Opinion

Swint v. City of Springfield

  • 305 Or. App. 679
  • 472 P.3d 800
Court
Court of Appeals of Oregon
Filed
Aug 5, 2020
Status
Published
On the bench
Lagesen
Cited by
0 cases
Authority
More cited than 30.7%

“In deter- mining whether the board’s order is supported by substan- tial reason, we consider whether that order articulates the reasoning that leads from the facts found to the conclusions drawn.” (Internal quotation marks omitted.)

How later courts described this case

  • “In deter- mining whether the board’s order is supported by substan- tial reason, we consider whether that order articulates the reasoning that leads from the facts found to the conclusions drawn.” (Internal quotation marks omitted.)

Written by the judges who cited it.

The opinion

679

Argued and submitted March 15, 2019, reversed and remanded August 5, 2020

In the Matter of the Compensation of

Justin A. Swint, Claimant.

Justin A. SWINT,

Petitioner,

v.

CITY OF SPRINGFIELD,

Respondent.

Workers’ Compensation Board

1701519; A167556

472 P3d 800

Claimant requested a hearing on whether his employer used the wrong rate

to calculate his periodic temporary disability compensation, resulting in a series

of underpayments that violated the employer’s obligations under ORS 656.262

(4)(b). After an administrative law judge agreed with claimant that he was enti-

tled to additional compensation, the Workers’ Compensation Board reversed

that decision. The board concluded that, because claimant’s hearing request was

made more than two years after the date of the first payment, it was time-barred

under ORS 656.319(6). Claimant seeks judicial review of the board’s order, argu-

ing that the board erred in concluding that his request was time-barred under

that statute. Held: The two-year window under ORS 656.319(6) is determined by

the specific “alleged action or inaction” in processing—a standard that necessar-

ily requires an assessment of the particular processing requirements imposed

on an employer by statute and rule. In the case of challenges to computations

required in the course of processing, the timeliness inquiry depends on (1) when

the statutes and rules require that computations be made; and (2) what, if any,

obligations are imposed to reevaluate prior computations. The board’s order did

not address those questions and failed to adequately explain why the first pay-

ment involved a claim-processing action that each subsequent payment did not.

Reversed and remanded.

Christopher D. Moore argued the cause and filed the

briefs for petitioner.

Howard R. Nielsen argued the cause for respondent. Also

on the brief was Bohy Conratt, LLP.

Before Lagesen, Presiding Judge, and DeVore, Judge, and

Sercombe, Senior Judge.

LAGESEN, P. J.

Reversed and remanded.

680 Swint v. City of Springfield

LAGESEN, P. J.

In this workers’ compensation case, claimant

requested a hearing on whether his employer used the wrong

rate to calculate his periodic temporary disability compen-

sation, resulting in a series of underpayments that violated

the employer’s obligations under ORS 656.262(4)(b). After an

administrative law judge (ALJ) agreed with claimant that

he was entitled to additional compensation, the Workers’

Compensation Board reversed that decision. The board con-

cluded that, because claimant’s hearing request was made

more than two years after the date of the first payment, it

was time-barred under ORS 656.319(6). Claimant seeks

judicial review of the board’s order, arguing that the board

erred in concluding that his request was time-barred under

that statute. For the reasons explained below, we conclude

that the board’s order lacks substantial reason to support its

conclusion, and we therefore reverse and remand the order.

The facts are not in dispute, so we draw them from

the summary in the board’s order and the ALJ’s factual find-

ings, which the board adopted. See McDowell v. Employment

Dept., 348 Or 605, 608, 236 P3d 722 (2010). Claimant, a

police officer for the City of Springfield, suffered a compen-

sable injury in September 2014; he was released to light

duty and subsequently returned to modified work later that

month. The city accepted his claim and, on October 8, 2014,

sent a “Notice of Wage Calculation” letter to claimant.1 The

notice advised claimant that his temporary total disability

(TTD) rate was calculated as $830.43, based on an aver-

age weekly wage (AWW) of $1,245.59, but that the city had

elected to provide “wage continuation” in lieu of paying tem-

porary disability benefits. “Wage continuation” refers to a

self-insured employer’s ability to “pay[ ] to an injured worker

who becomes disabled the same wage at the same pay inter-

val that the worker received at the time of injury,” which

is “deemed timely payment of temporary disability pay-

ments pursuant to ORS 656.210 and 656.212 during the

time the wage payments are made.” ORS 656.262(4)(b). The

“Notice of Wage Calculation” explained that the AWW/TTD

1

Many of the actions at issue were taken through the city’s claims adminis-

trator; for readability, we do not distinguish between the two.

