Opinion

Hotard v. Avondale Industries, Inc.

Court
District Court, E.D. Louisiana
Filed
Apr 3, 2024
Cited by
0 cases
Authority
More cited than 22.4%

“Long-established general principles of interpreting indemnity agreements require that indemnification for an indemnitee’s own negligence be clearly and unequivocally expressed.”

How later courts described this case

  • “Long-established general principles of interpreting indemnity agreements require that indemnification for an indemnitee’s own negligence be clearly and unequivocally expressed.”

Written by the judges who cited it.

The opinion

UNITED STATES DISTRICT COURT

EASTERN DISTRICT OF LOUISIANA

PAUL HOTARD CIVIL ACTION

VERSUS NO. 20-1877

AVONDALE INDUSTRIES, INC. ET AL SECTION "L" (1)

ORDER AND REASONS

Before the Court are three motions. Huntington Ingalls Incorporated (“Avondale”) filed a

Motion for Partial Summary Judgment. R. Doc. 535. Hopeman Brothers, Inc. and Liberty Mutual

Insurance Company (collectively “Hopeman Interests”) filed a Motion for Partial Summary

Judgment. R. Doc. 551. Lastly, Exxon Mobil Corporation and SeaRiver Maritime, Inc.

(collectively “SeaRiver”) filed a Cross-Motion for Partial Summary Judgment. R. Doc. 561. The

parties have also filed various replies and oppositions to the foregoing motions. R. Docs. 563, 565,

575, 582, 584, 595. On March 27, 2024, the Court held oral argument on the motions. Considering

the briefing, applicable law, and oral argument, the Court now rules as follows.

I. BACKGROUND

The Court is familiar with the extensive factual history of this case and will not repeat it

here. See R. Doc. 520 for a full history. For this motion, the relevant background is as follows.

This litigation arises from Decedent Paul Hotard’s alleged exposure to injurious levels of

asbestos and asbestos-containing products designed, manufactured, sold and/or supplied by several

Defendant companies while employed by Avondale in the mid-1960s. R. Doc. 1-2 at 2. Mr. Hotard

allegedly was diagnosed with mesothelioma on or around April 2020. R. Doc. 166-2 at 2; R. Doc.

181-1 at 2. His alleged occupational exposure to asbestos-containing products at Avondale was a

result of a failure by the company and its executive officers “to provide a safe place in which to

work free from the dangers of respirable asbestos-containing dust.” R. Doc. 166-2 at 5. Decedent,

a citizen of Kentucky, brought Louisiana state law negligence and strict liability tort claims against

the defendants in Orleans Parish Civil District Court. R. Doc. 1-2.

Avondale removed the case to this court on the basis of diversity jurisdiction. The matter

was originally assigned to Chief Judge Brown. On or about September 21, 2021, Paul Hotard, the

decedent, died allegedly because of malignant mesothelioma. R. Doc. 233. His widow, Patricia

Hotard, filed an amended complaint as the independent administratrix of decedent’s estate. Id.

On April 8, 2021, Hopeman Interests entered a settlement with Plaintiff. R. Doc. 191. On

January 26, 2022, Chief Judge Brown granted Avondale’s motion for summary judgment, holding

that “the ‘date of disease manifestation’ theory of accrual governs Plaintiff’s claim, rendering the

post-1972 version of the [Longshore and Harbor Workers’ Compensation Act (“LHWCA”), 33

U.S.C. § 901, et seq.] applicable to this case. The Court also found that the LHWCA preempts

Plaintiff’s state law tort claims.” R. Doc. 271 at 35. Accordingly, the Court dismissed with

prejudice Plaintiff’s state law tort claims against Avondale. Id. at 36. On February 15, 2022, Chief

Judge Brown recused herself and the matter was reallotted to this Section. R. Docs. 304-06.

