Opinion

In re: PG&E Corporation

Court
District Court, N.D. California
Filed
May 30, 2023
Cited by
0 cases
Authority
More cited than 18.9%

rejecting 6 appellant’s argument that it had an unconditional right to intervene under section 1109 that 7 “cannot be limited by Federal Rule of Civil Procedure 24(a)’s requirement that applications to 8 intervene be ‘timely’”

How later courts described this case

  • rejecting 6 appellant’s argument that it had an unconditional right to intervene under section 1109 that 7 “cannot be limited by Federal Rule of Civil Procedure 24(a)’s requirement that applications to 8 intervene be ‘timely’”
  • determining the timeliness of a motion for intervention in a bankruptcy 4 proceeding by weighing “1
  • finding that 1 intervention as of right
  • “Denial 3 of a motion to intervene is a final order and immediately appealable.”

Written by the judges who cited it.

The opinion

1

2

3

4 UNITED STATES DISTRICT COURT

5 NORTHERN DISTRICT OF CALIFORNIA

6

7 Case No. 22-cv-02834-HSG

8 In re: PG&E Corporation ORDER AFFIRMING BANKRUPTCY

COURT

9

Re: Dkt. No. 10

10

11

12

Before the Court is the appeal filed by the City of Santa Clara, doing business as Silicon

13

Valley Power, and Northern California Power Agency (“SVP & NCPA”) of the Bankruptcy

14

Court’s Order Regarding Dispute Between Debtors and California Department of Water

15

Resources entered on April 22, 2022. BR Dkt. No. 12207.1 Having carefully considered the

16

briefs,2 the Court AFFIRMS the Bankruptcy Court’s order.

17

I. BACKGROUND

18

A. PG&E’s Bankruptcy And Chapter 11 Plan

19

On January 29, 2019, PG&E Corporation and Pacific Gas and Electric Company, as

20

debtors and reorganized debtors (together, the “Debtors” or “PG&E”), commenced voluntary

21

cases for relief under chapter 11 of title 11 of the United States Code (“Bankruptcy Code”) in the

22

United States Bankruptcy Court for the Northern District of California (“Bankruptcy Court”).

23

Significantly, the Debtors needed to propose a plan of reorganization that satisfied the

24

requirements of A.B. 1054. In light of the “increased risk of catastrophic wildfires,” A.B. 1054

25

26

1 “BR Dkt. No.” references are to the Bankruptcy Court’s docket, Case No. 19-30088 (DM)

27

(Bankr. N.D. Cal.). “Dkt. No.” references are to the Court’s docket.

1 created the “Go-Forward Wildfire Fund” as a multi-billion dollar safety-net to compensate future

2 victims of public utility fires by “reduc[ing] the costs to ratepayers in addressing utility-caused

3 catastrophic wildfires,” supporting “the credit worthiness of electrical corporations,” like the

4 Debtors, and providing “a mechanism to attract capital for investment in safe, clean, and reliable

5 power for California at a reasonable cost to ratepayers.” A.B. 1054 § 1(a).

6 For the Debtors to qualify for the Go-Forward Wildfire Fund, however, A.B. 1054

7 required, among other things, the Debtors to obtain an order from the Bankruptcy Court

8 confirming a plan of reorganization by June 30, 2020. See A.B. 1054 § 16, ch. 3, 3292(b). After

9 more than sixteen months of negotiations among a variety of stakeholders, and following

10 confirmation hearings that spanned several weeks, the Debtors’ Plan of Reorganization dated June

11 19, 2020 (“Plan”) was confirmed by the Bankruptcy Court on June 20, 2020 and became effective

12 on July 1, 2020 (“Effective Date”).

13 B. The CDWR Claims Dispute

14

1. The Cotenancy Agreement And CDWR’s Decision To Terminate

15

This dispute arises from the termination of a 1984 Agreement of Cotenancy in the Castle

16

Rock Junction-Lakeville 230- kV Transmission Line (the “Cotenancy Agreement”) between

17

Appellee California Department of Water Resources (“CDWR”), PG&E, and SVP & NCPA.

18

Under Section 14.3 of the Cotenancy Agreement the termination process begins with the

19

terminating party providing one year advance notice to all parties. BR Dkt. No. 11889-2 at 36.3

20

Under Section 14.5, if all remaining cotenants decide to no longer operate the transmission line,

21

the terminating cotenant must pay removal costs. Id. at 36-37. Under Section 14.6, when a

22

cotenant terminates and the other cotenants wish to continue operating the line, the terminating

23

party must pay “financial obligations incurred prior to its effective date of termination.” Id. at 37-

24

38. Section 13.2 provides that disputes between the parties shall be subject to binding arbitration.

25

Id. at 30-33.

