IN THE UNITED STATES BANKRUPTCY COURT

FOR THE MIDDLE DISTRICT OF PENNSYLVANIA

INRE:

KIMMEL'S COAL AND PACKAGING, INC., Case No. 18-bk-01609 (HWV)

MEADOWBROOK COAL COMPANY, INC., Case No. 18-bk-02506 (HWV)

MICHAEL COAL COMPANY, INC., Case No. 18-bk-02507 (HWV)

KIMMEL 'S POWER PLANT SERVICES, INC., Case No. 18-bk-02509 (HWV)

KIMMEL'S MINING COMPANY, INC. Case No. 18-bk-02510 (HWV)

Debtors-in-Possession Jointly Administered under

Docket No. 18-1609

FULTON BANK, N.A.,

Motion for Stay of Order Pending Appeal

Respondent/A ppellee

V.

RAUSCH CREEK LAND, L.P.,

Movants/A ppellant

MEMORANDUM DECISION

DENYING DEBTORS' MOTION FOR A STAY PENDING APPEAL

Before the Court is the Motion of Rausch Creek Land, L.P. ("Rausch Creek"), pursuant

to Federal Rule of Bankruptcy Procedure 8007, for a stay pending appeal of this Court's Order

(ECF No. 577) granting the Motion of Fulton Bank, N.A. ("Fulton Bank") to Compel

Compliance with Sale Order and For Declaratory Relief Regarding Security Interests of Fulton

Bank, N.A. (the "Motion to Compel")(ECF No. 369) in part and denying Fulton Bank's Motion

for Order of Contempt Against Rausch Creek (the "Motion for Contempt")( ECF No. 494).

Rausch Creek argues it is entitled to a stay because it has a substantial possibility of success on

appeal and will suffer irreparable harm if the Court denies them a stay (ECF No. 581).

Additionally, Rausch Creek asserts that granting a stay will not substantially harm either Fulton

Bank or the Pennsylvania Department of Environmental Protection ("PA DEP"), and the balance

of public interest concerns weighs in favor of the imposition of a stay (ECF No. 581). Fulton

Bank, the PA DEP, and the Chapter 7 Trustee, Markian R. Slobodian ("Trustee"), each oppose

the Motion, arguing that Rausch Creek is unlikely to succeed in its appeal, will not suffer any

irreparable injury without a stay, and have failed to show the granting of a stay is consistent with

public interests (ECF Nos. 590, 595, and 596).

For the following reasons, the Court finds that Rausch Creek has not met the standard for

a stay but agrees with Rausch Creek that there is a likelihood of success on the merits insofar as

the Court previously concluded that: (i) 25 Pa. Code § 86.56 (hereinafter "§ 86.56") was the only

way to effectuate transfer1 of the Permits,2 or the rights granted thereunder, pursuant to the APA

and Sale Order, (ii) Rausch Creek had to seek transfer of the Permits, or the rights granted

thereunder, pursuant to the APA and Sale Order under § 86.56, and (iii) reclamation liability

would be assumed by Rausch Creek as a matter of law pursuant to § 86.56. These findings do not

disrupt this Court's core holding in In re Kimmel's Coal & Packaging, Inc., No. 18-BK-01609

(HWV), 2021 WL 4458835 (Bankr. M.D. Pa. Sept. 28, 2021) (hereinafter "Kimmel's fl") that

under the plain terms of the parties' agreement, Rausch Creek was contractually obligated to

apply for and accept transfer of whatever portion of the Permits that it could even if that portion

is something less than 100%. Kimmel' s II, WL4458835, at * 10. The Court, therefore, suggests

that the proper remedy would be for this Court's Order in Kimmel' s II to be vacated and the

1 As will be further explained infra, the word "transfer" is a significant source of confusion in this case. Throughout

Kimmel 's I and Kimmel 's 11, the Court has construed the word "transfer" as a nontechnical term that ordinarily means

"to convey from one person, place, or situation to another" or simply "convey". Transfer, Merriam-Webster's

Collegiate Dictionary. https://www merriam-webster.com/-dictionary/transfer. In contrast, Rausch Creek appears to

believe the word "transfer" is technical in nature and should thus be given a technical meaning based on PA DEP's

interpretation of25 Pa. Code§ 86.56 ("Transfer of permit"). For present purposes, and unless otherwise noted, the

Court will continue to give the word "transfer" its ordinary non-technical meaning, which is "convey."

2 All capitalized terms used herein and not otherwise defmed in this Memorandum Order will have the meanings set

forth in Kimmel's I and Kimmel's II.

matter remanded to correct the above errors and to address the potentially unresolved ( and

primary) issue of responsibility for pre-existing reclamation liability.

