discussing duty to verify bids under FAR Part 14
How later courts described this case
- discussing duty to verify bids under FAR Part 14
- “Bid protest actions are subject to the standard of review established under section 706 of title 5 of the Administrative Procedure Act (‘APA’
- “Under FAR 52.212-1(g), the Government may waive “informalities and minor irregularities.’”
- “Following passage of the APA in 1946, the District of Columbia Circuit in Scanwell Labs., Inc. v. Shaffer, 424 F.2d 859 (D.C. Cir. 1970
Written by the judges who cited it.
The opinion
In the United States Court of Federal Claims
Nos. 24-172C; 24-406C; 24-446C; 24-448C; 24-461C; 24-467C; 24-471C
Filed: February 3, 2025
Redacted Version Issued for Publication: February 27, 20251
* * * * * * * * * * * * * * * * *
*
GOVWAVE, LLC, et al., *
*
*
Protestors,
*
v. *
*
UNITED STATES,
*
Defendant.
*
* * * * * * * * * * * * * * * * **
Eric Valle and Jonathan Williams, PilieroMazza PLLC, Washington, DC, for
protestor GovWave, LLC.
Taylor Holt and Emily Chancey, Maynard Nexsen PC, Huntsville, AL, for
protestor Futron, Inc.
Kathy Potter and Sharon Roach, Potter & Murdock, P.C., Washington, DC, for
protestor Government Acquisitions, Inc.
John Tolle, Baker, Cronogue, Tolle & Werfel, LLP, McLean, VA, for protestor DH
Technologies, Inc.
Nicole Pottroff and Greg Weber, Koprince McCall Pottroff LLC, Lawrence, KS,
for protestor Enterprise Technology Solutions, Inc.
Matthew Long, Moore & Lee, McLean, VA, for protestor Unicom Government, Inc.
Olivia Lynch and Emily Golchini, Crowell & Moring LLP, Washington, DC, for
protestor Advanced Computer Concepts, Inc.
Kristin Olson, Department of Justice, Commercial Litigation Branch, Civil
Division, Washington, DC, for defendant. With her were Miles J. Wright, Trial Attorney,
1 This Opinion was issued under seal on February 3, 2025. The parties were asked to
propose redactions prior to public release of the Opinion. This Opinion is issued with the
some of the redactions that the parties proposed in response to the court’s request. Words
which are redacted are reflected with the notation: “[redacted].”
Commercial Litigation Branch, Isabelle Aubrun, Trial Attorney, Commercial Litigation
Branch, Corinne A. Niosi, Assistant Director, Commercial Litigation Branch, Patricia M.
McCarthy, Director, Commercial Litigation Branch, and Brett A. Shumate, Acting
Assistant Attorney General, Civil Division. Of counsel Maj. James Kim and Maj. Joshua
Fix, Trial Attorneys, Contract Litigation & Intellectual Property Division, U.S. Army Legal
Services Agency, Fort Belvoir, VA, and Alex M. Cahill, Attorney-Advisor, Army Materiel
Command Legal Center-Rock Island Arsenal, Rock Island, IL.
OPINION
HORN, J.
Protestors GovWave, LLC (GovWave), Futron, Inc. (Futron), Government
Acquisitions, Inc. (Government Acquisitions), DH Technologies, Inc. (DH Technologies),
Enterprise Technology Solutions, Inc. (Enterprise Technology Solutions) Unicom
Government, Inc. (Unicom), and Advanced Computer Concepts, Inc. (Advanced
Computer Concepts) each filed pre-award bid protests in the United States Court of
Federal Claims challenging the decision of the Department of the Army, Army Contracting
Command – Rock Island (Army) to exclude the protestors’ offers in response to
Solicitation W52P1J-20-R-0082 (the Solicitation).2 Each of the seven protestors were
eliminated from the competition for failing to comply with the Army’s “strict compliance
requirements” during Step 1 of the evaluation process.
FINDINGS OF FACT
The Army’s April 15, 2021 Acquisition Plan related to the Solicitation at issue in the
above captioned protests explains:
This acquisition is a follow-on to the Information Technology Enterprise
Solutions-3 Hardware (ITES-3H) Multiple Award Indefinite Delivery
Indefinite Quantity (IDIQ) contracts awarded in February 2016. The purpose
of this acquisition is to support Army, Department of Defense (DoD) and all
Federal Agency Information Technology (IT) infrastructure and infostructure
goals with a full range Commercial Off-The-Shelf (COTS) hardware and
related incidental software and services that meet the definition in Federal
Acquisition Regulation (FAR) 2.101, Definitions, for “commercial items.”
Army Contracting Command – Rock Island (ACC-RI), in support of CHESS
[Computer Hardware, Enterprise Software and Solutions], intends to award
2 The court notes that although the agency has not yet made awards under the
Solicitation, and, therefore, the protestors cannot protest an award decision to another
offeror or offerors in a post-award bid protest, at this time, unlike a pre-award protest in
which offerors challenge the Solicitation itself, the seven protestors have been evaluated,
at the first step of a three step evaluation procedure for the procurement established by
the agency, and eliminated from the competition by the agency for non-compliance.
2
at least 17 Firm Fixed Price (FFP) IDIQ contracts, with up to 7 awards
reserved for small business. The ITES-4H ceiling is $10,000,000,000.00
with a five-year base period and one five-year option period. Ordering will
be decentralized and open to all DoD and Federal Agencies. The IDIQs will
allow the Government to realize cost savings, provide visibility and oversight
through contractor reporting and analysis of CHESS IT e-Mart data, and
streamline the acquisition process.
(capitalization in original; alteration added).3 The April 15, 2021 Acquisition Plan
continued:
The intention of this acquisition is to integrate, modernize and refresh the
existing IT equipment for client, server, storage, and network environments
while providing standardized interfaces. The acquisition provides an
ordering vehicle for authorized users to meet equipment requirements. The
contractors will be required to perform in a fully responsive, complete and
flexible manner over the entire contract life, recognizing the dynamic nature
of the IT environment: changes in the requirements of users, standards,
regulations, and technology, as well as the various commercial alternatives
available for purchase, leasing and licensing.
The Solicitation, as amended, projects evaluating offers in three separate steps in
order to make a best value award. The Solicitation provides:
EVALUATION FACTORS FOR AWARD
M.1 BASIS FOR CONTRACT AWARD
The awards will be made based on the best overall (i.e., best value)
proposals that are determined to be the most beneficial to the Government,
with appropriate consideration given to the four evaluation factors:
3 As explained on the Army’s website:
Computer Hardware, Enterprise Software and Solutions (CHESS) is the
Army’s designated primary source for commercial IT. CHESS provides a
no-fee, flexible procurement strategy through which an Army user may
procure commercial-off-the-shelf (COTS) IT hardware, software, and
services via an e-commerce (IT e-mart) based process. CHESS offers
simple, straightforward contract vehicles through its online Army e-
commerce ordering system, the IT e-mart (https://chess.army.mil). These
contracts provide continuous vendor competition for best value and
consolidation of requirements to maximize cost avoidance and leverage the
Army’s buying power.
https://www.eis.army.mil/programs/chess (last visited Feb. 27, 2025).
3
Technical Factor, Price, Past Performance, and Small Business
Participation. In the evaluation, the technical factor is more important than
the Past Performance factor and the past performance factor is more
important than Small Business Participation. All non-priced factors
combined are significantly more important than Price. Although Price is not
the most important factor, the closer the ratings in the non-price factors, the
more significant price becomes. The Government will perform a trade-off
analysis of the non-priced factors with price to select the best value
proposals that provide the best value to the Government. To receive
consideration for award, a rating of no less than Acceptable must be
achieved for the technical factor (to include each subfactor) and the Small
Business Participation factor. Additionally, any Other Than Small Business
Offeror must have an acceptable Small Business Subcontracting Plan to
receive an award in accordance with FAR 19.702(a). Offerors are cautioned
that awards may not be made to the lowest priced proposal. An award will
not be made to any Offeror with a deficiency in any factor.
M.2 NUMBER OF CONTRACT AWARDS
The Government intends to award at least 17 Firm Fixed Price (FFP),
Indefinite Delivery, Indefinite Quantity (IDIQ) type contracts as a result of
this solicitation. Each contract will have a base period of 5 years, with one
available 5-year option period.
i. The Government will first reserve an anticipated seven awards for small
businesses. The Government will select these small business awardees
based on a trade-off analysis of all factors, including price, to select the
small business Offerors who represent the best value to the Government.
ii. Next, the Government will consider all remaining Offerors, without regard
to size status, to make the remaining awards. The Government anticipates
making at least 10 additional awards to the remaining Offerors without
consideration of size status. These Offerors will be selected on a trade-off
analysis of all factors, including price, to select the Offerors who represent
the best value to the Government.
M.3 EVALUATION METHODOLOGY
This is a competitive best value source selection in which competing
Offerors will be evaluated against four evaluation factors: Technical, Price,
Past Performance, and Small Business Participation. The contract award
decisions will be determined based upon the evaluation of each Offeror's
complete proposal against the evaluation criteria identified below. Selection
of awardees will be accomplished as follows:
4
Step 1 - STRICT COMPLIANCE REQUIREMENT: Proposals will be
reviewed to determine if all compliance requirements set forth in the
Instructions to Offerors are satisfied. Failure to provide proposals in
compliance with the instructions specified as STRICT COMPLIANCE
REQUIREMENTS in the Instructions to Offerors of this RFP [Solicitation]
shall render the Offerors proposal [sic4] non-compliant. Any Offeror’s
proposal determined non-compliant will not be evaluated and will not be
further considered for award. Only Offerors whose proposals are
determined compliant will move to Step 2 of the evaluation process.
Step 2 - Review of Part A - Equipment List: The Offerors Equipment List will
be evaluated on an Acceptable/Unacceptable basis. To determine technical
acceptability, the Government will evaluate an Offerors Equipment List
using statistical sampling. In this regard, the Government will evaluate a
percentage of the proposed items in the Equipment List (i.e., the statistical
sample) to determine if the Offerors proposed Equipment List meets the
Governments minimum requirements indicated in Column C of Attachment
0002.[5] All Offerors Equipment Lists will be evaluated for the same items
4 The Army in the Solicitation and evaluation documents consistently and incorrectly uses
the phrase “the Offerors proposal.” The court does not add a “[sic]” after each
grammatically incorrect use of the phrase “the Offerors proposal” going forward in the
Opinion.
5 The Solicitation included a list of attachments to the Solicitation:
5
as part of the statistical sample. In the context of this evaluation, Acceptable
is defined as the Government determining that all items evaluated in the
statistical sample meet or exceed the Governments minimum requirements
as identified in Column C of Attachment 0002. Unacceptable is defined as
the Government determining through statistical sampling that the Offerors
Equipment List does not meet the minimum requirements identified in
Column C of Attachment 0002. If the Government determines through
statistical sampling that an Offeror does not meet a minimum requirement
identified in Column C of Attachment 0002, the Government will not further
evaluate the Offerors Equipment List and the statistical sampling evaluation
will stop. The Offerors proposal will be deemed Unacceptable and will not
proceed to Step 3.
Step 3 - Evaluation of Part B - Technical, Past Performance, Price and
Small Business Participation proposals: The Government intends to
evaluate proposals and may conduct discussions. If discussions are
determined to be necessary by the Government, a Competitive Range
consisting of the most highly rated proposals based on the Technical Part
B, Past Performance, Price and Small Business Factors will be established.
The Government may engage in Communications under FAR 15.306(b) as
necessary to determine which Offerors should be included in the
Competitive Range. The Competitive Range, if necessary, will be
established considering the Governments intent to make seven awards to
small businesses, and thereafter make at least 10 unrestricted awards to all
remaining Offerors. Any proposal, which does not have a realistic chance
of receiving award, will not be included in the Competitive Range.
Relevant to the above captioned protests, Attachment 0005 was removed by Amendment
0029. Attachment 0005 was titled: “Price Model - Option Period - Five Year,” and the
Solicitation explained
Attachment 0004 - Price Model - Base Period - 5 Years. Attachment 0004
has been revised to include a tab at the bottom for Option Period pricing
input, in lieu of separate documents for the base period and option periods.
Offerors are required to utilize this revised Price Model for their proposal
submission. Failure to utilize the revised Price Model will deem the Offerors
submission noncompliant and will receive no further evaluation or eligibility
for award. . . .
b. Delete the following attachments in their entirety:
i. Attachment 0005 - Price Model - Option Period - Five Years, Attachment
0005 has been deleted in its entirety as a result of the revisions made to
Attachment 0004.
(omission added).
6
M.4 DISCUSSIONS
a. After receipt of proposals, the Government will conduct an evaluation.
During the conduct of this acquisition, the Acquisition Source Selection
Interactive Support Tool (ASSIST) will be used by the Government to
support the proposal evaluation and source selection process. A separate
tool, the ASSIST2Industry, will be used in conjunction with ASSIST to
facilitate exchanges with Offerors after receipt of proposals pursuant to FAR
15.306.
(capitalization in original; emphasis, alterations and footnotes added). The Solicitation
continued:
M.5 EVALUATION FACTORS
The following evaluation factors and subfactors will be used to evaluate
each proposal. Awards will be made to the Offerors whose proposals are
most advantageous to the Government based upon an integrated
assessment of the evaluation factors and subfactors described below.
FACTOR 1: Technical Factor is divided into the following:
PART A - Equipment List (Acceptable/Non-Acceptable as evaluated at Step
2)
PART B - Technical Narrative (Overall Adjectival Rating)
SUBFACTOR 1 - Compliant IT Equipment (Adjectival Rating)
KEY POINT #1 - Compliant Solutions
KEY POINT #2 - Catalog Management
KEY POINT #3 - Technical Migration Management
SUBFACTOR 2 - Quality Programs (Adjectival Rating)
KEY POINT #1 - Quality Qualifications
KEY POINT #2 - Quality Methodology
KEY POINT #3 - Supply Chain Risk Management (SCRM)
KEY POINT #4 - Contract Management
7
Factor 2: Price (No Rating Assigned)
Factor 3: Past Performance (Relevancy/Confidence Rating)
Factor 4: Small Business Participation (Adjectival Rating; applies only to
Other than Small Business).
M.6 RELATIVE IMPORTANCE
Factor 1: Technical is the most important factor. An overall Technical Part
B factor rating will be assigned to each Offeror. Within Part B Technical
Narrative, Subfactor 1 - Compliant IT Equipment is more important than
Subfactor 2 - Quality Programs. Within Subfactor 1, all key points are of
equal importance. Within Subfactor 2, all key points are of equal
importance. Factor 1 – Technical Part B is significantly more important that
Price, Past Performance and Small Business Participation.
The past performance factor is more important than Small Business
Participation. All non-priced factors combined are significantly more
important than Price. Although Price is not the most important factor, the
closer the ratings in the non-price factors, the more significant price
becomes. The Government will perform a trade-off analysis of the non-
priced factors with price to select the best value proposals that provide the
best value to the government.
M.7 EVALUATION RATINGS
M.7.1 Ratings for Technical Evaluation Part A
Table 1 Technical Acceptable/Non-acceptable Ratings (Part A)
Adjectival Rating Description
Acceptable The Government determining that all
items evaluated in the statistical sample
meet or exceed the Governments
minimum requirements as identified in
Column C of Attachment 0002.
Non-Acceptable The Government determining through
statistical sampling that the Offerors
Equipment List does not meet the
minimum requirements identified in
Column C of Attachment 0002.
