Opinion

Student Resource Center v. Eastern Gateway Community College

Court
District Court, S.D. Ohio
Filed
Jan 6, 2025
Cited by
0 cases
Authority
More cited than 33.5%

“When a litigant fails to address a claim in response to a motion for summary judgment, that claim is deemed abandoned or forfeited.”

How later courts described this case

  • “When a litigant fails to address a claim in response to a motion for summary judgment, that claim is deemed abandoned or forfeited.”
  • “In an action for breach of contract, those damages that a plaintiff could have avoided with reasonable effort and without undue risk or expense cannot be charged against a defendant; to that extent, a plaintiff has a duty to mitigate damages.”
  • “The determination whether a material breach of an agreement has occurred is generally a question of fact.”

Written by the judges who cited it.

The opinion

IN THE UNITED STATES DISTRICT COURT

FOR THE SOUTHERN DISTRICT OF OHIO

EASTERN DIVISION

STUDENT RESOURCE CENTER, LLC, :

:

Plaintiff, :

: Case No. 2:22-cv-02653

:

v. :

: Judge Algenon L. Marbley

EASTERN GATEWAY COMMUNITY :

COLLEGE, : Magistrate Judge Chelsey M. Vascura

:

Defendant. :

:

OPINION & ORDER

This matter comes before this Court on Plaintiff Student Resource Center’s (“SRC”)

Motion for Summary Judgment. (ECF No. 85). For the reasons that follow, the Motion is

GRANTED IN PART and DENIED IN PART.

I. BACKGROUND

This case centers on a contract dispute between Plaintiff Student Resource Center (“SRC”),

a private educational services company, and Defendant Eastern Gateway Community College

(“EGCC”), a public two-year college based in Steubenville, Ohio. In June 2017, SRC and EGCC

entered an agreement to “collaborate on implementation of an online strategy” to support the

parties’ Free College Benefit Program (“FCBP”). (ECF No. 85-1). To better understand the

parties’ obligations under the Agreement and the alleged breaches giving rise to this lawsuit, a

brief review of the history of the FCBP business model is in order.

1. The Free College Benefit Program Business Model

Title IV of the Higher Education Act of 1965, 20 U.S.C. §§ 1070-1099c-2, established

several loan and grant programs to assist eligible students with offsetting the costs of higher

1

education. In the late 1980s and early 1990s, the Senate’s Permanent Subcommittee on

Investigations determined that unethical admissions and recruitment practices, among other things,

were undermining the integrity of the federal student financial aid programs. See Abuses in Federal

Student Aid Programs, S. Rep. No. 58, 102d Cong., 1st Sess., at 1-2, 8 (1991). A year later,

Congress amended and extended the Higher Education Act, known as the Incentive Compensation

Ban, to include a new prohibition on the use of commissioned salespersons and recruiters. H.R.

Rep. No. 102-447, at 10, 1992 U.S.C.C.A.N. 334, at 343. A school’s participation in federal

student aid programs thereafter became conditioned upon the school’s agreement that it:

will not provide any commission, bonus, or other incentive payment

based directly or indirectly on success in securing enrollments or

financial aid to any persons or entities engaged in any student

recruiting or admission activities or in making decisions regarding

the award of student financial assistance. . . .

20 U.S.C. § 1094(a)(20); see also 34 C.F.R. § 668.14(b)(22) (implementing regulations). In March

2011, the Department of Education (the “Department”) published a Dear Colleague letter

discussing trends it had observed among stakeholders. Letter GEN-11-05, Implementation of

Program Integrity Regulations (“Dear Colleague Letter”), at 8-14,

https://fsapartners.ed.gov/sites/default/files/attachments/dpcletters/GEN1105.pdf. One such trend

was the practice of “tuition sharing,” in which third parties charged schools a percentage of

recruited students’ tuition as a way of assuming the business risk associated with student

recruitment. Id. at 11. These third parties typically combined student recruitment services with

other services not covered by the Incentive Compensation Ban, such as advertising, marketing,

counseling, and support services to admitted students, among other things. Id. The Department

advised that it “generally views the payment based on the amount of tuition generated as an indirect

payment of compensation based on success in recruitment and therefore a prohibited basis upon

which to measure the value of the services provided.” Id. Nonetheless, the Department noted that

2

“payment based on the amount of tuition generated by an institution” does not violate the Incentive

Compensation Ban “if that payment compensates an unaffiliated third party that provides a set of

services that may include recruitment services.” Id.

2. The Parties’ 2017 Agreement

In compliance with the Incentive Compensation Ban, SRC and EGCC entered a contract

on June 30, 2017 (“Collaboration Agreement”). The Agreement began with reciting the parties’

“desire to collaborate on implementation of an online strategy” that includes “[a]ssissting in the

development and marketing of high quality online courses and programs to members of unions,”

“[a]ccelerating the growth of EGCC’s online offerings,” “identifying additional offerings . . . that

meet unmet needs within available markets,” “providing professional development opportunities

for full-time and adjunct faculty related to online teaching,” “providing professional development

opportunities for full-time and adjunct faculty related to online teaching,” and “assist[ing] with

faculty development, marketing, recruiting, enrollment, and academic support, e.g. mentoring and

online tutoring.” (ECF No. 85-1). Collectively, these activities were referred to as the

“Collaboration.” The Agreement also recited EGCC’s “desire[] to establish a free college benefit

(the ‘Initiative’) under the auspices of EGCC for the purposes of facilitating the Collaboration and

providing new online educational instruction and services to participating students.” (ECF No. 85-

1).

As part of the Agreement, and through what came to be known as the Free College Benefit

Program (“Program” or “FCBP”), SRC was responsible for outreach and marketing, including

developing and promoting online courses and programs to members of unions and professional

organizations; expanding EGCC’s offerings by targeting adult learners; identifying untapped

student markets; and providing professional development opportunities related to online teaching

for faculty. (See ECF No. 85-1 § 2.3). EGCC, on the other hand, held the operational reins,

3

maintaining educational approvals; developing the course materials and curricula; recruiting

faculty; establishing student admission standards; and managing general administrative and other

services like finances and human resources. (See generally id. § 2.2).

Through the FCBP, unions, professional organizations, and their members benefited from

free or significantly discounted education. FCBP revenues came from federal student financial aid

programs, primarily under the Pell Grant Program, 20 U.S.C. §§ 1070 et seq., which EGCC would

receive and pay to SRC for its services. By June 1, 2022, ninety-five percent (95%) of SRC’s

revenues came from the FCBP.

Towards the end of 2020, EGCC’s accrediting body, the Ohio Higher Learning

Commission (“HLC”), raised concerns about EGCC’s educational practices. On November 9,

2021, HLC placed EGCC on probation because it was out of compliance with criteria for

accreditation. (ECF No. 28, ¶ 35). In March 2022, SRC removed then-CEO Michael Perik and

replaced him with Phillip Braithwaite, after it was discovered that Perik was allegedly assisting

EGCC’s President Michael J. Geoghegan in hiding from Sterling, a company interested in

purchasing SRC, that EGCC had been placed on probation. (Id., ¶¶ 114 – 16). On May 12, 2022,

SRC received a Notice of Breach from EGCC stating that SRC had breached the Agreement by

replacing CEO Perik without notifying EGCC in advance. (ECF No. 58 at 1; 28 ¶ 6)).

On June 30, 2022, SRC filed this action and moved for a preliminary injunction seeking to

enjoin EGCC from terminating the Agreement pursuant to EGCC’s Notice of Breach and to enjoin

SRC from breaching the Agreement’s non-compete provision. (ECF Nos. 1 & 2). On

July 11, 2022, this Court granted SRC’s motion, enjoining EGCC from (1) “terminating the

Agreement as set in motion by the Notice of May 12, 2022”; and from (2) “breaching the

Agreement’s non-competition provisions by starting and operating a competing business while the

Agreement remains in effect.” (ECF No. 14 at 15–16). Shortly thereafter, on July 18, 2022, the

4

Department of Education issued a Cease-and-Desist letter to EGCC stating that the Free College

Benefit program violated Title IV’s prohibition against assessing higher charges to Title IV

scholarship recipients than those charges assessed to non-Title IV recipients. (ECF No. 28, ¶ 85).

