Opinion

Glen Cruzen v. Ayman Awad

Court
Court of Appeals of Tennessee
Filed
Jun 25, 2010
Status
Published
On the bench
Judge J. Steven Stafford
Cited by
0 cases
Authority
More cited than 29.3%

“When the trial court hears the evidence, but the evidence is not included in the record on appeal, it is presumed that the evidence supports the ruling of the trial court.”

How later courts described this case

  • “When the trial court hears the evidence, but the evidence is not included in the record on appeal, it is presumed that the evidence supports the ruling of the trial court.”
  • “[I]n order to show an abuse of discretion, the plaintiff must show some prejudice or surprise which arises from the trial court's failure to grant the continuance.”

Written by the judges who cited it.

The opinion

IN THE COURT OF APPEALS OF TENNESSEE

AT NASHVILLE

May 27, 2010 Session

GLEN CRUZEN v. AYMAN AWAD

Direct Appeal from the Circuit Court for Davidson County

No. 08C-1866 Barbara N. Haynes, Judge

No. M2009-00632-COA-R3-CV - Filed June 25, 2010

This case arises out of the alleged breach of a contractual agreement entered by and between

Appellant and Appellee for the repair and renovation of a commercial building. Appellant

filed suit, asserting that Appellee had failed to fully compensate Appellant for his work on

the building. The trial court granted Appellee’s motion for summary judgment, finding that

Appellant was an unlicensed contractor under Tenn. Code Ann. §62-6-102, and that his

recovery was, therefore, limited to actual documented expenses under Tenn. Code Ann. §62-

6-103(b). Finding no error, we affirm.

Tenn. R. App. P. 3. Appeal as of Right; Judgment of the Circuit Court Affirmed

J. S TEVEN S TAFFORD, J., delivered the opinion of the Court, in which D AVID R. F ARMER, J.,

and H OLLY M. K IRBY, J. , joined.

Glen Cruzen, Nashville, Tennessee, pro se.

Laura M. Williams and Samuel T. Bowman, Nashville, Tennessee, for the appellee, Ayman

Awad.

OPINION

On or about December 16, 2007, Appellant Glen Cruzen emailed Appellee Ayman

Awad, indicating that he would be able to do some renovations and repairs to the exterior

stucco on a commercial property occupied by Mr. Awad. In his email, Mr. Cruzen estimated

the total cost for the job to be $25,000. A February 27, 2008 “Final Invoice” is also

contained in the appellate record. According to the invoice, as of February 27, 2008, Mr.

Cruzen indicated that the total price for the job was $38,550.73, and that the balance owed

thereon was $13,550.73.

On February 29, 2008, Mr. Cruzen filed a warrant in the General Sessions Court of

Davidson County, alleging that Mr. Awad had failed to pay the entire amount due under the

parties’ agreement. On April 10, 2008, Mr. Awad filed a counter-complaint against Mr.

Cruzen, alleging violation of the Tennessee Consumer Protection Act, and intentional and/or

negligent misrepresentation on the part of Mr. Cruzen. By Order of June 12, 2008, the case

was removed to the Circuit Court at Davidson County, pursuant to Tenn. Code Ann. § 16-15-

732.1

On August 14, 2008, Mr. Awad filed a motion for summary judgment. On August 25,

2008, Mr. Awad also filed a motion to stay discovery until the motion for summary judgment

was heard.2 In support of his motion for summary judgment, Mr. Awad argued, in relevant

part, that Mr. Cruzen was not a licensed contractor; consequently, under Tenn. Code Ann.

§ 62-6-103(b), Mr. Awad asserted that Mr. Cruzen was only entitled to his actual expenses.

Moreover, Mr. Awad averred that he had already paid Mr. Cruzen the contract price of

$25,000, and that Mr. Cruzen was not entitled to the additional $13,550.73 that he claimed.3

Mr. Cruzen opposed the motion for summary judgment, which motion was set for hearing

on September 26, 2008. There is no indication in the record that Mr. Cruzen opposed Mr.