M.7.2 Ratings for Technical Evaluation Part B
8
Table 2 Combined Technical/Risk Ratings (Part B)
Adjectival Rating Description
Outstanding Proposal indicates an exceptional
approach and understanding of the
requirements and contains multiple
strengths, and risk of unsuccessful
performance is low.
Good Proposal indicates a thorough approach
and understanding of the requirements
and contains at least one strength, and
risk of unsuccessful performance is low
to moderate.
Acceptable Proposal meets requirements and
indicates an adequate approach and
understanding of the requirements, and
risk of unsuccessful performance is no
worse than moderate.
Marginal Proposal has not demonstrated an
adequate approach and understanding
of the requirements, and/or risk of
unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of
the solicitation, and thus, contains one or
more deficiencies, and/or risk of
unsuccessful performance is
unacceptable. Proposal is unawardable.
In accordance with the Army Source Selection Supplement (28 November 2017),
Section 3.1, the Army methodology for evaluating Technical Approach and Related
Risk is the Combined Technical/Risk Rating, (see Table 1 above). This
methodology considers risk, in conjunction with the significant strengths, strengths,
weaknesses, significant weaknesses, uncertainties, and deficiencies in
determining technical ratings.
M.7.3 Relevancy Ratings for Past Performance Evaluation
9
Table 3 Past Performance Relevancy Ratings
Rating Definition
Very Relevant
Present/Past Performance effort that has a
value of at least $2,000,000.00 with delivery of
items that correspond to four (4) or more of the
ITES-4H catalogs.
Relevant Present/Past Performance effort that has a
value of at least $1,000,000.00 with delivery of
items that correspond to three (3) or more of the
ITES-4H catalogs.
Somewhat Relevant Present/Past Performance effort that has a
value of at least $250,000.00 with delivery of
items that correspond to two (2) or more of the
ITES-4H catalogs.
Not Relevant Present/Past Performance effort that has a
value of $249,999.99 or less with delivery of
items that correspond to one (1) or less of the
ITES-4H catalogs.
M.7.4 Confidence Ratings for Past Performance Evaluation
Table 4 Past Performance Confidence
Adjectival Rating Definition
Substantial Confidence Based on the Offerors recent/relevant
performance record, the Government
has a high expectation that the Offeror
will successfully perform the required
effort.
Satisfactory Confidence Based on the Offerors recent/relevant
performance record, the Government
has a reasonable expectation that the
Offeror will successfully perform the
required effort.
Limited Confidence Based on the Offerors recent/relevant
performance record, the Government
has a low expectation that the Offeror will
successfully perform the required effort.
10
No Confidence Based on the Offerors recent/relevant
performance record, the Government
has no expectation that the Offeror will be
able to successfully perform the required
effort.
Unknown (Neutral) Confidence No recent/relevant performance record is
available, or the Offerors performance
record is so sparse that no meaningful
confidence assessment rating can be
reasonably assigned. The Offeror may
not be evaluated favorably or unfavorably
on the factor of past performance.
M.7.5 Adjectival Ratings for Small Business Participation Evaluation
Table 5 Small Business Participation Ratings
Rating Description
Outstanding Proposal indicates an exceptional
approach and understanding of the small
business objectives.
Good Proposal indicates a thorough approach
and understanding of the small business
objectives.
Acceptable Proposal indicates an adequate
approach and understanding of the small
business objectives.
Marginal Proposal has not demonstrated an
adequate approach and understanding
of the small business objectives.
Unacceptable Proposal does not meet small business
objectives.
(capitalization and emphasis in original).
In the instructions to offerors, the Solicitation stated:
INSTRUCTIONS TO OFFERORS
11
L.1 OVERVIEW
The Army is conducting the ITES-4H competition in order to enter into
contracts to acquire the information technology required to meet the Armys
[sic] information technology mission.
The U.S. Army Computer Hardware, Enterprise Software and Solutions
(CHESS) in coordination with the Army Contracting Command Rock Island
(ACC-RI), requires contracts to support the Armys [sic] requirements both
Continental United States (CONUS) and Outside the Continental United
States (OCONUS), including remote OCONUS, covering a full range of
Information Technology (IT) equipment for client, server, storage, and
network environments; for related incidental services and software; for
maintenance/warranty of legacy IT equipment; and for warranty variations
as part of an Information Technology Enterprise Solutions 4 Hardware
(ITES-4H) solution. The equipment and services shall be commercial in
accordance with the definition of commercial items in Federal Acquisition
Regulation (FAR) 2.101.
L.2 PROPOSAL SUBMISSION REQUIREMENTS
a. Each Offeror shall submit only one comprehensive and complete
proposal, which consists of all required information with associated
attachments each in their appropriate file formats, that addresses all
Government requirements outlined in the solicitation. Submission of a
proposal shall be on an all or none basis. Partial proposals are not
acceptable and shall not be evaluated. If the Government has not received
the Offerors proposal by the due date and time, the proposal will be
considered incomplete and will not be further considered for award.
(capitalization in original; alterations added). The Solicitation continued:
L.3 STRICT COMPLIANCE REQUIREMENT
All volumes and files have strict compliance requirements and strict
compliance to those requirements will be evaluated. Any items identified as
a STRICT COMPLIANCE REQUIREMENT will be evaluated for compliance
prior to any further evaluation of the Offerors proposal. Failure to abide by
the strict compliance requirements for any of these factors will deem the
Offerors proposal non-compliant and will eliminate it from further
consideration. Factors and subfactors with strict compliance requirements
are clearly identified throughout these instructions.
(capitalization in original).
Regarding the format of the offerors’ proposals, the Solicitation explained:
12
L.4 PROPOSAL FORMAT
This section specifies the format each Offeror shall use in preparing its
proposal. The intent is not to restrict the manner in which proposals are
prepared, but rather to ensure a certain degree of uniformity in proposal
format for evaluation purposes. The proposal shall be prepared in a clear,
legible, practical manner. Five separate volumes shall be submitted. These
volumes shall be self-contained and shall not be cross-referenced. The
Government will not assume the duty to search for data or information to
cure problems discovered in any proposal submitted.
...
L.4.1.2 Each Offeror shall submit ONLY one proposal and that proposal
shall address all of the requirements of the Request for Proposals (RFP).
To be considered for this requirement, the Offeror must submit a complete
response to this RFP using the instructions provided in Section L. STRICT
COMPLIANCE REQUIREMENT: If the Offeror’s proposal fails to meet the
terms and conditions of the RFP or takes exception to any of the terms and
conditions of the RFP, it will render the Offeror’s proposal unacceptable and
will not be further considered for award.
L.4.1.2 (a) Each Offeror shall submit the most current versions of
Attachments 0002, 0004, 0006, 0007 and 0013 required for this RFP. The
Government will verify that the Offerors submission contains the most
current RFP Attachments 0002, 0004, 0006, 0007 and 0013 that were
provided by email with this Amendment.
L.4.1.2 (b) STRICT COMPLIANCE REQUIREMENT: Failure to provide the
most current versions of the RFP Attachments 0002, 0004, 0006, 0007 and
0013 shall render the Offerors proposal non-compliant and will not be
further considered for award. To be considered for award the Offeror must
submit a response to this solicitation in full to include the most recent
attachments provided.
L.4.1.3 A proposal is presumed to represent the Offerors best efforts to
respond to the RFP. The Offeror must provide adequately detailed
information that complies with the solicitation requirements, allows for
meaningful review by the Government evaluators, and affirmatively
demonstrates the merits of its proposal. The Offeror shall provide sufficient
detail to substantiate the validity of all stated assertions and must not merely
repeat the RFP requirements, but rather must provide convincing
documentary evidence of how contract requirements will be met. Data not
submitted with the proposal, but submitted previously, or presumed to be
known (i.e., previous projects performed for the United States Government
(USG)) will not be considered. Clarity and completeness are essential.
13
(capitalization in original; omission added).
Regarding the Technical Factor, the Solicitation provided:
L.5 SPECIFIC PROPOSAL INSTRUCTIONS
L.5.1 VOLUME I - Technical Factor. The volume shall be organized into the
following sections:
L.5.1.1 PART A - Equipment List. STRICT COMPLIANCE REQUIREMENT:
ANY cells marked for Contractor Fill-In on the Equipment List that are left
blank or are unintelligible as to the product the Offeror is proposing shall
render the Offerors proposal non-compliant and will not be further
considered for award.
This portion of the proposal shall include a completed Equipment List
spreadsheet (Attachment 0002) considering the following instructions:
a. The Offerors proposed configuration for each, and every System
Description identified on each Catalog (Catalog I through Catalog VII); The
Offeror shall complete the Equipment List at Attachment 0002 by providing,
in the proposed configuration column, its proposed item to meet each
requirement; and
b. An Offerors annotation with technical detail identifying that every
Requirement related to each System Description in the proposed
configuration is met or exceeded as to be confirmed by the Government. All
proposed configuration cells must contain content for the Offerors proposal
to receive consideration. STRICT COMPLIANCE REQUIREMENT: Cells
that contain linked content are non-compliant. Additionally, modification of
the Equipment List outside of indicated proposed configuration inputs are
not permitted and will result in a proposal being determined non-compliant
and not further evaluated; and
c. An identification of each Offerors proposed configuration product
Description providing identification of (brand/model) within the Offerors
proposed configuration for each and every System Description; and
d. Each Catalog Identification per each Description (brand/model) and
every Platform addition, inclusive to aid in associating equipment list to price
models.
e. The Offeror may also complete the Catalog Identification column to
coordinate association between equipment list and price models. The
burden of proof that the proposed item meets or exceeds the minimum
requirements remains with the Offeror.
14
f. The minimum processor types are defined for Catalogs I and II. Offerors
may propose a different base processor if the Offeror provides proof that
the processor meets or exceeds the minimal architecture of the processor
listed in the Equipment List.
g. Equipment List, electronic copy: Equipment List must remain in native
MS Excel file format. Offerors proposed configuration information must be
directly input in the proposed configuration field. Equipment List must not
be password protected. Offeror proposed configuration input is only
permitted in column D. STRICT COMPLIANCE REQUIREMENTS: Failure
to provide the most current version of the RFP Attachment 0002 shall render
the Offerors proposal non-compliant and will not be further considered for
award. Unauthorized modifications to the Equipment List are not permitted
and will render an Offerors proposal non-compliant and not further
considered for evaluation. Linked inputs are not permissible and will render
a proposal non-compliant.
h. The items in the Price Model that refer to the hardware and their detailed
specifications are in the Equipment List (Attachment 0002). The pricing
proposed in the Price Model (Attachment 0004) shall be for the same
products and configurations proposed in the Equipment List (Attachment
0002). Any discrepancy between the product proposed in the Equipment
List vs. the product proposed and priced out in the Price Model may result
in an unfavorable finding in the Offerors proposal.
(capitalization in original). The Solicitation at L.5(c)-(d) provides:
c. Executed copies of all amendments. Each Offeror shall complete (fill-in
and sign) the solicitation amendment sections (Standard Form 30
AMENDMENT OF SOLICTIATION/MODIFICATION OF CONTRACT,
Contract Administration Data Representations, Clause fill-ins, Certification
and Other Statements of Offerors) using the file provided with the
solicitation amendment. An authorized official of the firm shall sign the SF
30s and all certifications requiring original signature. An Acrobat PDF file
shall be created to capture the signatures for submission.
d. Should an amendment be issued against the solicitation; the Offeror shall
acknowledge by signing one copy of the Standard Form (SF) 30 entitled
Amendment of Solicitation/Modification of Contract and include it in the
proposal submission. In Accordance With (IAW) FAR 52.215-1(b),
acknowledgement of solicitation amendments issued after the proposal due
date shall be submitted via email to usarmy.ria.acc.mbx.ites-4h-
rfp@army.mil no later than date and time identified in the Amendment.
(capitalization in original).
15
As the defendant explained in its omnibus cross-motion for judgment on the
Administrative Record for all of the above captioned bid protests:
The Equipment List is a product catalog of various items the Government
may purchase. The Equipment List contains seven catalogs and identifies
the various “Product Descriptions” the Army requires, along with a System
Description and the necessary “Minimum Requirement” for each system.
The Army completed Columns A, B and C with its pre-configured inputs.
The Army marked the top of Column D as “Proposed Configuration” and
marked the top of Column E as “Catalog Identification.”
(internal references omitted). Therefore, in order to comply with the strict compliance
requirement for the Equipment List under the Technical Factor at Step 1, an offeror would
have to complete each box for Column D and Column E.
Regarding Price, the Solicitation provided:
L.5.2 VOLUME II - Price Factor.
The volume shall be organized as follows:
(1) Electronic Copy. Price submission requirements: Files contained in the
Volume II Price submission may not be password protected. Electronic links
are not permissible. The Offeror shall not include pivot tables in Excel
spreadsheets. The Offeror shall complete the Price Model in full. Offerors
must ensure that Attachment 0004 is completed and submitted with the
proposals. STRICT COMPLIANCE REQUIREMENT: All cells contain an
appropriate value. Any cells marked as contractor fill-in that are blank or
unintelligible in Attachment 0004 will render the Offerors submission as non-
compliant and the Offerors proposal will receive no further consideration or
evaluation. Offerors intending to propose zero dollars for a particular cell
must ensure the appropriate cell contains a 0. The Government will not
assume a blank cell in Attachment 0004 represents a zero as any blank cell
will result in the Offerors proposal being deemed non-compliant and not
further considered for award.
(2) General Instructions. In accordance with FAR 15.402 and FAR 15.403-
1, certified cost or pricing data is not required based on the fact that
adequate competition is expected for this procurement. If after receipt of
proposals the Contracting Officer determines that there is insufficient
information available to determine price reasonableness, the Offeror may
be required to submit other than certified cost or pricing data. Information
other than certified cost or pricing data may be submitted in contractors
chosen format to provide sufficient information in order to support price
reasonableness. There are no page limitations for this volume. Proposal
information included in this volume that is not directly related to Price will be
16
disregarded. Proposed dollar values shall be identified in US Dollars with
only two decimal places. Any cells with more than two decimal places will
be rounded up or down to the next whole cent.
L.5.2.1 Instructions for the Price Model
a. A price must be proposed for every item in each catalog identified in the
Price Model. Proposed prices shall be for new items/equipment only.
b. DO NOT alter any part of the Price Model other than the cells shaded in
yellow and orange.
c. Do not enter any formulas into the Price Model.
d. Offerors shall completely fill out the updated Price Model (Attachment
0004) included with this Amendment. Failure to provide prices for all items
and catalogs identified in the Price Model of the solicitation will render the
Offeror ineligible for award. Further, all proposed prices and numbers shall
be stated in U.S. Dollars, rounded, and displayed to two decimal places. It
will be assumed that rows/columns containing zeros instead of prices are
intentional and shall be considered as having no cost to the Government.
e. Pricing for catalog items, as discounted, shall not exceed the Offerors
lowest available General Services Administration (GSA) Federal Supply
Schedule price, other Government contract vehicle price, commercial
catalog, or publicly published price list.
f. The Government anticipates receiving competitive proposals and using
competition to determine price reasonableness. The Government reserves
the right to request other than certified cost or pricing data to establish the
reasonableness of the proposed contract and/or subcontract prices after
receipt of proposals.
(capitalization in original).
Regarding Past Performance Factor, the Solicitation provided:
L.5.3 VOLUME III - Past Performance Factor. The Government will assess
the degree of confidence it has that the Offeror will successfully complete
the requirements in accordance with the contract terms based on the
Offerors demonstrated record of recent and relevant past performance.