Cite as 305 Or App 679 (2020) 681

information was being provided because any work disabil-

ity award, if determined to be due at the time of closure,

would be based upon that wage calculation. The notice fur-

ther advised claimant that, if he disagreed with the wage

calculation, he must immediately notify the city of his

disagreement.

In this case, the wage continuation in lieu of tempo-

rary disability was the result of an agreement between the

city and the police union, the Springfield Police Association.

Pursuant to that agreement, the city paid claimant his

regular base pay plus incentives (e.g., contributions to his

retirement account, and medical and dental insurance) in

two-week intervals; he received his regular base pay for

40 hours a week even if he worked less than 40 hours, but he

did not have an opportunity to work overtime.

The first wage-continuation payment was made to

claimant on October 10, 2014, for the period of September 21

to October 4, 2014. Payroll information accompanying the

check indicates that an hourly rate of $31.14 was used to

calculate wages, which was claimant’s regular hourly base

pay rate. Wage-continuation payments continued to be paid

every two weeks until February 28, 2017, when claimant

was released to regular work without restrictions.

On April 7, 2017, claimant requested a hearing to

challenge the city’s processing of his temporary disability

benefits. In claimant’s view, the wage calculation used by the

city had erroneously failed to account for his actual wages,

including the overtime that he regularly worked, meaning

that he had not been paid “the same wage at the same pay

interval that the worker received at the time of injury” as

required by ORS 656.262(4)(b).

In response, the city disagreed with claimant’s posi-

tion that the payments violated ORS 656.262(4)(b), arguing

that claimant got a “better bargain” from the city by receiv-

ing his base pay for reduced hours rather than the hours

he worked. However, the city also asserted, as a threshold

matter, that claimant’s request for a hearing was untimely

under ORS 656.319(6). That statute provides that “[a] hear-

ing for failure to process or an allegation that the claim was

processed incorrectly shall not be granted unless the request

682 Swint v. City of Springfield

for hearing is filed within two years after the alleged action

or inaction occurred.”

The city’s timeliness argument was premised on its

view that the “alleged action” that triggered the two-year

limitation period in ORS 656.319(6) was the notice of wage

calculation. The city contended:

“Here [the city’s claims administrator] sent the Claimant

a notice of wage calculation on October 8, 2014 * * *. It

advised Claimant of the calculated average weekly wage

and advised that the city provides salary continuation in

lieu of time loss benefits. * * *

“Claimant never challenged that notice letter, again not

until April of this year. That notice letter was an affirma-

tive action that triggered the time to Request for Hearing,

but apparently Claimant was content to receive salary con-

tinuation benefits and really didn’t have any problems with

his average weekly wage because [the claims administra-

tor] never heard anything from him until April of this year

when he was represented by [counsel].”

Claimant, on the other hand, argued that each pay-

ment raised the calculation issue anew, because each pay-

ment violated the city’s ongoing obligation to pay him the

same wage at the same pay interval that he received at the

time of injury under its election to provide wage continua-

tion in lieu of disability payments. He argued that, “with

their action or failure to act, it was renewed each and every

time it acted or failed to act, so it’s timely. At worst, you

could say it—you’re going to take it back two years from

April of 2017 to April of 2015, but I think that the issue was

actually raised fully each and every time and, therefore, we

can go back farther.”

The ALJ agreed with claimant regarding timeli-

ness, rejecting the city’s view that the notice of wage calcula-

tion was the “alleged action” for purposes of ORS 656.319(6).

