Opinion

Aker Solutions Inc. v. Shamrock Energy Solutions, LLC

Court
District Court, E.D. Louisiana
Filed
Oct 8, 2019
Cited by
0 cases
Authority
More cited than 22.2%

court can pierce corporate veil to reach the alter ego of company member and hold company member liable for debts of LLC

How later courts described this case

  • court can pierce corporate veil to reach the alter ego of company member and hold company member liable for debts of LLC
  • court can pierce corporate veil of LLC under alter ego doctrine
  • restating and applying Green’s eighteen-factor test

Written by the judges who cited it.

The opinion

UNITED STATES DISTRICT COURT

EASTERN DISTRICT OF LOUISIANA

AKER SOLUTIONS, INC. CIVIL ACTION

VERSUS NO. 16-2560

SHAMROCK ENERGY SECTION M (4)

SOLUTIONS, LLC; AND

SAMURAI INTERNATIONAL

PETROLEUM, LLC

FINDINGS OF FACT & CONCLUSIONS OF LAW

This matter involves unpaid invoices for services rendered where the obligation and the

obligor are disputed. Plaintiff Aker Solutions, Inc. (“Aker”) filed this suit against defendants

Shamrock Management, LLC d/b/a Shamrock Energy Solutions (“Shamrock Management”),

Shamrock Energy Solutions, LLC (“Shamrock Energy”), Samuari International Petroleum, LLC

(“SIPCO”), and Jeffrey Trahan (collectively, “Defendants”) alleging that SIPCO is obligated by

contract to Aker in the amount of $1,780,144.19 for work performed, and SIPCO breached the

contract by failing to pay.1 Aker alleges that Shamrock Management, Shamrock Energy, and

Trahan are also jointly and severally liable for SIPCO’s debt under single-business-enterprise

and alter-ego theories.2

This matter was tried before the Court, sitting without a jury, over two days. Having

considered the evidence admitted at trial, the arguments of counsel, and the applicable law, the

Court issues its findings of fact and conclusions of law pursuant to Rule 52 of the Federal Rules

of Civil Procedure. To the extent a finding of fact constitutes a conclusion of law, the Court

adopts it as such, and vice versa.

1 R. Doc. 77.

2 Id.

FINDINGS OF FACT

I. THE PARTIES

1. Aker is a corporation organized under the laws of the State of Delaware, with its

principal place of business in Houston, Texas. In general, Aker provides a wide variety of

engineering and technical services and solutions to oil-and-gas exploration-and-production

(“E&P”) companies.3

2. Shamrock Management is a limited liability company formed on September 24,

1997, under the laws of the State of Louisiana, with its principal place of business in Houma,

Louisiana. Trahan purchased Shamrock Management in 2008 and was the sole member and

manager of the company during the relevant period.4

3. Shamrock Energy is a limited liability company formed on February 13, 2014,

under the laws of the State of Louisiana, with its principal place of business in Houma,

Louisiana. Trahan was the sole member and manager of the company during the relevant

period.5

4. SIPCO is a limited liability company formed on February 4, 2013, under the laws

of the State of Louisiana, with its principal place of business in Houma, Louisiana. Trahan was

the sole member and manager of the company throughout its existence.6

5. Shamrock Management, Shamrock Energy, and SIPCO are all located at the same

business address: 4800 LA-311, Houma, Louisiana 70360.7

3 R. Doc. 109 at 3.

4 Id. at 3 & 12; Exhibit 1; Testimony of Trahan.

5 R. Doc. 109 at 3 & 12; Testimony of Trahan.

6 Id.

7 R. Doc. 109 at 3.

6. Trahan is a citizen of Louisiana residing in Houma. Trahan is the sole member of

Shamrock Management, Shamrock Energy, and SIPCO, none of which is publicly traded.

Trahan is also president and chief executive officer (“CEO”) of Shamrock Management and

SIPCO and provides the funding for both companies.8

II. SIPCO’S RELATIONSHIP WITH SHAMROCK MANAGEMENT AND SHAMROCK ENERGY

7. Shamrock Management is engaged in the business of providing contract and

subsidiary labor, such as electricians, mechanics, company men, tool pushers, etc., to oil-and-gas

E&P companies.9

8. Shamrock Energy is a holding company for Shamrock Management. It was

formed to rebrand Shamrock Management to more closely tie Shamrock Management to the

energy sector as a solutions provider for oil-and-gas E&P companies. On June 29, 2015,

Shamrock Management registered the trade name “Shamrock Energy Solutions” as part of a

rebranding process, such that Shamrock Management, LLC became Shamrock Management,

LLC d/b/a Shamrock Energy Solutions.10

9. According to the terms of a loan agreement with Jefferson Capital, which

restricted the type of business ventures Shamrock Management could pursue, Shamrock

Management could not engage in the oil-and-gas E&P business. But for this restriction,

Shamrock Management would have engaged in the oil-and-gas E&P business, and SIPCO would

not have been formed.11

10. On February 4, 2013, Trahan formed SIPCO to vet oil-and-gas E&P opportunities

for acquisition and to act as a start-up E&P company. On July 8, 2014, SIPCO was “capitalized”

8 R. Doc. 109 at 4 & 12-13; Exhibit 181.

9 R. Doc. 109 at 12; Testimony of Trahan.

10 R. Doc. 109 at 12.

11 Testimony of Jason Lyons (Shamrock Management and SIPCO’s in-house counsel).

with a $5,000 payment from Trahan into SIPCO’s separate bank account, which constitutes the

sole capital contribution made to it throughout its existence.12

11. SIPCO’s purpose was to vet oil-and-gas E&P opportunities to help create

business for Shamrock Management and to make money for Trahan. The intention was for

SIPCO and Shamrock Management to work in unison, and for Shamrock Management to

provide labor to SIPCO to work in the oil fields. Thus, if SIPCO had become a viable E&P

company, Shamrock could have benefitted financially.13

12. SIPCO shared offices and office equipment with Shamrock Management in

Houma, Louisiana, and Houston, Texas. However, SIPCO did not operate out of Shamrock

Management’s offices in Broussard or Lafayette, Louisiana; Kennedy, Levelland, or Pecos,

Texas; Wheeling, West Virginia; or North Dakota. SIPCO and Shamrock Management also

have the same Houston office telephone number, which is listed in the Shamrock Management

and SIPCO email account signature blocks.14

13. SIPCO did not own any property and never earned any income.15

14. SIPCO did not have any of its own W-2 employees.16

15. Rene Breaux, III, Shamrock Management’s vice president of finance and chief

financial officer (“CFO”), also served as SIPCO’s CFO.17

16. Jason Lyons, Shamrock Management’s vice president and general counsel, also

served as general counsel and manager of SIPCO after it was formed.18

12 R. Doc. 109 at 13-14; Testimony of Trahan & Rene Breaux (Shamrock Management and SIPCO’s CFO).

13 Testimony of Lyons & Trahan; Exhibits 53 & 181.

14 R. Doc. 109 at 14.

15 Id; Testimony of Trahan & Breaux.

16 R. Doc. 109 at 13.

17 Id.

18 Id; Testimony of Trahan & Lyons.

17. Thus, SIPCO appointed three officers: (i) Trahan, president and CEO, (ii) Breaux,

CFO, and (iii) Lyons, general counsel. Shamrock Management employed these same three

persons in the exact same officer roles. However, Shanna Kornegay and Darryl Rousse were

additional officers of Shamrock Management.19

18. Shamrock Energy had an operating agreement and articles of organization, held

annual and special meetings, and prepared and filed annual meeting minutes.20

19. While SIPCO held annual meetings and has produced four “Actions by

Unanimous Written Consent of Members in Lieu of Meeting,” there is no evidence in the record

that SIPCO prepared or filed annual reports, and SIPCO was deemed to be “not in good standing

for failure to file Annual Report” by the Louisiana Secretary of State.21

20. In 2012, Shamrock Management hired Richard Sharp, an engineer. Sharp

rendered services on SIPCO’s behalf after it was formed in 2013. In 2013, Shamrock

Management hired Luke Jensen, a geologist at an annual salary of $350,000, to vet potential oil-

and-gas E&P opportunities, but he rendered these services on SIPCO’s behalf after it was formed

in 2013.22

21. While Shamrock Management had over 800 employees, the following Shamrock

Management employees provided services on behalf of SIPCO, and were paid by Shamrock

Management: Breaux (financial), Lyons (legal), Sharp (engineering), Jensen (geology), Clint

Schexnayder (legal), Chisolm Lindsey (mechanical engineering), Russel Heim (facility

engineering), Bob O’Neil (process engineering), Aarti Punase (petroleum engineering), Shanna

19 Testimony of Trahan, Lyons, Breaux & Thompson.

20 Testimony of Trahan; Exhibit 12.

21 Testimony of Trahan & Lyons; Exhibit 11.

22 R. Doc. 109 at 14; Testimony of Trahan.

Korneygay (administrative), Bill Bates (information technology and administrative), Gary

Stansbury (business development), and Darkus Prosperie (controller).23

22. SIPCO officers and Shamrock Management employees, who were rendering

services on behalf of SIPCO, including Trahan, Breaux, Sharp, Lyons, and Jensen, used their

Shamrock and SIPCO email addresses interchangeably when communicating internally and with

third parties.24

23. For example, Trahan transmitted and received emails interchangeably from both

email accounts, such that both of his email addresses would sometimes appear in the same email

string. Also, Trahan would sometimes use his Shamrock Management email address for SIPCO

business.25

24. Similarly, Breaux and Sharp both transmitted emails from their SIPCO email

addresses but continued to include their Shamrock signature block in these emails.26

25. Jensen transmitted emails that contained both Shamrock and SIPCO email

signature blocks, including in an email he sent to Aker.27

26. SIPCO was completely financially dependent on Shamrock Management. SIPCO

did not have a separate accounting function or its own financial records. Shamrock Management

paid SIPCO’s expenses and debts, which were captured within Shamrock Management’s

accounting system. Shamrock Management directly paid a third-party for a SIPCO debt on at

least two occasions.28

23 R. Doc. 109 at 13-14; Testimony of Trahan & Breaux.

24 Exhibits 16, 17, 20, 21, 23, 30, 32, 33, 37, 38, 39, 40, 41, 42, 43, 44, 46, 47, 81, 89, 94, 96, 100, 103,

138, 182 & 187.