I. JURISDICTION

The Court has jurisdiction over this contested matter pursuant to 28 U.S.C. §§ 157 and

1334, and the Amended Order of Reference entered to Middle District Docket No. 16-3. The

Court declares that Rausch Creek's Motion for a Stay Pending Appeal ("Motion for Stay"), and

the Responses filed thereto by Fulton Bank, the PA DEP, and the Trustee, create a core

proceeding for purposes of 28 U.S.C. § 157(b )(2)(A), over which this Court has constitutional

authority to enter a final judgment.

II. BACKGROUND

Rausch Creek's assertion that mining permits cannot be partially transferred under

Pennsylvania mining law is central to its Motion for Stay. This simple averment is difficult to

evaluate, however, without a shared interpretation of Pennsylvania mining law and a mutual

understanding of the word "transfer." Because a great deal of confusion seems to flow from the

latter, the Court will begin there.

A. Transfer

The importance of the meaning of the word "transfer" as used in this case cannot be

overstated as it is central to explaining the widely divergent positions taken by the Court and by

Rausch Creek. Indeed, this case is an example of the problems that can emanate from different

interpretations of a single word. As will be explained infra, in its simplest terms, throughout

Kimmel 's I and Kimmel 's II the Court has interpreted the word "transfer," particularly as it

appears in context in the AP A and Sale Order, as a nontechnical term that means "to convey

from one person, place, or situation to another" or simply "convey."3 Transfer, Merriam-

Webster's Collegiate Dictionary, https://www.merriam-webster.com/-dictionary/transfer; see

Kimmel' s II, 2021 WL 4458835, at *7 n.12. In contrast, and importantto understanding Rausch

Creek's position here, it appears Rausch Creek believes the word "transfer" in context in

the AP A is technical in nature and should be given a technical meaning based on the PA

DEP's interpretation of§ 86.56. If this is the case, the Court does not agree with Rausch

Creek's technical interpretation of the word "transfer," particularly as it relates to the

AP A. Likewise, Rausch Creek does not appear to agree with the Court's ordinary

interpretation of the word "transfer" as it relates to this case generally. Incredibly, until

the writing of this Memorandum it appears the Court and Rausch Creek were each

unaware of the other's different interpretation of this critical word. Since the different

meanings ascribed by the parties lead to such disparate conclusions in this case, this issue

(more than any other) explains why Rausch Creek and the Court seem to have

irreconcilable interpretations of the AP A, the Sale Order, the Stipulation, and the Court's

opinions in Kimmel' s I and Kimmel' s II.

B. Pennsylvania Mining Law

Another source of confusion in this matter flows from the interpretation and application

of Pennsylvania mining law, and particularly§ 86.56. Some of this confusion is sourced in the

different meanings given to the word "transfer" as described above. The rest of it comes from

different interpretations of Pennsylvania mining law, particularly § 86.56. The applicability of

3 In so doing, the Court applied the Ordinary-Meaning Canon, which provides "words are to be understood in their

ordinary, everyday meanings -unless the context indicates that they bear a technical sense." Antonin Scalia & Bryan

A. Garner, Reading Law: The Interpretation of Legal Texts 69 (2012); see also In re Piazza, 719 F.3d 1253, 1261

(11th Cir. 2013). Since the contextual use of the words, "transferable," "transferred," and "transfer" in the APA do

not bear a technical sense, the Court understands them in their ordinary, everyday meanings.

this section is important because if the Permits cannot be transferred under§ 86.56, then

reclamation liability will not follow as a matter of law pursuant to § 86.56(c )(2) and the issue of

who bears responsibility for the pre-existing reclamation on the Real Property may remain

unresolved.

In Kimmel' s I, the Court generally interpreted§ 86.56 as establishing the only method

available under Pennsylvania mining law to effectuate the transaction contemplated under the

AP A.4 See Kimmel' s I, WL 5576960, at *7, *9, n. 17. In Kimmel' s II, the Court interpreted§

86.56 more specifically as establishing the only method available under Pennsylvania mining

law for Rausch Creek to obtain some or all the rights to mine the Permitted Land as those rights

existed under the Permits on the date of Closing. See Kimmel's II, 2021 WL 4458835, at *8-10.

Rausch Creek seems to misunderstand the Court's general interpretation of§ 86.56 in Kimmel' s I

to mean that unless transfer of the Permits occurs pursuant to§ 86.56 exclusively, Rausch Creek

has no additional responsibility under the AP A to seek mining rights or assume reclamation

liability.5 Such an understanding is incorrect. This has become a significant source of confusion

in this case.