The ALJ reasoned that the notice advised claimant of

the city’s election to provide salary continuation in lieu of

temporary disability, but that claimant was not challeng-

ing the election. “Rather,” the ALJ explained, “claimant is

challenging the [city’s] failure to pay him the same wage

that he received at the time of injury, which is a statutory

Cite as 305 Or App 679 (2020) 683

requirement of providing salary continuation in lieu of tem-

porary disability.” “Thus, the claim processing actions being

challenged by claimant are the [city’s] wage-continuation

payments that were made in lieu of paying temporary dis-

ability benefits.” Because claimant had filed his hearing

request within two years of when those alleged underpay-

ments ended in February 2017, the ALJ determined that

claimant’s request was timely. And, on the merits, the ALJ

agreed that claimant had been underpaid, directed the city

to pay additional benefits, and assessed attorney fees and

penalties.

The city sought board review of the ALJ’s decision,

arguing, among other contentions, that the ALJ erred in

concluding that the hearing request was timely. As it did

before the ALJ, the city argued that the “October 8, 2014 let-

ter was the action that triggered the two-year time frame for

claimant to request a hearing regarding the average weekly

wage and temporary disability rate calculations.” Claimant

defended the ALJ’s ruling, again arguing that each pay-

ment involved a new alleged action—or inaction—in failing

to pay the statutorily required rate.

The board ultimately rejected the claimant’s view

and the ALJ’s conclusion that each payment involved a new

“alleged action,” but it also rejected the city’s position that

the notice of wage calculation was the relevant trigger.2 The

board instead ruled that the first payment, not the notice or

subsequent payments, was the relevant “alleged action”:

“[T]he claim processing ‘action’ that triggered the two-

year limitation period in ORS 656.319(6) occurred on

October 10, 2014 (the date of the first wage-continuation

payment), when the employer allegedly did not include

overtime when calculating claimant’s ‘same wage.’ That is

when the employer’s allegedly incorrect processing of the

wage replacement began. Because that action triggered

the running of the two-year time limitation, claimant’s

April 7, 2017, request for hearing was untimely filed and

thus time-barred.”

2

The order states, “Although we disagree with the employer’s contention

that the Notice of Wage Calculation letter tolled [sic] the two-year limitation in

ORS 656.319(6), we still conclude that claimant’s hearing request was not timely

filed.”

684 Swint v. City of Springfield

The board therefore vacated the ALJ’s order and dismissed

claimant’s request for a hearing.

Claimant seeks judicial review of that order. He

argues, as he did before the ALJ and the board, that the

“alleged action or inaction” in this case is the city’s failure

to pay the statutorily required rate—an ongoing processing

obligation that was breached within the two-year limita-

tions period. The city, as it did below, disputes that proposi-

tion. But the city now hedges, in light of the board’s order,

about exactly when the “alleged action or inaction” occurred:

“Although claimant asserts that each salary check he

received was a new separate processing action giving rise to

an independent right to request a hearing, the actual action

that claimant asserts was allegedly incorrect—calculation

of his salary at base wage—occurred either when he was

informed by the Notice of Wage Calculation letter, or when he

received his first check based on that wage rate calculation.”

(Emphasis added.)

The ambiguity in the city’s response highlights the

fundamental problem with the board’s order: It fails to artic-

ulate the connection between the facts of the case and the

result reached, leaving the city to supply an explanation.

See Walker v. Providence Health System Oregon, 254 Or App

676, 686, 298 P3d 38, rev den, 353 Or 714 (2013) (“In deter-

mining whether the board’s order is supported by substan-

tial reason, we consider whether that order articulates the

reasoning that leads from the facts found to the conclusions

drawn.” (Internal quotation marks omitted.)).

The timeliness question presented in this case is

bound up, to a significant extent, in the merits of claimant’s

allegations. On the merits, claimant contends that ORS

656.262(4)(b) creates an ongoing or recurring obligation to

pay “the same wage at the same pay interval that the worker

received at the time of injury” if the employer wants to take

advantage of that provision, whereas the city argues that

the statute contemplates only an initial wage calculation.