25 Exhibits 13, 18, 20, 22, 25, 28, 48, 50, 60, 65, 76, 77, 89 & 185.

26 Exhibits 184.

27 Exhibit 154.

28 Exhibits 32, 33, 166 & 169; Testimony of Trahan & Breaux.

27. Greenstone Equity Partners (“Greenstone”) was engaged by SIPCO to help find

potential investors, and Breaux told Greenstone that SIPCO was financially dependent upon

Shamrock. SIPCO owed Greenstone a total of $60,000 for its services in facilitating meetings

between SIPCO (Breaux and Jensen) and potential investors in the Middle East. Shamrock

Management paid Greenstone for the services it provided to SIPCO.29

28. On July 2, 2014, Breaux told Greenstone’s Omar Algharabally that he “will not

be able to wire the funds today. We are waiting on funding from Shamrock. Shamrock was

supposed to receive payment from a couple of our large accounts, which would have given me

some availability to move $40,000 from Shamrock to SIPCO. Unfortunately, those payments

have not be[en] made as of today.” On July 28, 2014, Breaux emailed Algharabally that “[t]he

current activity of SIPCO is supported by Shamrock, which is related to SIPCO by common

ownership.”30

29. On February 2, 2015, Breaux informed Greenstone that “Shamrock actually

makes the payments on behalf of SIPCO, so the process is not as simple as simply cutting a

check.” 31

30. On February 4, 2015, Breaux emailed Algharabally that the payments from

SIPCO for Greenstone’s services were late, explaining: “SIPCO has no accounting structure

because we have not yet closed a deal. We rely on Shamrock to cover SIPCO’s expenses in the

interim.”32

31. Eventually, Shamrock Management directly paid Greenstone for SIPCO’s debt,

one payment for $20,000 and the other for $40,000, which debt arose out of services Greenstone

29 Testimony of Breaux; Exhibit 32.

30 Exhibits 32 & 33.

31 Testimony of Breaux; Exhibit 166.

32 Exhibit 169.

provided to SIPCO pursuant to the contract between Greenstone and SIPCO. SIPCO never

reimbursed Shamrock Management for the two payments, totaling $60,000, that Shamrock

Management made to Greenstone on SIPCO’s behalf.33

32. Shamrock Management never invoiced SIPCO for any costs it incurred on

SIPCO’s behalf, nor did SIPCO ever reimburse Shamrock Management for any payments or

costs incurred on SIPCO’s behalf. Nor did SIPCO ever reimburse Shamrock for any of the work

or services that Shamrock Management employees rendered on SIPCO’s behalf.34

33. Shamrock Management employees rendering services on behalf of SIPCO shared

SIPCO’s and Shamrock Management’s overview presentations to potential third-party investors

and financiers for SIPCO’s projects. They promoted the availability to SIPCO of Shamrock

Management’s experience, skill sets, and E&P capabilities to convince third parties to invest in

SIPCO projects. They also referred to Shamrock Energy and SIPCO as vertically integrated

sister companies.35

34. Breaux shared Shamrock Management’s 2012, 2013, and 2014 financial

statements with a third-party investor that SIPCO was trying to engage.36

35. On August 6, 2014, Jensen emailed Ezra Beren of Platinum, subject line

“Transaction Questionnaire – SIPCO,” stating: “I have attached a company overview of SIPCO

and our vertically integrated sister company, Shamrock Energy Solutions, which already

operates and maintains deepwater platforms for IOCs. ... That should familiarize you with us as

33 R. Doc. 109 at 14; Testimony of Breaux.

34 Testimony of Trahan.

35 Exhibits 51, 63, 83, 84, 97, 98 & 99.

36 R. Doc. 109 at 14.

well as the experience, skills sets, and Exploration & Production capabilities we bring to the

table.” Trahan and Breaux both received copies of this email on August 7, 2014.37

36. On September 18, 2014, Jensen emailed Jackson Kirby of Goldman Sachs, saying

“we would like to progress with setting up a meeting with SIPCO senior management, including

our CEO and CFO, to meet with your team and provide [you] with further background on SIPCO

E&P and its sister company Shamrock Energy Solutions, our goals, and how Goldman Sachs

could potentially help us achieve them in a mutually beneficial way.”38

37. In 2014 and, then again in 2018, Aker considered purchasing Shamrock

Management and Shamrock Energy, but never considered purchasing SIPCO.39

III. AKER’S PROPOSAL FOR THE CONCEPT VALIDATION STUDY

38. In May 2014, SIPCO was considering acquiring an oil-and-gas lease offshore in

the Gulf of Mexico, known as the Trident Field, the rights to which belonged to Rocksource

Exploration Norway AS (“Rocksource”). SIPCO began discussions with Rocksource to acquire

the lease, but because the field had no infrastructure or producing assets of any kind located on

it, SIPCO had to develop a plan to install the infrastructure to produce oil and gas before it could

acquire the lease.40

39. Toward that end, Sharp, on behalf of SIPCO, approached Aker about performing

a concept validation study (“CVS”) for the Trident Field. A CVS is conducted to understand

what is required both technically and economically to develop a complex oil-and-gas facility. As

a prelude to conducting the CVS, the full range of options – commonly referred to as “concepts”

– are considered from a technical and economic perspective. Through this initial study (often

37 Exhibit 51.

38 Exhibit 63.

39 Testimony of Trahan.

40 Id.

referred to as a feasibility study), the options are narrowed to those that are feasible. Then a

CVS is performed to validate a concept or set of concepts deemed feasible.41

40. Previously, in 2011, Aker had performed a Trident Field Development Options

Study (hereinafter “Feasibility Study”) for Rocksource. Sharp obtained a copy of the Feasibility

Study from Rocksource and provided it to Thompson when he initially approached Aker in May

2014 about performing the CVS. The purpose of the 2014 CVS was to improve upon the

previous study performed for Rocksource, address any new technologies and developments,

account for the price of oil and material changes, as well as, validate the initial study.42

41. On June 23, 2014, Barbara Thompson, Aker’s vice president of its front-end

spectrum (“FES”)43 division, and Vladi Gorescu, Aker’s director of projects and construction

within the FES division, met with Sharp and Jensen. Sharp and Jensen asked Thompson and

Gorescu to prepare a proposal and cost estimate to perform the CVS.44

42. On July 3, 2014, in response to SIPCO’s request, Aker emailed to Sharp its

proposal for performing the CVS (“Proposal”), which contained a cost, time, and resources

(“CTR”) summary estimating the hours it would take to complete all facets of the CVS and

discussing at length the cost breakdown for each discipline’s scope of work. The initial

estimated price for performing the CVS was $1,497,151 and, of that total, the estimate for labor

was $1,444,771.45

41 Testimony of Barbara Thompson (Aker’s corporate representative). Thompson was laid-off from Aker

due to a downturn in the oil market. Nevertheless, Aker paid for her travel, hotel, and time to serve as its corporate

representative. Id.

42 Id.; Exhibit 118.

43 FES is an industry term/acronym used to refer to the concept development business, particularly in the

offshore energy industry. Testimony of Thompson.

