“When a contract is expressed in unambiguous language, its terms will be given their plain meaning and will be enforced as written.” (citation omitted)
How later courts described this case
- “When a contract is expressed in unambiguous language, its terms will be given their plain meaning and will be enforced as written.” (citation omitted)
- “[E]ach provision in a contract must be interpreted in light of the other provisions so that each is given the meaning suggested by the contract as a whole.” (citing LA. CIV. CODE art. 2050)
Written by the judges who cited it.
The opinion
UNITED STATES BANKRUPTCY COURT
EASTERN DISTRICT OF LOUISIANA
IN RE * BANKR. NO. 19-11528
*
CELLA III, LLC, * CHAPTER 11
*
DEBTOR. * SECTION “A”
*
************************************* *************************************
CELLA III, LLC, *
*
PLAINTIFF, *
*
V. * ADVERSARY NO. 19-01145
*
JEFFERSON PARISH HOSPITAL *
DISTRICT #2, PARISH OF JEFFERSON, *
STATE OF LOUISIANA D/B/A/ EAST *
JEFFERSON GENERAL HOSPITAL, *
*
DEFENDANT. *
MEMORANDUM OPINION
This Court conducted a three-day trial on September 18, 21, and 22, 2020, to resolve the
claims asserted in the Petition for Declaratory Judgment, Breach of Contract of Lease, and
Damages (the “Petition”), [ECF Doc. 1-1], filed in the above-captioned adversary. At the close of
the trial, the Court took the matter under submission. The Court now makes the following findings
of fact and conclusions of law pursuant to Rule 52 of the Federal Rules of Civil Procedure, made
applicable to these proceedings by Rule 7052 of the Federal Rules of Bankruptcy Procedure.1
1 These findings of fact and conclusions of law constitute the Court’s findings of fact and conclusions
of law pursuant to Federal Rule of Bankruptcy Procedure 7052. To the extent that any of the following
findings of fact are determined to be conclusions of law, they are adopted and shall be construed and deemed
conclusions of law. To the extent any of the following conclusions of law are determined to be findings of
fact, they are adopted and shall be construed and deemed as findings of fact.
RELEVANT PROCEDURAL BACKGROUND
Prepetition, the plaintiff, Cella III, LLC (“Cella”) filed the Petition against the defendant,
Jefferson Parish Hospital District #2, Parish of Jefferson, State of Louisiana d/b/a East Jefferson
General Hospital (“EJGH”) in the 24th Judicial District Court for the Parish of Jefferson, State of
Louisiana (the “State Court”), on September 12, 2018. In its Petition, Cella asserts a claim for
breach of a May 2016 lease between Cella and EJGH (the “Lease”) and seeks declaratory
judgments that, pursuant to the Lease and extrinsic evidence, (i) EJGH is required to building a
“Free-Standing Emergency Department” or pay Cella damages in “an amount to have someone
else build-out the building as a Free-Standing Emergency Room in accordance with the plan
submitted by EJGH”; and (ii) EJGH has breached the Lease, failed to cure the breach timely, and,
therefore, the Lease has terminated and Cella may collect “accelerated rent, cost[s], and attorney
fees.”
Shortly after filing for bankruptcy relief in this Court on June 5, 2019, Cella removed the
State Court case to the U.S. District Court for the Eastern District of Louisiana (the “District
Court”) pursuant to 28 U.S.C. §§ 1334(b), 1446(a), and 1452, as well as Federal Rule of
Bankruptcy Procedure 9027. The District Court referred the case to this Court, [No. 19-11743,
ECF Doc. 18 (E.D. La. Oct. 22, 2019)], where it was allotted to Judge Jerry Brown.
JURISDICTION AND VENUE
Congress conferred authority to bankruptcy judges through two sections of title 28 of the
United States Code: (i) § 1334, which grants subject-matter jurisdiction to district court for “all
civil proceedings arising under title 11, or arising in or related to cases under title 11,” 28 U.S.C.
§ 1334(b); and (ii) § 157, which allows district courts to transfer cases under title 11 or related-to
cases under title 11 to bankruptcy courts, 28 U.S.C. § 157(a). A proceeding which arises under or
2
arises in a case under title 11 is a “core” proceeding. 28 U.S.C. § 157(b); see also Wood v. Wood
(In re Wood), 825 F.2d 90, 97 (5th Cir. 1987) (“[T]he phrases ‘arising under’ and ‘arising in’ are
helpful indicators of the meaning of core proceedings. If the proceeding involves a right created
by the federal bankruptcy law, it is a core proceeding; for example, an action by the trustee to
avoid a preference. If the proceeding is one that would arise only in bankruptcy, it is also a core
proceeding; for example, the filing of a proof of claim or an objection to the discharge of a
particular debt.”). Section 157 provides a nonexclusive list of matters considered to be “core.”
See 28 U.S.C. § 157(b)(2). But a matter is considered to be “non-core” if it is merely “related to”
a case under title 11. See 28 U.S.C. § 157(c)(1).
“Congress gave bankruptcy courts the power to ‘hear and determine’ core proceedings and
to ‘enter appropriate orders and judgment,’ subject to appellate review by the district court.”
Wellness Int’l Network, Ltd. v. Sharif, 135 S. Ct. 1932, 1940 (2015); see also 28 U.S.C.