26

On July 30, 2018, CDWR delivered notice to each cotenant of its intention to terminate its

27

1 participation in the operation of the transmission line. BR Dkt. No. 11889-3. PG&E and SVP &

2 NCPA initially opposed CDWR’s termination pending “payment of its proportional share of

3 reasonable estimated costs associated with decommissioning and removal of the New Line.” BR

4 Dkt. No. 11896 at 12. On October 18, 2019, CDWR filed a proof of claim in the Chapter 11 cases

5 in the amount of $101,026.75 for overpayment of operation and maintenance fees following

6 termination. BR Dkt. No. 11889-8.

7 2. CDWR’s Termination And The Chapter 11 Plan And Confirmation Order

8

Following objections by various California agencies, including CDWR, and a hearing on

9

the Debtors’ reorganization, the Bankruptcy Court entered the order (the “Confirmation Order”)

10

confirming the Plan on June 20, 2020. BR Dkt. No. 8053. Under the Plan and Confirmation

11

Order, executory contract disputes were to be resolved by the Bankruptcy Court. Id. at 33-35.

12

Additionally, the Bankruptcy Court retained post-confirmation jurisdiction over matters arising

13

under, arising out of, or related to the Plan. BR Dkt. No. 8053-1 at 90.

14

On February 1, 2022, CDWR moved for relief in the Bankruptcy Court, arguing that (1)

15

Appellants and PG&E sought to block its termination by alleging the Agreement was “live” and

16

could have been assumed on confirmation of Debtor’s plan, (2) CDWR did not owe any removal

17

costs for termination to be effective, and (3) PG&E refused to pay CDWR’s claim. BR Dkt. No.

18

11887 at 6. CDWR argued that “[t]here is no authority in the [Cotenancy] Agreement to demand

19

future removal costs from a departing Cotenant when there has been no decision by the Remaining

20

Cotenants to discontinue operating the Line, much less demand payment of such removal costs

21

from a cotenant before a termination can become effective.” Id. at 12-13. CDWR argued that in

22

the event of termination, the specific terms in Sections 14.5 controlled over the general terms in

23

Section 14.6. Id. at 19 (“Removal costs were negotiated and included in the contract under

24

Section 14.5 only for the situation where all the cotenants decided to terminate the Agreement.”).

25

Additionally, CDWR asserted that the matter should not be referred to arbitration as the

26

Bankruptcy Court retained jurisdiction to resolve executory contract and claim disputes. Id. at 6.

27

One day later, PG&E moved to modify the Plan injunction and compel arbitration,

1 asserting that CDWR must “pay the remaining parties its proportionate share of estimated costs,

2 including those of operation, maintenance, and removal, prior to terminating its participation in

3 the agreement.” BR Dkt. No. 11896 at 7. PG&E argued that the issue of termination inherently

4 encompassed removal cost liability, stating that “CDWR cannot terminate its participation in the

5 Cotenancy Agreement without first complying with its obligation under the Cotenancy Agreement

6 to pay a pro rata share of estimated removal costs to PG&E and the remaining Cotenants.” Id. at

7 17. SVP & NCPA opted to not participate in the proceeding, instead supporting PG&E’s

8 arbitration motion and PG&E’s oppositions to CDWR’s motion. Id. at 5 n. 1; BR Dkt. No. 11937

9 at 2 n. 1.

10 On March 2, 2022, the Bankruptcy Court held a hearing on CDWR’s motion and PG&E’s

11 opposition. Appellants’ counsel was present, and the Bankruptcy Court said they could be heard if

12 they wished. Mar. 2, 2022 Hr’g Tr. at 26 (BR Dkt. No. 11986) (PG&E counsel stating “we

13 actually have also in the courtroom Jane Luckhardt from NCPA and Lisa Gast from the SVP” if

14 the Bankruptcy Court wished to hear from them, and Bankruptcy Court confirming that “if either

15 [SVP & NCPA] wishes to be brought in, I’ll accommodate them.”). SVP & NCPA’s counsel

16 heard the Bankruptcy Court discuss its view of the removal cost liability issue and its

17 understanding that CDWR would separately pursue its rights under a contract between CDWR and

18 SVP & NCPA called the “Transmission Services Agreement” (“TSA”). Id. at 57 (describing

19 CDWR as “[making] it clear they’ll deal with the transmission agreement separately.”) The

20 Bankruptcy Court also observed that SVP & NCPA had not taken any action on the motion before

21 the hearing. Id. (“[SVP & NCPA] have repeatedly said we’re just going along with [PG&E]”).

