“[S]o long as [an] expert is at least minimally qualified, gaps in his qualifications generally will not preclude admission of his testimony, as [they] relate[] more to witness credibility and thus the weight of the expert’s testimony[] than to its admissibility.”
How later courts described this case
- “[S]o long as [an] expert is at least minimally qualified, gaps in his qualifications generally will not preclude admission of his testimony, as [they] relate[] more to witness credibility and thus the weight of the expert’s testimony[] than to its admissibility.”
- “A claim for indemnity arises only when a party pays damages on behalf of another.” (emphasis added)
Written by the judges who cited it.
The opinion
UNITED STATES DISTRICT COURT
MIDDLE DISTRICT OF FLORIDA
ORLANDO DIVISION
JOHNSON BROS. CORP.,
Plaintiff,
Vv. Case No. 6:21-cv-200-JA-EJK
WSP USA, INC. and CDM
SMITH, INC.,
Defendants.
ORDER
This case is before the Court on Defendants’ Daubert! motions (Docs. 137
& 138), Plaintiffs responses (Docs. 150 & 151), and Defendants’ replies (Docs.
166 & 168). Having reviewed the parties’ submissions, the Court will grant the
motions in part and deny them in part.
I. BACKGROUND
This dispute stems from problems encountered during the design and
construction of the Veterans Memorial Bridge in Volusia County, Florida. (Doc.
140 { 1; Doc. 143 § 1; Doc. 153 at 2). In February 2013, the County contracted
with Defendant WSP USA, Inc. for design and engineering services on the
bridge project. (Doc. 76-1 at 39; Doc. 140 § 3; Doc. 143 J 3; Doc. 153 at 2). Three
1 Daubert v. Merrell Dow Pharms., Inc., 509 U.S. 579 (1998).
years later, in February 2016, the County entered into a contract with Plaintiff
whereby Plaintiff became the general contractor for construction of the bridge.
(Doc. 76-3 at 64; Doc. 140 § 4; Doc. 143 § 2; Doc. 153 at 5). Shortly thereafter,
in March 2016, the County contracted with Defendant CDM Smith, Inc. for
Construction, Engineering, and Inspection (CEI) services on the project. (Doc.
76-2 at 34; Doc. 140 { 5; Doc. 143 J 7; Doc. 153 at 3).
Whenever Plaintiff encountered a problem during the project that affected
Plaintiffs work to the point that Plaintiff wanted reimbursement from the
County, Plaintiff submitted an official Notice of Intent to File Claim (NOI) to
the County regarding the problem. (See, e.g., Doc. 76-4 at 2). Over the course of
the project, Plaintiff submitted multiple NOIs. (Doc. 76 § 23; Doc. 140 § 7; Doc.
143 9 18-15; see Doc. 153 at 9).
Initially in this lawsuit, Plaintiff sued only the County, (see Docs. 1, 9, 13,
36, & 70), alleging that the County “rejected or failed to respond to” claims
raised in various NOIs, (Doc. 13 { 10—11; Doc. 36 4 10-11; Doc. 70 Ff □□□□□□□
The County filed a third-party complaint against WSP for indemnification,
breach of contract, and negligence. (See Doc. 45). Eventually, Plaintiff settled
with the County, and under the settlement agreement, the County assigned to
Plaintiff rights to sue WSP and CDM for damages related to the project. (Doc.
76-49 §§ 2.1, 8.1). Accordingly, Plaintiff now sues Defendants both in its own
right and as the County’s assignee. (See, e.g., Doc. 76 FJ 32, 36, 45).
Plaintiff asserts claims in connection with sixteen NOIs: twelve against
both Defendants (NOIs 3, 13, 18, 20, 21, 26, 35, 38, 41, 44, 45, and 46), two
against WSP only (NOIs 28 and 33), and two against CDM only (NOIs 8 and
47). (See id. | 28, 32-680). For each NOI, Plaintiff brings breach-of-contract
and contractual-indemnification claims as the County’s assignee and a
negligence claim in its own right under Florida common law. (See id. { 26; see,
e.g., id. [§ 32-55 (the three counts against WSP related to NOI 3)). As the
County’s assignee, Plaintiff also asserts general-indemnification claims against
both Defendants. Ud. 681—706).
