finding that, where a claim arises under a contract containing no arbitration clause, it still may be arbitrated when its underlying allegations “touch matters” covered by an arbitration clause
How later courts described this case
- finding that, where a claim arises under a contract containing no arbitration clause, it still may be arbitrated when its underlying allegations “touch matters” covered by an arbitration clause
- “When determining both the existence and the scope of an arbitration agreement, there is a presumption in favor of arbitrability.”
- under the 12(b)(6) standard to a motion to compel arbitration, the court may “consider the substance of the contracts that ostensibly compel arbitration”
Written by the judges who cited it.
The opinion
IN THE UNITED STATES DISTRICT COURT
FOR THE EASTERN DISTRICT OF PENNSYLVANIA
SARAH CAR CARE, INC., :
:
Plaintiff, :
: Civil Action
v. :
: No. 21-1761
LOGISTICARE SOLUTIONS, LLC and :
MODIVCARE SOLUTIONS, LLC F/K/A :
LOGISTICARE AND/OR LOGISTICARE :
SOLUTIONS, LLC, :
:
Defendants.
MEMORANDUM
J. Younge January 9, 2024
I. INTRODUCTION
Currently before this Court is Defendants LogistiCare Solutions, LLC and ModivCare
Solutions, LLC f/k/a LogistiCare and/or LogistiCare Solutions, LLC (hereinafter
“ModivCare”)’s Motion to Dismiss or Stay and Compel Arbitration. (ECF No. 5.) The Court
finds this Motion appropriate for resolution without oral argument. Fed. R. Civ. P. 78; L.R.
7.1(f). For the reasons set forth in this Memorandum, Defendants’ Motion to Compel
Arbitration is Granted, and this matter is referred to arbitration.
II. FACTUAL BACKGROUND
Defendant ModivCare was selected by Pennsylvania’s Department of Human Services as
a transportation broker that would coordinate non-emergency medical transportation for Medical
Assistance consumers in Philadelphia County. See Medical Assistance Transportation Program
(hereinafter “MATP”) Agreement, ECF No. 1-1, pp. 60-71.1 The selection process, as outlined
in the Request for Proposals for the MATP, required that MATP proposals identify their
intended subcontractors, including specific instructions for intended partnerships with Small
Diverse Businesses (hereinafter “SDBs”). See Request for Proposals, ECF No. 1-1, pp. 73-91.
Any SDB participation submissions in an applicant’s proposal had to include a written
commitment to assigning that SDB a certain numerical percentage of the total cost. (Request for
Proposals, ECF No. 1-1, p. 78-79.) The Request for Proposals specifies that a resultant MATP
agreement between the state and the winning applicant that includes SDB participation in its
MATP proposal “must also include a provision requiring the Selected Offeror to meet and
maintain those commitments made to SDBs at the time of proposal or negotiation.” (Request for
Proposals, ECF No. 1-1, p. 89.) It further states that “The selected contractor’s commitments to
[SDBs] made at the time of proposal submittal or contract negotiation shall, to the extent
provided in the commitment, be maintained throughout the term of the contract.” (Request for
Proposals, ECF No. 1-1, p. 91.)
Plaintiff Sarah Car Care (hereinafter “SCC”) is categorized as an SDB. On November
15, 2016, in ModivCare’s Letter of Intent to SCC (hereinafter “Services Commitment”),
included in its MATP proposal, ModivCare outlined its commitment to SCC as follows:
If [ModivCare] is the successful vendor, Sarah Car Care, Incorporated shall provide
Non-Emergency Medical Transportation in Philadelphia County on the start of the
contract date to be determined as the effective date and will end three years after
the effective date with a possible option to extend the agreement for one additional
two year period. These services represent 2.1% of the total cost in the [ModivCare]
cost submittal for the initial term of the contract. Dependent on final negotiated
contract pricing and actual contract usage or volume, it is expected that Sarah Car
Care, Incorporated will receive an estimated $5,000,000.00 (five million dollars
and zero cents) during the initial contract term.