Offerors shall provide a specific narrative explanation of each contract listed
in Section II of the past performance questionnaire describing the contract
requirements achieved and detailing how the effort is relevant to the
requirements of this solicitation.
17
L.5.3.1 Past Performance Contract References: The Offeror shall submit
with its initial proposal up to five contract references for itself. If the contract
reference the Offeror is submitting is an ordering type contractual vehicle
(e.g., an Indefinite Delivery “D” type contract, Blanket Purchase Agreement,
Basic Ordering Agreement, etc.), PPQ [Past Performance Questionnaire]
references are only acceptable after issuance of a delivery/task order where
performance is ongoing or has occurred.
a. Contract references may be provided for any combination of CONUS
and/or OCONUS locations.
b. The Government will only consider those references in which the Offeror
is identified as the Prime or First-tier subcontractor.
L.5.3.2 Specific Proposal Instructions. This volume shall be organized into
the following sections:
a. Contract Reference Information and ITES-4H PPQ POC List (Attachment
0013): The Government will not accept just the basic contract ordering
number for ordering type contractual vehicles. Given this, an individual
order (or orders) under the basic ordering contract vehicle must be
submitted in lieu of just the basic ordering contract itself. Each submitted
order shall be counted as one contract reference. For example, if an offeror
has performance on an IDIQ type contract, the Offeror must provide the
specific orders it desires the Government to evaluate. The Offeror must not
provide just the basic IDIQ contract number. All contract reference(s) shall
represent recent and relevant performance as a prime and/or first-tier
subcontractor under Government Agency contracts (i.e., Department of
Defense: Army, Navy, Air Force, Marine Corps, Defense Logistics Agency
(DLA) etc.; Federal, Department of Homeland Security, Department of
State, etc.). If submitting a reference as a first-tier subcontractor, Offeror is
expected to provide the name of the Prime contractor under which it worked.
If the Offeror has no Government Agency contracts, commercial references
may be provided. The recency period is 25 October 2019 through 16
October 2023. STRICT COMPLIANCE REQUIREMENT: The Offeror must
submit a completed ITES-4H PPQ POC List (Attachment 0013) of all the
POCs who received a questionnaire with the submission of the proposal.
Failure to provide a completed ITES-4H PPQ POC List will render the
proposal non-compliant and will not be further considered for award. The
past performance questionnaire (Attachment 0007) shall be used for each
contract reference submitted. The completed PPQs are excluded from the
page count for Past Performance.
b. Adverse Contract Performance: STRICT COMPLIANCE
REQUIREMENT: In addition to the contract references, the Offeror shall
identify any recent and relevant Government contract(s) it was awarded that
18
encountered any performance problems related to deliverables; services,
security violations (i.e. data, physical, virtual, etc.), Environmental
Protection Agency (EPA) violations, and every contract that was terminated
(termination for default or termination for cause only), in whole or in part
from 25 October 2019 through 16 October 2023. If there are no contracts
that meet the description above, the Offeror shall state as such and include
a statement in the Volume III of the proposal. The number of contract
references provided in response to this paragraph is unlimited. Submission
of Adverse Contract Performance information shall not count as part of the
page count for Past Performance.
For any contract falling under the Adverse Contract Performance
description above, provide all the information listed as follows:
1. Contract number and Order number.
2. Define the performance problem and/or Type of Termination or Breach.
3. Describe the performance problem that caused the adverse action,
termination, and/or breach.
4. Describe the corrective actions taken to resolve issues; and provide
date(s) of issue/resolution.
5. Provide a copy of any Letter of Concern, cure notice, or show cause
letters received.
6. Identify reasons for any Terminations for Default or Terminations for
Cause.
7. Describe in detail any performance problems that include
internal/external customer complaints and/or Contract Deficiency Reports
(CDRs), EPA violations.
8. Provide points of contact who can confirm the success of the corrective
measures to include email address and a valid telephone number.
The Government is under no obligation to search for additional past
performance references for any Offeror as the Government intends to
evaluate an Offerors past performance based on the information submitted
as part of an Offerors proposal. However, the Government reserves the
right to use data provided in the Offeror's proposal and data obtained from
other sources. To ensure inclusion of all references in the evaluation
process, the Offeror is encouraged to provide the Government with the most
current data on each reference.
(capitalization in original; alteration added).
Regarding the Small Business Participation Factor, the Solicitation provided:
L.5.4 VOLUME IV - Small Business Participation Factor. THIS
REQUIREMENT APPLIES TO OTHER THAN SMALL BUSINESS
OFFERORS ONLY. IAW 13 CFR 125.3(g), Small Business Offerors will be
given the maximum score, credit, or rating without having to submit any
19
information in connection with this factor. An Offeror is considered a Small
Business if it can certify Small Business status under North American
Industry Classification System (NAICS) 334111. STRICT COMPLIANCE
REQUIREMENT: Failure to submit Attachment 0006 will render the
Offeror's proposal non-compliant.
The Offeror shall demonstrate small business participation by detailing its
proposed approach to meet the requirements under this factor by
addressing the following two areas in its Small Business Participation
proposal:
a. Proposed Small Business Participation Commitment Document in
performance of the potential contract (applies only to Other Than Small
Businesses). The Offeror shall complete the Small Business Participation
Commitment Document at Attachment 0006 to show maximum practicable
opportunities to Small Businesses to compete on this requirement in
accordance with FAR 52.219-8, Utilization of Small Business concerns.
b. Commitment to Small Business:
i. Payment Procedures The Offeror shall include a written statement of its
established procedures to ensure timely payments to small business
subcontractors in accordance with FAR 52.219-8, Utilization of Small
Business Concerns, (for those contracts under which it was required within
the period of 25 October 2019 through 16 October 2023). If not required in
any recent contracts, the Offeror shall so state.
ii. Compliance with Small Business Subcontracting Plan - Offerors must be
in compliance with terms and conditions of FAR 52.219-9, Small Business
Subcontracting Plan (if required on recent contracts). The Offeror shall
provide three Individual Subcontracting Reports for recent contracts (where
performance occurred within the period of 25 October 2019 through 16
October 2023) that included a subcontracting plan. Offerors submitting
Commercial Subcontracting Plans shall provide three Summary
Subcontract Reports (SSRs) and the associated Commercial
Subcontracting Plan for each SSR. Caution: SSRs based on Individual
Subcontracting Plans will not be accepted. If Small Business
Subcontracting Plans were not required in any recent contracts, the Offeror
shall so state. If the Offeror has less than three recent contracts, the Offeror
shall provide the most recent Individual Subcontracting Report (or SSR for
Commercial Subcontracting Plans) for each contract it has, and state that
the Offeror does not have three recent contracts.
(capitalization in original).
20
The Solicitation was originally issued by the Army on August 25, 2021. Prior to
receiving the responses to the Solicitation, the Army issued 26 amendments to the
Solicitation, mostly in responses to questions and requests for clarifications from potential
offerors to the Solicitation. It appears that the Army received 96 offerors when the
Solicitation closed on October 25, 2022. In response to an agency level protest and a
subsequent protest at the United States Government Accountability Office (GAO), the
Army took partial corrective action, and issued two additional amendments, Amendment
27, and Amendment 28, with revised proposals due by January 23, 2023. The Army
subsequently issued Amendments 29, 30, and 31, addressing further questions and
ultimately making proposals due by October 16, 2023.
In October 2023, the Branch Chief Shanna Henao and the Procuring Contracting
Officer Carrie Lansing issued a Memorandum for Record for the Solicitation. The October
2023 Memorandum for Record provided in full:
MEMORANDUM FOR RECORD 11 Oct 2023
SUBJECT: Determination to Amend Solicitation W52P1J-20-R-0082 for the
ITES-4H requirement in support of Program Executive Office-Enterprise
Information Systems (PEO-EIS).
BLUF[6]: Determination to amend the above-mentioned solicitation in an
effort to update and revise the Tech evaluation process, past performance
process, as well as adding additional members to the technical team in
order to streamline the acquisition process and re-solicit for new proposals
to evaluate in a more effective and efficient manor with the goal of an award
in 1st quarter FY25, calendar year 2024 instead of an award in 1st quarter
FY26, calendar year 2025.
Background and Justification: The above-mentioned solicitation was issued
on 25 AUG 2021 and closed on 25 OCT 2022. An agency-level protest was
received by the closing date of the solicitation. The Army took partial
corrective action in response to the protest and denied the remaining
grounds. Subsequently, the protester filed a protest at the Government
Accountability Office (GAO), which was ultimately dismissed. Due to the
need to take partial corrective action in response to the agency-level
protest, two amendments were issued (Amendments 0027 and 0028) that
allowed offerors to submit revised proposals. Thus, evaluations for ITES-
4H began on 15 FEB 2023.
From FEB 2023 to APR 2023 both the Army Contracting Command-Rock
Island (ACC-RI) and the PEOCHESS team worked together several times
a week over the three-month period to go over the past performance
evaluations, the technical evaluations as well as the small business and
price evaluations. While progress was being made, it was not at the rate per
6 “BLUF” is an acronym for “Bottom Line Up Front.”
21
the anticipated milestones and therefore the award date was moving further
to the right. It was determined that the technical team did not have the staff
necessary to keep up with 89 technical proposals and complete the 2.5
evaluations necessary per week to make the scheduled award. Part of the
issue taking a significant amount of time regarded the extensive number of
items technical evaluators had to review as part of the Equipment List along
with reading through a lengthy 25 page narrative for Sub-factors 1 and 2.
Combined, this technical evaluation approach was significantly slowing the
Technical team, especially due to some poor proposal quality issues from
offerors. The Technical team also experienced several issues in terms of
proposal quality. The past performance team also encountered issues with
offerors providing a base IDIQ contract number without identifying any
specific delivery or task orders for the Army to evaluate. Due to these
difficulties, both the Past Performance and Technical evaluation teams
were behind schedule.
After a meeting with senior Army leaders in April 2023, it was determined
that the team, both PEO and ACC-RI, needed to come up with several
Courses of Action (COAs)/opportunities in order to streamline the process
of evaluating the large amount of interested offerors to make an award
much more quickly and efficiently than the current method. From APR 2023
– JUL 2023 ACC-RI assigned a new PCO and lead specialist to the team
and PEO committed to assigning additional personnel to the technical team.
It was determined that the RFP required an amendment to revise the
evaluation criteria in order to streamline the evaluation process. Several
amendments starting with Amendment 0029 have been issued. The
following highlights the main areas that were revised in the amendments as
well as the rationale for the change. Not every specific RFP change is
discussed below, however, the key changes to the RFP are noted below:
(a) Added Strict Compliance Requirements: The solicitation that initially
closed in October 2022 already contained some Strict Compliance
requirements for this solicitation in the form of Attachment 0014. This
amendment will increase the number of items with a strict compliance
requirement in order to enable the Army to efficiently evaluate and deal with
proposals that fail to provide the necessary information requested. In this
regard, Strict Compliance Requirements are notably being added to the
Equipment List to respond to situations where offerors leave blank cells in
the Equipment List. Providing a complete Equipment List (along with a
complete proposal) is essential to ensuring not only that the offeror complies
with the terms of the solicitation, but failing to provide a complete proposal
and Equipment List also significantly slows the evaluation process. Indeed,
this issue (blank cells on the Equipment List) significantly slowed the
Technical Evaluation Team during its evaluation. By adding strict
compliance to the Equipment List, and other material RFP requirements,
the Army can ensure it is spending its substantive evaluation time (i.e.,
22
reviewing Technical, Past Performance, Price, and Small Business) on only
complete proposals, rather than wading through numerous proposals that
are fundamentally incomplete. The RFP will clearly note what requirements
are considered matters of strict compliance and also will clearly note that
offerors deemed non-compliant will not be further evaluated or considered
for award.
(b) Added a “Phased” or “Step” Approach: Prior to this amendment, the RFP
contemplated the Technical, Past Performance, Price and Small Business
Evaluations occurring following the initial compliance check. This
amendment will add a “phased” or “Step” approach where offerors will
undergo the Step 1 compliance check and then have the Equipment List
Reviewed for Technical Acceptability. The Equipment List was already
being evaluated on an Acceptable/Unacceptable basis; however, it was
combined with the Subfactor 1 and Subfactor 2 evaluation. Now, the
Equipment List will be reviewed at Step 2 and only offerors who receive an
Acceptable will proceed to receive further consideration of Technical Sub-
factors 1 and 2, along with Past Performance, Small Business, and Price.
By using this additional Step 2 approach where offerors must provide an
acceptable Equipment List prior to receiving further evaluation, the Army
can ensure it is spending its substantive evaluation resources on proposals
that are not only complete, but also provide an acceptable baseline
Equipment List. Prior to this amendment, even if the Technical Team
determined an offeror had an unacceptable Equipment List, the team still
had to complete a full Technical evaluation of Sub-factors 1 and 2 in case
the SSA decided to include an unacceptable proposal as part of
discussions. Additionally, unacceptable proposals would still receive past
performance, price and small business evaluations. With this new
approach, the Army can streamline its evaluation by ensuring evaluation
resources are only spent on proposals with an acceptable equipment list,
which should assist the Army in meeting its award date goals.
(c) Added a Statistical Sampling Evaluation Methodology to Step 2: The
Equipment List is a large document comprising of seven product catalogs
offerors must complete with over 900 cells of data for review. Previously,
the Army was going line by line validating each product proposed by every
offeror, which was taking significant time, especially with 89 proposals to
evaluate. Now, this amendment will introduce a statistical sampling
evaluation method to more efficiently evaluate the Equipment List. In this
regard, it was determined that the Army will sample 35% of the data, which
the technical team believes will provide a sufficient sample size to determine
an offeror Technically Acceptable. All offerors will be evaluated for the same
sample of products from the various catalogs. The sampling will be as
follows:
23
Catalog 1: first 50 cells due to limited number of cells in the catalog;
Catalog 2: The sample will begin at row 299 and evaluate 50 odd numbers,
which provides a more diverse product sampling;
Catalog 3: first 50 cells to allow for maximum diversity in the catalog;
Catalog 4: first 50 cells due to limited number of cells in the catalog;
Catalog 5: There are only 44 cells; as such, all 44 will be evaluated;
Catalog 6: 50 cells beginning at row 8; all even numbers will be evaluated;
Catalog 7: There are only 41 cells; as such, all 41 will be evaluated.
(d) Reduced Technical Page Count: Offerors were provided with 25 pages
to demonstrate an approach for Technical sub-factors 1 and 2. Upon review
by the Technical Team, it was determined that 25 pages was greatly in
excess of what an offeror needs in order to submit a proposal that fully
addresses the sub-factor 1 and 2 requirements. Specifically, the Technical
evaluators noted that many offerors included a lot of banal commentary
throughout the 25 page narrative that served more as promotional material
rather than illustrated the merits of an offerors Technical approach. In order
to streamline the evaluation process and encourage offerors to succinctly
present the merits of their proposal, the page count for Technical Part B
(sub-factors 1 and 2) was reduced to eight pages as part of Amendment
0029. However, following extensive consideration of offeror feedback
following the issuance of Amendment 0029, it was determined that fourteen
pages would both meet the requests of offerors to increase the page count
from the previously identified page count of 8 pages in Amendment 0029,
while also satisfy the Army’s desire to reduce the page count as compared
to what offerors provided at the initial closing date of the solicitation (25
October 2022). Fourteen pages is a reasonable number as it effectively
provides offerors two pages for each Key Point. Additionally, fourteen pages
still allows an offeror to provide the merits of its approach to meeting the
Government’s requirements, but will encourage offerors to “skip the fluff”
and include succinct statements noting how an offeror will provide a solution
in response to the RFP’s requirements.