On August 23, 2022, this Court expanded the preliminary injunction to require EGCC to pay SRC

approximately $2.36 million of allegedly withheld profit-sharing payments for the semesters prior

to December 31, 2021. (Id., ¶ 71).

On September 12, 2022, EGCC filed its answer and asserted counterclaims for declaratory

judgment and breach of contract. (ECF No. 24). Specifically, EGCC sought a declaration “that

SRC has breached the Collaboration Agreement, has been overpaid and that EGCC is entitled to

terminate the Collaboration Agreement.” (Id. ¶ 46). As to breach, EGCC asserted that SRC

materially breached Section 8 of the Agreement “by engaging in discussions with Acadeum and

Brazosport College (and likely others) for the purpose of entering into a competing collaboration

in violation of the [] Agreement’s noncompetition provisions”; and Section 3.1 of the Agreement

by “submitting operating expense reimbursement requests for SRC Controlled Collaboration

Activities that are excessive, not normal and customary and/or for services that were not (or could

not) be rendered during the relevant time period” and by “submitting operating expense

reimbursement requests for SRC Controlled Collaboration Activities and demanding payment of

these expenses without approval of the Operating Committee and/or without an approved Annual

Budget or Joint Marketing Plan for fiscal year 2023.” (Id. ¶¶ 50–53).

On October 10, 2022, SRC filed its First Amended Complaint (“FAC”) (ECF No. 28). In

Count I, SRC alleged that it did not materially breach § 2.5 of the Agreement when it replaced

Perik without notice to EGCC. Counts II – V alleged breach-of-contract claims, specifically, in

Count II, a breach of contract claim for approximately $2.36 million in past due profit-sharing

payments and $300,000 in operating expenses from May to June 2022; in Count III, a breach of

5

contract claim for failure to comply with § 8’s non-compete provision for contacting SRC’s union

partners directly and attempting to poach SRC staff; in Count IV, a failure to pay just under

$700,000 in operating expenses and just under $7 million in profit-sharing invoices; and in Count

V, a breach of contract claim for failure to provide student enrollment data to SRC and being in

violation of the Agreement requiring compliance with DOE regulations. (Id., ¶¶ 121–68).

On October 31, 2022, EGCC moved to dismiss and strike SRC’s FAC (ECF No. 33) and,

a couple of days later, SRC moved to dismiss EGCC’s counterclaims. (ECF No. 34). Prior to these

motions, however, EGCC had obtained a preliminary injunction—in a separate case—enjoining

the DOE from enforcing the Cease-and-Desist letter based on the DOE’s failure to provide proper

notice. (See Eastern Gateway Community College v. Miguel Cardona, et al., Case No. 2:22-cv-

3326-JLG-EPD, ECF No. 37 (Oct. 21, 2022)).1 On January 13, 2023, EGCC moved to vacate this

Court’s order granting the preliminary injunction. (ECF No. 39).

On June 20, 2023, SRC sought leave to file a second amended complaint (“SAC”) for the

purpose of: (1) alleging that the Agreement had not terminated in October 2022 upon its filing of

the FAC but remains in effect; and (2) amending the FAC to add another breach of contract claim

and an unjust enrichment claim for unpaid expenses from September 2022 to the present. (ECF

No. 58 at 2). On August 9, 2023, the Magistrate Judge denied SRC’s request (ECF No. 58), and

SRC promptly objected (ECF No. 59).

On September 25, 2023, this Court issued an order that, among other things: (1) denied in

part EGCC’s motion to strike and dismiss SRC’s FAC; (2) granted in part and denied in part SRC’s

1 EGCC alleged that, shortly thereafter, it reached out to SRC to resume performance of the Agreement. (ECF No. 59

at 6). Although SRC maintained that it never stopped performance, SRC responded on October 27, 2022 and noted in

the letter that EGCC was in default of the Agreement because of past-due operating expense invoices and that SRC

needed assurances that EGCC was not in violation of Title IV. (Id.).

6

motion to dismiss EGCC’s counterclaims; and (3) denied EGCC’s motion to vacate the

preliminary injunction. On October 23, 2023, Defendant EGCC moved to dismiss and partially

strike SRC’s Second Amended Complaint. (ECF No. 67). In its motion, EGCC also asserted

amended counterclaims. (Id.). On November 13, 2023, SRC moved to dismiss EGCC’s amended

counterclaims. (ECF No. 70).

On May 1, 2024, SRC moved for summary judgment on Counts I through VI of SRC’s

Second Amended Complaint and Counts I and II of EGCC’s Amended Counterclaim. (ECF No.

85). EGCC objected to certain evidence submitted by SRC in support of its motion for summary

judgment (ECF No. 98) and further opposed summary judgment (ECF No. 111). SRC responded

to the objections and filed its reply in support of summary judgment (ECF No. 127).

On June 5, 2024, SRC moved for prejudgment attachment (ECF No. 106), which this Court

granted (ECF Nos. 145, 149). On August 15, 2024, this Court also resolved several motions that

were filed prior to SRC’s motion for summary judgment. (ECF No. 143). Specifically, this Court

denied EGCC’s motion to dismiss Count II of SRC’s SAC; denied EGCC’s motion to strike

Paragraphs 26-30 and 54 of SRC’s SAC; granted SRC’s motion to strike paragraphs ¶¶ 22, 38-49,

52, 55, 57-58, 62, 64-66 of EGCC’s amended counterclaims; and denied SRC’s motion to dismiss

Count II of EGCC’s amended counterclaims. (ECF No. 143).

On September 26, 2024, this Court held a telephonic status conference and re-opened

discovery to allow EGCC to re-depose Aimee Leishure for the limited purpose of examining the

damages analyses contained in her declaration, as filed in support of SRC’s motion for summary

judgment. (ECF No. 148). This Court also permitted the parties to file supplemental summary

judgment briefs following Ms. Leishure’s deposition. (Id.).

2 Specifically, this Court dismissed EGCC’s claim for unjust enrichment and for breach of Section 8 of the Agreement;

and denied the motion to dismiss EGCC’s claims for breach of Section 2.6 of the Agreement.

7

On October 18, 2024, EGCC filed its supplemental memorandum opposing SRC’s motion

for summary judgment (ECF No. 155), to which SRC responded (ECF No. 156). On December

27, 2024, the parties presented oral argument on SRC’s Motion for Summary Judgment. This

matter is now ripe for resolution.

II. STANDARD OF REVIEW

Summary judgment is appropriate when “there is no genuine dispute as to any material

fact[,] and the movant is entitled to judgment as a matter of law.” Fed. R. Civ. P. 56(a); Berryman

v. SuperValu Holdings, Inc., 669 F.3d 714, 716-17 (6th Cir. 2012). The Court’s purpose in

considering a summary judgment motion is not “to weigh the evidence and determine the truth of

the matter” but to “determine whether there is a genuine issue for trial.” Anderson v. Liberty

Lobby, Inc., 477 U.S. 242, 249 (1986). A genuine issue for trial exists if the Court finds a jury

could return a verdict, based on “sufficient evidence,” in favor of the non-moving party; evidence

that is “merely colorable” or “not significantly probative,” however, is not enough to defeat

summary judgment. Id. at 249-50.

The party seeking summary judgment shoulders the initial burden of presenting the Court

with law and argument in support of its motion as well as identifying the relevant portions of “‘the

pleadings, depositions, answers to interrogatories, and admissions on file, together with the

affidavits, if any,’ which it believes demonstrate the absence of a genuine issue of material fact.”

Celotex Corp. v. Catrett, 477 U.S. 317, 323 (1986) (quoting Fed. R. Civ. P. 56). If this initial

burden is satisfied, the burden then shifts to the non-moving party to set forth specific facts

showing a genuine issue for trial. See Fed. R. Civ. P. 56(e); see also Cox v. Ky. Dep’t of Transp.,

53 F.3d 146, 150 (6th Cir. 1995) (finding that after the burden shifts, the non-movant must

“produce evidence that results in a conflict of material fact to be resolved by a jury”). In

considering the factual allegations and evidence presented in a motion for summary judgment, the

8

Court “views factual evidence in the light most favorable to the non-moving party and draws all

reasonable inferences in that party’s favor.” Barrett v. Whirlpool Corp., 556 F.3d 502, 511 (6th

Cir. 2009).

