Opinion

CMR Construction & Roofing, LLC v. ASI Preferred Insurance Corporation

Court
District Court, M.D. Florida
Filed
Mar 9, 2021
Cited by
0 cases
Authority
More cited than 19.8%

finding insurer “incurred additional loss” when the city “required compliance with current ordinances in order to complete repairs”

How later courts described this case

  • finding insurer “incurred additional loss” when the city “required compliance with current ordinances in order to complete repairs”
  • “[C]ourts have almost uniformly held that an insurance company’s liability for replacement cost does not arise until the repair or replacement has been completed.”
  • listing “whether better conclusions could have been drawn without the delay” and “whether those conclusions could have been drawn more easily” as factors in determining whether an insured rebuts the presumption of prejudice
  • “Nor does PDQ proffer anything to indicate that the condition of the Property was in the same condition as it was after the storm. In fact, PDQ has indicated that the damages got worse over time.”

Written by the judges who cited it.

The opinion

UNITED STATES DISTRICT COURT

MIDDLE DISTRICT OF FLORIDA

FORT MYERS DIVISION

CMR CONSTRUCTION & ROOFING,

LLC A/A/O LAWRENCE

FARRINGTON,

Plaintiff,

v. Case No: 2:19-cv-442-FtM-29MRM

ASI PREFERRED INSURANCE

CORPORATION,

Defendant.

OPINION AND ORDER

This matter comes before the Court on defendant’s Motion for

Summary Judgment (Doc. #50) filed on September 3, 2020. Plaintiff

filed an Opposition (Doc. #61) on September 28, 2020, to which

defendant filed a Reply (Doc. # 66) on October 5, 2020. For the

reasons set forth below, the motion is granted in part and denied

in part.

I.

A. Factual Background

Defendant ASI Preferred Insurance Corporation (defendant or

ASI) issued a residential insurance policy (the Policy) to non-

party Lawrence Farrington (Farrington or the insured) which

provided coverage for Farrington’s home in Bonita Springs,

Florida. (Doc. #50, p. 2; Doc. #61, p. 1.)1 Damage to Farrington’s

roof, allegedly caused by Hurricane Irma in September 2017, was

discovered in March 2018. (Doc. #46-1, p. 77; Doc. #49-3, p. 96;

Doc. #50, p. 2; Doc. #61, p. 1.) On September 11, 2018, Farrington

contracted with plaintiff CMR Construction & Roofing, LLC (CMR or

plaintiff) to perform roof repairs, and assigned to CMR any and

all insurance rights, benefits, and proceeds under the Policy

related to the roof. (Doc. #3, ¶ 7; Doc. #3-1, p. 6.)

In mid-September 2018, ASI received its first notice that

there was a loss covered by the Policy.2 (Doc. #46-1, pp. 4, 77.)

CMR subsequently submitted an estimate for the needed roof repairs,

determining the entire roof needed to be replaced and estimating

the replacement cost value as $224,080.40. (Doc. #49-1, p. 76;

Doc. #49-2, pp. 91-95.) ASI investigated the claim while reserving

its rights under the Policy due, inter alia, to the untimely

notification of the loss. (Doc. #46-1, p. 77.)

1 The background facts are either undisputed or read in the

light most favorable to plaintiff as the nonmoving party. However,

these facts, accepted at the summary judgment stage of the

proceedings, may not be the “actual” facts of the case. Priester

v. City of Riviera Beach, Fla., 208 F.3d 919, 925 n.3 (11th Cir.

2000).

2 Defendant’s motion states the loss was first reported to it

on September 18, 2018, a fact which plaintiff admits in its

opposition. (Doc. #50, p. 2; Doc. #61, p. 1.) However, the record

demonstrates the loss was reported on September 12, 2018. (Doc.

#46-1, pp. 4, 77.) The difference is not material to any issue in

this motion.

An independent adjuster inspected the roof in September 2018

and determined it could be repaired for $763.31. (Doc. #46-1, pp.

85-87.) In October 2018, ASI hired a licensed professional

engineer to determine the cause and origin of the claimed roof

damage. (Doc. #45-1, p. 3.) The engineer inspected the property

on November 9, 2018 and observed vertically cracked roof tiles,

right corner cracked tiles, loose ridge/hip tiles, and two

displaced tiles. (Id. pp. 3-4.) The engineer determined the

vertically cracked tiles were caused by individuals walking on the

roof, the corner cracked tiles were likely the result of thermal

expansion or contraction, and the displaced tiles were caused by

wind. (Id. p. 4.) Regarding the latter, the engineer determined

the two displaced tiles were not cracked or broken and could be

reattached without needing to be replaced. (Id.)

