Opinion

Fiorentino v. CANTIERE DELLE MARCHE S.r.L. SOCIETA UNIPERSONALE

Court
District Court, S.D. Florida
Filed
Aug 8, 2024
Cited by
0 cases
Authority
More cited than 31.3%

“[If a contract] explicitly provides that ‘this contract’ is the entire agreement’ between the parties[,] . . . anything that does not constitute part of ‘this contract’ is not part of the parties’ agreement related to the contract.”

How later courts described this case

  • “[If a contract] explicitly provides that ‘this contract’ is the entire agreement’ between the parties[,] . . . anything that does not constitute part of ‘this contract’ is not part of the parties’ agreement related to the contract.”
  • “[T]he question [is] whether the present dispute was a foreseeable result of the performance of the licensing agreement.”
  • “[A court] may conclude as a matter of law that parties did or did not enter into an arbitration agreement only if there is no genuine dispute as to any material fact concerning the formation of such an agreement.” (cleaned up)
  • noting that, where a contract’s terms are clear and unambiguous, the court will apply those terms

Written by the judges who cited it.

The opinion

UNITED STATES DISTRICT COURT

SOUTHERN DISTRICT OF FLORIDA

CASE NO. 23-cv-21089-ALTMAN/Reid

JEFFREY FIORENTINO, et al.,

Plaintiffs,

v.

CANTIERE DELLE MARCHE

S.r.L. Societa Unipersonale, et al.,

Defendants.

______________________________/

ORDER

The Defendants have filed a Motion to Compel Arbitration (the “Motion”) [ECF No. 24],

asking us to stay this case and order the Plaintiffs to arbitrate their claims in London, England. After

careful review of the Motion, the record, and the governing law, we GRANT the Defendant’s Motion

to Compel Arbitration [ECF No. 24] and STAY this case pending the outcome of that arbitration.

THE FACTS1

In 2018, Jeffrey Fiorentino, our Plaintiff, engaged Italian yacht manufacture Cantiere Delle

Marche (“CDM”), our Defendant, to build him a custom explorer yacht. See Complaint [ECF No. 1]

¶¶ 1–20. To consummate their agreement, the parties entered into a “Standard Yacht Construction

1 In reviewing a motion to compel arbitration, we may consider allegations of fact from “the pleadings,

documents of uncontested validity, and affidavits or depositions submitted by either party[.]” Chemaly

v. Lamp, 2024 WL 663654, at *3 (S.D. Fla. Feb. 16, 2024) (Bloom, J.) (quoting Bertram v. Beneficial

Consumer Discount Co., 286 F. Supp. 2d 453, 456 (M.D. Pa. 2003)). But, because “[t]he party opposing

a motion to compel arbitration or to stay litigation pending arbitration has the affirmative duty of

coming forward by way of affidavit or allegation of fact to show cause why the court should not

compel arbitration,” Sims v. Clarendon Nat’l Ins. Co., 336 F. Supp. 2d 1311, 1324 (S.D. Fla. 2004)

(Altonaga, J.), we must resolve all disputes of material fact regarding the “formation” of the agreement

in favor of the nonmoving party, see Bazemore v. Jefferson Cap. Sys., LLC, 827 F.3d 1325, 1333 (11th Cir.

2016) (“[A court] may conclude as a matter of law that parties did or did not enter into an arbitration

agreement only if there is no genuine dispute as to any material fact concerning the formation of such

an agreement.” (cleaned up)).

Contract” in April 2019. Mot. at 3 (“[O]n or about April 21, 2019, [CDM] entered into a Standard

Yacht Construction Contract with Jefferey Fiorentino and/or assigns.”); see also Ex. A to Declaration

of Carlo Aquilanti (the “Contract”) [ECF No. 26-1] at 9–62. The Contract set a purchase price for the

Yacht of €9,000,000.00. See Contract § 3.1.

The Contract included a “Publicity and Confidentiality” Section, id. § 20.1, through which

CDM was granted the right to “take photographs and video footage of the Yacht during construction

and sea trials and at the time of delivery”—and to “publi[sh] . . . images and a brochure of the Yacht

for advertising purposes,” ibid.2 The Plaintiffs also agreed to “make the Yacht available to [CDM] for

exhibition” at the 2021 Fort Lauderdale International Boat Show (the “2021 FLIBS”), set for October

30, 2021, and to put “the Yacht at [CDM’s] disposal for any further promotional initiative in Florida

or elsewhere[.]” Id. § 20.1.1. CDM, in turn, “was required to pay all costs associated with exhibiting

the vessel at the 2021 [FLIBS].” Compl. ¶ 22; see also Contract § 20.1 (providing that CDM shall “bear

all costs in relation to such exhibition”). The Contract also included an arbitration clause, which made

clear that “all disputes arising under this Contract . . . will be submitted to and settled by binding

Arbitration in London in accordance with the Arbitration Act 1996 (or any re-enactment or

modification for the time being in force) and the rules then in force of the London Maritime

Arbitrators’ Association[.]” Contract § 17.3.

After the parties signed the Contract on April 21, 2019, “the project was shelved by [CDM]

and did not begin for several months.” Compl. ¶ 23. And, “when the build eventually began, problems

arose and snowballed.” Id. ¶ 24. Because of these delays, CDM informed Fiorentino that “it would be

2 A Co-Plaintiff in this case, 106 Fishplorer, LLC (a holding company created by Jeffrey Fiorentino),

see Declaration of Carlo Aquilanti [ECF No. 26-1] ¶ 10, holds the copyright to the Plaintiffs’

photographs of the Yacht, see Compl. ¶ 56 (“As of February 17, 2023, Plaintiff[ ] Fishsplorer has been

and still is the holder of the exclusive rights under the Copyright Act of 1976 . . . to reproduce,

distribute, display, or license the reproduction, distribution, and/or display of its photographs of the

vessel.”).

impossible to deliver the vessel in time to display it at the 2021 FLIBS.” Id. ¶ 25. Accordingly, the

parties, on January 7, 2022, “executed an addendum to the Contract which modified the publicity

provision,” Plaintiffs’ Response (“Resp.”) [ECF No. 27] at 2, allowing CDM to display the yacht “at

the [October 2022] Fort Lauderdale International Boat Show . . . and at any other following Boat

Show”—and, again, to use the Yacht “for any further promotional initiative [i]n Florida or

elsewhere . . . while the yacht is available,” Ex. C to Declaration of Carlo Aquilanti (the “Addendum”)

[ECF No. 26-1] at 70–72. According to Fiorentino, the parties also entered into a subsequent “oral

agreement” that allowed CDM “to use photographs of the vessel during the Cannes Boat Show, which

was scheduled for September 4–12, 2022.” Compl. ¶ 32. CDM agreed to cover “all expenses associated

with [that] exhibition.” Id. ¶ 33.