III. LAW AND ANALYSIS

As detailed above, SRC asserts six claims in its Second Amended Complaint: one for

declaratory judgment and five for breach of contract. EGCC’s first counterclaim likewise seeks

declaratory judgment, while its second counterclaim alleges breach of contract.

The Declaratory Judgment Act provides that federal courts, “[i]n a case of actual

controversy within its jurisdiction . . . may declare the rights and other legal relations of any

interested party seeking such declaration, whether or not further relief is or could be sought.” 28

U.S.C. § 2201(a). Under the Act, courts enjoy “substantial discretion in deciding whether to

declare the rights of litigants.” Wilton v. Seven Falls Co., 515 U.S. 277, 286 (1995). Any such

declaration “shall have the force and effect of a final judgment or decree and shall be reviewable

as such” and may be granted if it will serve a useful purpose in clarifying and settling the legal

relationship in issue, and terminate and afford relief from the uncertainty, insecurity, and

controversy giving rise to the proceeding. Grand Trunk Western R.R. Co. v. Consolidated Rail

Corp., 746 F.2d 323, 326 (6th Cir. 1984). Courts consider the following five factors in determining

whether declaratory relief is appropriate:

(1) whether the declaratory action would settle the controversy; (2)

whether the declaratory action would serve a useful purpose in

clarifying the legal relations in issue; (3) whether the declaratory

remedy is being used merely for the purpose of "procedural fencing"

or "to provide an arena for a race for res judicata;" (4) whether the

use of a declaratory action would increase friction between our

federal and state courts and improperly encroach upon state

jurisdiction; and (5) whether there is an alternative remedy which is

better or more effective.

Grand Trunk W. R.R. Co. v. Consol. Rail Corp., 746 F.2d 323, 326 (6th Cir. 1984).

9

Breach of contract, on the other hand, requires the moving party to prove by a

preponderance of the evidence that: (1) a contract existed; (2) the non-breaching party fulfilled its

contractual obligations; (3) the breaching party unlawfully failed to fulfill its contractual

obligations; and (4) the non-breaching party suffered damages as a result of the breach. Mikulski

v. Centerior Energy Corp., 501 F.3d 555, 561 n.3 (6th Cir. 2007); see also Hitachi Medical Sys.

Am., Inc. v. Choe, 2011 WL 4632033 (N.D. Ohio 2011). “Generally, a material breach of contract

will entitle a party to stop performance.” Kerner v. ETI Env't, No. 2:09-CV-01092, 2011 WL

5506107, at *3 (S.D. Ohio Nov. 9, 2011) (quoting Marion Family YMCA v. Hensel, 178 Ohio

App.3d 140, 142, 897 N.E.2s 184 (Ohio App. 3d Dist. 2008) (internal quotation marks omitted)).

“A material breach of contract is a failure to do something that is so fundamental to a contract that

the failure to perform defeats the essential purpose of the contract or makes it impossible for the

other party to perform.” Id. (internal quotation marks and citation omitted).

A. Count I – Declaratory Judgment that SRC Did Not Breach the Agreement by

Terminating Michael Perik as SRC’s CEO

SRC argues that it is entitled to summary judgment on Count I of its SAC, which seeks a

declaration that—contrary to EGCC’s May 2022 Notice of Breach (see ECF No. 11-3)—SRC’s

termination of Michael Perik as CEO did not constitute a material breach of the Collaboration

Agreement. (See ECF No. 85, at 26–27; ECF No. 66 ¶¶ 135–41). In support, SRC cites the

preliminary injunction issued in July 2022—which prohibited EGCC from terminating the

Agreement based on the May 2022 Notice—and urges this Court to “finalize [that] prior ruling”

because “no new facts bear on this issue.” (ECF No. 85, at 34–35).

As this Court has observed, however, “[t]he consideration that SRC had a strong likelihood

of success on the merits” of its declaratory judgment claim at the preliminary injunction stage “is

‘distinctly different from an actual success on the merits.’” (ECF No. 63, at 19–20) (quoting

10

Ramsek v. Beshear, 468 F.Supp.3d 904, 914 (E.D. Ky. 2020)). This Court “did not assess whether

SRC actually committed a material breach by firing CEO Perik” when it enjoined EGCC from

terminating the Agreement based on its May 2022 Notice. It simply noted that, because Perik’s

termination was “the first alleged breach in the timeline of events” and “goes to whether EGCC

had the right to terminate the Agreement based on an uncured breach by [SRC],” declaratory

judgment on this question would “serve[] a useful purpose” by “clarify[ing] the legal relationship

between the parties.” (Id.). In other words, SRC established a strong likelihood that declaratory

judgment would be an appropriate remedy—not necessarily a strong likelihood of showing that

Perik’s firing was not a material breach.

In any event, however, EGCC’s opposition fails to counter SRC’s entitlement to

declaratory judgment and waives its challenges to the claim. As the Sixth Circuit repeatedly

cautions: “[A]t the summary judgment stage, the non-moving party can forfeit an argument if they

fail to respond to the moving party's arguments.” Adkins v. Marathon Petroleum Co., LP, 105 F.4th

841, 854 (6th Cir. 2024) (quoting Palma v. Johns, 27 F.4th 419, 429 n.1 (6th Cir. 2022) (internal

quotation marks omitted)); see also Bennett v. Hurley Med. Ctr., 86 F.4th 314, 324 (6th Cir. 2023)

(“When a litigant fails to address a claim in response to a motion for summary judgment, that claim

is deemed abandoned or forfeited.”); Alexander v. Carter for Byrd, 733 F. App'x 256, 261 (6th Cir.

2018); (“When a plaintiff fails to address [a claim] in response to a motion for summary judgment,

the claim is deemed waived . . . . Where claims are so waived, district courts in the Sixth Circuit

grant summary judgment as a matter of course.” (internal quotation marks and citations omitted)).

Moreover, on the merits, the relevant factors weigh in favor of issuing a declaratory ruling.

As this Court previously observed, Perik’s termination was the “first alleged breach in the timeline

of events” and “goes to whether EGCC had the right to terminate the Agreement based on an

uncured breach by [SRC].” (ECF No. 63, at 21). A declaration that SRC did not breach the

11

Collaboration Agreement by terminating Perik helps clarify the legal relations at issue, particularly

between the parties in May 2022 and removes any uncertainty as to whether the contract was in

effect.

Accordingly, this Court GRANTS SRC’s Motion for Summary Judgment as to Count I of

the SAC. A declaratory judgment—that SRC’s termination of Michael Perik as CEO did not

breach the Collaboration Agreement—shall issue.

B. Count II – EGCC’s Breach of Section 3 of the Agreement by Failing to Pay

Operating Expenses Prior to September 2022 and Profit-Sharing Payments

Prior to Spring 2022

SRC contends that EGCC breached the Agreement by failing to make two sets of payments

to SRC. The first is $300,000 in “operating expenses” that SRC maintains it incurred in furtherance

of the Collaboration prior to September 2022. The second is $2,357,153.08 in unpaid “profit-

sharing expenses” incurred prior to Spring 2022.

1. $300,000 in Operating Expenses Prior to September 2022

The $300,000 at issue here relate to “Union Privilege allocation payments” that SRC

allegedly incurred prior to September 2022. As Mr. Braithwhaite explained in his deposition,

Union Privilege (which also goes by “Union Plus”) is a “non-profit that provides benefit programs

like health and life insurance to union members and their families.” (See ECF No. 90-1, 32:21–

32:2). According to Mr. Braithwhaite, Union Privilege’s relationship vis a vis SRC was that of a

“benefit management company that markets [SRC’s] education programs to their members and

their families” which then “results in the prospective students” that SRC refers to its academic

partners. (Id., 34:21 –35:11). When asked about the source of the $300,000 obligation, Ms.