Awad’s motion to stay discovery until the day of the hearing on the motion for summary

judgment. On September 26, 2008, Mr. Cruzen filed a motion for continuance, asking the

court to continue the trial to allow Mr. Cruzen to conduct discovery. After considering the

1

Tenn. Code Ann. §16-15-732 provides, in relevant part:

(c)(1) If the general sessions judge finds that a defendant's defense is

substantial, complex or expensive to present, and that the defendant has

posted a sufficient cost bond, the judge shall order the action removed to

the court that would have jurisdiction of an appeal if the action had been

tried in general sessions court. The judge shall direct the clerk to promptly

transmit the papers in the action to the clerk of the court to which the action

is removed.

2

The record indicates that Mr. Cruzen did not object to Mr. Awad’s motion to stay discovery.

Moreover, the record contains no indication that the trial court ruled on Mr. Awad’s motion. That being said,

the motion to stay discovery, whether granted or not, was rendered moot by the trial court’s grant of summary

judgment in favor of Mr. Awad. We further note that, although Mr. Cruzen could have objected to the

motion to stay discovery, and could have argued for more discovery at that time, as discussed, infra, he

waited until the morning of the scheduled hearing on Mr. Awad’s motion for summary judgment to file his

own motion for continuance, on grounds that he needed to conduct more discovery. The denial of Mr.

Cruzen’s motion to continue the hearing is the subject of the first appellate issue.

3

The record contains four checks drawn on Mr. Awad’s account, and made payable to Mr. Cruzen

or to Master Stucco: (1) December 28, 2007 for $5,000, (2) January 5, 2008 for $10,000, (3) February 18,

2008 for $5,000, and (4) February 22, 2008 for $5,000.

-2-

briefs, exhibits, and arguments of counsel, by Order of October 7, 2008, Judge Barbara

Haynes denied Mr. Cruzen’s motion for a continuance, and granted Mr. Awad’s motion for

summary judgment.

Mr. Awad’s counter-claim was heard on October 22-23, 2008. By Order of November

10, 2008, the trial court awarded Mr. Awad $4,000 in compensatory damages against Mr.

Cruzen. Mr. Cruzen was awarded $3,000 in restitution, leaving Mr. Cruzen with

compensatory damages owing in the amount of $1,000. The November 10, 2008 Order,

which is signed by Judge Hamilton Gayden, specifically provides:

[Mr. Awad] is awarded judgment for $4,000 in compensatory

damages against [Mr. Cruzen]. This compensatory damages

judgment is comprised of the following elements:

1. $1,800 for breach of contract damages to remove the stucco

from around three sets of conduit and wires....

2. $1,200 for breach of contract damages to remove...siding

from around the four air conditioning units.

3. $500.00 for breach of contract damages to scrape and clean

the overspray off all windows.

4. $500.00 for breach of contract damages to remove the debris

left by Mr. Cruzen.

5. Mr. Cruzen is awarded restitution in the amount of $3,000.

6. Mr. Cruzen’s restitution leaves Mr. Awad with compensatory

damages owing in the amount of $1,000.

On December 10, 2008, Mr. Cruzen moved the court to reverse its grant of summary

judgment in favor of Mr. Awad; however, no issue was raised concerning the award of

damages pursuant to Judge Gayden’s November 10, 2008 Order.

By Order of February 26, 2009, the trial court denied Mr. Cruzen’s motion, and

affirmed the grant of summary judgment in favor of Mr. Awad, and the award of

compensatory damages to Mr. Awad. Mr. Cruzen appeals, raising two issues for review:

1. Whether the trial court erred by denying Mr. Cruzen’s motion

for continuance for additional time for discovery?

2. Whether the trial court erred in granting Mr. Awad’s motion

for summary judgment.

-3-

Following the filing of his notice of appeal, Mr. Cruzen gave notice that he had filed

a statement of the evidence with the circuit court. Mr. Awad objected to the proposed

statement of the evidence, arguing that a transcript of the October 22-23, 2008 trial was

available, but had not been procured by Mr. Cruzen, and that the proposed statement of the

evidence did not convey an accurate account of the evidence adduced at the hearings.