(e) Added a Key Point to Sub-factor 2: Key Point 4 is added to Sub-factor 2
in order to provide the Government will a description of how the offeror
support and comply with the Statement of Work and the offeror’s processes
to support contract management. This is added in order to ensure a
successful offeror can manage a complex undertaking such as ITES-4H.
(f) Revised Past Performance: The past performance factor also was
changed in several key respects. First, if an offeror is submitting an ordering
type vehicle contract reference (e.g., IDIQ), the offeror is required to provide
the specific Delivery Order (DO) or Task Order (TO) it desires the Army to
evaluate. When the Army initially received proposals in October 2022,
numerous offerors simply provided the Army with the base IDIQ contract
number as a contract reference rather than provide a specific delivery or
24
task order. Because performance on an IDIQ type contract occurs at the
DO or TO level, the Army revised the terms of the RFP to ensure the Army
receives specific DO’s or TO’s where the offeror actually performed. This
will also ensure the Army knows exactly which references the offeror
desires the Army to evaluate. It will also help the Army ensure an efficient
evaluation process by not requiring the Army to guess or review potentially
thousands of DO’s or TO’s issued off of an IDIQ type contract.
Second, the Army revised the relevancy metrics as part of the Amendment
process. In this regard, the RFP now sets out specific dollar values and
number of catalogs an offeror must meet to receive a particular relevancy
rating. Offerors are expected to maintain an active role through extensive
participation over the life of the ITES-4H contract. ITES-4H is valued at
$10B over the 10-year period. CHESS expects total sales across all
awardees to equal approximately $1B per year. The relevancy dollar figures
were determined based on ITES-3H historical data points. CHESS looked
at the lowest total sales by a single vendor during a single year over the life
of the contract and structured the ratings based on that number.
Specifically, CHESS determined that the lowest sales by a single vendor
during a single year over the life of the contract was $1 million. Because $1
million was the lowest sales by a single vendor, the Army deems this value
to equate to a “Relevant” contract reference. Using the lowest total sales of
around $1,000,000.00 for a single year of performance allows room for
consideration of small business that could compete. Sales above
$2,000,000.00 would constitute as very relevant due to the historical data
from ITES-3H showing most vendors consistently sold above this number
and positively complied with all contract requirements. In addition, CHESS
determined anything under the Simplified Acquisition Threshold would be
the cutoff for relevant orders from a dollar value perspective. Considering
that the total contract value for ITES-4H is $10 billion, the Army’s dollar
value metrics for relevancy are very reasonable and are on the lower end
of the expected amount an awardee would receive as part of this contract
effort. The Army has specifically considered the lower threshold numbers in
order to promote competition for this effort. Further, the Army has set up the
past performance criteria to allow an offeror to meet the dollar value
requirements through combining up to five contract references. Overall, the
Government has set these dollar figure parameters because it is vital an
offeror can manage multiple contracts of higher value during a given period
of time. If an offeror is unable to complete multiple orders at a time due to
the magnitude of cost that could pose high risk to ITES-4H.
The relevancy definitions also provide a specific number of catalogs an
offeror must meet to align with a certain relevancy rating. Similar to the
dollar values, the Army has provided great leniency to offerors to meet the
requirements. ITES-4H has a total of seven catalogs. Here, to receive a
“Very Relevant” rating, an offeror would only need to provide contract
25
references meeting 4 catalogs (along with the associated dollar value) to
receive the highest rating. The Army believes its needs can adequately be
met through the aligned catalog numbers and also believes that because
the RFP allows offerors to provide up to five references, the Army’s catalog
relevancy requirements are more than reasonable and do not unduly restrict
competition.
I have also considered these amendments in light of the Federal Acquisition
Regulation (FAR) requirements at FAR 15.206. Specifically, I do not deem
these amendments to meet the requirements of FAR 15.206(e), which
would necessitate cancelling the solicitation. In this regard, the
requirements for ITES-4H have not changed. The Statement of Work
remains the same and the solicitation continues to require offerors provide
products that meet the Government’s requirements. What is changing is
portions of the evaluation criteria and how the Government intends to re-
structure the evaluation process to ensure the Army can award ITES-4H
requirement in a timely and efficient manner to meet the Army’s needs.
Because the fundamental ITES-4H requirement remains unchanged in
terms of the Army’s needs, I do not deem these amendments so substantial
that additional sources would have likely submitted offers. Indeed, the
changes in these amendments do not so significantly alter the purpose or
the nature of the contract. I also note that the RFP was released in August
2021 and did not close until October 2022—over a year for prospective
offerors to decide whether to submit a proposal. Ultimately, the Army
received 96 proposals in October—a significant amount of industry interest.
After conducting the initial compliance checks, 89 proposals remain, which
again is a large number offerors. This large number of offerors gives me
confidence that the field of competition for ITES-4H would not change based
on this amendment. Further, offerors have spent considerable time, effort
and money preparing proposals, thus, it is not in the interest of either the
Government or offerors to completely cancel the RFP. Based on these
considerations, I do not believe the ITES-4H solicitation requires
cancellation. Instead, several amendments starting with Amendment 0029
were issued and offerors will be allowed the opportunity to submit revised
proposals.
Additionally, the 7 offerors initially deemed non-compliant and removed
from the competition will not be re-instated. FAR 15.206(c) notes that
“Amendments issued after the established time and date for receipt of
proposals shall be issued to all offerors that have not been eliminated from
the competition.” Because the 7 were already eliminated, the FAR does not
require their reinstatement. Further, and importantly, the basis for which the
offerors were deemed non-compliant would not change as a result of this
amendment because the amendment is not relaxing any of the terms for
which the 7 offerors were removed.
26
(capitalization in original; footnote, alteration, and emphasis added).
Most relevant to the above captioned bid protests was the addition of the “Added
Strict Compliance Requirements,” which, as described above stated:
(a) Added Strict Compliance Requirements: The solicitation that initially
closed in October 2022 already contained some Strict Compliance
requirements for this solicitation in the form of Attachment 0014. This
amendment will increase the number of items with a strict compliance
requirement in order to enable the Army to efficiently evaluate and deal with
proposals that fail to provide the necessary information requested. In this
regard, Strict Compliance Requirements are notably being added to the
Equipment List to respond to situations where offerors leave blank cells in
the Equipment List. Providing a complete Equipment List (along with a
complete proposal) is essential to ensuring not only that the offeror complies
with the terms of the solicitation, but failing to provide a complete proposal
and Equipment List also significantly slows the evaluation process. Indeed,
this issue (blank cells on the Equipment List) significantly slowed the
Technical Evaluation Team during its evaluation. By adding strict
compliance to the Equipment List, and other material RFP requirements,
the Army can ensure it is spending its substantive evaluation time (i.e.,
reviewing Technical, Past Performance, Price, and Small Business) on only
complete proposals, rather than wading through numerous proposals that
are fundamentally incomplete. The RFP will clearly note what requirements
are considered matters of strict compliance and also will clearly note that
offerors deemed non-compliant will not be further evaluated or considered
for award.
(capitalization in original).
The Administrative Record for the above captioned protests reflects that in response to
the Solicitation, the Army received 83 proposals, including from the seven protestors.7
7 Tab 120 of the Administrative Record, titled “Proposal Tracking Sheet,” reflects that, of
the 87 proposals the Army expected to receive, 52 proposals were compliant with the
strict compliance requirement of Step 1 and moved to Step 2, 28 proposals were non-
compliant with the strict compliance requirement of Step 1, 3 proposals were submitted
late, and 4 offerors did not submit a proposal. As reflected above, the October 2023
Memorandum for Record states that “the RFP was released in August 2021 and did not
close until October 2022—over a year for prospective offerors to decide whether to submit
a proposal. Ultimately, the Army received 96 proposals in October,” although the October
2023 Memorandum for Record did not indicate a specific year when the 96 proposals
were received. The October 2023 Memorandum for Record continues: “After conducting
the initial compliance checks, 89 proposals remain, which again is a large number
offerors.” The Administrative Record does not address the discrepancy between the
remaining “89 proposals” in the October 2023 Memorandum for Record and the 83
27
As indicated above, all seven protestors who filed the above captioned bid protests
were eliminated during Step 1 of the Army’s ongoing evaluations.
Protestors’ Strict Compliance Evaluations
GovWave
The Army reviewed GovWave’s proposal and found GovWave’s proposal Past
Performance proposal non-compliant under Step 1. The January 12, 2024 Memorandum
for Record for GovWave’s evaluation provided:
Proposal submitted by GovWave, LLC. Dated 16 October 2023
The purpose of this memorandum is to document the determination that
made the above referenced proposal submitted by GovWave, LLC. Non-
Compliant per the terms and conditions of subject solicitation for the
Information Technology Enterprise Solutions – 4 Hardware (ITES-4H)
multiple award IDIQ base contracts. The proposal was reviewed against the
strict compliance requirements identified throughout the solicitation. The
United States Government (USG) performed initial Step 1 Compliance
Checks to ensure the accuracy of proposals and reduce risk to the
Government. Adherence to the Strict Compliance requirements identified
throughout the solicitation is vital to ensure the Government receives a
complete and high-quality proposal. Strict Compliance requirements
proposals the Army ultimately received. Amendment 0029 was issued on August 16,
2023, made significant changes to the evaluation scheme, and changed the proposal due
date to October 2, 2023. Amendment 0030 was issued on September 14, 2023, answered
questions from offerors, and changed the proposal due date to October 16, 2023.
Amendment 0031 was issued on September 28, 2023, made changes to the Solicitation
such that “revised proposals are REQUIRED,” and maintained the October 16, 2023 due
date for proposals. (capitalization in original). Because the contracting officer could not
know, when she electronically signed the October 2023 Memorandum for Record, that
the Army would receive 96 proposals on October 16, 2023, the 96 proposals referenced
by the Memorandum for Record may be referencing the number of proposals the Army
received in October 2022, which are not germane to the above captioned bid protests.
The defendant added to the confusion by stating in its omnibus cross-motion for judgment
on the Administrative Record: “The Army received eighty-seven proposals on October 16,
2023 in response to the updated RFP, including proposals from GovWave, Futron, ETSI,
GAI, DHT, UNICOM and ACC.” As summarized above, the Army received 83 proposals
in response to the Solicitation, and moreover, given that 3 proposals were received late,
it is not clear that the 3 proposals were submitted on October 16, 2023. At a hearing, the
court asked the defendant to address the number of proposals actually submitted to the
Army, but the defendant was unable offer clarity at the hearing.
28
encourage consistency and accuracy of information presented. Further,
ensuring the offeror has provided all necessary information is essential to
the efficient evaluation of proposals. The following are excerpts directly from
the Instructions to Offerors (Section L) and Evaluation Factors for Award
(Section M) of the RFP:
a. L.3 STRICT COMPLIANCE REQUIREMENT: All volumes and files have
strict compliance requirements and strict compliance to those
requirements will be evaluated. Any items identified as a STRICT
COMPLIANCE REQUIREMENT will be evaluated for compliance prior to
any further evaluation of the Offerors proposal. Failure to abide by the
strict compliance requirements for any of these factors will deem the
Offerors proposal non-compliant and will eliminate it from further
consideration. Factors and subfactors with strict compliance
requirements are clearly identified throughout these instructions.
b. L.4.1.3 – A proposal is presumed to represent the Offeror’s best efforts to
respond to the RFP. The Offeror must provide adequately detailed
information that complies with the solicitation requirements, allows for
meaningful review by the Government evaluators, and affirmatively
demonstrates the merits of its proposal. The Offeror shall provide sufficient
detail to substantiate the validity of all stated assertions and must not merely
repeat the RFP requirements, but rather must provide convincing
documentary evidence of how contract requirements will be met. Data not
submitted with the proposal, but submitted previously, or presumed to be
known (i.e., previous projects performed for the United States Government
(USG) will not be considered. Clarity and completeness are essential.
c. M.3 EVALUATION METHODOLOGY: Step 1 - STRICT COMPLIANCE
REQUIREMENT: Proposals will be reviewed to determine if all compliance
requirements set forth in the Instructions to Offerors are satisfied. Failure to
provide proposals in compliance with the instructions specified as “STRICT
COMPLIANCE REQUIREMENTS” in the Instructions to Offerors of this RFP
shall render the Offeror’s proposal non-compliant. Any Offeror’s proposal
determined non-compliant will not be evaluated and will not be further
considered for award. Only Offerors whose proposals are determined
compliant will move to Step 2 of the evaluation process.
2. Based upon a review of the strict compliance requirements set forth in
the solicitation, the following findings contributed to the determination that
above referenced proposal is non-compliant:
a. Volume 3 – Past Performance / Adverse Performance. The Offeror’s
Proposal did not acknowledge or include a statement regarding any adverse
past performance. The STRICT COMPLIANCE REQUIREMENT identified
in the solicitation states:
29
L.5.3.2 (b) Specific Proposal Instructions. Adverse Contract Performance:
STRICT COMPLIANCE REQUIREMENT: In addition to the contract
references, the Offeror shall identify any recent and relevant Government
contract(s) it was awarded that encountered any performance problems
related to deliverables; services, security violations (i.e. data, physical,
virtual, etc.), Environmental Protection Agency (EPA) violations, and every
contract that was terminated (termination for default or termination for cause
only), in whole or in part from 25 October 2019 through 16 October 2023. If
there are no contracts that meet the description above, the Offeror shall
state as such and include a statement in the Volume III of the proposal. The
number of contract references provided in response to this paragraph is
unlimited. Submission of Adverse Contract Performance information shall
not count as part of the page count for Past Performance.
FINDING 1 – No Statement Acknowledging Adverse Performance: It is
critical to the evaluation process that an Offeror provide a statement
regarding whether any adverse past performance has occurred or not
occurred. Acknowledgement of this requirement is important so that the
USG [United States Government] may gather information about an Offeror's
past performance in an efficient manner that allows for the evaluation of a
proposal to reflect the Offeror's past performance record. When an Offeror's
proposal is silent about whether it has any adverse past performance, that
silence effectively creates ambiguity and does not equate to a clear
statement that the Offeror has none. If Offeror has no history of adverse
contract performance, offeror must provide a statement as such.
3. Based upon the above findings and in accordance with the terms of the
RFP, Offeror CI [GovWave8] is determined to be non-compliant, and its
proposal is removed from consideration for award. A letter communicating
the details that make its proposal non-compliant will be provided along with
a written debriefing.
(capitalization and emphasis in original; alterations and footnote added).
8 The Army’s evaluation system created a labelling code for each offer in response to the
Solicitation. The following codes were used for the protestors in the above captioned bid
protests:
CI – GovWave
CG - Futron
AL - Government Acquisitions
DT -DH Technologies
AM - Enterprise Technology Solutions
AU - Unicom
CM - Advanced Computer Concepts
30
As reflected on the Army’s “Proposal Compliance Checklist” for GovWave, for the
column, “Meets terms and conditions of RFP?” the Army indicated: “NO,” with the
explanation: “Overall, this proposal is NON-COMPLIANT. Did not acknowledge
requirement to identify/discuss any potential adverse contract performacnce [sic].”