Leishure stated in her deposition that SRC had paid the $300,000 “to subsidize marketing on the

Union Privilege/Union Plus.” (See ECF No. 90-11, 19:8–11). Although she did not know whether

that was outlined in any memorandum of understanding between SRC and Union Privilege/Union

12

Plus, she explained that “Union Privilege/Union Plus invoiced [SRC], and it was approved by the

CEO at the time, who was Michael Perick”; the $300,000 was then “paid by SRC to Union

Privilege/Union Plus while [] Perick was still CEO, and I billed it to EGCC, the collaboration, in

spring of 2022.” (Id., 19:19 –20:5). SRC contends that EGCC’s failure to reimburse SRC for the

$300,000 Union Privilege/Union Plus payments violates Section 3.1 of the Agreement, which

provides:

3.1 Operating Expenses. The Collaboration shall be responsible for

the payment of all normal and customary operating expenses

incurred in furtherance of the Collaboration, including but not

limited to, costs and expenses relating to SRC Controlled

Collaboration Activities,3 to the extent set forth in the Initial Budget4

or Annual Budget5 (as hereinafter defined) (hereinafter “Operating

Expenses”). Operating Expenses shall be paid out of the

Collaboration Account in the priority set forth in Exhibit B upon

3 Section 2.3 of the Agreement provides that “SRC, directly or indirectly through its subcontractors, shall perform the

following with respect to the Collaboration, as determined by agreement of the Operating Committee (collectively,

‘SRC Controlled Collaboration Activities’): “(a) Assist in the development and marketing of high quality online

course and /or program offerings along with necessary services in support of student success inclusive of addressing

the development needs of some students; (b) Accelerate the growth of EGCC's online offerings through strategies

specific to attracting adult learners interested in online learning options; (c) Identify additional online offerings not

currently available through EGCC that meet unmet needs within the defined markets; (d) Provide professional

development opportunities for full-time and adjunct faculty related to online teaching, learning and student success;

(e) Provide support of all ancillary efforts around making on line products available including assistance with faculty

development, marketing, recruiting, enrollment, and academic support, e.g. mentoring and online tutoring; (f) Provide

an up-start investment strategy for launching the online initiative with no upfront capital investment by EGCC, but

with a contractual agreement specific to addressing profit and losses.” (ECF No. 85-1 § 2.3).

4 “Initial Budget” refers to the budget “set forth in the economic model attached as Exhibit A . . . .” (ECF No. 85-1 §

1.18). Exhibit A, as submitted to this Court, only states “See attached.” It is unclear what attachment is being

referenced. (See ECF No. 85-1 at 24).

5 “Annual Budget” means “the annual operating and capital budget agreed to by the Parties for each Fiscal Year, as

may be amended by mutually written consent of the Parties, as more particularly described in Section 7.2.” (Id. §

1.13). Section 7.2, in turn, dictates the “Annual Budget Approval Process,” which requires EGCC to “provide SRC

with projected Student Enrollment Data for each Educational Program and projected Fees for the following academic

year” three months before each academic year begins. To the extent the parties cannot agree on a budget two months

before that date, the Agreement provides that “the Annual Budget in effect [at that time] shall be the Annual Budget

for the following academic year until . . . the [] Parties mutually agree to a new Annual Budget.” (Id. § 7.2). This

Annual Budget includes: “a projected income statement including an operational and capital expenditure budgets for

the forthcoming academic year; a projected cash flow statement on a semester basis; projected student enrollment

numbers for each Educational Program and other additional data reasonably necessary for budgetary planning

purposes (collectively, the “Enrollment Data”) as more fully set forth in . . . Exhibit A; projected Fees and Revenues

as more fully set forth . . . Exhibit A; projected Collaboration costs and expenses incurred by the Parties; and such

other items reasonably requested by either Party.” (Id.).

13

approval of the Operating Committee. Each Party shall be

responsible for the payment of all expenses incurred by such Party

that are not set forth in the Initial Budget or Annual Budget. The

Annual Budget may be amended as mutually agreed upon in writing

by SRC and EGCC. If the Revenue7 collected by EGCC from the

Educational Programs8 are insufficient to cover the Operating

Expenses as set forth in the Initial Budget or Annual Budget, as the

case may be, and provided that such insufficiency is not caused by

EGCC’s failure to comply with the terms of this Agreement, then

(a) SRC shall be responsible for paying the amount of the Operating

Expenses each year that are not covered by said Revenue; and (b}

EGCC shall not be liable or have to pay for any Operating Expenses

not covered by the Revenue collected from the Educational

Programs.

6 Section 2.6 of the Agreement establishes the “Operating Committee,” providing in relevant part that “[t]he

Collaboration shall be conducted under the direction of a joint operating committee comprised of one (1)

representative of SRC and one (1) representative of EGCC.” (Id. § 2.6).

7 “Revenue” is defined as:

(a) all related charges, fees (as more specifically noted in 1.15 supra), grants (including.

but not limited to so-called Pell Grants), collections, and revenue recognized or

collected by EGCC with respect to Initiative Students, including, without limitation,

participation or material fees, tuition, or rental payments;

(b) State Subsidy relating to Initiative Students; provided, however, State Subsidy shall

only be included in Revenue for purposes of calculating amounts due pursuant to

Exhibit B when and if such Revenue is actually collected by EGCC;

(c) any other subsidies received from any municipal, state, or federal agency, board,

entity, or from any other source from or on behalf of Initiative Students;

(d) any other Fees and revenue collected by EGCC as a result of Tuition Reimbursement

Plans; and

(e) any other Fees arising from the enrollment of Initiative Students.

(ECF No. 85-1 § 1.29).

“Fees” means “all tuition charges, fees, and subsidies collected by EGCC in order to participate in the Educational

Programs as more fully set forth in the economic model attached as Exhibit A, subject to changes that may be

negotiated in the future to account for changes in fees or structure.” (ECF No. 85-1 § 1.15).

"Initiative Students" means “those EGCC students enrolled in an Educational Program pursuant to the Initiative,

including those EGCC students who enrolled in Initiatives program.” (Id. § 1.21).

"Tuition Reimbursement Plans" means “employer tuition reimbursement plans and/or programs for which Initiative

Students arc eligible. The Parties shall work together to maximize the collection of Revenue from Tuition

Reimbursement Plan arising from Initiative Students. EGCC will require eligible Initiative Students to apply for

benefits from such Tuition Reimbursement Plans.” (Id. § 1.34)

8 “Educational Programs” means “the online educational programs offered by EGCC through the Initiative to provide

online degrees, certificates and courses as more fully set forth in the economic model attached as Exhibit A, as may

be amended from time to time.” (Id. § 1.13).

14

(ECF No. 85-1 § 3.1).

EGCC does not dispute that, under the Agreement, it is required to pay SRC all “normal

and customary operating expenses” incurred in furtherance of the collaboration. It argues,

however, that the $300,000 in Union Privilege allocations are not “reimbursable operating

expenses because they are not expenses related to the collaboration.” (ECF No. 111, at 20–21).

Citing a declaration by Robert Semich, Controller of EGCC since 2017 and its Chief Financial

Officer since August 2023, EGCC contends that the Union Privilege allocations were scholarships

that SRC provided to Union Privilege members and/or their families who were not EGCC students

and were never in the collaboration budget and had not been paid before. (Id.). As such, EGCC

argues that these expenses were “not normal and customary operating expenses incurred in

furtherance of the collaboration and were not reimbursable under the Agreement.” (Id.). Mr.

Geoghegan’s deposition supports that position, as he maintains that he “withheld payment for

payments to the union foundation . . . because I can’t pay for scholarships for non-EGCC students,”

and “on the prior three billings there is a line item for union privilege, and I had never paid that

before. It had never been in the budget. So I didn't know what union privilege was so I didn't pay

for it.” (ECF No. 16 at 138).

In reply, SRC maintains that no triable issue exists regarding the $300,000 payment

“because EGCC’s only rebuttal to SRC’s argument is a self-serving declaration that EGCC crafted

after SRC moved for summary judgment and that contradicts the declarant’s prior deposition

testimony as well as the documentary evidence.” (ECF No. 127, at 7). SRC further notes that Mr.