On July 17, 2009, Judge Gayden heard arguments concerning the sufficiency of the

proposed statement of the evidence. By Order of August 11, 2009, Judge Gayden

disapproved the statement of the evidence and specifically required Mr. Cruzen to provide

a transcript of the October 22-23, 2008 proceedings. Concerning the hearing on Mr. Awad’s

motion for summary judgment, Judge Gayden ordered both Mr. Cruzen and Mr. Awad to

“resubmit a Statement of the Evidence regarding the September 26, 2009 Motion for

Summary Judgment heard by [the] Honorable Judge Barbara Haynes.” Mr. Cruzen was

given ninety days to comply with the August 11, 2009 order.

On November 23, 2009, the trial court clerk notified this Court that Mr. Cruzen had

failed to file a transcript or statement of the evidence. By Order of December 1, 2009, we

granted a fifteen day extension for the transcript and/or statement of the evidence to be

prepared and transmitted to this Court, or else show cause why the appeal should not be

dismissed.

On December 11, 2009, Mr. Awad filed a motion to dismiss the appeal for failure to

comply with Tenn. R. App. P. 24, the trial court’s August 11, 2009 Order, and this Court’s

order of December 1, 2009. On December 15, 2009, Mr. Cruzen filed a response to our show

cause order, in which he asserted that the only issues being appealed related to pre-trial

motions, for which there are no transcripts and that the transcript of the October 22-23, 2008

trial is unnecessary. Mr. Awad filed a reply to Mr. Cruzen’s response.

By Order of January 7, 2010, this Court denied Mr. Awad’s motion to dismiss the

appeal, specifically finding that:

This case involves both a summary judgment and a

judgment following a trial. In his response to our show cause

order, however, the appellant asserts the only issues he intends

to raise on appeal relate to the pretrial motions and not to the

trial of the counter-claim. The statement of the evidence

submitted by the appellant likewise lists issues related only to

the September 26, 2008 hearing and not to the October 22-23,

2008 trial. In light of the limited issues the appellant intends to

raise on appeal and the discretion granted to this court by Tenn.

-4-

R. App. P. 2, we have determined that the appellant should be

allowed to proceed without a transcript or statement of the

evidence.

The appellant shall, however, be bound by his assertions

regarding the issues he intends to raise on appeal, and the appeal

shall be limited to issues related to the pretrial motions.

Allowing the appellant to raise issues related to the October 22-

23, 2008 trial would likely be futile in any event because this

court would presume that, had a transcript or statement of the

evidence from the October 22-23, 2008 trial been filed, it would

have contained sufficient evidence to support the trial court’s

judgment.

Before reaching the issues, we first note that we are cognizant of the fact that Mr.

Cruzen is proceeding pro se . While a party who chooses to represent himself or herself is

entitled to the fair and equal treatment of the courts, Hodges v. Tenn. Att'y Gen., 43 S.W.3d

918, 920 (Tenn. Ct. App. 2000) (citing Paehler v. Union Planters Nat'l Bank, Inc., 971

S.W.2d 393, 396 (Tenn. Ct. App. 1997)), “[p]ro se litigants are not ... entitled to shift the

burden of litigating their case to the courts.” Whitaker v. Whirlpool Corp., 32 S.W.3d 222,

227 (Tenn. Ct. App. 2000) (citing Dozier v. Ford Motor Co., 702 F.2d 1189, 1194-95 (D.C.

Cir .1983)). Pro se litigants must comply with the same substantive and procedural law to

which represented parties must adhere. Hodges, 43 S.W.3d at 920-21.