When CDM “failed to reimburse Fiorentino for all costs associated with the Cannes Boat

Show,” id. ¶ 35, “Fiorentino declared a breach[,] . . . specifically revoked any prior permissions he had

granted [to the] Defendants to use Fiorentino’s copyrighted images, and demanded[ ] in writing that

Defendants discontinue use of these copyrighted images,” id. ¶ 36—a demand CDM has since ignored,

see id. ¶ 37 (“Notwithstanding Plaintiff’s demand, Defendants have continued to use, without

authorization, copyrighted photographs of the boat.”).

Fiorentino then sued CDM—along with its founder and CEO, Vasco Buonpensiere—alleging

claims for breach of contract, see id. ¶¶ 38–45 (Count I), account stated, see id. ¶¶ 46–54 (Count II),

and copyright infringement, see id. ¶¶ 55–63 (Count III). The Defendants have since filed a Motion to

Compel Arbitration, invoking the Contract’s arbitration provision. See Mot. at 1 (requesting that we

“compel[ ] the Plaintiffs to arbitrate the claims asserted in this action before, and in accordance with

the rules of, the London Maritime Arbitrators’ Association, in accordance with the applicable terms

of the parties’ Standard Yacht Construction Contract”). While that Motion was pending, the Plaintiffs

voluntarily dismissed their claims against Buonpensiere. See Notice of Voluntary Dismissal [ECF No.

35]. We’ll thus consider only whether the Plaintiffs’ claims against CDM must be sent to arbitration.

THE LAW

Chapter 2 of the Federal Arbitration Act provides that a “written” arbitration provision “in

any maritime transaction or a contract . . . shall be valid, irrevocable, and enforceable, save upon such

grounds as exist at law or in equity for the revocation of any contract[.]” Cosgun v. Seabourn Cruise Line

Ltd. Inc., 666 F. Supp. 3d 1270, 1280 (S.D. Fla. 2023) (Altman, J.) (emphasis omitted) (quoting 9 U.S.C.

§ 2). “This provision reflects both a liberal federal policy favoring arbitration, and the fundamental

principle that arbitration is a matter of contract.” Inetianbor v. CashCall, Inc., 768 F.3d 1346, 1349 (11th

Cir. 2014) (cleaned up). “The New York Convention on the Recognition and Enforcement of Foreign

Arbitral Awards (the ‘Convention’) is incorporated into federal law by the Federal Arbitration Act

(‘FAA’), which governs the enforcement of arbitration agreements, and arbitral awards made pursuant

to such agreements, in federal and state courts.” Northrop & Johnson Yachts-Ships, Inc. v. Royal Van Lent

Shipyard B.V., 2020 WL 5627263, at *2 (S.D. Fla. June 8, 2020) (Williams, J.), aff’d 855 F. App’x 468

(11th Cir. 2021).

An arbitration agreement falls within the jurisdiction of the New York Convention if it: (1) is

in writing; (2) involves at least one foreign party; and (3) “arise[s] out of a legal relationship, whether

contractual or not, which is considered as commercial[.]” Cosgun, 666 F. Supp. 3d at 1280 (quoting 9

U.S.C. § 202). If these jurisdictional elements are met, “the Convention requires that a motion to

compel arbitration must be granted,” Suazo v. NCL (Bah.), Ltd., 822 F.3d 543, 546 (11th Cir. 2016),

“unless the Court finds that the said agreement is null and void, inoperative or incapable of being

performed,” Cosgun, 666 F. Supp. 3d at 1293 (cleaned up) (quoting Convention on the Recognition

and Enforcement of Foreign Arbitral Awards art. II(3), June 10, 1958, 21 U.S.T. 2517, 330 U.N.T.S.

3); see also Lindo v. NCL (Bah.), Ltd., 652 F.3d 1257, 1276 (11th Cir. 2011) (“[A] court must order

arbitration unless (1) the . . . jurisdictional prerequisites are not met or (2) an affirmative defense under

the New York Convention applies.”). “The limited scope of the Convention’s null and void clause

must be interpreted to encompass only those situations—such as fraud, mistake, duress, and waiver—

that can be applied neutrally on an international scale.” Ibid. (cleaned up) (quoting Bautista v. Stat Cruises,

396 F.3d 1289, 1302 (11th Cir. 2005)).

In “deciding whether the parties agreed to arbitrate a certain matter, courts generally should

apply ordinary state-law principles that govern the formation of contracts.” First Options of Chi., Inc. v.

Kaplan, 514 U.S. 938, 944 (1995). In doing so, we apply “a summary judgment-like standard[.]”

Bazemore v. Jefferson Cap. Sys., LLC, 827 F.3d 1325, 1333 (11th Cir. 2016). As such, “a district court may

conclude as a matter of law that parties did or did not enter into an arbitration agreement only if ‘there

is no genuine dispute as to any material fact’ concerning the formation of such an agreement.” Ibid.

(quoting FED. R. CIV. P. 56(a)).

ANALYSIS

The parties disagree on the central question we face here—whether this case must be sent to

arbitration in London. CDM says that all three of the Complaint’s counts “arise from the Contract”

and thus belong in arbitration. Mot. at 9. We’ll address each count in turn. And, having determined

that the counts do, in fact, arise from the Contract, we’ll consider—and reject—the Plaintiffs’

affirmative defenses to arbitration.

I. The Plaintiffs’ Contract Claims

We’ll start with the Plaintiffs’ claims for breach of contract, see Compl. ¶¶ 38–45 (Count I),

and account stated, see id. ¶¶ 46–54 (Count II).3 In CDM’s view, those “claims . . . for reimbursement

3 We’ll consider these together because claims “for accounts stated” are “alleged in the alternative

to . . . breach of contract claims.” James Dar, LLC v. OJ Commerce.com, Inc., 2022 WL 18463415, at *1

(S.D. Fla. Dec. 22, 2022) (Smith, J.); see also RESTATEMENT (SECOND) OF CONTRACTS § 282 (Am. L.

Inst. 1981) (“If a debtor and a creditor make an agreement in the nature of a compromise or liquidation

of expenses incurred in the Cannes Boat Show . . . arise directly under § 20.1 of the Contract,” Mot.

at 3, and, therefore, must be sent to arbitration in London. We agree.