Semich’s declaration contradicts the “face of the invoice Ms. Leishure submitted on July 11, 2022,

for the $300,000 in Union Privilege fees that were charged to SRC in support of the Collaboration”

which shows that “these charges are for marketing fees related to EGCC’s FCBP (not

scholarships).” (Id. at 7 – 8). Citing Ms. Leishure’s deposition testimony and related exhibits, SRC

15

asserts that the invoice “shows that EGCC previously paid $25,000 for these marketing fees in the

past” and that “these charges were reflected in the Annual Budget.” (Id.). Upon review of the cited

documents, this Court notes that the invoice billed to EGCC that SRC contends Mr. Semich’s

declaration contradicts was part of an e-mail exchange between Ms. Leishure and Mr. Geoghegan,

in which Mr. Geoghegan states:

I do not understand the Union Plus Marketing Fees. These were not

included in the FY22 collaboration budget. Is there an agreement

between SRC and Union Plus regarding these fees? If so, please

send to me along with supporting documentation.

(ECF No. 127-2 at 2). Ms. Leishure’s response, in part, explains:

The earlier invoices (prior to April) were approved by Michael

Perik. Michael told me we could bill them to the collaboration when

the college had sufficient funds to pay us. The CFO of UnionPlus

(Steve Goldsmith) is the one who sends me the invoices.

(Id.). Mr. Geoghegan proceeds to forward the e-mail to Mr. Perik asking: “Is this correct?” (Id.).

But the e-mail chain cuts off there. Given the conflicting testimony, as well as the inconclusive

documentary records that SRC cites, summary judgment is improper. A genuine issue of material

fact exists as to whether the Union Privilege fees constitute “operating expenses” as defined by

the Agreement and if they were contemplated by the Annual Budget.

2. $2,357,153.08 in Profit-Sharing Payments Prior to Spring 2022

Separately, SRC argues that EGCC breached the Agreement by failing to pay

$2,357,153.08 in profit-sharing payments to SRC for semesters prior to Spring 2022. As relevant

here, Section 3.3 of the Agreement provides: “The Collaboration shall pay SRC pursuant to the

terms set out in Exhibit B.” (ECF No. 85-1 § 3.3.). Exhibit B, in turn, lists six provisions pertaining

to “Operating Expenses Reimbursement and Service Fee Payment.” (See ECF No. 85-1 at 25).

SRC contends that, EGCC’s failure to pay the profit-sharing amounts prior to Spring 2022, EGCC

breached Sections 2 and 3 of Exhibit B, which govern “Reimbursement of SRC Operating

16

Expenses” and “Payment of SRC Fees.” (See ECF No. 85-1 at 25, Ex. B §§ 23). Like Count I,

EGCC’s response does not challenge SRC’s entitlement to summary judgment on this claim. This

Court therefore considers EGCC to have waived any such challenge and finds in SRC’s favor on

its breach-of-contract claim for $2,357,153.08 in profit-sharing payments.

Accordingly, this Court GRANTS SRC’s Motion for Summary Judgment on Count II of

its SAC; DENIES summary judgment on SRC’s breach-of-contract claim for $300,000 in Union

Privilege allocation payments prior to September 2022; and GRANTS summary judgment on

SRC’s breach-of-contract claim for $2,357,153.08 in profit-sharing payments prior to Spring 2022.

C. Count III – EGCC’s Breach of Section 8 of the Agreement by Bringing SRC’s

Services In-House and by Contracting with Employee Benefit Services

SRC urges that summary judgment is warranted on its claim that EGCC breached the non-

compete provision of the Agreement, which provides:

[N]either SRC nor EGCC shall take any action for the purpose of

entering into any joint venture, collaboration or similar arrangement

that is competitive with the Educational Programs provided by the

Collaboration to union members; provided however, if SRC wishes

to pursue an agreement with a 4 year institution of higher learning

that compliments the Collaboration, it shall seek written permission,

in advance, from EGCC and such permission shall not be

unreasonably withheld.

(ECF No. 85-1 § 8). SRC’s argument that EGCC breached this section is two-fold. First, SRC

contends that, upon Perik’s departure from SRC, “Geoghegan began laying the groundwork to

bring SRC’s services in-house to squeeze SRC out of business.” (ECF No. 85 at 41). In support,

SRC relies on documents “found on Geoghegan’s laptop”—one titled “EGCC FY23 Budget

Proposal Move SSC & SRC Operations Inhouse” and another noting how EGCC “would rely on

the unions and their control over their own websites to bring SRC’s work in-house without

disruption” and further predicting that “[t]his insourcing will result in the review/elimination of

the bundled services exemption SRC needs to function, as outlined by the DOE, which will impair

17

SRC’s ability to deliver any level of customer service[.]” (Id.). SRC, however, has not met its

burden to show that EGCC’s plans to take certain services in-house were “for the purpose of

entering into [a] joint venture, collaboration or similar arrangement” as to be barred by the non-

compete provision. Indeed, EGCC cites evidence to the contrary, suggesting that the purpose of

its efforts to take services in-house was “to address HLC’s concerns about EGCC’s utilization of

third-party enrollment and academic advisors through SRC . . . .” (ECF No. 111, at 27).

SRC’s second argument—that EGCC breached the non-compete provision by contracting

with Employment Benefit Services (“EBS”)—fares no better. SRC explains that “[t]he terms of

the EBS agreement overlapped with the services SRC provided to EGCC under the Agreement.”

(Id. at 42). The record, however, is insufficient to conclude as a matter of law that EGCC’s hiring

of EBS breached the non-compete clause. EGCC notes that, unlike SRC, EBS is “a provider of

health and life insurance benefits to unions” and is therefore not SRC’s “competitor.” (Id. at 24-

25). EGCC also maintains that hiring EBS was meant to “build and repair EGCC’s brand and the

FCBP with key constituent groups” and thus “primarily involved the marketing and promotion of

EGCC and the FCBP with EBS’s union members and lobbying efforts in Washington, D.C.” (Id.).

Because factual issues remain as to the purpose of the EBS contract and whether the services

covered thereunder competed with SRC’s services, SRC is not entitled to summary judgment on

its claim that EGCC breached its non-compete obligations.

Accordingly, this Court DENIES SRC’s Motion for Summary Judgment as to Count III of

the SAC.

D. Count IV – EGCC’s Breach of Section 3 of Exhibit B by Failing to Reimburse

SRC Profit-Sharing Payments for Fiscal Years 2022 and 2023

Like Count II, Count IV’s breach of contract claim arises from Exhibit B to the Agreement.

Specifically, SRC argues that EGCC breached Section 3 of Exhibit B by failing to pay profit-

18

sharing payments to SRC for Fiscal Year 2022 ($7,056,205) and Fiscal Year 2023 ($2,330,867).

Section 3 of Exhibit B provides:

3. Payment of SRC Fees

Within thirty (30) days of the end of the Summer and Fall

Semesters, EGCC will provide SRC with a semester

reconciliation of the Revenue collected and Operating

Expenses paid in each such semester (“Semester

Reconciliation”). The Semester Reconciliations shall be in

accordance with GAAP. If there is a surplus of funds

remaining in the Collaboration Account as shown by the

Semester Reconciliation (“Surplus”), EGCC will distribute

the Surplus from the Collaboration Account as follows: 50%

to SRC and 50% to EGCC. EGCC will also make Surplus

payments at the end of the Spring Semester; however, the

Spring Semester Surplus payments will be made promptly

after the receipt of final numbers generated as part of

EGCC’s audited statements, but no later than September 30

of the following Fiscal Year.

Based on “EGCC’s own records,” SRC calculates that “EGCC owes SRC $6,941,363.03

for these profit-sharing payments.” SRC contends that, for Fiscal Year 2022, “EGCC paid SRC

$551,527.93 on September 30, 2022 based on its belief that this amount represented SRC’s portion

of profit-sharing payments for Fiscal Year 2022.” (ECF No. 85 at 20) (citing Leishure Dec., ¶ 10)).