Of the sixteen NOIs, eleven are potentially relevant in resolving the
Daubert motions. (See Doc. 138 at 20-21). NOI 3 involves jetting, (Doc. 76
{| 23a)—a method of installing piles (support structures for bridges) that uses
pressurized jets of water to loosen soil, (Doc. 137-4 at 4-5). NOI 8 involves
broken piling. (Doc. 76 { 23b). NOIs 13 and 18 involve repair of the cracking in
Piers 7 and 8, respectively. Ud. {| 23c—d). NOI 20 involves delays related to the
erection plan. (Id. 4 23e). NOI 26 involves pier-cap constructability. (Id. 23g).
NOI 28 involves Hanger-Rod constructability. dd. 4 23h). NOI 33 involves the
design of the Span 5 Bar Splice. Ud. { 231). NOI 35 involves the design of the
fishing piers. (Ud. {| 23j). NOI 38 involves cracking in the latex-modified overlay.
(Ud. {| 23k). And NOI 44 involves extra work and delay due to cracking in Piers
11 and 4. Ud. § 23m).
To support its. claims, Plaintiff retained five experts: Mr. Edwin
Mackiewicz, Mr. William Nickas, Mr. John Miseroy, Dr. Randall Poston, and
Mr. Peter Wade. (See Doc. 150 at 2-3, 12—13). Defendants now move to exclude
some of the opinions of these five experts. (See Docs. 137 & 138).
II. LEGAL STANDARD
Federal Rule of Evidence 702 governs the admissibility of expert opinions
and “compels” the Court “to perform [a] critical ‘gatekeeping’ function.” United
States v. Frazier, 387 F.3d 1244, 1260 (11th Cir. 2004) (en banc) (quoting
Daubert v. Merrell Dow Pharms., Inc., 509 U.S. 579, 589 n.7, 597 (1993)); see
Fed. R. Evid. 702 (“A witness who is qualified as an expert by knowledge, skill,
experience, training, or education may testify in the form of an opinion or
otherwise if: (a) the expert’s scientific, technical, or other specialized knowledge
will help the trier of fact to understand the evidence or to determine a fact in
issue; (b) the testimony is based on sufficient facts or data; (c) the testimony is
the product of reliable principles and methods; and (d) the expert has reliably
applied the principles and methods to the facts of the case.”). To decide the
admissibility of an expert’s opinions, the Court “engage[s] in a rigorous three-
part inquiry” and considers (1) whether the expert is qualified to provide the
opinions, (2) whether “the methodology by which the expert reache[d the
opinions] is sufficiently reliable,” and (3) whether in providing the opinions, the
expert will help the factfinder “understand the evidence or... determine a fact
in issue.” Frazier, 387 F.3d at 1260 (quoting City of Tuscaloosa v. Harcros
Chems., Inc., 158 F.3d 548, 562 (11th Cir. 1998)). “The party offering the expert
has the burden of’ establishing the expert’s qualifications, the methodology’s
reliability, and the opinions’ helpfulness to the factfinder “by a preponderance
of the evidence.” Rink v. Cheminova, Inc., 400 F.3d 1286, 1292 (11th Cir. 2005).
Ill. DISCUSSION
The Court discusses Mr. Mackiewicz, Mr. Nickas, Mr. Miseroy, Dr.
Poston, and Mr. Wade in turn.
A. Mr. Mackiewicz
Plaintiff retained Mr. Mackiewicz to opine on whether CDM breached the
standard of care for CEI services. (Doc. 137 at 3; Doc. 150 at 5). Mr. Mackiewicz
wrote in his expert report, (Doc. 137-2 at 8-9), and testified in his deposition,
(Doc. 137-1 at 12), that CDM not only failed to meet the standard of care but
also acted in bad faith. When asked during his deposition whether he had any
“special training or knowledge” on which to base his bad-faith determination,
Mr. Mackiewicz stated that he did not know if he did but that “through [his]
experience,” CDM’s conduct did not constitute “good[-]faith dealing.” (/d.). Mr.
Mackiewicz was also asked about the basis for his opinions on CDM’s
responsibilities regarding the project, and he responded that CDM’s
responsibilities went beyond the express obligations in its contract with the
County because the responsibilities were owed to the project and were for the
benefit of stakeholders besides the County. (/d. at 6—8). He explained that his
statements about CDM’s responsibilities were “not a legal opinion” but were
“based on [his] experience . . . in the CEI world.” (Ud. at 7).