Following these inspections and its claims investigation, ASI

determined that the only damage covered by the Policy was the loose

cap tiles, and that the cost to repair these fell below the

Policy’s $17,640 hurricane deductible. (Doc. #46-1, pp. 4, 80-

81.) Accordingly, the claim for wind damage was denied payment.

(Id. p. 81.) The failure to provide prompt notice of the loss was

not listed as a reason for denying the claim.

B. Procedural Background

In May 2019, CMR filed a one-count breach of contract

Complaint for Damages in the Circuit Court for the Twentieth

Judicial Circuit in and for Lee County, Florida. (Doc. #1-1.)

Defendant removed the case to federal court on the basis of

diversity jurisdiction under 28 U.S.C. § 1332(a). (Doc. #1.)

Defendant filed its Answer, Affirmative Defenses and Demand for

Jury Trial. (Doc. #9.) ASI asserted as an affirmative defense

that recovery under the Policy was barred by the failure to comply

with the Policy requirement that ASI be provided with prompt notice

of a loss. (Id. pp. 4-5.)

Defendant now seeks summary judgment on a variety of issues.

Specifically, ASI argues (1) recovery is barred as a matter of law

due to the late notice of the alleged loss; (2) plaintiff’s

recovery is limited to actual cost value only; (3) plaintiff is

not entitled to recovery of “matching” damages; (4) ordinance or

law coverage damages are not recoverable; and (5) any damages

relating to the home’s screened enclosure are limited by the

Policy. (Doc. #50, pp. 9- 20.) Plaintiff opposes all arguments

except for the last.

II.

Summary judgment is appropriate only when the Court is

satisfied that “there is no genuine dispute as to any material

fact and the movant is entitled to judgment as a matter of law.”

Fed. R. Civ. P. 56(a). “An issue of fact is ‘genuine’ if the

record taken as a whole could lead a rational trier of fact to

find for the nonmoving party.” Hickson Corp. v. N. Crossarm Co.,

Inc., 357 F.3d 1256, 1260 (11th Cir. 2004) (citation omitted). A

fact is “material” if it may affect the outcome of the suit under

governing law. See Anderson v. Liberty Lobby, Inc., 477 U.S. 242,

248 (1986). “A court must decide ‘whether the evidence presents

a sufficient disagreement to require submission to a jury or

whether it is so one-sided that one party must prevail as a matter

of law.’” Hickson, 357 F.3d at 1260 (quoting Anderson, 477 U.S.

at 251).

In ruling on a motion for summary judgment, the Court views

all evidence and draws all reasonable inferences in favor of the

nonmoving party. Tana v. Dantanna’s, 611 F.3d 767, 772 (11th Cir.

2010). However, “[i]f reasonable minds might differ on the

inferences arising from undisputed facts, then the court should

deny summary judgment.” St. Charles Foods, Inc. v. America’s

Favorite Chicken Co., 198 F.3d 815, 819 (11th Cir. 1999) (quoting

Warrior Tombigbee Transp. Co. v. M/V Nan Fung, 695 F.2d 1294, 1296-

97 (11th Cir. 1983)). “If a reasonable fact finder evaluating the

evidence could draw more than one inference from the facts, and if

that inference introduces a genuine issue of material fact, then

the court should not grant summary judgment.” Allen v. Bd. of

Pub. Educ. for Bibb Cty., 495 F.3d 1306, 1315 (11th Cir. 2007).

III.

A. “Prompt Notice” of Loss

Defendant first argues that all recovery under the Policy is

barred because the insured failed to provide it with prompt notice

of the loss, as required by the Policy. (Doc. #50, p. 9.) The

Policy requires that in case of loss to the insured property, the

insured must “[g]ive prompt notice” to ASI. (Doc. #46-1, p. 32.)

Defendant argues that because it was not given notice of the loss

until a year after Hurricane Irma, the prompt notice requirement

of the Policy was not met as a matter of law. (Doc. #50, pp. 9-

13.) Plaintiff responds that this issue may not be resolved on a

motion for summary judgment because there are material disputed

facts, which must be resolved by a jury. (Doc. #61, pp. 4-5.)

Insurance policies often require an insured to provide the

insurer with “prompt notice” (or some functionally equivalent

phrase) of loss to the insured property. The purpose of a notice

provision in an insurance policy is to allow an insurer “to

evaluate its rights and liabilities, to afford it an opportunity

to make a timely investigation, and to prevent fraud and imposition

upon it.” LoBello v. State Farm Fla. Ins. Co., 152 So. 3d 595,

3

598 (Fla. 2d DCA 2014) (citation omitted). In Florida , a notice

3

In this diversity case, Florida substantive law applies

because the insurance contract was negotiated in Florida. PDQ

of damage is generally a pre-condition to a claim. Bankers Ins.

