.3 (citing Tex. Civ. Prac. & Rem. Code § 37.006(b)). The City
contends that Oncor’s declaratory-judgment claims are barred by immunity because “the UDJA
does not waive the state’s sovereign immunity when the plaintiff seeks a declaration of his or her
rights under a statute or other law.” Id. at 621. The City characterizes Oncor’s claims only as
seeking a declaration of its rights under Chapter 21 of the Property Code, Chapter 251 of the Texas
Local Government Code, and the Texas Constitution. While Oncor alleges that these
condemnation statutes do not authorize the City’s threatened condemnation and thus a
condemnation proceeding against it would be unconstitutional, we conclude that Oncor’s request
for declaratory relief in substance challenges the validity and constitutionality of the condemnation
statutes’ application to the City’s threatened condemnation of Oncor’s “going concern.” In
addition, Oncor’s claims do not rest solely on the UDJA; it also seeks injunctive relief to prevent
the threatened condemnation proceeding, and we have concluded immunity is waived for deciding
Oncor’s underlying action for injunctive relief. See Texas Parks & Wildlife Dep’t v. Sawyer Tr.,
354 S.W.3d 384, 388 (Tex. 2011) (“[G]enerally, the [U]DJA does not alter a trial court’s
jurisdiction. Rather, the [U]DJA is ‘merely a procedural device for deciding cases already within
a court’s jurisdiction.’” (citations omitted)). Thus, we conclude that the UDJA’s waiver of
immunity applies to Oncor’s challenge to the validity and constitutionality of the condemnation
statutes’ application in the going-concern context.
C. The City’s Immunity Is Waived for Oncor’s Viable Constitutional Claim
As explained above, the Texas Constitution authorizes suits for equitable or
injunctive relief for violations of the Texas Bill of Rights, see Bouillion, 896 S.W.2d at 148-49, but
23
to invoke this limited waiver of immunity, the plaintiff must plead a viable constitutional claim,
City of Houston v. Downstream Env’t, L.L.C., 444 S.W.3d 24, 38 (Tex. App.—Houston [1st Dist.]
2014, pet. denied); see also Andrade v. NAACP of Austin, 345 S.W.3d 1, 11 (Tex. 2011) (citing,
e.g., City of Elsa, 226 S.W.3d at 392; Bouillion, 896 S.W.2d at 149).
“The protection of one’s right to own property is said to be one of the most
important purposes of government. That right has been described as fundamental, natural,
inherent, inalienable, not derived from the legislature and as preexisting even constitutions.”
Eggemeyer v. Eggemeyer, 554 S.W.2d 137, 140 (Tex. 1977). As the Texas Supreme Court recently
reiterated, “[t]he Texas Constitution helps ensure that government fulfills this purpose by
providing a robust right to adequate compensation—and waiver of immunity—if a person’s
property is ‘taken, damaged, or destroyed for or applied to public use . . . unless by the consent of
such person.’” Texas Dep’t of Transp. v. Self, 690 S.W.3d 12, 25 (Tex. 2024) (quoting Tex. Const.
art. I, § 17(a); citing Steele v. City of Houston, 603 S.W.2d 786, 791 (Tex. 1980)).
Oncor alleges that the City’s threatened condemnation of the Streetlight System
under Chapter 21 violates the constitutional mandate in the takings clause because it would subject
Oncor to a void process and that the holding in Lone Star supports the viability of its constitutional
claim. Oncor seeks to enjoin what it alleges is “an unconstitutional and unlawful attempt to
effectuate the taking of a utility business as a going concern.” In Lone Star, Fort Worth sought to
take Lone Star’s entire gas-distributing system and the various tangible and intangible property
that constituted the system. 98 S.W.2d at 799. In its petition, Oncor alleges that the City is
attempting to take the Streetlight System so that it can “provide the same [streetlight] service that
Oncor already furnishes,” and the City has acknowledged that if it takes the Streetlight System, it
will either operate the System itself or contract with an alternate operator. The court held in Lone
24
Star that the Constitution precludes a city from initiating a condemnation proceeding against a
utility if the condemnation would take not only the utility’s real property but also the “going
concern” value of its business. See id. at 803-806 (concluding that statutory condemnation
procedures were not intended to apply to this type of proceeding and that there was no statutory
procedure for ascertaining just compensation to be paid for taking going concern).
