Opinion

Relevant Group, LLC v. Stephen Nourmand

  • 116 F.4th 917
Court
Court of Appeals for the Ninth Circuit
Filed
Sep 5, 2024
Status
Published
Cited by
5 cases
Authority
More cited than 52.2%

The opinion

FOR PUBLICATION

UNITED STATES COURT OF APPEALS

FOR THE NINTH CIRCUIT

RELEVANT GROUP, LLC, a No. 23-55574

Delaware limited liability company;

1541 WILCOX HOTEL, LLC, a D.C. No.

Delaware limited liability company; 2:19-cv-05019-

6516 TOMMIE HOTEL, LLC, a PSG-KS

Delaware limited liability company;

6421 SELMA WILCOX HOTEL,

LLC, a California limited liability OPINION

company,

Plaintiffs-Appellants,

v.

STEPHEN NOURMAND, AKA

Saeed Nourmand an individual;

SUNSET LANDMARK

INVESTMENT, LLC, a California

limited liability company;

NOURMAND AND ASSOCIATES, a

California corporation; DOES, 1-10,

Defendants-Appellees.

Appeal from the United States District Court

for the Central District of California

Philip S. Gutierrez, District Judge, Presiding

2 RELEVANT GROUP, LLC V. NOURMAND

Argued and Submitted June 3, 2024

Pasadena, California

Filed September 5, 2024

Before: MILAN D. SMITH, JR. and BRIDGET S. BADE,

Circuit Judges, and SIDNEY A. FITZWATER, * District

Judge.

Opinion by Judge Milan D. Smith, Jr.

SUMMARY **

Noerr-Pennington Doctrine

The panel affirmed the district court’s summary

judgment in favor of Defendants, property developers who

operate the Hollywood Athletic Club, in an action in which

Plaintiffs, rival property developers who own three hotels,

alleged that Defendants abused the processes available under

the California Environmental Quality Act (CEQA) to extort

funds from Plaintiffs in violation of the Racketeer Influenced

and Corrupt Organizations Act.

The district court held that the Noerr-Pennington

doctrine—a rule that requires courts to construe statutes to

avoid burdening conduct that implicates the Petition Clause

*

The Honorable Sidney A. Fitzwater, United States District Judge for

the Northern District of Texas, sitting by designation.

**

This summary constitutes no part of the opinion of the court. It has

been prepared by court staff for the convenience of the reader.

RELEVANT GROUP, LLC V. NOURMAND 3

of the First Amendment—protected Defendants from

statutory liability for engaging in petitioning activity

challenging several of Plaintiffs’ proposed hotel projects

using the CEQA framework.

As a threshold matter, the panel held that District Judge

Gutierrez did not abuse his discretion in sua sponte

reconsidering the denial of summary judgment by District

Judge Wright, from whom the case was transferred before

trial, where Judge Gutierrez explained how Judge Wright’s

decision was clearly erroneous and how manifest injustice

would occur should the decision be allowed to stand.

The panel held that the district court did not err in

holding that Defendants’ petitioning activities were

protected under the Noerr-Pennington doctrine. In

determining whether the sham litigation exception to the

doctrine applies, the district court properly applied the

framework set forth in Pro. Real Est. Invs., Inc. v. Columbia

Pictures Indus., Inc., 508 U.S. 49 (1993) (PREI) (sham

litigation exception applies where a lawsuit is objectively

baseless and brought with an unlawful motive). In applying

the PREI framework, the district court did not err in

concluding that Defendants’ actions pursuant to CEQA were

not objectively baseless and therefore did not fall within the

sham litigation exception. The panel did not review

evidence suggesting that Defendants had an improper

purpose because courts may examine a litigant’s subjective

motivation only if the challenged litigation is objectively

baseless. And because the district court correctly held that

Defendants’ CEQA actions did not fall within the sham

litigation exception, the panel did not need to reach

Defendants’ other arguments in order to affirm the district

court.

4 RELEVANT GROUP, LLC V. NOURMAND

COUNSEL

Amit R. Vora (argued), Jennifer S. Recine, Donald J.

Reinhard, Kasowitz Benson Torres LLP, New York, New

York; Daniel Saunders, Kasowitz Benson Torres LLP, Los

Angeles, California; for Plaintiffs-Appellants.

Glenn A. Danas (argued) and Katelyn M. Leeviraphan,

Clarkson Law Firm PC, Malibu, California; Patrick M.

Maloney (argued), Gregory M. Smith, and Elizabeth T.

Schaus, Maloney Firm APC, El Segundo, California; for

Defendants-Appellees.

Laurence S. Zakson, Reich Adell & Cvitan, Glendale,

California; Aaron G. Lawrence, Reich Adell & Cvitan,

Glendale, California; Scott A. Kronland, Stacey M. Leyton,

and Corinne F. Johnson, Altshuler Berzon LLP, San

Francisco, California; for Amici Curiae The State Building

and Construction Trades Council, Sierra Club, Natural

Resources Defense Council, Communities for a Better

Environment, Planning and Conservation League, California

Communities Against Toxics, California State Council of

Laborers, and Coalition for Clean Air.

RELEVANT GROUP, LLC V. NOURMAND 5

OPINION

M. SMITH, Circuit Judge:

This case arises out of a dispute between two property

developers and their subsidiaries: Plaintiff-Appellant

Relevant Group, LLC, which owns the Wilcox, Tommie, and

Selma hotels (sometimes referred to as Plaintiffs herein), and

Defendant-Appellees Sunset Landmark Investment, LLC,

Stephen Nourmand, and Nourmand & Associates, which

operate the Hollywood Athletic Club. In their complaint,

Plaintiffs allege that Defendants abused the processes

available under the California Environmental Quality Act

(CEQA), Pub. Res. Code §§ 21000–21189.57, to extort

funds from Plaintiffs in violation of the Racketeer Influenced

and Corrupt Organizations Act (RICO), 18 U.S.C. §§ 1961–

68. The district court granted summary judgment in favor of

Defendants, holding that the Noerr-Pennington doctrine

protected Defendants’ petitioning activity from statutory

liability under the First Amendment. We affirm the district

court’s order.