Co. v. Macias, 475 So. 2d 1216, 1218 (Fla. 1985). An insured’s

failure to give timely notice under such a policy provision is “a

legal basis for the denial of recovery under the policy.” Ideal

Mut. Ins. Co. v. Waldrep, 400 So. 2d 782, 785 (Fla. 3d DCA 1981);

see also LoBello, 152 So. 3d at 599.

Most Florida cases follow a two-step analysis to determine

whether an insured’s notice to the insurer sufficiently complied

with such a policy requirement. Rodriguez v. Avatar Prop. & Cas.

Ins. Co., 290 So. 3d 560, 564 (Fla. 2d DCA 2020) (citation

omitted). Essentially, the inquiry involves a determination of

whether the notice of loss was timely and, if not, a determination

of whether the insurer was prejudiced by the untimely notice.

LoBello, 152 So. 3d at 599.

(1) Timely Notice

The first step “is to determine whether or not the notice was

timely given.” Rodriguez, 290 So. 3d at 564 (citation omitted).

This requires the identification of the triggering event from which

the time period is measured and the determination of whether the

notice was sufficiently prompt. A triggering event must be of

sufficient consequence to trigger an insured’s duty to provide

Coolidge Fromad, LLC v. Landmark Am. Ins. Co., 566 F. App’x 845,

847 (11th Cir. 2014).

notice. See Waldrep, 400 So. 2d at 785 (““Notice is necessary

when there has been an occurrence that should lead a reasonable

and prudent man to believe that a claim for damages would arise.”).

The hurricane itself may or may not be the event that would trigger

the notice requirement, Laquer v. Citizens Prop. Ins. Corp., 167

So. 3d 470, 473–75 (Fla. 3d DCA 2015), but neither awareness of

the full extent of the damage nor the determination of causation

are necessary for the notice requirement to be triggered. See

1500 Coral Towers Condo. Ass’n, Inc. v. Citizens Prop. Ins. Corp.,

112 So. 3d 541, 543 (Fla. 3d DCA 2013) (“[A]n insured must give

notice of the loss that implicates a potential claim without

waiting for the full extent of the damages to become apparent.”);

Waldrep, 400 So. 2d at 785 (“[T]he insured could not wait until

the full extent of the damage to the aircraft was apparent, because

the policy covered any ‘occurrence’ resulting in injury to the

aircraft.”).

“Prompt” is undefined in the Policy, but its meaning is well

settled under Florida law. “Prompt” and other comparable phrases,

like “immediate” and “as soon as practicable,” do not require

instantaneous notice. Cont’l Cas. Co. v. Shoffstall, 198 So. 2d

654, 656 (Fla. 2d DCA 1967). Rather, these phrases mean that

notice should be provided “with reasonable dispatch and within a

reasonable time in view of all of the facts and circumstances of

the particular case.” Laquer, 167 So. 3d at 474 (quoting Yacht

Club on the Intracoastal Condo. Ass’n v. Lexington Ins. Co., 599

F. App’x. 875, 879 (11th Cir. 2015)). The determination of whether

an insured provides “prompt” notice of a loss to an insurer is

usually a question for the finder of fact after considering all

the facts and circumstances of each particular case. Himmel v.

Avatar Prop. & Cas. Ins. Co., 257 So. 3d 488, 492 (Fla. 4th DCA

2018) (citation omitted); Everett v. Avatar Prop. & Cas. Ins. Co.,

2D19-1563, 2021 WL 300443, *4 (Fla. 2d DCA Jan. 29, 2021)

(citations omitted). Florida courts have not created a bright

line rule for when notice to an insurer is no longer “prompt.”

Restoration Constr., LLC v. SafePoint Ins. Co., 308 So. 3d 649,

652 (Fla. 4th DCA 2020).

While resolution of a promptness issue is usually for a jury,

Florida cases have recognized that “this issue of fact may

sometimes be resolved by summary judgment.” Laquer, 167 So. 3d at

474; see also Rodriguez, 290 So. 3d at 564.

(2) Prejudice From Lack of Timely Notice

In Florida, a failure to give timely notice creates a

rebuttable presumption of prejudice to the insurer. PDQ, 566 Fed.

App’x at 849 (citing Macias, 475 So. 2d at 1217-18). “The burden

is ‘on the insured to show lack of prejudice where the insurer has

been deprived of the opportunity to investigate the facts.’” Id.