1 When applicable, the Court adopts the pagination supplied by the CM/ECF docketing system,
which does not always match the document’s internal pagination.
(Services Commitment, ECF No. 1-1, p. 93.) ModivCare was awarded a $236 million grant
from the Commonwealth of Pennsylvania and entered into the MATP Agreement with the
Commonwealth on July 5, 2017, effective March 1, 2017. See MATP Agreement, ECF No. 1-1,
pp. 60-71. The MATP Agreement was extended for two years until 2022. (Notice from
Pennsylvania Department of Human Services, ECF No. 1-1, p. 111.)
On November 30, 2017, ModivCare and SCC entered into their Transportation
Agreement (hereinafter “TP Agreement”), which outlined expectations for the performance of
services on assignments given to SCC by ModivCare. See TP Agreement, ECF No. 5-2, pp. 5-
51. The TP Agreement states that ModivCare “wishes to enter into Agreements with qualified
transportation companies for the provision of high-quality transportation services . . . under the
terms and conditions set forth herein.” (TP Agreement, ECF No. 5-2, p. 5.) There is no mention
of the prior Services Commitment. The arbitration clause at issue in this matter is contained in
the TP Agreement, which states that “If any claim or controversy arising out of or relating to this
Agreement cannot be resolved by the parties . . . the dispute shall be referred for binding
arbitration in accordance with the commercial dispute arbitration rules of the American
Arbitration Association.” (TP Agreement, ECF No. 5-2, pp. 24-25.) The TP Agreement also
includes an integration clause specifying that “This Agreement contains the entire agreement of
the parties with respect to its subject matter and supersedes all prior oral or written agreements or
understanding regarding the same subject matter.” (TP Agreement, ECF No. 5-2, p. 25.)
On March 18, 2021, SCC filed a Complaint against ModivCare, alleging that it had been
under-assigned projects in violation of the Services Commitment, resulting in ModivCare being
$3 million short of their commitment by the expiration of the MATP Agreement. See
Complaint, ECF No. 1-1, pp. 7-58. SCC has brought claims for breach of the Services
Commitment, breach of contract as a third-party beneficiary to the MATP Agreement,
promissory estoppel, unjust enrichment, and racial discrimination in violation of 42 U.S.C. §
1981 and Title VI of the Civil Rights Act of 1964. See Complaint, ECF No. 1-1, pp. 7-58. The
Complaint makes no mention of the TP Agreement. This case was removed to this Court on
April 15, 2021. See Notice of Removal, ECF No. 1. On April 22, 2021, ModivCare filed its
Motion to Compel Arbitration based on the arbitration clause contained in the TP Agreement.
(ECF No. 5.) The Court ordered supplemental briefing on October 17, 2023. (Order, ECF No.
33.)
III. LEGAL STANDARD
The Federal Arbitration Act (“FAA”) reflects the strong federal policy in favor of
arbitration and “places arbitration agreements on equal footing with all other contracts.”
Buckeye Check Cashing, Inc. v. Cardegna, 546 U.S. 440, 443 (2006). Pursuant to the FAA,
courts “compel arbitration of claims covered by a written, enforceable arbitration agreement.”
Bacon v. Avis Budget Grp., Inc., 959 F.3d 590, 599 (3d Cir. 2020) (citing FAA, 9 U.S.C. §§ 3,
4). However, “[a]rbitration is strictly a matter of contract” and is thus governed by state law.
Bel-Ray Co. v. Chemrite (Pty) Ltd., 181 F.3d 435, 441, 444 (3d Cir. 1999). The federal policy
encouraging recourse to arbitration requires federal courts to look first to the relevant state law of
contracts, here Pennsylvania, in deciding whether an arbitration agreement is valid under the
FAA. Spinetti v. Serv. Corp. Int'l, 324 F.3d 212, 213 (3d Cir. 2003). Accordingly, when
deciding whether to compel arbitration under the FAA, the Court must determine “(1) whether
there is a valid agreement to arbitrate between the parties and, if so, (2) whether the merits-based
dispute in question falls within the scope of that valid agreement.” Sanford v. Bracewell &
Guiliani, LLP, 618 F. App’x 114, 117 (3d Cir. 2015); see also Trippe Mfg. v. Niles Audio Corp.,
401 F.3d 529, 532 (3d Cir. 2005) (“When determining both the existence and the scope of an
arbitration agreement, there is a presumption in favor of arbitrability.”).