(capitalization and emphasis in original; alteration added). For Volume 3, the Proposal
Compliance Checklist reflected that Volume 3 was submitted and for the column “Adverse
Contract Performance,” the Army indicated “NO,” with the explanation: “Not Mentioned in
Volume 3, renders proposal non-compliant.” (capitalization and emphasis in original).
For the column “Volume 3 Meets Requirements,” the Army indicated “NO.”
(capitalization and emphasis in original).
Futron
The Army reviewed Futron’s proposal and found its Equipment List non-compliant
under Step 1. The February 15, 2024 Memorandum for Record for Futron’s evaluation
provided:
Proposal submitted by Futron, Inc., dated 16 October 2023
1. The purpose of this memorandum is to document the determination that
made the above referenced proposal submitted by Futron, Inc. Non-
Compliant per the terms and conditions of subject solicitation for the
Information Technology Enterprise Solutions – 4 Hardware (ITES-4H)
multiple award IDIQ base contracts. The proposal was reviewed against
the strict compliance requirements identified throughout the solicitation.
The United States Government (USG) performed initial Step 1
Compliance Checks to ensure the accuracy of proposals and reduce risk
to the Government. Adherence to the Strict Compliance requirements
identified throughout the solicitation is vital to ensure the Government
receives a complete and high- quality proposal. Strict Compliance
requirements encourage consistency and accuracy of information
presented. Further, ensuring the offeror has provided all necessary
information is essential to the efficient evaluation of proposals. The
following are excerpts directly from the Instructions to Offerors (Section
L) and Evaluation Factors for Award (Section M) of the RFP:
a. L.3 STRICT COMPLIANCE REQUIREMENT: All volumes and files have
strict compliance requirements and strict compliance to those requirements
will be evaluated. Any items identified as a STRICT COMPLIANCE
REQUIREMENT will be evaluated for compliance prior to any further
evaluation of the Offerors proposal. Failure to abide by the strict compliance
requirements for any of these factors will deem the Offerors proposal non-
compliant and will eliminate it from further consideration. Factors and
subfactors with strict compliance requirements are clearly identified
throughout these instructions.
31
b. L.4.1.3 – A proposal is presumed to represent the Offeror’s best efforts
to respond to the RFP [Request for Proposal]. The Offeror must provide
adequately detailed information that complies with the solicitation
requirements, allows for meaningful review by the Government evaluators,
and affirmatively demonstrates the merits of its proposal. The Offeror shall
provide sufficient detail to substantiate the validity of all stated assertions
and must not merely repeat the RFP requirements, but rather must provide
convincing documentary evidence of how contract requirements will be met.
Data not submitted with the proposal, but submitted previously, or
presumed to be known (i.e., previous projects performed for the United
States Government (USG) [sic] will not be considered. Clarity and
completeness are essential.
c. M.3 EVALUATION METHODOLOGY: Step 1 - STRICT COMPLIANCE
REQUIREMENT: Proposals will be reviewed to determine if all compliance
requirements set forth in the Instructions to Offerors are satisfied. Failure to
provide proposals in compliance with the instructions specified as “STRICT
COMPLIANCE REQUIREMENTS” in the Instructions to Offerors of this RFP
shall render the Offeror’s proposal non-compliant. Any Offeror's proposal
determined non-compliant will not be evaluated and will not be further
considered for award. Only Offerors whose proposals are determined
compliant will move to Step 2 of the evaluation process.
2. Based upon a review of the strict compliance requirements set forth in
the solicitation, the following findings contributed to the determination that
above referenced proposal is non-compliant:
a. Volume 1 – Equipment List (Part A). Offeror’s Equipment List
(Attachment 0002) contained a blank cell. Please see table below for the
specific cell that is material to the evaluation process and was found blank:
Equipment List Compliance Check
Tab Blank Cell in Column D – Proposed Configuration
[redacted] [redacted]
The STRICT COMPLIANCE REQUIREMENT identified in the solicitation
states:
• L.5.1.1 PART A - Equipment List. STRICT COMPLIANCE REQUIREMENT:
ANY cells marked for Contractor Fill-In on the Equipment List that are left
blank or are unintelligible as to the product the Offeror is proposing shall
render the Offeror’s proposal non-compliant and will not be further
considered for award.
32
FINDING 1 – Blank Cell in Column D – Proposed Configuration: It is critical
to the evaluation process that all fillable cells in Column D of the Equipment
List are complete, as required by the solicitation. Completeness ensures
that the Offeror’s proposed configuration for each System Description
identified on each Catalog (Catalog I through Catalog VII) identifies clear
technical detail. Blank cells present a risk of ambiguity and misinterpretation
to the USG, as well as impede the efficient evaluation of proposals because
a blank cell does not allow the Government to clearly identify which
product/item an Offeror is proposing. Offerors are required to provide a
proposed configuration for every System Description; thus, a complete
Equipment List is important to the Government’s evaluation. Here, the
Government cannot determine if the offeror meets the requirement
associated with [redacted] regarding “[redacted]” because the Offeror has
provided a blank cell.
3. Based upon the above findings and in accordance with the terms of the
RFP, Offeror CG [Futron] is determined to be non-compliant, and its
proposal is removed from consideration for award. A letter communicating
the details that make its proposal non-compliant will be provided along with
a written debriefing.
(capitalization and emphasis in original; first alteration in original).
As reflected on the Army’s “Proposal Compliance Checklist” for Futron, for the
column, “Meets terms and conditions of RFP?” the Army indicated “NO,” with the
explanation: “Overall, this proposal is NON-COMPLIANT.” (capitalization and emphasis
in original). The Proposal Compliance Checklist reflected that Volume 1 was submitted
and the Equipment List at Attachment 0002 was submitted as an Excel file. For the
column “All contractor filled cells are completed? (blank/unintelligible fills are prohibited),”
the Army indicated “NO,” with the explanation:
1 Blank in required Proposal Configuration fill-ins, 508 Blanks in catalog ID.
PLEASE NOTE: The blanks in the Catalog ID (Column E) are waived from
the non-compliance IAW L.5.1.1(e) “The Offeror may also complete the
Catalog Identification column to coordinate association between equipment
list and price models.” (emphasis added.)
(capitalization and emphasis in original). For the column “Volume 1 Meets
Requirements,” the Army indicated “NO.” (capitalization and emphasis in original).
Government Acquisitions
The Army reviewed Government Acquisitions’ proposal and found its Price
proposal non-compliant under Step 1. The January 11, 2024 Memorandum for Record
for Government Acquisitions’ evaluation provided:
33
Proposal submitted by Government Acquisitions, Inc. (GAI), dated 16
October 2023
1. The purpose of this memorandum is to document the determination that
made the above referenced proposal submitted by Government
Acquisitions, Inc. (GAI) Non-Compliant per the terms and conditions of
subject solicitation for the Information Technology Enterprise Solutions – 4
Hardware (ITES-4H) multiple award IDIQ base contracts. The proposal was
reviewed against the strict compliance requirements identified throughout
the solicitation. The United States Government (USG) performed initial Step
1 Compliance Checks to ensure the accuracy of proposals and reduce risk
to the Government. Adherence to the Strict Compliance requirements
identified throughout the solicitation is vital to ensure the Government
receives a complete and high-quality proposal. Strict Compliance
requirements encourage consistency and accuracy of information
presented. Further, ensuring the offeror has provided all necessary
information is essential to the efficient evaluation of proposals. The following
are excerpts directly from the Instructions to Offerors (Section L) and
Evaluation Factors for Award (Section M) of the RFP:
a. L.3 STRICT COMPLIANCE REQUIREMENT: All volumes and files have
strict compliance requirements and strict compliance to those requirements
will be evaluated. Any items identified as a STRICT COMPLIANCE
REQUIREMENT will be evaluated for compliance prior to any further
evaluation of the Offerors proposal. Failure to abide by the strict compliance
requirements for any of these factors will deem the Offerors proposal non-
compliant and will eliminate it from further consideration. Factors and
subfactors with strict compliance requirements are clearly identified
throughout these instructions.
b. L.4.1.3 – A proposal is presumed to represent the Offeror’s best efforts
to respond to the RFP. The Offeror must provide adequately detailed
information that complies with the solicitation requirements, allows for
meaningful review by the Government evaluators, and affirmatively
demonstrates the merits of its proposal. The Offeror shall provide sufficient
detail to substantiate the validity of all stated assertions and must not merely
repeat the RFP requirements, but rather must provide convincing
documentary evidence of how contract requirements will be met. Data not
submitted with the proposal, but submitted previously, or presumed to be
known (i.e., previous projects performed for the United States Government
(USG) [sic] will not be considered. Clarity and completeness are
essential.
c. M.3 EVALUATION METHODOLOGY: Step 1 - STRICT COMPLIANCE
REQUIREMENT: Proposals will be reviewed to determine if all compliance
requirements set forth in the Instructions to Offerors are satisfied. Failure to
34
provide proposals in compliance with the instructions specified as “STRICT
COMPLIANCE REQUIREMENTS” in the Instructions to Offerors of this RFP
shall render the Offeror’s proposal non-compliant. Any Offeror’s proposal
determined non-compliant will not be evaluated and will not be further
considered for award. Only Offerors whose proposals are determined
compliant will move to Step 2 of the evaluation process.
2. Based upon a review of the strict compliance requirements set forth in
the solicitation, the following findings contributed to the determination that
above referenced proposal is non-compliant:
a. Volume 2 – Price Model. Offeror’s Price Model (Attachment 0004) contains
one blank cell on Tab Catalog III-O, Cell G6 Fixed Discount for Warranty
Variations.
The STRICT COMPLIANCE REQUIREMENT identified in the solicitation
states:
• L.5.2 VOLUME II - Price Factor (1) STRICT COMPLIANCE
REQUIREMENT: All cells contain an appropriate value. Any cells marked
as ‘contractor fill-in’ that are blank or unintelligible in Attachment 0004 will
render the Offeror’s submission as non-compliant and the Offeror’s
proposal will receive no further consideration or evaluation. Offeror’s
intending to propose zero dollars for a particular cell must ensure the
appropriate cell contains a “0.” The Government will not assume a blank cell
in Attachment 0004 represents a zero as any blank cell will result in the
Offeror’s proposal being deemed non-compliant and not further considered
for award.
• L.5.2.1 (d) Instructions for the Price Model: Offerors shall completely fill out
the updated Price Model (Attachment 0004) included with this Amendment
[Amendment 0031]. Failure to provide prices for all items and catalog
identified in the Price Model of the solicitation will render the Offeror
ineligible for award.
FINDING 1 – A cell that is color-coded for “contractor fill-in” is blank. Full
completion of all highlighted/color coded cells required to be filled in by the
Offeror is essential to ensure the Government clearly understands the price
proposed in order to perform an accurate and complete evaluation. Blank
cells present a risk of ambiguity and misinterpretation to the USG, create
uncertainty as to the proposed price, as well as impede the efficient
evaluation of proposals because a blank cell does not allow the Government
to clearly identify if or what is the Fixed Discount for Warranty Variation for
Tab Catalog III-O. This information is important to ensuring the Government
knows the pricing associated with the Offeror’s proposal.
35
3. Based upon the above findings and in accordance with the terms of the
RFP, Offeror AL [Government Acquisitions] determined to be non-
compliant, and its proposal is removed from consideration for award. A letter
communicating the details that make its proposal non-compliant will be
provided along with a written debriefing.
(capitalization, emphasis, and second alteration in original).
As reflected on the Army’s “Proposal Compliance Checklist” for Government
Acquisitions, for the column, “Meets terms and conditions of RFP?” the Army indicated:
“No.” (capitalization and emphasis in original). The Proposal Compliance Checklist
reflected that Volume 2 was submitted and Attachment 0004 was submitted as an Excel
file. For the column “All contractor filled cells are completed? (blank/unintelligible fills are
prohibited),” the Army indicated “No,” with the explanation: “Blank cells
identified.”(emphasis in original). For the column “Volume 2 Meets Requirements,” the
Army indicated “No.” (capitalization and emphasis in original).
DH Technologies
The Army reviewed DH Technologies’ proposal and found its Price proposal non-
compliant under Step 1. The February 12, 2024 Memorandum for Record for DH
Technologies’ evaluation provided:
Proposal submitted by DH Technologies, LLC. Dated 16 October 2023
1. The purpose of this memorandum is to document the determination that
made the above referenced proposal submitted by DH Technologies, LLC.
Non-Compliant per the terms and conditions of subject solicitation for the
Information Technology Enterprise Solutions – 4 Hardware (ITES-4H)
multiple award IDIQ base contracts. The proposal was reviewed against the
strict compliance requirements identified throughout the solicitation. The
United States Government (USG) performed initial Step 1 Compliance
Checks to ensure the accuracy of proposals and reduce risk to the
Government. Adherence to the Strict Compliance requirements identified
throughout the solicitation is vital to ensure the Government receives a
complete and high-quality proposal. Strict compliance requirements
encourage consistency and accuracy of information presented. Further,
ensuring the Offeror has provided all necessary information is essential to
the efficient evaluation of proposals. The following are excerpts directly from
the Instructions to Offerors (Section L) and Evaluation Factors for Award
(Section M) of the RFP:
a. L.3 STRICT COMPLIANCE REQUIREMENT: All volumes and files have
strict compliance requirements and strict compliance to those requirements
will be evaluated. Any items identified as a STRICT COMPLIANCE
REQUIREMENT will be evaluated for compliance prior to any further
36
evaluation of the Offerors proposal. Failure to abide by the strict compliance
requirements for any of these factors will deem the Offerors proposal non-
compliant and will eliminate it from further consideration. Factors and
subfactors with strict compliance requirements are clearly identified
throughout these instructions.
b. L.4.1.3 – A proposal is presumed to represent the Offeror’s best efforts
to respond to the RFP. The Offeror must provide adequately detailed
information that complies with the solicitation requirements, allows for
meaningful review by the Government evaluators, and affirmatively
demonstrates the merits of its proposal. The Offeror shall provide sufficient
detail to substantiate the validity of all stated assertions and must not merely
repeat the RFP requirements, but rather must provide convincing
documentary evidence of how contract requirements will be met. Data not
submitted with the proposal, but submitted previously, or presumed to be
known (i.e., previous projects performed for the United States Government
(USG) [sic] will not be considered. Clarity and completeness are
essential.
c. M.3 EVALUATION METHODOLOGY: Step 1 - STRICT COMPLIANCE
REQUIREMENT: Proposals will be reviewed to determine if all compliance
requirements set forth in the Instructions to Offerors are satisfied. Failure to
provide proposals in compliance with the instructions specified as “STRICT
COMPLIANCE REQUIREMENTS” in the Instructions to Offerors of this RFP
shall render the Offeror’s proposal non-compliant. Any Offeror’s proposal
determined non-compliant will not be evaluated and will not be further
considered for award. Only Offerors whose proposals are determined
compliant will move to Step 2 of the evaluation process.
2. Based upon a review of the strict compliance requirements set forth in
the solicitation, the following findings contributed to the determination that
the above referenced proposal is non-compliant:
a. Volume 2 – Price Model. Offeror’s Price Model (Attachment 0004)
contained material blank cells. Please see table below for specific cells that
were found blank:
Price Model Compliance Check
Tab Column D – Proposed Configuration
Catalog I-O D29, D30
The STRICT COMPLIANCE REQUIREMENT identified in the solicitation
states:
• L.5.2 VOLUME II - Price Factor (1) STRICT COMPLIANCE
REQUIREMENT: All cells contain an appropriate value. Any cells marked
as contractor fill-in that are blank or unintelligible in Attachment 0004 will
37
render the Offeror’s submission as non-compliant and the Offeror’s
proposal will receive no further consideration or evaluation. Offeror’s
intending to propose zero dollars for a particular cell must ensure the
appropriate cell contains a “0.” The Government will not assume a blank cell
in Attachment 0004 represents a zero as any blank cell will result in the
Offeror’s proposal being deemed non-compliant and not further considered
for award.