But this amount, according to SRC, “did not represent the entirety of what was owed to SRC” and

was based on “several improper and unsupported accounting adjustments.” (Id.). In opposition,

EGCC maintains that triable issues preclude summary judgment on this claim. Specifically, EGCC

notes that the adjustments to the cost allocation, that SRC now takes issue with, had taken place

“in 2021 when [EGCC and SRC] were negotiating the Fiscal Year 2022 budget and considering

the findings in the HLC’s November 9, 2020 mid-cycle review.” (ECF No. 111 at 26). EGCC

further asserts that these “changes to the FCBP were fully supported by SRC’s former management

to address HLC’s concerns and be removed from probation.” (Id.).

This Court finds that triable issues of fact exist as to whether EGCC’s profit-sharing

19

payments for Fiscal Years 2022 and 2023 fell short and thus breached the Agreement. Contrary to

SRC’s argument, EGCC cites both deposition and court testimony in support of the factual disputes

between the parties. While SRC’s witnesses may be of a different opinion, credibility

determinations are not appropriate when resolving summary judgment motions.

Accordingly, this Court DENIES SRC’s Motion for Summary Judgment as to Count IV

of the SAC.

E. Count V – EGCC’s Breach of Other Sections of the Agreement

SRC argues that DOE’s Cease-and-Desist Letter in July 2022 demonstrate that EGCC was

in violation of Title IV and thus EGCC breached its representations and warranties set forth in

Section 4 of the Agreement which, in relevant part, provide:

4.3. Consents. Except as set forth on Schedule 4.3, no authorization,

consent, approval, permit or license of, or filing with, any

Governmental Authority, Educational Agency or any other Person,

is required to authorize, or is required in connection with, the

execution, delivery and performance of this Agreement or any other

agreements contemplated hereby or thereby on the part of EGCC.

4.4 Educational Approvals. EGCC has (a) all approvals required

pursuant to its policies and procedures to offer the Initial

Educational Programs and (b) all material Educational Approvals,

to offer the Initial Educational Programs and to award Title IV

Program funds and other student financial assistance in connection

with such Initial Educational Programs.

4.5 No Violation. [. . .] EGCC is not in violation of any judgment,

decree, order, statute, rule, regulation, standard or policy of any

Governmental Authority or Educational Agency having jurisdiction

over EGCC, which violation could reasonably be likely to have a

material adverse effect on EGCC, the Collaboration or the Initiative.

In opposition, EGCC maintains that the July 18, 2022 Cease-and-Desist Letter cannot bet

evidence of any material breach of the representations and warranties in §§ 4.3, 4.4, 4.5 and 4.8 of

the Agreement, as those representations were made on June 30, 2017. (ECF No. 111, at 23-24).

20

EGCC’s position is well-taken. Representations and warranties made at the start of a

contract do not extend to future performance unless there is an explicit agreement to that effect.

See, e.g., Standard All. Indus., Inc. v. Black Clawson Co., 587 F.2d 813, 820 (6th Cir. 1978) (UCC

case). Here, there is nothing in the Agreement that speaks to the survival of representations and

warranties after execution of the Agreement. See Arcade Co. v. Arcade, LLC, 105 F. App’x 808,

810 (6th Cir. 2004) (addressing a contract provision, non-existent in this case, that explicitly stated

that the “representations, warranties, obligations, covenants, agreements, undertakings and

indemnifications of the parties ... shall survive the closing” and whether that provision supported

a finding that the parties intended to modify statutes of limitations).

As such, SRC is not entitled to summary judgment on its breach-of-contract claim as to

Section 4 of the Agreement. Accordingly, this Court DENIES SRC’s Motion for Summary

Judgment as to Count V.

F. Count VI – EGCC’s Breach of Exhibit B by Failing to Reimburse SRC

Operating Expenses from September 2022 to May 2023

In Count VI, SRC alleges that EGCC failed to pay SRC $908,749.62 in Operating Expense

reimbursements from September 6, 2022, through May 23, 2023, pursuant to Section 2 of Exhibit

B to the Agreement, which provides:

2. Reimbursement of SRC Operating Expenses

SRC will invoice the Collaboration for its Operating

Expenses incurred in the previous month. SRC will be paid

by the Collaboration from the Collaboration Account within

five (5) days of the receipt of the monthly deposit of Revenue

from the EGCC for all open invoices that are part of the

Initial Budget or Annual Budget and for which the

Collaboration has been invoiced, assuming there are

sufficient funds in the Collaboration Account. Provided

however, EGCC agrees that SRC Operating Expenses shall

only be reimbursed in the event that content fee obligations

to BNED LC have been satisfied and no amounts are due and

outstanding. Should there not be sufficient funds to pay

21

SRC's monthly installment of Operating Expenses, any

outstanding amounts due to SRC will be accrued and paid at

such time as the Collaboration Account has sufficient funds.

(ECF No. 85-1 at 25, Ex. B § 2). SRC argues it is entitled to summary judgment on this claim

because the evidence establishes that, at EGCC’s request, SRC continued to provide its services

under the Collaboration Agreement between September 6, 2022 through May 23, 2023, which

resulted in $908,749.62 of Operating Expenses that EGCC has refused to reimburse. This amount,

according to SRC, “corresponds to over a dozen invoices submitted to EGCC during that

timeframe for SRC staff members who scheduled appointments for over 25,533 reenrolled

students.” (See ECF No. 127 at 13 (citing 86-4, Leishure Decl. ¶ 9)). SRC maintains that these

employees “were needed to support the volume of EGCC students that were re-enrolling at

EGCC.” (Id. (citing ECF No. 90-11, Leishure Dep., 39:17-20)). Specifically, as stated in Ms.

Leishure’s declaration, these costs were incurred as follows:

[F]rom September 6, 2022 through May 23, 2023, SRC

employed seven full-time staff members who supported

EGCC and the Collaboration. Those staff members

scheduled appointments for over 25,533 re-enrolled students

and met biweekly with EGCC staff.

(ECF No. 86-4 ¶ 9).

EGCC, on the other hand, contends that the issuance of the Department of Education’s

Cease-and-Desist Letter in July 2022 “put the FCBP ‘on ice’ as neither EGCC nor SRC could

continue the collaborative program, making it impossible to continue the Agreement.” (ECF No.

111 at 7 (citing ECF No. 90-1, Braithwaite Dep., at 52:9-12, 56:12-57:21, 72:15-21; ECF No. 85-

2, Geoghegan Dep., at 275:21-24))). EGCC claims SRC failed substantially to perform its

obligations under the Agreement after July 18, 2022, when it “ceased recruiting and enrolling new

students and marketing the FCBP.” Id. (Braithwaite Dep. at 95:3-8, 96:9-14).

But two facts are undisputed. First, neither party disputes that the DOE letter—though later

22

enjoined—found that the FCBP “violates the Title IV prohibition against assessing charges to Title

IV recipients that are higher than those charges assessed to non-Title IV recipients,” ordered EGCC

to “cease providing the Free College Benefit program as currently implemented,” and further

directed EGCC to “not disburse Pell funds to any new students enrolling in the Free College

Benefit Program until it is redesigned to charge full tuition and fees to all non-Pell eligible

students.” (Id.). Second, even EGCC acknowledges that SRC continued to perform other

contractual obligations after July 2022, like “updating its union partners on the status of the FCBP

and managing existing students in the FCBP through SRC’s academic advisors.” (See ECF No.

111 at 7) (internal quotation marks and citation omitted).

“When the facts presented are undisputed, whether they constitute a performance or a

breach of a written contract, is a question of law for the court." Luntz v. Stern, 135 Ohio St. 225,

20 N.E.2d 241 (Ohio 1939). So long as the party obligated to perform under the contract “makes

an honest effort to do so, and there is no willful omission on its part,” substantial performance is

“all that is required to entitle the party to payment under the contract.” Cleveland Neighborhood

Health Serv., Inc. v. St. Clair Builders, Inc., 64 Ohio App.3d 639, 644, 582 N.E.2d 640 (Ohio Ct.

App. 1989) (citing Ashley v. Henahan, 56 Ohio St. 559, 569, 47 N.E. 573 (Ohio 1897)). Substantial

performance means “that mere nominal, trifling, or technical departures are not sufficient to break

a contract, and that slight departures, omissions and inadvertencies should be disregarded.’” Id.

