Opinion

Pursell v. Hydrochem LLC.

Court
District Court, S.D. Illinois
Filed
Nov 21, 2022
Cited by
0 cases
Authority
More cited than 21.3%

“It is not the responsibility of this court to make arguments for the parties.”

How later courts described this case

  • “It is not the responsibility of this court to make arguments for the parties.”

Written by the judges who cited it.

The opinion

IN THE UNITED STATES DISTRICT COURT

FOR THE SOUTHERN DISTRICT OF ILLINOIS

EARL AND MONICA PURSELL, )

)

Plaintiffs, )

)

vs. ) Case No. 3:20-CV-01188-MAB

)

HYDROCHEM LLC, ET AL., )

)

Defendants. )

MEMORANDUM AND ORDER

BEATTY, Magistrate Judge:

Presently before the Court is Miller Environmental’s motion for summary

judgment (Doc. 132). For the reasons outlined below, the motion will be denied.

PROCEDURAL BACKGROUND

This case was first filed on September 11, 2020 in the Third Judicial Circuit Court

in Madison County, Illinois. Plaintiffs Earl Pursell, III, and Monica Pursell seek to recover

money damages for personal injuries and consortium injuries after Mr. Pursell sustained

injuries from an incident that occurred on September 15, 2018 at the Wood River Refinery

in Madison County, Illinois. This case was then removed to the Southern District of

Illinois by Hydrochem, LLC (“Hydrochem”) on November 5, 2020 pursuant to diversity

jurisdiction (Doc. 1). See 28 U.S.C. §1332; 28 U.S.C. §1446.

Third-Party Plaintiff Hydrochem, LLC then filed a third party complaint against

Miller Environmental (“Miller”) on May 14, 2021 (Doc. 31). In this complaint, Hydrochem

details that Miller was hired by the landowner, Phillips 66, to decontaminate, clean,

hydro-clean, remove gases, and otherwise make safe the vessel/quench column V-18107

in anticipation of boilermakers for Miller Industrial Service Team, Inc., (“MIST”) to enter

the vessel to vacuum Raschig rings (Doc. 31, p. 2). According to Hydrochem, Miller

negligently and carelessly failed to properly inspect V-18107 to identify potentially

combustible dusts, vapors, gases, and other hazardous materials; negligently and

carelessly failed to properly decontaminate the vessel; and negligently and carelessly

failed to properly inspect the vessel (Id. at pp. 2-3). Hydrochem outlines that on

September 15, 2018, because of Miller’s negligent and careless actions, Mr. Pursell

suffered injuries due to a fire and explosion (Id. at p. 4).

After engaging in discovery, Miller filed its motion and supporting memorandum

for summary judgment on June 17, 2022 (Docs. 131 132). The same day, Miller also filed

a motion to exclude Hydrochem’s expert’s testimony (Doc. 133). On July 18, 2022,

Hydrochem filed separate responses to the motion for summary judgment and the

motion to exclude (Docs. 139, 138). Miller filed a reply brief on August 1, 2022 (Doc. 147).

FACTUAL BACKGROUND

I. Miller’s Proposal

On or about March 22, 2018, Miller submitted a proposal to decontaminate V-

18107 (Doc. 139-1). In the “Detailed Cleaning Method” portion of the proposal, Miller

stated that it would “inject Clean Sweep 2000X into the liquid circulation and supplied

steam headers” after the system is heated “for approximately 8-12 hours in each system”

(Id. at p. 10). The method, as described by Miller, goes on to state that “each system will

be steam rinsed for 1-2 hours prior to moving onto the next step in the decontamination

process” (Id.). Further, the proposal contained a Responsibility Table, which

demonstrated whether Miller, Phillips 66, or both would be responsible for performance

of certain activities (Id. at pp. 11-12). Among Miller’s sole and joint responsibilities were

“Vacuum Truck,” “Use of equipment to maximize the cleaning effectiveness,”

“Monitoring and testing of cleaning solution,” “Temperature of cleaning solution,”

“Temporary Circulation Equipment,” “Hydrocarbon Test,” and “Analytical Testing.” Id.

The scope of work, specifically as to V-18107, included a liquid wash and vapor phase

(Id. at p. 8).

II. Miller’s Procedure to Decontaminate V-18107

Miller developed a procedure to decontaminate V-18107 (Doc. 139-4). The

procedure outlines that the Clean Sweep™ 2000X “will neutralize iron sulfides and

oxidize residual hydrocarbons and pyrophoric material through a hybrid

decontamination process” (Id. at p. 2). Once injected into the liquid solution, Clean

Sweep™ 2000X continues “at a steady rate until the system is deemed hydrocarbon and

pyrophoric free,” and circulates liquid in the bottoms of V-18107 “to remove any

hydrocarbon and pyrophoric material in the system” (Id. at pp. 2-3). The procedure

further indicates that Miller “monitor[s] the waste from the bottom of the vessel to verify

the presence of cleaning solution” and that Miller has the option of either verifying

through “visual testing” or through “analytical testing” at the drain header (Id. at p. 6).