IV. DISCUSSION
A. A Valid Arbitration Agreement Exists Between the Parties.
In deciding whether a valid arbitration agreement exists between the parties, the Court
must first decide whether to apply the Federal Rule of Civil Procedure 12(b)(6) or Rule 56
standard of review. Sanford, 618 F. App’x at 117. The Court will review a motion to compel
arbitration under the Rule 12(b)(6) standard “when it is apparent, based on the face of a
complaint, and documents relied upon in the complaint, that certain of a party’s claims are
subject to an enforceable arbitration clause.” Guidotti v. Legal Helpers Debt Resolution, LLC,
716 F.3d 764, 776 (3d Cir. 2013) (internal quotations omitted). Under this standard, the Court
accepts as true all factual allegations in the complaint to determine whether those facts would
relieve the plaintiff of the arbitration requirement. Id.; see also CardioNet, Inc. v. Cigna Health
Corp., 751 F.3d 165, 168 n.2 (3d Cir. 2014) (under the 12(b)(6) standard to a motion to compel
arbitration, the court may “consider the substance of the contracts that ostensibly compel
arbitration”). Conversely, the Rule 56 standard will apply “when either the motion to compel
arbitration does not have as its predicate a complaint with the requisite clarity to establish on its
face that the parties agreed to arbitrate, or the opposing party has come forth with reliable
evidence that is more than a naked assertion . . . that it did not intend to be bound by the
arbitration agreement, even though on the face of the pleadings it appears that it did.” Guidotti,
716 F.3d at 774 (internal quotations omitted). Here, the Court will apply the Rule 12(b)(6)
standard in considering the arbitration clause because the arbitration clause is apparent on the
face of the Complaint.
1. The TP Agreement is Integral to Plaintiff’s Claims.
An arbitration clause is apparent on the face of a complaint where it is integral to the
complaint. See Saechow v. Phila. Acad. Health Sys., LLC, Civ. No. 19-2075, 2021 WL 1210008,
at *9 (E.D. Pa. Mar. 31, 2021) (“[A]n arbitration agreement need not be attached to the
complaint in order to be ‘apparent.’”); see also Lawson v. City of Phila., Civ. No. 18-1912, 2019
WL 934976, at *2 (E.D. Pa. Feb. 25, 2019) (“An arbitration clause may be deemed ‘apparent’
even when a contract, though not appended to the Complaint, is integral to, and referenced in, the
Complaint”) (internal quotations omitted). A document is considered integral to the complaint if
it was relied on in framing the complaint, In re Burlington Coat Factory Sec. Litig., 114 F.3d
1410, 1426 (3d Cir. 1997), or if it “by its very existence, and not the mere information it
contains, gives rise to the legal rights asserted” in the complaint, Santana v. A.L. Recovery, LLC,
Civ. No. 18-16, 2018 WL 3912830, at *4 (W.D. Pa. Aug. 16, 2018) (emphasis in original)
(internal citations omitted). Pennsylvania law tends to read together instruments created as part
of a single transaction and will construe them “with reference to the other,” even if they “may
have been executed at different times and do not in terms refer to each other.” Huegel v. Mifflin
Constr. Co., 796 A.2d 350, 354-55 (Pa. Super. Ct. 2002). Here, SCC’s Complaint cannot be
considered separately from the TP Agreement as the logistics of performing the Services
Commitment are integral to a claim of breach.
