Opinion

Appleby v. Knauf Gips KG

Court
District Court, S.D. Florida
Filed
Mar 8, 2023
Cited by
0 cases
Authority
More cited than 20.2%

noting the defendant pled the statute of repose as an affirmative defense

How later courts described this case

  • noting the defendant pled the statute of repose as an affirmative defense

Written by the judges who cited it.

The opinion

UNITED STATES DISTRICT COURT

SOUTHERN DISTRICT OF FLORIDA

CASE NO. 22-CIV-61411-RAR

VERONICA APPLEBY, et al.,

Plaintiffs,

v.

KNAUF GIPS KG, et al.,

Defendants.

________________________________/

ORDER GRANTING IN PART DEFENDANTS’ MOTION TO DISMISS

THIS CAUSE comes before the Court upon Defendants Knauf Gips KG and Knauf New

Building System (Tianjin) Co. Ltd.’s (the “Knauf Defendants”) Motion to Dismiss for Failure to

State Claim (“Motion”), [ECF No. 40], filed on August 23, 2022.1 Having considered Defendants’

Motion, the record, and being otherwise fully advised, it is hereby

ORDERED AND ADJUDGED that the Motion, [ECF No. 40], is GRANTED IN PART

AND DENIED IN PART for the reasons stated herein.

BACKGROUND

I. Procedural History Related to Chinese-Manufactured Drywall

This case arrived before the Court following a long history of litigation related to

Chinese-manufactured drywall.2 From approximately 2004 to 2006, a surge in housing demand

1 The Motion is fully briefed and ripe for adjudication. See Opp’n to Knauf Gips KG and Knauf New

Building System (Tianjin) Co. Ltd.’s Mot. to Dismiss for Failure to State a Claim (“Response”), [ECF No.

42]; Defs.’ Reply to Pls.’ Opp’n to Mot. to Dismiss for Failure to State a Claim, [ECF No. 43].

2 Defendants ask the Court to take judicial notice of rulings made by the Eastern District of Louisiana

(“MDL Court”) in In re Chinese Manufactured Drywall Products Liability Litigation, MDL No. 09-2047.

See Mot. at 2 n.1. Plaintiffs do not oppose this request, but the Court cites these decisions sparingly and

only cites materials filed on the Court’s docket.

in Florida, caused by rebuilding efforts following Hurricanes Rita and Katrina, created a shortage

of housing materials. Suggestion of Remand, Op. and Order, [ECF No. 18-1], at 1. As a result,

certain building materials, including drywall, were imported into the United States from China.

See id. This imported drywall “was largely manufactured by two groups,” one of which was

Defendants, who are collectively known as the “Knauf Entities.” Id. at 2. The Knauf Entities are

“international manufacturers of building products, including drywall,” and Defendant Knauf New

Building System (Tianjin) Co. Ltd., formerly operating under the name Knauf Plasterboard

(Tianjin) Co., Ltd., advertised and sold the drywall in the United States. Id.

After this drywall was installed into homes, many homeowners complained of damage to

their property and physical ailments purportedly caused by the drywall. See id. at 1–2. To

consolidate the large amount of litigation that followed, the Judicial Panel on Multidistrict

Litigation formed MDL 09-2047 on June 15, 2009. Id. at 2. The MDL Court eventually presided

over a bellwether trial and found in favor of the plaintiff family in that case. Id. Following this

trial, the Knauf Entities entered into a global class settlement, which Plaintiffs did not participate

in. Id. at 2–3.

Plaintiffs then filed their Complaint, [ECF No. 1], on May 4, 2021. See generally Compl.

This matter was subsequently transferred to the MDL Court, Conditional Transfer Order, [ECF

No. 16], and the MDL Court remanded this matter on July 28, 2022. Conditional Remand Order,

[ECF No. 18].

II. Factual Background

Turning to the facts of this action, the Court looks to Plaintiffs’ Complaint, the allegations

of which are taken as true for purposes of adjudicating the Motion. Plaintiffs own homes

containing the Chinese-manufactured drywall produced and sold by the Knauf Defendants.