Additionally, each procedural step in the cleaning process was required to be

signed off on before the next procedural step could occur (Doc. 139-3, p. 17). However,

no records of signing off exist because they were destroyed in a hurricane, and digital

copies were not retained. See Doc. 139-3, pp. 6-12.

III. Deposition Testimony Regarding Miller’s Decontamination Process

Joseph Melton was Miller’s project and site manager for the turnaround project at

Wood River (Doc. 132-1, p. 7). Miller’s role in the turnaround was to assist Phillips 66 in

removing Hydrogen Sulfide from the system so that Phillips 66 could open various

vessels for maintenance. Id. Mr. Melton testified that on most turnarounds, Miller is not

present on the site while hydro blasting, vacuuming, or similar activities are performed

(Id. at p. 9). Mr. Melton further testified as to the process by which Miller executed this

turnaround project. The turnaround project consisted of decontaminating (also called

“deconning”) gases within a vessel at Wood River using steam, water, and “chemistry”

(Id. at p. 15). Decontamination is different from chemical cleaning because chemical

cleaning uses acid and is caustic, while decontamination uses gases and vapor space. Id.

Generally, there are two ways to remove iron sulfides. This is done either “through

a chemical process with the iron scale through an acid wash and add some surfactant in

with it to remove some of it” or by “removing the H2S, which is the hydrogen sulfide,

which is a sulfur component in the iron [sulfides] […] because by taking one part of the

molecule out, you’ve eliminated” the iron sulfides (Doc. 139-2, pp. 5-6). For the Wood

River project, Mr. Melton explained that Miller used a liquid wash/vapor to de-gas the

V-18107 quench column at issue by injecting a propriety compound called Clean

Sweep™2000X into the column (Doc. 132-1, p. 16). Miller was hired to remove the

hydrogen sulfide from the system through the use of Clean Sweep 2000X in order for the

system to be opened up and repaired (Doc. 139-2, pp. 5-6).

Mr. Melton explained that Clean Sweep™ 2000X is “20% sodium permanganate,”

which is similar to the solutions used by other companies that perform this type of work

(Doc. 132-1, p. 16). Generally how this type of work occurs is that Miller fills the system

(V-18107, in this case) with water and then circulates that water using Phillips 66’s pumps

(Id. at p. 18). Miller then injects the chemical solution into the bottom of the system while

the vessel is heating up. Id. Mr. Melton explained that the airspace above the waterline

(“vapor space”) is then used to clean the overhead accumulator drum. Id. Mr. Melton

testified that Phillips 66 monitors this phase of the process to make sure it is flowing

correctly using a control board. Id.

Clean Sweep™ 2000X is purple in color and will change in color, which will trigger

different protocols. For example, if the solution is not purple, Mr. Melton explained that

there is a “dirty system with a lot of hydro carbonate and oxidation is available” (Id. at p.

18). When this happens, Miller continues to pump Clean Sweep™ 2000X into the system

until the solution turns purple again or there is an “oxidation percentage.” Id. Essentially,

this means the solution is still reacting with some of the sulfur content or some of the

hydrogen until it turns purple or there is an oxidation percentage. Ultimately, Mr. Melton

explained that “you can’t finish the process” until the solution is purple or there is an

oxidation percentage. Id. Before moving onto the next step in the process, Miller provides

Phillips 66 with a final sample (Id. at pp. 18-19). Phillips 66 also performs gas checks on

the overhead of the vessel to ensure hydrogen sulfide is removed from the airspace. Id.

During the de-gassing process, the hydrogen sulfide does not disappear; rather it

is “removed as neutralized and removed as a hazard” (Id. at p. 40). Similarly, Mr. Melton

explained that sulfur is neutralized, bonded with the oxidation and neutralized, and then

removed from a dangerous form. Id. The sulfur does not disappear. Id. Prior to working

at Miller, Mr. Melton worked for PSC and he testified that the degassing process he used

at PSC is identical to the process Miller used at Wood River in September 2018 (Id. at p.

42).

Miller analyzed the results of the cleaning process employed to “make sure the

[hydrogen sulfide] is removed” (Doc. 139-2, p. 10). Melton further testified that he would

not expect hydrogen sulfide or sulfur dioxide to still be present in the column after the

cleaning process and that “operations verifies it and says that the [hydrogen sulfide] and

everything is removed, everything is good” (Id. at p. 11).