Where a contract includes a valid arbitration clause, we must order arbitration “unless (1) the

. . . jurisdictional prerequisites are not met . . . or (2) one of the Convention’s affirmative defenses

applies.” Bautista, 396 F.3d at 1295. The Plaintiffs don’t disagree that their claims involve at least one

foreign party and “arise out of a legal relationship, whether contractual or not, which is considered as

commercial[.]” Cosgun, 666 F. Supp. 3d at 1280 (quoting 9 U.S.C. § 202); see also Resp. at 4 (“Plaintiffs

do not dispute that the relationship between the Plaintiffs and CdM . . . is a commercial one that was

initially documented in a written agreement entered into in Miami, Florida, and later modified by a

written addendum.”). So, the only remaining jurisdictional question for us is whether the parties had

an agreement in writing “to arbitrate the subject of the dispute[.]” Resp. at 4.4 The Contract’s express

terms satisfy us that they did.5

of a disputed or unliquidated debt, the agreement may be either a substituted contract or an accord

resulting in discharge . . . . If, however, they make an agreement in the nature of a computation rather

than of compromise of the debt, the agreement is called an ‘account stated.’”). And it’s irrelevant (for

arbitration purposes) that “an account stated may be oral,” RESTATEMENT (SECOND) OF CONTRACTS

§ 282, since “it is well established that a party may not avoid broad language in an arbitration clause

by attempting to cast its complaint in tort rather than contract,” McBro Planning & Dev. Co. v. Triangle

Elec. Constr. Co., 741 F.2d 342, 344 (11th Cir. 1984) (citing Acevedo Maldonado v. PPG Indus., Inc., 514

F.2d 614 (1st Cir. 1975)); see also Northrop & Johnson, 855 F. App’x at 474 (“[A plaintiff] cannot avoid

the express terms of the agreement it signed by bringing equitable tort claims rather than breach of

contract claims.” (cleaned up)).

4 While “the Eleventh Circuit has been clear—and not just once—that Convention jurisdiction hinges

on four elements (not three),” we’ve elsewhere “traced the origin of this (supposed) fourth element,

through several published Eleventh Circuit decisions, back to a First Circuit case that, in our view,

misreads the Convention and its implementing statute.” Cosgun, 666 F. Supp. 3d at 1281. We therefore

consider three elements—not four. Still, even if we looked to the fourth jurisdictional element courts

sometimes cite—“whether one or more of the parties to the agreement is not an American citizen or

the commercial relationship has some reasonable relation with a foreign state,” United States v. Water

Quality Ins. Syndicate, 689 F. Supp. 3d 1171, 1178 (S.D. Fla. 2023) (Barber, J.) (cleaned up)—our

Defendant would easily satisfy that element because it “is a company incorporated in the Italian

Republic,” Compl. ¶ 1.

5 The Contract is governed by English law. See Contract § 17.4 (“The Contract and any non-contractual

obligations arising out of or in connection with this Contract will be governed by and construed in

In interpreting the parties’ Contract, see Telecom Italia, SpA v. Wholesale Telecom Corp., 248 F.3d

1109, 1114 (11th Cir. 2001) (“Whether a party has agreed to arbitrate an issue is a matter of contract

interpretation[.]”), we’ll start, as always, with the text, see In Re Managed Care Litig., 2010 WL 6532985,

at *3 (S.D. Fla. Aug. 15, 2010) (Torres, Mag. J.) (“When interpreting a contract under Florida law, the

Court is guided first by the language of the documents itself . . . . [W]hen the terms are unambiguous,

the language itself is the best evidence of the parties’ intent and its plain meaning controls.” (citing

Dows v. Nike, Inc., 846 So. 2d 595, 601 (Fla. 4th DCA 2003))), report and recommendation adopted, 2011 WL

1522560 (S.D. Fla. Mar. 8, 2011) (Moreno, C.J.). The Contract’s arbitration clause mandates that “all

disputes arising under this Contract . . . will be submitted to and settled by binding Arbitration in London

in accordance with the Arbitration Act 1996 . . . and the rules then in force of the London Maritime

Arbitrators’ Association[.]” Contract § 17.3 (emphasis added). In other words, the parties agreed to

arbitrate all disputes “relating to interpretation and performance of [the] agreement itself.” Cape Flattery Ltd.

v. Titan Mar., LLC, 647 F.3d 914, 924 (9th Cir. 2011) (emphasis added). Our concern, then, “is not

the breadth of the arbitration clause, but the breadth of the . . . Contract” itself—viz., whether the

Contract’s text “governs” the parties’ obligations that are at issue here. Seaboard Coast Line R. Co. v.

Trailer Train Co., 690 F.2d 1343, 1350 (11th Cir. 1982).

Section 20.1 of the Contract governs the “Publicity and Confidentiality” agreement between

the parties. See Contract § 20.1. Under that provision, the Plaintiffs agreed to “make the Yacht available

to the Builder for exhibition at the Fort Lauderdale International Boat Show [on] October 30, 2021,”

accordance with English law.”). The parties, however, have “waived their reliance on foreign law” and

agree that the Contract should be interpreted pursuant to “the law of the state of Florida, rather than

the law of England.” Mot. Hr’g Tr. [ECF No. 37] at 5:21–7:3; see also Chavarria v. Intergro, Inc., 2018 WL

3427848, at *1 (M.D. Fla. July 16, 2018) (Merryday, J.) (“By failing to timely assert the claim, a party

waives the application of foreign law.” (first citing Daewoo Motor Am., Inc. v. Gen. Motors Corp., 459 F.3d

1249, 1257 (11th Cir. 2006); then citing Lott v. Levitt, 556 F.3d 564, 568 (7th Cir. 2009); then citing

Vukadinovich v. McCarthy, 59 F.3d 58, 62 (7th Cir. 1995); and then citing Anderson v. McAllister Towing

& Transp. Co., 17 F. Supp. 2d 1280, 1286 n.6 (S.D. Ala. 1998))).

and CDM agreed to “bear all costs in relation to such exhibition[.]” Ibid. The Plaintiffs “also agree[d]”

to place “the Yacht at the Builder’s disposal for any further promotional initiative in Florida or

elsewhere, granting access to the Yacht with brokers, clients, prospect clients, allowing filming crew

onboard, etc. at times that are mutually convenient for both Buyer and Builder.” Id. § 20.1.1. And the

2022 Addendum, which “the Parties intend[ed] to supplement clause 20.1 of the Contract,”

Addendum § (C), further provided that, “[s]ave as provided by clause 20.1 of the Contract, the Buyer

will make the Yacht available to the Builder for exhibition at the Fort Lauderdale International Boat

Show [ ] 2022, and at any other following Boat Show reachable depending on where the Yacht will be

located and the Buyer not using the Yacht for his personal cruising.” Id. § 1.1. It also reiterated that

CDM may access the Yacht “for any further promotional initiative in Florida or elsewhere[.]” Ibid.