Furthermore, we note that “[t]he burden is [] on the appellant to provide the Court

with a transcript of the evidence or a statement of the evidence from which this Court can

determine if the evidence ... [supports] the findings of the trial court.” Willcutts v. Willcutts,

No. W2002-02636-COA-R3-CV, 2004 WL 404497, at *9 (Tenn. Ct. App. Mar. 4, 2004)

(citing Coakley v. Daniels, 840 S.W.2d 367, 370 (Tenn. Ct. App. 1992)). “In the absence of

a transcript or a statement of the evidence, a presumption arises that the parties presented

sufficient evidence to support the trial court's judgment.” Mfrs. Consol. Serv., Inc. v. Rodell,

42 S.W.3d 846, 865 (Tenn. Ct. App. 2000). This presumption has been termed “conclusive.”

Coakley, 840 S.W.2d at 370; see also Scarbrough v. Scarbrough, 752 S.W.2d 94, 97 (Tenn.

Ct. App. 1988) (“When the trial court hears the evidence, but the evidence is not included

in the record on appeal, it is presumed that the evidence supports the ruling of the trial

court.”). In the instant case, no issue has been raised concerning either the correctness of

Judge Gayden’s decision to disapprove the proposed statement of the evidence, or the

correctness of his decision to have the parties’ resubmit proposed statements of the evidence

concerning the hearing before Judge Haynes. Moreover, this Court has not been requested

to reconsider its decision to allow Mr. Cruzen to proceed in his appeal without a transcript

-5-

or statement of the evidence. Consequently, our review is quite limited as the factual basis

for the trial court’s decisions is conclusively presumed to be correct. With that in mind, we

turn to the issues.

Denial of Mr. Cruzen’s Motion to Continue the Trial Date

Mr. Awad’s motion for summary judgment was set for hearing on September 26,

2008. On the morning of September 26, 2008, Mr. Cruzen filed a motion for continuance,

asking the court to deny Mr. Awad’s motion for summary judgment and to continue the trial

date to allow Mr. Cruzen an opportunity to conduct discovery. This motion was subsequently

denied by Judge Haynes. It is well settled that a trial court's decision to grant or deny a

motion for a continuance is within the court's sound discretion; therefore, its decision is

reviewed for an abuse of discretion. See Bailey v. Tasker, 146 S.W.3d 580, 584 (Tenn. Ct.

App. 2004). In determining whether the trial court abused its discretion in denying a motion

for continuance, “we must consider (1) whether the decision has a sufficient evidentiary

foundation; (2) whether the trial court correctly identified and properly applied the

appropriate legal principles; and (3) whether the decision is within the range of acceptable

alternatives.” Liberty Mut. Ins. Co. v. Friendship Home Health Agency, LLC, No.

M2007-02787-COA-R3-CV, 2009 WL 736659, at *3 (Tenn. Ct. App. Mar. 19, 2009); see

also Comm'r of Dep't of Transp. v. Hall, 635 S.W.2d 110, 111 (Tenn. 1982) (“[I]n order to

show an abuse of discretion, the plaintiff must show some prejudice or surprise which arises

from the trial court's failure to grant the continuance.”). This standard “does not permit an

appellate court to merely substitute its judgment for that of the trial court.” Henry v. Goins,

104 S.W.3d 475, 479 (Tenn. 2003).

After reviewing the record in this case, we find that the trial court did not abuse its

discretion in denying Mr. Cruzan’s motion to continue the trial date. While Mr. Cruzan

requested that the trial date be continued in order to conduct discovery, no where in his

motion does he specify what further discovery is needed. In fact, while the trial court denied

the motion for continuance, it ordered Mr. Awad to provide additional discovery to Mr.

Cruzan. Mr. Cruzan asserts that he did not receive this discovery until two days prior to the

trial date. Mr. Cruzan asserts that he again orally moved the trial court to continue the trial

the day of the trial, but that the trial court denied this motion. Unfortunately, because there

is not a transcript or statement of the evidence, there is nothing in the record to indicate that

Mr. Cruzan did renew his motion. Further, in the instant case, although we know that Judge

Haynes denied Mr. Cruzen’s motion to continue the trial date, the reason for her decision is

not included in the October 7, 2008 Order; in the absence of a transcript of the proceedings,

we must presume that the evidence supports the ruling of the trial court. Scarbrough v.