On January 6, 2023, trial dates for the matter were continued pending the Fifth Circuit’s

opinion in Barrosse v. Huntington Ingalls, Inc., 70 F.4th 315 (5th Cir. 2023), which was decided

on June 12, 2023.1 The Court then issued an order that defendants file or amend any third-party

1 On November 22, 2021, Judge Vitter held—in a similar line of cases—that state-law negligence claims against

Avondale were preempted by the LHWCA “because they directly conflicted with and frustrated the purposes of the

Act.” Id. at 317. Thus, the Court granted Avondale’s motion for summary judgment in favor of Avondale. Barrosse

v. Huntington Ingalls, Inc., 20-2042, 2021 WL 5447447 at *3 (E.D. La. Nov. 22, 2021). The plaintiff, Ronald Barrosse,

who was diagnosed with mesothelioma, appealed this decision. On June 12, 2023, the Fifth Circuit reversed the district

court’s decision and held that the plaintiff’s claims were not preempted by the LHWCA because his injury occurred

prior to the Louisiana’s 1975 worker’s compensation statute thereby creating a “twilight zone of concurrent

jurisdiction.” Barrosse, 70 F.4th at 324. Accordingly, and similar to the case at hand, Avondale once again became a

defendant in the case.

complaint by July 28, 2023. R. Doc. 463. A month later, the Court issued a scheduling order, which

included a new trial date, and reset trial to February 20, 2024. R. Doc. 480.

Though the Court had previously denied SeaRiver’s Motion for Leave to File a Third-Party

Demand because of its untimely nature, SeaRiver filed a Motion for Reconsideration of the Court’s

decision on July 28, 2023. Because the Court had reset deadlines to file third-party complaints and

trial dates, the Court granted the reconsideration motion. R. Docs. 469; 496. Accordingly, SeaRiver

filed a third-party complaint against Avondale and Hopeman Interests, bringing the latter back into

the suit.

At a telephone status conference held on December 4, 2023, Mrs. Hotard indicated to the

Court that she had reached a resolution with all parties—leaving only contractual and indemnity

claims between the defendants to be resolved. R. Doc. 528. At a late January 2024 telephone

conference, the Court granted the Hopeman Interests’ motion and reset trial dates to August 12,

2024. R. Doc. 546. Presently before the Court are three motions for partial summary judgment,

which focus on SeaRiver’s indemnity claims against Avondale and Hopeman Interests. On March

28, 2024, the Court heard oral argument on the motions.

II. PRESENT MOTIONS

a. Avondale’s Motion for Partial Summary Judgment

In its motion for partial summary judgment, Avondale argues that it is entitled to dismissal

of SeaRiver’s defense and indemnity claims that are based upon SeaRiver’s own negligence. R.

Doc. 535. SeaRiver’s predecessor-in-interest, Humble Oil & Refining Company, and Avondale

entered into a contract to build oil tankers on Avondale’s shipyard. This contract, known as the

SeaRiver-Avondale Contract, governs SeaRiver’s indemnity claims against Avondale. Under

Louisiana law, Avondale explains that the applicable legal standard for contractual indemnity

claims depends on whether it is based upon negligence or strict liability. Presently, Avondale seeks

a ruling from the Court focusing on SeaRiver’s indemnity claims arising out of SeaRiver’s own

negligence. It argues that indemnity contracts only cover the indemnitee’s own negligence when

that intention is expressly and unequivocally stated in the contract. The relevant indemnity

provision in the SeaRiver-Avondale Contract can be found in Article VII(3) and provides:

3. [Avondale] shall indemnify [Humble Oil] against and hold it

harmless from all claims and damages arising from injuries to any person

or persons (except employees of [Humble Oil], unless said employees are

injured through carelessness or negligence of [Avondale]) or from damages

to property in or about or connected with the fabrication, erection,

construction, launching, equipment, and operation of the Vessel until

delivery of the Vessel to [Humble Oil].