44 Id.

45 Id.; Exhibits 34 & 35.

43. Pursuant to the CTR for “Project Management” in the Proposal, under “Scope of

Work,” Aker would “Chair Weekly and Monthly Meetings and Issue Minutes of Meeting” and,

under “Deliverables/Activities,” Aker would perform and deliver “MOM (minutes of meeting),

Weekly Report, Monthly Reports, and Monthly Invoices.”46

44. On July 20, 2014, Sharp forwarded Aker’s Proposal to Jensen requesting his

feedback.47

45. Thompson had authority to negotiate certain contracts in conjunction with Aker’s

legal team. Thompson’s supervisor was Hennig Ostvig, who led FES globally and was based in

Oslo, Norway. Ostvig worked for Aker ASA, a different Aker entity than the one for which

Thompson worked, and Thompson considered the two companies to be separate. Aker had

distinct, but related, business entities in Norway and Malaysia with which Thompson worked. If

either of these related entities did work for Aker, Aker would incur intercompany charges for the

work.48

46. Together with another member of the Aker team on Shamrock Management

business, Thompson met Trahan while he was at an Aker meeting. At that time, Thompson

learned that Trahan owned SIPCO.49

47. Trahan testified that SIPCO had no way to pay for all of the vetting and research

SIPCO needed.50

46 Exhibit 35.

47 Exhibit 34.

48 Testimony of Thompson.

49 Id.

50 Testimony of Trahan.

IV. SHARP’S AUTHORITY TO SIGN THE MASTER SERVICE CONTRACT

48. When Sharp first introduced himself to Thompson he said that he worked for

SIPCO as an exploration-and-development manager, and for Shamrock Management as a project

manager. Sharp had a separate business card for each entity. The SIPCO and Shamrock

Management business cards were different in color and logo.51

49. Thompson testified that Sharp said SIPCO’s relationship to Shamrock

Management, other than having a shared ownership structure, was that “the management [of

Shamrock], himself included, had formed SIPCO because they felt like they knew quite a bit

about how to operate oil and gas facilities based on what they did for a living and because

[Sharp] had done some of this development before at some companies like Shell, [so] they felt

like they were well positioned to be able to [do] development and do their own field. And they

thought if they could make money doing the management, how much … better … they might be

suited to … actually [do] exploration and production.”52

50. Thompson also testified that Sharp’s title as exploration-and-development

manager at SIPCO, which was in his email signature and on his SIPCO business card, typically

denotes a senior person having broad responsibilities related to exploration, meaning he would

be the one developing this production facility, including managing drilling and other matters

related to development. In Thompson’s experience, exploration-and-development managers

usually have the authority to sign contracts for certain specialty services, like engineering.53

51 Testimony of Thompson.

52 Id.; see also Exhibit 181 (in which Jensen advises a third party that “SIPCO was founded in late 2012

somewhat naturally out of the realization that Shamrock essentially operates and maintains oil and gas fields with

the same liabilities and exposures as E&P asset owners, but without the benefit of and revenue stream from

production. The SIPCO team has since been assessing and ranking E&P opportunities that fit with our strength and

our business model for a profitable platform with room for strategic growth.”).

53 Testimony of Thompson.

51. Thompson’s impression of Sharp’s expertise and experience in the development

of oil-and-gas E&P ventures (akin to the Trident Field) was that he was knowledgeable and

understood the technical engineering side of developing the asset. Sharp had done a lot of

research on new technologies Aker could provide to improve upon the initial Feasibility Study it

had performed in 2011 and would be suitable for the Trident Field’s deep-sea environment.

Sharp worked with Aker’s engineers to devise an approach to the CVS that Aker’s engineers

agreed was prudent. Moreover, Sharp informed Thompson that he had worked at Shell for ten

years (before working for Shamrock and SIPCO) vetting assets offshore in environments like the

Trident Field.54

52. On the one hand, Sharp never indicated to Thompson that he did not have the

authority to sign for SIPCO the Master Service Contract (“MSC,” sometimes also referred to as

the Master Service Agreement or “MSA”) between Aker and SIPCO. But on the other hand,

Thompson never investigated the extent of Sharp’s authority, even though she knew she could

not get a Dun & Bradstreet (“D&B”) report on SIPCO, the company had few employees, and it

was a start-up entity.55

53. Sharp introduced Thompson to Trahan and explained that Trahan owned both

SIPCO and Shamrock Management. Indeed, from the outset of Thompson’s interactions with

Sharp and SIPCO, Sharp informed Thompson that SIPCO and Shamrock Management were

related by common ownership and management.56

54. Trahan testified that an Action by Unanimous Written Consent by SIPCO’s

officers was necessary to vest Sharp with authority to execute a document, and one does not exist

54 Id.

55 Id.

56 Id.

authorizing Sharp to enter into a contract with Aker on SIPCO’s behalf. Trahan further testified

that Sharp knew he needed Trahan’s approval before executing any agreement.57

55. But after agreeing that most employers would consider Sharp’s allegedly

unauthorized act on SIPCO’s behalf in entering into the MSC with Aker, as well as the

subsequent nearly $1.8 million work order, to amount to an egregious offense worthy of

termination, Trahan testified that Sharp was not terminated and continued to work for Shamrock

Management and SIPCO for many more months before he resigned on his own accord.58

56. At no time during their meetings about the MSC and related work order and

invoices did Trahan tell Thompson he would not pay the invoices on the ground that Sharp did

not have authority to enter into the MSC.59

V. THE MASTER SERVICE CONTRACT, WORK ORDER, AND CHANGE ORDER

57. In July 2014, pursuant to the terms of Aker’s Proposal, Aker and SIPCO began

negotiating the MSC that would govern the CVS that Aker was to perform for SIPCO.60

58. At the time, Aker knew that SIPCO, Shamrock Energy, and Shamrock

Management were all separate companies. Aker attempted to access a D&B report on SIPCO,

but one did not exist because SIPCO had not been around long enough; instead, Aker retrieved

the D&B report on Shamrock Management. Sharp and Jensen gave Ostvig an overview of

SIPCO because “SIPCO was not well-known as a company.”61

57 Testimony of Trahan.

58 Id.

59 Testimony of Thompson.

60 Id.; Exhibit 44.

61 Testimony of Thompson.

59. On July 23, 2014, Jensen (in Sharp’s stead) sent Lyons an email, having the

subject line “Re: Aker MSA status (re Trident/SIPCO work),” in which he related Aker’s inquiry

whether SIPCO found the MSC “acceptable to at least set up the boundary conditions for future

work.” Lyons responded, asking: “Can you send me the MSA again please?” Jensen replied that

he had a copy of Aker’s “[p]roposal/scope of work document, but not the MSA itself.” 62

60. On August 19, 2014, during the negotiation phase, Sharp stated that the MSC was

being reviewed by SIPCO’s legal department.63

61. On September 15, 2014, Aker and SIPCO executed the MSC, which would

govern the provision of certain services, goods, equipment, and facilities provided by Aker to

SIPCO for the CVS. Thompson signed the MSC on Aker’s behalf, and Sharp signed the MSC

on SIPCO’s behalf. 64

62. On September 29, 2014, Aker and SIPCO executed a work order under the MSC

for the CVS – 2014-016-TRD (“Work Order”). The approved budget for the CVS, pursuant to

the Work Order, was $1,444,771.65

63. On January 13, 2015, Aker issued Change Order No. 001 (“Change Order”) to

increase the approved budget for the CVS being performed under the MSC and Work Order to

$1,780,120. SIPCO approved and signed the Change Order on January 13, 2015.66

64. The Court finds that Aker and SIPCO, through the execution of the MSC, Work

Order, and Change Order, entered into a valid and legally binding contract.

62 Exhibit 44.

63 Testimony of Thompson; Exhibit 56.

64 Testimony of Thompson; Exhibit 67.

65 Exhibit 75.

66 Testimony of Thompson; Exhibit 195.

VI. AKER’S PERFORMANCE OF THE CONCEPT VALIDATION STUDY

65. Under the MSC, Work Order, and Change Order, Aker performed the CVS for

SIPCO, and SIPCO was fully aware of Aker’s progress in performing the CVS.67

66. Over the course of the CVS, Aker and SIPCO held and participated in bi-weekly

meetings at which Aker would distribute and make detailed presentations addressing the progress

of the CVS. These presentations allowed the parties to review and consider the activities

performed during the prior two weeks and look ahead to what would be performed during the

next couple of weeks. Additionally, every discipline head would provide a report specific to the

work they were performing. After these meetings, Aker would distribute detailed minutes

confirming and memorializing the progress that had been made.68

67. The two primary Shamrock Management employees vetting potential oil-and-gas

E&P opportunities, including the Trident Field, for SIPCO were Sharp and Jensen. As such,

Sharp and Jensen were SIPCO’s two primary leads for the CVS and attended most of the Aker-

SIPCO bi-weekly meetings, but, regardless of their physical attendance at the meetings, both

were copied on Aker’s communications about the meetings and kept current on all information

about the CVS.69

68. Trahan was aware of the Aker-SIPCO bi-weekly meetings. Moreover, in 2013,

2014, and 2015, when Jensen and Sharp were pursuing projects on SIPCO’s behalf, Trahan

monitored their work and they routinely reported to Trahan, “sometimes . . . multiple times in a

day, sometimes it was three or four times a week.” Thus, Trahan had knowledge of the CVS

while it was being performed between August 2014 and February 2015.70

67 Testimony of Thompson; Exhibit 196.

68 Id.

69 Testimony of Thompson & Trahan.

70 Testimony of Trahan.

69. The following table lists: (1) the Aker-SIPCO bi-weekly meetings, as well as some

other key meetings regarding the CVS; (ii) all SIPCO representatives who attended the meetings;

and (iii) the distribution list of the individuals who received the presentation and meeting

minutes for that meeting:

lied P= bat |

Beggs a □□ bo | yO

a id Bea ety eS) Sata =i

PRicthand Sharp Richaed Shisap

Luke Jensen Luke Jermseri

desa shobmeore derae holhisone

Trident Development Cocedimation Pussoet Hein: Pusssell Hein Ex. Mo. at

B24 Mieetireg Ruan Freckik Pasa F nedrike ER-000003

EX. No. 196 at

W204 Trident Development Kick OFF Meeting Picthiand Sharp Richard Shap AKER-000028

