Opinion

City of Elizabethton, Tennessee v. North American Fibers, Inc.

Court
Court of Appeals of Tennessee
Filed
Nov 19, 2004
Status
Published
On the bench
Judge Sharon G. Lee
Cited by
0 cases
Authority
More cited than 29.5%

The opinion

IN THE COURT OF APPEALS OF TENNESSEE

AT KNOXVILLE

September 20, 2004 Session

CITY OF ELIZABETHTON, TENNESSEE v. NORTH AMERICAN

FIBERS, INC., et al.

Appeal from the Chancery Court for Carter County

No. 24908 G. Richard Johnson, Chancellor

No. E2003-02930-COA-R3-CV - FILED NOVEMBER 19, 2004

This appeal arises out of a cause of action filed by a municipality against a corporate landowner for

breach of a sewer easement which the municipality purchased as a path for its underground sewer

line. The municipality alleged that after construction of the sewer line, the landowner’s long-

standing practice of depositing fly ash and cinders over the area of the easement rendered the line

inaccessible and necessitated the construction of an alternate sewage system for which the

municipality requested compensation. The municipality also sought to hold the landowner’s

president and chief executive officer liable as the alter ego of the landowner. The trial court decreed

that the landowner had unreasonably burdened the easement, awarded the municipality compensatory

damages, and decreed that although the landowner’s president was an alter ego of the landowner,

he was not personally liable. On appeal the landowner argues that the municipality’s cause of action

was barred under the statute of limitations and equitable doctrines of estoppel and laches, that under

the rule of practical construction the easement allowed the landowner to dump material over the

sewer line, that the trial court erred in its award of damages, and that the court erred in refusing to

strike findings with respect to the landowner’s president. We affirm the judgment of the trial court

as rendered and remand.

Tenn. R. App. P. 3 Appeal as of Right; Judgment of the Chancery Court Affirmed; Cause

Remanded

SHARON G. LEE , J., delivered the opinion of the court, in which HERSCHEL P. FRANKS, P.J. and

CHARLES D. SUSANO , JR., J., joined.

Stephen G. Anderson, Knoxville, Tennessee, for the Appellant, North American Fibers, Inc.

Charlton R. Devault, Jr., Knoxville, Tennessee, for the Appellee, City of Elizabethton, Tennessee.

OPINION

I.

Appellee, the City of Elizabethton (hereinafter "the City"), purchased in 1957 an easement

from Beaunit Mills and North American Rayon Corporation, Inc., predecessors in title to Appellant,

North American Fibers, Inc. (hereinafter "NAFI"). The easement ran approximately 1,700 feet

across an open field and provided the City with a path for placement of one of two 24 inch diameter

gravity sewer interceptor lines. The line which is the subject of this case, designated "the west

interceptor line", served as a conduit for seventy percent of the City’s total sewage. It began at a

collection point in the City and extended through NAFI’s property to the bank of the Watauga River

at which point sewage was siphoned under the river to the sewage treatment plant located on the

other side.

At times relevant to the instant matter, NAFI operated a coal-fired power plant in the vicinity

of the sewer easement. For a number of years NAFI and its predecessors had dumped cinders and

fly ash produced by the power plant in settling ponds and waste piles in the area through which the

easement ran. This practice continued after construction of the subject sewer line such that the

surface elevation over the line progressively and substantially increased and manholes to the line

were buried.

In the mid-1980's, the Tennessee Department of Conservation and Environment (hereinafter

"DCE") categorized the dumping area as a "private landfill" and ordered that the dumping cease.

In 1988, DCE, which had not been advised of the City’s sewer line easement, mandated that NAFI

place a clay "cap", or cover layer, over the dumping area. As a consequence of the accumulated ash,

cinders and other debris and the clay cap, manhole covers, which had been at ground level when the

line was constructed in 1958, were now buried twelve to twenty feet underground and the sewer line,

which had been approximately fifteen feet underground in 1958, was now more than thirty feet

underground.