FACTUAL AND PROCEDURAL BACKGROUND

A. Overview

Relevant Group, LLC is an umbrella entity that manages

the three other LLC Plaintiffs—the 1541 Wilcox Hotel LLC,

the 6516 Tommie Hotel LLC, and the 6421 Selma Wilcox

Hotel LLC (collectively, Relevant). Relevant has spent the

last decade trying to develop hotels in the Hollywood

neighborhood of Los Angeles.

The historic Hollywood Athletic Club, owned by Sunset

Landmark Investment LLC (Sunset) is located in the same

neighborhood as Relevant’s projects. Defendant Stephan

6 RELEVANT GROUP, LLC V. NOURMAND

“Saeed” Nourmand is Sunset’s principal. Saeed is also a

founder of Defendant Nourmand and Associates (N&A), a

residential real estate brokerage firm.

In 2015, Defendants began challenging Relevant’s

proposed hotel projects by, inter alia, opposing them during

the entitlements process with the City of Los Angeles (the

City) and by filing lawsuits against the City in California

Superior Court pursuant to the CEQA.

B. CEQA

CEQA “establishes a comprehensive scheme to provide

long-term protection to the environment.” Berkeley Hillside

Pres. v. City of Berkeley, 343 P.3d 834, 837 (Cal. 2015).

“Consistent with California’s strong environmental policy,

whenever the approval of a project is at issue, the statute and

regulations have established a three-tiered process to ensure

that public agencies inform their decisions with

environmental considerations.” San Lorenzo Valley Cmty.

Advocs. for Responsible Educ. v. San Lorenzo Valley Unified

Sch. Dist., 139 Cal. App. 4th 1356, 1372 (2006) (internal

quotation marks and citation omitted).

“The first tier requires an agency to conduct a

preliminary review to determine whether CEQA applies to a

proposed project.” Save Our Big Trees v. City of Santa Cruz,

241 Cal. App. 4th 694, 704 (2015). “If CEQA applies, the

agency must proceed to the second tier of the process by

conducting an initial study of the project.” Id.

At the second tier, the initial study is performed to

determine the impact of the project on the environment and

whether additional investigation must be undertaken. Id. at

704–05. If, per the initial study, there is “no substantial

RELEVANT GROUP, LLC V. NOURMAND 7

evidence 1 that the project or any of its aspects may cause a

significant effect on the environment,” the agency prepares

what is called a “negative declaration.” Id. at 705 (quoting

CEQA Guidelines, § 15063(b)(2)). Alternatively, if the

initial study identifies potential effects on the environment

that the agency nonetheless determines can be mitigated by

revisions to project plans to a point where clearly no

significant effect on the environment would occur, the

agency issues a “mitigated negative declaration” (MND). Id.

Only if “the initial study uncovers ‘substantial evidence

that any aspect of the project, either individually or

cumulatively, may cause a significant effect 2 on the

environment’” does the agency proceed to the third tier of

the review process, which involves preparing a full

environmental impact report (EIR). Id. (quoting CEQA

Guidelines, § 15063(b)(1)).

1

“In the CEQA context, substantial evidence ‘means enough relevant

information and reasonable inferences from this information that a fair

argument can be made to support a conclusion, even though other

conclusions might also be reached.’” Save Our Big Trees, 241 Cal. App.

4th at 705 (quoting CEQA Guidelines, § 15384 (a)).

2

“Significant effect on the environment means a substantial, or

potentially substantial, adverse change in any of the physical conditions

within the area affected by the project including land, air, water,

minerals, flora, fauna, ambient noise, and objects of historic or aesthetic

significance.” Keep Our Mountains Quiet v. County of Santa Clara, 236

Cal. App. 4th 714, 729 (2015) (quoting CEQA Guidelines, § 15382)

(internal quotation marks omitted). But “[t]here is no ‘ironclad

definition of what constitutes a significant effect.’” Id. (quoting CEQA

Guidelines, § 15064 (b)) (cleaned up).

8 RELEVANT GROUP, LLC V. NOURMAND

“When an agency issues a negative declaration or a

mitigated negative declaration, third parties with standing3

may seek judicial review of the adoption of the negative

declaration by filing a petition for writ of mandate in a

California court.” San Bernardino Valley Audubon Soc’y,

71 Cal. App. 4th at 385. A litigant who successfully

challenges an agency’s issuance of a negative declaration in

court may be entitled to attorneys’ fees. Friends of “B” St.

v. City of Hayward, 106 Cal. App. 3d 988, 994–95 (1980)

(citation omitted).

C. Relevant’s Hotel Projects

Sunset challenged several proposed Relevant projects

using the CEQA framework. Relevant alleges that Sunset

brought these challenges for the sole purpose of obstructing

Relevant’s work and extorting funds from Relevant.

i. The Thompson Project

In February 2015, the City issued a Notice of Public

Hearing for the Thompson Hotel project (Thompson

Project). A month later, the City published an initial MND

for the Thompson Project, meaning that “the initial study

identifie[d] potentially significant effects on the

environment” but that revisions to project plans could

mitigate those effects to where development would be

acceptable. Save Our Big Trees, 241 Cal. App. 4th at 705.

3

A party has standing to seek a writ of mandate in state court based on

alleged CEQA violations if she is “a property owner, taxpayer, or elector

who establishes a geographical nexus with the site of the challenged

project.” Citizens Ass’n for Sensible Dev. of Bishop Area v. County of

Inyo, 172 Cal. App. 3d 151, 158 (1985); see also San Bernardino Valley

Audubon Soc’y v. Metro. Water Dist., 71 Cal. App. 4th 382, 385–89

(1999).