The City asserts that the Local Government Code empowers it to “use eminent
domain authority to appropriate real property, rights-of-way, or other property as necessary” to
“buy, own, . . . and maintain and operate a[n] electric lighting plant . . . or other public service or
public utility” as long as it adequately compensates the condemnee. Tex. Loc. Gov’t Code
§ 552.002(b). While Section 552.002(b) authorizes the exercise of eminent-domain authority for
this purpose, other language contained in Section 552.002(b) supports Oncor’s argument that
Chapter 21 condemnation proceedings are not intended to be used in this situation. The statute
provides that “[i]n its charter, the municipality may adopt rules it considers advisable for the
acquisition or operation of the public service or public utility.” Id. (emphasis added).
The court in Lone Star Gas analyzed the condemnation statute then in effect, which
operated similarly to today’s condemnation statute, see 98 S.W.2d at 804-805, and a statutory
provision virtually identical to Section 552.002(b), see id. at 805. The court concluded as follows:
The fact that in connection with this particular power the Legislature has provided
that the city may adopt by its charter such rules and regulations as it may deem
advisable for acquiring public utilities, and has not made a similar provision with
reference to other powers, is potent proof that the Legislature thought the general
statutes were not sufficient, in the event of an attempted exercise of this particular
power. It is further convincing evidence that the Legislature intended to condition
the exercise of this power upon the adoption by the city of sufficient and adequate
rules and regulations for “acquiring” such utilities. It is admitted that the City of
Fort Worth has never made any such provisions in its charter. We think it is true,
25
therefore, that the power given to the city to take and appropriate the business and
properties of a public utility lies dormant.
It follows, we think, that the threatened attempt to take and appropriate plaintiff’s
business and properties in the absence of adequate and appropriate machinery for
ascertaining the constitutional compensation which plaintiff would be entitled to
receive, if permitted to be pursued, would be void; and injunction was the proper
remedy for preventing such attempt.
Id. The same situation that was present in Lone Star is present here. The City seeks to take over
the entire Streetlight System, but Texas law does not provide a mechanism for “assessing the
compensation to be paid a public utility for the taking of its business and plant as a going concern.”
Id. at 804 (concluding condemnation statute’s provisions “are wholly inappropriate, inapplicable,
and insufficient” for this purpose).
The City argues that Lone Star’s holding does not apply here because the Streetlight
System is not a regulated utility for which no adequate compensation for the “going concern” value
can be awarded in a Chapter 21 proceeding. The “going concern” value of a business refers to the
business’s intangible value, which is made up of such elements as its goodwill, managerial
efficiency, and ability to attract customers. See, e.g., Kimball Laundry Co. v. United States,
338 U.S. 1, 9-11 (1949); Lone Star, 98 S.W.2d at 803. In most condemnation situations,
compensation for going-concern value is not required by either the federal or Texas constitutions
because the owner is free to move his business to a new location when only the physical property
has been condemned. Kimball Laundry, 338 U.S. at 11. In Kimball Laundry, the U.S. Supreme
Court explained that
[t]he situation is otherwise, however, when the Government has condemned
business property with the intention of carrying on the business, as where public-
utility property has been taken over for continued operation by a governmental
26
authority. If, in such a case, the taker acquires going-concern value, it must pay
for it.
Id. at 12.
The City urges that this going-concern exception to the general rule applies only to
regulated water, sewer, or electric utilities, which cannot relocate their business operations and
“cannot ordinarily be operated profitably except as a monopoly,” meaning that even if the former
owner of the utility invested in duplicating the condemned facilities, it would have no prospect of
a profitable return. Id. at 12-13. The City acknowledges that Texas courts have concluded that
attempted takings by municipalities of regulated utilities are impermissible because “Texas law
has no mechanism to award going-concern compensation.” See Lone Star, 98 S.W.2d at 805; City
of Blue Mound v. Southwest Water Co., 449 S.W.3d 678, 692–93 (Tex. App.—Fort Worth 2014, no
pet.) (affirming summary judgment on ground that no statutory procedures exist authorizing City
of Blue Mound’s attempt to condemn Southwest’s water and wastewater system as going concern
“because as a matter of law [Southwest is] entitled to compensation for going-concern value as an
element of this purported taking, because the general Texas condemnation statutes provide no
mechanism for the awarding of going-concern value as held in Lone Star Gas Co., and because
Lone Star Gas Co. remains binding precedent”); City of Houston v. Southern Water Corp.,
678 S.W.2d 570, 572 (Tex. App.—Houston [14th Dist.] 1984, writ dism’d) (affirming trial court’s
temporary injunction prohibiting City of Houston from condemnation of sanitary-sewer and water-
supply systems of Hidden Valley subdivision that had been annexed by City of Houston based on
Lone Star’s holding that takings under general condemnation statutes are limited to real estate, and
that absent process established by general statute or city’s charter, city cannot condemn going-
concern aspects of business). The City contends, however, that the holdings in these cases are
27
limited only to attempted takings of an entire regulated utility system and that the Streetlight
System is not such a regulated utility, so therefore, Lone Star’s holding does not apply in this case.
We disagree that the holdings in Lone Star and Kimball Laundry are limited only
to a municipality’s attempt to take a regulated utility. Although Kimball Laundry gives the
government’s condemnation of a utility for continued operation by a governmental authority as an
example of a situation where the going-concern value must be paid for by the condemning entity,
it does not limit its holding only to utilities. 338 U.S. at 12-13. The Supreme Court states that in
utility cases, because the utility can only be operated profitably as a monopoly, the condemning
entity assures itself of freedom from the former owner’s competition and that owner retains nothing
of its going-concern value. Id. But the Supreme Court goes on to state that “the public-utility
cases plainly cannot be explained by the fact that the taker received the benefit of the utility’s
going-concern value.” Id. at 13. Instead,
[t]he rationale of the public-utility cases, as opposed to those in which
circumstances have brought about a diminution of going-concern value although
the owner remained free to transfer it, must therefore be that an exercise of the
power of eminent domain which has the inevitable effect of depriving the owner of
the going-concern value of his business is a compensable ‘taking’ of property.
Id. Accordingly, the Supreme Court applied this principle to the government’s wartime takeover
of a laundry plant for military use for several years during World War II because during the period
of the government takeover, the laundry-plant owners were completely deprived of the going-
concern value of their business. Id. at 13-14.
Therefore, we need not decide whether the Streetlight System, a discrete segment
of Oncor’s regulated TDU, which is governed by its Tariff, is itself a regulated utility to decide
that the City’s threatened taking is the type of taking that would have “the inevitable effect of
28
depriving the owner of the going-concern value of his business.” Id. at 13. The City’s stated
purpose in condemning the Streetlight System is to take over its operation. And under Lone Star,
which remains binding precedent, because the general Texas condemnation statutes provide no
mechanism for the awarding of going-concern value, we conclude that Oncor has stated a viable
constitutional claim for which the City’s immunity is waived. 98 S.W.2d at 805 (concluding
injunction was proper remedy for preventing City of Fort Worth’s attempt to take Lone Star’s
business and properties “in the absence of adequate and appropriate machinery for ascertaining the
constitutional compensation which plaintiff would be entitled to receive”).
We overrule the City’s second issue.
CONCLUSION
Having overruled the City’s issues, we affirm the trial court’s denial of the City’s
plea to the jurisdiction.
__________________________________________
Gisela D. Triana, Justice
Before Chief Justice Byrne, Justices Triana and Kelly
Dissenting Opinion by Justice Kelly
Affirmed
Filed: February 28, 2025
29