Fechard Sh-arp Richard Shap EA. Mo. TS6.er

91 Bi-‘teekh: Pleeting Mc 1 Luke Jenmen Luss heme AKER O06 1

Richard Shane EX. Me. 196 .at

SSN Design Basis Clarification Meeting Ludoe hermser AK ER-O000103

Fichard Sharp Richard Sharp EX No. 196 at

Ta Bi-Weekly Pieestire Mo 2 luke Jenner. Lise bere eri AMER-O00 1S

Pachand Sharp EX No, 136 at

1S Bi-Weekdi Messing Mo 3 Legke Jhem-neen AK 1

Pachard Sharp Ex. Ne. 136 a

TWEE Bi-Weekly: Meeting Mo □ Luke Jensen Richard Sharp AKER-000260

Fachand Sharp Fichard Shige (Ghee. TSG ae

TNH Seope Alignment Meeting with SiO Lule Jena Linke emer AK ER-O002S5

Paichiond Sharp Ex Be 196 ar

Rial Bi-Weekly Pleasing Mo. 5: luke Jhemanen Richard Shan AKER-000302

Richard Shap

Lise dere a

Aarti Pumas EX No. 13 at

VANE Bi-\+eehk: blessing Me. 6 Chicheolm Lisdew, AKER 000615

Richard Shap

Lise Jermaine

Aarti Pumase Ex. Neo. 196 a

W225 Bi-Weely Meeting No. 7 Chisholm Lindsey AKER-O00723

A. Defendants’ Knowledge of the Trident Concept Validation Study — Export Credit

Norway

70. Sharp and Jensen communicated with many potential financiers for the Trident

Field project, including Export Credit Norway.”!

71. On October 16, 2014, Sharp informed Trahan, Lyons, Jensen, Breaux, and

Schexnayder about his initial video conference meeting with Export Credit Norway in mid-

October 2014 and told them that “[t]he GIEK (Government Guarantor of Credit-Norway) would

act as guarantor of the loan but would probably guarantee only 60-70% and we would have to

provide a co-guarantor. ... This makes our life easier as we do not need to dilute as much

” Testimony of Trahan; Exhibit 94.

17

through PE [i.e., private equity] or partner route to seek development funding” for the Trident

Field project.72

72. To obtain financing, SIPCO provided information to Export Credit Norway about

SIPCO, Shamrock Management, the Trident Field project, and the ongoing CVS. SIPCO

referenced and utilized the ongoing CVS in its presentations to Export Credit Norway.73

73. On October 21, 2014, SIPCO sent several presentations to Export Credit Norway,

including: (i) a Trident Field overview (“Trident Overview”), (ii) a SIPCO/Shamrock

Management overview, and (iii) a general Shamrock Management presentation. Sharp attached

SIPCO’s Trident Overview presentation to an email he sent to Anna Musiej Aanensen of Export

Credit Norway on October 21, 2014, copying Jensen. In the email, Sharp says “I have shared the

information you provided during our call to our CFO and we see the path proposed as the ideal

solution. We do not view the provision of a bank guarantee in conjunction with whatever is

provided by GIEK as an insurmountable hurdle.”74

74. In SIPCO’s Trident Overview presentation sent to Export Credit Norway, SIPCO

included a slide entitled “Summary: Third Party Trident Concept Studies,” which referenced

“Aker Solutions: Cost & feasibility study for the four different development alternatives,

covering subsea and surface facilities,” with a bullet point stating: “Technical feasibility declared

and no major technology development required for project delivery.” This is a reference to

Aker’s CVS that was ongoing in October 2014.75

72 Exhibit 94. GIEK is a Norwegian acronym for Export Credit Norway

73 Exhibits 97-99.

74 Id.

75 Exhibit 99 (slide bearing bates no. SES-016831); Testimony of Trahan.

75. As of October 2014, Trahan knew (including through routine conversations with

Sharp and Jensen) that the Trident Field project was “technically feasible,” which was why

SIPCO was pursuing the asset.76

76. In SIPCO’s Trident Overview presentation sent to Export Credit Norway, SIPCO

also included a slide entitled “Development Concepts CAPEX and OPEX,” which identified the

“Aker Concept Study” and listed four case studies outlining different general infrastructure

concepts being considered by SIPCO in the CVS for the Trident Field project: a subsea option; a

FPU (floating production unit) option; a SPAR (single point anchor reservoir) option; and an

FPSO (floating production, storage, and offloading vessel) option. SIPCO also provided details

about the costs of the associated facilities and operations related to the four concepts.77

77. In SIPCO’s Trident Overview presentation sent to Export Credit Norway, SIPCO

also included a slide entitled “Development Activities Working,” which stated in part: “Concept

Validation Study underway to confirm pricing and delivery of Trident Development.”78

78. Trahan assumes he saw, during the October/November 2014 timeframe, the

Trident Overview presentation explicitly referencing the Aker CVS. In fact, Trahan believes that

Jensen presented the Trident Overview at a meeting he attended with Aker and Export Credit

Norway in Norway on November 15-16, 2014.79

79. Trahan testified that it “appears” that Sharp was openly sharing the CVS that

Aker was performing with third parties.80

76 Testimony of Trahan.

77 Exhibit 99 (slide bearing bates no. SES-016838); Testimony of Trahan.

78 Exhibit 99 (slide bearing bates no. SES-016841).

79 Testimony of Trahan; Exhibit 99.

80 Testimony of Trahan.

B.

80. On November 10, 2014, Christian Johnsud of Aker sent Jensen an email outlining

an agenda for a “SIPCO-Aker Meeting” (the subject line of the email) to occur in Oslo, Norway,

on November 15-16, 2014. The agenda included the following items: “15.00 – Alignment of

project timeline vs Aker activities (VC AKER Houston),” with a bullet point reciting: “High

level status of pre-feed, Additional activities needed.”81

81. Also, on November 10, 2014, Jensen shared Johnsud’s proposed agenda with

Trahan, Breaux, Lyons, and Sharp.82

82. That same day, Sharp circulated to Trahan, Lyons, Breaux, and Jensen a copy of

the Feasibility Study that Aker performed on behalf of Rocksource in 2011. Sharp’s cover email

transmitting the 2011 Trident study states: “See attached……includes economics.”83

83. Trahan testified that Sharp’s reference to the 2011 Feasibility Study “includ[ing]

economics” relates to pricing information concerning the feasibility of the Trident concept

options and that the 2011 Feasibility Study appears to include the cost estimates for the concepts

originally proposed to Rocksource in millions of dollars.84

84. In conjunction with Aker’s efforts to help SIPCO find financing, Aker introduced

SIPCO to the Export Credit Bank and Export Credit Norway. On November 15-16, 2014,

Trahan, Breaux, Lyons, and Jensen, participated in a meeting with Export Credit Norway and

Aker in Norway. Trahan testified that he would “suspect” Shamrock Management paid for him,

81 Exhibit 107.

82 Exhibit 114.

83 Exhibit 118.

84 Testimony of Trahan.

as well as Breaux, Lyons, and Jensen to travel to Oslo, Norway, to attend the November 15-16,

2014 meeting, including their lodging expenses.85

85. At the meeting, Aker and SIPCO discussed the ongoing CVS as one of the

Trident Field project-related tasks, additions/expansions to the CVS, and the need to “freeze” the

concept so Aker could move forward with critical long-lead items.86

86. Thompson and Gorescu called into the meeting from Houston, Texas, and

discussed the status of the CVS, specifically with regards to what had been accomplished and

what was forecasted to be completed. During their presentation, which lasted approximately

thirty minutes to an hour, no SIPCO representative expressed any surprise, lack of knowledge, or

concern (i) about the CVS or (ii) that SIPCO had entered into a contract with Aker. By mid-

November 2014, Aker had been working on the CVS for approximately two-and-a-half to three

months at a minimum.87

87. During the meeting, Jensen gave a presentation outlining the difference between

SIPCO and Shamrock Management. Jensen stated that SIPCO was formed to vet oil-and-gas

E&P opportunities and was looking for financing. Thompson was not present via telephone

when the presentation about the difference between Shamrock Management and SIPCO was

made, or when the possibility of Export Credit Bank’s financing SIPCO was discussed.88

88. Aker memorialized the discussions at the November 15-16, 2014 meeting in

minutes having the subject line: “Sipco & Aker Solutions meeting – Trident field development.”

85 Testimony of Trahan & Lyons.

86 Testimony of Thompson; Exhibit 124.

87 Testimony of Thompson & Trahan.

88 Testimony of Thompson & Lyons; Exhibit 124.

On December 1, 2014, Aker circulated the meeting minutes by email to the SIPCO attendees –

Trahan, Breaux, Jensen, Lyons, and Sharp.89

89. Trahan testified that the following statement in the meeting minutes, “FES team

in Houston participated via VC [i.e., videoconference] to discuss high level plan and stakeholder

committee,” is a reference to Aker’s front-end spectrum team that was performing the CVS in

Houston.90

90. The minutes state that “Aker agreed to provide a high level cost estimate for a

typical 75’, 100’ & 125’ barrel per day topside facility to support Sipco in their economic

evaluation of topside capacity vs # off field location to tie-in. Potential for topside concept with

modular expansion should also be addressed at high level.” The minutes further reflect that

“Aker flagged the need to freeze the concept/specifications to move forward with critical long

lead items.” This was especially important because of SIPCO’s desire to hasten the CVS (the

pre-FEED stage) to get to the FEED (front-end engineering design) stage. The request to “freeze

the concept” is referring to the need to freeze the concepts and specifications being studied from

a design standpoint, especially for items that “require serious engineering calculations.” Further,

one of the “actions” listed at the end of the minutes states: “Review team of ongoing Study work.