RELEVANT GROUP, LLC V. NOURMAND 9

In July of that year, the City published a revised MND

for the Thompson Project, adding several new mitigation

measures to address noise impacts. Then, in September,

Sunset filed objections to the Thompson Project, raising, in

part, concerns about the hotel’s impact on traffic and noise.

Nonetheless, on October 19, 2015, the City adopted another

MND and approved the Thompson Project. Ultimately, the

City granted final approval for the Thompson Project in

February 2016. A few weeks later, Sunset filed its Petition

for Writ of Mandate against the City, to challenge the

Thompson Project’s MND and require the City to prepare a

full EIR. As discussed below, the parties eventually reached

a settlement regarding the Thompson Project.

ii. The Tommie Project

While the Thompson Project was underway, Relevant

also proposed the Tommie Hotel project (Tommie Project).

In December 2016, the City produced an MND for the

Tommie project. A month later, Sunset filed objections

regarding plans for the Tommie Project, and a month

thereafter, Sunset filed an appeal challenging the approval of

the Tommie Project. The City nonetheless approved the

Tommie Project on May 12, 2017. On June 9, 2017, Sunset

filed a Petition for Writ of Mandate, seeking a full EIR for

the Tommie Project.

While the state court appeal was pending, Relevant and

Thompson settled their disputes regarding the Thompson

Project and Tommie Project on August 24, 2017, and a

formal agreement was executed in January of the following

year.

10 RELEVANT GROUP, LLC V. NOURMAND

iii. Selma Project

Meanwhile, Relevant was working on the Selma Hotel

project (Selma Project). In December 2017, the City

published an MND for the Selma Project, and in March

2018, the City issued a Notice of Public Comment. That

month, Sunset submitted an objection letter. The City

approved the Selma Project, but Sunset promptly appealed.

During the pendency of this appeal, Sunset also sent a letter

to the Los Angeles County District Attorney’s Office, the

California Attorney’s Office, the California Attorney

General, and the U.S. Attorney for the Central District of

California, requesting that prosecutors open an investigation

into the City’s approvals of Relevant projects in Hollywood.

In March 2019, the City denied all appeals related to the

Selma Project. A month later, Sunset filed a Petition for

Writ of Mandate seeking a full EIR for the Selma Project. 4

On January 8, 2020, the state court issued an interlocutory

order on Sunset’s petition, the effects of which the parties

dispute. The Selma Project remains pending before the City.

iv. Schrader Project

Finally, the district court discussed the Schrader Hotel

project (Schrader Project). The parties dispute the extent of

Relevant’s interest in the Schrader Project. The hotel is

technically being developed by a third party (KoarGroup),

as opposed to Relevant, but Relevant allegedly had an

ownership interest in the Schrader Project because it was a

party to a purchase agreement and had made a $1 million

nonrefundable down payment towards the purchase price.

4

On April 4, 2019, an individual named Casey Maddren also filed a

Petition for Writ of Mandate against the Selma. There is a dispute about

the extent of Maddren’s ties to Defendants.

RELEVANT GROUP, LLC V. NOURMAND 11

As with the other proposed projects, Sunset submitted an

objection to the Schrader Project and appealed its approval,

but later withdrew its challenge. Relevant claims that

Defendants ended their opposition to the Schrader Project

after learning that Relevant had lost interest in the project.

In June 2019, Relevant filed a complaint in federal court

bringing three RICO claims under 18 U.S.C. §§ 1962(c) and

(d) against Defendants based on alleged extortion and

attempted extortion relating to Defendants’ petitioning

activity.

Relevant’s claims survived two motions to dismiss and a

motion for summary judgment. After summary judgment

and before trial, however, the case was transferred from

Judge Wright to Judge Gutierrez. Judge Gutierrez sua

sponte ordered supplemental briefing on the issues resolved

at summary judgment before Judge Wright, and in a new

order, reversed the prior determination and granted summary

judgment in favor of Defendants. Relevant timely appealed.

JURISDICTION AND STANDARD OF REVIEW

We have jurisdiction pursuant to 28 U.S.C. § 1291. We

review de novo the district court’s summary judgment order.

2-Bar Ranch Ltd. P’ship v. U.S. Forest Serv., 996 F.3d 984,

990 (9th Cir. 2021).

ANALYSIS

I. The district court did not abuse its discretion in sua

sponte reconsidering the prior judge’s summary

judgment ruling.

As a threshold matter, Relevant argues that the law of the

case doctrine, “or, at a minimum, the principles underlying

the doctrine,” should have precluded the district court from

12 RELEVANT GROUP, LLC V. NOURMAND

sua sponte reconsidering its earlier decision denying

summary judgment.

Under the law of the case doctrine, “a court is generally

precluded from reconsidering an issue that has already been

decided by the same court . . . in the identical case.” Thomas

v. Bible, 983 F.2d 152, 154 (9th Cir. 1993). However, a

second district judge may review an interlocutory order by a

prior judge in the same case when “(1) the decision is clearly

erroneous and its enforcement would work a manifest

injustice, (2) intervening controlling authority makes

reconsideration appropriate, or (3) substantially different

evidence was adduced at a subsequent trial.” Zeyen v.

Bonneville Joint Dist., #93, --- F.4th ---, No. 23-35438, 2024

WL 3909574, at *5 (9th Cir. Aug. 23, 2024) (quoting Delta

Sav. Bank v. United States, 265 F.3d 1017, 1027 (9th Cir.

2001)). In the first scenario, where there has been no

intervening change in the law nor new evidence offered, the

district court judge must explain “(1) why the previous

decision is ‘clearly erroneous’; and (2) why enforcement of

the previous decision ‘would work a manifest injustice.’” Id.

(quoting Delta Sav. Bank, 265 F.3d at 1027). Moreover,

regardless of whether a judge has committed an abuse of

discretion by reviewing a prior judge’s ruling, “there is

nothing that insulates either judge’s conclusion from

appellate review.” Levald, Inc. v. City of Palm Desert, 998

F.2d 680, 687 (9th Cir. 1993); see also Delta Sav. Bank, 265

F.3d at 1027–28 (“[W]hether or not a district court judge

abuses his discretion by reversing an earlier judge’s ruling,

the Court of Appeals should review the merits of the

ruling.”).