R. Doc. 535-2 at 25-26.

Avondale argues that the language used in this provision does not expressly and

unequivocally state that Avondale is to indemnify SeaRiver for injuries arising out of SeaRiver’s

own negligence. It further distinguishes this provision from those that Louisiana courts have

previously held expressly state that an indemnitor is obligated to an indemnitee even in instances

arising from the indemnitee’s own negligence. Thus, Avondale requests that the Court dismiss

SeaRiver’s indemnity and defense claims against it arising out of SeaRiver’s own negligence.

Instead of submitting a substantive opposition, SeaRiver directs the Court to consider the

arguments it raises in its cross motion for partial summary judgment. R. Doc. 563.While those are

detailed in a separate section below, the Court briefly discusses the contentions that serve as

opposition to Avondale’s motion. For example, SeaRiver argues that the indemnity provision

obligates Avondale to indemnify it for Plaintiff’s strict liability claims against SeaRiver. It further

argues that it is entitled to recover 100% of its defense and settlement costs based on this

obligation. Thus, it argues that the Court need not address the issues in Avondale’s motion because

SeaRiver can fully recover from Avondale through indemnity for the strict liability claims.

In reply, Avondale first argues that SeaRiver has not contested any material facts as

asserted by Avondale and thus, SeaRiver concedes the SeaRiver-Avondale contract does not

obligate Avondale to indemnify SeaRiver for SeaRiver’s own negligence. R. Doc. 582 at 1-3.

Avondale next argues that SeaRiver’s contentions regarding 100% apportionment of settlement

costs pursuant to SeaRiver’s indemnity claim for strict liability is defies logic and would lead to

absurd consequences. Id. at 3. Avondale further argues that SeaRiver is not entitled to indemnity

or defense costs for its vicarious liability from Avondale. Id. at 7.

b. Hopeman Interests’ Motion for Partial Summary Judgment

For similar reasons that Avondale articulates, Hopeman Interests asks the Court to dismiss

SeaRiver’s indemnity claims against them that arise out of actions “wholly independent” of

Hopeman Interests. R. Doc. 551. Here, SeaRiver’s claims for indemnity against Hopeman Interests

stem from the Hopeman-Avondale contract, which was created to complete joiner work needed

for the tankers. The relevant indemnity provision provides that:

Vendor [Hopeman] shall protect, defend, indemnity and save ASI2

and Humble Oil and Refining Company harmless against any and all claims,

demands, and causes of actions of every kind and character arising in favor

of any person on account of personal injury, death or damages to property

occurring, growing out of incident to or resulting directly or indirectly from

the performance by the Vendor hereunder, and to pay all judgments

rendered against ASI and/or Humble Oil and Refining Company in

connection therewith.

R. Doc. 497-2 at 5.

Like Avondale, Hopeman Interests argues that the provision lacks clear and unambiguous

language for them to indemnify SeaRiver for claims arising out of SeaRiver’s own negligence.

2 ASI refers to Avondale Shipyards Inc.

Hopeman Interests further cites this Court’s earlier order which cabined SeaRiver’s indemnity

claims against them to strictly those arising directly or indirectly from Hopeman Interests’ actions.

Accordingly, they move the Court to dismiss any indemnity or defense claim from SeaRiver that

are independent of Hopeman Interests’ own actions.

Once again, in opposition, SeaRiver directs the Court to consider the arguments it raises in

its cross motion for summary judgment, which are discussed below. R. Doc. 565.

In reply, Hopeman Interests argues that SeaRiver failed to contest any material facts

submitted by Hopeman Interests. R. Doc. 575. They reject SeaRiver’s contentions about the

allocation of fault regarding its potential indemnity claims against Hopeman Interests. Lastly, they

briefly reiterate arguments raised in their motion for partial summary judgment.

c. SeaRiver’s Cross Motion for Partial Summary Judgment

As discussed, SeaRiver did not submit a substantive opposition to Avondale or Hopeman

Interests’ motions but instead filed a cross motion for summary judgment. R. Docs. 561, 563, 565.

SeaRiver argues that the indemnity provisions in the respective contracts obligate Avondale and

Hopeman Interests to indemnify it for Plaintiff’s strict liability claims against SeaRiver. It further

argues that it is entitled to recover 100% of its defense and settlement costs based on this

obligation. Thus, it argues that the Court need not address the issues raised in the other motions

because SeaRiver can fully recover from Avondale and Hopeman Interests under the strict liability

claims asserted against it. Should the Court be unconvinced of this argument, it avers that

Avondale and Hopeman Interests’ motions should be denied to the extent that SeaRiver is entitled

to indemnity for any vicarious liability for Avondale and/or Hopeman Interests’ negligence.

SeaRiver explains that courts use two different standards to determine whether an indemnity claim

can be enforced: actual or potential liability. SeaRiver argues that for its indemnity claim to be

enforced, it only has the burden of proving that it was potentially liable to Plaintiff to recover from

Avondale and Hopeman Interests because the indemnity provision is based on a written contract.

Further, it argues that it meets that burden.

Both Hopeman Interests and Avondale filed oppositions. In their opposition, Hopeman

Interests stresses the untimely nature of SeaRiver’s third party demand against them and argues

they should not have to indemnify SeaRiver for claims unrelated to their own actions. R. Doc. 587.

They further argue that SeaRiver is not entitled to any indemnity from them because no settlement

funds have been paid and there has been no judicial determination of fault. They aver that SeaRiver

must demonstrate actual liability to Plaintiff before SeaRiver seeks indemnity from them and that

the standard is only lowered to potential liability in one other circumstance, which is inapplicable

here. Accordingly, they argue that SeaRiver fails to meet this burden. They further argue that the

terms of the Hopeman-Avondale contract do not allow for reimbursement of attorneys fees. Lastly,

they argue that SeaRiver’s claim for indemnity against Hopeman Interests through vicarious

liability is unfounded because Plaintiff did not articulate a vicarious liability claim against

SeaRiver or Hopeman Interests.

In Avondale’s opposition, it argues that it may have a strict liability indemnity obligation

to SeaRiver—pending satisfaction of their burden of proof—but no obligation exists for

SeaRiver’s own negligence. R. Doc. 584. Avondale further argues that its potential obligation does

not include defense costs or attorneys fees and is limited to the amount of SeaRiver’s settlement

with Plaintiffs that is attributable to the strict liability claims. Regarding the standard that SeaRiver

must meet to have a successful indemnity claim, Avondale agrees with SeaRiver that its actions

should be evaluated under a potential liability standard. However, Avondale argues that SeaRiver

fails to meet that burden and its motion is nonetheless premature at this time because SeaRiver

provides no evidence that its settlement with Plaintiff was reasonable and/or untainted by

collusion. Lastly, Avondale argues that it has no duty to indemnify SeaRiver for vicarious liability.

In reply, SeaRiver argues that its motion is not premature and that it has provided enough

evidence to support its burden of proof. R. Doc. 595. It reiterates that the standard to evaluate its

indemnity claim is potential liability to Plaintiff and that it is entitled to indemnity for strict liability

and the defense costs associated with it. Intriguingly, SeaRiver concedes that it has not met the

“reasonableness of the settlement” prong of its indemnity claim. Yet, it still argues that it is entitled

to summary judgment.

III. LAW

Summary judgment is proper when “there is no genuine dispute as to any material fact and

the movant is entitled to judgment as a matter of law.” Fed. R. Civ. P. 56(a). The court must view

the evidence in the light most favorable to the nonmovant. Coleman v. Hous. Indep. Sch. Dist.,

113 F.3d 528, 533 (5th Cir. 1997). Initially, the movant bears the burden of presenting the basis

for the motion; that is, the absence of a genuine issue as to any material fact or facts. Celotex Corp.

v. Catrett, 477 U.S. 317, 323 (1986). The burden then shifts to the nonmovant to come forward

with specific facts showing there is a genuine dispute. See Fed. R. Civ. P. 56(c); Matsushita Elec.

Indus. Co. v. Zenith Radio Corp., 475 U.S. 574, 586-87 (1986). “A dispute about a material fact is

'genuine' if the evidence is such that a reasonable jury could return a verdict for the nonmoving

party.” Bodenheimer v. PPG Indus., Inc., 5 F.3d 955, 956 (5th Cir. 1993) (citation omitted).

IV. ANALYSIS

The questions raised in the motions for partial summary judgment can be boiled down to

two discrete issues. First, whether Avondale and/or Hopeman Interests are obligated to indemnify

SeaRiver for actions arising out of SeaRiver’s own negligence. Second, whether SeaRiver is

entitled to indemnity from Avondale and/or Hopeman Interests for Plaintiff’s strict liability claims

against it.

1. Whether Avondale and/or Hopeman Interests Are Obligated to Indemnify

SeaRiver for Actions Arising Out of SeaRiver’s Own Negligence.

The parties do not dispute that Louisiana law governs the instant matter. Under Louisiana

law, the applicable standard for a contractual indemnity claim depends on whether it is based on

negligence or strict liability. Courts use the rule articulated in Polozola v. Garlock, Inc. to evaluate

such claims rooted in negligence. 343 So. 2d 1000 (La. 1977). The Polozola rule provides that

contracts “whereby the indemnitee is indemnified against the consequences of his own negligence

[are] strictly construed, and such a contract will not be construed to indemnify an indemnitee

against losses resulting to him through his own negligent act, unless such an intention was

expressed in unequivocal terms.” Id. at 1003. Other sections of this court and the Fifth Circuit

recognize that indemnity provisions requiring indemnity for an indemnitee’s own negligence need

to be clearly and unequivocally expressed. Seal Offshore, Inc. v. Am. Standard, Inc., 736 F.2d

1078, 1081 (5th Cir. 1984) (“Long-established general principles of interpreting indemnity

agreements require that indemnification for an indemnitee’s own negligence be clearly and

unequivocally expressed.”); see also Donahue v. Republic Nat’l Distrib. Co., LLC, 439 F. Supp.

3d 455, 469 (E.D. La. 2020) (“In the absence of an express and unequivocal statement that a party

is to be indemnified for that party’s own negligence, the contract of indemnification will not be

construed to create such an obligation.”) (internal quotation omitted).

There are many instances where courts have found the party is to indemnify the indemnitee

for the indemnitee’s own negligence; however, that is not the case here. For example in Polozola,

the Louisiana Supreme Court held that contractor was to indemnify the indemnitee, Dow, because

the relevant provision stated “[c]ontractor assumes the entire responsibility and liability and will

protect, indemnify and hold harmless Dow . . . from and against [a]ny and all losses, expenses,

demands and claims made against Dow. . . whether caused by Dow’s negligence or otherwise. . .”

343 So. 2d at 1002; see also Miller v. La. Gas Services Co., No. 95-874 (La. App. 5th Cir. 6/25/96),

680 So. 2d 52, reh’g denied (10/17/96) (holding that an indemnitor was responsible for an

indemnitee’s own negligence because the contractual provision provided for indemnity “even if

caused by or resulting from the acts or omissions of officers, employees or agents of

[indemnitee]”). Unlike those provisions, the Court here finds that the provisions found in the

SeaRiver-Avondale and Hopeman-Avondale contracts are silent on liability in the event of

SeaRiver’s own negligence. R. Doc. 535-2 at 22-23; R. Doc. 497-2 at 5. The Fifth Circuit further

holds that “[a]n indemnification of ‘any and all claims’ will not include the negligence of the

indemnitee.” Seal Offshore, Inc., 736 F.2d at 1081. Thus, the Court can quickly dispose of the

argument that SeaRiver is owed indemnity because the SeaRiver-Avondale contract states that

Avondale shall indemnify SeaRiver from “all claims and damages arising from injuries to any

person. . .” or that the Hopeman-Avondale Contract provides that Hopeman shall indemnify

SeaRiver “against any and all claims.” Because the indemnity provisions lack any language to

suggest SeaRiver is to be indemnified for its own negligent conduct, the Court is hesitant to find

such an obligation exists.

Moreover, SeaRiver offers no opposition to the standard that courts use to evaluate such

provisions but instead argues that Avondale and Hopeman Interests’ motions should be denied

because it is entitled to indemnification for any vicarious liability it may have for the acts of

Hopeman Interests and Avondale. This argument is unpersuasive because any vicarious liability

that SeaRiver may be responsible for Plaintiffs is due to the consequences of its own actions—not

Hopeman Interests’ or Avondale’s.

This Court has previously addressed whether Plaintiff has a valid negligence claim—

whether through vicarious or direct liability—against SeaRiver.3 R. Doc. 420. Of relevance, this

Court explained that SeaRiver may be vicariously liable if SeaRiver (1) had operational control

over Avondale or Hopeman Interests or (2) authorized unsafe work practices by Avondale or

Hopeman Interests that caused the decedent’s workplace exposure to asbestos and resultant

mesothelioma. This Court held that while SeaRiver did not have operational control over

Avondale, factual questions still remain as to whether SeaRiver expressly or implicitly authorized

unsafe work practices. Id. at 11, 15. Accordingly, if SeaRiver is found to be vicariously liable to

the Plaintiffs, it will be because “the evidence suggests that [SeaRiver] nevertheless mandated

asbestos-containing materials to be used” without warning Avondale or any other subcontractor

involved with building the tankers, including Hopeman Interests. Id. at 15. Since the Court has

already found that SeaRiver cannot be vicariously liable for Avondale or Hopeman’s actions, any

negligence claim that Plaintiff has against SeaRiver cannot be rooted in that theory. It follows that

it is unreasonable for this Court to find that Avondale or Hopeman Interests would be liable to

SeaRiver for a claim that is not even being alleged against SeaRiver.

Because the provisions in both contracts do not clearly and unequivocally express that

SeaRiver is to be indemnified for its own negligence and there is no vicarious liability claim against

SeaRiver that is derivative of Avondale or Hopeman Interests’ actions, the Court holds that

Avondale and Hopeman Interests are not obligated to indemnify SeaRiver for SeaRiver’s own

negligent actions.

2. Whether SeaRiver Is Entitled to Indemnity From Avondale and/or Hopeman

Interests for Plaintiff’s Strict Liability Claims Against It

3 The Court issued that order in response to SeaRiver’s motion for summary judgment in which SeaRiver sought

dismissal of all of Plaintiff’s claims against it. R. Doc. 420.

In its cross-motion for partial summary judgment, SeaRiver first argues that it is entitled to

indemnity for the strict liability claims that Plaintiff has asserted against it. R. Doc. 561. To recover

on this claim, SeaRiver argues that it need only show potential liability—instead of actual

liability—to Plaintiff for her strict liability claim. In response, Avondale concedes that it may have

to indemnify SeaRiver for the strict liability claim and that SeaRiver need only prove that it is

potentially liable to succeed on that claim. However, it avers that SeaRiver fails to meet that burden

at this time. Hopeman Interests, on the other hand, argues that SeaRiver needs to demonstrate

actual liability to recover indemnity for this claim and that it fails to do so.

Long established law in this Circuit holds that when a party’s indemnity claim is based on

a written provision in a contract, then that party need only show potential liability. In Terra

Resources, Inc. v. Lake Charles Dredging & Towing Inc., the Fifth Circuit notes the adoption of

the Sixth Circuit rule that “[d]efendants need only show potential (rather than actual liability) to

recover indemnity where either (1) defendants tender the defense of the action to the indemnitor,

(2) the claim for indemnity is founded upon a judgment, or (3) the defendant’s claim is based on a

written contract of. . . indemnification.” 695 F.2d 828, 832 (5th Cir. 1983). Though Hopeman

Interests directs the Court to consider this case, it fails to consider, or even mention, the third

exception to the actual liability rule. Because SeaRiver’s alleged indemnity recovery is based upon

contractual provisions in the SeaRiver-Avondale contract and Hopeman-Avondale contract, the

Court finds that the instant matter fits within the third exception to the rule. Thus, SeaRiver need

only show potential liability to Plaintiff to recover indemnity for such claims.

To demonstrate potential liability, SeaRiver must establish four elements: “that the claim

was not frivolous, that the settlement was reasonable, that it was untainted by fraud or collusion,

and that the indemnitee settled under a reasonable apprehension of liability.” Chevron Oronite Co.,

L.L.C. v. Jacobs Field Servs. N. Am., Inc., 951 F.3d 219, 227 (5th Cir. 2020) (quoting Fontenot v.

Mesa Petrol. Co., 791 F.2d 1207, 1218 (5th Cir. 1986)). Here, Avondale concedes two of the

elements: Plaintiff’s claim against SeaRiver was non-frivolous and those two parties settled under

a reasonable apprehension of liability.4 However, Avondale argues that the motion should be

denied because SeaRiver fails to present evidence that the settlement was untainted by fraud and/or

collusion or that settlement was reasonable. Accordingly, Avondale avers that any ruling by the

Court on the matter at this time would be premature. The Court agrees.

Regarding the reasonability of the settlement between SeaRiver and Plaintiff, SeaRiver

states that it “did not address this element because SeaRiver concedes that discovery on this point

remains to be conducted if this Court—as SeaRiver’s cross-motion urges—finds that indemnity is

due to SeaRiver.” This statement perplexes the Court for it to find that indemnity is owed to

SeaRiver, then it must find that all elements of the potential liability standard are met. However,

SeaRiver requests that this Court grant it summary judgment and find that it was “entitled to

indemnity” without providing any evidence to establish the last element. The Court will not do so.

Because SeaRiver fails to provide sufficient evidence on the reasonability of its settlement with

Plaintiff, the Court need not discuss the fraud element of the potential liability test.

Accordingly, the Court finds that at this time SeaRiver does not successfully demonstrate

that it is entitled to indemnity from either party pursuant to its strict liability claim. Because this

issue is not ripe for the Court’s consideration at this time, the Court declines to comment on

whether SeaRiver is entitled to recover any—let alone all—of its defense and settlement costs from

Avondale and Hopeman Interests pursuant to that claim.

4 Because Hopeman Interests analyzed SeaRiver’s actions under the incorrect standard, the Court declines to further

comment on their assertions.

V. CONCLUSION

For the foregoing reasons,

IT IS ORDERED that Avondale’s Motion for Partial Summary Judgment, R. Doc. 535,

is GRANTED. IT IS FURTHER ORDERED that and Hopeman Interests’ Motion for Partial

Summary Judgment, R. Doc. 551, is GRANTED, in part, and DENIED, in part. The Court finds

that Hopeman Interests is not obligated to indemnify SeaRiver for actions arising out of SeaRiver’s

own negligence. However, the Court will not issue a ruling regarding SeaRiver’s indemnity for

claims “that grow out of actions wholly independent” of Hopeman Interests which extend past

SeaRiver’s own negligence because such actions are not clearly defined.

IT IS FURTHER ORDERED that SeaRiver’s Cross-Motion for Partial Summary

Judgment, R. Doc. 561, is DENIED. The parties reserve the right to re-urge any argument they

have regarding the indemnity claims derivative of strict liability.

New Orleans, Louisiana, this 3rd day of April, 2024.

Sell

14