§ 157(b)(1). “But it gave bankruptcy courts more limited authority in non-core proceedings: They
may ‘hear and determine’ such proceedings, and ‘enter appropriate orders and judgments,’ only
‘with the consent of all parties to the proceeding.’” Wellness Int’l Network, Ltd., 135 S. Ct. at
1940; see also 28 U.S.C. § 157(c)(2). “Absent consent, bankruptcy courts in non-core proceedings
may only ‘submit proposed findings of fact and conclusions of law,’ which the district courts
review de novo.” Wellness Int’l Network, Ltd., 135 S. Ct. at 1940; see also 28 U.S.C. § 157(c)(1).
Consent to a bankruptcy court’s authority to render a final judgment in a matter can be
express or implied. Indeed, “[n]othing in the Constitution requires that consent to adjudication by
a bankruptcy court be express[;] [n]or does the relevant statute, 28 U.S.C. § 157, mandate express
consent.” Wellness Int’l Network, Ltd., 135 S. Ct. at 1947. “Applied in the bankruptcy context,
3
[the implied-consent standard] possesses . . . pragmatic values—increasing judicial efficiency and
checking gamesmanship . . . .” Id. at 1948.
When Cella removed the State Court case to the District Court, it notified this Court and
EJGH that it consented to the entry of final orders or judgment by this Court as required by Federal
Rule of Bankruptcy Procedure 9027(a)(1). [ECF Doc. 9]. Rule 9027 also requires:
Any party who has filed a pleading in connection with the removed claim
or cause of action, other than the party filing the notice of removal, shall file a
statement that the party does or does not consent to entry of final orders or judgment
by the bankruptcy court. A statement required by this paragraph shall be signed
pursuant to Rule 9011 and shall be filed not later than 14 days after the filing of the
notice of removal. Any party who files a statement pursuant to this paragraph shall
mail a copy to every other party to the removed claim or cause of action.
FED. R. BANKR. P. 9027(e)(3). EJGH filed no such statement into the record.
On November 18, 2019, Judge Brown issued a Scheduling Order with pretrial and trial
dates to which “[c]ounsel for the parties have agreed.” [ECF Doc. 12]. The Order contained no
statement regarding EJGH’s lack of consent to Judge Brown’s ability to enter final orders or
judgment in resolving the claims contained in the Petition. The Scheduling Order was amended
on January 13, 2020, and again on March 31, 2020, at the request of the parties; neither of those
Orders contained a statement regarding EJGH’s lack of consent to Judge Brown’s ability to enter
final orders or judgment in this action. [ECF Docs. 21 & 41].
On April 24, 2020, EJGH requested Judge Brown to enter final judgment in not one, but
three motions for summary judgment or partial summary judgment. [ECF Docs. 47, 48 & 49]. On
April 30, 2020, EJGH filed a fourth motion for summary judgment, asking Judge Brown to enter
final judgment in its favor. [ECF Doc. 57]. On May 21, 2020, Judge Brown denied each of
EJGH’s motions for summary judgment or partial summary judgment. [ECF Doc. 69].
4
Cella’s bankruptcy case and this adversary proceeding were reassigned to the undersigned
on July 16, 2020, in anticipation of Judge Brown’s retirement. This Court held a status conference
on July 30, 2020, where, for the first time, EJGH notified this Court and Cella that it did not consent
to this Court entering final orders or judgment in this action. And at the start of the three-day trial
on the claims listed in the Petition, EJGH again announced that it did not consent to this Court’s
jurisdiction to render final judgment in this matter and asserted that this Court is limited to making
proposed findings of fact and conclusions of law for review by the District Court. See Hr’g Tr.
20:16–21:1 (Sept. 18, 2020) [ECF Doc. 163].
This Court finds, however, that EJGH impliedly consented to this Court’s jurisdiction to
enter final judgment in this action when it requested Judge Brown to enter final judgment on four
motions for summary judgment. See, e.g., Haley v. Barclays Bank Del. (In re Carter), 506 B.R.
83, 88 (Bankr. D. Ariz. 2014). EJGH did not file a Rule 9011 statement within fourteen days of
the removal of the case pursuant to Rule 9027. By its multiple motions for summary judgment, it
specifically asked this Court to enter final judgment in its favor. But then at trial—with a new
judge—EJGH objected to the constitutional authority of this Court to enter a final judgment under
Stern v. Marshall, 131 S. Ct. 2594 (2011), and its progeny. As explained by the court in In re
Carter:
One of the underlying reasons for the doctrine of waiver or forfeiture by litigation
conduct is to prevent litigation conduct that would be described as sandbagging,
“heads I win; tails you lose,” or second bite at the apple strategy. If a Stern
objection were not deemed waived by the party making it seeking summary
judgment, then the party could seek or permit a substantive ruling by the
Bankruptcy Court, and then waive that objection if the ruling is favorable but insist
on it if unfavorable, and get a second bite at the apple. To avoid the possibility of
that kind of litigation conduct by virtually any defendant in a bankruptcy adversary
proceeding or contested matter, the Court must conclude that [Executive Benefits
Ins. Agency v. Arkison, 133 S. Ct. 2880 (2013)] necessarily implies that a Stern
5
objection is waived or forfeited whenever the party making it requests a substantive
ruling from the Bankruptcy Court.
506 B.R. at 88 (citations omitted).
EJGH has been represented by its State Court litigation counsel as well as bankruptcy
counsel in the adversary proceeding before this Court. Cella made its Rule 9011 election timely.