• L.5.2.1 (d) Instructions for the Price Model: Offerors shall completely fill out
the updated Price Model (Attachment 0004) included with this Amendment
[Amendment 0031]. Failure to provide prices for all items and catalogs
identified in the Price Model of the solicitation will render the Offeror
ineligible for award.
FINDING 1 – Two cells that are color-coded for Contractor Fill-in are blank.
Full completion of all highlighted/color coded cells required to be filled in by
the Offeror is essential to ensure the Government clearly understands the
price proposed for a particular product in order to perform an accurate and
complete evaluation. Additionally, it is particularly critical to the evaluation
process that all fillable cells in Column D – Proposed Configuration of the
Price Model are complete to ensure that the Price Model can be cross
walked with Column D of the Equipment List. This ensures that the Offeror
consistently proposed its items on both solicitation attachments; the Catalog
ID does not provide enough information. Blank cells present a risk of
ambiguity and misinterpretation to the USG, create uncertainty as to the
product and price an offeror is proposing, as well as impede the efficient
evaluation of proposals because a blank cell does not allow the Government
to clearly identify the product associated with a particular price.
A Note Regarding Finding 1: The Army does note that the Offeror has
placed information regarding the Catalog Identification in Column E for the
associated blank cells. However, the information contained in Column E that
is associated with D29 and D30 is insufficient to find this offeror compliant
for the following reasons:
1) As noted above, it is important to the evaluation of proposals that Offerors
ensure consistency between the Equipment List and Price Matrix. This
ensures that not only can the Government adequately evaluate and assess
the price for the products an offeror is proposing, but also makes certain
that the offeror does not list one item on the Equipment List and list an
entirely different and potentially unacceptable item on the Price Matrix. The
Equipment List and the Price Matrix must be consistent, especially in
regards to column D, to ultimately ensure the Government is receiving
products that meet the Government’s minimum requirements at a fair and
reasonable price. By only providing the catalog identification number, the
38
Offeror does not clearly note what product it is proposing at the associated
price.
2) To the extent the offeror asserts that the Army, for the purposes of the
compliance check, should cross-reference the Offeror’s Equipment List to
the Price Matrix, such an assertion would be contrary to the terms of the
RFP. The RFP provides at L.4.1 that “Five separate volumes shall be
submitted. These volumes shall be self-contained and shall not be cross-
referenced. The Government will not assume the duty to search for data or
information to cure problems discovered in any proposal submitted.” Thus,
based on the clear language of L.4.1, the burden was on the offeror to
ensure volumes are self-contained and contain all necessary information for
the Government to evaluate.
3) It is also noted that It is an offeror’s responsibility to submit a well-written
proposal, with adequately detailed information which clearly demonstrates
compliance with the solicitation requirements and allows a meaningful
review by the Army. It is not the Army’s responsibility to scour through
various proposal documents to try and make an offeror compliant. Rather,
as the RFP notes, it is the offeror’s responsibility to comply with the clear
solicitation requirements and place all information in the correct volume in
order to allow the Government to conduct an efficient and effective
evaluation.
4) Fundamentally, without a clear description of the product proposed in
cells D29 and D30, the Army cannot know what product is being proposed
at the price noted in the Price Matrix, which materially inhibits the
evaluation.
3. Based upon the above findings and in accordance with the terms of the
RFP, Offeror DT [DH Technologies] is determined to be non-compliant, and
its proposal is removed from consideration for award. A letter
communicating the details that make its proposal non-compliant will be
provided along with a written debriefing.
(capitalization and emphasis in original; second alteration in original).
As reflected on the Army’s “Proposal Compliance Checklist” for DH Technologies,
for the column, “Meets terms and conditions of RFP?” the Army indicated “No,” with the
explanation: “Overall, this proposal is NON-COMPLIANT.” (capitalization and emphasis
in original). For Volume 1, the Proposal Compliance Checklist reflected that Volume 1
was submitted and the Equipment List at Attachment 0002 was submitted as an Excel
file. The Army indicated for the column “All contractor filled cells are completed?
(blank/unintelligible fills are prohibited),” “Yes,” with the explanation: “Catalog ID has
blanks, L.5.1.1(e) provided that: ‘The Offeror may also complete the Catalog
Identification column to coordinate association between equipment list and price
39
models.’ (emphasis added.) Non-compliance for this issue will be waived.” (emphasis
in original). For the column “Volume 1 Meets Requirements,” the Army indicated “Yes.”
(emphasis in original). As reflected on the Proposal Compliance Checklist for Volume 2,
the Proposal Compliance Checklist reflected that Volume 2 was submitted and for the
column “All contractor filled cells are completed? (blank/unintelligible fills are prohibited),”
the Army indicated “NO,” with the explanation:
1. Catalog I-O, Cells D29, D30 are blank.
2. Catalog Identification (Cell B6) on the top of some Tabs is blank.
These blank cells are immaterial as it is clear what catalog the offeror is
proposing to because each Tab is already labeled by the Government
as to the respective catalogs.
(capitalization and emphasis in original). For the column “Volume 2 Meets
Requirements,” the Army indicated “NO.” (capitalization and emphasis in original).
Enterprise Technology Solutions
The Army reviewed Enterprise Technology Solutions’ proposal and found its Price
proposal non-compliant under Step 1. The January 29, 2024 Memorandum for Record
for Enterprise Technology Solutions’ evaluation provided:
Proposal submitted by Enterprise Technology Solutions, Inc. (ETSI), dated
16 October 2023
1. The purpose of this memorandum is to document the determination that
made the above referenced proposal submitted by Enterprise Technology
Solutions, Inc. (ETSI) Non-Compliant per the terms and conditions of
subject solicitation for the Information Technology Enterprise Solutions – 4
Hardware (ITES-4H) multiple award IDIQ base contracts. The proposal was
reviewed against the strict compliance requirements identified throughout
the solicitation. The United States Government (USG) performed initial Step
1 Compliance Checks to ensure the accuracy of proposals and reduce risk
to the Government. Adherence to the Strict Compliance requirements
identified throughout the solicitation is vital to ensure the Government
receives a complete and high-quality proposal. Strict Compliance
requirements encourage consistency and accuracy of information
presented. Further, ensuring the offeror has provided all necessary
information is essential to the efficient evaluation of proposals. The following
are excerpts directly from the Instructions to Offerors (Section L) and
Evaluation Factors for Award (Section M) of the RFP:
a. L.3 STRICT COMPLIANCE REQUIREMENT: All volumes and files have
strict compliance requirements and strict compliance to those requirements
will be evaluated. Any items identified as a STRICT COMPLIANCE
40
REQUIREMENT will be evaluated for compliance prior to any further
evaluation of the Offerors proposal. Failure to abide by the strict compliance
requirements for any of these factors will deem the Offerors proposal non-
compliant and will eliminate it from further consideration. Factors and
subfactors with strict compliance requirements are clearly identified
throughout these instructions.
b. L.4.1.3 – A proposal is presumed to represent the Offeror’s best efforts
to respond to the RFP. The Offeror must provide adequately detailed
information that complies with the solicitation requirements, allows for
meaningful review by the Government evaluators, and affirmatively
demonstrates the merits of its proposal. The Offeror shall provide sufficient
detail to substantiate the validity of all stated assertions and must not merely
repeat the RFP requirements, but rather must provide convincing
documentary evidence of how contract requirements will be met. Data not
submitted with the proposal, but submitted previously, or presumed to be
known (i.e., previous projects performed for the United States Government
(USG) [sic] will not be considered. Clarity and completeness are
essential.
c. M.3 EVALUATION METHODOLOGY: Step 1 - STRICT COMPLIANCE
REQUIREMENT: Proposals will be reviewed to determine if all compliance
requirements set forth in the Instructions to Offerors are satisfied. Failure to
provide proposals in compliance with the instructions specified as “STRICT
COMPLIANCE REQUIREMENTS” in the Instructions to Offerors of this RFP
shall render the Offeror’s proposal non-compliant. Any Offeror’s proposal
determined non-compliant will not be evaluated and will not be further
considered for award. Only Offerors whose proposals are determined
compliant will move to Step 2 of the evaluation process.
2. Based upon a review of the strict compliance requirements set forth in
the solicitation, the following findings contributed to the determination that
above referenced proposal is non-compliant:
a. Volume 2 – Price Model. Offeror’s Price Model (Attachment 0004)
contained multiple blank cells. Please see table below for specific cells that
are material to the evaluation process and were found blank with no
additional explanations on the excel sheet:
41
Price Model Compliance Check
Tab Column D Column E Column H
Proposed Configuration Catalog Item Number Catalog Unit Price
[redacted] [redacted] [redacted] [redacted]
[redacted] [redacted] [redacted] [redacted]
[redacted] [redacted] [redacted] [redacted]
[redacted] [redacted] [redacted] [redacted]
[redacted] [redacted] [redacted] [redacted]
[redacted] [redacted] [redacted] [redacted]
The STRICT COMPLIANCE REQUIREMENT identified in the solicitation
states:
• L.5.2 VOLUME II - Price Factor (1) STRICT COMPLIANCE
REQUIREMENT: All cells contain an appropriate value. Any cells marked
as contractor fill-in that are blank or unintelligible in Attachment 0004 will
render the Offeror’s submission as non-compliant and the Offeror’s
proposal will receive no further consideration or evaluation. Offeror’s
intending to propose zero dollars for a particular cell must ensure the
appropriate cell contains a “0.” The Government will not assume a blank cell
in Attachment 0004 represents a zero as any blank cell will result in the
Offeror’s proposal being deemed non-compliant and not further considered
for award.
• L.5.2.1 (d) Instructions for the Price Model: Offerors shall completely fill out
the updated Price Model (Attachment 0004) included with this Amendment
[Amendment 0031]. Failure to provide prices for all items and catalogs
identified in the Price Model of the solicitation will render the Offeror
ineligible for award.
FINDING 1 – Multiple cells that are color-coded for contractor-fill in are
blank. Full completion of all highlighted/color coded cells required to be filled
in by the Offeror is essential to ensure the Government clearly understands
the price proposed in order to perform an accurate and complete evaluation.
Additionally, it is particularly critical to the evaluation process that all fillable
cells in Column D – Proposed Configuration of the Price Model are complete
to ensure that the Price Model can be cross walked with Column D of the
Equipment List. This ensures that the offeror consistently proposed its items
on both solicitation attachments. Blank cells present a risk of ambiguity and
misinterpretation to the USG, create uncertainty as to the proposed price,
as well as impede the efficient evaluation of proposals because a blank cell
does not allow the Government to clearly identify the proposed price for a
particular product.
3. Based upon the above findings and in accordance with the terms of the
RFP, Offeror AM [Enterprise Technology Solutions] is determined to be
42
non-compliant, and its proposal is removed from consideration for award. A
letter communicating the details that make its proposal non-compliant will
be provided along with a written debriefing.
(capitalization, emphasis, and second alteration in original).
As reflected on the Army’s “Proposal Compliance Checklist” for Enterprise
Technology Solutions, for the column, “Meets terms and conditions of RFP?” the Army
indicated: “No.” (capitalization and emphasis in original). The Proposal Compliance
Checklist reflected that Volume 2 was submitted and Attachment 0004 was submitted as
an Excel file. For the column “All contractor filled cells are completed? (blank/unintelligible
fills are prohibited),” the Army indicated “No,” with the explanation:
(1) Material Blank cells identified as Non-Compliant, which is described in
the compliance MFR.
(2) PLEASE NOTE: the USG reviewed Blanks Cells in Column E of all
Catalogs. Except those noted in the compliance MFR, the remaining
blanks in Column E are immaterial because of the offeror’s response in
Column D. The Offeror has noted that the [redacted], thus the offeror
has provided a reason for not assigning a catalog number. The
compliance MFR notes cells where the offeror did not provide any
rationale in Column D or E as to the blank cells.
(3) PLEASE NOTE: The Government noted that there is a blank Unit
Price [redacted] in Catalog [redacted] and in Catalog [redacted].
Because the Offeror has noted that [redacted] the Government does not
find the Offeror non-compliant for these cells. Effectively, the Offeror has
provided a reason as to why some cells were left blank. Thus, based on
the particular circumstances of this Offeror’s Price Model, the
Government does not find the Offeror non-compliant for these blank
cells.
(capitalization and emphasis in original). For the column “Volume 2 Meets
Requirements,” the Army indicated “No.” (capitalization and emphasis in original).
Unicom
The Army reviewed Unicom’s proposal and found its Equipment List non-compliant
under Step 1. The February 15, 2024 Memorandum for Record for Unicom’s evaluation
provided:
Proposal submitted by UNICOM Government, Inc, [sic] dated 16 October
2023
43
1. The purpose of this memorandum is to document the determination that
made the above referenced proposal submitted by UNICOM Government,
Inc. Non-Compliant per the terms and conditions of subject solicitation for
the Information Technology Enterprise Solutions – 4 Hardware (ITES-4H)
multiple award IDIQ base contracts. The proposal was reviewed against the
strict compliance requirements identified throughout the solicitation. The
United States Government (USG) performed initial Step 1 Compliance
Checks to ensure the accuracy of proposals and reduce risk to the
Government. Adherence to the Strict Compliance requirements identified
throughout the solicitation is vital to ensure the Government receives a
complete and high-quality proposal. Strict Compliance requirements
encourage consistency and accuracy of information presented. Further,
ensuring the offeror has provided all necessary information is essential to
the efficient evaluation of proposals. The following are excerpts directly from
the Instructions to Offerors (Section L) and Evaluation Factors for Award
(Section M) of the RFP:
a. L.3 STRICT COMPLIANCE REQUIREMENT: All volumes and files have
strict compliance requirements and strict compliance to those requirements
will be evaluated. Any items identified as a STRICT COMPLIANCE
REQUIREMENT will be evaluated for compliance prior to any further
evaluation of the Offerors proposal. Failure to abide by the strict compliance
requirements for any of these factors will deem the Offerors proposal non-
compliant and will eliminate it from further consideration. Factors and
subfactors with strict compliance requirements are clearly identified
throughout these instructions.
b. L.4.1.3 – A proposal is presumed to represent the Offeror’s best efforts
to respond to the RFP. The Offeror must provide adequately detailed
information that complies with the solicitation requirements, allows for
meaningful review by the Government evaluators, and affirmatively
demonstrates the merits of its proposal. The Offeror shall provide sufficient
detail to substantiate the validity of all stated assertions and must not merely
repeat the RFP requirements, but rather must provide convincing
documentary evidence of how contract requirements will be met. Data not
submitted with the proposal, but submitted previously, or presumed to be
known (i.e., previous projects performed for the United States Government
(USG) [sic] will not be considered. Clarity and completeness are
essential.
c. M.3 EVALUATION METHODOLOGY: Step 1 - STRICT COMPLIANCE
REQUIREMENT: Proposals will be reviewed to determine if all compliance
requirements set forth in the Instructions to Offerors are satisfied. Failure to
provide proposals in compliance with the instructions specified as “STRICT
COMPLIANCE REQUIREMENTS” in the Instructions to Offerors of this RFP
shall render the Offeror’s proposal non-compliant. Any Offeror's proposal
44
determined non-compliant will not be evaluated and will not be further
considered for award. Only Offerors whose proposals are determined
compliant will move to Step 2 of the evaluation process.
