“Without causation, there can be no claim for tortious interference . . . .”
How later courts described this case
- “Without causation, there can be no claim for tortious interference . . . .”
- describing true conspiracy as “a rare cause of action”
- characterizing a civil conspiracy claim based on substantial assistance as an “aiding and abetting theory”
- requiring, inter alia, that the defendant “knows that the . . . conduct [of another person] constitutes a breach of duty and gives substantial assistance or encouragement to the other so to conduct himself” (alterations in original
Written by the judges who cited it.
The opinion
UNITED STATES DISTRICT COURT
DISTRICT OF MASSACHUSETTS
___________________________________
)
BI 40 LLC, )
)
Plaintiff, )
)
v. ) Civil Action
) No. 21-cv-11904-PBS
TEWKSBURY LIVING GROUP, LLC, EC )
TEWKSBURY, LLC, and MH TEWKSBURY )
OPERATING, LLC, )
)
Defendants. )
)
)
ANN SUNY, as Executor of SUE T. )
FROST’S WILL, )
)
Plaintiff, )
)
v. ) Civil Action
) No. 22-cv-11005-PBS
BI 40 LLC, KCP ADVISORY SERVICES, )
LLC, EF, LLC, and ROBERT )
EISENSTEIN, )
)
Defendants. )
)
MEMORANDUM AND ORDER
February 13, 2025
Saris, D.J.
INTRODUCTION
This lawsuit arises from the abrupt transfer of Plaintiff Sue
T. Frost from Wood Haven Senior Living (“Wood Haven”), a memory
care assisted living facility in Massachusetts, in January 2022.1
The transfer of Frost and other residents followed a series of
pipe bursts that damaged significant parts of the facility.
Defendant BI 40 LLC (“BI 40”) is the lender that funded the
purchase of Wood Haven and was responsible for funding operations
at the facility when the entities that owned and operated Wood
Haven were later placed into receivership. Frost alleges that BI
40 engaged in a resident-dumping scheme to minimize its financial
losses. Following BI 40’s motion to dismiss, Frost’s remaining
claims allege that BI 40 committed tortious interference with
contract, aided and abetted a breach of fiduciary duty, and engaged
in civil conspiracy. Frost also seeks equitable subordination of
BI 40’s claim in the related receivership action.
BI 40 now moves for summary judgment on Frost’s remaining
claims. After hearing, the Court ALLOWS IN PART and DENIES IN PART
BI 40’s motion for summary judgment (Dkt. 244).
BACKGROUND
I. Factual Background
The Court “recite[s] the facts in the light most favorable to
the nonmovant -- here, [Frost] -- ‘consistent with record
support.’” Dixon-Tribou v. McDonough, 86 F.4th 453, 455 (1st Cir.
1 Frost passed away in May 2024. The Court substituted Ann Suny,
Frost’s daughter and the executor of her estate, as the plaintiff
in this case.
2023) (quoting Lahens v. AT&T Mobility P.R., Inc., 28 F.4th 325,
328 (1st Cir. 2022)).
A. Frost’s Residency at Wood Haven
Located in Tewksbury, Massachusetts, Wood Haven was a sixty-
four-bed memory care assisted living facility that specialized in
treating individuals with dementia. In May 2021, Frost, who
suffered from dementia, anxiety, depression, arthritis, and
dietary issues, signed a Residency Agreement to live at Wood Haven
and moved in soon thereafter. The Residency Agreement required
Wood Haven to give Frost thirty days’ notice if it wished to
terminate her tenancy.
B. BI 40’s Initial Involvement with Wood Haven
BI 40 is a Florida-based single-purpose entity affiliated
with a private lender called BridgeInvest. Its involvement with
Wood Haven traces back to March 2019 when entities associated with
Meridian Senior Living LLC (the “Meridian Entities”) purchased the
financially struggling facility with the aim of increasing
resident enrollment and reinvigorating the business.2 The Meridian
Entities financed the purchase of Wood Haven with a $6.8 million
loan from BI 40.
2 The corporate structure of the entities involved in the ownership
and operation of Wood Haven before the receivership is irrelevant
for present purposes, so the Court refers only to the Meridian
Entities generally.
The Meridian Entities’ turnaround plan did not succeed, and
Wood Haven began experiencing negative cash flow as early as June
2019. The COVID pandemic made matters worse, as state government
restrictions prevented the facility from accepting new residents.
By early April 2020, BI 40 was discussing the prospect that the
Meridian Entities would default on the loan, the difficulty it
would face in exercising its remedy of foreclosure, and the
possibility of selling the loan.
On April 15, 2020, BI 40 sent the Meridian Entities a notice
of default and acceleration of the loan. The parties eventually
executed a forbearance agreement effective through October 2021,
pursuant to which BI 40 advanced an additional $1 million to fund
Wood Haven’s operations. BI 40 asserts that it entered into this
agreement to provide the Meridian Entities with more time and
funding to improve operations and increase Wood Haven’s resident
census and revenue.
The Meridian Entities continued to hit roadblocks. After an
inspection of Wood Haven uncovered operational deficiencies and
regulatory violations, the Massachusetts Executive Office of Elder
Affairs (“EOEA”) issued a moratorium in June 2021 that barred the
facility from accepting new residents. The Meridian Entities
worked with the EOEA to try to remedy the deficiencies and
violations, and BI 40 received regular updates on their work. The
EOEA was unsatisfied with the progress, however, and continued to
identify new issues with the facility.
Around July 2021, BI 40 began considering options for the
deteriorating situation at Wood Haven. BI 40 spoke with KCP
Advisory Group, LLC (“KCP” or the “Receiver”) about serving as a
receiver for Wood Haven. BI 40 also urged the Meridian Entities to
hire a crisis manager to help lift the EOEA’s enrollment
moratorium. BI 40 suggested a firm called EF, LLC (“EF”) and
assisted the Meridian Entities by negotiating with EF on the terms
of the engagement and providing additional funds to hire EF. EF
and the Meridian Entities executed a two-month consulting
agreement in mid-August 2021, and the parties later extended the
engagement.
EF started working at Wood Haven on September 1, 2021, and
prepared regular updates that were sent to BI 40. In a cover email
to its first report -- which BI 40 received -- EF mentioned “the
severity of [its] concerns” about the status of Wood Haven. Dkt.
263-44 at 1.3 Although the scope of EF’s engagement did not include
an in-depth assessment of the facility’s physical infrastructure,
EF’s updates noted various building issues that came to its
attention. By the end of October, EF recommended to BI 40 that a
3 All docket citations are to the docket in BI 40 LLC v. Tewksbury
Living Group, LLC, et al., No. 21-cv-11904 (D. Mass. Nov. 24,
2021).
physical review of the facility be performed. EF’s initial efforts
were not enough to convince the EOEA to lift the enrollment
moratorium, and the EOEA notified Wood Haven on November 1, 2021,
that the moratorium would continue.
C. Problems with the Sprinkler System
BI 40 was aware of problems with Wood Haven’s sprinkler system
from the time of its initial loan to the Meridian Entities. Before
finalizing the loan, BI 40 commissioned an inspection of Wood
Haven, which identified areas of immediate or short-term concern
with the property. One such area was the sprinkler system. As a
result, the loan agreement included a $40,000 budget to replace
the sprinklers, and BI 40 periodically disbursed funds for
sprinkler repairs.
Issues with the sprinkler system persisted. According to a
document in BI 40’s possession in November 2020, Wood Haven
incurred unexpected operating expenses after a fire suppression
failure. During a January 2021 inspection, the Tewksbury Fire
Department (“TFD”) determined that the sprinkler system had a
temporary compressor and required regular maintenance by a
licensed service company. There is no evidence that BI 40 was told
about this particular inspection, but BI 40 was aware that the
sprinkler system required maintenance from time to time.