EJGH did not choose to do the same as required by the Bankruptcy Rules. This Court finds that
EJGH was “made aware of the need for consent and the right to refuse it, and still voluntarily
appears to try the case before the [bankruptcy court].” Wellness Int’l Network, Ltd., 135 S. Ct. at
1948. Based on EJGH’s conduct in this proceeding, the Court concludes that EJGH impliedly
consented to the entry of a final judgment by this Court. See id.; Frontseat, LLC v. Stern, No. 18-
CV-2208, 2020 WL 2933442, at *1–2 (E.D.N.Y. May 31, 2020); Herrera-Edwards v. Moore (In
re Herrera-Edwards), 578 B.R. 853, 860–61 (Bankr. M.D. Fla. 2017); Conti v. Perdue Bioenergy,
LLC (In re Clean Burn Fuels, LLC), 540 B.R. 195, 199 n.2 (Bankr. M.D.N.C. 2015).
Therefore, this Court has jurisdiction to grant the relief provided for herein on a final basis
pursuant to 28 U.S.C. §§ 1334 and 157(c)(2). The venue of the Debtor’s chapter 11 case is proper
under 28 U.S.C. §§ 1408 and 1409(a).
FINDINGS OF FACT
A. Cella’s Business and Capital Structure
Cella is a Louisiana limited liability company with a sole member, George Cella. See Hr’g
Tr. 63:12–22 (Sept. 18, 2020). Cella owns property located at 4545 Veterans Boulevard in
Metairie, Louisiana, on which sit three buildings. See Hr’g Tr. 67:8–19 (Sept. 18, 2020). One
building houses a Hertz car rental business, one building houses a Smoothie King franchise, and
the last building historically housed a bank in part of the building, while Cella continues to operate
6
a mini storage and vault business in another part of that building. See Hr’g Tr. 67:8–68–12 (Sept.
18, 2020).
B. The Lease
As of May 12, 2016, the date on which Cella and EJGH executed the Lease, the portion of
4545 Veterans Memorial Blvd that formerly housed a bank and includes certain parking spaces
and common areas (the “Leased Premises”) had been vacant for approximately one year. See Hr’g
Tr. 68:25–69:14 (Sept. 20, 2020). Under a section of the Lease entitled “Permitted Use,” Cella
“agree[d]” to EJGH’s “use of the leased premises for operation of a ‘Community Medical Center’,
defined as the provision of healthcare related services.” Lease, § 10.2
The Lease requires EJGH to pay base monthly rent plus common area maintenance
(“CAM”) charges. See Lease, §§ 4 & 5. The monthly rent for the first five years of the Lease is
estimated in the Lease to be $32,812.50 per month (or $37.50 per square foot per 10,500 square
feet / 12 months) and the Lease estimates the CAM charges to be $6,125 per month ($7.00 per
square foot per 10,500 square feet / 12 months).3 The base rent would increase by 10% starting in
Year 6 of the Lease. See Lease, § 4. The Lease also requires EJGH to maintain its own insurance
covering commercial general liability, property damage, worker’s compensation, flood hazard, and
business interruption, and, with the exception of worker’s compensation insurance, naming Cella
as an additional insured. See Lease, § 13.
The Lease states that “[t]he term of this Lease shall be for an initial period of one hundred
twenty (120) months, commencing on the lease Commencement Date, (“Commencement Date”),
2 The parties introduced the Lease into evidence as “Joint Exhibit 1.”
3 The parties stipulated at trial that the actual monthly rent and CAM charges totaled $43,499.82.
[ECF Doc. 154].
7
and ending at midnight on the day before the tenth (10th) anniversary of the Commencement Date.”
Lease, § 2(A). Section 3 of the Lease defines the “Commencement Date” as “the earlier to occur
of two hundred forty (240) days following Lease execution or receipt of license to operate as a
‘community emergency center’ (CEC) by the licensing bodies.” Lease, § 3. That section adds:
No Base Rent, pro-rata common area maintenance, property tax and property
insurance payments shall be due from Lessee for Months 1 through 8 after lease
execution for the Leased Premises during the period between the Lease Execution
and the Commencement Date, but such shall be required beginning in Month 9 and
thereafter.
Id.
The Lease refers to that initial period of 120 months referenced in section 2(A) of the Lease
as the “Initial Term.” Id. EJGH (or any successor in interest)4 has the right to terminate the Lease
at the expiration of the fifth year of the Lease, provided that it gives Cella written notice at least
180 days prior to the expiration of the fifth year of the Lease. See Lease, § 2(B). If that option is
chosen, “all Base Rents due and payable pursuant to terms of the lease for the next thirty (30)
months of the initial term shall immediately become due, as well as all unamortized commission
(25%) and improvement allowance costs (25%).” Id. But EJGH also has options to renew the
lease for three additional periods of 60 months, called “Renewal Term(s),” provided that (a) written
notice of that election is given at least 180 days prior to the expiration of the Initial Term or in-
force Renewal Term, (b) the “Lease is and remains in effect through its Initial Term and/or any in-
4 At the time of trial, LCMC Health, a New Orleans-based, non-profit health system, was in the
process of acquiring EJGH. See Hr’g Tr. 34:20–22 (Sept. 18, 2020) (“There’s no question that East
Jefferson is selling this Lease to LCMC.” (statement of counsel for Cella)); Hr’g Tr. 421:19–22 (Sept. 21,
2020) (“[W]ith the subject of East Jefferson, the voters just approved a sale to LCMC . . . .”) (statement of
counsel for EJGH)). That acquisition was finalized as of October 1, 2020, and knowledge of that closing
is in the public domain. See LCMC Health’s Acquisition of East Jefferson General Hospital Finalized,
LCMC HEALTH BLOG (Oct. 1, 2020), http://www.lcmchealth.org/blog/2020/lcmc-healths-acquisition-of-
east-jefferson-gener/.