A second source of confusion regarding Pennsylvania mining law centers upon whether a

proper application of§ 86.56 allows for partial transfer of a mining permit. While the Court

expressly did not decide whether a permit can be transferred in part under § 86.56, it did hold

that Rausch Creek was obligated under the Sale Order and AP A to submit an application

pursuant to§ 86.56 seeking transfer of the Permits or as much of them as is possible. Kimmel's

4 The Court's reasoning for this interpretation was based upon the language of§ 86.56(a), which plainly states: "[a]

transfer, assignment or sale of the rights granted under a permit may not be made except as provided in this section."

Id. The Court interpreted this to mean just what it says on its face: to transfer, assign, or sell the rights under a permit

(which is what the parties were seeking to do under the APA), the procedures set forth in§ 86.56 are the only way to

do it.

5 This may explain why Rauch Creek withdrew its 2019 Application just 7 days after Kimmel 's I was issued.

Coal II, 2021 WL 4458835, at 9-12. The Court's reasoning was that it did not read anything in

the plain language of§ 86.56 or other provisions of Pennsylvania mining law that expressly

precludes such a transfer of a portion of the rights under a Permit.6 Kimmel 's Coal II, 2021 WL

4458835, at *9. By contrast, Rausch Creek cites to a PA DEP Technical Guidance

Memorandum, Permits Transfers for Coal and Noncoal Operators, Document Number 563-

2112-218, March 19, 2016 (the "TGM") in support of its proposition that mining permits cannot

be partially transferred. ECF No. 581 at ,r 2.7 The PA DEP agrees that partial mining permit

transfers are not allowed under§ 86.56. (ECF No. 595, ,r 5). If Rausch Creek and the PA DEP

are correct, then the Court acknowledges that§ 86.56 cannot be used to convey the Permits or

any of the rights thereunder due to the inaccessibility of the Dale Coal Land. See Kimmel's I, WL

5576960, at *9.8

In sum, the disconnect ( and here is where the concept of the different definitions of

"transfer" comes back into play) is that the Court never intended: ( 1) for the concept of a transfer

to mean a "legal transfer" of Permits under§ 86.56 as Rausch Creek may believe; or (2) to rule

on how transfers can be legally effectuated under Pennsylvania mining law or whether the

6 Because the Court did not read the plain language of§ 86.56 to unequivocally prohibit a partial transfer, the Court

essentially found that there was a possibility the PA DEP could approve such a transfer (which, for reasons discussed

infra remains true). Believing that such a partial transfer was possible and there was no other way to transfer the

permits, the Court ordered Rausch Creek to fulfill its obligations under the AP A by applying for a partial permit

transfer under§ 86.56. However, the Court expressly left it to the PA DEP whether to approve any such application,

which included a potential denial on the ground that § 86.56 does not permit partial transfers. This, again, highlights

the confusion over the word "transfer." The Court did not need to decide this legal issue of partial transfer under §

86.56 because it was only deciding that Rausch Creek had to fulfill its agreement to seek permits to conduct mining

activities on the Real Property (which the Court incorrectly thought had to be done under§ 86.56).

7 The TGM may be found on the docket at ECF No. 593. The TGM states that "[t]he boundary of the permit being

transferred must remain unchanged. Transfer of a portion of a mine permit will not be granted." TGM at § A(4).

However, the TGM also says that it does not have the effect oflaw and is not binding on this Court or the PA DEP.

To the contrary, the Memorandum itself expressly states that it should not be given the weight or deference of an

adjudication or a regulation. TGM at p. i. It also affords the PA DEP the discretion to deviate from it as circumstances

warrant. Id. Thus, even with the TGM, there remains the possibility that a partial transfer is permissible under§ 86.56.

8 But, once again, this issue may be irrelevant because the Court was not intending to hold that the parties had to

effectuate a "legal transfer" under§ 86.56, but only that Rausch Creek had to endeavor to obtain permits to conduct

mining activities on as much of the Real Property as it could. The Court's error was in believing the only way to

accomplish this was under§ 86.56.

Permits could be legally transferred under same. Indeed, the latter is irrelevant and unnecessary

to the Court's underlying rationale in both Kimmel 's I and Kimmel 's II. Instead, the Court was

looking at this matter holistically and as a commercial sales transaction, just as it did when it

approved the Sale Order (e.g., Rausch Creek (as Buyer) paid a sum of money to the Debtors (as

Sellers) in exchange for the Real Property and the ability to seek and obtain permission to

conduct mining activities on that land and the Dale Coal Land, along with certain concomitant

obligations). Thus, the Court was not concerned with how mining permits can be transferred

under Pennsylvania mining law provided there was some means to accomplish it (which the

Court incorrectly thought was§ 86.56). Instead, the Court focused on the fact that Rausch Creek

purchased the ability to seek and obtain permission to conduct mining activities on the Real