Compl. at 1. Defendants’ drywall emitted “sulfur compounds” that damaged property belonging

to each Plaintiff. Compl. ¶¶ 26–30. At some point in 2006, Defendants learned their drywall was

causing this damage in homes, but they did not remediate the issue or warn consumers about the

possible risks to their property. See Compl. ¶¶ 36–39, 114, 145. Instead, Defendants allegedly

took steps to ensure their drywall would continue to be distributed throughout the United States,

including entering into indemnification agreements with distributors and continuing to advertise

the drywall without disclosing information about the damage it might cause. Compl. ¶¶ 40, 47,

114–15, 134–36, 145.

Based on these allegations, Plaintiffs bring twelve claims against the Knauf Defendants:

Negligence (Count I); Negligence Per Se (Count II); Strict Liability (Count III); Breach of Express

and/or Implied Warranty (Count IV); Private Nuisance (Count V); Negligent Discharge of a

Corrosive Substance (Count VI); Unjust Enrichment (Count VII); Violation of Consumer

Protectional Acts (Count VIII); Fraudulent Misrepresentation (Count IX); Negligent

Misrepresentation (Count X); Fraudulent Concealment (Count XI); and Fraud (Count XII).

Compl. ¶¶ 48–149.

LEGAL STANDARD

“To survive a motion to dismiss, a complaint must contain sufficient factual matter,

accepted as true, to ‘state a claim to relief that is plausible on its face.’” Ashcroft v. Iqbal, 556

U.S. 662, 678 (2009) (quoting Bell Atl. Corp. v. Twombly, 550 U.S. 544, 570 (2007)). When

evaluating a Rule 12(b)(6) motion to dismiss, the court must accept all well-pleaded factual

allegations as true and draw all inferences in favor of the plaintiff. Smith v. United States, 873

F.3d 1348, 1351 (11th Cir. 2017). Although the court is required to accept all allegations contained

in the complaint as true, courts “are not bound to accept as true a legal conclusion couched as a

factual allegation.” Iqbal, 556 U.S. at 678; (quoting Twombly, 550 U.S. at 555).

ANALYSIS

I. Statute of Repose

The Knauf Defendants first argue that all of Plaintiffs’ claims are time-barred by either of

two statutes of repose. Mot. at 5–9. The Court finds dismissal on these grounds inappropriate.

As a preliminary matter, the Court must distinguish between a statute of limitations and a

statute of repose. A statute of limitations puts an outer limit on when a plaintiff may bring suit

after the plaintiff’s cause of action accrues. Dusek v. JPMorgan Chase & Co., 832 F.3d 1243,

1247 (11th Cir. 2016). Statutes of repose also put an outer limit on when a plaintiff may bring a

cause of action, but the event that triggers the running of a statute of repose is the “last culpable

act or omission of the defendant,” not the occurrence or discovery of an injury caused by such act

or omission. Id. (quoting CTS Corp. v. Waldburger, 573 U.S. 1, 8 (2014)). Thus, a statute of

repose generally acts as an “absolute bar on a defendant’s temporal liability” once it has lapsed.

Dusek, 832 F.3d at 1247 (alteration accepted) (quoting Waldburger, 573 U.S. at 8). The rigidity

of statutes of repose is compounded by a crucial distinction between statutes of repose and statutes

of limitations: while statutes of limitations might be subject to equitable tolling, statutes of repose

are not. Id.

A bar from liability due to the running of a statute of repose, like a defense based on a

statute of limitations, is an affirmative defense. See, e.g., Competitor Liaison Bureau, Inc. v.

Cessna Aircraft Co., 454 F. App’x 792, 794 (11th Cir. 2011) (noting the defendant pled the statute

of repose as an affirmative defense). A complaint may be dismissed based on an affirmative

defense for failure to state a claim “only when the affirmative defense appears on the face of the

complaint.” Wells v. Brown, 58 F.4th 1347, 1350 (11th Cir. 2023); see also CDG Int’l Corp. v. Q

Cap. Strategies, LLC, No. 17-23902, 2018 WL 278891, at *6 (S.D. Fla. Jan. 3, 2018) (stating that

dismissal on the basis of a statute of limitations defense is only proper when “the factual allegations

in the complaint clearly show that the claim is untimely” (quoting St. John’s Univ, N.Y. v. Bolton,

757 F. Supp. 2d 144, 157 (E.D.N.Y. 2010)).

The Knauf Defendants proffer two statutes of repose they argue might govern this action.