Ron Weisar worked for Phillips 66 for nearly 25 years and during that time worked

on various turnaround projects at Wood River (Doc. 132-2, p. 24). Mr. Weisar testified

that his role in turnaround projects focused on detailing the work scope for a particular

piece of equipment or vessel, as well as determining what equipment needed repairs and

how to repair the equipment. Id. He also acted as a coordinator and planner for the

turnaround, and is familiar with the V-18107 vessel. Id. Mr. Weisar testified that hydro

blasting involves using water at high pressure to blast away material and “help clean up

a piece of equipment or structure so that Phillips 66 can properly inspect it and perform

any necessary repair.” Id. One of the objectives of hydro blasting is to remove sulfates,

which in “a wet form are like mud and in dry form are like dust.” Id. The removal of mud,

solids, or dusts containing sulfates occurs after a vessel, like V-18107, is degassed (Id. at

p. 25). Based on his experience, Weisar expects sulfates would be present inside a vessel

after the de-gassing and before hydro blasting takes place. Id.

Once a vessel, such as or similar to the V-18107, is tested and monitored, it is

opened to atmosphere (Id. at p. 26). After the vessel is opened, Phillips 66 uses air blowers

to move air through the tower to ensure a safe entry atmosphere within the tower. Id.

While air is being pumped into the vessel, Phillips 66 monitors the atmosphere inside the

vessel to ensure the process is progressing and to determine when the vessel will be ready

for entry (Id. at p. 27). Phillips 66 keeps a constant eye on the vessel to check for any smoke

or fumes and “starts keeping it wet.” Id. Per Mr. Weisar, it was Phillips 66’s expectation

that while some sulfates would be removed during the chemical cleaning process, others

would remain (Id. at p. 31).

Brett Haynes has worked at Miller as an MSS-SMC/Chemical Manager since May

2020 (Doc. 132-3, p. 1). Before joining Miller, Haynes worked for Hydrochem. Id. Haynes

is familiar with the de-gassing procedures used on vessels such as V-18107, and is familiar

with the processes Hydrochem used in 2018. Id.

With respect to the September 2018 turnaround at Wood River, Mr. Haynes

submitted an affidavit detailing that Miller’s scope of work was to degas the process

equipment of any volatile organic compounds, hydrogen sulfide, and light oils to allow

for maintenance and a final cleaning (Id. at p. 2). De-gassing, or decontamination, does

not mean a total cleaning of all scale and sludges, including scales and sludges that

contain sulfates. Id. Degassing likewise does not remove scale, sludges, and dusts from

packing material, including Raschig rings. Id. Degassing, however, does remove

contamination that would prohibit the plan from conducting additional mechanical

cleaning methods was needed, including hydro blasting or vacuuming. Id.

Hydrochem’s teaching methods and instruction regarding degassing of columns

such as or similar to V-18107 recognize that degassing is not designed or intended to

remove sludges, dusts, or solids, but instead removes bad atmospheric gases such as

hydrogen sulfide and volatile organic compounds (Id. at p. 3). Further, within

Hydrochem’s Chemical Services Division, it was known and understood that the

degassing process is not intended or designed to remove sulfur containing solids,

materials of this type were to be removed via hydro blasting (Id. at p. 4). Hydrochem’s

degassing process, like Miller’s, is designed and intended to remove Hydrogen Sulfide

and volatile organic gasses so that the structure or equipment can be opened, entered,

and cleaned and a subsequent cleaning process, such as hydro blasting would be used to

remove solids, including dusts and sludges which contain sulfur (Id. at pp. 3-4). Like

Miller’s process, Hydrochem’s degassing process is designed to make a vessel or other

similar equipment “clear for entry” (Id. at p. 3).

In September of 2018, Hydrochem employed Jeff Reese as its integration manager

and his duties included integrating PSC’s operations into Hydrochem’s (Doc. 132-4, p. 5).

Reese also acted as Hydrochem’s overall manager for the Wood River turnaround (Id. at

p. 6). As overall manager, Reese coordinated Hydrochem’s activities which he describes

as “multiple industrial cleaning activities across multiple operating units that was [sic]

bound for the turnaround” (Id. at p. 7). Reese describes the E-Train as a “sulfur unit” but

is unable to identify or provide even a general description of the E-Train unit’s purpose

and/or function. Id. Hydrochem provided a vacuum truck which was used to remove

packing material from the E-Train unit. Id. MIST employees used a hose attached to the

vacuum truck to remove the Raschig rings from the E-Train unit, including V-18107 (Id.

at p. 8).

With respect to V-18107, Reese had no discussions or communications with

anyone at Phillips 66 concerning the presence of combustible dust in the column once air

mover operations were commenced. (Id. at p. 13). As of September 15, 2018, Reese did not

believe a quench column specifically designed to remove sulfur from a petroleum

product would contain residual sulfur after it was degassed. (Id.). Reese concedes that he

“did not know the process” (Id. at p. 14).

IV. September 15, 2018 Incident

The removal of the Raschig rings that Pursell and another MIST employee were

doing on September 15, 2018, was done with the expectation that the quench column had

been decontaminated and was free of hydrocarbons and pyrophoric, and that any iron

sulfides had been neutralized (Doc. 139-5). MIST employed 57 people per shift, including

Earl Pursell and Walter Ricks (Id. at p. 3). The V-18107 vessel Ricks and Pursell were

working on at the time of the explosion/fire, has twenty to twenty-four inch diameter

manway which Ricks and Pursell used to enter the vessel’s interior. (Doc. 132-6).