8
force Renewal Term,” and (c) “if Lessee is not in default of the covenants, conditions and terms
contained in this Lease and any and all amendments hereto at the time of such exercise.” Lease,
§ 2(C). Should EJGH elect to renew the Lease after the Initial Term, the Base Rent would increase
in steps per the schedule identified in the Lease. Id.
Under “General Lessee Responsibilities,” the Lease gives EJGH, as of the Commencement
Date, the responsibility
for operation and maintenance of the Leased Premises, including payment of all
agreed-upon expenses related to said operation and maintenance. The operating
maintenance expenses for which Lessee is obligated shall include, but not be
limited to, Real Estate Taxes, Insurance, Utilities and Exterior and Interior
Maintenance of the Leased Premises, except for those responsibilities outlined in
Section 9 following.
Lease, § 8.5 That section also gives EJGH, as of the Lease Execution Date, “full and unlimited
access and use of the Premises for build-out/construction.” Id.
The Lease defines the “obligations and rights” of the parties concerning improvements and
alterations to the Leased Premises. Among other things, Cella as the Lessor would provide
a Lessee Improvement Allowance in the amount of $18.00 per rentable square foot,
such being payable upon completion of all tenant improvements or through rent
abatement, at Lessor’s option; if the rent abatement option is chosen, such
beginning with Month 9, fully abating each month’s rent until the Allowance is
fully depleted.
Lease, § 7(A)(1). EJGH’s “obligations and rights” include:
(1) All of Lessee’s Improvements, shall be constructed in a good and
workmanlike manner, in accordance with law, by a bonded or insured contractor,
chosen by Lessee; Lessee shall have the right to use reputable contractors,
subcontractors, architects and engineers of the Lessee’s selection for the design and
construction of any and all Lessee improvements and to competitively bid all work.
5 Section 9 of the Lease provides that Cella’s “responsibilities shall be limited to maintaining the
structural integrity of the roof, external walls, floor, floor slab, foundation and other structural elements of
the Building.” Lease, § 9.
9
Proof of payment of performance bonds and insurance shall be provided to Lessor
prior to commencement of any work. Prior to the commencement of construction
or demolition of any existing improvements, Lessee, or sub-lessee, shall furnish to
Lessor a complete set of plans and specifications of the improvements proposed by
Lessee for Lessor’s review and approval. All areas of design and engineering must
be certified by and conducted under the direct supervision of architects and
engineers license and registered in the State of Louisiana.
Lessee agrees that any changes to the exterior building shall be in
conformity with the architectural harmony with the existing architecture and with
the architectural integrity of the existing construction and shall not change the
design or appearance of the exterior of the premises without the specific consent of
the Lessor.
Lease, § 7(B)(1). The Lease further states:
(3) Lessee shall have the right to put its name on both sides of the
project’s pylon/monument signs at no cost to lessor. Lessee also shall have the
right to place signage on the front and both sides of the building. Lessee shall have
the right to install any signage required by and Federal or State Regulatory agency
in association with their use.
A medical sign shall be provided at the entry from the public road(s) serving
the site. The Medical sign at the entry to the side shall be illuminated and connected
to the emergency essential electrical system.
Lessee, at Lessee’s cost, shall have the right to install an LED sign on the
premises.
Any sign to be located on the front, sides or top of the Building, or the sign
pylon, by Lessee, shall be subject to Lessor’s prior approval which shall not be
unreasonably withheld. However, all signage must be in accordance with all Parish
ordinances and may not diminish the size or location of Lessor’s or any present
signage located on the building or lighted sign pylon.
(4) Lessee may renovate the exterior of the Building/Façade at Lessee’s
expense for branding and marketing purposes; Lessor approval of the renovation
plan, which will not be unreasonably withheld, is required.
Lease, § 7(B)(3)–(4). The language of the Lease also provides that EJGH “shall have the right to
construct two (2) canopies for patient drop off, and ambulance cover as regulated by Federal and
State Agencies,” and describes those canopies. Lease, § 7(B)(6).
10
According to the Lease, as the Lessee, EJGH,
at its sole cost and expense, will perform all maintenance, repairs, renovation and
replacements necessary or desirable to keep the Office Space and all associated
Improvements in good order, repair, condition and appearance at all times, and
shall, at its own expense, repair, clean, and renovate the said Leased Premises and
associated improvements, as may be necessary.
Lease, § 11(A).
The Lease includes a list of events of default by EJGH, which included: “(i) if Lessee fails
to pay any installment of Monthly Rent on the date on which it is due and if that failure continues
for thirty (30) calendar days after written notice by Lessor to Lessee of that failure” and “(ii) if
Lessee violates or fails to comply with any of the other covenants, conditions, or agreements
contained in this Lease, and if such violation or failure continues for more than thirty (30) calendar
days after written notice by Lessor to Lessee of such violation or failure.” Lease, § 20. The Lease
also identifies the remedies to which Cella may be entitled upon EJGH’s breach of the Lease:
Upon the occurrence of any one or more of the aforesaid events of default
by Lessee, Lessor shall have the options, without further notice or putting in default,
such notice being hereby waived, of invoking any or all of the following rights or
remedies: (i) proceeding for all past due Rent, damages, costs and reasonable
attorneys’ fees caused by such default; or (ii) proceeding for all past due Rent,
damages, costs and reasonable attorneys’ fees cause by such default and canceling
and terminating this Lease, which cancellation shall be effective immediately,
without putting Lessee in default, Lessee hereby assenting thereto and expressly
waiving the legal notice to vacate as required in Article 4701 of the Louisiana Code
of Civil Procedure. Notwithstanding the cancellation and terminating of this Lease,
Lessor shall also be entitled to recover the additional damages as set forth in Section
21(B) below.