Property, including an obligation to assume the existing reclamation liability once it obtained a

permit. Where the Court erred is in concluding that the only way to consummate the commercial

transaction was pursuant to § 86.56. Importantly, the Court now recognizes that § 86.56 is not

the only method available under Pennsylvania mining law for Rausch Creek to obtain some or all

the rights to mine the Permitted Land as the parties have identified other means under

Pennsylvania mining law to accomplish this.9

In view of the foregoing, while the Court believes it correctly concluded in Kimmel's II

that pursuant to the AP A and Sale Order the parties agreed that Rausch Creek would apply for

transfer of as much of the Permits as it could in accordance with Pennsylvania mining law, 10 and

9 The PA DEP has stated that the parties' agreement can be effectuated under Pennsylvania mining law by having

Rausch Creek submit a new application requesting a permit for all portions of the land exclusive of the Dale Coal

Lands and then have the Debtors reduce the size of the existing (White Pine) permit to exclude the lands contained in

the new application. Indeed, it appears that this is precisely what Rausch Creek was seeking to do with its 2019

Application (previously defined in Kimmel's I as the "New Permit Application" and defined in Kimmel's II as the

"2019 Application").

10 See§ III(A) of Kimmel's //where the Court held that "the plain language of the Sale Order and APA unambiguously

demonstrates that the parties intended a transfer of the Permits, or the rights granted thereunder, from the Debtors to

Rausch Creek as contemplated in the PA DEP Regulations." Kimmel's 11, WL4458835, at *6.

that Rausch Creek was contractually obligated to apply for and accept transfer of whatever

portion of the Permits that it could even if that portion is something less than 100%, 11 the Court

now believes it was incorrect in concluding that: (i) § 86.56 was the only way to effectuate such

a transfer under the AP A and Sale Order; (ii) Rausch Creek had to seek a transfer as described in

Kimmel' s II under§ 86.56; and (iii) reclamation liability followed as a matter of law pursuant to

§ 86.56. Such a scenario does not disrupt this Court's holding in Kimmel 's II because the

intended transfer of the Permits or the rights granted thereunder (e.g., the intended underlying

commercial transaction) can still occur under the Pennsylvania mining law even if it cannot be

accomplished under§ 86.56.

With the above context in mind, the Court now turns to the instant Motion for Stay.

III. DISCUSSION

The determination of whether to grant a stay pending appeal requires consideration of the

following four factors under the Third Circuit's "sliding-scale" approach: (1) whether the stay

applicant has made a strong showing that he is likely to succeed on the merits; (2) whether the

applicant will be irreparably injured absent a stay; (3) whether issuance of the stay will

substantially injure the other parties interested in the proceeding; and (4) where the public

interest lies. In re Revel AC, Inc., 802 F.3d 558, 568-70 (3d Cir. 2015); Republic of Philippines v.

Westinghouse Elec. Corp., 949 F.2d 653, 658 (3d Cir. 1991). These factors must be balanced,

with the first two being most critical. In re Revel AC, Inc., 802 F.3d at 568. The Court will

address each of these factors in the order presented.

11 See § III(B) of Kimmel's II where the Court held that "under the plain terms of the parties' agreement, Rausch

Creek was contractually obligated ... to apply for and accept transfer of ... whatever portion of the Permits that it

could ... even if that portion is something less than 100%." Kimmel's II, WL4458835, at *10.

A. Likelihood of Success on the Merits

To establish the first factor,t here must be a '"reasonable chance, or probability,o f

winning."' In re Revel AC, Inc., 802 F.3d at 568-69 (q uoting Singer Mgmt. Consultants, Inc. v.

Mi/gram,6 50 F.3d 223,2 29 (3d Cir. 2011)). A "reasonable chance of winning ... need not be

more likely than not," Id. at 569,b ut it must be "significantly better than negligible." Id. at 571.

For the following reasons,w hile the Court agrees that it may have misapplied§ 86.56,t here is

not a likelihood of success on the merits concerning this Court's fundamental holding that,u nder

the AP A and Sale Order,R ausch Creek was contractually obligated to apply for and accept

transfer of whatever portion of the Permits that it could even if that portion is something less

than 100%.

1. First Issue Presented on Appeal

Rausch Creek's first issue presented on appeal asserts that the Court erred as a matter of

law or abused its discretion "in ruling that mining permits can be partially transferred under

Pennsylvania's mining permit transfer law." (ECF No. 594,P g. 1).

To the extent this issue is interpreted to mean the Court erred in ruling that mining

permits can be partially transferred under § 86.56 exclusively,t he Court concludes that Rausch

Creek has no likelihood of success. This is so because the Court did not make such a ruling. To

the contrary,t he Court expressly wrote that:

The Court is not deciding whether a permit can be transferred in part. The Court

only holds that under the Sale Order and AP A Rausch Creek is obligated to submit

an application pursuant to § 86. 56 seeking transfer of the Permits or as much of

them as is possible. Whether any such transfer ultimately is approved is within the

purview of the PA DEP and subject to applicable state law.