Ron Weisar, the Phillips 66 Day Shift Turnaround Coordinator for the E-Train

Sulfur Recovery Unit, testified that the expectation was that there would not be

significant combustible dust encountered after the cleaning process (Id. at p. 1; 14). There

had never been an incident where there was any type of sulfur dust explosion from

vacuuming Raschig rings and Miller did not raise the potential for such an event (Doc.

139-6, p. 5). Weisar, therefore, signed off on the Entry Permit which did not reference

“fire/sparks” or “fire watch”, items which would have been referenced if combustible

dust were anticipated (Doc. 139-6, p. 6-8). He expected that Miller would remove most of

the sulfates or the solids from the tower (Id. at p. 11). Nor would Weisar expect SO2

(sulfur dioxide) and H2S (hydrogen sulfide) to be at levels outside of safe limits when

workers were going to be inside V-18107 (Id. at p. 13). Weisar admitted that an area may

be determined safe to enter, but the activity may disturb “a pocket of gas.” Id.

Ricks and Pursell used an unbonded plastic hose to vacuum the packing material,

also known as Raschig rings from V-18107. (Doc. 132-5, p. 5). The packing material or

Raschig rings were stacked eight foot high in the vessel and Pursell and Ricks had

removed between three to four feet of the rings from the vessel before the explosion/fire

occurred (Id. at p. 6). Ricks estimates it took three to four hours to remove the three to

four feet of rings/packing material from the vessel (Id. at pp. 7-8). Ricks and Pursell wore

Hydrogen Sulfide monitors and neither of which went off or otherwise activated prior to

the explosion/fire (Id. at p. 19). While Ricks was inside the vessel he detected a “small

hint of a sulfur smell” but that sensation did not cause him any alarm as it is not

uncommon to smell or note a “small hint of sulfur” (Id. at pp. 18-19).

Ricks observed a fireball exit the vacuum hose and enter the vessel. He heard a

sound comparable to shotgun going off, followed by a fire exiting the end of the hose. (Id.

at p. 22). The vacuum hose, in Ricks’ words, “choked down and just spit a big ball of fire

out of it.” Id. While he was vacuuming the packing material, Earl Pursell did not detect

or observe any dust accumulation in V-18107. (Doc. 132-7, p. 4). Pursell’s H2S alarm

buzzed and blinked following the explosion, but not before. (Id. at p. 2).

Back in June of 2018, Hydrochem would use bonded hoses to remove packing

material from a quench column such as V-18107 when it “knew of a known combustible

material” as is stated in Hydrochem’s policy (Doc. 132-4, p. 14). Reese did not ask Phillips

66 to provide documentation or material concerning the chemical cleaning process that

was to be performed before Hydrochem commenced its air mover operations on the E-

Train unit, including V-18107 and did not request MDS sheets (Id. at p. 20). Reese

acknowledges that elemental sulfur - assuming it’s not exposed to electricity or a certain

type of flame source, will not burst into flame, smolder or catch fire as it is not “self-

exploding” (Id. at p. 28). Reese acknowledges that he knew as of September of 2018 that

sulfur was a combustible dust but in planning Hydrochem’s work on this turnaround

did not reach out to Hydrochem’s Chemical Treatment Division to discuss potential

hazards associated with removing packing material from a sulfur quench tower such as

V-18107 (Id. at 110).

Reese was familiar with Phillips 66’s policies regarding safe vacuum truck

operations, and acknowledges those policies apply to Hydrochem’s operations at Wood

River. He was also aware of Phillips 66 policies which state, “all vacuum trucks and

hydro-excavation trucks must be grounded and hoses bonded at all times while loading

or unloading any material including hydrocarbon or flammable/combustible materials”

and “the movement of liquid or dry material through flexible hoses has the potential to

generate static sparks which is capable of igniting flammable material or vapors.” (Id. at

pp. 29-30).

V. Phillips 66 Incident Report + After Incident reports

Per an internal incident investigation report prepared by Phillips 66, the fuel that

caused the explosion, which resulted in the respiratory exposure incident suffered by

Pursell, was combustible sulfur dust (Doc. 139-12). Per XRF data gathered by Phillips 66

regarding the Raschig rings gathered from V-18107 following the incident, the residual

particulate covering the Raschig rings was more than 40% sulfur and more than 10% iron,

the two main components of iron sulfide (Doc. 139-13). Dust with greater than 25 percent

sulfur has the propensity for ignition or explosion (Doc. 139-11, p. 12).

VI. Hydrochem’s Expert Report and Findings

Hydrochem’s expert, Russell Ogle, Ph.D., found that the V-18107 was packed with

hydrocarbon and pyrophoric-contaminated Raschig rings (Doc. 139-15, p. 30; Doc. 139-

14, pp. 2-3; Doc. 139-11, pp. 3-4). Furthermore, the Phillips 66 incident investigation

observed a residue on the Raschig rings and determined that it was a combination of

metal sulfides, but principally iron sulfide based on chemical analysis (Doc. 139-12).

Aside from sulfur-containing residue on the Raschig rings, no other credible condensed-

phase fuels were identified in Phillips 66’s investigation or otherwise. “[V]arious gas

monitoring devices recorded concentrations of sulfur-containing gases” (Doc. 139-15, p.

35). Low concentrations of hydrogen sulfide were also recorded (Id. at pp. 36-40).

LEGAL STANDARD

Summary judgment must be granted “if the movant shows that there is no genuine

dispute as to any material fact and the movant is entitled to judgment as a matter of

law.” FED. R. CIV. P. 56(a); see also Celotex Corp. v. Catrett, 477 U.S. 317, 322 (1986); Spath

v. Hayes Wheels Int'l-Ind., Inc., 211 F.3d 392, 396 (7th Cir. 2000). The Court must construe

the evidence in the light most favorable to the nonmoving party and draw all reasonable

inferences in favor of that party. See Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 255

(1986); Chelios v. Heavener, 520 F.3d 678, 685 (7th Cir. 2008); Spath, 211 F.3d at 396.

The initial summary judgment burden of production is on the moving party to

show the Court that there is no reason to have a trial. Celotex, 477 U.S. at 323; Modrowski

v. Pigatto, 712 F.3d 1166, 1168 (7th Cir. 2013). If the moving party bears the burden of

persuasion on an issue at trial, it must “lay out the elements of the claim, cite the facts

which it believes satisfies these elements, and demonstrate why the record is so one-sided

as to rule out the prospect of a finding in favor of the non-movant on the claim.” Hotel 71

Mezz Lender LLC v. National Ret. Fund, 778 F.3d 593, 601 (7th Cir. 2015); accord Felix v.

Wisconsin Dep't of Transp., 828 F.3d 560, 570 (7th Cir. 2016). Where the moving party fails

to meet that strict burden, the Court cannot enter summary judgment for that party even

if the opposing party fails to present relevant evidence in response. Cooper v. Lane, 969

F.2d 368, 371 (7th Cir. 1992).

In responding to a motion for summary judgment, the nonmoving party may not

simply rest upon the allegations contained in the pleadings, but must present specific

facts to show that a genuine issue of material fact exists. Celotex, 477 U.S. at 322–

26; Anderson, 477 U.S. at 256–57; Modrowski, 712 F.3d at 1168. A genuine issue of material

fact is not demonstrated by the mere existence of “some alleged factual dispute between

the parties,” Anderson, 477 U.S. at 247, or by “some metaphysical doubt as to the material

facts.” Matsushita Elec. Indus. Co. v. Zenith Radio Corp., 475 U.S. 574, 586 (1986). Rather, a

genuine issue of material fact only exists if “a fair-minded jury could return a verdict for

the [nonmoving party] on the evidence presented.” Anderson, 477 U.S. at 252.

DISCUSSION

The Illinois Contribution Act provides that, “[W]here 2 or more persons are

subject to liability in tort arising out of the same injury to [the plaintiff], ... there is a right

of contribution among them, even though judgment has not been entered against any or

all of them.” Sherwood v. City of Chicago, No. 19 C 6605, 2020 WL 777258, at *3 (N.D. Ill.

Feb. 18, 2020) (citing 740 ILL. COMP. STAT. 100/2). The present matter is a third-party

action brought by Hydrochem against Miller based on negligence. “To state a cause of

action for negligence, a complaint must allege facts that establish the existence of a duty

of care owed by the defendant to the plaintiff, a breach of that duty, and an injury

proximately caused by that breach.” Simpkins v. CSX Transp., Inc., 965 N.E.2d 1092, 1096

(Ill. 2012) (internal citations omitted).

Miller contends that Hydrochem cannot prove the essential elements of its

contribution claim for negligence (duty, breach of duty, and causation) and thus

summary judgment is warranted (Doc. 132, p. 10). According to Miller, Hydrochem’s

central theory is that Miller left behind solids in the vessel in question, which caused the

explosion that resulted in Plaintiff’s injuries. But according to Miller, it never had a duty

to remove solids and solids containing sulfur specifically; rather, its duty was limited to

degassing the vessel in question (Id.). In fact, Miller argues that it was Hydrochem’s role

to neutralize iron sulfide and oxide pyrophoric materials (Id. at p. 11).

Hydrochem argues that Miller owed a duty to make V-18107 safe for workers

providing the next step in the turnaround process to bring the SRU back online by

neutralizing iron sulfides and oxidize residual hydrocarbons and pyrophoric material

through a hybrid decontamination process (Doc. 139, pp. 14-15, citing Doc. 139-4).

Furthermore, Hydrochem argues Miller had a duty to identify ignitable material that

could remain in the column and notify Phillips 66, as well as other personnel (Doc. 139,

p. 15). Miller filed a reply brief, arguing that Hydrochem submitted inadmissible

evidence (e.g., inadmissible hearsay, lack of foundation, and speculation/conjecture) and,

ultimately, Hydrochem’s arguments relating to duty and breach still fail. The Court first

turns to whether Miller owed a duty and, if so, the parameters of that duty.

I. Duty

Miller argues that Hydrochem’s amended complaint refers to contractual duties

as the basis for its claim against Miller (Doc. 132, p. 11). But Miller takes umbrage with

this position, as Hydrochem fails to “identify a contract, agreement or proposal and does

not allege or otherwise identify a specific contractual provision…[to] describe the nature,

extent and scope of the putative duty it would place on Miller” (Doc. 132, p. 11). But if

Hydrochem is referring to Miller’s proposal as the basis for liability, Miller argues that

the proposal outlines that the scope of the duty was limited to degassing the vessel only,

which Miller did (Id. at pp. 10-11). Specifically, Miller was hired to “ensure the sulfur E-

Train unit equipment, including V-18107, was properly degassed with a chemical

decontamination package” (Doc. 132-1).

Hydrochem argues that Miller had a duty to remove or neutralize pyrophoric

materials and iron sulfides and that had Miller succeeded in this, “there is no possibility

that Pursell would have been injured” (Doc. 139, p. 16). Hydrochem also says that the

record makes clear Miller had a duty to make V-18107 safe for workers before they

continued the next step in the turnaround process (Id. at p. 14).

Whether or not a duty exists is a question of law. Baroni v. Viox Servs., Inc., No. 11

C 3738, 2014 WL 3805745, at *4 (N.D. Ill. July 30, 2014) (citing Adams v. N. Ill. Gas Co., 809

N.E.2d 1248, 1257 (Ill. 2004)). For negligence in Illinois, a plaintiff must establish that the

“defendant owed a duty of care, that the defendant breached that duty, and that the

plaintiff incurred injuries proximately caused by the breach.” Sears, Roebuck & Co. v. Tyco

Fire Prod. LP, 833 F. Supp. 2d 892, 906 (N.D. Ill. 2011) (citing Johnson v. Wal–Mart Stores,

Inc., 588 F.3d 439, 441 (7th Cir.2009) (quoting Espinoza v. Elgin, Joliet & E. Ry. Co., 649

N.E.2d 1323, 1326 (Ill. 1995)). Where the negligence action is based on a contractual

obligation, the scope of the duty is determined by the contract terms. ExxonMobil Oil Corp.

v. Amex Constr. Co., 702 F.Supp.2d 942, 970 (N.D. Ill. 2010) (citing Melchers v. Total Elec.

Constr., 723 N.E.2d 815, 818 (Ill. App. Ct. 1999)); see also Dyduch v. Crystal Green Corp., 582

N.E.2d 302, 306 (Ill. App. Ct. 1991).

Despite Miller’s criticism of this argument, and Hydrochem’s failure to point to a

contract detailing Miller’s duty, both parties seem to argue that the Court must look to

Miller’s proposal to determine the scope of its duty. The parties cite to two main cases in

support of their positions—Bray and Pasquinelli. In Bray, the Court analyzed whether a

counter-defendant to the City of Chicago had a contractual duty to maintain a sidewalk

where the plaintiff fell and was injured. Bray v. City of Chicago, 2022 IL App (1st) 201214,

¶ 30. The court analyzed the contract and found there was some evidence from which a

jury could conclude that the counter-defendant owed plaintiff a duty of care to maintain

the sidewalk in a safe way, breached that duty, and the breach was the proximate cause

of her injuries. Id. at ¶ 40.

In Pasquinelli, the estate of an elderly married couple sued the company they hired

to take care of the couple after the couple died due to complications from carbon

monoxide poisoning after the husband left his car running in the attached garage for

many hours. The estate argued that the caretaking company owed the couple a

“common-law duty of care due to its ‘specialize knowledge in caring for elderly clients

reliant on [Comfort Keepers] for their safety’.” Pasquinelli v. Sodexo, Inc., 193 N.E.3d 836,

845 (Ill. App. Ct. 2021). Ultimately, the court found that the caretaking company did not

owe the aforementioned common-law duty of care to the couple because the couple and

their caregiver had a contract for their care; therefore, the scope of duty was determined

by the terms of the contract and the duties could not be expanded beyond the scope of

the contract. Id. at 846. Both Bray and Pasquinelli demonstrate that when a contract is in

play, the Court must look to the terms of the contract to analyze whether there is a duty

and the parameters of that duty.