(quoting Kichler’s, Inc. v. Persinger, 24 Ohio App.2d 124, 126, 265 N.E.2d 319 (Ohio Ct. App.

1970)).

Given the finding and directive from the U.S. Department of Education, this Court

concludes that a trier of fact may find that SRC was not in breach when it ceased its recruiting and

marketing efforts but continued its other contractual obligations. This conclusion would be

bolstered by Section 9 of the Agreement, which provides:

23

[I]n the event that either Party reasonably determines that the

performance of any particular service by either Party is in

violation of such legal or accreditation requirements, the

Parties agree that such service shall be promptly modified to

the extent reasonably necessary to secure continued

compliance with such legal and accreditation requirements.

(ECF No. 85-1, § 9(a)). In line with this contractual obligation, it is possible that SRC modified its

services arguably to maintain compliance with the U.S. Department of Education’s directive.

While such a decision may not constitute breach, or at least not one that is substantial enough as

to bar SRC’s entitlement to payment under the Agreement, the October 27, 2022 correspondence

from SRC’s counsel to EGCC’s counsel gives this Court some pause with respect to the timeline

(September 2022 to May 2023) for which SRC seeks to recover and SRC’s duty to mitigate. (See

ECF No. 109-5). In Ohio, “[t]he general rule is that an injured party has a duty to mitigate and

may not recover for damages that could reasonably have been avoided.” Chicago Title Ins. Co. v.

Huntington Natl. Bank, 87 Ohio St. 3d 270, 276 (Ohio 1999); Kanistros v. Holeman, 2005 Ohio

660, (Ohio Ct. App. 2005) (“In an action for breach of contract, those damages that a plaintiff

could have avoided with reasonable effort and without undue risk or expense cannot be charged

against a defendant; to that extent, a plaintiff has a duty to mitigate damages.”).

As stated in the October 2022 letter, after EGCC purportedly “reached out to [SRC]

requesting it to resume performance under the Collaboration Agreement in light of the court’s

Opinion and Order in Eastern Gateway Community College v. Cardona, Case No 2:22-cv-3326

(ECF No. 37),” SRC’s counsel wrote to EGCC notifying it that EGCC is in material breach of the

Collaboration Agreement and that SRC would not perform until certain demands for cure were

met. (See Braithwaite Dep. Ex. J, ECF No. 109-5). The letter remarked that “this request for

assistance” from EGCC demonstrated the “frivolous nature” of EGCC’s counterclaim,” because

on the one hand, EGCC’s counterclaim alleges material breach by SRC for deficient performance

24

of its services, “while on the other hand[,] EGCC begs for the resumption of these exact same

services now that EGCC’s need for them has resumed.” (Id.). SRC’s counsel proceeded by

outlining EGCC’s other shortcomings under the Agreement, including its failure to pay profit-

sharing and operating expenses owed to SRC, and ultimately declared that “EGCC's actions

constitute an ongoing material breach of the Collaboration Agreement” and that “EGCC must

reimburse SRC for its unpaid operating expenses and profit share amounts before addressing

EGCC's requests for support.” (Id.). EGCC admits that it did not cure any of SRC’s alleged

breaches and thus maintains that the Agreement terminated in December 2022.

Whether the Agreement terminated in December 2022 is a disputed issue of material fact

that directly bears on the amount of Operating Expense reimbursements (if any) that SRC was

entitled to from September 6, 2022, through May 23, 2023. As explained infra, factual disputes

also remain regarding whether SRC’s failure to designate Operating Committee members from

March 23, 2022, through August 31, 2022, prevented the parties from substantially performing

their obligations under the Agreement—including approving the Operating Expenses for Fiscal

Year 2023 that SRC seeks to recoup. As such, this Court DENIES SRC’s Motion for Summary

Judgment as to Count VI of the SAC.

G. Counterclaim I – Declaratory Judgment that SRC Breached the Agreement,

SRC was overpaid, and that, as a result, EGCC can terminate the Agreement

In its Amended Counterclaims, EGCC contends that factual questions exist regarding

whether “SRC has breached the Collaboration Agreement and has been overpaid, [whether] EGCC

was entitled to terminate the Collaboration Agreement pursuant to its May 12, 2022 Notice and, if

not, whether the Collaboration Agreement terminated pursuant to SRC’s October 27, 2022

Notice.” (See ECF No. 67). As SRC reiterates, and this Court now rules (see Part III.A supra),

EGCC was not entitled to terminate the Agreement pursuant to its May 12, 2022 Notice.

25

Nonetheless, factual questions remain as to whether SRC’s October 27, 2022 written notice of

material breach to EGCC terminated the Agreement. (See ECF No. 39-1, at ¶ 14; ECF No. 39-4;

ECF 90-1, at 82:6-23; ECF No. 109-5). As Mr. Braithwaite testified in his deposition, these

demands were that: EGCC reimburse SRC for invoiced operating expenses and profit share

amounts in excess of $7,000,000; provide SRC with “written assurance” that it is in “present

compliance with all Governmental Authority or Educational Agency judgments, decrees, orders,

statutes, rules, regulations, standards, or policies;” agree to indemnify and hold SRC harmless from

unspecified claims; and provide SRC with “written explanation of how [EGCC] intends to address

and resolve the concerns identified by the United States Department of Education’s July 18, 2022

[Cease-and-Desist] letter.” (Id.)

SRC nonetheless contends that “EGCC’s argument admits that it materially breached the

Agreement, yet EGCC claims its material breach of the Agreement bars SRC from recovery (or at

least creates a genuine dispute of material fact).” (ECF No. 127, at 24). But by the express terms

of the Agreement, SRC’s written notice of material breach to EGCC on October 27, 2022, would

have arguably triggered the Agreement’s automatic termination on December 31, 2022 (following

a 60-day cure period). As relevant here, Section 10 of the Agreement provides:

10.2 Termination. This Agreement shall be terminated prior to

expiration of the Term as follows:

* * *

(b) by either Party for material breach of any of the terms hereof by

the other party if such breach shall not have been cured within sixty

(60) calendar days after written notice of breach is delivered to the

defaulting party (or, it such breach requires more than sixty (60)

days to cure, if such cure is not commenced within sixty (60) days

and thereafter diligently prosecuted);

EGCC concedes that it “did not commence to cure the alleged material breaches within the

26

allotted 60-day cure period” and, as a result, “by express operation of Agreement’s termination

provision, the Agreement immediately terminated after the end of the cure period at 12:01 a.m. on

December 31, 2022.” (Id. at 20).

Whether EGCC did in fact materially breach the Agreement, as the October 2022 Notice

alleges, thereby triggering the Agreement’s termination provision, is disputed. This question thus

remains a matter for the trier of fact to decide. See Hanna v. Groom, 10th Dist. App. No. 07AP-

502, 2008-Ohio-765, ¶ 16 (“Whether a material breach has occurred ordinarily is a question of fact

for the fact-finder.”); Klaus v. Hilb, Rogal & Hamilton Co. of Ohio, 437 F. Supp. 2d 706, 731

(S.D. Ohio 2006) (“The determination whether a material breach of an agreement has occurred is

generally a question of fact.”).

Because a genuine dispute of material fact exists regarding when the Agreement terminated

on or before December 31, 2022, whether SRC is entitled to any operating expense reimbursement

or profit sharing after December 31, 2022, also remains unresolved. This precludes summary

judgment in SRC’s favor on Counterclaim I. Accordingly, this Court DENIES SRC’s Motion for

Summary Judgment as to Counterclaim I.

H. Counterclaim II: SRC’s Breach of the Agreement

EGCC’s breach of contract counterclaim charges SRC with a number of contractual

violations: (1) material breach § 2.6(a) of the Agreement by failing to timely designate new

representatives to the Operating Committee; (2) material breach of §§ 2.3 and 2.5 of the Agreement

by submitting operating expense reimbursement requests for SRC Controlled Collaboration

Activities that were excessive and for services that were not rendered during the relevant time

period; (3) material breach of § 3.1 of the Agreement and Exhibit B’s requirement that SRC pay

all operating expenses not covered by FCBP revenue; and (4) material breach of § 8 of the

Agreement by taking action for the purpose of entering into a competitive collaboration with

27

William Woods and other academic partners during periods of time when enrollment in the FCBP

was below 23,000 students (i.e., between June 6, 2022 and August 14, 2022 and after January 9,

2023). SRC argues that it is entitled to summary judgment on Counterclaim II in its entirety.