(quoting Macias, 475 So. 2d at 1218).

To carry this burden, an insured may submit evidence

creating a dispute of fact as to: “(a) whether better

conclusions could have been drawn without the delay” in

providing notice, “(b) whether those conclusions could

have been drawn more easily,” “(c) whether the repairs

to the affected areas that took place in the interim

would complicate an evaluation of the extent of the

damage or [the insured’s] efforts to mitigate its

damages,” or (d) whether “an investigation conducted

immediately following the occurrence would not have

disclosed anything materially different from that

disclosed by the delayed investigation.”

Lehrfield, 396 F. Supp. 3d at 1184 (quoting PDQ, 566 F. App’x at

849-50); see also Yacht Club, 599 F. App’x at 882 (“[I]f an

investigation conducted immediately following the occurrence would

not have disclosed anything materially different from that

disclosed by the delayed investigation, an insured may rebut the

presumption.” (marks and citations omitted)).

“Whether the presumption of prejudice to the insurer has been

overcome is ‘ordinarily . . . a separate issue of fact.’” De La

Rosa v. Fla. Peninsula Ins. Co., 246 So. 3d 438, 441 (Fla. 4th DCA

2018) (citation omitted). Prejudice is properly resolved on

summary judgment, however, where an insured fails to present

evidence sufficient to rebut the presumption. PDQ, 566 F. App’x

at 849 (citations omitted).

(3) Application of Legal Principles

(a) Prompt Notice

The Court rejects plaintiff’s suggestion that the promptness

of notice “is only appropriate for a jury’s determination.” (Doc.

#61, pp. 4-5); see Laquer, 167 So. 3d at 474; Yacht Club, 599 F.

App’x at 879; PDQ, 566 F. App’x at 848.

The undisputed summary judgment facts are that Hurricane Irma

passed through the Bonita Springs area in September 2017; plaintiff

first became aware of the roof damage in March 2018; and the claim

was not reported to the insurer until September 2018. While the

record is less clear as to when the insured became aware of the

damage, a reasonable inference is that he became aware of the

condition of the roof at or near the time he hired plaintiff to

inspect his roof. Despite defendant’s focus on the date of

Hurricane Irma in September 2017, the arguably applicable

triggering date for the notice requirement is the date the damage

was discovered, March 2018. Accordingly, the issue is whether the

six-month delay between discovery of the damage in March 2018 and

reporting it to the insurer in September 2018 constitutes prompt

notice under the Policy.

As plaintiff acknowledges, the main issue is “whether six

months is within the timeframe of a reasonably prudent person.”

(Doc. #61, p. 6.) While “there is no ‘bright-line’ rule under

Florida law setting forth a particular period of time beyond which

notice cannot be considered ‘prompt,’” Yacht Club, 599 F. App’x at

879, several courts have found similar delays untimely as a matter

of law. See, e.g., PDQ, 566 F. App’x at 849 (six months); Tamiami

Condo. Warehouse Plaza Ass’n, Inc. v. Markel Am. Ins. Co., 2020 WL

1692177, *2 (S.D. Fla. Feb. 24, 2020) (seven months); Lehrfield v.

Liberty Mut. Fire Ins. Co., 396 F. Supp. 3d 1178, 1183 (S.D. Fla.

2019) (eight months).

Plaintiff’s corporate representative testified that he had

“[n]o idea” why the claim was not reported until September 2018.

(Doc. #49-1, p. 44.) When asked why he waited to report the claim,

Farrington testified, “Probably because I didn’t think much was

wrong.” (Doc. #48-1, pp. 44-45.) However, even if Farrington was

not aware of the full extent of the damage, “an insured’s good

faith belief that the damage is trivial or not covered by the

policy is insufficient to justify non-compliance with the policy’s

notice provision.” Kendall Lakes Towers Condo. Ass’n, Inc. v.

Pacific Ins. Co., Ltd., 2012 WL 266438, *4 (S.D. Fla. Jan. 30,

2012); see also Yacht Club, 599 F. App’x at 880 (“Whatever concerns

the Board had about the extent of damage and its deductible are

not relevant under Florida law. Prompt notice is not excused

because an insured might not be aware of the full extent of damage

or that damage would exceed the deductible.”). Having considered

the evidence in the record as well as the arguments of the parties,

the Court finds as a matter of law that prompt notice was not

provided in this case. See Tamiami Condo., 2020 WL 1692177, *2

(finding no genuine dispute concerning whether notice was prompt

where record indicated plaintiff was aware of hurricane damage

seven months before reporting the claim and hired a roofing

contractor shortly after the storm). Accordingly, the Court

proceeds to the question of prejudice.