Aker.”91

91. Trahan testified that the meeting minutes were accurate, that Jensen “played a part

in drafting these minutes of meeting,” and that if something was “inaccurately described in these

minutes of meeting he could have objected and requested that it be changed.”92

89 Exhibits 123 & 124.

90 Testimony of Trahan; Exhibit 124.

91 Testimony of Thompson; Exhibit 124.

92 Testimony of Trahan.

92. In the cover email circulating the minutes, Johnsud stated that “[o]ne comment

from Sipco related to the [minutes] is that many of th[ese] issues [are] currently being addressed

(e.g. required base case production handling/storage capacities, long lead items, fluid

compatibilities/separation, etc.).” Trahan testified that Johnsud’s statement meant that Aker and

SIPCO were already tending to many of the issues discussed in the meeting minutes and that he

assumed the references to “addressing long lead items . . . relate[d] to the concept validation

study.” 93

93. Jensen, who was present at the November 15-16, 2014 meeting with Trahan, was

informed about the CVS through his participation in the bi-weekly meetings pertaining to the

CVS. At the time of the meeting in Norway, Trahan was aware Jensen attended the bi-weekly

meetings concerning the CVS and knew about the work Aker was performing to validate the

Trident Field concepts.94

94. Accordingly, the Court finds that SIPCO and Trahan, through his regular

meetings with Jensen and Sharp, were fully aware of the CVS Aker was performing, as well as

the effort required to perform the work. The Court also finds that Trahan’s testimony that he had

no knowledge of the CVS Aker was performing is not credible. The Court further finds that

Trahan’s testimony that he did not understand what was involved in performing the CVS is not

credible. And the Court finds that Breaux’s testimony that he had no knowledge of the CVS

Aker was performing is not credible.

C.

95. Trahan testified that it is an inherently expensive and risky endeavor to engage in

oil-and-gas exploration. Such a venture requires a lot of research and specialized knowledge to

93 Id.; Exhibit 123.

94 Testimony of Thompson & Trahan.

find a lease that will produce, to find an economical way to get the oil and gas to market so that

the lease will be profitable, and to gain an accurate understanding of the estimated oil-and-gas

reserves. Moreover, to be an oil-and-gas producing company in the Gulf of Mexico especially,

one must understand the infrastructure required to get the oil and gas to market, including what

type of production facilities are best suited for the environment given the water depth and how

one will moor the facilities to the seabed. Also, among the high-level issues that need to be

understood if one is engaging in E&P work in the Gulf of Mexico, such as the Trident Field

project, one needs to know whether risers, flow lines, new pipelines, or other subsea equipment

will be required. Potential investors are not going to invest in an E&P project, like the Trident

Field, unless there is a viable concept plan in place that provides some reasonable degree of

certainty that the project will be a success. The time, effort, research, and vetting of a potential

oil-and-gas project is expensive and often requires hiring third parties to perform studies to

address high-level issues posed by the project. Trahan testified that he understands that a

concept validation is a cost estimate.95

96. Trahan demonstrated that he understood fully the significant effort and costs

required to perform and produce the CVS, which would be required to obtain financing for the

Trident Field project. Trahan testified that he understands that such work is time consuming and

expensive. Accordingly, the Court finds that Trahan’s testimony that he had no knowledge of

the CVS and that he believed Aker was performing the work on the CVS for free is not credible.

VII. SIPCO’S FAILURE TO PAY AKER FOR THE CONCEPT VALIDATION STUDY

97. Aker performed the CVS between August 2014 and February 2015.96

95 Testimony of Trahan.

96 Testimony of Trahan; Exhibits 116 & 147.

98. Pursuant to section 7 of the MSC, Aker was obligated to bill SIPCO monthly for

the CVS, and SIPCO was obligated to pay within forty-five (45) days of receiving the monthly

invoice or to dispute the invoice within thirty (30) days of its receipt.97

99. There is no contingency in the MSC or Work Order whereby Aker would get paid

only if SIPCO acquired an oil-and-gas producing asset or obtained financing for the Trident

Field project.98

100. In connection with its performance of the CVS, Aker maintained time sheets

detailing the work that was being performed. These time sheets were included with the monthly

invoices that Aker sent to SIPCO. At no time did SIPCO request that Aker stop or suspend

work.99

101. Specifically, Aker submitted four invoices to SIPCO, including:

a. Invoice No. 917023043, dated November 10, 2014, for the CVS work

Aker performed during the period from August to October of 2014, in the

amount of $478,829.89;100

b. Invoice No. 917023670, dated December 12, 2014, for the CVS work

Aker performed during November 2014, in the amount of $554,928.70;101

c. Invoice No. 917023846, dated January 20, 2015, for the CVS work Aker

performed during December 2014, in the amount of $351,417.48;102 and

d. Invoice No. 917024077, dated March 20, 2015, for the remaining CVS

work Aker performed, in the amount of $394,968.12.103

97 Exhibits 67 (at bates no. AKER-014989), 116, 131, 159 & 176.

98 Id.; Testimony of Thompson.

99 Testimony of Thompson; Exhibits 117, 132 & 160.

100 R. Doc. 109 at 15; Exhibit 116.

101 R. Doc. 109 at 15; Exhibit 131.

102 R. Doc. 109 at 15; Exhibit 159.

103 R. Doc. 109 at 15; Exhibit 176.

102. Aker’s invoices total $1,780,144.19. In May 2015, Breaux received and

acknowledged receipt of Aker’s invoices related to the CVS.104

103. SIPCO has not paid any of the invoices that Aker issued for the CVS. SIPCO did

not comply with its obligation to pay Aker within 45 days of receiving any of the four invoices;

nor did SIPCO dispute any portion of the four invoices within the applicable 30-day period.105

104. Aker fully and completely performed the CVS in a satisfactory and timely

manner. Neither Trahan nor SIPCO disputed the CVS work Aker performed.106

105. Aker fully and completely created all supporting documentation for the final

report, including all drawings, calculations, cost estimates, schedules, diagrams, and computer

outputs. This information and documentation had been relayed to SIPCO throughout the course

of the performance of the CVS and the Aker-SIPCO meetings.107

VIII. AKER’S REPEATED DEMANDS FOR PAYMENT FROM SIPCO

106. Aker repeatedly made demands to SIPCO for the payment of its invoices.108

107. In fact, the demands for payment had become so frequent by January 9, 2015, that

Thompson sent an email to Sharp with the subject line “Consider this my daily nag…..”, wherein

she requested payment for the invoices. This email, like the previous demands for payment, was

to no avail.109

108. SIPCO repeatedly assured Aker that it would pay the outstanding invoices.110

109. In January 2015, despite not having paid any of the outstanding invoices, SIPCO

attempted to obtain a bridge financing loan from Aker to acquire the Trident Field lease. Aker

104 R. Doc. 109 at 15; Testimony of Trahan.

105 Testimony of Thompson.

106 Id.

107 Id.; Exhibit 197.

108 Id.

109 Exhibit 149.

110 Exhibits 148, 151, 156, 162, 163, 164 &167.

responded to SIPCO that any bridge financing from Aker was contingent on receiving payment

for the unpaid invoices.111

110. For example, on January 23, 2015, in response to Jensen’s question about the

possibility of obtaining bridge financing from Aker for the Trident Field acquisition, Aker’s Neil

Holder wrote, “As a reminder, payment for our on-going work is a prerequisite for us being able

to consider any future work, and in particular financing. As of now, we are yet to receive the

payments already due, despite various assurances that we would be paid this week. Please

ensure all outstanding amounts are paid in full by Monday.”112

111. Despite Jensen’s subsequent response to Holder assuring Holder that “[p]ayment

is on the way as discussed, it should be received on Monday so that aspect of the process should

be resolved,” and his assurance to Thompson that SIPCO will provide proof that the payments

have been made via a transmittal document from SIPCO’s bank, Aker did not receive any funds

from SIPCO for the Aker invoices.113

112. On March 23, 2015, Thompson sent Sharp the “complete bill,” attaching the last

invoice for the Aker work performed in January and February 2015. On March 26, 2015,

Thompson and Sharp had a meeting to discuss the payments due to Aker.114

IX. RATIFICATION OF AKER’S WORK & INVOICES

113. Trahan and Thompson had several conversations and meetings regarding the

Work Order for the CVS, during which they discussed the CVS, Sharp’s execution of the Work

111 Exhibits 155 & 161.

112 Exhibit 161.

113 Id.

114 Exhibit 177.

Order, Aker’s invoices for the CVS, and how Aker’s work would eventually be compensated and

applied. Thompson expected that SIPCO, not a related entity, would pay the invoices.115

114. In April 2015, after numerous demands for payment to SIPCO through Sharp,

Thompson decided to call Trahan personally. Following this phone call, also in April 2015,