The Complaint relies on agreements that recognize the inevitability, and indeed the
necessity, of the TP Agreement, which contains the provisions for how the assignments, as
referenced in the Services Commitment, would actually be performed. The Request for
Proposals specifically required that ModivCare enter into contracts with its subcontractors that
outline certain operating terms if selected. (Request for Proposals, ECF No. 1-1, p. 88.) The
Services Commitment itself contemplates a future contract putting its commitment into effect,
noting that the anticipated dollar amount that would go to SCC is “[d]ependent on final
negotiated contract pricing and actual contract usage or volume” (Services Commitment, ECF
No. 1-1, p. 93.) Although the Complaint does not reference the TP Agreement explicitly, the
two contracts that were allegedly breached – the Services Commitment and the MATP
Agreement – clearly contemplate its existence.
Moreover, the logistics of implementing an original agreement cannot be separated from
that original agreement where, as here, the Services Commitment could not be performed
without reference to the provisions of the TP Agreement. See Campano v. Kitchens, Inc., Civ.
No. 21-1317, 2021 WL 2473900, at *2 (E.D. Pa. June 17, 2021) (finding that arbitrability was
apparent on the face of the complaint because it relied on an employment relationship governed
by the Employment Agreement, which contained an arbitration clause, making the Agreement
integral to the complaint). An agreement to provide services and an agreement detailing how
those services will be provided must be considered part of the same transaction. Whether there
was compliance or noncompliance with the terms of the TP Agreement is integral to determining
whether there was a breach of the Services Commitment, particularly because the Parties dispute
whether SCC complied with such terms. See Motion to Compel Arbitration, ECF No. 5-1, p. 15.
To find otherwise, and to consider the Services Commitment in isolation from the TP
Agreement, would require the Court to find that ModivCare’s commitment to give SCC a certain
number of assignments can be considered separately from the terms upon which ModivCare will
give SCC those assignments. The Court finds these issues to be inseparable. The fact that these
terms were finalized the following year, after the grant was awarded to ModivCare, does not
make them any less integral to the understanding of their contractual relationship or
ModivCare’s compliance, or lack thereof, with the Services Commitment. Instead, the Parties’
relative obligations to each other, as outlined through both the Services Commitment and the TP
Agreement, must be read together. In reading these documents together as part of the same
transaction, the Court finds that the TP Agreement’s arbitration clause is apparent on the face of
the Complaint.
2. The Arbitration Clause is Enforceable.
Under the FAA, courts must enforce a valid arbitration clause based on ordinary contract
principles of the relevant state law. See China Minmetals Materials Imp. & Expo. Co., Ltd. v.
Chi Mei Corp., 334 F.3d 274, 290 (3d Cir. 2003). Under Pennsylvania law, the court must
determine: “(1) whether both parties manifested an intention to be bound by the agreement; (2)
whether the terms of the agreement are sufficiently definite to be enforced; and (3) whether there
was consideration.” Blair v. Scott Specialty Gases, 283 F.3d 595, 603 (3d Cir. 2002). The Court
finds that the Parties manifested an intent to be bound by the arbitration clause and that that
arbitration clause was supported by consideration. As the definitiveness of the TP Agreement’s
terms is not in dispute, the Court will not consider it.
i. Plaintiff’s Evidence is Insufficient to Support a Finding that There
Was a Lack of Intention to be Bound by the Arbitration Clause.
SCC has failed to provide evidence showing that, despite signing the TP Agreement, it
did not intend to be bound by its terms, including the arbitration clause. Pursuant to the first
prong, in Pennsylvania, “[c]ontracting parties are normally bound by their agreements, without
regard to whether the terms thereof were read and fully understood and irrespective of whether
the agreements embodied reasonable or good bargains.” Simeone v. Simeone, 525 Pa. 392, 400
(Pa. 1990). Having mutual assent between the contracting parties is an essential part of contract
formation. Morales v. Sun Constructors, Inc., 541 F.3d 218, 221 (3d Cir. 2008). After signing a
contract, a party may not claim they were unaware of or did not understand the material in the
contract. Bollinger v. Central Pa. Quarry Stripping & Constr. Co., 425 Pa. 430 (Pa. 1967).