In 1995, the City's wastewater plant manager found that the sewer line and manholes located

within the easement area were buried under the above described debris and clay cap and were

inaccessible. The City asked NAFI if it could borrow a bulldozer to remove the accumulation over

its sewer line and was advised that it would need DCE’s permission before proceeding. The City

subsequently determined that the process of getting DCE’s approval and accessing the line by

bulldozing was both impractical and cost prohibitive. Thereafter, the City entered into discussions

with NAFI in an effort to resolve the problem, but a mutually acceptable solution was not realized

and, on August 16, 2000, the City filed a complaint against North American Fibers, Inc., North

American Corporation; and Charles K. Green, individually and as ‘alter ego’ of North American

Fibers, Inc. The complaint demands that NAFI “remove the existing burden on the plaintiff’s sanitary

sewer line easement” and “restore complete and regular access” to the line. After the complaint was

filed, negotiations between the parties continued without resolution and, in July of 2001, the City

completed construction of a bypass system consisting of two parallel pressurized sewer lines and a

-2-

pump station. This system eliminated the City’s dependence upon both the inaccessible west

interceptor line and the east interceptor line and both of those lines were abandoned.

On February 14, 2002, the City filed an amended complaint which notes the futility of

negotiations between itself and NAFI and, inter alia, recites as follows:

Since the filing of its original complaint, the plaintiff constructed and

placed in service in July 2001, a forced-main sewer line which bypasses that

portion of its sanitary sewer line system which has been illegally burdened and

obstructed by defendant. Plaintiff avers that the construction of the sewer line

bypass and accompanying pump-stations were necessary to preserve the integrity

of the municipal sanitary sewer system and to protect the health and safety of the

inhabitants of the City and of the community in general. Plaintiff avers the costs

incurred in the construction of the forced-main bypass were $1,102,754.00 and

were reasonable.

The complaint demands that the City be awarded the $1,102,754.00 incurred in construction

of the bypass system and an amount adequate to reimburse it “for the increased debt service which

it has incurred in order to finance the construction of its sewer line bypass.”

Trial of the City’s complaint was held in December of 2002 after which the trial court entered

its memorandum opinion and final order decreeing that NAFI “unreasonably and substantially

burdened” the City’s sewer line easement and awarding the City damages in the amount of

$3,414,985.00, consisting of $1,102,754.00, attributable to the construction of the bypass system,

plus $2,312,231.00 in interest. In response to post judgment motions filed by NAFI, the trial court

reduced its judgment to $3,215,270.00 and further reduced that amount to its present value of

$1,187,581.49. Thereafter, NAFI timely filed the instant appeal.

II.

The following issues are presented for our review in this case:

1) Was the City’s cause of action against NAFI barred under either the statute of limitations

or the equitable doctrines of laches and estoppel?

2) Did the trial court err in its award of damages?

3) Did the trial court err in failing to find that NAFI was authorized to dump waste material

on the land over the City’s sewer line based upon the parties’ practical construction of the easement?

4) Did the trial court err in refusing to strike from the record its findings with respect to

Charles K. Green?

-3-

III.

Our standard of review in this non-jury case is de novo upon the record of the proceedings

below and there is no presumption of correctness with respect to the trial court’s conclusions of law.

Campbell v. Florida Steel Corp., 919 S.W.2d 26, 35 (Tenn. 1996) and T.R.A.P. 13(d). The trial

court's factual findings are, however, presumed to be correct and we must affirm such findings

absent evidence preponderating to the contrary. Union Carbide Corp. v. Huddleston, 854 S.W.2d

87, 91 (Tenn. 1993). “On an issue which hinges on the credibility of witnesses, the trial court will

not be reversed unless there is found in the record clear, concrete, and convincing evidence other

than the oral testimony of witnesses which contradict the trial court’s findings.” Galbreath v. Harris,

811 S.W.2d 88, 91 (Tenn. Ct. App. 1990), citing Tennessee Valley Kaolin Corp. v. Perry, 526

S.W.2d 488, 490 (Tenn. Ct. App. 1974).

IV.

The first issue we address is whether the City’s cause of action in this case was barred under

either the statute of limitations or the equitable doctrines of laches and estoppel.

Tenn. Code Ann. § 28-2-103(a) provides as follows:

(a) No person or anyone claiming under such person shall have any action, either

at law or in equity, for the recovery of any lands, tenements or hereditaments, but

within seven (7) years after the right of action accrued.

Ordinarily, a suit to abate an adverse use of an easement under this section must be brought

within seven years from the time the cause of action arose. Shearer v. Vandergriff, 661, 682 S.W.2d

680 (Tenn. 1983). And, as acknowledged by this Court in Moffitt v. Meeks, 199 S.W.2d 463, 465

(Tenn. Ct. App. 1946), this statute of limitations begins to run from the time the adverse action

commences. However, Tenn. Code Ann. §28-1-113 provides that the provisions of Title 28 are not

applicable to actions brought by the state “unless otherwise expressly provided for.” The City’s

action is not asserted to be an action “otherwise expressly provided for.”

In Hamilton County Board of Education v. Asbestospray Corporation, 909 S.W.2d 783, 785

(Tenn. 1995) the Tennessee Supreme Court discussed the origin and applicability of Tenn. Code

Ann. § 28-1-113 as follows:

The common law doctrine of nullum tempus occurit regi, which is literally

translated as “time does not run against the king,” prevents an action brought by

the State from being dismissed due to the expiration of the statutory period of

limitations normally applicable to the specific type of action. This doctrine has

been justified on the ground “that the public should not suffer because of the

negligence of its officers and agents ...” State ex rel. Board of University &

School Lands v. Andrus, 671 F.2d 271, 274 (8th Cir. 1982). Tennessee’s version

-4-

of this doctrine, found at § 28-1-113, provides as follows: “The provision of this

title [pertaining to statutes of limitation] do not apply to actions brought by the

State of Tennessee, unless otherwise expressly provided.” This doctrine is not to

be lightly regarded, as we have repeatedly stated that statutes of limitation are

looked upon with disfavor in actions brought by the State, and will not be

enforced in the absence of clear and explicit statutory authority to do so. Dunn v.

W.F. Jameson & Sons, Inc., 569 S.W.2d 799, 802 (Tenn. 1978); Anderson v.

Security Mills, 175 Tenn. 197, 133 S.W.2d 478 (1939).

Moreover, it is settled that the nullum tempus doctrine applies, in certain

cases, to subordinate organs of the state, such as counties or municipalities. The

basic rule regarding the application of nullum tempus to actions brought by

subordinate bodies is set forth in Wood v. Cannon County, 25 Tenn. App. 600,

166 S.W.2d 399 (1942), where we stated:

The statute of limitations does not run against the sovereign or the state, or

against a county, when [the county is seeking] to enforce a demand arising

out of, or dependent upon, the exercise of its governmental functions as an

arm of the state. But the statute does run against a county or municipality

in respect of its rights or claims which are of a private or corporate nature

and in which only its local citizens are interested, as distinguished from a

public or governmental matter in which all the people of the state are

interested.

Wood, 166 S.W.2d at 401 [citations omitted]. See also Jennings v. Davidson

County, 208 Tenn. 134, 344 S.W.2d 359, 361-362 (1961).

Pursuant to the standard indicated by the Court in Hamilton County, we are required to

determine whether the City’s breach of easement case against NAFI is “of a private or corporate

nature and is a matter in which only its local citizens are interested, as distinguished from a public

or governmental matter in which all the people of the State are interested.”

NAFI apparently argues that the breach of easement suit filed by the City was of a private

nature because, in filing the suit, the City “was seeking to reduce costs of sewer improvements

undertaken by the City for the benefit of local citizens and ratepayers.” We disagree with this

conclusion.

It is true that the damages which were awarded in this case do benefit the local citizenry in

that the costs of the new sewer system will now be paid for by NAFI and not from municipal

revenue. However, the problem which resulted in the award of damages - the problem which

prompted the prosecution of this case - was the fact that a significant portion of the City’s sewage

system was rendered inaccessible as a result of the overburden placed upon it by NAFI. The

-5-

potential consequences of this situation were attested to by the City’s wastewater manager, Johann

Coettzee, as follows:

Q. What would you, as the wastewater manager, have had to do in the event that

there had been any type of blockage or collapse in the line under the landfill?

A. I would be in a very bad position. Because of the length of the pipe that is

covered, one would have no idea where to dig; and digging in itself would be a

lengthy and time-consuming operation. So, the risk that we have there was that

you could have an environmental catastrophe with millions of gallons of

wastewater going into the Watauga River and spilling into the fields upstream of

the landfill during the time it would take to locate where exactly is the problem

in the landfill, which is a monumental undertaking considering the length of the

area that this covered and the depth that the pipe was at.

The Water Quality Control Act, codified at Tenn. Code Ann. Title 69, provides at § 69-3-

102(a):

Recognizing that the waters of Tennessee are the property of the state and are held

in public trust for the use of the people of the state, it is declared to be the public

policy of Tennessee that the people of Tennessee as beneficiaries of this trust,

have a right to unpolluted waters. In the exercise of its public trust over the waters

of the state, the government of Tennessee has an obligation to take all prudent

steps to secure, protect, and preserve this right.

If for no other reason, resolution of the problem which caused the City to file its complaint

in this case benefits not only the citizens of Elizabethton, but the general population of this state by

securing, protecting and preserving the “right to unpolluted waters.” The City was engaged in the

exercise of a governmental function as an arm of the state in this case and, accordingly, the City is

not subject to the indicated statute of limitations.

NAFI also argues that the City is equitably estopped from pursuing its cause of action under

the doctrine of laches, arguing that the City unreasonably delayed in asserting its rights. In its brief,

NAFI alleges that the City was aware that NAFI was dumping material over its sewer line for more

than thirty years and yet “the City watched and said nothing”and, thereby, acquiesced in the

dumping.

Laches is a defense peculiar to courts of equity and is usually applied in the absence of a

statute of limitations. Clark v. American National Bank and Trust Company of Chattanooga, 531

S.W.2d 563, 572 (Tenn. Ct. App. 1974). It is based upon the doctrine of estoppel which provides

“that one may not enforce rights against another when that other has materially relied on some

conduct of the moving party which is in conflict with his asserted rights.” Hannewald v. Fairfield

Communities, Inc., 651 S.W.2d 222, 228 (Tenn. Ct. App. 1983). Laches provides that equity will

-6-

not intervene on behalf of a plaintiff who has unreasonably delayed in pursuing his rights,

Hannewald, id. However, as the Tennessee Supreme Court stated in Bledsoe County v. McReynolds,

703 S.W.2d 123, 124,125 (Tenn. 1985), the doctrine of estoppel generally does not apply to the acts

of public authorities:

Public agencies are not subject to equitable estoppel or estoppel in pais to the

same extent as private parties and very exceptional circumstances are required to

invoke the doctrine against the State and its governmental subdivisions.

...

It is significant to observe that in those Tennessee cases where estoppel was

applied, or could have been applied, the public body took affirmative action that

clearly induced a private party to act to his or her detriment, as distinguished

from silence, non-action or acquiescence. In the instant case the defendants have

nothing upon which to predicate the essential element of inducement, except

silence and inaction. (Emphasis added)

In the matter before us, NAFI references no evidence in the record which shows that the City

“took affirmative action that clearly induced” NAFI to place the overburden on the City’s easement

and, accordingly, the doctrine of equitable estoppel and laches do not apply.

The next issue we address is whether the trial court erred in its award of damages.

In its memorandum opinion, the trial court stated as follows with respect to the award of

damages in this case:

The burden that the Defendant has placed on the city’s easement has

reduced the value of the easement beneath the waste and cap to zero, as the city

cannot reasonably access that portion of its sewer line. In light of all of the

circumstances, the city chose a reasonable method of accessing its sewer line by

having constructed a new pressurized by-pass sewer line contiguous to the cap

covered line. The cost of construction of the new line was $1,102,754.00

principal, plus $2,312,231.00 interest, for a total cost of $3,414,985.001. The

investment and interest lost due to the cost of the project is not an appropriate

element of damages, as the Plaintiff will be made whole by being reimbursed by

the Defendant for the actual reasonable costs for accessing its sewer line, which

costs were incurred as a result of the Defendant’s acts in making the line

unreasonably inaccessible.

1

As we have noted the amount of damages awarded was subsequently reduced to a lesser amount.

-7-

The Defendant argues that the Plaintiff failed to mitigate its damages.

When the record is considered as a whole, the Plaintiff has acted with reasonable

care and diligence under the circumstances, and did not enhance its damages.

With regard to the issue of damages NAFI first contends that “the preponderance of the

evidence was that the West Interceptor was not damaged and that access to it could have been

permanently restored for about $140,000.”

NAFI’s argument that the west interceptor line was not damaged is inapposite. The trial

court’s award of damages is based upon its finding that the line was no longer subject to reasonable

access, not that the line was damaged. NAFI’s argument that access to the line could have been

restored for $140,000.00 is based upon the report and testimony of E. Roberts Alley, an engineering

expert who appeared as a witness in the case on behalf of NAFI. Apparently the fill over the City’s

easement covers four manholes which open into the covered sewer line. Mr. Alley proposed that the

material above the manholes be excavated which would allow for the insertion of pre-manufactured

ten foot diameter metal cylinders as access channels to each of these manholes. Assuming that this

solution did allow access to the covered manholes, it would not provide access to the line as a whole.

In its reply brief, NAFI concedes that a block in the west interceptor “could be such that it could not

be fixed from a manhole and might require a dig-down repair.” We have already referenced

testimony of Mr. Coetzee to the effect that a dig down repair under the present circumstances would

be a time consuming undertaking which could result in a major environmental catastrophe. This

evidence supports the conclusion that Mr. Alley’s proposed solution of accessing the manholes was

inadequate and unacceptable. Other evidence in the record does not preponderate to the contrary.

NAFI next argues that the new sewage system cost the City $2,202,000.00 but that that

money was spent in lieu of the $1,300,000.00 the City otherwise would have spent to replace a forty

year old influent pump which was part of the replaced system. NAFI asserts that “the extra

$900,000.00 gave the City a new modern system in place of an aging one built in the 1950's,

eliminated the invert siphon under the Watauga River and brought the City other advantages.” NAFI

contends that the “damages from breach of the easement cannot be more than the net additional cost

incurred by the City as a result of the breach.”

While it is true that the new system resulted in incidental benefits to the City, this does not

belie the fact that the new system constituted a reasonable solution to problem caused by NAFI.

NAFI’s alternative to the implemented solution was to gain entry to the four manholes and, as we

have indicated, we do not agree that this would have solved the problem presented. The evidence

does not preponderate against the finding that construction of the new system was the only proposal

presented that constituted a reasonable solution to the overburden problem.

NAFI also contends that the City failed to mitigate its damages in this case.

A plaintiff has the duty to exercise reasonable care and diligence to avoid loss or minimize

damages. Haynes v. Cumberland Builders, Inc., 546 S.W.2d 228, 234 (Tenn. Ct. App. 1976). But

-8-

only reasonable action is required of a plaintiff in this regard and a plaintiff is not required to

mitigate damages if such action is unduly burdensome. Id. In Tampa Electric Company v. Nashville

Coal Company, 214 F. Supp. 647, 652 (M.D. Tenn. 1963) the Court states as follows regarding

limitations on the plaintiff’s duty to mitigate :

The critical factor in determining fulfillment of a plaintiff’s duty to mitigate is

whether the method which he employed to avoid consequential injury was

reasonable under the circumstances existing at the time. The rule with respect to

mitigation of damages may not be invoked by a contract breaker “as a basis for

hypercritical examination of the conduct of the injured party, or merely for the

purpose of showing that the injured person might have taken steps which seemed

wiser or would have been more advantageous to the defaulter.” In re Kellett

Aircraft Corp., 186 F.2d 197, 198-199 (3rd Cir. 1950). As stated in McCormick,

Damages, Sec. 35 (1935), “a wide latitude of discretion must be allowed to the

person who by another’s wrong has been forced into a predicament where he is

faced with a probability of injury or loss. Only the conduct of a reasonable man

is required of him.”

In support of its argument that the City failed to mitigate damages, NAFI states that “[i]t is

virtually self-evident that the problem with fly ash over the sewer line could have been avoided if

the city had ever objected to the practice.” Contrary to this assertion that the City never objected, we

note the following letter dated November 11, 1971, from then City Attorney, Walter Curtis, to Dan

Laws, counsel for NAFI’s predecessor, Beaunit Corporation:

Dear Dan:

On August 28, 1957, Beaunit Corporation, then doing business as Beaunit

Mills, Inc., for and in consideration of the sum of $10,000.00, executed a Deed

conveying an Easement to the City of Elizabethton, Tennessee, for the purpose of

installing an Interceptor Sewer Line for the City of Elizabethton, Tennessee. This

Document is of record in Deed Book 145 at Page 43, in the Register’s office for

Carter County, Tennessee, and a copy of same is attached hereto for your

information.

There is also enclosed herewith a map or survey showing the City Sanitary

Sewer Line referred to above, in its relation to the wet basin settling ponds now

being used by Beaunit.

Examination of this map will show that several hundred feet of the Sewer

Line, and Two (2) Manholes marked “A” and “B” on the map, are now completely

covered up, and inaccessible, by reason of the wet basin settling ponds.

-9-

I am advised by the City Engineer that in the event of any leakage from the

settling ponds into the Sewer Line, there would probably be damages incurred at

our Sewer Treatment Plant in the neighborhood of a million dollars before the

Plant could be shut down. Moreover, in the event any repair work is ever needed

on the Line at the points in question, such repair work would be impossible under

the present existing conditions.

I have been directed to call this matter to your attention as Counsel for

Beaunit Corporation with the hope that we can possibly arrange a conference on

the matter to determine what if anything, needs to be done, or can be done to

reduce the possible exposure to both the City and Beaunit.

Your kind consideration of this matter would be greatly appreciated, and

I am sure that Mr. James Clear, or Mr. John McCready or our City Manager, Mr.

Robert P. Asbury, Jr., will be glad to answer any questions you have in regards to

this matter.

In light of this correspondence, we do not agree with NAFI’s assertion that the City was

inattentive to the problem created by the constant dumping which continued despite notification.

As we have indicated, the City’s problem of accessing its sewer line was further exacerbated by the

capping of the already overburdened easement, an event which was mandated by the DCE in

consequence of NAFI’s dumping of fly ash. Upon its discovery that the area over the sewer line had

been capped and the line was no longer accessible without great expense, the City entered into

negotiations with NAFI in an attempt to resolve the problem. The City ultimately implemented a

reasonable solution and NAFI was apparently unable to present a viable alternative. Under these

circumstances and our review of the record, we find no merit in NAFI’s argument that the City failed

to take reasonable action to mitigate damages in this case.

As a final matter with respect to the award of damages in this case ,we note that NAFI’s brief

statement that the requirement that it pay the prospective cost of financing the new sewer system “is

unwarranted and unprecedented.” NAFI presents no authority to support its argument that the trial

court should not have included these financing costs in its award of damages. Accordingly, the trial

court’s decision in this regard is affirmed.

NAFI next argues that the parties’ practical construction of the easement authorized it to

dump fly ash on the surface over the City’s sewer line because “for more than 30 years the City, as

grantee, acted as if it had no right to stop NAFI from using the land above the sewer line as a

landfill.”

The rule of practical construction provides that the interpretation placed upon a contract by

the parties thereto as evidenced by their acts will be adopted by the court. Galleria Associates, L.P

v. Mogk, 34 S.W.3d 874, 877 (Tenn. Ct. App. 2000). However, the rule of practical construction is

only applicable if “the language used by the parties to the contract is indefinite or ambiguous, and

-10-

hence of doubtful construction.” Fidelity-Phenix Fire Ins. Co. of New York v. Jackson, et al., 181

S.W.2d 625 (Tenn. 1944). The easement granted to the City in the matter sub judice is neither

ambiguous nor indefinite and states in pertinent part as follows:

It is the intention of this instrument to convey only such rights or easements over

said land as is reasonably necessary to construct said sewer interceptor line, and

to maintain the same ... .

It is beyond dispute that an overburdening of the sewer line with fly ash and other material

interfered with the City’s clearly articulated right under the easement to maintain the line.

Accordingly, the rule of practical construction is not applicable. Even if the rule were applicable in

this case evidence hitherto referenced in this opinion contradicts NAFI’s assertion that the City acted

as if it had no right to stop NAFI from dumping fly ash over its sewer line.

The final issue presented in this appeal is whether the trial court erred in refusing to strike

from the record findings with respect to defendant Charles K. Green.

Charles K. Green became president and chief executive officer of North American Rayon

Corporation, NAFI’s predecessor in title, in 1987. He subsequently became the corporation’s sole

owner and changed its name to North American Fibers, Inc. In its complaint, the City avers that

Charles K. Green is the alter ego of the named corporate defendants and that he “transfers property

between his companies, loans himself money from his companies, controls the entire operations and

employee complements of each company, and deals with each company as if it were a sole

proprietorship.” The complaint further avers that “[t]he defendants are one and the same entity for

purposes of this civil action.” As set forth in its memorandum opinion, the trial court agreed that

Mr.Green was the alter ego of the defendant corporations and that the defendant corporations were

the alter egos of each other. However, the trial court also concluded that no liability attached with

regard to Mr. Green because the City “had not proven by a preponderance of the evidence that any

alter ego act of Green, or any alter ego act of the corporations, legally or proximately caused the

unreasonable and substantial burden on the Plaintiff’s sewer easement.” NAFI argues that since the

trial court concluded that it did not matter whether Mr. Green was the alter ego of the defendant he

should not be embarrassed by findings of the court relative to its determination in this regard.

Accordingly, NAFI argues that the trial court erred in failing to delete from the record these

“embarrassing” findings.

It is our determination that the trial court did not abuse its discretion in failing to delete any

of its findings with respect to Charles K. Green. In any event, no supporting authority is cited in

support of this argument and, therefore, the issue is waived. As recognized in State v. Brown, 795

S.W.2d 689, 698 (Tenn. Cr. App. 1990):

Failure of a defendant to cite authority for propositions in his argument on

appeal constitutes waiver of the issue. State v. Houston, 688 S.W.2d 838 (Tenn.

Crim. App. 1984); Moorman v. State, 577 S.W.2d 473 (Tenn. Crim. App. 1978).

-11-

The brief of the appellant should contain an argument setting forth the contentions

of the appellant with respect to the issues presented with citations to the

authorities and appropriate references to the record.

For the foregoing reasons the judgment of the trial court is affirmed and the cause is

remanded for further action consistent with this opinion. Costs of appeal are adjudged against North

American Fibers, Inc.

_________________________________________

SHARON G. LEE, JUDGE

-12-