Thompson and Trahan met at Shamrock’s Lafayette office to discuss the invoices and what

Trahan would do to get them paid. Trahan indicated that he would put them at the top of the

vendor list and that “he generally wanted to get them paid but indicated that he didn’t know how

he was going to get it done [because] SIPCO didn’t have the money.” 116

115. Breaux also assured Thompson that SIPCO would pay Aker for the outstanding

invoices at Trahan’s direction. Specifically, in a letter to Thompson dated May 11, 2015, Breaux

wrote: “We are providing this correspondence in regards to the current outstanding invoices

[from] Aker Solutions to SIPCO as discussed in your previous conversations with Jeff Trahan. It

is the intention of SIPCO to place the Aker invoices at the top of the vendor list for payment

once … one of the … SIPCO transactions come to fruition. … We are looking forward to

continuing and growing our business relationship with Aker Solutions in the very near future.”117

116. While discussing Breaux’s May 11, 2015 letter to Aker regarding the invoices,

Trahan testified that “[i]f we would have received funding or positive feedback from Ecopetraol,

we would have needed any work that was performed by Aker and, therefore, there was no reason

to dispute it.” Yet, Trahan testified that neither the payment provisions of the MSC nor Aker’s

invoices were contingent upon some future financing arrangement or business venture.118

115 R. Doc. 109 at 15; Testimony of Thompson.

116 Testimony of Thompson.

117 Testimony of Breaux; Exhibit 178.

118 Testimony of Trahan.

117. Thompson and Trahan had another meeting in late September or early October

2015, during which Trahan repeated his intention to pay the invoices.119

118. In October 2015, Trahan called Thompson and assured her that “he was trying to

get together enough money as a good faith effort to pay [Aker] at least [$]500,000” of the total

cost of the invoices by the end of 2015 and that he would send a letter by November 6, 2015,

confirming this assurance of payment in writing.120

119. On October 27, 2015, Thompson sent Trahan an email asking him “to confirm

that you will send a letter by November 6th stating that you will be able to pay $500K towards

our invoices by the end of the year.” In response, on November 6, 2015, Trahan emailed Aker’s

Svenn Ivar that he “should have more information to convey in the later part of the next

week.”121

120. Then, on November 19, 2015, and again on December 10, 2015, Ivar emailed

Trahan requesting information on SIPCO’s status of paying Aker for the unpaid invoices. On

December 14, 2015, Trahan responded (from his Shamrock email account) to Ivar’s email that he

still did not have any good news to report but “we still have interest in moving forward.” On

December 20, 2015, Ivar replied to Trahan that Aker will resend the invoice to Trahan at the end

of the year.122

121. Despite these assurances from Trahan and Breaux, Aker’s invoices related to the

CVS were never paid.123

119 Testimony of Thompson.

120 Id.

121 Exhibit 185.

122 Id.

123 R. Doc. 109 at 15.

122. Neither Trahan nor Breaux ever represented that SIPCO would not pay Aker’s

invoices because Sharp had no authority to enter into a contract.124

123. Given SIPCO’s failure to pay the invoices, Aker decided to withhold the final

Trident Concept Validation Study because it was the only mitigating activity that Aker could

implement.125

124. Neither Trahan nor Breaux ever told Aker that SIPCO would not pay the invoices

because they disputed the work, because Aker’s performance was defective or poor, or because

they did not receive a final report.126

125. Until this lawsuit was filed, no SIPCO or Shamrock Management officer ever

disputed the Aker invoices related to the CVS despite numerous opportunities to do so. Lyons

was not asked to dispute Aker’s invoices although part of his job as general counsel for

Shamrock and SIPCO was to be involved in claims and disputes. Lyons testified that he was not

engaged by SIPCO or Trahan to dispute the invoices or help communicate with Aker with

respect to either Breaux’s May 11, 2015 letter or the email exchange during October-December

2015 timeframe (which included Thompson’s October 27, 2015 email to Trahan).127

X. SIPCO’S DISSOLUTION

126. On November 1, 2015, Breaux entered into a contract on behalf of both SIPCO

and Shamrock Management for SIPCO to reimburse Shamrock Management for certain

expenses it incurred on behalf of SIPCO, retroactive to January 1, 2015. There is no similar

124 Testimony of Thompson & Breaux.

125 Testimony of Thompson; Exhibit 171.

126 Testimony of Trahan, Thompson & Breaux.

127 Testimony of Lyons.

agreement for expenses Shamrock Management incurred on SIPCO’s behalf prior to January 1,

2015.128

127. The agreement between Shamrock Management and SIPCO was executed

because, at that time, Trahan had entered into a non-binding agreement with Reignwood for

Reignwood to purchase SIPCO. Thus, the purpose of the Shamrock Management/SIPCO

agreement was to have SIPCO reimburse Shamrock Management for expenses incurred on

SIPCO’s behalf once Reignwood acquired SIPCO.129

128. Reignwood never acquired SIPCO. Thereafter, SIPCO became inactive, and

Sharp resigned from Shamrock near the end of 2015.130

129. SIPCO never reimbursed Shamrock Management for any costs or expenses it

incurred on SIPCO’s behalf.

130. Neither SIPCO nor Shamrock Management ever executed a binding agreement

with any financier related to the Trident Field project.131

131. Near the end of 2015, Jensen resigned from Shamrock Management after Trahan

told Jensen that he wanted to go in a different business direction.132

132. On February 1, 2016, a petition for liquidation and dissolution on behalf of

SIPCO was filed with the clerk of court for the Parish of Terrebonne, State of Louisiana.133

128 R. Doc. 109 at 15; Exhibit 186; Testimony of Trahan.

129 R. Doc. 109 at 15.

130 Id. at 15-16.

131 Id. at 16.

132 Id.

133 Id.; Exhibit 189.

CONCLUSIONS OF LAW

I. JURISDICTION AND VENUE

1. This Court has diversity subject-matter jurisdiction over this matter pursuant to 28

U.S.C. § 1332, because the parties are of diverse citizenship and the amount in controversy

exceeds $75,000.

2. Pursuant to 28 U.S.C. § 1391(1) and (2), venue is proper in this Court because all

the Defendants reside, and a substantial part of the events giving rise to Aker’s claims occurred,

within this judicial district.

II. BREACH OF CONTRACT

3. Aker contends that SIPCO has breached the contract (the MSC, Work Order, and

Change Order) they entered. To succeed on a breach-of-contract claim under Louisiana law, a

plaintiff must prove: “(1) the obligor’s undertaking an obligation to perform, (2) the obligor

failed to perform the obligation (the breach), and (3) the failure to perform resulted in damages

to the obligee.” Favrot v. Favrot, 68 So. 3d 1099, 1108-09 (La. App. 2011). Under Louisiana

Civil Code article 1994, “[a]n obligor is liable for the damages caused by his failure to perform a

conventional obligation. A failure to perform results from nonperformance, defective

performance, or delay in performance.” La. Civ. Code art. 1994. “A failure to pay money due

under a contract is a failure to perform in the context of La. Civ. Code Art. 1994.” Occidental

Chem. Corp. v. La. Pub. Serv. Comm’n, 494 F. Supp. 2d 401, 416 (M.D. La. 2007) (citing

Whitney Nat’l Bank of New Orleans v. Poydras, 557 So. 2d 422, 425-26 (La. App. 1990)).

4. Defendants dispute whether a contract ever existed between SIPCO and Aker

regarding the CVS. “A contract is an agreement by two or more parties whereby obligations are

created, modified, or extinguished.” La. Civ. Code art. 1906. Under Louisiana law, the

formation of a valid contract requires: (1) capacity to contract; (2) mutual consent; (3) a certain

object; and (4) a lawful cause. Id. arts. 1918, 1927, 1966 and 1971. “The burden of proof in an

action for breach of contract is on the party claiming rights under the contract.” Rebouche v.

Harvey, 805 So. 2d 332, 334 (La. App. 2001) (citation omitted). “The existence of the contract

and its terms must be proved by a preponderance of the evidence.” Id. Moreover, “[t]he

existence or nonexistence of a contract is a question of fact and, accordingly, the determination

of the existence of a contract is a finding of fact.” Sam Staub Enters., Inc. v. Chapital, 88 So. 3d

690, 693 (La. App. 2012) (citation omitted).

5. The MSC, Work Order, and Change Order between Aker and SIPCO had a

certain object that was a lawful cause – namely, for Aker to perform the CVS of the Trident Field

and for SIPCO to pay for that study in the amount of $1,780,144.19 as consideration for the

services rendered by Aker. And it is undisputed that both Aker and SIPCO had the capacity to

enter into a contract. Defendants dispute, however, that there was mutual consent, contending

that Sharp did not have authority to enter into the contract on SIPCO’s behalf.

6. Under Louisiana law, an agent’s authority is composed of actual authority,

expressed or implied, and any apparent authority which the principal has invested in him by its

conduct. Jefferson Parish Hosp. Serv. Dist. No. 2 v. K & W Diners, LLC, 65 So. 3d 662, 668

(La. App. 2011) (citing Boulos v. Morrison, 503 So. 2d 1, 3 (La. 1987)).