As discussed above, this case was originally assigned to

Judge Wright, and then to Judge Gutierrez. By the time the

case reached Judge Gutierrez, Judge Wright had already

RELEVANT GROUP, LLC V. NOURMAND 13

denied Defendants’ two motions to dismiss and motion for

summary judgment. On January 20, 2023, Judge Gutierrez

vacated the trial date and ordered supplemental briefing on

the issues resolved by the prior summary judgment order. In

that order, Judge Gutierrez expressed doubt regarding Judge

Wright’s view of the Noerr-Pennington doctrine and noted

that “[t]he issues identified in this order are complex and

important and require a second look to ensure that the law is

correctly interpreted and applied. It is also in the interests of

justice that these issues are clarified for the parties, the

Court, and a jury should the case proceed to trial.”

The parties filed their supplemental briefs. On May 24,

2023, Judge Gutierrez granted summary judgment in favor

of Defendants. In his order, Judge Gutierrez acknowledged

Relevant’s objection to his sua sponte reconsideration of

summary judgment, noting that a judge generally should not

overrule a prior decision of another judge in the same case.

However, he was “firmly convinced that the prior order is

erroneous and, if upheld, would endanger core constitutional

rights.”

Judge Gutierrez did not abuse his discretion in

reconsidering Judge Wright’s denial of summary judgment.

Rather, Judge Gutierrez met the Delta Savings Bank

standard by explaining both how Judge Wright’s decision

was clearly erroneous (misapplication of the Noerr-

Pennington doctrine) and how manifest injustice would

occur should the prior decision be allowed to stand (“core

constitutional rights” were at issue).

Moreover, Relevant’s arguments that Judge Gutierrez

abused his discretion are not persuasive. It continuously

characterizes Judge Wright as having rejected defendants’

Noerr-Pennington defense “three separate times” prior to

14 RELEVANT GROUP, LLC V. NOURMAND

Judge Gutierrez’s reversal, thereby portraying

reconsideration as highly problematic. But the first two

times Judge Wright rejected defendants’ arguments were on

two separate motions to dismiss, filed by two separate

defendants. And as this court has said, “[p]retrial rulings,

often based on incomplete information, don’t bind district

judges for the remainder of the case.” Peralta, 744 F.3d at

1088. As to reconsideration of the final “time” Judge Wright

rejected the argument, our court has noted that “denial of

summary judgment often is reconsidered.” Id. (citing

Charles Alan Wright, Arthur R. Miller & Edward H. Cooper,

18B Fed. Prac. & Proc.: Juris. 2d § 4478.1 (2002)).

Regardless, any procedural error would be harmless. As

detailed below, Judge Gutierrez’s decision granting

summary judgment in favor of Defendants was correct.

II. The district court did not err in holding that

Defendants’ activities were protected under the

Noerr-Pennington Doctrine.

The Noerr-Pennington doctrine “is a rule of statutory

construction that requires courts to construe statutes to avoid

burdening conduct that implicates the protections of the

Petition Clause of the First Amendment.” United States v.

Koziol, 993 F.3d 1160, 1171 (9th Cir. 2021). That clause

protects “the right of the people . . . to petition the

government for a redress of grievances.” Id. (quoting U.S.

Const. amend. I). The doctrine originally arose in the

antitrust context but has since been applied “outside the

antitrust field.” Sosa v. DIRECTV, Inc., 437 F.3d 923, 930

(9th Cir. 2006).

“Under the Noerr-Pennington doctrine, those who

petition any department of the government for redress are

generally immune from statutory liability for their

RELEVANT GROUP, LLC V. NOURMAND 15

petitioning conduct.” Id. at 929. The classic example is

Noerr itself, where a group of truck operators sued a group

of railroad companies under the antitrust laws after the

railroads began a publicity campaign to obtain legislation

favoring their industry. E. R.R. Presidents Conf. v. Noerr

Motor Freight, Inc., 365 U.S. 127, 129 (1961). The Court

held that the publicity campaign was protected petitioning

activity, notwithstanding any underlying anticompetitive

motive on the railroads’ part. Id. at 136. We have since

extended Noerr protection to lawsuits, noting that the

doctrine “overprotects baseless petitions so as to ensure

citizens may enjoy the right of access to the courts without

fear of prosecution.” Sosa, 437 F.3d at 934.

However, “neither the Petition Clause nor the Noerr-

Pennington doctrine protects sham petitions, and statutes

need not be construed to permit them.” Id. at 932. Our court

has identified three circumstances in which the sham

litigation exception might apply: first, where the lawsuit is

objectively baseless and the defendant’s motive in bringing

it was unlawful, Pro. Real Est. Invs., Inc. v. Columbia

Pictures Indus., Inc., 508 U.S. 49, 54 (1993) (PREI); second,

where the conduct involves a series of lawsuits “brought

pursuant to a policy of starting legal proceedings without

regard to the merits” and for an unlawful purpose, USS–

POSCO Indus. v. Contra Costa Cnty Bldg. & Constr. Trades

Council, 31 F.3d 800, 810–11 (9th Cir. 1994) (POSCO); and

third, if the allegedly unlawful conduct “consists of making

intentional misrepresentations to the court, litigation can be

deemed a sham if ‘a party’s knowing fraud upon, or its

intentional misrepresentations to, the court deprive the

litigation of its legitimacy.’” Sosa, 437 F.3d at 938 (quoting

Kottle v. Nw. Kidney Ctrs., 146 F.3d 1056, 1060 (9th Cir.

1998)).

16 RELEVANT GROUP, LLC V. NOURMAND

A. The PREI framework rather than the POSCO

framework applies.