First, they direct the Court to section 95.11(3)(c) of the Florida Statutes, which governs

improvements to real property. That statute imposes a ten-year repose period on the

commencement of actions “founded on the design, planning, or construction of an improvement

to real property.” Fla. Stat. § 95.11(3)(c). This ten-year period begins running at the later of:

[T]he date of actual possession by the owner, the date of the issuance

of a certificate of occupancy, the date of abandonment of

construction if not completed, or the date of completion of the

contract or termination of the contract between the professional

engineer, registered architect, or licensed contractor and his or her

employer.

Fla. Stat. § 95.11(3)(c). Plaintiffs instituted this action on May 4, 2021, so if this statute of repose

is applicable, their action is only timely if the triggering event occurred on or after May 4, 2011.

Alternatively, Defendants argue Florida’s statute of repose governing products liability

bars Plaintiffs’ claims. This statute of repose provides that plaintiffs may not bring actions for

products liability “to recover for harm allegedly caused by a product with an expected useful life

of 10 years or less” if the harm was due to exposure or use “more than 12 years after delivery of

the product to its first purchaser or lessee who was not engaged in the business of selling or leasing

the product or of using the product as a component in the manufacture of another product.” Fla.

Stat. § 95.031(2)(b). Except for some exceptions not relevant here, all products are conclusively

presumed to have an expected useful life of 10 years or less. Id. However, there are two statutory

exceptions to this repose period. First, the repose period does not apply if the plaintiff was

“exposed to or used the product within the repose period” but the plaintiff’s injury did not manifest

until after the repose period expired. Id. § 95.031(c). Second, the repose period is tolled “for any

period during which the manufacturer through its officers, directors, partners, or managing agents

had actual knowledge that the product was defective in the manner alleged by the claimant and

took affirmative steps to conceal the defect.” Id. § 95.031(d). Assuming no exception applies,

Plaintiffs’ claims are timely if the triggering event occurred on or after May 4, 2009, under this

statute of repose.

The Knauf Defendants argue that because the MDL Court found Chinese-manufactured

drywall was imported into the United States from approximately 2005 to 2008, it is improbable

the triggering events relevant to Plaintiffs’ claims occurred after either date stated above. Mot. at

5–9. The Court does not need to decide which statute of repose is applicable, because neither of

these affirmative defenses “appears on the face of the complaint.” Wells, 58 F.4th at 1350.

Nowhere in the Complaint do Plaintiffs indicate dates relevant to the triggering events, and thus

the Court cannot determine, based solely on Plaintiffs’ allegations, that Plaintiffs’ causes of action

are time-barred. See generally Compl. While it might be true the drywall at issue was primarily

imported between 2005 and 2008, this fact has little to do with either of the cited statutes of repose.

None of the triggering events listed in the statute of repose governing improvements to real

property relate to when the materials arrived in the United States. Fla. Stat. § 95.11(3)(c).

The same is generally true of the statute of repose for products liability, and by Defendants’

own calculation, this statute only bars suit if the triggering event was before May 4, 2009. Given

this is only about five months after “2005 to 2008,” which is itself an approximation, the Court

disagrees the Complaint must be dismissed because it is implausible Plaintiffs’ claims are timely.

While a statute of repose might ultimately bar Plaintiffs’ claims, the Court will not dismiss the

Complaint on this ground.

II. Rule 9 Particularity

Defendants argue Plaintiffs have failed to satisfy Federal Rule of Civil Procedure 9(b)’s

pleading requirements in alleging Fraudulent Misrepresentation (Count IX), Fraudulent

Concealment (Count XI), and Fraud (Count XII). Mot. at 11–13. Plaintiffs only respond to this

argument as it relates to their fraud claim. Resp. at 4. Plaintiffs’ failure to respond to Defendants’

arguments as to Counts IX and XI is a concession to their dismissal, because “a ‘party’s failure to

respond to any portion or claim in a motion indicates such portion, claim or defense is

unopposed.’” See, e.g., Rasof v. Lyubovny, No. 22-60930, 2022 WL 18464860, at *2 (S.D. Fla.

Nov. 1, 2022) (quoting Jones v. Bank of Am., N.A., 564 F. App’x 432, 434 (11th Cir. 2014)).