1. SRC’s Breach of Section 2.6(a) by Failing to Timely Designate a Representative

to the Operating Committee

In Counterclaim II, EGCC charges SRC with materially breaching the Collaboration

Agreement by failing to designate a replacement representative to the collaboration’s Operating

Committee from March 23, 2022 through August 31, 2022. Specifically, EGCC claims that SRC

breached Section 2.6(a), which provides:

The Collaboration shall be conducted under the direction of a joint

operating committee comprised of one (1) representative of SRC

and one (1) representative of EGCC (the "Operating Committee").

Each Member Party may designate up to three (3) individuals, who

may at any given time, individually serve as the representative for a

Member Party during meetings of the Operating Committee. Each

Member Party may change its designated representatives to the

Operating Committee from time to time, in its sole discretion,

effective upon notice to the other Member Parties of such change.

These representatives shall have appropriate credentials, experience

and knowledge, and ongoing familiarity with the Collaboration.

Additional representatives or consultants may from time to time, by

mutual consent of the Member Parties, be invited to attend

Operating Committee meetings, subject to such representative's or

consultant's written agreement to comply with the confidentiality

requirements of Section 14. Each Member Party shall bear its own

expenses related to the attendance of such meetings by its

representatives.

(ECF No. 85-1 § 2.6(a). Citing the Collaboration Agreement, EGCC explains that the Operating

Committee is “the governing body of the FCBP collaboration under which material decisions

affecting the collaboration is made.” (See ECF No. 111 at 13–14 (citing ECF No. 85-1, at § 2.6)).

Specifically, the Agreement provides that the Operating Committee “shall confer regarding the

status of the Collaboration, review relevant data and the progress of the applicable activities under

the Collaboration, and consider and advise on any operational issues that arise relating to the

28

Collaboration that may be referred to, or invited for referral by, the Operating Committee.” (ECF

No. 85-1 § 2.6(c)). The Operating Committee must: approve changes to SRC Controlled

Collaboration Activities (see id. at § 2.3); approve changes to the most important and material

Collaboration Activities (see id. at § 2.4) and direct and approve the payment of all operating

expenses and other expenditures from the Collaboration Account (see id. at § 3.1 and Ex. B to the

Agreement). According to EGCC, “SRC’s failure to designate a representative to the Operating

Committee from March 23, 2022 through August 31, 2022, left the collaboration without a

governing body and rendered it unable to make material decisions affecting the collaboration,

including approvals to pay operating expenses.” (ECF No. 111 at 14).

SRC, on the other hand, contends that “[o]n March 28, 2022, Geoghegan’s executive

assistant cancelled all subsequent Operating Committee meetings,” and Mr. Geoghegan explained

in his deposition that the Operating Committee meetings were cancelled “because we [EGCC]

weren’t meeting with them [SRC] anymore.” (Geoghegan Dep. 157:17-25). In addition to

cancelling the Operating Committee meetings, SRC contends that “EGCC also admitted that it

never asked SRC for notice of who SRC would designate on the Operating Committee and never

rescheduled the meetings after SRC designated new representatives to the Operating Committee.”

(See ECF No. 85 (citing Geoghegan Dep., 161:1-14)). According to SRC, it made “several

attempts to resume Operating Committee meetings with EGCC but the school refused to do so.”

(Id. (citing Leishure Dec., ¶ 18)). At oral argument, EGCC maintained that SRC failed to designate

new representatives upon terminating the prior members which, regardless of EGCC’s removal of

appointments from calendars, constituted a material breach of § 2.6(a).

Given these opposing positions and the evidence set forth by both sides, there are material

factual disputes regarding SRC’s failure to designate Operating Committee members thus

precluding summary judgment on this question.

29

2. SRC’s Alleged Breach of §§ 2.3, 2.4, and 3.1 of the Agreement

EGCC also alleges SRC has materially breached the Collaboration Agreement, §§ 2.3, 2.4

and 3.1, by submitting operating expense reimbursement requests between September 2022 and

May 2023 for SRC Controlled Collaboration Activities that are excessive, not normal and

customary, and/or for services that were not (or could not), by refusal to perform or otherwise, be

rendered during the relevant time period. (See ECF No. 67 ¶ 62). EGCC separately purports that

SRC breached § 3.1 because the reimbursements that SRC requested were made without an

approved Annual Budget or Joint Marketing Plan for Fiscal Year 2023. (Id. ¶ 63).

SRC, on the other hand, contends that it is entitled to summary judgment on these claims

because, under § 7.2 of the Agreement, the Annual Budget for Fiscal Year 2022 carried over to

Fiscal Year 2023 because “EGCC refused to engage with SRC and response to its proposed Fiscal

Year 2023 Annual Budget and joint marketing plan.” (See ECF No. 85 at 53). As discussed supra,

however, there are factual disputes regarding whether SRC’s failure to designate Operating

Committee members from March 23, 2022, through August 31, 2022, prevented the parties from

substantially performing their obligations under the Agreement—including approving an Annual

Budget for Fiscal Year 2023. As this Court explained in its prior order, the success of these claims

“hinges on a factual question: whether the breach occurred prior to or after September 12, 2022.”

(ECF No. 143 at 19). Accordingly, SRC is not entitled to summary judgment on EGCC’s breach-

of-contract counterclaim regarding §§ 2.3, 2.4, and 3.1.

3. SRC’s Breach of § 8 of the Agreement by Collaborating with Academic Partners

In its prior orders, this Court has already disposed of EGCC’s argument regarding SRC’s

breach of Section 8, finding that “the terms of § 8 plainly give SRC the authority to enter into the

arrangements in question.” (See ECF No. 143, at 11–14 (denying EGCC’s motion to alter court’s

order “dismissing EGCC’s Counterclaim II as it relates to SRC’s alleged breach of § 8 of the

30

Collaboration Agreement” because “EGCC failed to raise these arguments when it was required

to do so and because the terms of § 8 plainly give SRC the authority to enter into the arrangements

in question”); see also id. at 17 (“Having already disposed of the arguments regarding § 8 . . . this

Court will not rehash them here.”); ECF No. 63 at 27 (granting “SRC’s Motion to Dismiss

Counterclaim II as it relates to § 8’s non-compete provision”).

“[W]hen a court decides upon a rule of law, that decision should continue to govern the

same issues in subsequent stages in the same case.” Eaton v. Ascent Res. - UTICA, LLC, No. 2:19-

CV- 3412, 2021 WL 858517, at *3 (S.D. Ohio Mar. 8, 2021) (quoting Miller v. Maddox, 866 F.3d

386, 389 (6th Cir. 2017). Because this claim had already been disposed of, this Court need not

address this claim on summary judgment.

Accordingly, this Court DENIES SRC’s Motion for Summary Judgment as to

Counterclaim II.

31

IV. CONCLUSION

For the foregoing reasons, Plaintiff Student Resource Center’s Motion for Summary

Judgment (ECF No. 85) is GRANTED IN PART and DENIED IN PART:

- GRANTED in SRC’s favor as to Count I of the SAC;

- DENIED IN PART and GRANTED IN PART in SRC’s favor as to Count II:

o DENIED on SRC’s claim for $300,000 in operating expenses prior to

September 2022;

o GRANTED in SRC’s favor on its claim for $2,357,153.08 in profit-sharing

payments prior to Spring 2022;

- DENIED as to Count III of the SAC;

- DENIED as to Count IV of the SAC;

- DENIED as to Count V of the SAC;

- DENIED as to Count VI of the SAC;

- DENIED as to Counterclaim I; and

- DENIED as to Counterclaim II.

IT ISSO ORDERED.

ALGEN . MARB

UNITED STATES DISTRICT JUDGE

DATED: January 6, 2025

32

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.