Relevant’s first argument is that the district court erred

by applying the test to determine whether litigation activity

is a “sham” under the framework in PREI as opposed to that

in POSCO (i.e., the first as opposed to the second of the three

circumstances set forth above). To understand that

argument, we need to consider each of these cases.

PREI involved a dispute between a company that owned

copyrights in certain films (Columbia) and a hotel where

guests could rent those films to watch in their rooms (PRE).

508 U.S. at 51–53. When Columbia sued PRE for copyright

infringement, PRE counterclaimed, alleging that the

copyright suit was a sham brought with the motive of

monopolizing movie distribution. Id. at 53. The Supreme

Court affirmed the district court’s decision to deny discovery

into Columbia’s subjective motives for bringing the

copyright suit, explaining that PRE first had to show that (1)

the lawsuit was “objectively baseless,” and only then that (2)

the defendant had an improper motive in bringing the suit.

Id. The Court ultimately held that the suit was not

objectively baseless and thus immunized.

POSCO, unlike PREI, is not a Supreme Court case, but

as explained below, drew its reasoning from Supreme Court

precedent. In POSCO, a group of unions “began a campaign

to eliminate non-union construction” by allegedly bringing a

“series of overlapping, repetitive and sham lawsuits” against

a company named BE&K, which had been awarded a

construction contract but did not employ union workers.

POSCO, 31 F.3d at 804. BE&K filed suit against the unions

alleging various antitrust violations, and the unions asserted

RELEVANT GROUP, LLC V. NOURMAND 17

that their activities were protected by the Noerr-Pennington

doctrine. Id.

In opposing the unions’ invocation of Noerr-Pennington,

BE&K cited a Supreme Court case from 1972, California

Motor Transport Co. v. Trucking Unlimited, where the

Supreme Court held the allegations “that petitioners

‘instituted the proceedings and actions . . . with or without

probable cause, and regardless of the merits of the cases,’”

were “[o]n their face . . . within the ‘sham’ exception.” 404

U.S. 508, 512, 516 (1972). In response, the unions argued

that PREI, discussed above, effectively overruled California

Motor Transport and that the two-step analysis applied to all

invocations of the “sham” exception. POSCO, 31 F.3d at

810.

The POSCO panel was “not persuaded that Professional

Real Estate Investors effectively overrules California Motor

Transport.” Id. It reconciled the two cases by “reading them

as applying to different situations”:

Professional Real Estate Investors provides a

strict two-step analysis to assess whether a

single action constitutes sham petitioning.

This inquiry is essentially retrospective: If

the suit turns out to have objective merit, the

plaintiff can’t proceed to inquire into

subjective purposes, and the action is

perforce not a sham.

California Motor Transport deals with the

case where the defendant is accused of

bringing a whole series of legal

proceedings . . . [It] recognized that the filing

of a whole series of lawsuits and other legal

18 RELEVANT GROUP, LLC V. NOURMAND

actions without regard to the merits has far

more serious implications than filing a single

action, and can serve as a very effective

restraint on trade. When dealing with a series

of lawsuits, the question is not whether any

one of them has merit—some may turn out

to, just as a matter of chance—but whether

they are brought pursuant to a policy of

starting legal proceedings without regard to

the merits and for the purpose of injuring a

market rival. The inquiry in such cases is

prospective: Were the legal filings made, not

out of a genuine interest in redressing

grievances, but as part of a pattern or practice

of successive filings undertaken essentially

for purposes of harassment?

Id. at 810–11. Unfortunately, cases in our circuit since PREI

and POSCO have occasionally blurred the lines concerning

which test should apply and when. For example, while cases

originally referred to PREI as the test to apply when a

“single” suit is at issue, subsequent cases have described

PREI as the test to use when there is “a single sham lawsuit

(or a small number of such suits).” See, e.g., Freeman v.

Lasky, Haas & Cohler, 410 F.3d 1180, 1184 (9th Cir. 2005)

(emphasis added) (citing Kottle, 146 F.3d at 1060).

Similarly, we have never defined what number constitutes a

“series” of lawsuits in POSCO. See, e.g., Amarel v. Connell,

102 F.3d 1494, 1519 (9th Cir. 1996), as amended (Jan. 15,

1997) (“[W]e do not attempt to define here the number of

RELEVANT GROUP, LLC V. NOURMAND 19

legal proceedings needed to allege a ‘series’ or ‘pattern’ of

litigation as required in [POSCO].”). 5

The district court handled this dilemma by surveying the

case law applying PREI and POSCO and comparing it to the

facts here. It noted, for example, that we declined to apply

the POSCO exception in Amarel, 102 F.3d at 1519, because

plaintiffs had “cite[d] only two lawsuits, not a ‘series’ or a

‘pattern’ of them.” It also noted that POSCO itself involved

significantly more lawsuits: twenty-nine, to be exact. See

POSCO, 31 F.3d at 811. Noting that Defendants challenged

four of Relevant’s projects in CEQA proceedings, the

district court concluded: “Four is much closer to two than

twenty-nine, and so the PREI exception should apply.”

Relevant argues that the district court “erred in

presuming that [application of] the [POSCO] exception is a

mere counting exercise.” It asserts that the district court

instead should have conducted a “holistic” analysis of

Defendants’ conduct. It cites Clipper Exxpress v. Rocky

Mountain Motor Tariff Bureau, Inc., 690 F.2d 1240, 1256

(9th Cir. 1982) for the proposition that “it is not the number

of claims which is controlling, but whether the evidence

5

In some cases, it appears that it was easier for a panel to assume that

the POSCO test applied and to reach the merits of that test, rather than

determining which test applied at the outset. Cf. Kaiser Found. Health

Plan, Inc. v. Abbott Lab’ys, Inc., 552 F.3d 1033, 1046 (9th Cir. 2009)

(“We need not decide whether Kaiser has waived its argument that the

California Motor Transport test applies, for even under that test Kaiser

loses its sham litigation claim.”); B&G Foods N. Am., Inc. v. Embry, 29

F.4th 527, 539 (9th Cir. 2022), cert. denied, 143 S. Ct. 212 (2022)

(assuming that POSCO applied where plaintiff alleged that defendant

“filed or threatened to file dozens of cases,” but affirming dismissal of

complaint based on failure to plead success rate of lawsuits).