Federal Rule of Civil Procedure 9(b) mandates that when a complaint contains allegations

of fraud or mistake the plaintiff “must state with particularity the circumstances constituting fraud

or mistake.” See FED. R. CIV. P. 9(b). The particularity requirement ensures the complaint “alert[s]

defendants to the precise misconduct with which they are accused.” See Perkins v. Nat’l LGBTQ

Task Force, Inc., 580 F. Supp. 3d 1236, 1239 (S.D. Fla. 2021) (citation omitted). Rule 9(b) does

not dispose of notice pleading, but Plaintiffs must allege “the who, what, when, where, and how

of the allegedly false statements.” Mizzaro v. Home Depot, Inc., 544 F.3d 1230, 1237 (11th Cir.

2008). A plaintiff can meet this requirement by alleging sufficient information regarding (1) the

allegedly fraudulent statements or omissions, as well as the documents or oral representations

where they were made; (2) when and where these statements or omissions were made and who

made them; (3) the content of these statements and how the plaintiff was misled by them; and (4)

the benefit the defendant gained from making the fraudulent statements or omissions. See

FindWhat Invs. Grp. v. FindWhat.com, 658 F.3d 1282, 1296 (11th Cir. 2011).

Here, Plaintiffs certainly plead some specifics in Count XII. For example, Plaintiffs

identify two Knauf employees—Mike Norris and Isabel Knauf—who in some form internally

discussed complaints Defendants received about the drywall. Compl. ¶ 145. Plaintiffs also allege

that after Defendants confirmed the drywall was defective, they entered into an indemnification

agreement with one of their distributors in an effort “to encourage continuing sales of the defective

product without any limitation or disclosure regarding the defective nature of their product.”

Compl. ¶ 145. This indemnification agreement allegedly provided that the parties would keep the

agreement confidential. Compl. ¶ 145. Plaintiffs have sufficiently pleaded the “what” of the

allegedly fraudulent statements: they identify several pieces of information they believe

Defendants needed to disclose, such as the “drywall was not adequately tested” and “that testing

had revealed unreasonably high risk of damage to homes and personal property.” Compl. ¶ 145.

However, Plaintiffs’ allegations as to the “when” and “where” of the fraudulent statements

or omissions are too conclusory. Plaintiffs simply allege that “each and every advertisement and

marketing channel” omits information about the risks posed by the drywall and overstates its

quality. See Compl. ¶ 145. The Complaint contains no temporal limitation on these

advertisements or marketing channels other than they must have been made after some unspecified

time in 2006, when Defendants first learned about the true nature of the drywall. See generally

Compl. Without further allegations regarding these statements—such as their nature or general

content and a reasonable timeframe during which they were made—the Complaint falls short of

putting Defendants on notice of their “precise misconduct.” Perkins, 580 F. Supp. 3d at 1239

(citation omitted); see also Galstaldi v. Sunvest Communities USA, LLC, 637 F. Supp. 2d 1045,

1059 (S.D. Fla. 2009) (“Plaintiffs are not expected to specify the exact time and the particular

place of each factual omission or misrepresentation, but they must provide a sufficiently narrow

time frame from which defendants could derive notice as to when the misrepresentations were

made.” (citation omitted)). Plaintiffs must therefore replead Count XII.

Though the Court construes Plaintiffs’ failure to respond to Defendants’ arguments relating

to Counts IX and XI as a concession to the dismissal of those claims, a review of these counts

shows they share the same deficiency. Count IX alleges that Defendants distributed “marketing

material” and “information about [Defendants’] product” that overstated the quality of the drywall

and did not contain information that Defendants were purportedly required to disclose. Compl. ¶¶

113–17. Count XI similarly claims that Defendants “provided false information” to “Plaintiffs,

Plaintiff’s builders, distributors, importers, and the public.” Compl. ¶ 133. Plaintiffs also allege

Defendants should have disclosed information about the known risks in “advertising, marketing

materials, sales personnel, [and] publications.” Compl. ¶ 134. While Rule 9(b)’s requirements

are not exacting, Plaintiffs must include additional information about these allegedly fraudulent

materials to put Defendants on notice of the claims against them. Plaintiffs must therefore replead

these claims as well.