Within a month of starting its engagement at Wood Haven in
September 2021, EF learned of a ceiling leak associated with the
sprinkler system. Tewksbury officials inspected the sprinkler
system on October 27, 2021, and notified EF the next day that the
“system ha[d] issues with a few zones not working” that “need[ed]
repair ASAP (today) or the building w[ould] need a fire watch or
possibly be evacuated.” Dkt. 263-25 at 3-4. EF forwarded
Tewksbury’s notification to BI 40, which responded that it wanted
to be on any calls about the sprinkler problem and other pressing
building issues noted by the town. Some repairs were performed on
the sprinkler system in the fall of 2021.
D. Appointment of the Receiver
At the end of the forbearance period on October 1, 2021, the
Meridian Entities were unable to repay BI 40’s loan. BI 40 kicked
around options for how to proceed, including having the Meridian
Entities buy off the loan, foreclosing on and then selling the
facility, or taking ownership of Wood Haven itself. BI 40 also
considered financial projections for Wood Haven and the
possibility of applying for COVID-19 stimulus programs.
Ultimately, BI 40 opted to petition for a receiver to take
over operations at Wood Haven. BI 40 testified that it did so with
the hope that a receiver with assisted living facility expertise
would stabilize operations, ensure the safety of residents, and
eventually secure an end to the EOEA enrollment moratorium. Before
filing its receivership petition, BI 40 had substantial
discussions about the situation at Wood Haven with KCP, the would-
be receiver, and EF, which would manage operations on the ground.
On November 24, 2021, BI 40 filed an action in this Court
alleging breach of contract by the Meridian Entities and seeking
emergency appointment of KCP as a receiver (the “Receivership
Action”). BI 40 argued that a receivership was necessary because
the EOEA’s enrollment moratorium was preventing the Meridian
Entities from generating sufficient revenue to cover their
operating expenses and loan obligations. BI 40 also argued that a
receivership would allow it to provide the additional funding
needed to improve conditions at Wood Haven in anticipation of a
sale.
The Court convened a hearing on December 9, 2021. The Court
initially expressed concern that the receivership would result in
significant cost cuts that would impact the care received by
residents. BI 40 responded that EF would “be primarily the boots
on the ground, insuring [sic] that the standard of care to the
residents is maintained, which is of the utmost priority right
now.” Dkt. 58 at 5-6. The Receiver added that it was in discussions
with BI 40 about providing additional capital to stabilize
operations at Wood Haven. BI 40 confirmed that it was “fully
prepared to fund this case to the extent that . . . operating
revenues are insufficient.” Id. at 16. In response to a concern
raised by the EOEA, BI 40 also committed that the Receiver would
comply with state law if Wood Haven were closed and the agreements
with the residents were terminated, including a regulatory
requirement that the facility give residents ninety days’ notice
of the closure. See 651 Mass. Code Regs. 12.03(10)(a) (2021).4
Following the hearing, the Court entered an order appointing
KCP as a receiver (the “Receivership Order”). The Receivership
Order required the Receiver to submit a budget that was “subject
to review and written approval by [BI 40]” and absolved BI 40 of
the “obligation to fund any disbursements which are not approved.”
Dkt. 23 ¶ 17. It also provided that “[p]rior to the Receiver and
[BI 40’s] agreement on [an] Initial Budget, the Receiver shall
submit disbursement requests to [BI 40] and disbursements may be
made in [BI 40’s] sole and absolute discretion.” Id. There is no
evidence that the residents of Wood Haven or their families were
ever told about the receivership.
The Receiver took over Wood Haven and retained EF to manage
day-to-day operations. EF acted pursuant to the direction of the
Receiver but provided regular updates to BI 40.
E. Building Inspection and Continued Sprinkler Issues
Upon assuming control of Wood Haven, the Receiver began
efforts to improve the facility’s operational deficiencies. The
4 The Massachusetts regulation has since been amended to require
120 days’ notice of the closure of an assisted living facility.
See 651 Mass. Code Regs. 12.03(10)(a) (2025).
Receiver identified a number of concerns with the facility’s
physical infrastructure, including the sprinkler system. The
Receiver pointed out some of these issues to a representative of
BI 40 who visited Wood Haven shortly after entry of the
Receivership Order. At EF’s recommendation, the Receiver hired
Building Operations, LLC (“Building Operations”) to conduct a
thorough inspection of the building. Meanwhile, a sprinkler leak
required emergency repairs on December 28, 2021.
Building Operations inspected Wood Haven on January 5, 2022.
That day, Building Operations informed EF that the necessary
repairs to the building would cost between $3 million and $4
million. There is no evidence that EF conveyed this figure or any
details about Building Operations’ inspection to BI 40 that day.
On January 7, 2022 -- two days after the inspection -- the
EOEA ordered Wood Haven to submit a proposal to address the issues
with the sprinkler system (and problems with the door security
system). Later that day, the Receiver sent BI 40 a draft response
to the EOEA and told BI 40 that it would send the email “[a]s soon
as [it] g[ot] the go-ahead from [BI 40] on funding commitment.”
Dkt. 247-11 at 2. BI 40 approved the Receiver’s response, and the
Receiver sent it on the evening of January 7. The response
explained that Building Operations had “perform[ed] a high-level
review of the property and its infrastructure” and “recommended a
thorough review by [a sprinkler] contractor to develop an immediate
plan for remediation”; that this contractor was coming on January
10 for an assessment; and that employees were performing hourly
“fire watch” rounds to ensure the sprinklers were not
malfunctioning. Dkt. 247-12 at 4.
The sprinkler contractor performed a survey of the system on
January 10. The contractor’s invoice reflects that it recommended
the entire system be replaced. The next day, EF stated in an email
that Wood Haven “ha[d] contracted with [a company] to come in and
mitigate the sprinkler system problem as soon as possible”; that
this would “be a permanent fix”; and that the facility was “just
arranging funding for it now.” Dkt. 263-59 at 2.
On January 12, the Receiver emailed BI 40 that something had
to be done that day about the sprinkler system because some of the
zones were not working. The Receiver warned BI 40 that the TFD
would require the facility to evacuate if the sprinkler system was
not repaired. The sprinkler contractor came to perform emergency
repairs that day. In the same email, the Receiver forwarded quotes
from Building Operations for vendors, including the sprinkler
contractor, “to figure out the existing systems and th[eir]
existing condition, test the systems and then understand what
repairs are necessary.” Dkt. 247-13 at 3. The Receiver told BI 40
that if it received $100,000 that day, it “c[ould] use some of it
for” these vendors. Id. As noted below, BI 40 wired the Receiver
$100,000 later that day.
Around this time, the TFD ordered Wood Haven to update its
emergency evacuation plan. As part of this undertaking, EF
contacted other facilities to see if they could accept new
residents.
F. Financing the Receiver’s Operations
While the parties were getting a handle on the building’s
infrastructure issues, BI 40 and the Receiver also began
negotiating financing for Wood Haven’s ongoing operations. While
BI 40 and the Receiver tried to find different sources of capital,
most of their discussions concerned the budget and financing
contemplated by the Receivership Order. The Receiver first asked
for a protective advance from BI 40 on December 29, 2021, when it
notified BI 40 that Wood Haven had overdrawn on its bank account.
In the same email, the Receiver told BI 40 that it was “struggling
to get good data for a proposed cash flow budget, mostly around
the facility issues,” and that it was going to “have to take a
stab in the dark.” Dkt. 248-16 at 1.
On January 3, 2022, the Receiver sent BI 40 a proposed budget.
The budget requested $100,000 for each week in January and an
additional $300,000 across February and March and estimated a total
of $1.45 million for capital expenditures, including $225,000 for
a “[n]ew [f]ire system.” Dkt. 247-6 at 11. In its cover email, the
Receiver asked BI 40 to transfer the first $100,000 of funding the
next day. On January 6, a BI 40 employee internally circulated a
recommendation to release the first week’s request for $100,000 to
cover continuing operations and capital expenses necessary to lift
the EOEA moratorium.