CDM argues that Mr. Mackiewicz’s opinions on its subjective bad faith
should be excluded because he is not qualified to offer psychological opinions, he
does not have special training in bad faith, and anyway, “the subject of a
person’s state of mind is off-limits to expert testimony.” (Doc. 137 at 4-5). CDM
further maintains that his statements on the scope of its responsibilities should
be excluded because he is not qualified to opine on legal issues and because the
Court is better suited than he is to interpret CDM’s contract with the County
and to instruct the factfinder on CDM’s legal duties. Ud. at 5—7; Doc. 166 at 8-
9). As to bad faith, Plaintiff responds: “Mr. Mackiewicz is not offering any
opinions on CDM’s state of mind[,] its corporate ethics[,] and whether CDM met
certain legal thresholds” but is instead “opining on the customs and practices in
the CEI industry and how CDM failed to comply with those customs and
practices giving rise to bad faith.” (Doc. 150 at 6). As to the scope of CDM’s
responsibilities, Plaintiff contends that Mr. Mackiewicz will refer to CDM’s
contract and scope of work “for contextual purposes only” and will testify that
“in furnishing [CEI] services, CDM should have acted in a way to benefit the
[p]roject as a whole—as is the custom and practice—and not solely and
exclusively for the benefit” of the County. (/d. at 7-8).
State-of-mind and legal opinions are generally improper. See Romano v.
John Hancock Life Ins. Co. (USA), No. 19-21147-CIV, 2022 U.S. Dist. LEXIS
83703, at *13-14 (S.D. Fla. May 9, 2022). Accordingly, although Mr. Mackiewicz
will be permitted to opine on CEI customs and practices, he will not be permitted
to opine on CDM’s bad faith or legal duties. See id.
B. Mr. Nickas
Plaintiff retained Mr. Nickas primarily to opine on pile-installation
methods, particularly the jetting method. (See Doc. 137-3 at 3, 7; Doc. 137-4 at
1, 4-5). Mr. Nickas testified in his deposition that he considers himself an expert □
in bridge engineering and construction, not the day-to-day work of construction
inspection. (Doc. 137-3 at 31-82). In his report, Mr. Nickas concluded that WSP
deviated from the standard of care for bridge engineering because WSP created
confusion about whether jetting would be allowed during the project, (Doc. 137-
4 at 27), and he faulted CDM for failing to suggest that WSP revise the project
plans for clarity on this issue, (id. at 28). Focusing on a plan note stating, “When
a required jetting or preformed elevation is not shown on the table, the
contractor shall coordinate with the engineer of record to obtain written
approval prior to jetting or preforming pile locations,” Mr. Nickas took issue
with the vagueness of the verb “coordinate” and opined that WSP should have
specified the requirements imposed by the note and should have been explicit
about prohibiting jetting with language like “do not jet” if jetting was to be
Ey
prohibited. Ud. at 11, 27). Mr. Nickas further opined that CDM was “supposed
to be the go[-]between and honest broker with all parties involved with the
project,” (id. at 33-34); was supposed to “remain impartial and nonJ[-]bias[ed]”
regarding “the totality of the [plans, specifications, and estimates] package,” (id.
at 28); “should have been forthright” and alerted the County to problems arising
from discrepancies in the plans and specifications, (id. at 42-43); and “could
have encouraged” the County—‘[f]rom the onset of the project”—“to engage an
independent panel” as a Dispute Review Board (DRB), (id. at 49). Mr. Nickas
stated that a DRB would have advised the County of inconsistencies that CDM
failed to bring to the County’s attention. (/d. at 43).
CDM makes four arguments as to Mr. Nickas: (1) he is not qualified to
opine on the CEI standard of care because he has minimal experience specific
to CEI services, (2) his statements about CDM’s being an “honest broker” and
“impartial and non[-]bias[ed]” are pure opinion, (3) his statement that a DRB
would have advised the County of inconsistencies is pure speculation, and (4)
his standard-of-care testimony is cumulative given Mr. Mackiewicz’s testimony.
(Doc. 137 at 7-10; Doc. 166 at 9-10). And WSP maintains that Mr. Nickas’s
jetting opinions related to NOI 3 should be excluded as unreliable and unhelpful
because Mr. Nickas focused too closely on the “coordinate” note and did not
consider WSP’s overall performance on the project and because his
“conclusion . . . converts the standard of care [required of a design professional
RQ
like WSP] to a near strict liability standard.” (Doc. 138 at 14-18). In its
responses, Plaintiff addresses all these arguments except CDM’s speculation
argument. (See Doc. 150 at 9-15; Doc. 151 at 15-17).
As to the issue of qualifications, Mr. Nickas is qualified to testify to the
CEI standard of care. “A witness is qualified as an expert if he is the type of
person who should be testifying on the matter at hand.” Moore v. Intuitive
Surgical, Inc., 995 F.3d 839, 852 (11th Cir. 2021) (emphasis omitted). A witness
may be qualified “by knowledge, skill, experience, training, or education.” Fed.
R. Evid. 702. Mr. Nickas holds a Bachelor of Science degree in Civil Engineering
from The Citadel Military College of South Carolina and has worked for four
decades in positions related to “the design and construction of transportation
facilities,” including complex bridges in Florida. (Doc. 137-4 at 53). Although he
has minimal experience specific to CEI services, the CEI subfield sufficiently
overlaps with the areas of civil engineering in which he has education and
experience that he is qualified to opine on CEI services. See Hendrix v. Evenflo
Co., 255 F.R.D. 568, 578 (N.D. Fla. 2009) (“[S]o long as [an] expert is at least
minimally qualified, gaps in his qualifications generally will not preclude
admission of his testimony, as [they] relate[] more to witness credibility and
thus the weight of the expert’s testimony[] than to its admissibility.”).
As to Mr. Nickas’s “honest broker” and “impartial and nonJ[-]bias[ed]”
statements, Mr. Nickas will be permitted to opine on CEI customs and practices,
OQ
including the purported expectation that a CEI act as an impartial honest
broker on a project. But Mr. Nickas will not be permitted to opine that CDM
failed to act in accordance with this expectation. In other words, Mr. Nickas may
not say that CDM was not an impartial honest broker for the bridge project. See
Romano, 2022 U.S. Dist. LEXIS 83703, at *13-14.
As to the statement that a DRB would have advised the County of
inconsistencies that CDM failed to bring to the County’s attention, Mr. Nickas
admitted during his deposition that the statement was “just speculation.” (Doc.
137-3 at 38). And Plaintiff does not address the statement or CDM’s speculation
argument in its response to CDM. (See Doc. 150 at 9-15). As the party offering
Mr. Nickas as an expert, Plaintiff bears the burden of establishing that his
statement has an appropriate basis. See Rink, 400 F.3d at 1292. Because the
statement appears to be based on speculation, it will be excluded. See Kilpatrick
v. Breg, Inc., 613 F.3d 1329, 1335 (11th Cir. 2010) “Daubert requires that trial
courts act as ‘gatekeepers’ to ensure that speculative, unreliable expert
testimony does not reach the jury.”).
As to the issue of cumulativeness, Mr. Nickas’s anticipated testimony on
the CEI standard of care is not necessarily cumulative to Mr. Mackiewicz’s for
two reasons. First, the two witnesses have “different professional perspectives.”
See Royal Bahamian Ass’n v. QBE Ins. Corp., No. 10-21511-CIV-MORE, 2010
US. Dist. LEXIS 115308, at *5 (S.D. Fla. Oct. 21, 2010) (“Testimony on the same
1n
topic by different experts . . . is not needlessly cumulative where the experts will
testify from different professional perspectives.”). Mr. Nickas has a general-
engineering perspective, (see Doc. 137-4 at 53), and Mr. Mackiewicz has a
perspective specific to CEI, (see Doc. 137-1 at 5). (See also Doc. 150 at 13). And
second, Mr. Nickas will offer jetting-centric testimony while Mr. Mackiewicz will
discuss not only jetting but also a range of other issues. Accordingly, Mr. Nickas
will be allowed to testify to the CEI standard of care.?
As to the reliability and helpfulness of Mr. Nickas’s opinions, the Court
agrees with Plaintiff that his method of “investigating a single note on a drawing
and then opining about the standard of care with respect to the formulation of
that note” is not inherently unreliable, (Doc. 151 at 15), given his overview of
WSP’s work, (see Doc. 137-3 at 29 (explaining that WSP “went above and
beyond” in various other ways during the project)), and that his standard-of-
care testimony is more likely to assist than confuse the factfinder, (Doc. 151 at
17), who will receive instructions on legal standards from the Court. In general,
WSP’s arguments about Mr. Nickas are more appropriate for a trial than for a
motion to exclude. See Daubert, 509 U.S. at 596 (“Vigorous cross-examination,
presentation of contrary evidence, and careful instruction on the burden of proof
2 The Court disagrees with CDM’s assessment that Mr. Nickas is “(mis)stepping
into the proverbial shoes of a CEI to form” his opinions. (Doc. 166 at 11). To borrow |
CDM’s phrase, Mr. Nickas is wearing general-engineering shoes, not CEI shoes.
11
are the traditional and appropriate means of attacking shaky but admissible
evidence.”).
C. Mr. Miseroy
Plaintiff retained Mr. Miseroy to provide opinions related to NOIs 3, 20,
26, and 35, including standard-of-care opinions as to CDM and WSP. (See Doc.
137-7 at 2; Doc. 150 at 16; Doc. 151 at 14). In his report, Mr. Miseroy commented
that when Plaintiff asked for help solving a problem with pier-cap
constructability, CDM did not provide assistance, (Doc. 137-7 at 35), and when
Plaintiff identified a problem with the design of the fishing piers, CDM required
Plaintiff “to perform significant extra work to produce” the “design illustrated
in the plans,” @d. at 36 (emphasis omitted)). Mr. Miseroy stated that Virgil
Rook, CDM’s Senior Project Engineer on the project, “did not grasp the extra
work” that Plaintiff “was required to perform.” (Id. at 54 (emphasis omitted)).
In his deposition, Mr. Miseroy testified that he did not examine the scope of
work required of CDM by its contract with the County. (Doc. 137-5 at 32). He
based his CEI opinions, he said, on “what other CEI firms have done on projects”
in which he participated “over the years” and on “how issues were escalated or
not” during the Veterans Memorial Bridge project. Uid.). And he testified that
like a DRB, a CEI firm should provide advice to “help [a] project avoid disputes
and delays.” Ud. at 33).
Both Defendants challenge Mr. Miseroy’s qualifications to offer standard-
12
of-care testimony because he has never worked in CEI and is not a professional
engineer in Florida. (Doc. 137 at 10—11; Doc. 188 at 13-14; Doc. 166 at 10).
Additionally, CDM contends that his opinions should be excluded because he
does not base them “on solid ground” and because they are duplicative of Mr.
Mackiewicz’s standard-of-care opinions. (Doc. 1387 at 11—12; accord Doc. 166 at
10-11). Plaintiff responds that “Mr. Miseroy is a highly qualified marine
contractor with extensive experience constructing bridges and piers,” (Doc. 151
at 14), and that his opinions are “grounded on” industry customs and practices,
(Doc. 150 at 17). Plaintiff also asserts that Mr. Miseroy’s opinions are not
needlessly duplicative of Mr. Mackiewicz’s. (Id.).
The Court agrees with Plaintiff that Mr. Miseroy’s professional experience
qualifies him to opine on the relevant standards of care, informs his knowledge
of the applicable customs and practices, and provides a sufficient basis for his
opinions. See Fed. R. Evid. 702; cf. Maiz v. Virani, 253 F.3d 641, 668-69 (llth
Cir. 2001) (rejecting the argument that an expert’s testimony about “the
passport-stamping practices of Mexican immigration authorities” was
unreliable when the testimony was “based largely on [the expert’s] personal
experience”). However, the Court agrees with CDM that Mr. Miseroy’s opinions
as to CDM are duplicative of Mr. Mackiewicz’s. Accordingly, Mr. Miseroy will be
permitted to opine as to WSP but not as to CDM.
13
D. Dr. Poston
Plaintiff retained engineering expert Dr. Poston to opine on various NOIs.
(See, e.g., Doc. 159). Although CDM briefly argues that Dr. Poston’s opinion on
the CEI standard of care should be excluded as needlessly duplicative of Mr.
Mackiewicz’s opinions, (Doc. 137 at 12-13), most of the arguments to exclude
Dr. Poston’s opinions come from WSP, (Doc. 138 at 4-13). As to NOIs 26, 28, 33,
and 35, WSP seeks to exclude Dr. Poston’s testimony as unhelpful because he
does not offer standard-of-care opinions about WSP’s conduct. (Doc. 138 at 4—
10). And as to NOIs 13, 18, and 44, WSP asserts that the only standard-of-care
opinion offered by Dr. Poston relies on the unsupported assumption that “WSP
had a contractual obligation to perform construction phase services” related to
the pier cracking described in the NOIs. (/d. at 10-13). In response to WSP’s
arguments, Plaintiff submitted an affidavit from Dr. Poston in which he opines
that WSP’s conduct fell below the applicable standard of care as to all these
NOIs except for NOI 28. (Doc. 159 at 2-5). Plaintiff represents that with respect
to that NOI, Plaintiff “does not attribute any damages or delay” to WSP. (Doc.
151 at 6). But in general, says Plaintiff, Dr. Poston’s opinions are helpful for the
breach-of-contract and negligence claims and are reliable. (Doc. 151 at 4—14).
Regarding CDM’s argument, Dr. Poston’s opinions will not be excluded as
duplicative of Mr. Mackiewicz’s because the two experts offer “different
professional perspectives.” See Royal Bahamian, 2010 U.S. Dist. LEXIS 115308,
14
at *5. Regarding WSP’s arguments, Dr. Poston’s testimony related to NOI 28—
and, indeed, all opinions about NOI 28—will be excluded as unhelpful given
Plaintiffs representation that as to that NOI, Plaintiff “does not attribute any
damages or delay” to WSP, (Doc. 151 at 6)—the only defendant for the NOI 28
claims, (see Doc. 76 at 91-97). See Resnick v. AvMed, Inc., 693 F.3d 13817, 1325
(11th Cir. 2012) (isting damages as an element of breach-of-contract and
negligence claims under Florida law); see also ACMG of La., Inc. v. Towers
Perrin, Inc., 390 F. App’x 936, 938 (11th Cir. 2010) (“A claim for indemnity arises
only when a party pays damages on behalf of another.” (emphasis added)). That
said, Dr. Poston’s testimony is otherwise helpful in light of his standard-of-care
opinions about WSP’s conduct. And his testimony about NOIs 138, 18, and 44 is
sufficiently reliable because the opinions on these NOIs are not based on an
unsupported assumption about WSP’s contractual obligations. Instead, they are
based on WSP’s overreactions in addressing ordinary shrinkage cracks (“a
natural phenomenon in concrete construction”) by “callfing] for a detailed
investigation” and “a repair and remediation protocol” and “suspend[ing] work
on the project” pending the investigation. (Doc. 159 at 5).
Ek. Mr. Wade
Plaintiff retained Mr. Wade to calculate its damages, including its lost
opportunity costs. (See Doc. 160-1 at 7). During his deposition, Mr. Wade
testified that he used the Consolidated Financial Statements of Plaintiffs
15
parent company, Southland Holdings Companies—rather than Plaintiffs
Consolidated Financial Statements—to calculate Plaintiffs lost opportunity
costs. (Doc. 138-4 at 4). Defendants move to exclude Mr. Wade’s opinions on
Plaintiffs lost opportunity costs, arguing that he based his opinions on financial
data unrelated to Plaintiff. (Doc. 137 at 13; Doc. 138 at 18—20). Plaintiff
responds that Mr. Wade misspoke during his deposition and that he in fact used
Plaintiffs, not its parent company’s, financial data as the basis for his opinions.
(Doc. 150 at 18-20; Doc. 151 at 17~18). Mr. Wade admits his mistake in an
affidavit, (Doc. 160 § 9), and has submitted an errata sheet correcting his
testimony, (Doc. 169-4 at 2). The affidavit and errata sheet are consistent with
his reports, which state that he used Plaintiffs data to calculate its lost
opportunity costs. (See Doc. 170-9 at 48; Doc. 170-10 at 18). Although WSP
moved to strike Mr. Wade’s affidavit and errata sheet as contradicted by his
prior deposition testimony, (Doc. 169 at 19-24), the Court denied the motion,
(Doc. 203 at 2). Because Defendants’ arguments about Mr. Wade’s opinions are
predicated on incorrect information about his process for calculating Plaintiffs
lost opportunity costs, they are unpersuasive. Accordingly, Mr. Wade’s opinions
will not be excluded.
IV. CONCLUSION
For the reasons explained above, it is ORDERED that Defendants’
Daubert motions (Docs. 137 & 138) are GRANTED in part and DENIED in
1a
part. The Court excludes Mr. Mackiewicz’s opinions about CDM’s bad faith and
legal duties, Mr. Nickas’s opinion that CDM did not act as an impartial honest
broker for the bridge project, Mr. Nickas’s opinion that a DRB would have
advised the County of inconsistencies that CDM failed to bring to the County’s
attention, Mr. Miseroy’s opinions about CDM, and all opinions about NOI 28.
The motions to exclude are otherwise denied.
The Court expects that no more than two experts will give opinion
testimony as to each standard of care per NOI. The parties shall govern
themselves accordingly in preparation for trial.
DONE and ORDERED in Orlando, Florida, on June **_, 2024.
i □
JOHN ANTOON II
United States District Judge
Copies furnished to:
Counsel of Record
17