22 On March 8, 2022, the Bankruptcy Court granted CDWR’s motion and denied PG&E’s

23 motion for arbitration. BR Dkt. No. 11999. The Bankruptcy Court held that “[t]he determination

24 of whether the Agreement is an executory contract that may be assumed, and if so under what

25 circumstances and leading to what consequences, is clearly a core matter for determination.” Id. at

26 5. Following the March 8 ruling, the Bankruptcy Court invited further proceedings regarding

27 CDWR’s removal cost liability. BR Dkt. No. 11999 at 7-8. SVP & NCPA then sought to

1 4-5 (arguing without citing any specific rule that SVP & NCPA sought “permission to intervene

2 and submit a brief” focused on “the interrelated nature of the [TSA] and the [Agreement]”).4 The

3 Bankruptcy Court denied the application on March 21, 2022. BR Dkt. No. 12054 at 2 (“SVP and

4 NCPA conferred with Debtors and deliberately chose not to respond to the substance of the

5 [C]DWR Motion”). The Bankruptcy Court did not make any decision with respect to any claims

6 based on the TSA. BR Dkt. No. 12147 at 4; BR Dkt. No. 12207 at 3.

7 3. Final Briefing and Adjudication by The Bankruptcy Court

8

On March 25, 2022, PG&E filed a memorandum stating that it would pay the CDWR

9

claim of $101,026.75 and that no further action by the Bankruptcy Court was needed (including

10

with respect to determining CDWR’s removal costs). BR Dkt. No. 12076. Appellants and PG&E

11

then initiated an ultimately unsuccessful arbitration proceeding on March 30, 2022. BR Dkt. No.

12

12129-1 at 6-20, 22-24. On April 13, 2022, the Bankruptcy Court issued a tentative ruling in

13

response to the March 25 memorandum, characterizing PG&E’s strategy as an “inappropriate and

14

improper change of position and forum shopping” and stating that the “Debtors simply ignored the

15

direction by this court to address the merits of their disagreement with CDWR following its

16

Termination by a Cotenant under Section 14.3 of the Cotenancy Agreement.” BR Dkt. No. 12147

17

at 3. On the merits, the Bankruptcy Court stated its intent to rule in favor of CDWR “based upon

18

(1) the record that there are no material facts in dispute; (2) that CDWR’s interpretation of the

19

applicable sections of the Cotenancy Agreement is correct; (3) that CDWR does not owe any

20

estimated future removal costs or anything else to Debtors and the remaining cotenants under the

21

Cotenancy Agreement; and (4) there are no damages to be assessed, by this court or by arbitration,

22

under that agreement.” Id. at 3-4. During a hearing later that day, the Bankruptcy Court held that

23

an adversary proceeding was not required because “the way this dispute played out afforded both

24

sides adequate due process.” Apr. 13, 2022 Hr’g Tr. at 28. The Bankruptcy Court entered its final

25

26

4 SVP & NCPA now complain that “[C]DWR recasts [their] request to file a brief as one of

27

intervention.” Appellants’ Reply at 18. But Appellants themselves chose to frame the request as

1 order on April 22, 2022, BR Dkt. No. 12207. On May 5, 2022, SVP & NCPA appealed. BR Dkt.

2 No. 12310.

3

II. LEGAL STANDARD

4

District courts have jurisdiction to hear appeals from final judgments, orders, and decrees

5

of bankruptcy judges. 28 U.S.C. § 158. The district court reviews the issue of whether an

6

appealing party has standing de novo. In re First Prot., Inc., 440 B.R. 821, 826 (B.A.P. 9th Cir.

7

2010). In assessing the denial of intervention, this Court reviews the Bankruptcy Court’s holding

8

for abuse of discretion. Sanford v. MemberWorks, Inc., 483 F.3d 956, 960 (9th Cir. 2007).

9

10 III. DISCUSSION

11 SVP & NCPA argue that the Bankruptcy Court erred in several respects in denying

12 PG&E’s motion for arbitration and interpreting the Cotenancy Agreement in CDWR’s favor. As

13 the Court has already addressed many of these issues in a prior ruling,5 the Court need only

14 address here (A) whether SVP & NCPA have standing, and (B) whether the Bankruptcy Court

15 erred in denying SVP & NCPA’s application seeking to intervene. The Court finds that

16 Appellants have standing but that the Bankruptcy Court did not abuse its discretion in denying

17 intervention. Accordingly, the Court affirms the Bankruptcy Court’s ruling.

18 A. SVP & NCPA Have Article III And Prudential Standing

19

The Constitution limits the Court’s jurisdiction to disputes presenting a live case or

20

controversy. Matter of E. Coast Foods, Inc., No. 21-55967, 2023 WL 3296746, at *3 (9th Cir.