With these cases in mind, the Court first turns its attention to the language

contained in Miller’s proposal and procedure. The proposal outlines the work that Miller

planned to do at the Wood River site. “The Clean Sweep™ 2000X is an exceptionally high

performing chemistry used at a very low concentration in water/steam to internally clean

and decontaminate the refinery process equipment” (Doc. 139-1, p. 10). The Sulfur Unit

E-Train Decontamination Procedure outlines that the Clean Sweep™ 2000X “will

neutralize iron sulfides and oxidize residual hydrocarbons and pyrophoric material

through a hybrid decontamination process” (Doc. 139-4, p. 2). The process of injecting

Clean Sweep™ 2000X would continue “at a steady rate until the system is deemed

hydrocarbon and pyrophoric free,” as well as circulating liquid in the bottoms of V-18107

“to remove any hydrocarbon and pyrophoric material in the system” (Id. at pp. 2-3).The

procedure further indicates that Miller would “monitor the waste from the bottom of the

vessel to verify the presence of cleaning solution” and that Miller had the option of either

verifying through “visual testing” or through “analytical testing” at the drain header (Id.

at p. 6). Ultimately, Miller was hired to remove the hydrogen sulfide from the system

through the use of Clean Sweep™ 2000X in order for the system to be opened up and

repaired (Doc. 139-2, pp. 5-6). Before moving onto the next step in the process, Miller

provided Phillips 66 with a final sample. Id. at pp. 18-19. Phillips 66 also performs gas

checks on the overhead of the vessel to ensure hydrogen sulfide is removed from the

airspace. Id.

Based on the documents before the Court, Miller was responsible for degassing

the vessel and removing and/or neutralizing hydrocarbon and pyrophoric material as

well as iron sulfides so that the next step in the decontamination process could occur.

Furthermore, the proposal details that safety is “the single most important thing we do

every day—it is the number one priority at Miller Environmental” (Doc. 139-1, p. 4).

Hydrochem has presented more than sufficient factual basis demonstrating that Miller

had a duty to decontaminate V-18107 and make it safe per its own procedural documents,

and the understandings of the parties to the agreement. As such, the Court moves onto

whether Miller is entitled to summary judgment based on proximate cause.

II. Proximate Cause

Miller further argues that Hydrochem cannot establish that Miller’s breach of its

duty was the proximate cause of Plaintiff’s injuries either (Doc. 132, pp. 11-12). Simply

put, Miller argues that the incident, alone, is not proof that Miller proximately caused the

incident. Miller argues that Hydrochem has failed to submit evidence that the circulation

of Clean Sweep™ 2000X was not performed or that testing to support that

decontamination was also not performed (Id. at p. 13). Furthermore, Miller says

Hydrochem only submits inadmissible hearsay statements offered “by alleged

witnesses,” including Whiddon, Call, Ketcham, and Jarett. Miller contends these

individuals do not have personal knowledge as to the work Miller performed (Id. at p.

14). Lastly, Miller argues that Hydrochem’s expert, who believes “the incident and Mr.

Pursell’s injuries were caused by [Miller]’s failure to adequately decontaminate the

column,” is unqualified and his testimony and opinion are inadmissible because they do

not meet the requirements of Daubert or Rule 702 (Doc. 132, p. 15). Miller filed a reply

brief as well, in which it reiterated its argument that the only support in the record for

Hydrochem’s position is “inadmissible hearsay,” which the Court should not consider in

its analysis (Doc. 147, citing to Docs. 139-7, 139-8, 139-9, and 139-10).

As an initial matter, “a court may only consider admissible evidence in assessing

a motion for summary judgment. Gunville v. Walker, 583 F.3d 979, 985 (7th Cir. 2009). In

both the initial motion and the reply brief, Miller does not explain how certain

depositions are inadmissible hearsay and the Court declines to make those arguments for

Miller. See Mulvania v. Sheriff of Rock Island Cty., 850 F.3d 849, 860 (7th Cir. 2017) (citing

Vaughn v. King, 167 F.3d 347, 354 (7th Cir. 1999) (“It is not the responsibility of this court

to make arguments for the parties.”))). Without a proper objection that Whiddon, Call,

Ketcham, and Jarett’s testimony cannot be presented in any admissible form, the Court

finds this testimony to be competent summary judgment evidence creating a genuine

issue of material fact for trial. See Lewandowski v. City of Milwaukee, 823 F. App'x 426, 428–

29 (7th Cir. 2020) (noting that a district court “cannot consider inadmissible hearsay, over

proper objections, in deciding summary judgment”)1 (emphasis added). If a jury were to

credit the deposition testimony presented by Hydrochem, it could reasonably find that

Hydrochem’s version of the events were true.

Even if this testimony were disregarded, Miller still would not be entitled to

judgment as a matter of law, as there is additional evidence in the record to support a

jury finding in favor of Hydrochem. Miller argues that Hydrochem’s expert cannot be

considered because his report and testimony do not meet the requirements of Daubert

and Rule 702. But this Court previously found those arguments to be unavailing in its

October 21, 2022 Order (Doc. 168). “A district court’s decision to exclude expert testimony

is governed by Federal Rules of Evidence 702 and 703, as construed by the Supreme Court

1 See also Cohn v. Wexford Health Sources, Inc., No. 3:19-CV-00376-NJR, 2022 WL 2802304, at *6 (S.D. Ill. July

18, 2022) (noting that the party seeking exclusion of testimony as hearsay had failed to argue that the

testimony could not be presented in a form that would be admissible in evidence).

in Daubert v. Merrell Dow Pharms., Inc., 509 U.S. 579, 113 S.Ct. 2786, 125 L.Ed.2d 469

(1993).” Brown v. Burlington Northern Santa Fe Ry. Co., 765 F.3d 765, 771 (7th Cir. 2014).

Ultimately, the Court found that Mr. Ogle would be permitted to testify and that his

opinions and testimony could not be excluded, as he is qualified to provide his opinions

on the very technical subject matter (Doc. 168, p. 7). The Court will not reiterate its

reasoning here as to why Mr. Ogle’s opinion is admissible.

Now turning to proximate cause, “[t]he term ‘proximate cause’ [under Illinois law]

encompasses two distinct requirements: cause in fact and legal cause.” City of Chicago v.

Beretta U.S.A. Corp., 821 N.E.2d 1099, 1127 (Ill. 2004). In determining whether a plaintiff

has established cause in fact, the Court asks, “whether the injury would have occurred

absent the defendant's conduct.” Id. “The second requirement, legal cause, is established

only if the defendant's conduct is so closely tied to the plaintiff's injury that he should be

held legally responsible for it.” Id. (internal citation omitted). ExxonMobil Oil Corp., 702 F.

Supp. at 964–65.

Miller was hired to decontaminate gases and vapors from the V-18107 vessel,

which included removing and/or neutralizing iron sulfides and hydrogen sulfide (Doc.

139-2, pp. 5-6; 132-1, p. 16). Specifically, Clean Sweep™ 2000X “will neutralize iron

sulfides and oxidize residual hydrocarbons and pyrophoric material through a hybrid

decontamination process” (Doc. 139-4, p. 2). An internal incident investigation report

prepared by Philipps 66 stated that the fuel that caused the explosion was combustible

sulfur dust (Doc. 139-12). Hydrochem’s expert, Russell Ogle, Ph.D., found that the V-

18107 was packed with hydrocarbon and pyrophoric-contaminated Raschig rings (Doc.

139-15, p. 30; Doc. 139-14, pp. 2-3; Doc. 139-11, pp. 3-4). Furthermore, the Phillips 66

incident investigation observed a residue on the Raschig rings and determined that it was

a combination of metal sulfides, but principally iron sulfide based on chemical analysis

(Doc. 139-12). Miller may argue that any residue qualifies as “solids” for which they are

not responsible. But Hydrochem also put forth deposition testimony that had Miller

adequately decontaminated the column, it would have eliminated the presence of fuel

within the column (Doc. 139-15, p. 42 (“Had all of the iron sulfide and other sulfur

compounds been fully oxidized by Clean Sweep™ 2000X, no flammable sulfur

compounds or sulfur-containing combustible dust would have remained. The presence

of this fuel is proof that ME failed to adequately decontaminate the column”; See also Doc.

139-11, p. 13 (stating that one of the goals of decontamination was to eliminate iron sulfite

and that per the lab analysis, iron sulfite and elemental Sulphur were both identified on

the dust from the Raschig rings)). Hydrochem also put forth evidence that, per Miller’s

proposal and procedure, Miller was supposed to recirculate the Clean Sweep™2000X

solution, but this was not completed, performed, and/or there is no record of this being

performed (Doc. 139-15, p. 42). Additionally, Hydrochem’s expert opined that “analytical

testing to confirm that the column had been decontaminated was apparently not

performed” (Doc. 139-15, p. 42). Ultimately, Mr. Ogle has opined that Mr. Pursell’s

injuries were caused by Miller’s failure to adequately decontaminate the column (Id. at p.

42).

There is evidence in the record that materials Miller was hired to neutralize and/or

remove certain materials from the vessel and these materials were still present after the

incident. Miller argues that these solid substances were not part of their work to

decontaminate the vessel, but ultimately, this argument, and the evidence supporting it,

are not for this Court to weigh at this time. Hydrochem and Miller offer two very different

stories as to what exactly happened to cause the explosion that injured Mr. Pursell.

Simply put, this dispute cannot be resolved at the summary judgment stage and the

motion for summary judgment will be denied.

CONCLUSION

For the aforementioned reasons, Miller’s motion for summary judgment (Doc. 131)

is DENIED. This matter remains set for an in-person status conference on November 30,

2022 at 10:30 a.m.

IT IS SO ORDERED.

DATED: November 21, 2022

/s/ Mark A. Beatty

MARK A. BEATTY

United States Magistrate Judge