The October 2022 Cannes Boat Show—the exhibition at issue here—falls squarely within “the

scope [of § 20.1.1 as] originally intended by the parties,” Seaboard Coast Line, 690 F.2d at 1352, because

it’s a “further promotional initiative in Florida or elsewhere,” Contract § 20.1.1. As another boat show,

the Cannes Boat Show is precisely the kind of “further promotional event”—i.e., a promotional event

in addition to the 2021 (or 2022) Fort Lauderdale International Boat Show—for which the Contract

and Addendum allow CDM access to the Yacht. See Further, WEBSTER’S THIRD NEW INTERNATIONAL

DICTIONARY (1993) (“Going or extending beyond what exists; additional” (cleaned up)). And the

Cannes Boat Show, of course, took place in “Florida or elsewhere[.]” Contract § 20.1.1 (emphasis added);

see also Elsewhere, BLACK’S LAW DICTIONARY (11th ed. 2019) (“[I]n another place[.]”). By its plain

meaning, § 20.1 “governs” CDM’s use of the Yacht at the 2022 Cannes Boat Show. Seaboard Coast

Line, 690 F.2d at 1350. So, the Plaintiffs’ claim that CDM failed to “perform[ ]” the obligations it

incurred as a result of the Cannes Boat Show, Cape Flattery, 647 F.3d at 924; see also Compl. ¶ 44

(“Defendants have failed to reimburse Fiorentino for all costs associated with the Cannes Boat

Show.”), necessarily “aris[es] under th[e] Contract”—thus bringing it within the purview of the

arbitration clause, see Contract § 17.3.

Resisting this reading, the Plaintiffs offer three arguments for their view that their contract

claims fall outside of § 17.3’s arbitration provision. We reject them all.

First, the Plaintiffs claim that the parties’ duties arising from the 2022 Cannes Boat Show stem

not from the written Contract and Addendum, but from an “oral agreement reached between Jeffrey

Fiorentino and the Defendants.” Resp. at 9. According to the Complaint, “[s]ubsequent to the vessel’s

completion, . . . Fiorentino and Defendants entered into an oral agreement,” through which they

stipulated that CDM would display the Yacht at the 2022 Cannes Boat Show and “pay all expenses

associated with the exhibition[.]” Compl. ¶¶ 40–42. Although CDM disputes that this conversation

occurred, see Declaration of Carlo Aquilanti (“Aquilanti Decl.”) [ECF No. 26-1] ¶ 23 (“In short, there

was no oral agreement[.]”), we must assume that it did for the purpose of adjudicating CDM’s Motion,

see Valiente v. Nexgen Global, LLC, 2023 WL 6213583, at *4 (S.D. Fla. Sept. 25, 2023) (Altman, J.)

(“When evaluating a motion to compel arbitration, courts treat the facts as they would when ruling on

a motion for summary judgment, construing all facts and reasonable inferences that can be drawn

from those facts in a light most favorable to the non-moving party.” (quoting Totten v. Kellogg Brown &

Root, LLC, 152 F. Supp. 3d 1243, 1249 (C.D. Cal. 2016))). Even when we do that, though, the

Plaintiffs’ oral-agreement argument fails.

We may not consider parol evidence external to “the four corners” of the Contract “to

determine the intent of the parties” when “the terms of a contract are clear and unambiguous[.]” In

Re Managed Care Litig., 2010 WL 6532985, at *3 (citing Dows, 846 So. 2d at 601); see also Davis v. Miami-

Dade Cnty. Sch. Bd., 2008 WL 11411387, at *1–2 (S.D. Fla. Feb. 12, 2008) (Ungaro, J.) (“[If] the

[contract] is unambiguous[,] . . . parol evidence cannot be considered to ascertain the parties’ intent.”

(citing Fla. Moss Prods. Co. v. City of Leesburg, 112 So. 572, 573 (Fla. 1927))). The Plaintiffs acknowledge

as much. See Resp. at 10 n.2 (“[T]he parties’ respective rights and obligations pertaining to the Contract

and Addendum arise out of those documents, not collateral documents.” (citing Century Sur. Co. v.

Hallandale Beach Serv. Station, LLC, 490 F. App’x 237, 238 (11th Cir. 2012) (noting that, where a

contract’s terms are clear and unambiguous, the court will apply those terms))). Even so, the Plaintiffs

fail to appreciate that the 2022 Cannes Boat Show plainly falls within § 20.1’s scope as a “further

promotional event.” Contract § 20.1.1.6

Second, the Plaintiffs argue that nothing in the written Contract “precludes the parties from

entering into a later [oral] agreement[.]” Resp. at 9. Not so. The Contract’s merger and modification

clauses unambiguously state that the Contract “constitute[s] the whole of the agreement between the

Builder and the Buyer relating to the Yacht,” Contract § 20.7 (emphasis added), and can “only be varied

in writing signed by or on behalf of the parties,” id. § 20.8; see also Jenkins v. Eckerd Corp., 913 So. 2d

43, 53 (Fla. 1st DCA 2005) (“[A] merger clause is a highly persuasive statement that the parties

intended the agreement to be totally integrated and generally works to prevent a party from

introducing parol evidence to vary or contradict the written terms.” (citing RESTATEMENT (SECOND)

OF CONTRACTS § 216, cmt. e (Am. L. Inst. 1981))). And, “[w]hen contracting parties elect to adopt a

6 Even if the Contract were ambiguous—thus allowing the parties to offer parol evidence, see Duval

Motors Co. v. Rogers, 73 So. 3d 261, 265 (Fla. 1st DCA 2011) (“As a general rule, evidence outside the

contract language, which is known as parol evidence, may be considered only when the contract

language contains a latent ambiguity.” (cleaned up))—our Plaintiffs would still lose. CDM, after all,

has adduced undisputed evidence demonstrating that the Plaintiffs read the Contract as covering the

Cannes Boat Show. See Ex. D to Aquilanti Decl. (“Email Exhibit”) [ECF No. 26-1] at 79 (“From:

Gilbert Fiorentino . . . . [P]lease see attached invoice for costs relating to The Cannes Boat Show as

covered in paragraph 8.3.4 of the contract.”); id. at 76 (“From: Gilbert Fiorentino . . . . According to

paragraph 3.6 of the main contract, 1.5% has been added (AND WILL CONTINUE TO BE

ADDED), so the amount due is now . . . [€]22,213[.]”); see also Resp. at 10 n.2 (acknowledging that

“the Fiorentinos may have mistakenly believed the Contract/Addendum applied” to the Cannes Boat

Show); Biggin v. RLI Ins. Co., 2006 WL 1232620, at *5 (M.D. Fla. May 5, 2006) (“A court may not . . .

reform a contract if there was only a unilateral mistake by one of the parties.” (citing Ghahramani v.