Kimmel' s Coal II, 2021 WL 4458835, at n.20.12 Thus, the language of Kimmel' s II contradicts

any assertion that the Court erred as a matter of law or abused its discretion in ruling that mining

permits can be partially transferred under§ 86.56. Likewise, to the extent this issue is interpreted

to mean the Court erred in ruling that mining permits can be partially transferred under the

Pennsylvania mining regulations, 25 Pa. Code §§ 1.1 et seq., the Court again finds no likelihood

of success on the merits. This is because the Court interpreted the word "transfer" as used in the

AP A and Sale Order to mean "convey." As such, the word ''transfer" is not limited to any

technical meaning or understanding under§ 86.56. Because the Permits or a portion of the rights

granted thereunder can clearly be "conveyed" from the Debtors to Rausch Creek as evidenced by

the 2019 Application and the representations of the PA DEP, Rausch Creek's argument to

contrary here must fail.

Notwithstanding the foregoing, however, the Court does find a likelihood of success on

the merits regarding Rausch Creek's first issue presented to the extent it raises concerns

regarding the Court's conclusions that: (i) § 86.56 was the only way to effectuate transfer

(conveyance) of the Permits, or the rights granted thereunder, pursuant to the AP A and Sale

Order; and (ii) Rausch Creek had to seek transfer of the Permits, or the rights granted thereunder,

pursuant to the APA and Sale Order under§ 86.56 only. As discussed above, however, any such

error does not negate the Court's primary holding that "under the plain terms of the parties'

agreement, Rausch Creek was contractually obligated ...t o apply for and accept transfer of ...

whatever portion of the Permits that it could ...e ven if that portion is something less than

100%." Kimmel' s II, WL4458835, at * 10.

12 See n.6 supra.

2. Second Issue Presented on Appeal.

Rausch Creek's second issue presented asserts the Court erred as a matter of law or

abused its discretion in "interpreting the Asset Purchase Agreement to require a partial transfer

of a mining permit in contravention of Pennsylvania's mining permit transfer law." (ECF 594, at

I). To the extent this issue is interpreted to mean the Court erred in interpreting the Asset

Purchase Agreement to require a partial transfer of a mining permit in contravention of 25 Pa.

Code §§ l.l et seq., the Court concludes that Rausch Creek has no likelihood of success for

several reasons.

First, Rausch Creek has failed to offer any argument challenging the Court's reasoning in

§ III(B) ofKimmel's If where it found that under the plain terms of the parties' agreement,

Rausch Creek was contractually obligated to apply for and accept transfer of whatever portion of

the Permits that it could even if that portion is something less than 100%. Kimmel's II,

WL4458835, at* IO. Second, and as with the first issue presented,t he Court interpreted the word

"transfer" in context in the APA and Sale Order to mean "convey." As such, the word "transfer"

is not limited to any technical meaning that Rausch Creek may believe is imposed by § 86.56.

Because the Permits or the rights granted thereunder can be partially "conveyed" from the

Debtors to Rausch Creek as evidenced by the 2019 Application and the representations of the PA

DEP and because Rausch Creek has failed to offer any argument challenging the Court's

reasoning in § III(B) of Kimmel' s II, Rausch Creek's argument here must fail.

Notwithstanding the foregoing, however,t he Court does find a likelihood of success on

the merits regarding Rausch Creek's second issue presented on appeal to the extent it raises

concerns regarding the Court's conclusions that: (i) § 86.56 was the only way to effectuate

transfer (conveyance) of the Permits,o r the rights granted thereunder,p ursuant to the APA and

Sale Order; and (ii) Rausch Creek had to seek transfer of the Permits, or the rights granted

thereunder, pursuant to the APA and Sale Order under § 86.56 only. As discussed above,

however, any such error does not negate the Court's primary holding that "under the plain terms

of the parties' agreement, Rausch Creek was contractually obligated ...t o apply for and accept

transfer of ...w hatever portion of the Permits that it could ...e ven if that portion is something

less than 100%." Kimmel 's II, WL4458835, at * 10.

3. Third Issue Presented on Appeal.

Rausch Creek's third issue presented asserts the Court erred as a matter of law or

abused its discretion in "placing the burden of proof upon Rausch Creek to show whether

a mining permit can be partially transferred." (ECF 594, at 1). To the extent this issue is

interpreted to mean the Court erred in requiring Rausch Creek to engage in a futile act

(e.g., apply for a transfer pursuant to§ 86.56 knowing it will likely be denied)13 the Court

concludes that Rausch Creek may have some likelihood of success. As noted in Kimmel 's

II, the Court does not read anything in the plain language of§ 86.56 that precludes a

"transfer, assignment, or sale" of a portion of the rights under a permit. Kimmel 's II, 2021

WL 4458835, at *9.14 However, the Court acknowledges that the PA DEP disagrees and

believes any such application under § 86.56 would likely be denied.15

In view of the foregoing, then, the Court does find some likelihood of success on the

merits regarding Rausch Creek's third issue presented on appeal to the extent it raises concerns

regarding the Court's conclusions that: (i) § 86.56 is the only way to effectuate a transfer

13 ECF No. 581, at 7, ,r 27,

14 See n.6, 7 supra.

15 The Court notes that resolution of this issue (e.g., whether partial mining permit transfers are allowed under§ 86.56)

is not necessary because it does not impact the Court' primary holding that "under the plain terms of the parties'

agreement, Rausch Creek was contractually obligated ... to apply for and accept transfer of ... whatever portion of

the Permits that it could ... even if that portion is something less than 100%." Kimmel's II, WL4458835, at *10.

(conveyance) of the Permits or the rights granted thereunder consistent with the AP A and Sale

Order; and (ii) Rausch Creek must seek such a transfer of the Permits, or the rights granted

thereunder, consistent with the AP A and Sale Order under § 86.56 as opposed to another means

permitted by state law.

4. Fourth Issue Presented on Appeal.

The Court does not find a likelihood of success on the merits regarding Rausch Creek's

fourth issue presented on appeal asserting the Court erred as a matter of law or abused its

discretion "in ruling that Rausch Creek was judicially estopped from asserting a mining permit

cannot be partially transferred." (ECF No. 594, at 1). Recall that to establish a strong likelihood

of success on the merits, there must be a "'reasonable chance, or probability, of winning."' In re

Revel AC, Inc., 802 F.3d at 568-69 (quoting Singer Mgmt. Consultants, Inc. v. Milgram, 650

F.3d 223, 229 (3d Cir. 2011)). Here, Rausch Creek has failed to plead a single fact or averment

or make any arguments in its Motion for Stay to support its assertion here.

In contrast, the record demonstrates that Rausch Creek previously acknowledged an

obligation to apply for and obtain the rights to mine a "portion" of the Permitted Land including

any reclamation liability attendant thereto in its Response to the Motion to Compel. See Rausch

Creek's Response to the Motion to Compel, ECF No. 381, ,r,r 11-16; see also Kimmel's II,

WL4458835, at *8.16 This acknowledgement was subsequently confirmed and clarified by

Rausch Creek in the Stipulation partially resolving the Motion to Compel and Rausch Creek's

response thereto, where Rausch Creek agreed to apply for and obtain the rights to mine the Real

16 Given the Court's interpretation of the word "transfer" and assuming the mining rights sought by Rausch Creek are

just as those rights existed under the Permits at Closing, the Court has always viewed this acknowledgment to apply

for and accept a partial conveyance of the rights granted under the Permits as a qualifying partial transfer of the

Permits under paragraph 2.l(c) of the APA. See Kimmel's I, WL 5576960, at *11, and Kimmel's 11, WL 4458835, at

*13.

Property (only) on or before July 15, 2019. Pursuant to the Stipulation, Rausch Creek submitted

its 2019 Application to the PA DEP on July 15, 2019 seeking the rights to mine the Real

Property Gust as those rights existed under the Permits at Closing) and assuming all reclamation

liability attendant thereto.17 Fulton Bank, the Debtors, the PA DEP, and the Court all relied upon

the foregoing representations made by Rausch Creek in its Response to the Motion to Compel,

the Stipulation, and the 2019 Application. See, i.e., Mot. to Compel Hr'g Tr. 17:19-24, 7:17-8:9,

9:16-21, 5:19-6:1, 11: 15-16, 12:20-25. As such, in Kimmel' s I, the Court was led to believe there

was not (a nd would never be) any dispute over the reclamation liability on the Real Property

because Rausch Creek had already submitted an application assuming that liability. However,

seven days after the Court issued Kimmel' s I, Rausch Creek withdrew the 2019 Application and

submitted the 2020 Application in which it did not assume all reclamation liability attendant to

the Real Property. This change may be due to Rausch Creek's misunderstanding of the Court's

general interpretation of the APA and§ 86.56 as described above. Nevertheless, Rausch Creek

should be estopped from changing its position as described in its Response to Motion to Dismiss,

the Stipulation, the 2019 Application, and as it represented to the Court at the Hearing on the

Motion to Compel.

Accordingly, the Court does not find a likelihood of success on the merits regarding this

issue.

B. No Irreparable Harm.

Rausch Creek also must demonstrate that irreparable injury is likely and not merely

possible in the absence of a stay. In re Revel AC, Inc., 802 F.3d at 569. Establishing irreparable

17 For the reasons previously stated, the Court views the 2019 Application as a partial conveyance of the Permits that

qualifies as a "transfer" under paragraph 2.l(c) of the APA. See n. 16, supra. Resubmitting this 2019 Application

would therefore satisfy the conditions of the Court's ruling in Kimmel's 11, with the obvious exception of requiring

Rausch Creek to submit an application pursuant to§ 86.56 (which the Court now recognizes as possibly incorrect).

harm requires showing that it is "more apt to occur than not." Id To demonstrate irreparable

injury, the movant must demonstrate "harm that cannot be prevented or fully rectified by a

successful appeal." United States v. Safehouse, 458 F. Supp. 3d 687, 691 (E.D. Pa. 2020) (citing

In re Revel AC, Inc., 802 F.3d at 568 (quoting Roland Mach. Co. v. Dresser Indus., 749 F.2d

380, 386 (7th Cir. 1984) (Posner, J.)). The "possibility that adequate compensatory or other

corrective relief will be available at a later date, in the ordinary course of litigation, weighs

heavily against a claim of irreparable harm." In re Revel AC, Inc., 802 F.3d at 571 (quoting

Sampson v. Murray, 415 U.S. 61, 90, 94 S. Ct. 937, 39 L.Ed.2d 166 (1974) (internal quotation

marks omitted)).

Here, Rausch Creek argues that this Court "has set [] Rausch Creek up for failure since

what it is ordering Rausch Creek to do is impossible." (ECF No. 581, at 8, if32). Rausch Creek

further argues that it "will have no legal recourse if it is forced to comply with this Court's order

and the PA DEP changes its previous opinion that the Permits cannot be transferred due to this

Court's (incorrect) order." (ECF No. 581, at. 8, if33). The Court rejects these arguments as

unpersuasive. To begin, even assuming Rausch Creek's first argument as stated above is true and

correct, it is not clear to this Court how the argument establishes (o r even articulates) "harm that

cannot be prevented or fully rectified by a successful appeal." Consider the possibilities: If the

PA DEP denies the § 86.56 Application ( as Rausch Creek believes it must under the law), then

Rausch Creek will have complied with this Court's Order with minimal effort and expense18 and

will not be automatically liable under the law for pre-existing reclamation. Alternatively, and

contrary to Rausch Creek's second argument identified above, if "the PA DEP changes its

previous opinion that the Permits cannot be transferred due to this Court's (incorrect) order" and

18 Rausch Creek already prepared and previously submitted an application (the 2019 Application) that would satisfy

the Court's Order in Kimmel's II.

approves the§ 86.56 Application, then Rausch Creek will be free to appeal that decision in

accordance with state law as any other aggrieved party is entitled to do. Any such successful

appeal will prevent the claimed harm of being forced to accept reclamation liability. ECF No.

581 at ,r 12.

Furthermore, as stated by the PA DEP in its Response to Rausch Creek's Motion for

Stay, "if the stay is not granted and Rausch Creek submits a new permit application or in the

alternative amends the 2020 permit application to comply with the Bankruptcy Court's ruling,

and later the District Court reverses the Bankruptcy Court's holding, the permit can be duly

revised pursuant to 25 Pa. Code§ 86.52. As such, Rausch Creek will suffer no irreparable harm

if a stay is not granted." (ECF No. 595. at 4, ,r 12).

Thus, as to this second factor, Rausch Creek has failed to demonstrate that any

irreparable injury is likely to occur in the absence of a stay.

C. Balance of Harms and Public Interest.

If an "applicant satisfies the first two factors, the traditional stay inquiry calls for

assessing the harm to the opposing party and weighing the public interest." In re Revel AC, Inc.,

802 F.3d at 569 (quoting Nken v. Holder, 556 U.S. 418, 435 (2009)). Courts must then weigh the

likely harm to the movant (absent a stay) (factor two) against the likely irreparable harm to the

stay opponent(s) if the stay is granted (factor three). Id. This is called the balancing of harms or

balancing of equities. Courts must also take into account where the public interest lies (factor

four)-in effect, how a stay decision has "consequences beyond the immediate parties." Id.

(quoting Roland Mach. Co. v. Dresser Indus., 749 F.2d 380, 388 (7th Cir.1984) (Posner, J.)).

Although the Court finds Rausch Creek has not satisfied the second factor (irreparable

harm), the Court nonetheless continues its analysis and finds that this third factor also is not

satisfied. Here, Rausch Creek begins by arguing that "entry of an order staying the Motion to

Compel Order will not cause substantial injury to the Debtors or any other party to this

proceeding." (ECF No. 581,a t 8, ,i 34). In support of this averment, Rausch Creek argues that

Fulton Bank will not be harmed "as reclamation takes years to undertake and PA DEP has not

demanded cleanup of the affected areas of the Permits." (ECF No. 581,a t 8, ,i 35). It also argues

that "[t]he allegation that the Bankruptcy Estate will have a large administrative claim is

disingenuous as such administrative claim existed on the day the Debtors were in bankruptcy and

had nothing to do with actions taken by Rausch Creek." (ECF No. 581,a t 9,,i 37). These

arguments are unpersuasive.

Regarding the first argument advanced by Rausch Creek,t he PA DEP advised the Court at

the November 9,2 021 hearing on the Motion for Stay (the "Stay Hearing") that granting a stay in

this matter would allow Rausch Creek to continue to pursue its 2020 Application which was

close to being approved. Stay Hearing at 12:30:42. PA DEP also advised that "what Rausch

Creek is proposing in the 2020 permit would possibly trigger the Department to call the [Fulton

Letters of Credit] because the old permit would have to be shrunk and that reclamation would

have to be done on the old permit." Stay Hearing at 11: 33:31. Based upon these representations,

the Court rejects Rausch Creek's first argument.

The Court also rejects Rausch Creek's second argument that the "administrative claim

existed on the day the Debtors were in bankruptcy and had nothing to do with actions taken by

Rausch Creek." (ECF No. 581,a t 9,,i 37). The Court rejects this argument because it i ores the

gn

obvious intervening and superseding circumstances associated with: (1) the sale of substantially

all the Debtors' assets; (2) the terms and conditions of the AP A (which Rausch Creek voluntarily

bound itself to); (3) the Sale Order approving each of those things (and the Court's findings

attendant thereto); and (4 ) the Court's findings and conclusions in Kimmel 's I and Kimmel 's II.

Significantly, this Court would never have approved the Sale Order if Rausch Creek was

obtaining the rights to mine the property without also accepting the existing reclamation

obligations.

Finally,r egarding the public policy element,t he Court agrees with the PA DEP's

assessment. In its Response to the Motion for Stay, the PA DEP observes:

Rausch Creek latches on to a technicality claiming that because the Permits[]

cannot be transferred in full under 25 Pa. Code § 86. 56, it should be relieved of all

reclamation obligations. This outcome is contrary to the intent of the parties as forth

in the Sale Order, the AP A, and the July 8, 2019 Stipulation and as evidenced by

the 2019 Permit Application[] and is contrary to public policy. To allow Rausch

Creek to be relieved of all reclamation obligations is contrary to the intent and

purpose of the sale process under bankruptcy law because it leaves the obligations

with the insolvent Debtors.

ECF No. 595,a t 4-5,i J 13.

For the foregoing reasons,R ausch Creek has failed to satisfy its burden of demonstrating

that a balancing of harms or balancing of equities in this matter favors issuing a stay pending

appeal. Rausch Creek also has failed to demonstrate that the absence of the stay will have

negative "consequences beyond the immediate parties." To the contrary, to the extent public

policy considerations are relevant here,t hey tend to favor denying the request for a stay for the

reasons stated above.

IV, CONCLUSION

In conclusion, the word "transfer" is a si ificant source of confusion in this case. The

gn

different meanings ascribed to this word explain the disparate conclusions reached by the parties

and explains why Rausch Creek and the Court seem to have irreconcilable interpretations of the

APA,t he Sale Order,t he Stipulation, and the Court's opinions in Kimmel 's I and Kimmel 's II.

The same is true,t hough to a lesser extent,r egarding the proper interpretation and application of

§ 86.56. With that context in mind, the Court finds that Rausch Creek has not met the standard

for a stay but agrees with Rausch Creek that there is a likelihood of success on the merits insofar

as the Court previously concluded that: (1) § 86.56 was the only way to effectuate transfer of the

Permits, or the rights granted thereunder, pursuant to the APA and Sale Order, (11) Rausch Creek

had to seek transfer of the Permits, or the rights granted thereunder, pursuant to the APA and

Sale Order under § 86.56, and (411) reclamation liability would be assumed by Rausch Creek as a

matter of law pursuant to § 86.56. The Court, therefore, suggests that the proper remedy would

be for this Court’s Order in Kimmel’s IT to be vacated and the matter remanded to correct the

above errors and to address the potentially unresolved (and primary) issue of responsibility for

pre-existing reclamation liability.

For the foregoing reasons, Rausch Creek’s Motion for Stay Pending Appeal is denied. An

appropriate order will follow.

Dated: December 3, 2021 By the Court,

Henry W. Van Eck, Chief Bankruptcy Judge ™®

19