Scarbrough, 752 S.W.2d at 97. Because Mr. Cruzan has not demonstrated that the trial court

-6-

abused its discretion in denying his motion to continue the trial date, we affirm the decision

of the trial court.

Summary Judgment

When a motion for summary judgment is made, the moving party has the burden of

showing that “there is no genuine issue as to any material fact and the moving party is

entitled to judgment as a matter of law.” Tenn. R. Civ. P. 56.04. The moving party may

accomplish this by either: (1) affirmatively negating an essential element of the non-moving

party's claim; or (2) showing that the non-moving party will not be able to prove an essential

element at trial. Hannan v. Alltel Publ'g Co., 270 S.W.3d 1, 8-9 (Tenn. 2008). However,

“[i]t is not enough for the moving party to challenge the nonmoving party to ‘put up or

shutup’ or even to cast doubt on a party's ability to prove an element at trial.” Id. at 8. If the

moving party's motion is properly supported, “[t]he burden of production then shifts to the

nonmoving party to show that a genuine issue of material fact exists.” Id. at 5 (citing Byrd

v. Hall, 847 S.W.2d 208, 215(Tenn.1993)). The non-moving party may accomplish this by:

“(1) pointing to evidence establishing material factual disputes that were overlooked or

ignored by the moving party; (2) rehabilitating the evidence attacked by the moving party;

(3) producing additional evidence establishing the existence of a genuine issue for the trial;

or (4) submitting an affidavit explaining the necessity for further discovery pursuant to Tenn.

R. Civ. P., Rule 56.06.” Martin v. Norfolk Southern Ry. Co., 271 S.W.3d 76, 84

(Tenn.2008) (citations omitted).

When reviewing the evidence, a court must determine whether factual disputes exist.

In evaluating the decision to grant summary judgment, we review the evidence in the light

most favorable to the nonmoving party and draw all reasonable inferences in the nonmoving

party's favor. Stovall v. Clarke, 113 S.W.3d 715, 721 (Tenn.2003). If we find a disputed fact,

we must “determine whether the fact is material to the claim or defense upon which summary

judgment is predicated and whether the disputed fact creates a genuine issue for trial.”

Mathews Partners, No. M2008-01036-COA-R3-CV, 2009 WL 3172134 at *3 (Tenn.Ct.App.

Oct.2, 2009)(citing Byrd, 847 S.W.2d at 214). “A disputed fact is material if it must be

decided in order to resolve the substantive claim or defense at which the motion is directed.”

Byrd, 847 S.W.2d at 215. A genuine issue exists if “a reasonable jury could legitimately

resolve the fact in favor of one side or the other.” Id.

In its Order of October 7, 2008, the trial court granted Mr. Awad’s motion for

summary judgment, specifically finding that:

[Mr. Cruzen] is an unlicensed contractor engaging in contracting

in the State of Tennessee, as defined by Tennessee Code

-7-

Annotated section 62-6-101, et. seq.; [Mr. Cruzen] was paid at

least $25,000 by Mr. Awad; and [Mr. Cruzen’s] expenses are

less than $25,000. Accordingly, summary judgment is granted

in favor of Mr. Awad as to all claims brought by [Mr. Cruzen].

Based upon its findings that Mr. Cruzen is, in fact, an unlicensed contractor, the trial

court limited his recovery pursuant to Tenn. Code Ann. § 62-6-103(b), which provides:

Any contractor required to be licensed under this part who is in

violation of this part or the rules and regulations promulgated by

the board shall not be permitted to recover any damages in any

court other than actual documented expenses that can be shown

by clear and convincing proof.

On appeal, Mr. Cruzen argues that the grant of summary judgment should be reversed

based upon his allegation that he is not a “contractor.” Rather, Mr. Cruzen contends that Mr.

Awad was the contractor and that he was a subcontractor. Based upon the evidence in the

record, we find this argument to be unpersuasive.