Guzman, 768 So. 2d 535, 538 (Fla. 4th DCA 2000))). So, “the true intent of the parties” appears to be

exactly what was “expressed in the written instrument.” Providence Square Ass’n v. Biancardi, 507 So. 2d

1366, 1371 (Fla. 1987) (cleaned up).

term or condition, including one addressing the question of modification, it is not the province of a

court to second guess the wisdom of their bargain, or to relieve either party from the burden of that

bargain by rewriting the document.” Okeechobee Resorts, L.L.C. v. E Z Cash Pawn, Inc., 145 So. 3d 989,

993 (Fla. 4th DCA 2014) (first citing Pol v. Pol, 705 So. 2d 51, 53 (Fla. 3d DCA 1997); then citing Int’l

Expositions, Inc. v. City of Miami Beach, 274 So. 2d 29, 30–31 (Fla. 3d DCA 1973); and then citing Rybovich

Boat Works, Inc. v. Atkins, 587 So. 2d 519, 521–22 (Fla. 4th DCA 1991)).

The parties’ obligations with respect to CDM’s use of the Yacht at the Cannes Boat Show

obviously relate to the Yacht—thus bringing them within the purview of the “whole agreement”

memorialized in the Contract. See Contract § 20.7; see also Gauthier v. Hard to Stop LLC, 2022 WL

344557, at *6 (S.D. Ga. Feb. 4, 2022) (“The ordinary meaning of the words ‘relating to’ is a broad

one—‘to stand in some relation; to have bearing or concern; to pertain; refer; to bring into association

with or connection with[.]’” (cleaned up) (quoting Morales v. Trans World Airlines, Inc., 504 U.S. 374,

383 (1992))). So, any conditions for that exhibition beyond what’s already covered by the Contract, see

Contract § 20.1.1 (agreeing to place “the Yacht at the Builder’s disposal for any further promotional

initiative in Florida or elsewhere”); see also ANTONIN SCALIA & BRYAN A. GARNER, READING LAW:

THE INTERPRETATION OF LEGAL TEXTS 93 (2012) (“[A] matter not covered is to be treated as not

covered.”), would need to be in writing to alter the complete agreement as enshrined in the text, see

Duval, 73 So. 3d at 266 (“[If a contract] explicitly provides that ‘this contract’ is the entire agreement’

between the parties[,] . . . anything that does not constitute part of ‘this contract’ is not part of the

parties’ agreement related to the contract.”). And that’s precisely what the parties did when they

executed the written Addendum. See Addendum § (C) (“[T]he Parties intend to supplement clause 20.1

of the Contract.”). But, because the oral agreement (by definition) isn’t in writing, it has no operative

effect on “the [written] agreement between the Builder and the Buyer relating to the Yacht.” Contract

§ 20.7.

In the Plaintiffs’ view, “[i]t would be error to require the parties to arbitrate a dispute . . .

merely because a prior agreement between the same parties contained an arbitration provision.” Resp.

at 9 (citing Int’l Underwriters AG v. Triple I: Int’l Invs., Inc., 533 F.3d 1342, 1346 (11th Cir. 2008)). That’s

true, but it’s irrelevant in the circumstances of our case because the parties’ written Contract (and,

therefore, its arbitration provision) expressly contemplates (and governs) the obligations at issue

here—obligations that can “only be varied in writing[.]” Contract § 20.8. Since the oral agreement

didn’t (validly) modify those obligations in writing, our dispute can only “aris[e] under th[e] [written]

Contract,” id. § 17.3, and be settled at arbitration.

Third, the Plaintiffs contend that “the Contract and the Addendum are silent as to [CDM’s]

use of the vessel during the Cannes Yachting Festival, which occurred in September 2022,” because

“the Addendum expressly applied to the [2022] Fort Lauderdale Boat Show, which occurred in

October 2022, ‘and at any [other] following Boat Show.’” Resp. at 7 (quoting Addendum § 1.1). By the

Plaintiffs’ reading, the “written Contract and Addendum did not by their plain terms apply to any Boat

Shows scheduled prior to October 2022, such as Cannes.” Id. at 8–9 (first emphasis omitted); see also

Deposition of Vasco Buonpensiere [ECF No. 27-1] at 25:9–11 (“Q. So the Cannes Boat Show was

prior to the Ft. Lauderdale show. Correct? A. Yes.”). But that’s just wrong.

The Addendum, which the parties executed “to supplement clause 20.1 of the Contract,”

Addendum § (C); see also Supplemental, BLACK’S LAW DICTIONARY (“supplying something additional”),

doesn’t displace the original Contract’s broad language allowing CDM access to the Yacht at “any

further promotional initiative in Florida or elsewhere,” Contract § 20.1.1. Granted, the Addendum

says that, “[i]n the event of any discrepancy between any of the provisions of the Addendum and

those of the Contract, the provisions of this Addendum shall prevail.” Addendum § 3.1. But we have

no such discrepancy here.

Section 1.1 of the Addendum—the Section that requires the Plaintiffs to “make the Yacht

available . . . for exhibition at the [2022 FLIBS] . . . and at any other following Boat Show”—expressly

applies “[s]ave as provided by clauses 20.1 of the Contract[.]” Id. § 1.1. By its own terms, then, § 1.1

of the Addendum is subordinate to § 20.1 of the Contract, see Savings Clause, BLACK’S LAW

DICTIONARY (“[A textual] provision exempting from coverage something that would otherwise be

included.”); SCALIA & GARNER at 183 (“[T]he specific provision is treated as an exception to the

general rule.”), and to the latter’s coverage of “any further promotional initiative in Florida or

elsewhere,” Contract § 20.1.1; see also SCALIA & GARNER at 156 (“Material within a[ ] . . . subpart

relates . . . to that subpart. . . . In a paper contract, the formatting has credence: the parties, after all,

saw and signed the document as prepared.”). So, while the Addendum “expressly applied to the [2022]

Fort Lauderdale Boat Show . . . [and] any [other] following Boat Show,” Addendum § 1.1, nothing in

that Section altered the parties’ existing obligations under § 20.1 of the original Contract.