BI 40 emailed the Receiver a number of questions about its
proposed budget on January 11. The Receiver promptly responded
that it “need[ed] confirmation of funding ASAP” and that “[w]ithout
a commitment, [it would] need to share with [the EOEA and the town]
that [it could] not make the investments necessary to address the
plan of correction and life safety issues.” Dkt. 263-31 at 6-7. In
later communications that day, the Receiver’s counsel told BI 40’s
counsel that “a move to shutdown w[ould] be necessary” if the
Receiver did not receive funding by the next day and that the
Receiver’s “current ask [was] $175,000.” Id. at 2, 6.
The Receiver testified that it requested funding from BI 40
between five and ten times in late December 2021 and early January
2022 and that BI 40 only funded one of those requests. For its
part, BI 40 testified that during the period when the parties were
still negotiating the terms of the budget and financing, it
reviewed the Receiver’s funding requests via the preexisting
approval process under the original loan agreement with the
Meridian Entities, which required submission of a formal, written
request. BI 40 conceded that the Receiver may have made
“informal[]” funding requests via telephone or email but insisted
that it approved all “official” requests. Dkt. 263-5 at 29, 31.
The Receiver submitted its first formal funding request for
$100,000 on January 12, and BI 40 wired the money the same day.
Among other expenses, this $100,000 was meant to cover the invoices
from a staffing agency that had threatened to pull out of Wood
Haven if it was not paid.
The Receiver and BI 40 continued to negotiate financing terms
into mid-January. These negotiations included a back-and-forth
about the terms and amount of a “wind-down budget” that would cover
a thirteen-week period if the facility needed to shut down. Dkt.
263-31 at 4-5. BI 40 also suggested that the parties shorten the
period of the financing to around two months; focus on operational
costs through that point; and then, if the EOEA were to lift its
moratorium, turn their attention to capital expenditures.
In a January 26 status report in the Receivership Action, the
Receiver stated that “[t]he only budget approved by [BI 40] was
dated 1/8/22, which detailed expected funding requirements of
$750,000.” Dkt. 29 at 5. Nevertheless, both BI 40 and the Receiver
testified that BI 40 never approved the Receiver’s budget, and the
record reflects that the parties were still negotiating financing
terms in mid-January when the evacuation occurred.
G. Evacuation of Wood Haven
The immediate events leading to the evacuation of Wood Haven
began on January 13, 2022, when a cracked sprinkler pipe flooded
twelve rooms and forced residents to move to another section of
the facility. The pipe was repaired the same day. Frost was among
the relocated residents, but her daughter was not informed. The
Receiver told BI 40 about the incident and the repairs the next
day and noted that the sprinklers were operational. On January 15,
a sprinkler head on the same pipe leaked and flooded a resident
room, necessitating further emergency repairs. The Receiver again
notified BI 40 about the leak and the repairs the following day.
Matters came to a head on January 16. That morning, a pipe
burst rendered the kitchen unusable and necessitated a temporary
shutdown of the main water supply at the facility. Later that day,
leaks from multiple pipes damaged more residents’ rooms, which led
Wood Haven to move all the residents into the one undamaged wing
of the facility.
The Receiver and EF had a call during the evening of January
16 to discuss the unfolding situation. According to notes from the
call, the Receiver told the group that “if [they] d[id not] shut
[Wood Haven] down now, EOEA or [the TFD] w[ould] shut [them] down.”
Dkt. 263-29 at 2. One participant on the call testified that either
the Receiver or EF affirmatively said that Wood Haven was shutting
down. Others recalled that the Receiver stated that the facility
needed to be shut down but was not sure how the shutdown would
happen. The Receiver also suggested that Wood Haven find new
placements for the residents so that the transfers could occur in
an orderly fashion. EF started making arrangements for the
transfers that night. Notes from the call indicate that the
Receiver intended to contact BI 40 that night, but the record
contains no evidence as to whether the Receiver actually did so
and, if it did, what BI 40 was told. The Receiver did, however,
email BI 40 shortly after the call with EF to report the burst
pipe in the kitchen and to tell BI 40 that they “[n]eed[ed] a
solution immediately.” Dkt. 263-18 at 7.
The TFD visited Wood Haven on the morning of January 17. The
parties hotly dispute what happened during this visit. EF and the
Receiver both testified that the TFD issued a verbal order to
evacuate Wood Haven within three days. The TFD denied doing so.
After the TFD’s visit, EF and the Receiver began evacuating
residents from Wood Haven. When the Receiver began the evacuation,
it did not know whether the relocation of residents was permanent
or whether the sprinkler issues could be repaired and the residents
returned to the facility.
Midday on January 17, the Receiver told BI 40 what happened
the day before and explained that “[t]his [was] now officially a
shutdown.” Dkt. 248-31 at 1. The Receiver also relayed that it had
determined over the prior few days that it would cost about half
as much to shut down the facility than to continue to operate it.
BI 40 testified that it was unaware of the evacuation until it was
underway.
The next morning, EF notified the Wood Haven residents that
the facility was evacuating under an order from the TFD. Around
the same time, the EOEA spoke to the TFD, which denied issuing an
evacuation order. Based on the information from the TFD, the EOEA
immediately emailed the Receiver ordering it to stop removing
residents from Wood Haven and emphasizing that any closure of the
facility must comply with the requirement of ninety days’ notice
under state law. The EOEA also told the Receiver to issue a
corrected notice to the residents by that night explaining that no
evacuation order had been issued. The Receiver failed to do so.
Although the Receiver learned that the TFD had disclaimed an
evacuation order, the Receiver continued to believe that Wood Haven
was uninhabitable and unsafe for the residents. The Receiver and
EF therefore continued to transfer residents from the facility.
The Receiver and EF testified that the transfers following the
EOEA’s order were voluntary and with the consent of the residents’
families, and the record reflects efforts by the Receiver to ensure
that this consent was secured. The Receiver notified BI 40 that it
was continuing the transfers despite the TFD’s disclaiming of the
evacuation order due to the condition of the facility. The Receiver
subsequently sent BI 40 multiple documents indicating that it was
securing consent from the residents’ families for the transfers.
Only five residents remained at Wood Haven as of January 22.
Frost was among the residents evacuated during this period.
Ann Suny, Frost’s daughter, learned on January 18 that Wood Haven
intended to transfer Frost to a different facility. When she
learned this news, Suny was suffering from COVID-19 and, therefore,
was unable to visit Wood Haven. Suny had conversations with EF on
January 18 and January 19 in which EF represented that the TFD had
ordered an evacuation of Wood Haven. EF also threatened Suny that
Frost would be “taken away and placed in nursing homes across the
state wherever there was space available.” Dkt. 263-32 at 5.
Frost’s transfer occurred on January 19. While a contemporaneous
record indicates that Suny consented to the transfer, Suny denies
that any consent she may have given was voluntary or fully
informed.
At its corporate deposition, the Receiver was asked about the
adequacy of the funding it received from BI 40. The Receiver
testified that its decision-making during the receivership “was
based on what funding [it] could get from [BI 40]” and that, at
times, “that lack of funding . . . prevented [it] from fulfilling
[its] duties as a receiver.” Dkt. 263-6 at 24, 26. The Receiver
also answered affirmatively when asked whether “part of the reason
why [the sprinkler system] wasn’t improved was because [it was
not] getting funding from BI 40.” Dkt. 263-8 at 5-6. That said,
the Receiver stated that it “c[ould not] answer [the] question” of
whether the “lack of funding caused significant impact to the
resident [sic] of the facilities,” noting that it was “not sure
that the funding would have been sufficient or fast enough to
resolve the issues prior to the events . . . that ended on
[January] 17th.” Id. at 6. The Receiver later reiterated that it
was “not sure that in the five weeks from the beginning of the
receivership . . . there was enough time before these pipes burst
to address all the issues” and that it was “unclear . . . that any
funding sooner would have necessarily made a change.” Dkt. 248-30
at 2-3. Finally, the Receiver denied that the evacuation on January
17 was “a financial decision.” Dkt. 248-15 at 19.