20 RELEVANT GROUP, LLC V. NOURMAND

shows that the claim or claims filed constitute an abuse of

process.” Id. at n.25.

But there are several problems with Relevant’s

argument. First, even setting aside the fact that Clipper was

decided before PREI and POSCO, that statement in Clipper

is taken out of context. The panel made the statement not to

suggest that one “action” can constitute numerous “actions”

under Noerr, but rather to rebut defendants’ assertion in that

case that Noerr-Pennington protection applies only where a

plaintiff has alleged more than one “sham.” Id. at 1256–57.

After reviewing Supreme Court case law, the Clipper court

explained: “there is no reason to believe that the [Supreme]

Court intended to extend the sham exception only to cases

involving repetitive claims.” Id. at 1256.

More to the point, Relevant’s proposed alternative

method of counting “proceedings” for purposes of the sham

exceptions is not supported by case law. Relevant contends

that the district court should have counted as separate

“proceedings” certain discrete actions Defendants took

while attempting to halt each of Relevant’s four projects,

such as “administrative objections and challenges.” In

particular, Relevant asserts that the district court should have

counted as “proceedings” various objections and appeals,

such as: “[an] Administrative appeal to the Planning and

Land Use Management [] Committee,” “Objections

submitted to the City Council”; “[a] Petition for writ of

mandamus filed in California Superior Court” and “[a]

Comment letter to Community Redevelopment Agency of

Los Angeles [] regarding proposed Owner Participation

Agreement.” When counting “proceedings” this way,

Relevant asserts that the total number of proceedings is

twenty, rather than four.

RELEVANT GROUP, LLC V. NOURMAND 21

Relevant argues that California Motor Transport

supports that we should count “comment letters,”

“objections” and “appeals” as discrete “proceedings”

because the Supreme Court there acknowledged that the

allegations “extended to rehearings and to reviews or appeals

from agency or court decisions.” 404 U.S. at 509. It also

cites to POSCO for the proposition that the sham exception

applies to “lawsuits and other legal actions,” POSCO, 31

F.3d at 811 (emphasis added), implying that comment letters

and objections would fall within the latter.

We are not persuaded. POSCO used the words

“lawsuits,” “actions” and “proceedings” interchangeably

throughout the opinion. Although the panel did not define

these terms, they are all words that refer to a larger concerted

effort toward a remedy, rather than to individual, discrete

actions taken within that effort, such as a letter sent to an

administrative body. See, e.g., Proceeding, Black’s Law

Dictionary (11th ed. 2019) (“The regular and orderly

progression of a lawsuit, including all acts and events

between the time of commencement and the entry of

judgment.” (emphasis added)); cf. Action at law, Black’s

Law Dictionary (11th ed. 2019) (“A civil suit stating a legal

cause of action and seeking only a legal remedy.”).

Moreover, California Motor Transport is vague

regarding whether it counted the above-quoted “rehearings

and . . . reviews or appeals from agency or court decisions”

as “proceedings” in the legal sense, or even what the

“proceedings” at issue constituted (e.g., objection letters,

comment letters, etc.). 404 U.S. at 509.6 Notably, there is

6

California Motor Transport was also an appeal from a motion to

dismiss, rather than from a motion for summary judgment and therefore

was subject to the laxer Fed. R. Civ. P. 12(b)(6) standard. Id.

22 RELEVANT GROUP, LLC V. NOURMAND

some suggestion in California Motor that petitioners “use[d]

administrative and judicial proceedings so as to deny

[respondents] ‘free and unlimited access’ to those tribunals,”

such that “the machinery of the agencies and the courts was

effectively closed to respondents.” Id. at 511. Those kinds

of allegations are not present here, where it appears that

Relevant was able to litigate each challenge brought by

Defendants in each applicable forum.

Ultimately, neither California Motor Transport nor

POSCO supports counting each discrete litigation activity as

a “proceeding” that together can constitute a “series of

proceedings” for purposes of the POSCO test. Indeed, to the

extent there is case law in our circuit defining what

constitutes a “proceeding” for purposes of the POSCO

exception, that case law is more harmful than helpful to

Relevant. In Manistee Town Center v. City of Glendale, 227

F.3d 1090, 1094 (9th Cir. 2000), we explained that “[t]he

sham exception is more easily applied to litigation, however,

than it is to lobbying before executive or legislative bodies.”

And in Kottle we stated that “for purposes of the sham

exception, executive entities are treated like judicial entities

only to the extent that their actions are guided by enforceable

standards subject to review.” 146 F.3d at 1062. Thus,

“[o]nly when administrative officials must follow rules is it

meaningful to ask whether” the sham exception applies. Id.

As N&A notes, there are several alleged “proceedings”

in this case that may not actually qualify as such for purposes

of the POSCO exception because many of the activities are

non-judicial. For example, N&A notes that “the permitting

process is non-judicial.” That fact removes a number of

discretionary decisions out of Relevant’s list of alleged

“proceedings” it seeks to count to have the court apply the

POSCO exception.

RELEVANT GROUP, LLC V. NOURMAND 23

Admittedly, the district court’s counting exercise might

seem elementary. But a review of our precedent shows that

it is not unreasonable. More importantly, Relevant’s

proposed counting method is both unsupported by case law

and would inevitably result in line-drawing problems. For

example, there is a reasonable argument that actions

Defendants had to take to exhaust their administrative

remedies should not be counted for purposes of the “sham”

exception. Similarly, we struggle to see how lower courts

hereafter would know whether to count a “letter” or

“motion” as a “proceeding,” or a dispositive motion as

opposed to discovery motion as a “proceeding,” just to name

a few examples.

In establishing its “series” framework, POSCO relied on

a fact pattern that involved twenty-nine lawsuits. POSCO,

31 F.3d at 810–11. Perhaps due to the rarity of that number,

its infrequent application in our case law is a feature rather

than a bug. Because this case only involves four actions

resembling “lawsuits” in the traditional sense, we apply the

PREI exception, rather than the POSCO exception to the

facts of this case.

B. Applying the PREI framework, the proceedings are

not shams.

Under the PREI exception, a proceeding is a “sham”

(1) “where the lawsuit is objectively baseless,” and

(2) where “the defendant’s motive in bringing it was

unlawful.” Sosa, 437 F.3d at 938. “Only if challenged

litigation is objectively meritless may a court examine the

litigant’s subjective motivation.” PREI, 508 U.S. at 50.

The district court found that Defendants’ actions were

not objectively baseless as a matter of law. Relevant argues

that the district court erred in reaching this conclusion

24 RELEVANT GROUP, LLC V. NOURMAND

because there were disputes of material fact regarding that

first prong of the PREI test. But “[w]here, as here, there is

no dispute over the predicate facts of the underlying legal

proceeding, a court may decide” objective baselessness “as

a matter of law.” Id. at 63; Clipper, 690 F.2d at 1254 (“These

allegations fall within the sham exception as a matter of

law.”). There are no factual (as opposed to legal) disputes

about the underlying proceedings here, which are made up

of “public legal filings and rulings,” the content of which the

parties do not dispute. Therefore, the district court did not

err by viewing the facts in the light most favorable to

Relevant, but still deciding objective baselessness as a

matter of law.

An action is objectively baseless when “no reasonable

litigant could realistically expect success on the merits.”

PREI, 508 U.S. at 60. As the PREI court explained,

objective reasonableness is measured by the existence of

“probable cause” as understood in traditional common law

actions. Id. at 62 (“The existence of probable cause to

institute legal proceedings precludes a finding that an

antitrust defendant has engaged in sham litigation.”). The

threshold for what constitutes probable cause is low: it

requires no more than a “reasonable belief” that there is

“some chance” “that [a] claim may be held valid upon

adjudication.” Id. at 62–63; 65; see also Theme Promotions,

Inc. v. News Am. Mktg. FSI, 546 F.3d 991, 1008 (9th Cir.

2008) (holding that suit was not objectively baseless where

it was “potentially meritorious”). While a winning lawsuit

“is by definition . . . not a sham,” the inverse is not true, and

“a court must resist the understandable temptation to engage

in post hoc reasoning by concluding” that an ultimately

unsuccessful “action must have been unreasonable or

RELEVANT GROUP, LLC V. NOURMAND 25

without foundation.” PREI, 508 U.S. at 61 n.5. (internal

quotation marks and citations omitted).

The district court concluded that the Thompson and

Tommie actions were not objective baseless because “[t]he

fact that Relevant settled both lawsuits is strong, if not

conclusive, evidence” of that fact. Relevant argues that the

district court’s reliance on the settlements as evidence of

probable cause was erroneous. It argues that when it comes

to settlement, “[a] victim facing ruin will pay anything to

avoid it—and where the threat of ruin comes from the

litigation process, that means settlement.” Id. at 60–61

(explaining that sham exception is concerned with the “use

[of] the governmental process—as opposed to the outcome

of that process—as an anticompetitive weapon”).

However, we have previously said that settlement

indicates a lawsuit is not objectively baseless. In Theme

Promotions, Inc. v. News America Marketing FSI, 546 F.3d

at 1008, the court analyzed whether pre-suit letters from one

party threatening litigation fell within the sham exception.

The court noted that “the letters can be interpreted as threats

to include the packaged goods companies in the ongoing

litigation between [the parties]” and that, to the extent that

interpretation was correct, “[t]he fact that this ongoing

litigation settled suggests that the original suit was not

objectively baseless.” Id.

Relevant fails to address Theme in its briefing. But even

if Relevant were correct that settlements are not indicative

of a lack of objective baselessness, that does not mean that

they are indicative of objective baselessness, either. A

survey of other cases in our circuit suggests that to the extent

settlements are relevant to the sham exception, they are only

relevant as to the second prong of the PREI exception, i.e.,

26 RELEVANT GROUP, LLC V. NOURMAND

whether the lawsuit was brought with an improper motive.

See, e.g., B&G, 29 F.4th at 541–42 (reversing district court’s

denial of leave to amend because new allegations could

“support the subjective element [of the PREI exception], as

they could support the inference that Defendants threatened

and filed suit because they wanted to improperly pressure

B&G into settling”); see also Rock River Commc’ns, Inc. v.

Universal Music Grp., Inc., 745 F.3d 343, 353 (9th Cir.

2014) (holding that allegations that a party hoped to enforce

its “rights through the threat of litigation rather than through

actual litigation” could “satisfy[ ] the second criterion for the

sham exception”); Koziol, 993 F.3d at 1172 n.12 (explaining

that government could prove “improper motive” even if

defendant filed threatened complaint because “the

incongruity between his settlement demands and the

complaint would be probative evidence of sham litigation”).

Moreover, as the district court noted, the terms of the

settlement here contained nonmonetary provisions that “a

CEQA litigant might want, including provisions for noise

reduction measures and a height reduction provision for the

Thompson hotel.” To the extent the Tommie/Thompson

settlements are relevant, it would suggest that the underlying

proceedings were not objectively baseless. Relevant

responds that the terms of the settlement also required it “to

forgo CEQA challenges to Defendants’ own future

developments, which is the antithesis of CEQA’s animating

purpose.” But as we said in Microsoft Corp. v. Motorola,

Inc., 795 F.3d 1024, 1048 (9th Cir. 2015), “a contractual

commitment [and enforcement of it] to refrain from

litigation does not violate the First Amendment; if it did,

every settlement of a lawsuit would be unenforceable as a

Noerr–Pennington violation.”