Here, SCC appears to suggest that, because SCC’s owner, Mr. Abuelgasim Mohamed, is
a nonnative English speaker and lacks a legal education, SCC lacked the intention to be bound
by the arbitration clause when Mr. Mohamed signed the TP Agreement. (Plaintiff’s Response in
Opposition to Defendant’s Motion to Compel Arbitration, ECF No. 11, pp. 17-18.) Additionally,
SCC suggests that Mr. Mohamed may not have read the TP Agreement prior to signing, though it
has not offered any evidence in support of that suggestion. (Plaintiff’s Response, ECF No. 11, p.
18.) That the Plaintiff’s agent speaks English as a second language or lacks a legal education is
insufficient to show that SCC lacked the intent to be bound by the provisions of the TP
Agreement, including the arbitration clause. See Morales, 541 F.3d at 222-23 (finding that, in
the absence of fraud, the fact that a party did not understand the language the contract was
written in before executing it does not affect the enforceability of the contract because it is the
parties’ obligation to acquaint themselves with the content before binding themselves to it.)
Lacking supportive evidence, the presentation of a hypothetical situation in which Mr. Mohamed
had not been able to read the TP Agreement prior to signing is similarly unpersuasive.
Furthermore, the realities of a subcontractor agreement that forms a necessary part of
meeting a grantee’s obligations to the Commonwealth weighs in favor of finding that the Parties
intended to be bound by this arbitration clause. The determination that arbitration would serve as
a more efficient and practical tool to resolve disputes than litigation, thereby limiting interference
with obligations under the MATP Agreement, is a practical consideration that supports finding
that the Parties knowingly chose to arbitrate claims between them. The Court therefore finds that
the Plaintiff has not shown that they did not intend to be bound by the arbitration clause.
ii. The Arbitration Clause Was Supported by Consideration.
Both the arbitration clause and the TP Agreement it was attached to are supported by
consideration. Consideration will be found where the contracting parties receive something of
value in exchange for their respective promises or detriments. Universal Computer Sys. v. Med.
Servs. Ass’n of Pa., 474 F. Supp. 472, 477 (M.D. Pa. 1979), aff’d, 628 F.2d 820 (3d Cir. 1980).
Mutual promises constitute consideration. In re Ratony’s Estate, 277 A.2d 791, 793-94 (Pa.
Super. 1971). Pennsylvania courts will not inquire into the adequacy of the consideration made.
Romero v. Allstate Ins. Co., 1 F. Supp. 3d 319, 404 (E.D. Pa. 2014).
The Third Circuit has made clear that a mutual promise to arbitrate constitutes sufficient
consideration to support an arbitration agreement apart from its attached contract. Blair v. Scott
Specialty Gases, 283 F.3d 595, 603-04 (3d Cir. 2002). Furthermore, the TP Agreement itself is
supported by sufficient consideration. While SCC argues that its claims rest solely on the
Services Commitment made the year prior, this Court agrees with ModivCare that the TP
Agreement outlines SCC’s promise to provide those services in a certain way in exchange for
ModivCare’s returned obligations. The TP Agreement is not merely a reiteration of an earlier
obligation by ModivCare – it is an agreement whereby ModivCare provided that it would pay a
certain amount for certain services performed in a particular way. These are mutual promises
that constitute consideration for the agreement itself as well as the embedded arbitration clause.
As such, the Court finds that the arbitration clause is valid and binding on the parties.
B. Arbitrability Will be Determined by the Arbitrator.
Courts will generally decide issues of arbitrability unless, as here, this power has been
expressly delegated to the arbitrator. Arbitrability considers whether the dispute falls within the
scope of the arbitration clause. John Hancock Mut. Life Ins. Co. v. Olick, 151 F.3d 132, 137 (3d
Cir. 1998). The issue of scope is substantive and subject to federal law as set out in the FAA.