Tenn. Code Ann. §62-6-102 provides, in relevant part, as follows:

(4)(A)(i) “Contractor” means any person or entity that

undertakes to, attempts to or submits a price or bid or offers to

construct, supervise, superintend, oversee, schedule, direct or in

any manner assume charge of the construction, alteration, repair,

improvement, movement, demolition, putting up, tearing down

or furnishing labor to install material or equipment for any

building, highway, road, railroad, sewer, grading, excavation,

pipeline, public utility structure, project development, housing,

housing development, improvement or any other construction

undertaking for which the total cost is twenty-five thousand

dollars ($25,000) or more;

In Kyle v. Williams, 98 S.W.3d 661 (Tenn. 2003), our Supreme Court discussed the

definition of “contractor” under Tenn. Code Ann. §62-6-102, explaining:

[T]he language of the licensing statutes, particularly Sections

62-6-102(3)(A) & (6), is crystal-clear and requires no

interpretation. “Contracting” encompasses all phases and aspects

of construction-from contract formation through the contract's

-8-

completion. Any person or entity who engages in any of the

activities classified as “contracting” must submit evidence of

qualifications and be licensed. See Tenn. Code Ann. §

62-6-103(a). If a person engages in any of these activities

without possessing a valid license, then simple logic dictates

that the person is an unlicensed contractor for purposes of

Tennessee Code Annotated section 62-6-103(b) and is limited

in recovery to those documented expenses proven by clear and

convincing evidence.

Id. at 665.

Turning to the record, we find at least three grounds to support the trial court’s

decision that Mr. Cruzen was acting as a contractor in this case. First, in his December 16,

2007 email to Mr. Awad, Mr. Cruzen submits a bid of $25,000 as an “estimate for stucco

repair.” Tenn. Code Ann. §62-6-102 clearly states that a contractor is any person or entity

who “undertakes to, attempts to, or submits a price or bid or offers to construct...for which

the total cost of the same is twenty-five thousand dollars ($25,000) or more....” The email

evidence is substantiated by Mr. Awad’s answers to Mr. Cruzen’s request for admission,

wherein Mr. Awad admits that he paid Mr. Cruzen $25,000. In short, not only did Mr.

Cruzen submit a bid of $25,000, but he was also paid that amount.

In his email bid, Mr. Cruzen offers to do the following work in exchange for $25,000:

To apply stucco to the buildings[’] main walls, applying metal

lathe to the exterior of the right and rear walls on the front

building and wrapping the lathe around the corner of the rear

wall 5' to encompass the cinder blocks which have delaminated

and are in jeopardy of failing, and install metal lathe on the

inside exposed areas of the rear wall of the front building as well

as the right and left walls of the rear building; then apply a one

coat stucco layer over the metal lathe and smooth this coat of

acrylic cement with a sponge which will expose a sanded

texture, and then paint all of the area on which the stucco has

been applied.... Total price: $25,000.

In addition, Mr. Cruzen states, in his email, that: (1) “I have experience that will enable me

to manage each of these tasks;” and (2) “[m]y crews can do just about any type of

construction.” Moreover, in his response to the motion for summary judgment, Mr. Cruzen

states that the “[a]ll of the work performed on [Mr. Awad’s] building was performed by staff

-9-

who work directly for [Mr. Cruzen] and no outside staff or services were used by [Mr.

Cruzen] to perform any work on this project.”

Tenn. Code Ann. §62-6-102(4)(A)(i) indicates that a contractor is one who supervises,

superintends, oversees, directs, or in any manner assumes charge of a construction project.

This criterion was clearly met in the present case. While the foregoing evidence supports a

finding that Mr. Cruzen was a contractor, as defined by the statute, Mr. Cruzen nonetheless

contends that he was acting as a subcontractor. Specifically, Mr. Cruzen argues that Mr.

Awad was not the owner of the subject property, and that this fact somehow indicates that

Mr. Awad was the actual contractor on the project. We find this argument unpersuasive.