H. Post-Evacuation Events
On January 21, 2022, EF received a written report from
Building Operations about its January 5 inspection. The report
documented a litany of infrastructural problems with the building.
As relevant here, the report noted issues with the sprinkler
system, advised that Wood Haven “immediately implement a
mitigation and repair plan,” and warned that “[t]he likelihood of
a catastrophic event is imminent and should be taken seriously.”
Dkt. 248-19 at 4 (cleaned up). The report estimated that
immediately needed repairs to the building would cost between
$950,000 and $1.2 million and that a total budget of between $3.5
million and $4 million would be required to bring the building
into compliance with state and local regulations.
Following the evacuation, BI 40 and the Receiver considered
whether it was possible to repair and reopen the facility and
maintain the operating license. BI 40 had internal discussions
about whether it was willing to cover the substantial capital
expenditures required to reopen the facility, especially with
little-to-no revenue coming in. BI 40 learned that there was no
mechanism to temporarily shut down the facility for repairs and
then reopen it without losing the license.
As these discussions were happening, the Receiver notified BI
40 on January 25 that it would file an emergency motion in the
Receivership Action “to shut down the facility immediately and
compel [BI 40] to fund operations.” Dkt. 263-18 at 31. Because it
lacked funds to pay Wood Haven’s bills, the Receiver advised that
“some of the costs that currently cannot be paid will result in
treble damages.” Id. The Receiver filed its emergency motion the
following day, requesting that the Court allow Wood Haven to close
without the required ninety days’ notice. In its accompanying
status report, the Receiver explained that “[o]utstanding
operational expenses, including payroll, total[ed] in excess of
$400,000” and that the Receiver and its counsel “ha[d] yet to be
paid.” Dkt. 29 at 5. The same day, the Receiver sent BI 40 its
second formal funding request for $225,000, which BI 40 approved
and disbursed on January 27.
The Court convened a hearing on the Receiver’s emergency
motion on January 27. The Court declined to close Wood Haven
immediately in light of both assurances by EOEA and TFD officials
that the facility was habitable and doubts about whether the Court
had the authority to waive the ninety-day notice requirement.
The day after the hearing, BI 40 told the Receiver that it
wanted to proceed to a receivership sale as quickly as possible.
A few days later, the Receiver issued a ninety-day closure notice
for Wood Haven. The Receiver also worked with the remaining handful
of residents to arrange voluntary transfers to other facilities.
The final residents left Wood Haven on February 11. While the
Receiver was arranging the final transfers, BI 40 informed the
Receiver that it would not be providing more funding “[b]ased on
the exorbitant cost of maintaining the facility with no incoming
revenue.” Dkt. 263-37 at 2. Nonetheless, BI 40 did disburse almost
$19,000 to the Receiver on February 11 and around $250,000 to
various vendors over the subsequent nine months.
By this point, the entities in receivership owed BI 40 around
$9 million in secured debt. On the Receiver’s motion, the Court
agreed to put Wood Haven up for auction. BI 40 was the sole bidder,
offering to pay $2.6 million in a credit bid and $408,770 in cash.
The Court approved the sale to BI 40, which promptly resold the
property for $3.8 million.
I. Effects on Frost of Her Transfer from Wood Haven
Frost submitted an expert report about the effects of her
transfer from Wood Haven. Dr. Elizabeth H. Nasser, a clinical
psychologist specializing in geropsychology and neuropsychology,
opined that Frost suffered from “an increase in restlessness,
agitation, anxiety, lethargy and depression immediately following
the move to the new facility.” Dkt. 263-4 at 3. Dr. Nasser also
opined that Frost “moved from a moderate to severe stage of
dementia over the course of just a single month” and that this
“rapid decline appears to be a direct result of the unplanned and
traumatic move to a new facility.” Id. at 7. BI 40 disputes Dr.
Nasser’s opinion about the effects of the transfer on Frost but
has not offered its own expert opinion on the subject.
II. Procedural History
Frost intervened in the Receivership Action in April 2022.
Two months later, she filed suit against BI 40, the Receiver, EF,
and a principal of EF (the “Frost Action”). Frost asserted a slew
of state statutory and common-law claims in her third amended
complaint.
BI 40 moved to dismiss all of Frost’s claims against it. The
Court allowed the motion except as to the claims for civil
conspiracy, tortious interference with contract, and aiding and
abetting a breach of fiduciary duty. See Frost v. BI 40, LLC,
No. 22-cv-11005-PBS, 2023 WL 6307530, at *8-9 (D. Mass. Aug. 29,
2023). On the conspiracy claim, the Court explained that Frost
alleged that BI 40, the Receiver, and EF together “operated a
resident dumping scheme,” “conspired to commit breaches of the
fiduciary duties owed to the [r]esidents in furtherance of this
scheme,” acted with “actual malice . . . unrelated to a legitimate
corporate interest,” and deliberately fabricated the evacuation
order to expel the residents and allow BI 40 to take control of
Wood Haven. Id. at *7 (alteration in original). The Court held
that Frost stated a claim for tortious interference with her
Residency Agreement for similar reasons and because she alleged
that BI 40 intentionally withheld funding to force Wood Haven’s
closure. See id. at *7-8. And Frost’s claim for aiding and abetting
a breach of fiduciary duty survived based on her allegations that
BI 40’s withholding of funding and role in the resident dumping
scheme constituted active participation in the breach of the
Receiver’s and EF’s fiduciary duties to residents. See id. at *8.
Finally, the Court explained that it would address Frost’s request
for equitable subordination of BI 40’s claim on the receivership
assets in the context of the Receivership Action. See id. at *6.5
5 The Receiver also moved to dismiss Frost’s claims against it on
the basis of quasi-judicial immunity and failure to state a claim.
The Court dismissed some claims due to quasi-judicial immunity but
otherwise denied the Receiver’s motion to dismiss. See Frost, 2023
WL 6307530, at *4-5. The Receiver filed an interlocutory appeal
challenging the Court’s refusal to dismiss certain claims based on
quasi-judicial immunity. See Frost v. KCP Advisory Grp., LLC,
No. 23-1800 (1st Cir. Sept. 26, 2023). That appeal remains pending.
In due course, the Court consolidated the Receivership Action
and the Frost Action for purposes of discovery. Once discovery
concluded, BI 40 moved for summary judgment on Frost’s remaining
causes of action and her request for equitable subordination of
its claim in the Receivership Action.6
LEGAL STANDARD
Summary judgment is appropriate “if the movant shows that
there is no genuine dispute as to any material fact and the movant
is entitled to judgment as a matter of law.” Fed. R. Civ. P. 56(a).
“A genuine dispute is one which ‘a reasonable jury could
resolve . . . in the favor of the non-moving party,’ and a material
issue is one with the ‘potential to affect the outcome . . . under
the applicable law.’” Kinzer v. Whole Foods Mkt., Inc., 99 F.4th
105, 108 (1st Cir. 2024) (alterations in original) (quoting
Cherkaoui v. City of Quincy, 877 F.3d 14, 23-24 (1st Cir. 2017)).
In determining whether to grant summary judgment, a court must
construe “the facts in the light most favorable to the non-moving
party” and “draw[] all reasonable inferences” in her favor. Id.
6 Six former Wood Haven residents other than Frost (or their
representatives) filed similar lawsuits to hers. The Court stayed
those suits pending resolution of the Receivership Action and the
Frost Action. Three of those plaintiffs filed an opposition to BI
40’s motion for summary judgment in the Frost Action. Insofar as
they raise arguments not advanced by Frost, the Court declines to
address those arguments at this juncture.