7. “As between principal and agent the limit of the agent’s authority to bind the

principal is governed by the agent’s actual authority. As between the principal and third persons,

the limit of an agent’s authority to bind the principal is governed by his apparent authority. ...

Apparent authority is a judicially created concept of estoppel which operates in favor of a third

party seeking to bind a principal for the unauthorized act of an apparent agent.” Boulos, 503 So.

2d at 3 (citing Broadway v. All-Star Ins. Corp., 285 So. 2d 536 (La. 1973); Interstate Elec. Co. v.

Frank Adam Elec. Co., 136 So. 283 (La. 1931)).

8. “Apparent authority is created as to a third person by conduct of the principal

which, reasonably interpreted, causes the third person to believe that the principal consents to the

act done on his behalf by the person purporting to act for him. Apparent authority is

distinguished from actual authority because it is the manifestation of the principal to the third

person rather than to the agent that is controlling.” Cactus Pipe & Supply Co. v. M/V

Montmartre, 756 F.2d 1103, 1111 (5th Cir. 1985) (citing RESTATEMENT (SECOND) OF AGENCY §

27). Thus, for apparent authority to apply under Louisiana law, “the principal must first act to

manifest the alleged mandatary’s authority to an innocent third party. Then, the third party must

reasonably rely on the mandatary’s manifested authority.” Jefferson Parish Hosp. Serv. Dist.

No. 2, 65 So. 3d at 668 (citing Boulos, 503 So. 2d at 3).

9. If the agent had neither actual, nor implied, nor apparent authority, the principal

may still be bound to contracts made by an agent with a third party if the principal ratifies the

agent’s unauthorized acts. La. Civ. Code art. 1843 (“Ratification is a declaration whereby a

person gives his consent to an obligation incurred on his behalf by another without authority.”);

see also RESTATEMENT (THIRD) OF AGENCY § 4.01. “A ratification is not effective unless it

encompasses the entirety of an act, contract, or other single transaction.” RESTATEMENT (THIRD)

OF AGENCY § 4.07. Louisiana law provides that implied or tacit ratification occurs when “the

principal, knowing of the contract, does not repudiate it but accepts its benefits.” Bamber

Contractors, Inc. v. Morrison Eng’g & Contracting Co., 385 So. 2d 327, 331 (La. App. 1980);

La. Civ. Code art. 1843. The party asserting ratification must prove that the principal clearly

intended to ratify the act. Bamber Contractors, 385 So. 2d at 331.

10. Although Trahan testified that Sharp did not have actual authority to bind SIPCO

to the MSC with Aker, Sharp clearly had apparent authority to do so. Sharp approached Aker to

discuss the CVS and told Thompson that he was SIPCO’s exploration-and-development

manager. In Thompson’s many years of experience in the oil-and-gas E&P industry, a company

representative with such a title typically is in senior management and responsible for the

development of the production facility and has the authority to sign contracts for certain specialty

services, like engineering. Sharp provided Thompson with the Rocksource Feasibility Study for

the Trident Field stating that the CVS was intended to improve upon and validate that study.

Thompson thought Sharp was knowledgeable in the technical engineering part of developing the

asset because he had worked for Shell for ten years vetting offshore assets, did a lot of research

on new technologies, and worked with Aker’s engineers to devise an approach to the CVS.

Sharp’s indicia of expertise and experience in the relevant area manifested to Thompson his

apparent authority to bind SIPCO to contracts for engineering services.

11. Further, throughout all their dealings, SIPCO did not do anything to dispel Aker’s

assumption that Sharp had such authority. For example, Lyons was aware that Sharp was

negotiating the CVS but did not contact Aker to say that Sharp did not have authority to enter

into the contract on SIPCO’s behalf or to request any changes to the contract.

12. Aker’s reliance on Sharp’s authority to act on behalf of SIPCO was reasonable.

13. Even if Sharp did not have apparent authority, SIPCO ratified the MSC on many

occasions. SIPCO’s three officers, Trahan, Lyons, and Breaux, all had knowledge of the MSC

and did not do or say anything to repudiate the MSC, Work Order, Change Order, Aker’s

invoices, or Aker’s performance of the CVS. Trahan and Breaux’s repeated assurances of

payment to Aker, as well as Trahan’s statements to Aker wherein he expressed an intention and a

desire to accept the benefits of the CVS, evince SIPCO’s ratification of Sharp’s execution of the

MSC, Work Order, and Change Order on SIPCO’s behalf.

14. Accordingly, the Court finds that Sharp had apparent authority to enter into the

MSC on SIPCO’s behalf; but even if he did not, Trahan and others acting on SIPCO’s behalf

ratified Sharp’s entering into the MSC, Work Order, and Change Order, and, as such, SIPCO is

bound for its debts to Aker. The Court further finds that SIPCO’s ratification is retroactive to

September 15, 2014, the date of the ratified obligation. See La. Civ. Code art. 1844.

15. The evidence shows that Aker fully and completely performed all work in a

timely manner in accordance with the terms of the MSC, Work Order, and Change Order, which

included holding bi-weekly meetings with SIPCO’s representatives to discuss the progress of the

CVS. SIPCO’s liability to pay Aker for its work was not contingent on any future financing

arrangement for SIPCO or any future business deal.

16. SIPCO did not pay Aker for the work it performed on the CVS, and Aker was

damaged by SIPCO’s failure to pay the $1,780,144.19 invoiced.

17. Thus, SIPCO breached the contract between it and Aker, which has resulted in

damages to Aker in the amount of $1,780,144.19, plus pre- and post-judgment interest,

attorney’s fees, and court costs.134

III. ALTER EGO THEORY

18. Aker contends that Trahan is personally liable for SIPCO’s debt to it under the

alter ego theory.

134 Exhibit 67 (at bates no. AKER-014996). Defendants argue that Aker’s damages should be reduced

because it failed to mitigate by stopping work on the CVS when its first few invoices were not paid. At that time,

Aker was helping SIPCO find financing and SIPCO’s representatives were assuring Aker that it would eventually be

paid for its work. Aker had no reason to believe otherwise, and thus, had no reason to stop work to mitigate its

damages.

19. Generally, in Louisiana “corporations are distinct legal entities, separate from the

individuals who comprise them, and … the shareholders are not liable for the debts of the

corporation.” Riggins v. Dixie Shoring Co., 590 So. 2d 1164, 1167 (La. 1991) (citations

omitted). However, a “court may ignore the corporate fiction and hold the individual

shareholders liable … where the corporation is found to be simply the ‘alter ego’ of the

shareholder,” which “usually involves situations where fraud or deceit has been practiced by the

shareholder acting through the corporation.” Id. at 1168 (citations omitted).

20. Louisiana courts have determined that the same veil-piercing requirements

regarding corporations also apply to limited liability companies. ORX Res., Inc. v. MBW Expl.,

L.L.C., 32 So. 3d 931, 935 (La. App. 2010) (court can pierce corporate veil of LLC under alter

ego doctrine); Prasad v. Bullard, 51 So. 3d 35, 40 (La. App. 2010) (court can pierce corporate

veil to reach the alter ego of company member and hold company member liable for debts of

LLC). Under Louisiana law, the veil of protection afforded by the limited liability company

form may be pierced if in fact the limited liability company was operating as the alter ego of its

members or if its members were committing fraud or deceit on third parties. Hollowell v.

Orleans Reg’l Hosp., 1998 WL 283298, at *10 (E.D. La. May 29, 1998), aff’d, 217 F.3d 379 (5th

Cir. 2000).

21. Aker is seeking to pierce SIPCO’s corporate veil to impose liability upon Trahan

in SIPCO’s stead under an alter ego theory, but not a theory of fraud.

22. “The alter ego doctrine, like all variations of piercing the corporate veil doctrine,

is reserved for exceptional cases. The doctrine applies only if (1) the owner exercised complete

control over the corporation with respect to the transaction at issue and (2) such control was used

to commit a fraud or wrong that injured the party seeking to pierce the veil.” Bridas S.A.P.I.C. v.

Gov’t of Turkm., 447 F.3d 411, 414 (5th Cir. 2006) (quotation marks and citations omitted).

23. To prove alter ego liability, a plaintiff must “prove that the shareholders [or

members] disregarded the corporate entity to such an extent that it ceased to become

distinguishable from themselves.” Medve Energy Ventures LLC v. Warhorse Oil & Gas LLC,

2018 WL 7051038, at *6 (W.D. La. Nov. 21, 2018) (quotation marks and citation omitted); see

also Riggins, 590 So. 2d at 1168. In determining whether to apply the alter ego theory and

pierce the veil, courts consider evidence of: “1) commingling of corporate and shareholder funds;

2) failure to follow statutory formalities for incorporating and transacting corporate affairs; 3)

undercapitalization; 4) failure to provide separate bank accounts and bookkeeping records; and

5) failure to hold regular shareholder and director meetings.” Riggins, 590 So. 2d at 1168. The

foregoing list is illustrative, not exclusive, and a court must consider the totality of the

circumstances when deciding whether to pierce the corporate veil. Id. at 1168-69.

24. The Court finds that, under the totality of the circumstances, piercing the

corporate veil to impose liability upon Trahan under the alter ego theory is not warranted. The

evidence shows that Trahan did not have exclusive control over SIPCO’s contract with Aker.