RELEVANT GROUP, LLC V. NOURMAND 27

The district court listed a few other reasons it thought the

Thompson/Tommie actions were not objectively baseless.

First, it noted that before trial was set to begin in the

Thompson suit, “the Judge issued a tentative order denying

the City’s motion to augment the administrative record,

which if granted ‘would [have] support[ed] the City’s

argument that it disclosed certain design changes in the

Project that are not found in the MND because they were

added by the Real Party to the Project after the public

comment period closed for the MND.’” Moreover, the

district court noted that “two other petitions were filed

against the project, which later settled.” “One of those other

petitioners was Lauren Farmer, who cited Sunset’s

objections and appeals to the City, and received a favorable

remand and injunction from state court.”

Relevant argues that neither of these facts is probative of

probable cause because “no court ever ordered an EIR.” But

we agree with the district court that Relevant’s framing of

what constitutes a “success” under CEQA is too narrow.

CEQA’s framework is unlike traditional litigation in that

it involves a multi-tiered and multi-layered review process,

rather than a win/loss binary. As described above, CEQA is

multi-tiered in that “success” may be found in the form of

something less than an EIR, such as an MND, which would

tentatively allow a project to proceed subject to certain

conditions. In addition, CEQA is multi-layered in the sense

that it involves broad participation by the public, and

requires the agency involved to review those comments.

Given that “[t]he overriding purpose of CEQA is to

ensure that agencies regulating activities that may affect the

quality of the environment give primary consideration to

preventing environmental damage,” Defendants’ actions

28 RELEVANT GROUP, LLC V. NOURMAND

cannot be said to be objectively baseless as they “succeeded”

in having the agency consider the environmental impacts of

Relevant’s projects. Save Our Big Trees, 241 Cal. App. 4th

at 704 (emphasis added) (citation omitted). As California

courts have noted, this suggests that CEQA creates a “low

threshold” for success. Georgetown Pres. Soc’y v. County

of El Dorado, 30 Cal. App. 5th 358, 371 (2018). But if

Relevant is concerned about the CEQA process being abused

(as many persons and entities have claimed has occurred

since its enactment), its recourse is to bring this to the

attention of the state legislature and the governor, not to try

to squash the process altogether in federal court.

For the same reason, the district court was correct to

conclude that the Selma litigation was not objectively

baseless. That conclusion is more obvious, as the state court

reviewing that petition explicitly found CEQA violations

and entered an order “for further proceedings and for the

City to make specific findings to clarify the Project’s

baseline and resolve the issue of the impact on air quality.”

Finally, the district court was correct to conclude that

objections to the Schrader Project were not objectively

baseless. The district court viewed the facts in the light most

favorable to Relevant, whose narrative is that Defendants

only halted their objections to the project once they found

out that Relevant was no longer involved. But even if that is

true, those facts are probative of improper motive, not

objective baselessness. See Koziol, 993 F.3d at 1171, 1180–

81 (noting that unlike the first prong, the second prong of

PREI test involves a subjective standard, and that “Koziol’s

failure to file the threatened lawsuit supports the second

prong of the sham exception (improper motive)”) (emphasis

added).

RELEVANT GROUP, LLC V. NOURMAND 29

In sum, the district court did not err in concluding that

Defendants’ actions pursuant to CEQA were not objectively

baseless. That is not surprising, given that we have

previously said that courts should not “lightly conclude in

any Noerr–Pennington case that the litigation in question is

objectively baseless, as doing so would leave that action

without the ordinary protections afforded by the First

Amendment, a result we would reach only with great

reluctance.” White v. Lee, 227 F.3d 1214, 1232 (9th Cir.

2000).

To be sure, Relevant raises several facts suggesting that

Defendants had an improper purpose in bringing their

actions. For example, Relevant asserts that when it met with

Nourmand regarding certain objections, Nourmand

responded, “you know the drill. It will take a check to make

this go away.” But we cannot review that evidence unless

we first find that Defendants’ actions were objectively

baseless. PREI, 508 U.S. at 50 (“Only if challenged

litigation is objectively meritless may a court examine the

litigant’s subjective motivation.”); White, 227 F.3d at 1232.

As the Supreme Court instructed, “[w]hether applying Noerr

as an antitrust doctrine or invoking it in other contexts, we

have repeatedly reaffirmed that evidence of anticompetitive

intent or purpose alone cannot transform otherwise

legitimate activity into a sham.” PREI, 508 U.S. at 59. That

conclusion makes sense in light of the doctrine’s ultimate

purpose, which is to “overprotect” potentially baseless

petitions to ensure that First Amendment rights are not

chilled. See Sosa, 437 F.3d at 934 (referring to Noerr-

Pennington protection as “breathing room protection”);

White, 227 F.3d at 1233 (“This court has held that when an

action involves the right to petition governmental bodies

under Noerr–Pennington, it is necessary to apply a

30 RELEVANT GROUP, LLC V. NOURMAND

heightened level of protection . . . to avoid ‘a chilling effect

on the exercise of this fundamental First Amendment right.”

(internal quotations omitted)).

Because the district court correctly held that Defendants’

CEQA actions did not fall within the sham exception, we

need not reach their other arguments to affirm the district

court. These arguments are that “‘litigation activity’ can

never be a ‘predicate act’ for purposes of civil RICO

liability,” and that Relevant has not alleged enough predicate

acts to sustain a cause of action under RICO. Both of these

questions involve unresolved issues of law, and we do not

address them here. See PDK Labs, Inc. v. U.S. D.E.A., 362

F.3d 786, 799 (D.C. Cir. 2004) (“[T]he cardinal principle of

judicial restraint—if it is not necessary to decide more, it is

necessary not to decide more—counsels us to go no

further.”) (Roberts, J., concurring in part and concurring in

the judgment).

CONCLUSION

For the foregoing reasons, we AFFIRM the order of the

district court.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.