The closely related question under ORS 656.319(6) concerns

when the “alleged action or inaction occurs” for that type

of processing error: when the calculation is made, or when

each payment is calculated incorrectly (or made without

Cite as 305 Or App 679 (2020) 685

correcting the initial calculation)? Thus, both the merits

and timeliness turn on what particular processing obliga-

tions an employer has with regard to calculating wages for

purposes of ORS 656.262(4)(b), and when those processing

obligations must occur.3

Here, however, the board never addressed the ques-

tion of what ORS 656.262(4)(b) specifically requires with

regard to processing and, in particular, the timing and

nature of an employer’s wage calculation obligations under

that statute. Instead, the board discussed our decision in

French-Davis v. Grand Central Bowl, 186 Or App 280, 285,

62 P3d 865 (2003), and its own decisions applying ORS

656.319(6), before concluding that the limitation period was

triggered by the first payment, not the earlier notice of cal-

culation or subsequent payments. But nothing in the board’s

order, or any of the cases cited therein, logically connects the

facts of this case to the board’s conclusion.

In French-Davis, we considered what type of “inac-

tion” amounts to a “failure to process” a claim so as to trig-

ger the two-year limitation period in ORS 656.319(6). We

explained that, as used in the statute, “inaction” refers

to “what might be called (oxymoronically) affirmative

inaction”—a “failure to perform a time-specific, discrete

duty, request or obligation.” Id. at 285. We explained that,

if it were otherwise and the “inaction” referred to an ongo-

ing failure to act, then the time period would never expire.

Id.

In this case, the board distinguished French-Davis

on the ground that “claimant is not alleging a failure to pro-

cess the claim, but rather is alleging that the employer pro-

cessed the claim incorrectly by not including consideration

of overtime in his ‘same wage’ calculation for wage continu-

ation purposes.” It then explained, “In other words, the issue

in this case is not an alleged failure to process, as was the

case in French-Davis, but rather concerns an alleged incor-

rect claim processing. Thus, we are required to determine

the date of the alleged ‘action’ (as opposed to ‘inaction,’ as

3

Despite being bound up with the merits, timeliness under ORS 656.319(6)

is jurisdictional and the board is required to address it before reaching the mer-

its. Hamilton v. SAIF, 275 Or App 978, 983, 365 P3d 1116 (2015).

686 Swint v. City of Springfield

was the case in French-Davis) that triggered the two-year

period under ORS 656.319(6).” 4

The board then turned to one of its own opinions,

Terrizino D. Williams, 58 Van Natta 1487, 1489 (2006), which

it described as “instructive.” In Williams, the claimant had

“alleg[ed] that the employer processed the claim incorrectly

by not including supplemental temporary disability in his

initial temporary disability payment.” Id. at 1490. The board

in that case determined that it involved “action” rather

than “inaction” as in French-Davis, and that the triggering

“ ‘action’ occurred on February 12, 2003, when the employer

allegedly did not correctly include supplemental temporary

disability in claimant’s temporary disability payment.” Id.

In its order in this case, the board relied on the

implication from Williams that each payment was not a new

processing “action”:

“Of note, temporary disability benefit payments in Williams

from February 23, 2003 through July 2, 2003, if consid-

ered individually, would have been within two years of the

request for hearing. However, our decision did not address

each payment, but, as mentioned, focused on the com-

mencement of the incorrect processing as the ‘action’ trig-

gering ORS 656.319(6).

“Applying the Williams rationale to the present case, we

do not evaluate each individual wage-continuation payment

separately as an ‘action’ under ORS 656.319(6). Rather, we

conclude that the claim processing ‘action’ that triggered

the two-year limitation in ORS 656.319(6) occurred on

October 10, 2014 (the date of the first wage-continuation

payment), when the employer allegedly did not include

overtime when calculating claimant’s ‘same wage.’ That is

when the employer’s allegedly incorrect processing of the

wage replacement began. Because that action triggered

4

The board’s characterization of claimant’s argument was incomplete.

Claimant contended that each check represented an incorrect processing “action”

in that the check, in claimant’s view, was based on an incorrectly computed wage

rate, but claimant also argued that, with each check, the city failed to act to

correct its alleged previous error. If claimant is correct in either respect—that

is, if (1) with each check, the city had a discrete obligation to correctly compute

claimant’s wage rate but did so incorrectly; or (2) with each check, the city had a

discrete processing obligation to review and correct any past errors in the wage

rate, but did not take that action—then his hearing request would be timely as to

those checks issued no more than two years before his hearing request.