(quoting Harley-Davidson Credit Corp. v. Galvin, 807 F.3d 407, 408
(1st Cir. 2015)).
The party seeking summary judgment “must [first] adumbrate
‘an absence of evidence to support the nonmoving party’s case.’”
Pleasantdale Condos., LLC v. Wakefield, 37 F.4th 728, 733 (1st
Cir. 2022) (alteration in original) (quoting Brennan v. Hendrigan,
888 F.2d 189, 191 (1st Cir. 1989)). Once the movant does so, “[t]he
burden then shifts to the nonmovant to establish the existence of
a genuine issue of material fact.” Id. To satisfy this burden, the
nonmovant “must present definite, competent evidence” showing that
a trialworthy issue exists. Id. (quoting Mesnick v. Gen. Elec.
Co., 950 F.2d 816, 822 (1st Cir. 1991)). “[C]onclusory allegations,
improbable inferences, and unsupported speculation” do not
suffice. Kinzer, 99 F.4th at 108 (quoting Ellis v. Fid. Mgmt. Tr.
Co., 883 F.3d 1, 7 (1st Cir. 2018)).
DISCUSSION
Three of Frost’s claims survived BI 40’s motion to dismiss:
tortious interference with contract, civil conspiracy, and aiding
and abetting a breach of fiduciary duty. See Frost, 2023 WL
6307530, at *9. The Court discusses these three remaining claims
and then addresses Frost’s request for equitable subordination in
the Receivership Action.
I. Tortious Interference with Contract
Frost first alleges that BI 40 tortiously interfered with her
Residency Agreement with Wood Haven. To succeed on a tortious
interference claim under Massachusetts law, “a plaintiff must
establish that ‘(1) [s]he had a contract with a third party;
(2) the defendant knowingly induced the third party to break that
contract; (3) the defendant’s interference, in addition to being
intentional, was improper in motive or means; and (4) the plaintiff
was harmed by the defendant’s actions.’” Weiler v. PortfolioScope,
Inc., 12 N.E.3d 354, 363 (Mass. 2014) (quoting Psy-Ed Corp. v.
Klein, 947 N.E.2d 520, 536 (Mass. 2011)); see Tenants’ Dev.
Corp. v. AMTAX Holdings 227, LLC, 248 N.E.3d 647, 662 (Mass. 2025).
BI 40 does not dispute that Frost’s Residency Agreement with
Wood Haven was a valid contract that satisfies the first element.
BI 40 argues, however, that no reasonable jury could conclude on
this record that Frost has proven the remaining elements of her
claim.
For a tortious interference claim, “intentionality requires
that the defendant ‘either desired to bring about the harm to the
plaintiff or [] kn[ew] that this result was substantially certain
to be produced by [its] conduct.’” Conformis, Inc. v. Aetna, Inc.,
58 F.4th 517, 539 (1st Cir. 2023) (alterations in original)
(quoting Restatement (Second) of Torts ch. 37, intro. note (Am. L.
Inst. 1979)). “Massachusetts courts will find the improper motive
element met when a defendant exhibits ‘“actual malice” or “a
spiteful, malignant purpose, unrelated to [a] legitimate corporate
interest.”’” Hamann v. Carpenter, 937 F.3d 86, 90 (1st Cir. 2019)
(alteration in original) (quoting Tuli v. Brigham & Women’s Hosp.,
656 F.3d 33, 43 (1st Cir. 2011)). The improper means inquiry asks
“whether the defendant ‘violated a statute or a rule of common
law[,] . . . used threats, misrepresented any facts, defamed
anyone, or used any other improper means’ in interfering with the
business relationship.” Conformis, Inc., 58 F.4th at 540
(alterations in original) (quoting United Truck Leasing Corp. v.
Geltman, 551 N.E.2d 20, 24 (Mass. 1990)). Finally, the plaintiff
must show that the defendant’s interference “caused her harm.”
Sindi v. El-Moslimany, 896 F.3d 1, 23 (1st Cir. 2018); see Med.
Air Tech. Corp. v. Marwan Inv., Inc., 303 F.3d 11, 22 (1st Cir.
2002) (“Without causation, there can be no claim for tortious
interference . . . .”).
As framed in her opposition to BI 40’s summary judgment
motion, Frost advances two interrelated theories of how BI 40
tortiously interfered with her Residency Agreement. First, she
contends that once BI 40 realized it could not salvage Wood Haven’s
prospects, it participated in fabricating an evacuation order from
the TFD on January 17, 2022, to justify evicting the residents for
the purpose of minimizing its financial losses. Second, Frost
posits that, for similar reasons, BI 40 intentionally underfunded
Wood Haven’s operations under the receivership and, thus, forced
the Receiver to transfer the residents after the pipes repeatedly
burst between January 13 and January 16, 2022.
A. Evacuation and Shutdown Decision
The record does not support Frost’s theory that BI 40 was
involved in fabricating the TFD evacuation order. There is a
genuine dispute as to whether the TFD ordered the Receiver and EF
to evacuate Wood Haven on the morning of January 17. But even if
the TFD never issued an order to evacuate -- and the Receiver
and/or EF falsely stated there was such an order -- no reasonable
jury could conclude that BI 40 played a role in evacuating the
facility under false pretenses.
To begin, there is no evidence that, as Frost asserts, BI 40
directed the Receiver to shut down Wood Haven in the days before
the evacuation began on January 17. Frost points to emails
exchanged by counsel for BI 40 and the Receiver on January 12 that
discussed a “Wind-Down Budget” and a “Wind-Down Reserve.” Dkt.
263-31 at 4-5. These were provisions of the financing agreement
that the parties were negotiating and did not imply an order from
BI 40 to shut down Wood Haven. Frost also cites a set of January
12 emails in which EF found placements for Wood Haven residents at
other facilities, but the emails make clear that EF made these
arrangements as part of an evacuation plan that the TFD required
Wood Haven to create. See Dkt. 263-30 at 2-3.
Moreover, Frost offers no evidence that BI 40 either knew
that the Receiver and EF had fabricated the evacuation order or
played a role in deciding to evacuate the facility. Rather, the
record reflects that the Receiver told BI 40 about the multiple
pipe bursts between January 13 and January 16, see Dkt. 248-23 at
2; Dkt. 248-27 at 1; Dkt. 263-18 at 7; decided to evacuate the
facility without BI 40’s input on either January 16 or January 17,
see Dkt. 248-17 at 13-15, 21, 35; Dkt. 263-3 at 8; and then informed
BI 40 after the resident transfers were already underway that it
was shutting down the facility, see Dkt. 248-9 at 11-12; Dkt. 248-
31 at 1-2. Frost does cite notes from a call between the Receiver
and EF on January 16, which indicate that the Receiver intended to
speak to BI 40 that evening. See Dkt. 263-29 at 2. But the only
evidence of any subsequent communication that day between the
Receiver and BI 40 is an email in which the Receiver reported the
burst kitchen pipe and emphasized to BI 40 that they “[n]eed[ed]
a solution immediately.” Dkt. 263-18 at 7. It would be pure
speculation to conclude that BI 40 and the Receiver decided
together on the evening of January 16 to evacuate Wood Haven under
false pretenses the next day.
Nor does the record reflect any culpability on BI 40’s part
in the Receiver’s decision to continue transferring residents from
Wood Haven after the EOEA reported on January 18 that the TFD had
not ordered an evacuation. Suny, Frost’s daughter, insists that
she was isolating with COVID-19 when Frost was transferred, that
EF continued to tell her that an evacuation order was in place,
and that EF threatened to send Frost to any facility with space in
Massachusetts. See Dkt. 263-32 at 5-6. Frost has, therefore, raised
a genuine dispute as to whether her January 19 transfer was
consensual. Again, though, the record does not provide a basis for
concluding that BI 40 was aware that Frost’s transfer was without
consent or participated in the decision to continue the resident
transfers. To the contrary, the Receiver told BI 40 that it was
continuing to transfer residents because it believed the facility
was unsafe, see Dkt. 248-9 at 13-14, and sent BI 40 multiple
documents indicating that it was securing consent for the transfers
from the residents’ families, see Dkt. 248-35 at 1; Dkt. 263-74 at
2-3.