Lease, § 21(A). Section 21(B) identifies those “additional damages” that Cella is entitled to
recover in the event EJGH breaches the Lease and Cella terminates the Lease:
If Lessor elects option (ii) [in section 21(A) of the Lease] and terminates
this Lease, then Lessor shall use its best efforts to re-lease the Leased Premises for
such price on such terms as may be reasonable and immediately obtainable and
Lessee shall be and remain liable, not only for Rent due and other obligations
11
incurred up to the date of termination, but also for stipulated or liquidated damages
for its nonperformance which shall be equal to the amount by which the total
amount of all Monthly Rent and other charges that Lessor was to have received
under this Lease from the date of termination to the original expiration date of the
Initial Term or if Lessee has exercised the Option to Renew, the Renewal Term
then in effect, exceeds the total amount of rental payments by the new tenant during
such period along with reasonable attorney’s fees, costs and expenses.
Lease, § 21(B). Further, the Lease provides a general default provision applying to both Cella and
EJGH that states:
If either party is in default in the performance of any of the terms, covenants,
agreements, or conditions contained in this Lease and the non-defaulting party
places the enforcement of this Lease, or any party thereof, in the hands of an
attorney the defaulting party in such dispute agrees to pay, on demand, all
reasonable attorney’s fees and other expenses or fees incurred by the prevailing
party in connection with such actions.
Lease, § 24.
The Lease also contains a merger clause as well as a choice-of-law provision, requiring the
Lease to be “governed and interpreted solely by the laws of the State of Louisiana.” Lease, § 32(A)
& (C).
CONCLUSIONS OF LAW
A. Choice of Law
When resolving state law claims that do not implicate federal policy, bankruptcy courts
apply the choice-of-law rules of the forum in which they sit. See ASARCO LLC v. Americas
Mining Corp., 382 B.R. 49, 60–61 (S.D. Tex. 2007) (citations omitted). Therefore, this Court
applies Louisiana’s choice-of-law rules found in the Louisiana Civil Code.
Article 3537 of the Louisiana Civil Code provides the general choice-of-law rule in the
absence of a contractual choice-of-law clause: “Except as otherwise provided in this Title, an issue
of conventional obligations is governed by the law of the state whose policies would be most
12
seriously impaired if its law were not applied to that issue.” Article 3540 of the Louisiana Civil
Code governing “Party autonomy” supplies choice-of-law doctrine when parties have agreed to a
choice-of-law rule: “All other issues of conventional obligations are governed by the law
expressly chosen or clearly relied upon by the parties, except to the extent that law contravenes
the public policy of the state whose law would otherwise be applicable under Article 3537.”
The Lease states that it “shall be governed and interpreted solely by the laws of the State
of Louisiana.” Lease, § 32(C). Because the parties have agreed to apply Louisiana law to construe
the Lease, this Court will apply Louisiana law unless doing so would seriously impair the public
policy of the state whose law would otherwise be applicable under article 3537. The Court
concludes that, even in the absence of a choice-of-law provision, Louisiana law would be
applicable here under article 3537. Pursuant to article 3537, applicable state law
is determined by evaluating the strength and pertinence of the relevant policies of
the involved states in light of: (1) the pertinent contacts of each state to the parties
and the transaction, including the place of negotiation, formation, and performance
of the contract, the location of the object of the contract, and the place of domicile,
habitual residence, or business of the parties; (2) the nature, type, and purpose of
the contract; and (3) the policies referred to in Article 3515, as well as the policies
of facilitating the orderly planning of transactions, of promoting multistate
commercial intercourse, and of protecting one party from undue imposition by the
other.
LA. CIV. CODE. art. 3537.6
6 Article 3515 provides that applicable state law
is determined by evaluating the strength and pertinence of the relevant policies of all
involved states in the light of: (1) the relationship of each state to the parties and the
dispute; and (2) the policies and needs of the interstate and international systems, including
the policies of upholding the justified expectations of parties and of minimizing the adverse
consequences that might follow from subjecting a party to the law of more than one state.
LA. CIV. CODE. art. 3515.
13
The relevant facts in this case point toward the application of Louisiana law. Both parties
are domiciled in Louisiana, see Petition, ¶¶ 1–2, and the object of the Lease is located in Louisiana.
Under articles 3515 and 3537, Louisiana’s policies would be most seriously impaired if its law
were not followed. Further, the parties contractually agreed that Louisiana law would apply to
disputes arising under the Lease, and Louisiana law honors such choice-of-law provisions. See
Delhomme Indus., Inc. v. Houston Beechcraft, Inc, 669 F.2d 1049, 1058 (5th Cir. 1982) (citation
omitted).
B. Legal Standards for Contractual Interpretation
“Agreements legally entered into have the effect of laws on those who have formed them.”
McCrary v. Park S. Props., 560 So.2d 38, 45 (La. App. 2 Cir. 1990). “It is not the province of the
court to relieve the party of a bad bargain, no matter how harsh.” Id. Rather, “courts are bound to
give legal effect to all contracts according to the true intent of the parties and the intent is to be
determined by the words of the contract when these are clear and explicit and lead to no absurd
consequences.” Id. Indeed, “[a] court’s overriding question when interpreting a contract is
determining the parties’ intent to give effect to their intentions.” Northstar Offshore Group, LLC
v. A&B Valve & Piping Sys., LLC (In re Northstar Offshore Grp., LLC), No. 17-03406, 2018 WL
5880949, at *5 (Bankr. S.D. Tex. Nov. 5, 2018) (citing Reliant Energy Servs., Inc. v. Enron Can.