(b) Prejudice to Insurer

Plaintiff suggests that the evidence submitted by defendant

is insufficient to demonstrate prejudice. (Doc. #61, pp. 7-8.)

However, since the Court has determined prompt notice of the loss

was not given, defendant’s burden of demonstrating prejudice is

satisfied by the presumption, and the burden is shifted to

plaintiff to overcome the presumption of prejudice. See Yacht

Club, 599 F. App’x at 881 (“The Yacht Club criticizes Lexington

for failing to place any evidence in the record to show that it

was prejudiced by the late notice. Such a requirement, however,

would flip the burden from the insured to the insurer, which is

contrary to Florida law.”).

Plaintiff argues there is sufficient evidence in the record

to show defendant was not prejudiced, thus rebutting the

presumption, or at the very least enough evidence to create a jury

question on the issue. (Doc. #61, p. 9.) Plaintiff asserts that

prejudice is rebutted because defendant was able to determine the

cause of the roof damage. (Id. p. 7.)

But defendant has presented evidence that its investigation

was impacted by the delayed notice. In his declaration, the

engineer hired by defendant asserts that although he was able to

determine the cause of the observed damage, “the passage of time

from the date of loss until [his] inspection hindered [his] ability

to determine a general time-frame of when the damage occurred.”

(Doc. #45-1, p. 4.) The engineer also states that “[a] timely

inspection would have allowed [him] to more easily determine

whether the conditions [he] observed on the roof resulted from

post-loss maintenance and/or repairs, or if they were present

before Hurricane Irma.”4 (Id.) This was corroborated by

plaintiff’s own expert engineer, who testified at a deposition

that “the closer you inspect to the actual event, the more data

you’ll be able to collect.” (Doc. #47-1, pp. 77-78.) When asked

if it would have assisted him to have inspected the roof closer in

time to Hurricane Irma to make a better determination, plaintiff’s

engineer agreed that “[i]t would help.” (Id. p. 77); see PDQ, 566

F. App’x at 849-50 (listing “whether better conclusions could have

been drawn without the delay” and “whether those conclusions could

have been drawn more easily” as factors in determining whether an

insured rebuts the presumption of prejudice).

However, although initially reserving its right to deny the

claim due to the failure to provide prompt notice, defendant

ultimately denied the claim solely due to its determination that

4 Plaintiff argues that this assertion should be stricken

because it contradicts the engineer’s determination as to the cause

of the roof damage. (Doc. #61, p. 7.) The Court disagrees. As

previously noted, the ability to determine causation does not mean

prejudice does not exist. Yacht Club, 599 F. App’x at 881.

the damage fell below the amount of the policy’s hurricane

deductible. This fact undermines defendant’s suggestion that the

delayed notice affected its ability to investigate the claim.

The evidence is similarly contradictory as to whether the

condition of the roof materially changed before defendant was

alerted to the damage. On the one hand, the evidence does not

suggest the damage to the roof worsened between the date of

discovery and the date of notification, a factor the Eleventh

Circuit has focused on in finding prejudice to an insurer. Yacht

Club, 599 F. App’x at 881 (“[E]ven The Yacht Club’s own expert

acknowledged that the structure sustained additional damage

because repairs were not made immediately after Hurricane Wilma.

. . . This is evidence of the prejudicial effect of the passage of

time.”); PDQ, 566 F. App’x at 850 (“Nor does PDQ proffer anything

to indicate that the condition of the Property was in the same

condition as it was after the storm. In fact, PDQ has indicated

that the damages got worse over time.”). On the other hand, there

is also evidence that Farrington hired someone to make minor

repairs to the roof, although it is unclear as to when these

repairs took place. (Doc. #48-1, p. 22); see Yacht Club, 599 F.

App’x at 881 (“The Yacht Club undertook certain repairs before

filing a claim with Lexington. Lexington was prejudiced by not

being able to investigate prior to those repairs and by not

participating in the repair of those damages.”).

Viewing it in the light most favorable to plaintiff as the

non-moving party, the Court finds the record contains conflicting

evidence as to “whether better conclusions could have been drawn

without the delay,” “whether those conclusions could have been

drawn more easily,” “whether the repairs to the affected areas

that took place in the interim would complicate an evaluation of

the extent of the damage,” and whether “an investigation conducted

immediately following the occurrence would not have disclosed

anything materially different from that disclosed by the delayed

investigation.” Lehrfield, 396 F. Supp. 3d at 1184 (quoting PDQ,

566 F. App’x at 849-50). The Court concludes there is sufficient

evidence in the record to create a jury question on this issue of

whether the presumption of prejudice has been rebutted. See

Kendall Lakes, 2012 WL 266438, *7 (“[W]hether a prompt

investigation would have enabled Pacific to determine the cause of

the damage with greater certainty or to take steps to mitigate

damages and, if so, whether Pacific was placed at a substantial

disadvantage as to be prejudiced by the delay, present genuine

questions of material fact that cannot be resolved on a motion for

summary judgment.”).