Through the Contract and its Addendum, the parties have entered into an agreement

governing CDM’s use of the Yacht at “promotional events” beyond the 2021 FILBS, see Contract §

20.1.1, including the 2022 Cannes Boat Show. Because the Plaintiffs’ breach-of-contract and account-

stated claims are “related—with at least some directness—to performance of” § 20.1.1 of the Contract,

they are “disputes ‘arising out of’ the [C]ontract.” Hemispherx Biopharma, Inc. v. Johannesburg Consol. Invs.,

553 F.3d 1351, 1367 (11th Cir. 2008) (quoting Telecom Italia, 248 F.3d at 1114). In accordance with the

plain terms of the arbitration clause, then, these claims must be resolved at arbitration. See Contract §

17.3 (“[A]ll disputes arising under this Contract . . . will be submitted to and settled by binding

Arbitration in London in accordance with the Arbitration Act 1996[.]”)

II. The Plaintiffs’ Copyright Claim

CDM also seeks to submit the Plaintiffs’ copyright-infringement claim to arbitration, arguing

that this claim likewise “arise[s] under th[e] Contract[.]” Ibid.; see also Mot. at 9 (“All three counts of

the Plaintiffs’ Complaint arise from the Contract.”). Count III alleges that CDM has “continued to

use, without authorization, copyrighted photographs of the vessel in violation of Fishsplorer’s

registered copyright.” Compl. ¶ 57. For that allegedly unauthorized use, the Plaintiffs seek damages

under the Copyright Act of 1976, see Compl. at 10 (demanding “actual damages suffered by Plaintiff

as a result of the infringement . . . or, in the alternative, at Plaintiff’s election, statutory damages for

infringement of each separate copyright as set forth in 17 U.S.C. § 504”). But, while the Copyright Act

(obviously) provides a cause of action for copyright infringement, see 17 U.S.C. § 504 (“[A]n infringer

of copyright is liable for either . . . the copyright owner’s actual damages and any additional profits of

the infringer . . . or statutory damages[.]” (cleaned up)), a plaintiff’s ability to assert that claim in federal

court is subject to any applicable arbitration agreement, see 21 SAMUEL WILLISTON, WILLISTON ON

CONTRACTS § 57:182 (4th ed. 2024) (“A broad arbitration clause in a publishing or licensing agreement

encompasses Copyright Act claims, and an arbitrator has jurisdiction to base an award on the

Copyright Act where ‘the arbitration clause was broad enough to encompass Copyright Act claims

which required interpretation of the contract.’” (quoting Kamakazi Music Corp. v. Robbins Music Corp.,

684 F.2d 228 (2d Cir. 1982))); see also NCR Corp. v. Korala Assocs., Ltd., 512 F.3d 807, 815 (6th Cir.

2008) (“It is sufficient that a court would have to reference the 1998 Agreement [containing the

arbitration provision] for part of [the plaintiff’s] direct infringement claim. Under these circumstances,

we find that the copyright infringement claim . . . falls within the scope of the arbitration agreement.”).

Here, the arbitration provision covers the Plaintiffs’ copyright claim because that claim

“relate[s] to [the] interpretation and performance” of the Contract, Cape Flattery, 647 F.3d at 924, and

thus “aris[es]” from it, Contract § 17.3. The Contract specifically contemplates CDM’s use of images

of the Yacht in its marketing and promotional materials, stating that:

[t]he Builder may take photographs and video footage of the Yacht during

construction and sea trials and at the time of delivery. The Buyer . . . will allow the

publication of images and brochure of the Yacht for advertising purposes[.]

Id. § 20.1.

The Plaintiffs’ copyright claim alleges that CDM “use[d] . . . [the] copyrighted photographs of

the vessel in . . . promotional material,” Compl. ¶¶ 57–58—i.e., “the very same acts that [CDM] was

authorized to do under the licensing agreement” that’s included in § 20.1, Polvent v. Global Fine Arts,

Inc., 2014 WL 4672442, at *3 (S.D. Fla. Sept. 18, 2014) (Moreno, J.). As such, “these acts were a

‘foreseeable result’ of the performance of the underlying agreement,” ibid., placing them squarely

within the scope of the arbitration provision, see Hemispherx Biopharma, 553 F.3d at 1366 n.16 (claims

“arise under” an arbitration agreement when the claims were a “foreseeable result” of the performance

of the underlying agreement).

The Plaintiffs try to parry this conclusion in two ways—both unpersuasive. First, they fixate

on the first sentence of the Publicity and Confidentiality provision, reading it to mean that “the

Contract only permitted CdM to take photographs prior to delivery.” Resp. at 11. But, while the Contract

may limit when CDM can take photographs and video footage, see Contract § 20.1 (“The Builder may

take photographs and video footage of the Yacht during construction and sea trials and at the time of

delivery.”), it includes no such limitation on when CDM may publish images of the Yacht (just as it

doesn’t circumscribe which images CDM may use), ibid.; see also SCALIA & GARNER at 101 (“General

terms are to be given their general meaning.”). And we won’t be rewriting § 20.1 to include those

omitted conditions. See SCALIA & GARNER at 94 (“The absent provision cannot be supplied by the

courts.” (cleaned up)). It’s thus irrelevant that the images CDM published were “taken after delivery

by Fiorentino[.]” Resp. at 11 (emphasis omitted). Because the Plaintiffs’ copyright claim is predicated

on CDM’s “publication of images . . . of the Yacht,” Contract § 20.1, it falls neatly within the scope

of the Contract and its arbitration provision.

Second, the Plaintiffs offer two arguments for their position that “Polvent is easily

distinguish[able]” from our case. Resp. at 14. But we don’t think it is.