Corp., 349 F.3d 816, 822 (5th Cir. 2003)).
“To determine intent, [courts] look to the plain language of the contract, its commercial
context, and its purposes.” Reliant Energy Servs., Inc., 349 F.3d at 822 (citing Pennzoil Co. v.
FERC, 645 F.2d 360, 388 (5th Cir. 1981)). Contract interpretation begins by looking to the “four
corners” of the contract, followed by consideration of extrinsic evidence only if the contract is
ambiguous. Dean v. City of Shreveport, 438 F.3d 448, 460 (5th Cir. 2006); see also Reliant Energy
14
Servs., Inc., 349 F.3d at 822 (“When a contract is expressed in unambiguous language, its terms
will be given their plain meaning and will be enforced as written.” (citation omitted)). Indeed,
“[w]hen the words of a contract are clear and unambiguous and lead to no absurd consequences,
the Court will discern the contract’s meaning and the parties[’] intent within the four corners of
the document.” Pellerin Constr., Inc. v. Witco Corp., 169 F. Supp. 2d 568, 578 (E.D. La. 2001)
(citing LA. CIV. CODE arts. 1848 & 2046).
A contract “is ambiguous when it is reasonably susceptible to more than one meaning, in
light of surrounding circumstances and established rules of construction.” Dean, 438 F.3d at 460–
61 (quoting N. Shore Lab. Corp. v. Cohen, 721 F.2d 514, 519 (5th Cir. 1983)). “The mere fact
that the parties may disagree on the meaning of a contractual provision is not enough to constitute
ambiguity.” Reliant Energy Servs., Inc., 349 F.3d at 822. And “a contract should be interpreted
as to give meaning to all of its terms—presuming that every provision was intended to accomplish
some purpose, and that none are deemed superfluous.” Transnational Learning Cmty. at
Galveston, Inc. v. U.S. Office of Pers. Mgmt., 220 F.3d 427, 431 (5th Cir. 2000); see also New
Orleans Jazz & Heritage Found., Inc. v. Kirksey, 40 So.3d 394, 400 (La. App. 4 Cir. 2010)
(“[E]ach provision in a contract must be interpreted in light of the other provisions so that each is
given the meaning suggested by the contract as a whole.” (citing LA. CIV. CODE art. 2050)).
C. Legal Standards for Breach of Contract and Damages
Under Louisiana law, “[t]he essential elements of a breach of contract claim are the
existence of a contract, the party’s breach thereof, and resulting damages.” 1100 S. Jefferson Davis
Parkway, LLC v. Williams, 165 So.3d 1211, 1216 (La. App. 4 Cir. 2015) (citation omitted); see
also Bellwether Enter. Real Estate Capital v. Jaye, Nos. 19-10351 & 19-13058, 2020 WL
15
3076661, at *9 (E.D. La. June 10, 2020). “The party claiming the rights under the contract bears
the burden of proof.” 1100 S. Jefferson Davis Parkway, LLC, 165 So.2d at 1216 (citation omitted).
“An obligor is liable for the damages caused by his failure to perform a conventional
obligation.” LA. CIV. CODE art. 1994. “Damages are measured by the loss sustained by the obligee
and the profit of which he has been deprived,” LA. CIV. CODE art. 1995, and “[t]he party bringing
suit has the burden of proving any damage suffered by it as a result of a breach of contract,”
Payphone Connection Plus, Inc. v. Wagners Chef, LLC, 276 So3d 589, 597 (La. App. 4 Cir. 2019)
(internal quotations and citation omitted). Indeed, “[a] court is not justified in fixing damages in
the absence of definite proof.” Jackson v. Lare, 779 So.2d 808, 814 (La. App. 2 Cir. 2000).
Louisiana law permits parties to “stipulate the damages to be recovered in case of
nonperformance, defective performance, or delay in performance of an obligation.” LA. CIV. CODE
art. 2005. That general rule is subject to an exception allowing judicial modification of a stipulated
damages provision if it is “so manifestly unreasonable as to be contrary to public policy.” LA.
CIV. CODE art. 2012. When enforcing stipulated damages provisions under Louisiana law, courts
should consider three principles: (1) “the aim of a stipulated damages provision is to fix the
measure of damages in advance and to constrain the timely performance of the principal
obligation”; (2) “stipulated damages should reasonably approximate the obligee’s loss in the event
of a breach”; and (3) “the stipulated amount is presumed reasonable, and the party that says
otherwise must rebut the presumption.” Bellwether Enter. Real Estate Capital, 2020 WL 3076661,
at *6–7 (internal quotations and citations omitted).
16
D. EJGH’s Failure to Date To Develop a Community Medical Center on the Leased
Premises Does Not Constitute a Breach of the Lease
In Count One, Cella asks this Court to interpret the terms of the Lease and consider other
extrinsic evidence to (i) declare that EJGH is required “to build-out a Free-Standing Emergency
Department and no other type of ‘Community Medical Center’” and (ii) require EJGH to complete
the construction of that Free-Standing Emergency Department or pay Cella damages in “an amount
to have someone else build-out the building as a Free-Standing Emergency Room.” Petition, at
14. In Count Two, Cella likewise asks for a declaration based on the Lease and extrinsic evidence
that (i) EJGH breached the Lease and, therefore, (ii) the Lease is terminated and Cella may obtain
damages under section 21(A)(ii) of the Lease. See Petition, at 15. Finally, in Count Three, Cella
asserts a breach-of-contract claim for failure to respond timely to demand letters sent by Cella and
to cure the alleged breaches of the Lease. To the extent that each of those claims is dependent
upon EJGH having the obligation under the Lease to improve the property and build specifically
a community medical center, the Court finds that, at this time, no breach has occurred.