B. Replacement Cost Value Damages

The Policy at issue contains a loss settlement provision

stating that property losses to buildings covered by the Policy,

such as dwellings, are settled at replacement cost without

deduction for depreciation. (Doc. #46-1, pp. 14, 18.) However,

the Policy also states that the insurer “will pay no more than the

actual cash value of the damage until actual repair or replacement

is complete.” (Id. p. 18.) It is undisputed that none of the

repairs in plaintiff’s $224,080.40 estimate have been completed

yet. Defendant therefore argues that plaintiff is barred from

seeking replacement cost value (RCV) damages in this case. (Doc.

#50, pp. 13-16.) The Court agrees.

In Buckley Towers Condominium, Inc. v. QBE Insurance

Corporation, the court stated:

In the first place, the insurance contract unambiguously

requires the insured to repair its property before

receiving RCV damages. The insurance contract

specifically provides that QBE “will not pay on a

replacement cost basis for any loss or damage (1) Until

the lost or damaged property is actually repaired or

replaced; and (2) Unless the repairs or replacement are

made as soon as reasonably possible after the loss or

damage.” . . . The insurance contract contains no

allowances for advance payments to fund repairs. Both

parties agree, and the record undeniably establishes,

that Buckley Towers never completed repairs and, thus,

would be barred from recovering RCV damages under the

plain terms of the contract.

Id. at 662-63; see also CMR Constr. & Roofing, LLC v. Empire Indem.

Ins. Co., 2021 WL 246201, *2 (11th Cir. Jan. 26, 2021) (“The

insurance policy provides that a claim for replacement cost value

will not be paid ‘[u]ntil the lost or damaged property is actually

repaired or replaced’ and ‘[u]nless the repairs or replacement are

made as soon as reasonably possible after the loss or damage.’

That ‘until and unless’ provision is plain and unambiguous. It

means that Empire was not obligated to pay CMR the replacement

cost value until CMR had actually made the repairs and incurred

the costs of doing so.”); Ceballo v. Citizens Prop. Ins. Corp.,

967 So. 2d 811, 815 (Fla. 2007) (“[C]ourts have almost uniformly

held that an insurance company’s liability for replacement cost

does not arise until the repair or replacement has been

completed.”); Palm Bay Yacht Club Condo. Ass’n, Inc. v. QBE Ins.

Corp., 2012 WL 13012457, *5 (S.D. Fla. May 8, 2012) (“The Court

agrees with QBE that it owes no coverage for replacement-cost-

value benefits for items that Palm Bay has not repaired or

replaced. The policy states plainly that QBE ‘will not pay on a

replacement cost basis for any loss or damage’ ‘[u]ntil the lost

or damaged property is actually repaired or replaced.’ . . . .

Here, where repairs have yet to occur, the policy by its plain

language does not afford replacement-cost-value coverage.”); Ocean

View Towers Ass’n, Inc. v. QBE Ins. Corp., 2011 WL 6754063, *11

(S.D. Fla. Dec. 22, 2011) (“As QBE correctly argues, the policy

plainly provides RCV coverage only after ‘the lost or damaged

property is actually repaired or replaced,’ and even then only if

‘the repairs or replacement[s] are made as soon as reasonably

possible after the loss or damage.’ Here, the repairs have yet to

occur; therefore, the policy does not afford RCV coverage.”

(citation omitted)).

Plaintiff relies mainly upon Citizens Property Insurance

Corporation v. Tio, 304 So. 3d 1278 (Fla. 3d DCA 2020). (Doc.

#61, pp. 9-11.) In Tio, the insurer argued section 627.011(3),

Florida Statutes, limited the damages a jury may award for breach

of an insurance contract. Id. at 1280. Here, while defendant

cites to section 627.7011(3) in support, its argument is based on

the language of the Policy. (Doc. #50, p. 13, 16) (“The plain

language of the policy limits Plaintiff’s initial recovery to ACV

only, until repairs have been made. . . . The policy and Florida

case law are clear in that Plaintiff is not able to recover the

RCV amounts sought in its estimate based on the fact that the

estimated repairs have not yet been performed.”). Because the

insurer apparently did not argue that RCV damages were precluded

under the language of the policy, Tio is not applicable to this

case.