SIPCO’s other officers, Breaux and Lyons, were also aware of the contract, with Breaux assuring

Aker that the invoices would be paid by SIPCO. Further, Sharp and Jensen were SIPCO’s point-

persons on the CVS. Thus, Trahan did not exercise exclusive control over the MSC, Work

Order, and Change Order in connection with any damage to Aker resulting from this transaction.

25. With respect to the Riggins factors, the only one that is arguably satisfied as to

Trahan is undercapitalization. Trahan testified that SIPCO had a separate bank account into

which he deposited $5,000 when SIPCO was formed. And there is no evidence that Trahan

comingled his personal funds with those of SIPCO. While SIPCO’s record of following

corporate formalities is mixed, there is no indication that Trahan treated SIPCO as a mere

personal instrumentality. As for undercapitalization, Trahan testified that $5,000 was an

adequate initial investment for SIPCO because it was only vetting oil-and-gas E&P

opportunities. But Trahan also testified he knew the type of research needed to properly vet such

opportunities is expensive. The expense is evident by SIPCO’s large debt to Aker. Therefore,

SIPCO was undercapitalized. However, such undercapitalization, when considered in the totality

of the circumstances, is insufficient to apply the alter ego theory to hold Trahan personally

responsible for SIPCO’s debt to Aker.

IV. SINGLE BUSINESS ENTERPRISE THEORY

26. Aker contends that Shamrock Management is liable for SIPCO’s debt to it under

the single-business-enterprise theory.

27. The single-business-enterprise doctrine is “a theory for imposing liability where

two or more business entities act as one.” Brown v. ANA Ins. Grp., 994 So. 2d 1265, 1266 n.2

(La. 2008) (citing Green v. Champion Ins. Co., 577 So. 2d 249 (La. App. 1991)). Generally,

under this doctrine, “[w]hen corporations integrate their resources in operations to achieve a

common business purpose, each business may be held liable for wrongful acts done in pursuit of

that purpose.” Id.

28. When the single-business-enterprise theory applies, a court can disregard the legal

fiction of distinct corporate entities “when a corporation is so organized and controlled as to

make it merely an instrumentality or adjunct of another corporation.” Green, 577 So. 2d at 257.

“If one corporation is wholly under the control of another, the fact that it is a separate entity does

not relieve the latter from liability,” because “the former corporation is merely an alter ego or

business conduit of the latter.” Id. (citation omitted).

29. Courts examine the substance, rather than the form, of the corporate structure in

determining whether one entity is an instrumentality or alter ego of another. Id. The following

eighteen factors are considered: identity or substantial identity of stock ownership (i.e.,

ownership of sufficient stock to give actual working control); common directors or officers;

unified administrative control of entities whose business functions are similar or supplementary;

directors and officers of one corporation act independently in the interest of that corporation;

corporation financing another corporation or asset commingling; inadequate capitalization; one

corporation causing the incorporation of another affiliated corporation; one corporation paying

the salaries and other expenses or losses of another corporation; receiving no business other than

that given to it by its affiliated corporations; one corporation using the property of another

corporation as its own; noncompliance with corporate formalities; common employees; services

rendered by the employees of one corporation on behalf of another corporation; common offices;

centralized accounting; undocumented transfers of funds between corporations; unclear

allocation of profits and losses between corporations; and excessive fragmentation of a single

enterprise into separate corporations. Id. at 257-58; see also Rive v. Briggs of Cancun, Inc., 82 F.

App’x 359, 366-67 (5th Cir. 2003) (restating and applying Green’s eighteen-factor test). The

foregoing “list is illustrative,” and not intended to be exhaustive; nor is any one factor

dispositive. Id. at 258. A court must consider the “totality of the circumstances” in each case to

discern if the companies are being operated as a single entity. Bona Fide Demolition &

Recovery, LLC v. Crosby Constr. Co. of La., Inc., 690 F. Supp. 2d 435, 444 (E.D. La. 2010).

30. Louisiana courts have held that where there is evidence of common management

and ownership, and the companies are perceived as linked by one company referring to itself as a

“sister company” to another which provided complementary business functions, these factors

show a disregard for the corporate separateness of the entities and, as such, are considered a

single business enterprise. Hollowell, 217 F.3d at 389-90.

31. Louisiana courts have held that there was sufficient evidence to support the

determination that two corporations constituted a single-business enterprise where an affiliated

entity handled all of the day-to-day operations for the entity at issue, the two entities shared the

same office and computer systems, all of the daily operations were handled by the affiliated

entity’s employees, and the affiliated entity billed the entity’s clients without the entity directly

reimbursing the affiliated entity for any of its services. Andretti Sports Mktg. La., LLC v. NOLA

Motorsports Host Comm., Inc., 147 F. Supp. 3d 537, 554-55 (E.D. La. 2015) (citing to Grayson

v. R.B. Ammon & Assocs., Inc., 778 So. 2d 1 (La. App. 2000)).

32. Considering the above factors, the evidence establishes that Shamrock

Management and SIPCO were operated as a single-business enterprise. Most of the Green

factors are satisfied, including at least the following:

a. Shamrock Management and SIPCO shared common ownership. Trahan was the

sole member of both entities.

b. Shamrock Management and SIPCO had common officers. Trahan, Breaux and

Lyons were the CEO, CFO, and general counsel, respectively, for both

companies.

c. Unified administrative control existed between Shamrock Management and

SIPCO and that the entities’ business functions were similar and supplementary.

Indeed, SIPCO was formed to vet oil-and-gas E&P opportunities because

Shamrock Management was not permitted to do so, and it was intended that

should SIPCO have become successful, it would obtain its labor from Shamrock

Management. In addition, Trahan was the sole manager of both entities.

d. Shamrock Management financed SIPCO by paying its expenses, including the

salaries of SIPCO’s employees. (Defendants argue that it is common for related

entities, including, for example, the various Aker entities, to contract for labor

among themselves. The difference Defendants ignore, however, is that the labor

contracted from one related entity is usually paid for by the other related entity, as

did the Aker entities, whereas, here, SIPCO never paid Shamrock Management

for the labor it provided.)

e. As discussed above, SIPCO was inadequately capitalized, especially considering

the contract with Aker, the CVS, and the scope and anticipated cost of the

offshore E&P project contemplated.

f. Although Shamrock Management did not cause the formation of its affiliated

company, SIPCO, Trahan, the common owner of both companies caused the

formation of SIPCO to aid Shamrock Management by vetting oil-and-gas E&P

opportunities.

g. SIPCO did not receive any other business other than vetting oil-and-gas E&P

opportunities to aid Shamrock Management. Indeed, SIPCO never made any

money, while incurring a large liability that was intended ultimately to benefit

Shamrock Management.

h. SIPCO used the property of Shamrock Management as its own without ever

reimbursing Shamrock Management.

i. Shamrock Management and SIPCO shared common employees. Although

Shamrock Management had over 800 employees and only shared fourteen with

SIPCO, all fourteen were employed by both SIPCO and Shamrock Management

and those fourteen possessed skills that were essential to SIPCO’s purpose,

including geology, engineering, legal, and accounting.

j. Shamrock Management’s employees rendered services on SIPCO’s behalf

without SIPCO ever reimbursing for such services.

k. Shamrock Management and SIPCO shared common offices. All of SIPCO’s

offices were also offices of Shamrock Management, even though Shamrock

Management had additional offices.

l. Shamrock Management and SIPCO shared centralized accounting. Breaux was

CFO of both entities, and Shamrock Management made payments to third parties

on SIPCO’s behalf. These accounting functions were handled by Shamrock

Management on SIPCO’s behalf, not by SIPCO itself.

m. In addition, it may be said that the manager and officers of each entity did not act

independently in that the raison d’êntre for SIPCO was to perform the very

function forbidden to Shamrock Management, using Shamrock Management’s

officers, offices, employees, and resources to do so.

n. And, while there is no evidence that Shamrock Management failed to comply

with corporate formalities, the record on this score as to SIPCO is mixed. It failed

to file annual reports but may have conducted annual meetings.

33. Regardless, even if the evidence established that Shamrock Management and

SIPCO’s manager and officers acted independently in the interests of the respective entities, and

even if Shamrock Management and SIPCO complied in large measure with the requisite

corporate formalities, this is insufficient to prevent the application of the single-business-

enterprise theory.

34. Thus, from a totality of the circumstances, Shamrock Management and SIPCO

constitute a single-business enterprise under the controlling law and jurisprudence because they

are so affiliated that the legal fiction of their corporate distinctiveness should be disregarded, and

they can be treated as a single entity, liable for the actions and debts of each other. Therefore,

Shamrock Management is jointly and solidarily liable with SIPCO for the debt and liability it

owes to Aker.

CONCLUSION

Accordingly, for the foregoing reasons,

IT IS ORDERED that judgment be entered in favor of Aker and against SIPCO and

Shamrock Management awarding Aker $1,780,144.19, plus pre- and post-judgment interest,

attorney’s fees, and court costs, for which SIPCO and Shamrock Management are jointly and

solidarily liable.

IT IS ALSO ORDERED that judgment be entered in favor of Trahan dismissing all of

Aker’s claims against him.

New Orleans, Louisiana, this 8th day of October, 2019.

________________________________

BARRY W. ASHE

UNITED STATES DISTRICT JUDGE