Pursuant to Louisiana’s rules of statutory construction, this Court’s determination of the
obligations owed by EJGH begins with the “four corners” of the Lease, followed by consideration
of extrinsic evidence only if the Lease is ambiguous. See Dean v. City of Shreveport, 438 F.3d
448, 460 (5th Cir. 2006); see also Reliant Energy Servs., Inc. v. Enron Can. Corp., 349 F.3d 816,
822 (5th Cir. 2003). Here, the Court finds that the intent of the parties regarding their obligations
under the Lease can be ascertained by a careful reading of each unambiguous provision and the
Lease as a whole. Therefore, the Court examines only the plain terms of the Lease and cannot
resort to examination of any extrinsic evidence.
17
A reading of the Lease as a whole plainly indicates the parties’ intention that EJGH would
have the right to make Cella-approved improvements to the Leased Premises at its own cost, and
the right to operate on the Leased Premises a “‘Community Medical Center’, defined as the
provision of healthcare related services.” Lease, §§ 7–8 & 10–11. The Lease provided that Cella
would give EJGH an “improvement allowance” in the form of rent abatement for the first eight
months after the Lease was signed by the parties. See Lease, §§ 3 &7(A)(1). And at the end of
the Lease, any improvements made to the Leased Premises not affixed to the realty would become
Cella’s property without any compensation to EJGH. See Lease, § 7(A)(4).
But like the lease considered in McCrary v. Park South Properties, “[t]he language of these
portions of the lease appear to place no time limits on lessee[’s] obligation and/or right to develop
the property and no such limits are contained elsewhere in the lease.” 560 So.2d 38, 48 (La. App.
2 Cir. 1990). And like the parties in McCrary, the parties here are sophisticated commercial parties
who included a merger clause in the Lease. See Lease, § 32(A). “Thus, had the parties intended
to impose a timetable for the development of the property such a requirement would have been
expressly stated in the lease.” McCrary, 560 So.2d at 48. Indeed, the plain terms of the Lease
indicate that parties anticipated that the construction of a “Community Medical Center” was not a
guaranteed endeavor, as it was dependent upon obtaining licensing and permitting from third
parties:
SECTION 28: CONTINGENCIES
Execution of the Lease Agreement shall be contingent upon the receipt of a
Zoning Certification Letter from the Parish of Jefferson Zoning Administrator
certifying or confirming that the operation of a “Community Medical Center”, 24
hours per day and 7 days per week, at this location is an allowed/permitted use.
Lease will be contingent and conditioned upon the issuance of required
licensing by the Louisiana Department of Health and Human Services and all other
18
governmental agencies, including the Fire and Sanitary Departments, having
jurisdiction thereof, which authorizes the access, use and occupancy of the Leased
Premises for all Permitted Uses (as defined above). . . .
Lease, § 28. That section also allowed EJGH the option of terminating the Lease before Day 45
of the Lease, forfeiting only the first month’s rent and CAM charges, if those approvals were not
obtained within 45 days of the execution of the Lease. Id.
In this case, however, the Lease became effective with or without EJGH obtaining
regulatory approval to operate a community emergency center on the Leased Premises.7 Even
though the regulatory approvals were not obtained within the 45-day inspection period, EJGH did
not choose to exercise its exclusive option to terminate the Lease. Further, the definition of the
“Commencement Date” of the Lease left room for the possibility that those required licenses and
permits would not be obtained within the first 240 days of the execution of the Lease—or at all—
7 Contrast this case and the McCrary case with Crescent City Liquidation Trust v. Mirage Resorts,
Inc., No. 01-899, 2002 WL 1046709 (E.D. La. May 20, 2002). There, Mirage Resorts, Inc. (“Mirage”)
entered into a contract to purchase a riverboat casino from a debtor in bankruptcy proceedings, contingent
upon Mirage obtaining regulatory approval for the transfer of the casino’s operating license and the transfer
of the berthing site from New Orleans by the parties’ contractual “drop-dead” date of January 24, 1996. Id.
at *3–6. When the appropriate regulatory agency failed to approve the transfer of the berthing site by the
closing date, Mirage terminated the contract. Id. at *4. The debtor filed suit a year later, alleging that
Mirage had breached the contract because (i) the closing deadline was not a material, “suspensive”
condition of the agreement; and (ii) Mirage’s dilatory efforts in securing the various regulatory approvals
demonstrated a lack of good faith to proceed to closing. Id. In affirming the bankruptcy court’s finding
that Mirage had not breached the contract, the district court held that “[t]he clear language of the [contract
as amended] demonstrates that the closing of Mirage’s purchase was conditioned unequivocally upon
obtaining regulatory approval for the transfer of [the debtor’s] license and the transfer of the berthing site
from New Orleans by January 24, 1996.” Id. at 6. When the required regulatory approvals were not
obtained timely, the contract failed to become effective; therefore, no breach could have occurred. Id. The
district court also affirmed the bankruptcy court’s finding that the debtor had not met its burden to show
Mirage’s bad faith or dilatory practices that affected the timing of regulatory approval. Id.