The absence of evidence that BI 40 directed the Receiver to
evacuate the residents or shut down Wood Haven, knew the TFD’s
evacuation order was fabricated, or was aware the Receiver was
transferring residents without their consent is fatal to this
theory of tortious interference. Without such evidence, a
reasonable jury could not conclude that BI 40 intended for the
Receiver to breach Frost’s Residency Agreement by evacuating or
transferring her or acted with improper motive or means. Frost’s
mere speculation that BI 40 participated in a scheme to fabricate
the evacuation order or transfer residents under false pretenses
is insufficient to fend off summary judgment. See Rodríguez v.
Encompass Health Rehab. Hosp. of San Juan, Inc., __ F.4th __, __
(1st Cir. 2025) [2025 WL 274217, at *1] (emphasizing “the bedrock
principle that a party opposing summary judgment must adduce
specific evidence sufficient to create a genuine issue of material
fact”).
B. Underfunding of Operations During the Receivership
Frost’s second theory of tortious interference with contract
is that BI 40 intentionally underfunded Wood Haven’s operations
during the receivership, thereby causing the Receiver to evict her
in violation of her Residency Agreement. Frost has offered
sufficient evidence to raise a triable claim of tortious
interference under this theory.
A reasonable jury could conclude that by underfunding Wood
Haven’s operations, BI 40 knowingly induced the Receiver to breach
Frost’s Residency Agreement. As discussed above, there is a genuine
dispute as to whether Frost’s transfer was consensual and, thus,
whether the Receiver violated the Residency Agreement’s
requirement that Frost be given thirty days’ notice of termination
of her tenancy.
Turning to BI 40’s knowledge and intent, the record contains
evidence that BI 40 was well aware of the poor state of the Wood
Haven facility, including the sprinkler system. At least as early
as September 2021 when EF began sending BI 40 updates about its
work at Wood Haven, BI 40 knew of serious operational and
infrastructural problems with the facility. See Dkt. 263-14 at 2-
14; see also Dkt. 263-44 at 2 (September 7 cover letter from EF
describing “the severity of [its] concerns” about Wood Haven). BI
40 was also informed in October 2021 when the TFD threatened to
evacuate the facility if the sprinkler system was not immediately
repaired. See Dkt. 263-25 at 3-4. A representative from BI 40
visited Wood Haven in late December 2021 or early January 2022, at
which point the Receiver pointed out areas of concern with the
building. See Dkt. 248-15 at 4, 14. Moreover, the Receiver
forwarded to BI 40 the EOEA’s January 7 email in which the EOEA
ordered Wood Haven to come up with immediate proposals to fix the
door security and sprinkler systems. See Dkt. 247-10 at 2-3.
The record also contains evidence that BI 40 knew from early
in the receivership that the Receiver needed funding promptly in
order to maintain operations at the facility. On December 29, 2021,
for example, the Receiver asked BI 40 for a protective advance
because Wood Haven had overdrawn on its bank account. See Dkt.
248-16 at 1. BI 40 was also aware that at the beginning of January
2022, a staffing agency threatened to pull its workers from Wood
Haven because its invoices were not paid. See Dkt. 248-16 at 1;
Dkt. 263-11 at 3-5. On January 11, the Receiver’s counsel told BI
40’s counsel that “a move to shutdown [would] be necessary” if BI
40 did not disburse funding by the next day. Dkt. 263-31 at 6.
Finally, there is evidence that BI 40 funded the receivership
at an unreasonably slow pace. BI 40 did not provide the Receiver
with the first disbursement of funds until January 12, about two
weeks after the Receiver first asked for a protective advance on
December 29. The Receiver testified that it requested funding five
to ten times during this period. See Dkt. 263-6 at 5, 23-25. When
BI 40 finally did disburse funding to the Receiver, it only
provided $100,000 even though the Receiver made clear the day
before that its then-“current ask [was] $175,000.” Dkt. 263-31 at
2. And after most of the residents were evacuated in mid-January,
BI 40 provided a second round of funding once the Receiver had
incurred over $400,000 in outstanding operational expenses and had
threatened to file an emergency motion in the Receivership Action
“to shut down the facility immediately and compel [BI 40] to fund
operations.” Dkt. 263-18 at 31; see Dkt. 29. A jury could find BI
40’s delay in providing funding to the Receiver to be unreasonable
given its knowledge of the exigent conditions at Wood Haven.
The Court concludes that a jury could reasonably infer that
BI 40 delayed providing funding to the Receiver and underfunded
the receivership with a desire to precipitate a shutdown of Wood
Haven. In addition, the motive that Frost posits for BI 40’s
underfunding -- that BI 40 wanted to minimize its losses after
realizing that it could not salvage its investment in Wood Haven
-- is plausible in light of the record.
BI 40 insists that it intended to maintain Wood Haven as an
operational assisted living facility until the pipe bursts and
subsequent evacuation of the residents made doing so impossible.
In support, BI 40 points to contemporaneous evidence suggesting
that its aim during the receivership was to keep operating Wood
Haven and make improvements to the facility in order to lift the
EOEA enrollment moratorium. See, e.g., Dkt. 247-6 at 2-3; Dkt.
247-11 at 2; Dkt. 248-4 at 32-33. BI 40 also cites evidence
indicating that, even after the evacuation, it considered whether
Wood Haven could reopen. See, e.g., Dkt. 248-1 at 58-61; Dkt. 248-
17 at 26-28; Dkt. 248-30 at 7-8; Dkt. 263-75 at 2; Dkt. 271 ¶ 351.
And it is true that Frost has offered no smoking gun evidence of
BI 40’s unlawful intent. But a court cannot “weigh the evidence”
on a summary judgment motion. Ahmed v. Johnson, 752 F.3d 490, 495
(1st Cir. 2014). The evidence of BI 40’s knowledge of the dire
state of the facility and the pace of its disbursements would allow
a rational factfinder to disbelieve BI 40’s claim that it intended
to keep Wood Haven open.
Frost has also offered sufficient evidence to show that BI 40
interfered with her Residency Agreement via improper means.
“Violating a court order certainly constitutes an ‘improper . . .
means’” for purposes of a tortious interference claim. Wolfson v.
Am. Airlines, Inc., 170 F. Supp. 2d 87, 93 (D. Mass. 2001)
(alteration in original). Here, a reasonable jury could find that
BI 40’s underfunding violated the Receivership Order.
The parties vigorously dispute whether BI 40 complied with
the funding terms of the Receivership Order. Frost emphasizes that
when BI 40 sought appointment of a receiver, it reassured the Court
that it was “fully prepared to fund this case to the extent
that . . . operating revenues are insufficient” and that “the
standard of care to the residents” was “of the utmost priority.”
Dkt. 58 at 5-6, 16. In Frost’s view, BI 40 did not live up to this
promise because, among other things, BI 40 failed to approve
numerous funding requests made by the Receiver, Wood Haven overdrew
on its bank account, and the Receiver lacked sufficient funding to
pay for staff and necessary repairs at the facility. BI 40 responds
that the Receivership Order gave it “sole and absolute discretion”
to approve the Receiver’s disbursement requests before the parties
agreed on a budget. Dkt. 23 ¶ 17. BI 40 also notes that its
representation to the Court solely concerned covering operating
expenses and not capital expenditures and that it did approve the
one and only “formal” disbursement request the Receiver made before
the evacuation (for $100,000 on January 12).
A reasonable jury could conclude that BI 40 underfunded Wood
Haven’s operations in violation of the Receivership Order.7 When
7 Frost and certain other former Wood Haven residents who have
intervened in the Receivership Action have moved to hold BI 40 in
approving the receivership, the Court relied on BI 40’s
representation that it would adequately fund operations at Wood
Haven to ensure the well-being of the residents. Although this
representation did refer to “operating expenses,” ensuring
resident well-being requires maintaining a habitable and safe
building. And the Receivership Order did not mandate the procedure
for “formal” disbursement requests on which BI 40 now relies.
Moreover, for the reasons offered by Frost, the record supports a
finding that BI 40 did not provide sufficient funding to maintain
an adequate standard of care for the residents. The fact that the
Receiver had incurred over $400,000 in outstanding operational
expenses by January 26 is concerning, especially since the Receiver
testified that its decision-making “was based on what funding [it]
could get from [BI 40]” and that, at times, “that lack of
funding . . . prevented [it] from fulfilling [its] duties as a
receiver.” Dkt. 263-6 at 24, 26.
Finally, Frost has raised a triable case that BI 40’s unlawful
interference with her Residency Agreement caused her harm. BI 40
does not meaningfully dispute that Dr. Nasser’s expert report
offers sufficient evidence that Frost suffered physical and
psychological effects from her abrupt transfer from Wood Haven.
Frost causally connects BI 40’s underfunding to these effects in
contempt for violating the Receivership Order. The Court takes no
position on those contempt motions at this time.
two ways. First, she posits that the lack of adequate funding
caused the pipes to burst between January 13 and January 16, which
in turn led to her transfer from the facility. Second, she argues
that the Receiver decided to shut down Wood Haven because it did
not have the funds to continue to maintain operations at Wood
Haven.
The record adequately supports both causation theories. The
Receiver testified equivocally at its deposition as to whether
additional funding from BI 40 could have prevented the pipe bursts
between January 13 and January 16 that led to Wood Haven’s closure.
See, e.g., Dkt. 248-30 at 2-3 (“The inability to get funds was
clearly an issue relative to the ongoing operations of the
facility. I’m not sure that in the five weeks from the beginning
of the receivership to this point that there was enough time before
these pipes burst to address all the issues, so it’s unclear to
me . . . that any funding sooner would have necessarily made a
change.”); Dkt. 263-8 at 5-6 (answering affirmatively when asked
whether “part of the reason why [the sprinkler system] wasn’t
improved was because [the Receiver was not] getting funding from
BI 40”). Deciding what aspects of the Receiver’s equivocal
testimony to credit is a role for the jury. In addition, a rational
jury could find that the Receiver decided to shut down Wood Haven
because it did not have the funds to continue to maintain
operations. Although the Receiver testified that its choice to
evacuate Wood Haven was not “a financial decision,” Dkt. 248-15 at
19, the Receiver performed an analysis of the costs of continuing
operations versus shutting down the facility in the days before
the evacuation, see Dkt. 263-40 at 2-3.
C. Conclusion
Accordingly, the Court grants summary judgment to BI 40 on
Frost’s claim for tortious interference with contract with regard
to the decisions about the evacuation and transfer of residents
from Wood Haven in the days following the pipe bursts. The Court
denies BI 40’s summary judgment motion with regard to Frost’s
theory that it underfunded operations at Wood Haven during the
receivership.
II. Civil Conspiracy
The Court now turns to Frost’s claim against BI 40 for civil
conspiracy.
A. Applicable Law
Massachusetts law provides for two types of civil conspiracy:
true conspiracy and concerted action conspiracy. See Greene v.
Philip Morris USA Inc., 208 N.E.3d 676, 682 (Mass. 2023). To
succeed on a claim of true conspiracy, “a plaintiff must prove
that alleged conspirators agreed to accomplish an unlawful purpose
or ‘a lawful purpose by unlawful means,’ and then caused harm to
the plaintiff via ‘some “peculiar power of coercion”’ that they
would not have had, had they been acting independently.” Id. at
685 n.10 (citation omitted) (first quoting Willett v. Herrick, 136
N.E. 366, 370 (Mass. 1922); and then quoting DesLauries v. Shea,
13 N.E.2d 932, 935 (Mass. 1938)). Circumstances giving rise to
liability under this theory “are rare and should be added to with
caution.” Id. (quoting Fleming v. Dane, 22 N.E.2d 609, 611 (Mass.
1939)); see Anoush Cab, Inc. v. Uber Techs., Inc., 8 F.4th 1, 24
(1st Cir. 2021) (describing true conspiracy as “a rare cause of
action”).
A concerted action claim is “akin to a theory of common law
joint liability in tort.” Id. at 683 (quoting Aetna Cas. Sur.
Co. v. P & B Autobody, 43 F.3d 1546, 1564 (1st Cir. 1994)). This
form “of civil conspiracy requires an underlying tort [and t]he
conspiracy consists in agreeing to, or assisting in, this
underlying tort.” Thomas v. Harrington, 909 F.3d 483, 490 (1st
Cir. 2018) (alteration in original) (quoting Taylor v. Am.
Chemistry Council, 576 F.3d 16, 35 (1st Cir. 2009)).
“To prove a ‘concerted action’ conspiracy, a plaintiff must
show that defendants either (1) acted ‘in concert with or pursuant
to a common design with’ the tortfeasor or (2) ‘gave substantial
assistance to’ the tortfeasor’s conduct.” Id. (quoting Kyte v.
Philip Morris Inc., 556 N.E.2d 1025, 1027 (Mass. 1990)). The
“common design” theory has two elements: “first, a common design
or an agreement, although not necessarily express, between two or
more persons to do a wrongful act and, second, proof of some
tortious act in furtherance of the agreement.” Id. (quoting Aetna
Cas. Sur. Co., 43 F.3d at 1564). And “under the ‘substantial
assistance’ theory, ‘a person may be liable in tort if he “knows
that the . . . conduct [of another person] constitutes a breach of
duty and gives substantial assistance or encouragement to the other
so to conduct himself.”’” Id. at 491 (alterations in original)
(quoting Kurker v. Hill, 689 N.E.2d 833, 837 (Mass. App. Ct.
1998)). While the substantial assistance theory does not require
the plaintiff to “provide evidence of an agreement between the
defendant and the tortfeasor,” the plaintiff must show the
defendant’s “intent to substantially assist or encourage”
another’s tortious conduct. Id. (quoting Taylor, 576 F.3d at 35).
B. Analysis
Frost advances civil conspiracy claims under each of the true
conspiracy, common plan, and substantial assistance theories.
1. True Conspiracy and Common Plan Theories
Frost’s true conspiracy and common plan theories allege that
BI 40 entered into an agreement with the Receiver and/or EF to
unlawfully evict her and the other residents from Wood Haven. BI
40 argues that Frost has offered insufficient evidence to prove
that it entered into any such agreement or common plan with either
the Receiver or EF. The Court agrees with BI 40. See Daly v. Mason,
__ F. Supp. 3d __, __ (D. Mass. 2024) [2024 WL 4426420, at *11]
(dismissing true conspiracy claim where the plaintiff did not
“point to any facts indicating an actual agreement between
Defendants”); Jakuttis v. Town of Dracut, 656 F. Supp. 3d 302, 340
(D. Mass. 2023) (granting summary judgment to the defendants on a
concerted action claim where the record lacked evidence of “an
express or implied agreement between [the defendants] or any kind
of ‘common plan’” (quoting Bettencourt v. Town of Mendon, 334 F.
Supp. 3d 468, 487 (D. Mass. 2018))).
Frost argues that a reasonable factfinder could infer the
existence of a tacit agreement or common plan to unlawfully evict
the residents because BI 40 brought the Receiver and EF into Wood
Haven and was in close contact with them about the situation at
the facility throughout the period leading up to the mid-January
2022 evacuation. To be sure, a conspiratorial agreement need not
be express, see Thomas, 909 F.3d at 490, and its existence may be
inferred from the parties’ conduct, see id.; Mackey v. Town of
Tewksbury, 433 F. Supp. 3d 116, 172 (D. Mass. 2020). But to infer
that BI 40 conspired with the Receiver and EF based on the facts
Frost cites would be to engage in “unsupported speculation” that
is insufficient to show a genuine dispute of material fact. Kinzer,
99 F.4th at 108 (quoting Ellis, 883 F.3d at 7); see Echavarria v.
Roach, 565 F. Supp. 3d 51, 100 (D. Mass. 2021) (granting summary
judgment to defendants on concerted action claim where the record
contained no evidence of an agreement and instead reflected that
the parties merely worked together and communicated with each
other).
In fact, the record is replete with evidence contradicting
the inference that BI 40 entered into a conspiratorial agreement
or common plan with either the Receiver or EF. BI 40 was at
loggerheads with the Receiver and EF throughout the receivership,
especially about the level of funding BI 40 was providing.8 BI 40
also did not pay the Receiver’s and EF’s fees in full or promptly:
the Receiver and its counsel had received nothing by January 26,
2022, and EF ended up settling with BI 40 for a $15,000 discount
on its fees. See Dkt. 29 at 5; Dkt. 263-2 at 25. This evidence is
inconsistent with the existence of an agreement to unlawfully evict
the residents among BI 40, the Receiver, and EF.
Nor do the circumstances surrounding the decision to transfer
residents from Wood Haven in mid-January 2022 support a reasonable
8 See Dkt. 263-31 at 6-7 (January 11, 2022 emails from the Receiver
to BI 40 stating that it “need[ed] confirmation of funding ASAP”
and that “unless [it] ha[d] funding tomorrow, [it thought] a move
to a shutdown will be necessary”); Dkt. 263-6 at 26 (Receiver
testimony responding affirmatively to whether “the lack of funding
ever prevented [it] from fulfilling [its] duties as a receiver”);
Dkt. 263-29 at 2 (notes of January 16 call between the Receiver
and EF, during which the Wood Haven executive director said that
she “d[id not] trust BI [40] to fund what [the facility]
need[ed]”); Dkt. 263-18 at 31 (January 25, 2022 email from the
Receiver to BI 40 stating that it was “drafting a motion . . . to
shut down the facility immediately and compel [BI 40] to fund
operations”); Dkt. 30 at 5 (January 26, 2022 emergency motion from
the Receiver to close Wood Haven discussing “the impasse between
the Receiver and [BI 40] as to funding the Facility”).
inference that BI 40 and the Receiver or EF agreed to unlawfully
evict the residents. As noted, there is a genuine dispute on this
record as to whether the TFD ordered the Receiver and EF to
evacuate Wood Haven on the morning of January 17. Yet there is no
evidence that BI 40 knew either that the Receiver and EF had
fabricated the evacuation order or that Wood Haven was in fact
habitable when the Receiver insisted that it was not. Similarly,
even if Frost was transferred from Wood Haven without her
daughter’s informed consent, the record offers no basis to conclude
that BI 40 was aware of that fact. Finally, while a reasonable
jury could conclude that BI 40 wanted Wood Haven to shut down for
financial motives, Frost points to nothing suggesting that BI 40
and the Receiver entered into an agreement to do so. Without
knowledge of the allegedly tortious nature of the Receiver’s
decisions regarding the evacuation of the facility, BI 40 cannot
have entered into an unlawful agreement or common plan.
2. Substantial Assistance Theory
Frost also advances a claim of civil conspiracy under the
substantial assistance theory. She asserts that BI 40
substantially assisted the Receiver’s breach of fiduciary duty and
the Receiver’s and EF’s tortious interference with her Residency
Agreement in connection with her transfer from Wood Haven.
This theory of civil conspiracy fails because the record does
not support a reasonable finding that BI 40 was aware of any
tortious conduct by the Receiver or EF that it substantially and
intentionally assisted or encouraged. See Thomas, 909 F.3d at 491
(requiring, inter alia, that the defendant “knows that the . . .
conduct [of another person] constitutes a breach of duty and gives
substantial assistance or encouragement to the other so to conduct
himself” (alterations in original) (quoting Kurker, 689 N.E.2d at
837)). Again, no reasonable juror could find that BI 40 knew that
the Receiver or EF fabricated the TFD evacuation order as a pretext
to evict the residents.
III. Aiding and Abetting Breach of Fiduciary Duty
Frost next claims that BI 40 aided and abetted a breach of
fiduciary duty by the Receiver. This claim has three elements:
“(1) there must be a breach of fiduciary duty, (2) the defendant
must know of the breach, and (3) the defendant must actively
participate or substantially assist in or encourage the breach to
the degree that he or she could not reasonably be held to have
acted in good faith.” Arcidi v. Nat’l Ass’n of Gov’t Emps., Inc.,
856 N.E.2d 167, 174 (Mass. 2006).
Frost’s aiding and abetting claim is materially identical to
her civil conspiracy theory alleging that BI 40 substantially
assisted the Receiver’s breach of fiduciary duty. See Mass. Port
Auth. v. Turo Inc., 166 N.E.3d 972, 981-82 (Mass. 2021) (applying
the elements of a substantial assistance theory to a claim of
aiding and abetting a tort); Kyte, 556 N.E.2d at 1028
(characterizing a civil conspiracy claim based on substantial
assistance as an “aiding and abetting theory”). The Court has
already concluded that no reasonable jury could find BI 40 liable
for substantially assisting a breach of fiduciary duty by the
Receiver. For the same reasons, summary judgment is also warranted
in BI 40’s favor on Frost’s claim for aiding and abetting a breach
of fiduciary duty.
IV. Equitable Subordination in the Receivership Action
Finally, Frost seeks equitable subordination of BI 40’s claim
to the assets of the receivership in the Receivership Action. BI
40 moves for summary judgment on the basis that it did not engage
in inequitable conduct that would warrant equitable subordination.
BI 40 also contends that there are no assets left in the
receivership estate that could be used to satisfy claims by any
creditor, except for $100,000 that it deposited into escrow to
secure any liability on its part to Frost. See Dkt. 88 ¶ 9; Dkt.
128 ¶ P.
The doctrine of equitable subordination allows a bankruptcy
court to “subordinate for purposes of distribution all or part of
an allowed claim to all or part of another allowed claim.” In re
Merrimac Paper Co., 420 F.3d 53, 59 (1st Cir. 2005) (quoting 11
U.S.C. § 510(c)(1)). This remedy is warranted when 1) “the
claimant [is] found to have engaged in inequitable conduct”;
2) “the misconduct . . . either resulted in injury to creditors or
g[ave] the claimant an unfair advantage”; and 3) equitable
subordination is not “in conflict with the provisions of federal
bankruptcy law.” Id. The doctrine of equitable subordination is
applicable in receiverships. See SEC v. Spongetech Delivery Sys.,
Inc., 98 F. Supp. 3d 530, 551 (E.D.N.Y. 2015).
As previously discussed, Frost has raised a genuine dispute
as to whether BI 40 intentionally underfunded the receivership and
whether she suffered harm as a result. If proven at trial, that
underfunding would qualify as “inequitable conduct” that could
justify equitably subordinating BI 40’s interest in any remaining
receivership assets to Frost’s claim.
ORDER
For the foregoing reasons, BI 40’s motion for summary judgment
(Dkt. 244) is DENIED as to Frost’s claim in the Frost Action for
tortious interference with contract (Count X) with regard to her
allegations of underfunding operations during the receivership and
ALLOWED as to Frost’s other theories of tortious interference with
contract (Count X) and her claims of civil conspiracy (Count VII)
and aiding and abetting a breach of fiduciary duty (Count XVI).
The Court also DENIES BI 40’s motion for summary judgment as to
Frost’s request for equitable subordination in the Receivership
Action.
SO ORDERED.
/s/ PATTI B. SARIS__________
Hon. Patti B. Saris
United States District Judge