Mitsubishi Motors Corp. v. Soler Chrysler, 473 U.S. 614, 626 (1985). Federal policy favors
arbitration, and “doubts concerning the scope of arbitrable issues should be resolved in favor of
arbitration.” Id. (quoting Moses H. Cone Mem. Hosp. v. Mercury Constr. Corp., 460 U.S. 1, 24-
25 (1983). In determining whether a claim “falls within the scope of an arbitration agreement,
the focus is on the factual underpinnings of the claim rather than the legal theory alleged in the
complaint.” Medtronic AVE, Inc. v. Advanced Cardiovascular Sys., Inc., 247 F.3d 44, 55 (3d
Cir. 2001) (internal citations omitted). A claim may fall within the scope of an arbitration clause
in a related contract even if arising under an agreement without an arbitration clause. See
Brayman Constr. Corp. v. Home Ins. Co., 319 F.3d 622, 626 (3d Cir. 2003) (finding that, where
a claim arises under a contract containing no arbitration clause, it still may be arbitrated when its
underlying allegations “touch matters” covered by an arbitration clause); In re NBR Antitrust
Litigation, 207 F. App’x 166, 172 (3d Cir. 2006) (finding that an indemnification claim arising
under an agreement that did not contain an arbitration clause but was premised on the alleged
breach of covenants under related contracts with an arbitration clause was arbitrable because of
the “impossibility of reaching the merits of [the party’s] claim without resolving arbitrable
questions”).
Courts “should not assume that the parties agreed to arbitrate arbitrability unless there is
clear and unmistakable evidence that they did so.” First Options of Chicago, Inc. v. Kaplan, 514
U.S. 938, 944-47 (1995). If such “clear and unmistakable evidence” is found, a court may not
decide the arbitrability issue. Henry Schein, Inc. v. Archer and White Sales, Inc., 139 S. Ct. 524,
530 (2019). To be “clear and unmistakable,” the relevant provisions “must be both specific and
exclusive.” PPT Research, Inc. v. Solvay USA, Inc., Civ. No. 20-2645, 2021 WL 2853269, at *3
(E.D. Pa. July 7, 2021) (internal citations omitted). Here, the express terms of the arbitration
clause delegate decisions as to the arbitrability of SCC’s claims – breach of the Services
Commitment, breach of the MATP Agreement to which SCC is a third-party beneficiary,
promissory estoppel, unjust enrichment, and violations of Section 1981 and Title VI – to the
arbitrator.
The relevant arbitration clause states that “[i]f any claim or controversy arising out of or
relating to this Agreement cannot be resolved by the parties . . . the dispute shall be referred for
binding arbitration in accordance with the commercial dispute arbitration rules of the American
Arbitration Association.” (TP Agreement, ECF No. 5-2, pp. 24-25.) The mandatory and
expansive language contained within this clause specifically incorporates the AAA rules, which
the Third Circuit has found supports that there was a “clear and unmistakable” intent to delegate
decisions as to arbitrability to the arbitrator. Richardson v. Coverall North America, Inc., 811 F.
App’x 100, 103 (3d Cir. 2020); American Arbitration Association, Commercial Arbitration
Rules and Mediation Procedures, Rule 7(a) (“The arbitrator shall have the power to rule on his or
her own jurisdiction, including any objections with respect to . . . the arbitrability of any claim or
counterclaim”). While “a contract might still otherwise muddy the clarity of the parties’ intent to
delegate” despite reference to the AAA rules, Richardson, 811 F. App’x at 103 n.2, the contract
at issue here is unambiguous in its delegation of authority. The Third Circuit in Richardson
found that a similar provision – stating that “all controversies . . . shall be submitted promptly for
arbitration . . . subject to . . . the then current rules of the American Arbitration Association for
Commercial Arbitration” – was “about as ‘clear and unmistakable’ as language can get.” Id. at
103 (internal citations omitted). This Court finds the same here. As such, the Court will grant
the Defendants’ Motion to Compel Arbitration with arbitrability to be determined by the
arbitrator.
V. CONCLUSION
For the foregoing reasons, Defendants’ Motion to Compel Arbitration is Granted, and this
matter is referred to arbitration.
An appropriate Order follows.
IT IS SO ORDERED.
BY THE COURT:
/s/ John Milton Younge
Judge John Milton Younge