The parties here did not include a “drop-dead” date by which EJGH was obligated to obtain
regulatory approvals to operate as a community emergency medical center on the Leased Premises. Indeed,
neither party here argues that obtaining regulatory approvals constituted a suspensive condition to be met
before the contract became effective, suggesting that the primary “cause” for the Lease, at least on Cella’s
part, was the collection of rent for the Leased Premises.
19
which is why the Lease would commence—and EJGH would start paying rent—on “the earlier to
occur of two hundred forty (240) days following Lease execution or receipt of license to operate
as a ‘community emergency center’ (CEC) by the licensing bodies.” Lease, § 3 (emphasis added).
Indeed, EJGH’s monthly rental obligation to Cella during the life of the Lease was not affected by
whether or not any improvements to the Leased Premises were made by EJGH.
Under the Lease, EJGH is obligated to pay monthly base rent and CAM charges, starting
in month 9 of the Lease. See Lease, §§ 3–5 & 7(A)(1). The parties stipulated at trial that EJGH’s
total monthly rental obligation under the Lease is $43,499.82, comprising of $35,415.62 in base
rent and $8,084.20 in CAM charges. See ECF Doc. 154, ¶ 3; see also Lease, §§ 3–4. The parties
also stipulated that EJGH has always made timely monthly rental payments in the amount of
$43,499.82 up to the date of trial, resulting in the total payment of $1,952,929.58 in rent to Cella.
See ECF Doc. 154, ¶¶ 4–5.
Although the parties’ intention vis-à-vis the Lease is for EJGH to build and operate a
“community medical center” on the Leased Premises, the parties included no time limits under
which EJGH would be obligated to obtain the regulatory approvals required to do so. The plain,
unambiguous terms of the Lease indicate that the parties contemplated that the required regulatory
approvals may never arrive, see Lease, §§ 3 &28, leaving EJGH with only the obligation to pay
rent, which it has done.8
8 Time still exists under the Lease for EGJH, or now its successor, LCMC Health, see supra note 4,
to develop the Leased Premises. The Lease states that the Leased Premises and any improvements made
to the Leased Premises not affixed to the realty will become Cella’s property at the end of the term of the
Lease without any further compensation to EJGH. See Lease, § 7(A)(4). Although the Court finds that no
breach of the Lease has occurred by EJGH as of the date of trial, the Court makes no ruling at this time
regarding whether a breach could occur and damages could accrue before or at the end of the term of the
Lease. See, e.g., BRS Leasing & Fin., LLC v. Neff Rental, Inc., No. 03-3343, 2005 WL 32788, at *2–4
(E.D. La. Jan. 4, 2005) (summarizing the Louisiana Supreme Court’s holding in Bloom v. Southern
Amusement Co., 81 So.2d 763 (La. 1955) and finding that when a lease is not terminated, “a lessor’s right
20
E. EJGH Has Not Breached the Lease by Failing To Obtain and Maintain Insurance
as Required Under the Lease
Cella also claims that EJGH breached the Lease by failing to obtain and maintain proof of
insurance on the Leased Premises as required under the Lease. See Petition, at 13; Hr’g Tr. 37:22–
24 (Sept. 18, 2020). Section 13 of the Lease requires EJGH to “obtain [and] maintain in full force
and effect at all times during the term” its own commercial general liability and property damage
insurance, worker’s compensation insurance, flood hazard insurance, and business interruption
insurance at all times during the term of the Lease, as well as obtain and maintain a builders risk
insurance policy “to cover the entire value of improvements made by Lessee while work is
underway.” Lease, § 13. The Lease required that Cella be listed as an additional insured on all
policies, with the exception of the worker’s compensation insurance policy. Id.
Ellen Marallo, EJGH’s Risk Manager and Compliance Analyst, testified that she is the
person responsible for “anything that has to do with insurance, anything that has to do with any
claims or exposures for the hospital as well as licensures.” Hr’g Tr. 374:20–22 (Sept. 21, 2020).
Her credible and unrefuted testimony and documentary evidence regarding insurance coverage
under the Lease showed that EJGH maintained all required insurance coverage during the term of
the Lease, maintained builders risk insurance up to the date that development of the Leased
Premises was interrupted on January 2, 2018 (satisfying the Lease’s requirement for such coverage
“while work is underway”), and listed Cella as an additional insured where required. See Hr’g Tr.
374:23–414:21 (Sept. 21, 2020); Joint Exs. 5–7 & Ex. J.9
to damages in the event the lessee fails to make repairs does not accrue until the property is restored to the
owner at the expiration of the lease”).
9 Clarence “Bub” Millet, Senior Director of Facility Management for EJGH, testified that he
instructed the contractor performing work to develop the Leased Premises to let the builder’s risk insurance
21
Based on the evidence presented, the Court finds that EJGH satisfied the terms of the Lease
by obtaining and maintaining the required insurance protections and designating Cella as an
additional insured where required.
CONCLUSION
For the foregoing reasons, this Court finds that Cella has failed to meet its burden to show
that EJGH has breached the Lease and, therefore, Cella is not entitled to damages on any of the
claims alleged in its Petition. The Court thus dismisses the Petition in its entirety.
A judgment based upon this ruling will be entered separately as required by Rule 58 of the
Federal Rules of Civil Procedure and Rule 9021 of the Federal Rules of Bankruptcy Procedure.
New Orleans, Louisiana, December 29, 2020.
UNITED STATES BANKRUPTCY JUDGE
policy lapse as of January 2, 2018, because he had received instruction that EJGH’s development of the
Leased Premises would be “holding for now.” Hr’ g Tr. 281:15—21; 289:8-15 & Ex. 28.
22