The Eleventh Circuit has rejected plaintiff’s argument that

defendant’s failure to tender ACV prevented the repairs from taking

place (Doc. #61, p. 11):

Under Florida’s binding law, . . . courts are not free

to rewrite the terms of an insurance contract and where

a policy provision “is clear and unambiguous, it should

be enforced according to its terms.” Acosta, Inc. v.

Nat’l Union Fire Ins. Co., 39 So. 3d 565, 573 (Fla. Dist.

Ct. App. 2010) (citation and quotation marks

omitted). Allowing Buckley Towers to claim RCV damages

without repairing or replacing entirely removes the

plaintiff’s obligations under the Replacement Cost Value

section of the contract. The parties freely negotiated

for that contractual provision and it is not the place

of a court to red-line that obligation from the contract.

Nor is it a defense to say that it would be costly for

Buckley Towers to comply with the insurance contract as

written. “Inconvenience or the cost of compliance [with

contractual terms], though they might make compliance a

hardship, cannot excuse a party from the performance of

an absolute and unqualified undertaking to do a thing

that is possible and lawful.” N. Am. Van Lines v.

Collyer, 616 So. 2d 177, 179 (Fla. Dist. Ct. App.

1993). Although Buckley Towers may be unable to receive

the full range of benefits of their contract without an

advance payment under Florida law, that cost and

inconvenience may not relieve them of repairing the

building prior to claiming RCV damages.

Buckley Towers, 395 F. App’x at 663.

It is undisputed that the repairs have not been completed.

Accordingly, the Court will enter summary judgment in favor of

defendant finding that plaintiff may not recover RCV damages at

this time.

C. Matching Damages

Defendant argues that pursuant to the Policy plaintiff is

precluded from seeking “matching” damages, i.e., “replacement of

undamaged property to ensure that it matches replacements to

physically damaged materials.” (Doc. #50, pp. 16-18.) The Policy

provides coverage for “direct loss” to the residence. (Doc. #46-

1, p. 14.) Because replacement of undamaged property does not

constitute property that suffered a “direct loss,” defendant

argues matching damages are inappropriate. (Doc. #50, pp. 16-18.)

Plaintiff responds that because the need to replace the roof is

not merely based on matching, there is a question of fact “as to

the proper methodology of repair due to the physical damage to the

roof itself.” (Doc. #61, pp. 12-14.)

The Court agrees with defendant that matching damages do not

fall within the Policy’s definition of “direct loss.” See Palm

Bay Yacht Club, 2012 WL 13012457, *4 (“[T]he Court agrees with QBE

that it owes no coverage for costs related to matching or

uniformity. The policy provides that QBE will pay for ‘direct

physical loss of or damage’ to the covered property resulting from

any covered cause of loss. Palm Bay cites no policy provision

showing its entitlement to matching of undamaged property to newly-

repaired property.”); Ocean View Towers, 2011 WL 6754063, *10 (“QBE

argues that the policy provides coverage only for ‘direct physical

loss or damage’ and does not cover the replacement of undamaged

property to ensure ‘matching.’ The Court agrees.”).

As acknowledged by defendant, section 626.9744(2), Florida

Statutes, provides that in homeowner insurance claims in which a

loss requires replacement of items and the replaced items do not

match in quality, color, or size, “the insurer shall make

reasonable repairs or replacement of items in adjoining areas.”

However, the statute’s requirements apply “[u]nless otherwise

provided by the policy.” § 626.9744, Fla. Stat. Here, because

the policy limits coverage to “direct” losses, section 626.9744(2)

would not be applicable. See Vazquez v. Citizens Prop. Ins. Corp.,

304 So. 3d 1280, 1285 (Fla. 3d DCA 2020) (“Ms. Vazquez’s

interpretation further disregards the plain text of the matching

statute, which clearly defers to the policy as controlling.”).

Accordingly, the Court grants summary judgment in defendant’s

favor on this issue. See id. (rejecting argument that matching

costs are part of actual cash value).5

D. Ordinance or Law Damages

For an additional premium, the Policy provides “coverage for

costs associated with the enforcement of any ordinance or law

regulating the construction, repair, or demolition of a building

or structure” insured under the Policy. (Doc. #46-1, p. 57.)

However, the coverage under this provision applies to costs

“incurred” as a result of an ordinance or law. (Id.) Defendant

argues that because plaintiff has not undertaken any repairs of

the roof, it has not incurred any costs and, therefore, is not

entitled to ordinance or law damages. (Doc. #50, pp. 18-19.)