One, they tell us that the Polvent Court “compelled arbitration on grounds not related to the

copyright claim[.]” Ibid. (citing Polvent, 2014 WL 4672442, at *3). Polvent (it’s true) recognized that

arbitration was separately required because the “Plaintiff’s challenge [was] . . . directed to the validity of

the contract as a whole, i.e. whether it had expired[,] [and] [a]ny ‘challenge to the validity of a contract

as whole . . . must go to the arbitrator.’” Polvent, 2014 WL 4672442, at *3 (quoting Shea v. BBVA

Compass Bancshares, Inc., 2013 WL 869526, at *4 (S.D. Fla. Mar. 7, 2013) (Moore, J.)). It’s equally true,

though, that the court’s foreseeable-result analysis provided an independent and sufficient basis to send

the copyright claim to arbitration. See ibid. (“Moreover, Plaintiff’s copyright claim alleges . . . the very

same acts that Global Fine Arts was authorized to do under the licensing agreement. Given the broad

language of this arbitration clause, the Court finds these acts were a ‘foreseeable result’ of the

performance of the underlying agreement.” (emphasis added) (quoting Hemispherx Biopharma, 553 F.3d

at 1366 n.16)); see also Hemispherx Biopharma, 553 F.3d at 1368 (“[T]he question [is] whether the present

dispute was a foreseeable result of the performance of the licensing agreement.”). And that’s the same

conclusion we’ve come to here.7

Two, the Plaintiffs claim that “the purpose of the Contract was for the construction of a yacht,

not the licensing and distribution of photographs of the yacht.” Resp. at 14. The Plaintiffs never really

explain why that’s relevant. We assume that they’re trying to craft some distinction between the

underlying contract in Polvent, which was only a “licensing agreement,” Polvent, 2014 WL 4672442, at

7 For what it’s worth, our Plaintiffs, like Ms. Polvent, are also challenging the “validity” of the licensing

provision in § 20.1—“i.e. whether it had expired.” Polvent, 2014 WL 4672442, at *3; cf. Resp. at 11

(“Defendants’ unauthorized use of copyrighted photographs taken after delivery to Plaintiffs goes well

beyond the rights afforded them under the Contract. The above language does not permit CdM to

take photographs (or use others’ photographs) at its whim, in perpetuity, nor does it give CDM the

right to use Copyrighted Images that they did not take or commission.”); Compl. ¶ 36

(“Fiorentino . . . specifically revoked any prior permissions he had granted for Defendants to use

Fiorentino’s copyrighted images[.]”). So, the Plaintiffs’ purported distinction between our case and

Polvent is both irrelevant as a matter of law and incorrect as a matter of fact.

*3, and our Contract’s “Publicity and Confidentiality” provision, which the Plaintiffs view as merely

“incidental” to the overall Contract, Resp. at 14. But that’s a distinction without a difference.

Whatever the Contract’s purpose is (or purposes are),8 the arbitration clause isn’t limited to

disputes arising from “the construction of a yacht,” Resp. at 14—it covers “all disputes arising under

[the] Contract,” Contract § 17.1 (emphasis added). And, as in Polvent, the Plaintiffs’ copyright claim is

based on (at least some of) the “the very same acts that [CDM] was authorized to do” under the

Contract, bringing it “within the ambit of the arbitration clause.” Polvent, 2014 WL 4672442, at *3.

III. The Plaintiffs’ Affirmative Defenses

Having established that each of the Plaintiffs’ claims meets the jurisdictional prerequisites for

arbitration, we’ll now consider whether “one of the Convention’s affirmative defenses applies.”

Bautista, 396 F.3d at 1294; see also 9 U.S.C. § 2 (“[A]n agreement in writing to submit to

arbitration . . . shall be valid, irrevocable, and enforceable, save upon such grounds as exist at law or

in equity for the revocation of any contract[.]”). At this stage of the case, the affirmative defenses

available to the Plaintiffs “encompass only those situations—such as fraud, mistake, duress, and

waiver—that can be applied neutrally on an international scale.” Bautista, 396 F.3d at 1302 (cleaned

up).

The Plaintiffs first maintain that the fraud defense applies here because “Buonpensiere, as an

inducement to contract, fraudulently stated that CdM would not enforce the arbitration provision.”

Resp. at 16 (first citing Declaration of Jeffrey Fiorentino (“J. Fiorentino Decl.”) [ECF No. 29-1] ¶¶ 4–

8; and then citing Declaration of Gilbert Fiorentino (“G. Fiorentino Decl.”) [ECF No. 28] ¶¶ 4–8).

According to the Plaintiffs, Buonpensiere did so “on three separate occasions,” J. Fiorentino Decl. ¶

8 Cf. ARISTOTLE, NICOMACHEAN ETHICS 9 (W.D. Ross trans., Batoche Books 1999) (c. 350 B.C.)

(“[C]learly not all ends are final ends[.]”).

4, with one of those assurances taking place before the Contract was signed.9 But, even if

Buonpensiere told the Plaintiffs, before the Contract’s execution, that CDM wouldn’t enforce the

arbitration provision, but see Reply Declaration of Vasco Buonpensiere [ECF No. 31-1] (“That is

untrue[.]”), Florida law prevents us from using the Plaintiffs’ parol evidence to nullify the effects of

the written arbitration clause.

To be sure, Florida law recognizes a fraudulent-inducement exception to the general rule

against parol evidence, allowing “parol evidence [to be] admissible to establish a contemporaneous

oral agreement which induced the execution of a written contract, [even] though it may vary, change,

or reform the instrument.” Mallard v. Ewing, 164 So. 674, 678 (Fla. 1935); see also Ben-Yishay v. Mastercraft

Dev., LLC, 553 F. Supp. 2d 1360, 1367 (S.D. Fla. 2008) (Moore, J.) (“[D]efenses such as fraud,

unconscionability and duress are governed by state law.”). But that exception “does not apply where

‘the alleged oral agreement relate[s] to the identical subject matter embodied in the written agreement

and . . . directly contradict[s] an express provision of the written agreement.” Ungerleider v. Gordon, 214

F.3d 1279, 1282 (11th Cir. 2000) (first quoting Linear Corp. v. Standard Hardware Co., 423 So. 2d 966,

968 (Fla. 1st DCA 1982); and then citing Bond v. Hewitt, 149 So. 606, 608 (Fla. 1933)).

Here, Buonpensiere’s statement—“Look, my attorneys make me put in the arbitration in

London clause but I assure you that we will never enforce that provision . . . [and] will agree to court

9 In his Declaration, Gilbert Fiorentino first alleges that, “[o]n Wednesday, January 23, 2019[,] . . .

Buonpensiere had a separate conversation with Jeffrey and [Gilbert Fiorentino] in which he stated

words to the effect of, ‘Look, my attorneys make me put in the arbitration in London clause but I

assure you that we will never enforce that provision. We will agree to court in Florida if that’s what

you want.’” G. Fiorentino Decl. ¶ 5. Second, Fiorentino says that, “on December 8, 2021 . . .

Buonpensiere stated again that he/CDM would not enforce the arbitration provision and he agreed

to include that in a written addendum to the Contract.” Id. ¶ 7. Third, he claims that, “on January 8,

2022 . . . Buonpensiere stated that his lawyers would not allow him to remove the arbitration provision

but he had already agreed twice not to enforce the provision and that should be enough[.]” Id. ¶ 8.

Jeffrey Fiorentino offers near-identical allegations in his Declaration. See J. Fiorentino Decl. ¶¶ 5, 7–

8; see also id. ¶ 9 (“On each of these three occasions I took Mr. Buonpensiere at his word that CDM

would not enforce the arbitration provision.”).

in Florida,” G. Fiorentino Decl. ¶ 6—plainly “relate[s]” to the arbitrability of disputes, i.e., “the

identical subject matter embodied in the written agreement” in the arbitration clause, Linear Corp.,

423 So. 2d at 968. And it “directly contradict[s],” ibid. (emphasis added), that clause’s unambiguous

requirement that “all disputes arising under this Contract . . . will be submitted to and settled by

binding Arbitration in London,” Contract § 17.3. Buonpensiere’s pre-execution statement is,

therefore, “not admissible under the inducement exception to the parol evidence rule.” Ungerleider, 214

F.3d at 1284.

We also reject the Plaintiffs’ contention that CDM “waived” the right to enforce the arbitration

provision when “Buonpensiere affirmatively disclaimed any intention to enforce [it].” Resp. at 16–17.

As to any pre-execution statements, the Plaintiffs’ waiver argument is vitiated by the Contract’s merger

clause, which explicitly disclaimed “all prior . . . representations (whether written or oral) concerning

[the Contract’s] subject matter which may have been made by or on behalf of the Builder.” Contract

§ 20.7; see also Sas v. Serden Tech., Inc., 2013 WL 12086638, at *7 (S.D. Fla. Dec. 3, 2013) (Williams, J.)

(“Where the written contract contains a merger clause and both parties had an opportunity to

participate in drafting the contract, a plaintiff’s reliance on a separate oral promise is not justifiable[.]”

(first citing SEB S.A. v. Sunbeam Corp., 148 F. App’x 774, 798 (11th Cir. 2005); then citing Johnson

Enters. of Jacksonville, Inc. v. FPL Grp., Inc., 162 F.3d 1290, 1315 (11th Cir. 1998); and then citing Pettinelli

v. Danzig, 722 F.2d 706, 710 (11th Cir. 1984))).

Nor do Buonpensiere’s post-execution oral assurances constitute a valid waiver of any

contractual terms. The Contract clearly states that “[n]o claim or right arising out of this Agreement

can be waived or discharged by one Party, in whole or in part unless in writing,” Contract § 20.9, so

“the ‘defenses of waiver and estoppel [are] defeated as a matter of law by the [anti-waiver] provisions

of the contract itself,’” Dioguardi v. Giroski, LLC, 2013 WL 12092475, at *2 (S.D. Fla. Mar. 20, 2013)

(Martinez, J.) (quoting Nat’l Home Cmty., LLC v. Friends of Sunshine Key, Inc., 874 So. 2d 631, 634 (Fla.

3d DCA 2004)); see also Nat’l Home Cmty., 874 So. 2d at 634 (“Florida courts have consistently enforced

these types of clauses.” (first citing Rybovich Boat Works, 587 So. 2d at 519; then citing Gergora v. Flynn,

486 So. 2d 5 (Fla. 3d DCA 1986), rev. denied, 500 So. 2d 544 (Fla. 1986); then citing Raimondi v. I.T.

Chips, Inc., 480 So. 2d 240 (Fla. 4th DCA 1985); then citing Eskridge v. Macklevy, Inc., 468 So. 2d 337

(Fla. 1st DCA 1985), rev. denied, 478 So. 2d 54 (Fla. 1985); and then citing Philpot v. Bouchelle, 411 So.

2d 1341 (Fla. 1st DCA 1982))).10 So, that defense likewise fails.

* * *

Since each of the Plaintiffs’ claims meets the jurisdictional prerequisites for arbitration—and

because the Plaintiffs have failed to show that any affirmative defenses preclude arbitration—we must

compel the parties to arbitrate this dispute in accordance with § 17.3 of the Contract. See Bautista, 396

F.3d at 1294–95 (“A district court must order arbitration unless (1) the four jurisdictional prerequisites

are not met or (2) one of the Convention’s affirmative defenses applies.” (cleaned up)). Where, as

here, “the issue involved . . . is referable to arbitration,” a district court “shall on application of one of

the parties stay the trial of the action until such arbitration has been had in accordance with the terms

of the agreement[.]” 9 U.S.C. § 3. And the parties agree that a stay is warranted. See Mot. at 1

(requesting that we “stay[ ] this action pending the outcome of the arbitration”); Resp. at 18 (“Plaintiffs

respectfully submit that dismissal would not be appropriate, and that the Court should stay the action

pending arbitration.”). We’ll therefore STAY this case while the parties arbitrate their dispute in

London.

10 For these same reasons, we can also reject the Plaintiffs’ conclusory statement that “CdM should be

equitably estopped from seeking to compel arbitration.” Resp. at 17 (citing Major League Baseball v.

Morsani, 790 So. 2d 1071, 1077 n.12 (Fla. 2001)). We’d probably have done that regardless, since the

Plaintiffs made “nothing more than a passing reference” to that defense. Walter Int’l Prods. Inc. v. Salinas,

650 F.3d 1402, 1413 n.7 (11th Cir. 2011); see also In re Egidi, 571 F.3d 1156, 1163 (11th Cir. 2009)

(“Arguments not properly presented . . . are deemed [forfeited].”).

CONCLUSION

After careful review, we hereby ORDER and ADJUDGE as follows:

1. The Defendants’ Renewed Motion to Stay Action and Compel Arbitration [ECF No. 24]

is GRANTED.

2. ‘The parties ace COMPELLED to submit this dispute to “binding Arbitration in London

in accordance with the Arbitration Act [of] 1996 (or any re-enactment or modification for

the time being in force) and the rules then in force of the London Maritime Arbitrators’

Association[.]” Contract § 17.3.

3. Every ninety days from the date of this Order, the parties shall file a joint status report

on the progress of their arbitration proceedings.

4. Within fifteen days of the arbitration’s conclusion, the parties shall file a joint notice

describing the outcome of arbitration.

5. ‘This case shall remain STAYED and CLOSED pending the completion of arbitration.

All other deadlines are TERMINATED, and any pending motions ace DENIED as

moot.

DONE AND ORDERED in the Southern District of Florida on August 8, 2024.

“he

UNITE STRICT JUDGE

cc: counsel of record

21