2. Based upon a review of the strict compliance requirements set forth in
the solicitation, the following findings contributed to the determination that
above referenced proposal is non-compliant:
a. Volume 1 – Equipment List (Part A). Offeror’s Equipment List
(Attachment 0002) contained one blank cell in [redacted]. This cell is
material to the evaluation process.
The STRICT COMPLIANCE REQUIREMENT identified in the solicitation
states:
• L.5.1.1 PART A - Equipment List. STRICT COMPLIANCE REQUIREMENT:
ANY cells marked for Contractor Fill-In on the Equipment List that are left
blank or are unintelligible as to the product the Offeror is proposing shall
render the Offeror’s proposal non-compliant and will not be further
considered for award.
FINDING 1 – Blank Cell in Column D – Proposed Configuration: It is critical
to the evaluation process that all fillable cells in Column D of the Equipment
List are complete, as required by the solicitation. Completeness ensures
that the Offeror’s proposed configuration for each System Description
identified on each Catalog (Catalog I through Catalog VII) identifies clear
technical detail. Blank cells present a risk of ambiguity and misinterpretation
to the USG, as well as impede the efficient evaluation of proposals because
a blank cell does not allow the Government to clearly know what
product/item an Offeror is proposing. Offerors are required to provide a
proposed configuration for every System Description; thus, a complete
Equipment List is important to the Government’s evaluation. Here, the
Government cannot determine if the offeror meets the requirement
associated with [redacted] because the offeror has provided a blank cell.
3. Based upon the above findings and in accordance with the terms of the
RFP, Offeror AU [Unicom] is determined to be non-compliant, and its
proposal is removed from consideration for award. A letter communicating
the details that make its proposal non-compliant will be provided along with
a written debriefing.
(capitalization and emphasis in original; alterations added).
As reflected on the Army’s “Proposal Compliance Checklist” for Unicom, for the
column, “Meets terms and conditions of RFP?” the Army indicated: “No.” (capitalization
and emphasis in original). The Proposal Compliance Checklist reflected that Volume 1
45
was submitted and the Equipment List at Attachment 0002 was submitted as an Excel
file. For the column “All contractor filled cells are completed? (blank/unintelligible fills are
prohibited),” the Army indicated “No,” with the explanation:
1. 1 blank cell in Catalog II configuration that is material: [redacted]
2.Note: Blank cells were also identified in the Catalog ID column.
However, due to a solicitation ambiguity, these blank cells in Column E
do not make the Offeror non-compliant. See MFR regarding the
ambiguity for further details.
(emphasis in original). For the column “Volume 1 Meets Requirements,” the Army
indicated “No.” (capitalization and emphasis in original). Similarly for Volume 2, the
Proposal Compliance Checklist reflected that Volume 2 was submitted and for the column
“All contractor filled cells are completed? (blank/unintelligible fills are prohibited),” the
Army indicated “No,” with the explanation:
Please note [redacted]. As it pertains to this Offeror’s proposal, these
cells are immaterial as the Offeror input a response in Column D noting
its proposed technical approach, which explains why the cells are blank.
Here, [redacted]. Because the Offeror has explained why the cells are
blank, these cells are immaterial to the Step 1 evaluation.
(capitalization and emphasis in original). The Proposal Compliance Checklist asked if
“Volume 2 Meets Requirements,” and the Army indicated “No.”
Advanced Computer Concepts
The Army reviewed Advanced Computer Concepts’ proposal and found its
Equipment List non-compliant under Step 1. The February 14, 2024 Memorandum for
Record for Advanced Computer Concepts’ evaluation provided:
Proposal submitted by Advanced Computer Concepts, dated 16 October
2023
1. The purpose of this memorandum is to document the determination that
made the above referenced proposal submitted by Advanced Computer
Concepts Non-Compliant per the terms and conditions of subject solicitation
for the Information Technology Enterprise Solutions – 4 Hardware (ITES-
4H) multiple award IDIQ base contracts. The proposal was reviewed against
the strict compliance requirements identified throughout the solicitation. The
United States Government (USG) performed initial Step 1 Compliance
Checks to ensure the accuracy of proposals and reduce risk to the
Government. Adherence to the Strict Compliance requirements identified
throughout the solicitation is vital to ensure the Government receives a
complete and high-quality proposal. Strict Compliance requirements
46
encourage consistency and accuracy of information presented. Further,
ensuring the offeror has provided all necessary information is essential to
the efficient evaluation of proposals. The following are excerpts directly from
the Instructions to Offerors (Section L) and Evaluation Factors for Award
(Section M) of the RFP:
a. L.3 STRICT COMPLIANCE REQUIREMENT: All volumes and files have
strict compliance requirements and strict compliance to those requirements
will be evaluated. Any items identified as a STRICT COMPLIANCE
REQUIREMENT will be evaluated for compliance prior to any further
evaluation of the Offerors proposal. Failure to abide by the strict compliance
requirements for any of these factors will deem the Offerors proposal non-
compliant and will eliminate it from further consideration. Factors and
subfactors with strict compliance requirements are clearly identified
throughout these instructions.
b. L.4.1.3 – A proposal is presumed to represent the Offeror’s best efforts
to respond to the RFP [Request for Proposal]. The Offeror must provide
adequately detailed information that complies with the solicitation
requirements, allows for meaningful review by the Government evaluators,
and affirmatively demonstrates the merits of its proposal. The Offeror shall
provide sufficient detail to substantiate the validity of all stated assertions
and must not merely repeat the RFP requirements, but rather must provide
convincing documentary evidence of how contract requirements will be met.
Data not submitted with the proposal, but submitted previously, or
presumed to be known (i.e., previous projects performed for the United
States Government (USG) [sic] will not be considered. Clarity and
completeness are essential.
c. M.3 EVALUATION METHODOLOGY: Step 1 - STRICT COMPLIANCE
REQUIREMENT: Proposals will be reviewed to determine if all compliance
requirements set forth in the Instructions to Offerors are satisfied. Failure to
provide proposals in compliance with the instructions specified as “STRICT
COMPLIANCE REQUIREMENTS” in the Instructions to Offerors of this RFP
shall render the Offeror’s proposal non-compliant. Any Offeror’s proposal
determined non-compliant will not be evaluated and will not be further
considered for award. Only Offerors whose proposals are determined
compliant will move to Step 2 of the evaluation process.
2. Based upon a review of the strict compliance requirements set forth in
the solicitation, the following findings contributed to the determination that
above referenced proposal is non-compliant:
a. Volume 1 – Equipment List (Part A). Offeror’s Equipment List
(Attachment 0002) contained blank cells. Please see table below for the
specific cell that is material to the evaluation process and was found blank:
47
Equipment List Compliance Check
Tab Blank Cells in Column D – Proposed Configuration
[redacted] [redacted]
The STRICT COMPLIANCE REQUIREMENT identified in the solicitation
states:
• L.5.1.1 PART A - Equipment List. STRICT COMPLIANCE
REQUIREMENT: ANY cells marked for Contractor Fill-In on the Equipment
List that are left blank or are unintelligible as to the product the Offeror is
proposing shall render the Offeror’s proposal non-compliant and will not be
further considered for award.
FINDING 1 – Blank Cells in Column D – Proposed Configuration: It is critical
to the evaluation process that all fillable cells in Column D of the Equipment
List are complete, as required by the solicitation. Completeness ensures
that the Offeror’s proposed configuration for each System Description
identified on each Catalog (Catalog I through Catalog VII) identifies clear
technical detail. Blank cells present a risk of ambiguity and misinterpretation
to the USG, as well as impede the efficient evaluation of proposals because
a blank cell does not allow the Government to clearly identify which
product/item an Offeror is proposing. Offerors are required to provide a
proposed configuration for every System Description; thus, a complete
Equipment List is important to the Government’s evaluation. Here, the
Government cannot determine if the offeror meets the requirement
associated with [redacted] regarding “[redacted]” because the offeror has
provided a blank cell.
3. Based upon the above findings and in accordance with the terms of the
RFP, Offeror CM [Advanced Computer Concepts] is determined to be non-
compliant, and its proposal is removed from consideration for award. A letter
communicating the details that make its proposal non-compliant will be
provided along with a written debriefing.
(capitalization and emphasis in original; first alteration in original).
As reflected on the Army’s “Proposal Compliance Checklist” for Advanced
Computer Concepts, for the column, “Meets terms and conditions of RFP?” the Army
indicated: “No,” with the explanation: “Overall, this proposal is NON-COMPLIANT. Blanks
in Equipment List.” (capitalization and emphasis in original). The Proposal Compliance
Checklist reflected that Volume 1 was submitted and the Equipment List at Attachment
0002 was submitted as an Excel file. For the column “All contractor filled cells are
completed? (blank/unintelligible fills are prohibited),” the Army indicated “No,” with the
explanation:
48
1. 1 blank cell in [redacted] configuration that is material: [redacted].
2. Note: Blank cells were also identified in the Catalog ID column. However,
due to a solicitation ambiguity, these blank cells in Column E do not make
the Offeror non-compliant. See MFR regarding the ambiguity for further
details.
(capitalization and emphasis in original). For the column “Volume 1 Meets
Requirements,” the Army indicated “NO.” (capitalization and emphasis in original).
Additionally, for price, the Proposal Compliance Checklist reflected that Volume 2
was submitted and Attachment 0004 was submitted as an Excel file. For the column “All
contractor filled cells are completed? (blank/unintelligible fills are prohibited),” the Army
indicated “No,” with the explanation:
Please note [redacted]. As it pertains to this Offeror’s proposal, these cells
are immaterial as the Offeror input a response in Column D noting its
proposed technical approach, which explains why the cells are blank. Here,
[redacted]. Because the Offeror has explained why the cells are blank,
these cells are immaterial to the Step 1 evaluation.
Although noting that there were “33 Total Blank cells in Price Model,” for the column
“Volume 2 Meets Requirements,” the Army indicated “YES.” (capitalization and
emphasis in original).
As described above, in response to being eliminated by the Army under Step 1 of
the evaluation process, each of the seven protestors filed a pre-award bid protest in the
United States Court of Federal Claims, the above captioned bid protests, alleging the
Army arbitrarily and capriciously eliminated them from further evaluation of their proposals
for possible award of the procurement.
Protestors’ Complaints
GovWave
As stated above, the Army reviewed GovWave’s proposal and found GovWave’s
Past Performance proposal non-compliant under Step 1. In its amended complaint,
GovWave argues that the Army eliminated GovWave’s proposal
because, after its initial review of GovWave’s proposal, the Agency is
unsure whether GovWave has any adverse past performance. The Army
made this decision even though Solicitation No. W52P1J20R0082 required
offerors with adverse past performance to identify such contracts in their
proposal and provide various details and documents about their adverse
past performance, and GovWave’s proposal includes none of this
information because it does not have any adverse past performance to
address. The Army also made this decision despite several statements in
49
GovWave’s proposal that, like the absence of any identified contracts or
further details about adverse past performance, confirm it does not have
adverse past performance. For example, GovWave’s proposal states that
[redacted].
(internal references and footnote omitted). GovWave continues:
The Army believes it is justified in removing GovWave from the competition
(and the opportunity to provide ITES hardware for the next ten years) before
conducting a full evaluation of its proposal because the Army claims the
Solicitation contained a so-called “strict compliance requirement”
mandating that GovWave use specific language to state that it does not
have any adverse past performance. Yet, the Solicitation did not include
“magic language” that offerors had to use if they do not have adverse past
performance and, moreover, the Solicitation did not identify this instruction
as a strict compliance requirement. The operative strict compliance
requirement in the Solicitation only applied to the identification of recent and
relevant contracts that encountered performance problems, which, again,
GovWave does not have. There are other flaws in the Agency’s decision,
insofar as it indicates the Agency used an unstated evaluation criterion and
that it abused its discretion in not seeking clarification of the perceived
ambiguity or waiving an obvious and minor informality in GovWave’s
proposal. Indeed, this matter could be easily and quickly resolved through
clarification in a one-sentence email or a brief phone call through which
GovWave would confirm what it believes is already clear from its proposal:
namely, that it does not have any recent and relevant contracts that
encountered performance problems. Such a clarification would not require
a revision to GovWave’s proposal, would not delay the procurement any
longer than it takes the Agency to ask, “please confirm you have no adverse
past performance,” and would ensure the Agency has the benefit of
GovWave’s strong proposal in the competition for the Solicitation.
GovWave’s amended complaint has five counts: In Count One, GovWave alleges that
“[t]he Agency’s interpretation of the strict compliance requirement for adverse contract
performance is contrary to the Solicitation and constitutes use of an unstated evaluation
criterion.” (alteration added). In Count Two, GovWave alleges “[t]he Agency’s finding that
GovWave’s proposal does not comply with the instructions for adverse contract
performance is arbitrary and capricious.” (alteration added). In Count Three, GovWave
contends “[i]f the Agency had any doubt about whether GovWave had adverse Past
Performance, it should have sought clarification of GovWave’s proposal.” (alteration
added). In Count Four, GovWave alleges, “[i]n the alternative, the Agency’s decision to
exclude GovWave’s proposal for an obvious informality or minor irregularity is arbitrary,
capricious, and an abuse of discretion.” (alteration added). In Count Five, GovWave
argues “[a]lternatively, the Solicitation contained a latent ambiguity.” (alteration added).
In Count Six, GovWave argues that “[t]he Agency engaged in disparate treatment and
unequally evaluated GovWave’s proposal to its prejudice.” (alteration added). GovWave
asks this court to declare “the Agency’s evaluation of GovWave’s proposal arbitrary,
50
capricious, and contrary to law,” order the Army to “rescind its elimination of GovWave’s
exclusion from the competition and reinstate GovWave into Step 2 of the evaluation
process,” or, alternatively, “require the Agency to clarify its requirements in an amended
Solicitation, resolicit revised proposals, and evaluate proposals in accordance with the
law.”
Futron
As reflected above, the Army reviewed Futron’s proposal and found its Equipment
List non-compliant under Step 1. Futron’s complaint has a single count and alleges that
“[t]he Army abused its discretion by failing to allow Futron to correct the omission through
clarification,” arguing that “the agency “excluded Futron from competition because Futron
left one cell blank in its equipment list. Excluding Futron instead of seeking clarification
was improper. First, the error is minor and can easily be corrected. All information
pertaining to the [redacted] is featured in the cells above and below the blank,” and,
furthermore, that “the Army was on notice of the error.” (alteration added). Futron further
alleges that “[t]he Solicitation requirement also does not serve a substantive purpose or
deprive the Army of any substantive information.” (alteration added). Futron asks the court
to determine “that the Army’s decision to eliminate Futron from consideration was
arbitrary, capricious and irrational,” and “[r]equire the Army to evaluate Futron’s proposal.”
(alteration added).
Government Acquisitions
As indicated above, the Army determined Government Acquisitions’ Price proposal
was non-compliant under Step 1. Government Acquisitions’ amended complaint begins
by alleging
GAI’s [Government Acquisitions’] summary exclusion from evaluation under
the Army Contracting Command Solicitation W52P1J-20-R-0082 for
Information Technology Enterprise Solutions 4 Hardware was in error. The
Agency’s exclusion of GAI was arbitrary, capricious, an abuse of discretion,
and was otherwise contrary to law for the following reasons: the Agency’s
interpretation of Strict Compliance is arbitrary, capricious, and otherwise not
in accordance with law; the Agency’s finding that GAI’s proposal does not
comply with the instructions for cell completion is arbitrary, capricious and
otherwise not in accordance with law; the Agency abused its discretion by
not waiving the blank cell as a minor informality or irregularity; the Agency’s
failure to seek clarification was arbitrary, capricious, and was otherwise not
in accordance with law; the Solicitation was latently ambiguous; the Agency
failed to comply with stated evaluation criteria and applied unstated
evaluation criteria to the evaluation of offers; and the Agency disparately
evaluated proposals.
(internal references omitted; alteration added). Government Acquisitions’ amended
complaint noted that for the pricing information, the
51
data had to be entered manually. The use of formulae to populate the
spreadsheet was not permitted, and the spreadsheet was password
protected. Offerors could not use common programs both internal and
external to Excel to prepare or review the Amendment 31 spreadsheet.
Offerors were given 18 calendar days to complete the 1,352 cells in the
pricing spreadsheet. In the course of manually moving the data from the
original spreadsheets Amendment 31 spreadsheet, GAI left Cell G6, Fixed
Discount for Warranty Variations, on Tab Catalog III-O blank. It was GAI’s
understanding that the government would not assign a 0 to a blank cell.
Normally when a column is summed in an Excel spreadsheet, it only sums
the numbers occurring after the blank space. For example, if there are 10
rows in a column of numbers and the 6th row is a blank, the system will only
sum the last 4 rows. When this happens, the user is alerted that there must
be a blank cell somewhere because the total number will be off. Apparently,
contrary to what the solicitation stated regarding blank cells, the government
had an algorithm embedded in the spreadsheet that assigned a zero value
to the blank cell, or its formula construction led to that result. Had the
spreadsheet provided by the Army not assigned a 0 value to the blank cell,
the whole column would not have been included in the total and GAI would
have been alerted that the total was dramatically different than expected
and would have gone looking for a blank cell. GAI’s Total Contract Line
Price was only [redacted] higher than presented by GAI’s initial submission,
so that did not raise any red flags for GAI.
(internal references omitted; emphasis in original). Government Acquisitions’ amended
complaint has seven counts, in Count One, Government Acquisitions alleges that “[t]he
Agency's interpretation of the strict compliance requirement regarding blank cells is
arbitrary, capricious, and otherwise not in accordance with law.” (alteration added). In
Count Two, Government Acquisitions argues “[t]he Agency's finding that GAI's proposal
does not comply with the instructions for cell completion is arbitrary and capricious.”
(alteration added). In Count Three, Government Acquisitions alleges that “[t]he Agency
abused its discretion by not waiving the blank cell G6 as a minor informality or irregularity.”
(alteration added). In Count Four, Government Acquisitions claims that “[i]f the Agency
had any doubt about GAI’s discount percentage it should have sought clarification of
GAI's proposal.” (alteration added). In Count Five, Government Acquisitions alleges that
“[t]he Solicitation was latently ambiguous.” (alteration added). In Count Six, Government
Acquisitions alleges that “[t]he Agency’s failure to comply with the stated evaluation
criteria was arbitrary and capricious.” (alteration added). In Count Seven, Government
Acquisitions argues that “[t]he Agency evaluated offers unequally.” (alteration added).
Government Acquisitions asks the court to order “the Agency to rescind its elimination of
GAI's exclusion from the competition and reinstate GAI into Step 2 of the evaluation
process,” or “[a]lternatively, require the Agency to clarify its requirements in an amended
Solicitation, resolicit revised proposals, and evaluate proposals in accordance with the
law.” (alteration added).
52
DH Technologies
As referenced above, the Army reviewed DH Technologies’ proposal and found its
Price proposal non-compliant under Step 1. Prior to filing a complaint, and then an
amended complaint in this court, DH Technologies filed a bid protest at the GAO “that
was dismissed by the GAO as a result of other protests being filed at the Court.” DH
Technologies’ amended complaint in this court has five counts. In Count One, DH
Technologies alleges that “[t]he very information that the Agency rejected DH Tech’s
proposal for being missing was actually found in other parts of its proposal in the same
volume,” and “[w]hile the Solicitation did contain a prohibition on cross-referencing the
five separate volumes as each volume self-contained,” “there was no prohibition in the
Solicitation on the Agency cross-referencing within a particular volume. Since the alleged
missing information was in the proposal, albeit in another place than where the Agency
found it to be missing, it was still in the same volume proposal.” (alterations added;
internal references omitted). In Count Two of the amended complaint, DH Technologies
alleges the “Army improperly rejected DH Tech’s proposal for failure to meet a minor and
immaterial defect.” In Count Three, DH Technologies alleges that “[t]he Agency should
have waived the requirement.” (alteration added). In Count Four, DH Technologies’
amended complaint argues that the “Agency evaluated offerors unequally.” In Count Five,
DH Technologies alleges that the “Agency engaged unequal clarifications/discussions.”
DH Technologies requests the court find the Army’s actions were “irrationally based [sic],
arbitrary, capricious, and contrary to applicable statutes and regulations,” and “require the
Agency to properly evaluate Plaintiff’s proposal.” (alteration added).
Enterprise Technology Solutions
As referenced above, the Army reviewed Enterprise Technology Solutions’
proposal and found its Price proposal non-compliant under Step 1. Enterprise Technology
Solutions’ amended complaint argues that
[t]he Army deviated from its own Solicitation criteria in its evaluation of
ETSI’s [Enterprise Technology Solutions’] proposal—but followed such
criteria for other proposals that moved on to step two of the evaluation; and
thus, it unequally evaluated offerors. The Army engaged in unfair and
unequal clarifications with offerors. It failed to provide an administrative
record sufficiently justifying its evaluation decisions. And the Army was
latently ambiguous as to the utilization of the price model spreadsheet for
this Solicitation. Were proposals properly evaluated, ETSI would have
advanced in this competition, with a substantial chance of award.
(alterations added; internal references omitted). Enterprise Technology Solutions’
amended complaint argues that
[t]he Administrative Record produced by the Army for this case shows
multiple offerors deemed compliant and allowed to move on to step two that
had blank fields in their price model—blank fields identical to the blank fields
53
in ETSI’s price model that the Army specifically relied on to deem ETSI non-
compliant. The Administrative Record shows multiple offerors deemed
compliant and allowed to move on to step two that filled out their price
models in the same and/or similar fashion as ETSI. The Administrative
Record shows multiple offerors deemed compliant and allowed to move on
to step two that included non-numerical explanations (i.e., “N/A”) in fields of
their price models the same as and/or similar to ETSI’s non-numerical
explanations in those same fields of ETSI’s price model, upon which Army
specifically relied to deem ETSI non-compliant. The Administrative Record
even shows at least one offeror excluded from the competition at step one
purportedly based on blank fields in another proposal attachment—but
which had some of the same blank fields and similar non-numerical
explanations in certain fields of its price model as ETSI’s price model was
excluded for—and which: (i) received a notification from the Army of non-
compliance and exclusion from competition for blank fields in another
proposal attachment; (ii) apparently, subsequently sent the Army a
response or responses to (or otherwise communicated with the Army
responding to) the Army’s notification of its noncompliance and exclusion
from competition; (iii) received a second notification letter from the Army
amending the Army’s position on its compliance as a result of the offeror’s
communicated responses; and (iv) was then allowed back in the
competition and promoted to step two of the competition.
(emphasis in original; alteration added). In Count One of five counts in Enterprise
Technology Solutions’ amended complaint, the protestor alleges that “[t]he Army’s
evaluation of ETSI deviated from the Solicitation.” (alteration added). In Count Two,
Enterprise Technology Solutions’ amended complaint alleges “[t]he Army engaged in
unequal evaluation of offerors.” (alteration added). In Count Three, Enterprise Technology
Solutions alleges that “[t]he Army engaged in unequal clarifications with offerors.”
(alteration added). In Count Four of the amended complaint, Enterprise Technology
Solutions alleges that “[t]he Army inadequately documented its evaluation.” (alteration
added). In Count Five, Enterprise Technology Solutions alleges that “[t]he debrief shows
a latent ambiguity/contra proferentem.” (alteration added). Enterprise Technology
Solutions seeks an order from this court declaring “that the Army’s evaluation of ETSI’s
proposal and resulting elimination of ETSI from competition were arbitrary and
capricious,” and instructing the “Army to conduct a re-evaluation of certain or all
proposals, in line with its equal evaluation requirements, consistent with the reasonable
interpretation ETSI (and potentially others) applied,” or, “[a]lternatively, require the Army
to officially clarify its requirements related to the price model attachment in the Solicitation
in an amended Solicitation, ensure the input the Army is requiring for each field is not
limited by the spreadsheet, and allow for relevant revisions to all proposals,” and
subsequently require the Army to re-evaluate all the proposals. (alteration added).
Unicom
54
As described above, the Army reviewed Unicom’s proposal and found its
Equipment List non-compliant under Step 1. Unicom’s complaint in this court alleges
[c]ontrary to the express terms of the Solicitation, the Agency impermissibly
broadened its Step 1 evaluation and disqualified UGI’s [Unicom’s] proposal
based on an alleged “material” omission in UGI’s proposal. Specifically, the
Agency eliminated UGI’s proposal based on a Solicitation term that was not
a “Strict Compliance Requirement” and UGI’s inadvertent and immaterial
omission of information from one cell of a fifty-four (54) page, seven (7) tab
Excel spreadsheet that UGI should have been permitted to correct.
(alterations added). Unicom’s complaint continues:
The Agency contends that exclusion of UGI from the competitive range was
proper because UGI failed to comply with a “Strict Compliance
Requirement” of the Solicitation, compliance with which was to be evaluated
at Step 1 of a three-step proposal evaluation process. The Agency’s
position is unsupported by the terms of the Solicitation. Completion of the
missing cell was not a Strict Compliance Requirement under the Solicitation
and, therefore, was not subject to the Step 1 evaluation. Moreover, the
omission of information from a single spreadsheet cell was an obvious,
immaterial, and clerical error. The relevant information was reflected
elsewhere in UGI’s proposal.
(internal references omitted). Unicom’s complaint has four counts. Count One alleges
“[t]he Agency failed to properly perform its ‘Step 1’ evaluation in accordance with the
terms of the Solicitation and applied unstated evaluation criteria.” (alteration added).
Count Two alleges “[t]he Agency’s finding that UGI’s proposal does not comply with the
Solicitation instructions and exclusion of UGI’s proposal from the Step 2 evaluation is
arbitrary and capricious.” (alteration added). Unicom’s complaint at Count Three alleges
“[i]f the Agency had any doubt about whether UGI’s proposed Performance Notebook
(GSS High End Laptop) product included [redacted], the Agency should have permitted
UGI to correct or clarify an obvious and immaterial clerical error in its proposal.” (alteration
added). Count Four alleges “[i]n the alternative, the Agency’s decision to exclude UGI’s
proposal for an obvious informality or minor irregularity is arbitrary, capricious, and an
abuse of discretion.” (alteration added). Unicom seeks a court order that “the Agency’s
evaluation of UGI’s Proposal was arbitrary, capricious, and contrary to law,” and “requiring
the Agency to rescind its elimination of UGI’s exclusion from the competitive range and
reinstate UGI into Step 2 of the Solicitation evaluation process,” requiring “the Agency to
permit UGI to clarify and confirm that its proposed Performance Notebook (GSS High End
Laptop) [redacted],” and requiring “the Agency to advance UGI’s Proposal to Step 2 of
the evaluation process.”
55
Advanced Computer Concepts
As indicated above, the Army reviewed Advanced Computer Concepts’ proposal
and found its Equipment List non-compliant under Step 1. Prior to filing a complaint in this
court, Advanced Computer Concepts filed a bid protest at the GAO. The GAO
subsequently “dismissed the protest because the ‘matter involved is currently pending
before a court of competent jurisdiction.’” Advanced Computer Concepts’ complaint in this
court alleges that Advanced Computer Concepts’
proposed Equipment List contained one minor typographical error—among
over a thousand cells that needed to be completed in the Equipment List,
ACC [Advanced Computer Concepts] inadvertently a [sic] word from one
single cell—[redacted]. In [redacted], ACC was to confirm that the [sic] its
[redacted] met the requirement to include a [redacted]. Despite the single
blank cell (which the Agency expected to be completed using the word,
“meets”), ACC’s proposal made an unequivocal commitment to provide a
solution that met all of the RFP’s requirements—including the requirement
for a [redacted]. Based upon the contents of ACC’s proposal, there could
have been no doubt in the evaluators’ minds that ACC’s solution was fully
compliant with all of the RFP requirements. However, rather than waiving
this minor typographical error or conducting a clarification to allow ACC to
add the word, “meets” to [redacted] of its Equipment List, the Army
improperly elevated form over substance, concluding that this single
missing word—a word that had no material impact on ACC’s proposal—
justified ACC’s elimination from the procurement. The Army had no rational
basis to eliminate ACC’s proposal, rather than waiving or clarifying the
immaterial missing word. The Army’s decision to eliminate ACC entirely
failed to consider an important aspect of the issue: that ACC’s proposal
made clear—even without the missing word—that its performance laptop
met the requirement to include [redacted]. Indeed, because ACC’s
Equipment List affirmatively stated that its solution included [redacted] and
that it would provide a computer using Windows 10 or higher, ACC’s
solution, by definition, included a [redacted]. It would have been impossible
to offer ACC’s solution without a [redacted]. As a result, there should have
been no doubt in the evaluators’ minds that ACC’s solution met the
requirement for a [redacted].
(emphasis in original; alterations added; internal reference omitted). Advanced Computer
Concepts’ complaint has three counts. In Count One of Advanced Computer Concepts’
complaint, Advanced Computer Concepts alleges that “[t]he Army’s elimination of ACC’s
proposal based on its blank [redacted] was arbitrary and capricious.” In Count Two,
Advanced Computer Concepts alleges that “[t]he Army acted in an arbitrary and
capricious manner by failing to waive the minor informality in ACC’s proposal.” (alteration
added). In Count Three, Advanced Computer Concepts alleges “[t]he Army acted in an
arbitrary and capricious manner by failing to engage in clarifications with ACC regarding
[redacted].” (alteration added). Computer Concepts requests the court to “enjoin the Army
56
from making award under the Solicitation until the flawed described above are remedied,”
and Advanced Computer Concepts additionally requests the court order “the Army to
include ACC in the competition and reinstate ACC into Step 2 of the evaluation process.”
In response to the pre-award bid protests, the court held a series of hearings to
address the various bid protests and determine how to proceed in all seven bid protests.
After discussions with the parties, the court instructed the defendant to file the
Administrative Record. Subsequently, the parties briefed cross-motions for judgment on
the Administrative Record and the court held oral argument in all seven bid protests.
DISCUSSION
Cross-Motions for Judgment on the Administrative Record
Regarding the parties’ arguments in the cross-motions for judgment on the
Administrative Record, as indicated by the United States Court of Appeals for the Federal
Circuit:
Cross-motions for judgment on the administrative record are governed by
Rule 52.1(c) of the Rules of the United States Court of Federal Claims. “In
deciding these motions, the [Claims Court] considers ‘whether, given all the
disputed and undisputed facts, a party has met its burden of proof based on
the evidence of record.’”
XOtech, LLC v. United States, 950 F.3d 1376, 1379–80 (Fed. Cir. 2020) (alteration in
or