Cite as 305 Or App 679 (2020) 687

the running of the two-year time limitation, claimant’s

April 7, 2017, request for hearing was untimely filed and

thus time-barred.”

(Footnotes omitted.)

Although the board’s order refers to the Williams

“rationale,” Williams itself supplies little explanation as to

why the first payment in that case involved “processing” but

later payments did not. The two-year window under ORS

656.319(6) is determined by the specific “alleged action

or inaction” in processing—a standard that necessarily

requires an assessment of the particular processing require-

ments imposed on an employer by statute and rule. In the

case of challenges to computations required in the course of

processing, the timeliness inquiry depends on (1) when the

statutes and rules require that computations be made; and

(2) what, if any, obligations are imposed to reevaluate prior

computations. Williams did not address those questions.

Although it does not appear that the claimant in Williams

sought judicial review to test whether the order in that case

was supported by substantial reason, that does not insulate

the board’s later opinions from scrutiny for substantial rea-

son. In other words, an agency’s reliance on its own prec-

edent cannot supply the required substantial reason—the

logical explanation as to how the conclusion follows from the

facts found—when that precedent itself lacks the requisite

substantial reason connecting the facts found to the legal

conclusions reached.

The reasoning in the remaining cases cited by the

board is equally sparse on that point, providing only bare

conclusions. See Randall E. Kelley, 54 Van Natta 1645, 1646

(2002) (concluding, without analysis, that “[w]e decline to

find that each individual temporary disability payment

constitutes an ‘action or inaction’ under the statute”); see

also Howard E. Benjamin, 65 Van Natta 215 (2013) (rely-

ing on Williams and concluding, in a case where no pay-

ments occurred in the two years before the claimant’s 2011

hearing request, that the request was untimely filed with

regard to the insurer’s claim processing actions in 2006 and

2007); Jesse G. Ayala, Jr., 66 Van Natta 1845, 1850 (2014)

(referring to Williams and stating that, “whether claimant’s

688 Swint v. City of Springfield

challenge is interpreted as contesting the employer’s ‘action’

of calculating his TTD benefits as TPD benefits starting

August 2010, or its ‘action’ of awarding such benefits in the

February 8, 2011 closure notice (which the employer was

obligated to pay effective February 22, 2011),” the April 2013

hearing request was untimely).

In fact, the only case cited in the board’s order that

analyzed the question of “action or inaction” in terms of spe-

cific statutory or rule requirements reached the opposite

conclusion as to whether separate payments involved dis-

crete processing obligations. See Armando Morin, 68 Van

Natta 1760, 1764 (2016) (explaining that “OAR 436-060-0150

(5)(h) and (6) establish specific time frames for the payment

of temporary disability benefits generally, and following an

ALJ’s order. Those time-specific obligations fell on multiple

dates. Therefore, we evaluate each obligation separately in

determining which of the multiple issues raised by claim-

ant’s hearing request are timely and may be addressed.”).

Here, the board did not engage with the reasoning in that

case—which appears to have approached the question cor-

rectly, determining first what processing obligations the

employer had and the timing of those obligations. Instead,

the board distinguished Morin solely on the ground that it

“involved a failure to process, as opposed to incorrect claim

processing”—a conclusion that fails to account for the fact

that claimant also alleged that the city had a discrete pro-

cessing obligation to review and correct any past errors in

the wage rate, but did not take that action. See 305 Or App

at 686 n 4.

On the facts of this case, the lack of reasoning with

regard to when the calculation of a wage is, or is not, an

action that is part of the processing of a payment made

pursuant to ORS 656.262(4)(b) is especially pronounced,

because the city provided a notice of calculation before the

first payment, relied on that as a claim-processing action

that required a response from claimant if he disagreed, and

had never argued that the initial payment following the

notice of calculation constituted the claim-processing action.

Beyond that, on the face of it, the record in this case sup-

plies no basis to conclude that the city’s first check to the

claimant involved a processing action or inaction that each

Cite as 305 Or App 679 (2020) 689

subsequent check did not also involve. The board’s order

fails to adequately explain why the first payment nonethe-

less involved a claim-processing action related to the city’s

obligation under ORS 656.262(4)(b) but each subsequent

payment did not. We therefore reverse and remand the order

for reconsideration.

Reversed and remanded.