In the first instance, ownership of the subject property is not a mandatory

consideration under the statutory definition of “contractor.” In general terms, a

“subcontractor” is a person who has a contract with a general or primary contractor to

perform a portion of the work that the general or primary contractor has already contracted

to perform. See, e.g. Winter v. Smith, 914 S.W.2d 527, 539 (Tenn. Ct. App. 1995) (citations

omitted). In Winter, Mr. Smith asserted that he was not required to obtain a contractor’s

license because he was a subcontractor performing work for which a license was not

required. Id. at 534. This Court held that the fact that a property owner assumed duties

during a construction project, which would normally be responsibilities of a general

contractor, did not transform the owner into a “contractor” so as to transform a contractor

into a subcontractor. Id. at 540. Here, as in Winter, Mr. Cruzen argues that Mr. Awad was

acting as the contractor, thus making Mr. Cruzen the subcontractor. This argument, however,

does not change the fact that Mr. Cruzen’s activities and statements concerning the project

satisfied the mandates of Tenn. Code Ann.§62-6-102. As stated in Kyle, the statute is

“crystal-clear”–if a person engages in any of the activities listed in §62-6-102, the person is

a contractor for purposes of the Act. Mr. Cruzen’s attempt to allege that Mr. Awad was not

the owner and thus could have been a contractor does not change the evidence showing that

Mr. Cruzen met the statutory definition of contractor.

Based upon the record as a whole, we conclude that the evidence supports the trial

court’s conclusion that Mr. Cruzen was acting as an unlicensed contractor.4 The question

then is whether the trial court erred in limiting Mr. Cruzen’s recovery under Tenn. Code

Ann. §62-6-103(b), supra. This statute limits any unlicensed contractor’s recovery to actual

documented expenses, which must be proved by clear and convincing evidence. Tenn. Code

4

The record contains the April 15, 2008 Affidavit of Matthew Vogeler, an Auditor with the

Tennessee Board for Licensing Contractors. Mr. Vogeler states that, following a thorough search of the

applicable records, he was unable to find Mr. Cruzen’s name. Consequently, Mr. Vogeler avers that Mr.

Cruzen is not licensed with the Board for Licensing Contractors or the Home Improvement Commission.

-10-

Ann. §62-6-103(b). Clear and convincing evidence is evidence that “eliminates all serious

or substantial doubt concerning the correctness of the conclusions to be drawn from the

evidence. Evidence satisfying this standard will produce in the fact-finder's mind a firm

belief or conviction regarding the truth of the factual propositions sought to be established

by the evidence.” In re Groves, 109 S.W.3d at 330. (citations omitted).

As noted by this Court in Henshaw’s Heating & Air Conditioning, Inc. v. Selig, No.

03A01-9709-CV-00420, 1998 WL 156906, *3-4 (Tenn. Ct. App. March 26, 1998), actual

documented expenses do not include profits. In his invoice, Mr. Cruzen lists the job, the

price, and whether the price is based on labor, materials, or both. Mr. Cruzen asserts that his

labor expenses total $567.73. While Mr. Cruzen alleges that his expenses exceeded $25,000,

from our review of the record, he has provided no proof to support this claim. It is well

settled that a party cannot simply state that his or her expenses are more than the invoice

shows. See, e.g., Wiltcher v. Bradley, 708 S.W.2d 407 (Tenn. Ct. App. 1985), perm. app.

denied (Tenn. March 3, 1986) (“[I]n the absence of an invoice, cancelled check, receipt,

ledger or journal sheet, or other record of business dealings,” contractor was not entitled to

recover for additional labor and materials he furnished). Here, Mr. Cruzen’s invoice is not

supported by additional proof; consequently, he has not clearly and convincingly proven

expenses in excess of $25,000. Moreover, it is undisputed in the record that Mr. Awad paid

Mr. Cruzen at least $25,000 under the terms of the agreement. Because no additional

amounts were proved by clear and convincing evidence, Mr. Cruzen is not entitled to recover

additional expenses.

For the foregoing reasons, we affirm the order of the trial court. Costs of this appeal

are assessed against the Appellant, Glen Cruzen, and his surety.

__

J. STEVEN STAFFORD, JUDGE

-11-

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.