III. Discovery Rule Applicability

In a section of the Complaint simply labeled “Discovery Rule,” Plaintiffs blanketly allege

their causes of action “did not accrue until Plaintiffs discovered” the defective nature of the

drywall. See Compl. ¶ 45. The Knauf Defendants argue that Plaintiffs must amend this portion

of their Complaint to include more factual information about the applicability of a discovery rule.

See Mot. at 8–9. Plaintiffs do not appear to respond to this argument.

A plaintiff does not need to preempt a defendant’s affirmative defenses. See, e.g., Merino

v. Ethicon Inc., 536 F. Supp. 3d 1271, 1288 (S.D. Fla. 2021) (dismissing a distinct cause of action

for “[d]iscovery [r]ule, [t]olling and [f]raudulent [c]oncealment” because these were simply

“pre-emptive attacks on Defendants’ potential affirmative defenses”). However, a plaintiff

purporting to rely on equitable tolling based on a discovery rule must plead sufficient facts to

demonstrate when the discovery occurred and that the plaintiff was diligent in discovering the

claim. See Varner v. Domestic Corp., No. 16-22482, 2017 WL 3730618, at *9 (S.D. Fla. Feb. 7,

2017); Eddit v. Bank of Am., No. 8:17–cv–1534–T–26TBM, 2018 WL 573406, at *4 (M.D. Fla.

Jan. 26, 2018).

It is unclear from the Complaint whether this section is meant to preemptively invoke an

argument based on a statute of limitations, statute of repose (insofar as Florida law provides for

statutory tolling of a repose period), or both. No matter which tolling rule Plaintiffs attempt to

invoke, they do not plead any facts relating to when they discovered the defect. See generally

Compl. ¶ 45–47. Therefore, if Plaintiffs intend to rely on a discovery rule, they must include

factual allegations relating to when they discovered their claims and their diligence. Though this

is not an independent claim, the Court will require Plaintiffs to replead this section of the

Complaint.

IV. Unjust Enrichment

Defendants move to dismiss Plaintiffs’ claims for Unjust Enrichment (Count VII), arguing

they are duplicative of Plaintiffs’ other claims. Mot. at 13. Plaintiffs once again did not respond

to this argument and have thus conceded these claims warrant dismissal. Jones, 564 F. App’x at

434. Nonetheless, Defendants are correct these claims should be dismissed. Unjust enrichment is

an equitable remedy that may be plead in the alternative to legal causes of action, but when a claim

for unjust enrichment is based purely on the “same factual predicates” as a legal theory “it is not a

true alternative theory of relief.” See, e.g., Koski v. Carrier Corp., 347 F. Supp. 3d 1185, 1196

(S.D. Fla. 2017) (citing Licul v. Volkswagen Grp. of Am., Inc., No. 13–61686, 2013 WL 6328734,

at *7 (S.D. Fla. Dec. 5, 2013)). Count VII of the Complaint simply incorporates by reference the

allegations of preceding counts and alleges it would be unjust for Defendants to retain any benefit

they received. Compl. ¶¶ 104–107. Thus, this claim is not sufficiently distinct from Plaintiffs’

legal causes of action and must be dismissed as duplicative.

V. Breach of Express or Implied Warranties

Defendants argue Plaintiffs’ claims for Breach of Express and/or Implied Warranties

(Count IV) must be dismissed because Plaintiffs were not in privity with the Knauf Defendants,

and alternatively, did not provide the Knauf Defendants with notice as required by Florida law.

Mot. at 9-10. In their Response, Plaintiffs concede that they were not in privity with the Knauf

Defendants and these claims should be dismissed. Resp. at 4. Therefore, Plaintiffs’ amended

complaint must omit these claims.

CONCLUSION

For the foregoing reasons, Defendants’ Motion, [ECF No. 40], is GRANTED IN PART

AND DENIED IN PART as follows:

1. Counts IX, XI, and XII, and the section of the Complaint relating to the “Discovery

Rule” are dismissed without prejudice with leave to amend.

2. Counts IV and VII are dismissed with prejudice.

3. Plaintiffs must file an amended complaint on or before April 8, 2023.

4. The parties shall file a Joint Scheduling Report within fourteen (14) days of the

date of this Order.

DONE AND ORDERED in Miami, Florida, this 8th day of March, 2023.

UNITED STATES DISTRICT JUDGE

Page 11 of 11