“‘Ordinance and Law’ is the cost of bringing any structure

(here, the roof) into compliance with applicable ordinances or

laws.” Jossfolk v. United Prop. & Cas. Ins. Co., 110 So. 3d 110,

5 The Court’s ruling is limited to the issue of whether

matching damages constitute “direct loss” under the Policy, and

does not preclude plaintiff’s suggestion that replacement of all

the roof tiles is required by the Florida Building Code, or

determine whether such a replacement is covered under any other

Policy provision.

111 (Fla. 4th DCA 2013). In similar situations, several courts,

including the Eleventh Circuit, have determined an insured was not

entitled to such costs when the property was never repaired or

replaced. See, e.g., Buckley Towers, 395 F. App’x at 665 (“[U]nder

Florida law and under the terms of the contract, Buckley Towers is

not entitled to law and ordinance damages because it never repaired

the property and never actually incurred increased damages due to

the enforcement of laws or ordinances.”); Oriole Gardens Condo.

Ass’n I v. Aspen Specialty Ins. Co., 875 F. Supp. 2d 1379, 1385

(S.D. Fla. 2012) (granting summary judgment on issue of whether

party could recover “the increased costs of construction resulting

from compliance with an ordinance or law” because “the policy makes

clear that an insurer must first repair or replace the damaged

property before seeking benefits for increased costs of

construction,” and no repairs or replacement had taken place); Los

Palacios II Condo. Ass’n, Inc. v. Aspen Specialty Ins. Co., 2011

WL 13100234, *6-7 (S.D. Fla. Sept. 6, 2011) (agreeing that insured

was not eligible for coverage related to “increased cost of

construction to comply with enforcement of applicable building

codes” “because it failed to actually repair or replace the damaged

property, as the Policy requires”). While these cases support

defendant’s argument that plaintiff is not entitled to ordinance

or law damages, the Court nonetheless finds summary judgment

inappropriate because there is a genuine issue of material fact as

to whether the costs have been “incurred.”

The record indicates Farrington has entered into a contract

with plaintiff to make repairs to his roof. (Doc. #3-1, p. 6.)

It also indicates that one of the reasons repairs are allegedly

required is to comply with Florida’s Building Code. (Doc. #47-1,

pp. 71-72; Doc. #49-1, pp. 77-78). While the Florida Supreme Court

has held that an insured must have “incurred an additional loss in

order to recover under the supplemental coverage,” it has also

agreed that “‘to incur’ means to become liable for the expense,

but not necessarily to have actually expended it.” Ceballo, 967

So. 2d at 815. The Court finds whether any ordinance or law

damages have been “incurred” in this case is a question for the

jury. See Jossfolk, 110 So. 3d at 113 (finding insurer “incurred

additional loss” when the city “required compliance with current

ordinances in order to complete repairs”); Everhart v. Citizens

Prop. Ins. Corp., 90 So. 3d 374, 375 (Fla 1st DCA 2012) (Makar,

J., specially concurring) (suggesting “entering a written

contract” to rebuild storm-damaged home would constitute incurring

liability for purposes of “law and ordinance” coverage).

Accordingly, defendant’s request for summary judgment on this

issue is denied.

E. Screen-Related Repair Damages

Finally, defendant moves for partial summary judgment on the

issue of whether the Policy covers the cost of rescreening

Farrington’s pool enclosure and the attached door. (Doc. #50, pp.

19-20.) The Policy contains a “Limited Screened Enclosure and

Carport Coverage” endorsement that specifically states it “does

not provide coverage for screen material or costs associated with

removing or replacing screens.” (Doc. #46-1, p. 71.) In response,

plaintiff acknowledges that the endorsement excludes coverage for

these items and to the extent the costs are contained in its

estimate, plaintiff withdraws its claim for such items. (Doc.

#61, p. 15.) Given plaintiff’s withdrawal, this portion of

defendant’s motion has been rendered moot.

Accordingly, it is now

ORDERED:

Defendant’s Motion for Summary Judgment (Doc. #50) is GRANTED

in part and DENIED in part as follows:

1. Defendant’s request for summary judgment on the issues of

prompt notice and ordinance and law damages is denied;

2. Defendant’s request for summary judgment on the issues of

replacement cost value damages and matching damages is

granted; and

3. Defendant’s request for summary judgment on the issue of

screen-related repair damages is denied as moot.

DONE AND ORDERED at Fort Myers, Florida, this 9th day of

March, 2021.

Z tkisok

JGHE E. STEELE

SHEIOR UNITED STATES DISTRICT JUDGE

Copies: Counsel of record

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies