“[A]n agreement guaranteeing the particular debt of another does not extend to any other indebtedness not within the intention of the parties.”
How later courts described this case
- “[A]n agreement guaranteeing the particular debt of another does not extend to any other indebtedness not within the intention of the parties.”
Written by the judges who cited it.
The opinion
Not for Publication
UNITED STATES DISTRICT COURT
DISTRICT OF NEW JERSEY
TIAA COMMERCIAL FINANCE,
INC.,
Plaintiff,
Civ. No. 19-14809 (ES) (CLW)
v.
OPINION
JAMES GALUSHA, et al.,
Defendants.
MCNULTY, DISTRICT JUDGE
Before the Court is the motion (DE 9) of plaintiff TIAA Commercial
Finance, Inc.1 for default judgment against defendants James and Sharron
Galusha. (DE 9). The matter has been reassigned from Judge Salas to me for
purposes of this motion. Having considered TIAA’s submissions, I decide this
matter without oral argument. See Fed. R. Civ. P. 78(b); L. Civ. R. 78.1(b).
To summarize, I have found that a default judgment should be granted
as to the claim regarding the Notes, but denied as to the claim regarding the
Michelangelo Lease. Within 14 days, plaintiff shall file a submission stating
whether it wishes to opt to abandon the Michelangelo Lease Claim and have
the Court enter judgment on the Notes claim (thus ending the case), or whether
it wishes to continue to pursue the claim regarding the Michelangelo Lease via
service of an amended complaint and a new motion for default judgment.
1 Formerly known as EverBank Commercial Finance, Inc. (“ECF”).
I. BACKGROUND2
TIAA is a financial services corporation. (Complaint ¶ 1). James and
Sharron Galusha are the vice president and president (respectively) of Silverado
Stages, Inc., a service-oriented passenger transportation business. (Id. ¶¶ 4 &
7). TIAA entered into two master security agreements with Silverado in 2013
and 2015. (Id. ¶¶ 7–8). Pursuant to these master security agreements,
“Silverado acknowledged that [TIAA] would, from time to time, enter into
certain credit agreements with Silverado for the purchase of certain property
and/or equipment as further described in each individual Note and Schedule
executed by Silverado.” (Id. ¶ 9). TIAA and Silverado executed three relevant
notes and schedules from 2013 to 20153 (“Notes”). (Id. ¶¶ 10–12).
In or around December 2016, Silverado acquired another service-
oriented passenger transportation business called Michelangelo Leasing, Inc.
(Id. ¶ 13). Before Silverado acquired Michelangelo, on February 29, 2016,
“Michelangelo entered into a 36-month equipment lease with Imagine
2 Citation to record documents will be abbreviated as follows:
Complaint = TIAA’s complaint, DE 1
Guarantees = The December 12, 2013 and March 11, 2015 personal guaranty
agreements signed by the Galushas and attached as exhibits H and I to TIAA’s
motion for default judgment, DE 9-12 and 9-13.
Mov. Br. = TIAA’s brief in support of its motion for default judgment, DE 9-1
3 The first note and schedule, dated on or about December 12, 2013, was in the
amount of $481,428.00 for the purchase of one 2014 Setra S407 Motorcoach.
(Complaint ¶ 10). A second note and schedule, also dated on or about December 12,
2013, was in the amount of $1,444,284.00 for the purchase of three 2014 Setra S407
Motorcoaches. (Id. ¶ 11). On March 11, 2015, Plaintiff and Silverado executed a third
note and schedule for two 2013 Van Hool/T2145 busses and one 2011 Van
Hool/T2145 bus in exchange for $1,125,000.00. (Id. ¶ 12).
Technology [Group LLC]” (the “Michelangelo Lease”). (Id. ¶ 14). At the time the
Michelangelo Lease was formed, Imagine was already in business with TIAA; in
October 2014, TIAA and Imagine entered into a “Master Agreement and
Assignment of Leases – Notification Assignment, [ ] whereby [TIAA] acquired
certain leases from Imagine.” (Id. ¶ 15). Through this agreement with Imagine,
TIAA acquired the Michelangelo Lease; and as a result of Silverado’s acquisition
of Michelangelo in 2016, “Silverado became obligated to Plaintiff under the
Michelangelo Lease.” (Id. ¶¶ 16–17).
According to the Complaint, as security for the repayment of Silverado’s
obligations to plaintiff, the Galushas executed two personal guarantees, dated
December 12, 2013, and March 11, 2015, “whereby Defendants, among other
things, jointly and severally and irrevocably and unconditionally guaranteed
the full and prompt performance by Silverado of all present and/or future
obligations owed by Silverado to Plaintiff.” (Id. ¶ 18). According to TIAA, under
the Guarantees, the Galushas “guaranteed that the amounts due under the
Notes and Michelangelo Lease would be paid strictly in accordance with their
terms.” (Id. ¶ 19). The Galushas further agreed that their obligations under the
Guarantees were independent of Silverado’s, “and that a separate action or
actions may be brought and prosecuted against them to enforce the
Guarantees.” (Id. ¶ 20).
These facts set the scene for Silverado’s default under the Notes and the
Michelangelo Lease. According to TIAA, “[s]ince at least January 1, 2018,
Silverado has failed to make monthly payments of principal and/or interest
due under the Notes and Michelangelo Lease.” (Id. ¶ 21). On or about October
5, 2018, Silverado and Michelangelo filed separate bankruptcy petitions in
Arizona. (Id. ¶¶ 25–26).4 As of the filing of the Complaint, TIAA alleges that it is
owed (i) at least $1,857,460.94, plus interest, late fees, and collection costs on
the Notes and (ii) at least $10,824.83 plus interest, late fees, and collection
costs on the Michelangelo Lease. (Id. ¶¶ 23–24).
TIAA filed this lawsuit seeking to recover the amounts due under the
Notes and Michelangelo Lease and pursuant to the Guarantees. TIAA alleges
claims for (i) breach of contract; (ii) unjust enrichment; and (iii) attorneys’ fees.
(Id. ¶¶ 28–37). Because the Galushas have yet to appear in this action and
respond to the Complaint, and at TIAA’s request, the Clerk of Court entered
default against them on December 11, 2019. TIAA now moves for default
judgment pursuant to Federal Rule of Civil Procedure 55.
II. LEGAL STANDARD
A district court may enter default judgment against a party who has
failed to plead or otherwise respond to the action filed against him. Fed. R. Civ.
P. 55(b)(2). “[E]ntry of a default judgment is left primarily to the discretion of
the district court.” Hritz v. Woma Corp., 732 F.2d 1178, 1180 (3d Cir. 1984).
“Before entering default judgment, the Court must address the threshold
4 Plaintiff implies that it participated in the Arizona bankruptcy proceedings. The
Complaint, however, contains an obvious omission. It fails to state that this action is
not barred by the automatic stay, see 11 U.S.C. § 362, and that the debt has not been
discharged in bankruptcy. I will require such a representation before entering
judgment. See infra.
issue of whether it has personal jurisdiction and subject matter jurisdiction
over the parties.” Prudential Ins. Co. of Am. v. Bramlett, No. 08-0119, 2010 WL
2696459, at *1 (D.N.J. July 6, 2010). Then, “the Court must determine (1)
whether there is sufficient proof of service, (2) whether a sufficient cause of
action was stated, and (3) whether default judgment is proper.” Teamsters
Health & Welfare Fund of Phila. & Vicinity v. Dubin Paper Co., No. 11-7137,
2012 WL 3018062, at *2 (D.N.J. July 24, 2012) (internal citations omitted).
To determine whether granting default judgment is proper, the Court
must consider “(1) whether the party subject to default has a meritorious
defense, (2) the prejudice suffered by the party seeking default, and (3) the
culpability of the party subject to default.” Doug Brady, Inc. v. N.J. Bldg.
Laborers Statewide Funds, 250 F.R.D. 171, 177 (D.N.J. 2008). In making these
determinations, “the factual allegations of the complaint, except those relating
to the amount of damages, will be taken as true.” DIRECTV, Inc. v. Pepe, 431
F.3d 162, 165 n.6 (3d Cir. 2005) (quoting Comdyne I, Inc. v. Corbin, 908 F.2d
1142, 1149 (3d Cir. 1990)). “While the court may conduct a hearing to
determine the damages amount, Fed. R. Civ. P. 55(b)(2), a damages
determination may be made without a hearing as long as the court ensures
that there is a basis for the damages specified in the default judgement.” Days
Inns Worldwide, Inc. v. Panchal, No. 15-1459, 2015 WL 5055318, at *2 (D.N.J.
Aug. 25, 2015) (internal quotation marks and alterations omitted).
III. DISCUSSION
A. Jurisdiction
I am satisfied that that the Court has both subject matter and personal
jurisdiction. The Court has subject matter jurisdiction based on diversity of
state citizenship pursuant to 28 U.S.C. § 1332(a). TIAA, as a corporation, is
deemed to be a citizen of any state by which it has been incorporated (here,
Delaware) and of the state where it has its principal place of business (here,
New Jersey). 28 U.S.C. § 1332(c)(1); (Complaint ¶ 1). The Galushas are alleged
to be citizens of Texas (Mov. Br. at 5).5 TIAA plausibly alleges an amount in
controversy exceeding $75,000. (See Complaint ¶ 33).
As to personal jurisdiction, “a [d]istrict [c]ourt typically exercises
personal jurisdiction according to the law of the state where it sits.” O’Connor v.
Sandy Lane Hotel Co. Ltd., 496 F.3d 312, 316 (3d Cir. 2007). New Jersey
exercises long-arm jurisdiction over non-resident defendants to the extent
consistent with due process of law. HV Assocs LLC v. PNC Bank, N.A., No. 17-
8128, 2018 WL 1731346, at *2 (D.N.J. Apr. 10, 2018) (citing Avdel Corp. v.
Mecure, 277 A.2d 207, 209 (N.J. 1971)). In New Jersey, contractual consents to
5 Actually, the Complaint itself alleges that the Galushas have “an address” in
Arizona. (Complaint ¶¶ 2–3). Such an allegation is insufficient to establish domicile or
citizenship for jurisdictional purposes. See Guerrino v. Ohio Cas. Ins. Co., 423 F.2d
419, 421 (3d Cir. 1970). However, it appears that, through efforts to serve the
Galushas, TIAA learned that the Galushas are domiciled in Texas. (Mov. Br. at 5; see
infra Section IIIB). I am satisfied based on the factual record that diversity jurisdiction
exists (and obviously the distinction between Arizona and Texas makes no difference).
Particularly in light of the defaulting defendants’ possession of the relevant facts, I will
excuse the pleading deficiency. Any amended complaint filed in response to this
Opinion and corresponding Order shall adequately allege citizenship for purposes of
diversity jurisdiction.
personal jurisdiction “do not offend due process so long as the agreement is
‘freely negotiated’ and the provision is not ‘unreasonable and unjust.’” YA
Global Investments, L.P. v. Cliff, 15 A.3d 857, 861–62 (N.J. Super. Ct. App. Div.
2011) (quoting Burger King Corp. v. Rudzewicz, 471 U.S. 462, 472 n.14 (1985));
see also Park Inn Int’l, LLC v. Mody Enterprises, Inc., 105 F. Supp. 2d 370, 373
(D.N.J. 2000).
Here, the Galushas expressly consented to personal jurisdiction in this
Court by signing the Guarantees, which contain a contractual consent to
personal jurisdiction clause:
“Guarantor hereby irrevocably submits to the jurisdiction of
any New Jersey state or federal court sitting in New Jersey . .
. in any action or proceeding arising out of or relating to this
Guaranty, and the Guarantor hereby irrevocably agrees that
all claims in respect of such action or proceeding may be
heard and determined in such New Jersey state or federal
court.”
(Guarantees § 6). In the limited submissions before the Court, there is nothing
to suggest that the personal jurisdiction clause was not “freely negotiated.” I
am thus satisfied that the parties’ agreement satisfies the personal jurisdiction
inquiry.
B. Proof of Service
I am also satisfied that there is sufficient proof of service. TIAA explains
that it served the Galushas pursuant to Federal Rule of Civil Procedure 4(e)(1)
and New Jersey Court Rule 4:4-4(b)(1)(C). Federal Rule 4(e)(1) provides that an
individual may be served in accordance with the law of the state where the
district court is located or where service is made. In turn, New Jersey Court
Rule 4:4–4(b) provides the following:
(1) By Mail or Personal Service Outside the State. If it appears
by affidavit satisfying the requirements of R. 4:4-5(b) that
despite diligent effort and inquiry personal service cannot be
made in accordance with paragraph (a) of this rule, then,
consistent with due process of law, in personam jurisdiction
may be obtained over any defendant as follows:
[. . . ]
(C) mailing a copy of the summons and complaint by
registered or certified mail, return receipt requested, and,
simultaneously, by ordinary mail to: (1) a competent
individual of the age of 14 or over, addressed to the
individual’s dwelling house or usual place of abode . . . .
“There is no fixed standard for determining whether a party has exercised
diligence. . . . Rather, the Court must conduct a fact sensitive inquiry to
determine if diligence has been exercised.” Prudential Ins. Co. of Am. v.
Holladay, No. 07-5471, 2008 WL 1925293, at *2 (D.N.J. Apr. 30, 2008)
(internal citation omitted). And it is the requesting party who bears the burden
of establishing diligence was exercised. Id.
TIAA states that it “attempted to personally serve Defendants at their
residence in accordance with Fed. R. Civ. P. 4(e)(2)(A)” (Mov. Br. at 5).
Specifically, as documented in the Affidavit of Diligent Inquiry (DE 5) and
Affidavit of Service of Summonses and Complaint (DE 6), TIAA used a process
server and the Bexar County Sherriff’s Office to try to effectuate service, and
each made several attempts at doing so at the Galushas’ last known address.6
6 Counsel for TIAA explains that his firm conducted a comprehensive public
records search, which revealed the Galushas’ last known address to be 11503
Toponga, Boerne Texas 78006-8488, which is located in Bexar County. (DE 6 ¶ 3). The
firm then checked the Tax Assessor’s records for Bexar County, which showed that the
Galushas owned property at that same address. (Id. ¶ 4; see also DE 6-1, Ex. A).
(DE 5 ¶¶ 3–11; DE 6 ¶¶ 3–11). The attempted service forms for both James and
Sharron Galusha indicate that on September 13, 2019, a security guard at the
entrance of the subdivision indicated that the subject did indeed reside at the
location. (DE 6-4 at 4; DE 6-5 at 4). In addition, the attempted service form for
Sharron Galusha indicates that, on August 20, 2019, a subject matching the
description of the subject came to the door, saw the officer (who identified
himself and called out the name on the documents) but turned away and did
not open the door. (DE 6-5 at 4). Unable to comply with Federal Rule 4(e)(2)(A),
TIAA enacted service pursuant to Federal Rule of Civil Procedure 4(e)(1) and
New Jersey Court Rule 4:4–4(b)(1)(C) by “mailing the Summonses and
Complaint to Defendants via certified mail,” and “simultaneously, by ordinary
U.S. mail to their residence” located in Boerne, Texas. (Mov. Br. at 5; DE 6 ¶
14).
Based on the foregoing, I am satisfied that TIAA’s detailed efforts “were
sufficiently diligent to warrant alternative service,” Knights Franchise Sys., Inc.
v. Imperial Lodgings, LLC, No. 14-6121, 2017 WL 1535090, at *3 (D.N.J. Apr.
26, 2017), and that TIAA properly effectuated service by mail.
Having considered the threshold issues of jurisdiction and service of
process, I next consider whether TIAA has stated a sufficient cause of action
and whether default judgment is proper.
C. Sufficient Cause of Action/Meritorious Defense
Granting default judgment is improper where the plaintiff has failed to
state a sufficient cause of action. See Wallace v. Fed. Employees of U.S. Dist.
Court, EDPA, 325 F. App’x 96, 101 (3d Cir. 2009) (“Even if service had been
timely, a default judgment still would not have been proper because, as
explained below, the complaint fails to state a claim upon which relief can be
granted.”).
Courts in this district turn to the familiar Federal Rule 12(b)(6) standard
in determining whether a sufficient cause of action has been stated. See Mineo
v. McEachern, No. 12-01950, 2014 WL 2197032, at *2 (D.N.J. May 27, 2014)
(“A court will deny a default judgment if the complaint fails to state a claim
under Federal Rule of Civil Procedure 12(b)(6).”). “Because a defaulting party
does not admit conclusions of law, a court must make an independent inquiry
into whether the unchallenged facts constitute a legitimate cause of action.”
Panda Rest. Grp., Inc. v. Panda Chinese & Japanese Rest., LLC, No. 12-11718,
2018 WL 5294568, at *1 (D.N.J. Oct. 25, 2018). In the ordinary case, the issue
of whether plaintiff has a legitimate cause of action will often overlap with the
issue of whether the defendant has a meritorious defense. See Ramirez v.
Nacerima Indus., No. 10-01204, 2012 WL 3262466, at *1 (D.N.J. Aug. 8, 2012)
(“[T]he Court finds that Defendants have a meritorious defense: namely,
Plaintiff has failed to state a claim upon which relief can be granted.”).
1. The Guarantees
TIAA alleges that the Galushas signed two personal guaranty
agreements, which obligated them to pay the outstanding amounts due under
the Notes and Michelangelo Lease. (Complaint ¶¶ 19 & 31). In support of this
motion, TIAA provided the Court with copies of the Guarantees as well as
copies of, inter alia, the relevant Notes, master security agreements, and the
Michelangelo Lease. Upon my review of the Complaint, TIAA’s motion, and the
relevant agreements, I conclude that TIAA has sufficiently stated a claim for
breach of contract for amounts due under the Notes, but not for amounts due
under the Michelangelo Lease.
To establish a cause of action for breach of contract, a plaintiff must
plead three elements: (i) that a valid contract exists, (ii) that there was a breach
of that contract, and (iii) resulting damages. See Howard Johnson Int’l v. Jay
Shree Ganesh, No. 17-4658, 2018 WL 4005744, at *3 (D.N.J. Aug. 22, 2018).7
New Jersey courts have typically understood a personal guaranty to be a
contract which “must be interpreted according to its clear terms so as to effect
the objective expectations of the parties.” See, e.g., Housatonic Bank and Trust
Co. v. Fleming, 560 A.2d 97, 99 (N.J. Super. Ct. App. Div. 1989). Guaranty
agreements are to be strictly construed, and “[a] guarantor cannot be held
liable beyond the strict terms of the agreement.” Modern Techs. Grp., Inc. v.
Danzi, No. A-5287-08T3, 2010 WL 4107747, at *6 (N.J. Super. Ct. App. Div.
Aug. 12, 2010).
Pursuant to the Guarantees, the Galushas “jointly and severally . . .
irrevocably and unconditionally guarantee[d] the full and prompt performance
by Obligor [(Silverado)] of all obligations which Obligor may presently or
hereafter have to ECF [(now known as TIAA)] under the Credit Agreements. . . .”
7 I apply New Jersey law pursuant to the choice of law provision in the
Guarantees. (Guarantees § 13).
(Guarantees § 1). There are two preliminary statements to the Guarantees,
which state the following:
(1) ECF has entered into, or may from time to time enter into,
various equipment leases, conditional sale contracts,
security agreements, or other agreements with and/or accept
notes from SILVERADO STAGES, INC. (“Obligor”) a
company organized and existing under the laws of California
(such agreements, as amended from time to time, being the
“Credit Agreements,” and each a “Credit Agreement;” the
terms defined therein and not otherwise defined herein being
used herein as therein defined).
(2) It is a condition precedent to the execution of a “Credit
Agreement” that the Guarantor shall have executed and
delivered this Guaranty.
(Guarantees at 1, Preliminary Statement). In sum, the Galushas personally
guaranteed Silverado’s obligations with respect to “Credit Agreements” entered
into between Silverado and TIAA (then ECF), whether those obligations existed
at the time of the Guarantees or sometime thereafter.
2. The Notes Claim
Based on the foregoing, I am satisfied that TIAA has adequately pled a
breach of contract claim with respect to the amounts due under the Notes (the
“Notes Claim”), and that no meritorious defense appears.
The first element of any contract claim is the existence of a valid
contract, and it is satisfied by these allegations. The Notes fit squarely within
the definition of a “Credit Agreement” between TIAA and Silverado. No issue
arises as to guarantees of future obligations, because the Notes are dated the
same dates as the Guarantees: December 12, 2013, and March 11, 2015.
(Complaint ¶¶ 7–12 & 18–20). These allegations, which are substantiated by
the record documents, are sufficient to allege an existing contractual obligation
for amounts due under the Notes and pursuant to the Guarantees.
The second element of the Notes Claim, a breach of that contractual
obligation, has also been adequately pled. The Complaint alleges that since
January 1, 2018, Silverado has failed to make payments of principal and/or
interest due under the Notes, and that, notwithstanding their obligations as
guarantors, the Galushas failed to make payment of the amounts owed by
Silverado. (Complaint ¶¶ 21 & 32).
As for the third element, damages, TIAA alleges that as a result of the
breach it is left with an outstanding balance of at least $1,857,460.94 (plus
accrued interest, fees, and costs). (Complaint ¶¶ 23 & 33).
Assessment of a claim is inevitably hampered by the lack of an
adversarial presentation of issues. Based on the record before me, however, I
do not discern any meritorious defense that the Galushas may have to this
breach of contract claim with respect to the Notes.
3. The Michelangelo Lease Claim
As to the claim of breach of contract with respect to the Michelangelo
Lease (the “Michelangelo Lease Claim”), however, my conclusion is different. To
start, there are important differences between the Notes and the Michelangelo
Lease which suggest that the Lease may not be covered by the Guarantees.
First, unlike the Notes, which are dated the same day as the Guarantees, the
Michelangelo Lease was entered into on February 29, 2016, well after the
Guarantees were executed. (Complaint ¶ 14). In addition, the Michelangelo
Lease was not “entered into” between Silverado and TIAA. Instead, Silverado
became obligated to TIAA under the Michelangelo Lease following Silverado’s
acquisition of Michelangelo in December 2016 and as a result of TIAA’s
agreement with Imagine. (Complaint ¶¶ 13–17). This fact pulls the
Michelangelo Lease outside of the scope of defined “Credit Agreements” for
which the Galushas executed the Guarantees. (See Guarantees at 1,
Preliminary Statement).
Finally, as described supra, a condition precedent to Silverado and TIAA
entering into a “Credit Agreement” as defined in the Guarantees was that the
parties would execute the form guaranty. (Id.). It appears that the parties
intended that an executed form guaranty agreement would accompany any
future qualifying “Credit Agreement” between TIAA and Silverado. In
connection with the Notes, the Galushas did execute and deliver the
Guarantees; as to the Michelangelo Lease, however, the Complaint is silent as
to that issue.
TIAA relies on certain broad language in the Guarantees whereby the
Galushas agreed to jointly and severally guaranty the full and prompt
performance “of all present and/or future obligations owed by Silverado to
Plaintiff.” (Complaint ¶18). While I agree that this language is broad, guaranty
agreements must be strictly construed, and “a guarantor’s promise cannot be
extended by implication.” Modern Techs. Grp., 2010 WL 4107747, at *6. I am
particularly wary, moreover, of catchall commitments regarding obligations to
be incurred in the future. Without more specific allegations tying the
Guarantees to the Michelangelo Lease, “[t]here is no reason to believe that the
parties intended to extend the obligations of guarantee beyond those of the
[Notes].” Gen. Elec. Credit Corp. v. Castiglione, 360 A.2d 418, 424–25 (N.J.
Super. Ct. Law. Div. 1976). As a result, TIAA has failed to state a sufficient
cause of action as to the breach of contract claim stemming from the
Michelangelo Lease. See Kiss Elec., LLC v. Waterworld Fiberglass Pools, N.E.,
Inc., No. 14-3281, 2015 WL 1346240, at *4 (D.N.J. Mar. 25, 2015) (rejecting in-
part a breach of contract claim on a default judgment motion finding no
enforceable contract).
My overall conclusion as to the merits of these causes of action is that,
although the documents clearly cover the Galushas’ guaranty of the Notes, they
do not cover the Michelangelo Lease. See MII Exports, Inc. v. Feingold, No.90-
3224, 1990 WL 149298, at *6 (E.D. Pa. Sept. 18, 1990) (dismissing
counterclaim based on a guaranty where the alleged obligation was not
contemplated in the documents); see also Ctr. 48 Ltd. P’ship v. May Dep’t Stores
Co., 810 A.2d 610, 619 (N.J. Super. Ct. App. Div. 2002) (“[A]n agreement
guaranteeing the particular debt of another does not extend to any other
indebtedness not within the intention of the parties.”).
D. Culpability and Prejudice
The remaining considerations for granting a default judgment, culpability
and prejudice, require no extended discussion. The defendants have been
served, and no good excuse is proffered for their failure to respond. The
resulting prejudice is that the plaintiff is impaired from pursuing at least one
meritorious claim and recovering amounts owed.
E. Options as to Entry of Judgment
As I say, however, TIAA has adequately pled only the claim on the Notes,
not on the Michelangelo Lease. Unless I dismiss the claims based on the
Michelangelo Lease, or they are withdrawn, I cannot enter final judgment,
which must dispose of all claims as to all parties.8 See Garcia-Martinez v. V.
Puzino Dairy, Inc., No. 11-6829, 2014 WL 956123, at *1 (D.N.J. Mar. 12, 2014).
U.S. Golf Ass’n v. ISaAC Scoring Sys., LLC, No. 09-1848, 2010 WL 323203, at *3
(D.N.J. Jan. 20, 2010) (“Until these claims have been either resolved or
withdrawn, the Court cannot enter final judgment.”).
There is the option of a partial judgment under Federal Rule of Civil
Procedure 54. “A default judgment that does not dispose of all of the claims
among all parties is not a final judgment unless the court directs entry of final
judgment under Rule 54(b).” Fed. R. Civ. P. 55(c) advisory committee’s note to
2015 amendment; see Fed. R. Civ. P. 54(b) (explaining that the court may
direct entry of final judgment as to fewer than all claims “only if the court
expressly determines that there is no just reason for delay”).
I will not exercise my discretion in that manner. This is a case in which
8 The same is true of TIAA’s claim for unjust enrichment, which is asserted in the
Complaint (Compl. ¶¶ 34–35) but not raised in the motion for default judgment. (See
Mov. Br. at 6). To the extent I have found an enforceable agreement between the
parties, there is no need to invoke quasi-contractual liability. See MK Strategies, LLC v.
Ann Taylor Stores Corp., 567 F. Supp. 2d 729, 734 (D.N.J. 2008). And even as to the
Michelangelo Lease, the claim seems to stand or fall with the existence, or not, of a
binding contract; absent such an agreement, TIAA does not adequately allege how the
Galushas may be held personally liable for Silverado’s debt based on an unjust
enrichment theory.
defendants have not appeared. It should be disposed of, or not disposed of, but
there is no point in simply leaving open indefinitely a claim that I have already
found inadequate. I will therefore give the plaintiff two options:
Option 1: Plaintiff may opt to abandon the deficient Michelangelo Lease
claims. If so, the Court will enter final judgment on the remaining, Notes
Claim in an appropriate dollar amount, for the reasons stated in this
Opinion, and close the case.
Option 2: Plaintiff may, if it wishes, amend the Complaint to remedy the
deficiencies in the Michelangelo Lease Claim. The amended complaint
must be re-served on the defendants. Should the defendants again
default, the plaintiff may move for entry of a default judgment on the
amended Michelangelo Lease claims. Should the defendants respond,
and/or move to reopen the default, one claim or both may be litigated.
Plaintiff shall make a submission electing for either Option 1 or Option 2
within 14 days. In either case, however, the plaintiff’s submission shall contain
a representation that the debt has not been discharged in bankruptcy and that
this action is not barred by the automatic stay, see 11 U.S.C. § 362.
IV. CONCLUSION
For the foregoing reasons, the motion for default judgment is denied as
presented, but relief is granted in part, subject to the plaintiff’s exercise of
Option 1 or Option 2 and its representation that the bankruptcy proceedings
do not bar such relief, within 14 days, as set forth in more detail above. An
appropriate Order accompanies this Opinion.
/s/ Kevin McNulty
Kevin McNulty, U.S.D.J.