21

May 8, 2023). To have standing to appeal a bankruptcy court order, a party must be “directly and

22

adversely affected” by that order such that it “diminish[es] the appellant's property, increase[s] its

23

burdens, or detrimentally affect[s] its rights.” In re Thorpe Insulation Co., 677 F.3d 869, 884 (9th

24

Cir. 2012). In determining whether a party has standing, the Court must assess both Article III

25

standing and prudential standing. In re Palmdale Hills Prop., LLC, 654 F.3d 868, 874 (9th Cir.

26

27

1 2011). “To have Article III standing, [the appellant] must show: (1) it has suffered an “injury in

2 fact” that is (a) concrete and particularized and (b) actual or imminent, not conjectural or

3 hypothetical; (2) the injury is fairly traceable to the challenged action of the defendant; and (3) it is

4 likely, as opposed to merely speculative, that the injury will be redressed by a favorable decision.”

5 Id. at 873. Prudential standing, also known as the “person aggrieved” requirement, provides that

6 “only those persons who are directly and adversely affected pecuniarily by an order of the

7 bankruptcy court . . . have standing to appeal that order.” Id. at 874 (citation and quotations

8 omitted) (holding that prudential standing is not invoked “in instances in which the appellant was

9 the party that brought the motion at issue on appeal,” but instead only “when the appellant is a

10 party other than the moving party”); Matter of E. Coast Foods, Inc., No. 21-55967, 2023 WL

11 3296746, at *3 (“The “person aggrieved” standard was designed to limit appeals in bankruptcy

12 proceedings because such cases invariably implicate the interests of various stakeholders,

13 including those not formally parties to the litigation.”).

14 Appellants satisfy both the Article III and prudential standing requirements. SVP &

15 NCPA allege that they have suffered actual and concrete injuries, and that their injuries are

16 traceable to CDWR’s termination of the Cotenancy Agreement and the Bankruptcy Court’s April

17 22 ruling foreclosing removal cost payments to which SVP & NCPA argued they were entitled

18 upon CDWR’s termination. See Thorpe, 677 F.3d at 887 (appellants had Article III standing

19 where the plan affected their “contractual rights, affect[ed] their financial interests, and ha[d] the

20 possibility of affecting their litigation rights in court”); Palmdale Hills, 654 F.3d at 874 (affirming

21 the Bankruptcy Appellate Panel’s finding that appellee had prudential standing where it had an

22 interest in loans subject to a stay of foreclosure on collateral securing the loans). And this injury is

23 capable of being adequately redressed by the Court. The Court thus determines that SVP &

24 NCPA have standing.6

25

6 CDWR cites Marino v. Ortiz, 484 U.S. 301 (1998), which holds that “only parties to a lawsuit, or

26

those that properly become parties, may appeal an adverse judgment.” Appellee’s Opp. at 22. But

that principle from civil litigation does not apply here, and the controlling cases cited above

27

clearly establish the standard in bankruptcy cases.

1

\\

2

B. The Bankruptcy Court Properly Denied Appellants’ Request to Intervene

3

1. Appellants Did Not Have an Unconditional Right to Intervene When They

Made Their Motion

4

As a preliminary matter, the Court finds that even if SVP & NCPA had a right to be heard

5

as a party in interest under 11 U.S.C. § 1109(b), the Bankruptcy Court correctly determined that

6

they had to exercise that right in a timely manner.

7

a. SVP & NCPA Were Parties In Interest Under §1109(b)

8

Under §1109(b), “[a] party in interest… may raise and may appear and be heard on any

9

issue in a case under this chapter.” 11 U.S.C. § 1109(b). “[A] party in interest is one who has a

10

legally protected interest that could be affected by a bankruptcy proceeding.” In re Tower Park

11

Properties, LLC, 803 F.3d 450, 457 (9th Cir. 2015) (citation and quotations omitted). Here,

12

Appellants were parties in interest under § 1109(b) because they were parties to the Agreement

13

and creditors in the Chapter 11 case before the Bankruptcy Court. See id.

14

b. The Bankruptcy Court Correctly Applied a Timeliness Requirement to

15 SVP & NCPA’s Request for Intervention

16 SVP & NCPA argue that they had a right under §1109(b) to appear and file a brief after the

17 Bankruptcy Court’s March 8 ruling. Appellant’s Brief at 33. While the parties cite no controlling

18 authority on point, and the Court has not found any, the Court finds that even though SVP &

19 NCPA were parties in interest under § 1109(b), they had to show that their motion to intervene

20 after the Bankruptcy Court’s ruling was timely. 7 Even the out-of-circuit authorities on which

21 Appellants rely stand for the principle that whatever right to be heard is conferred by § 1109(b),

22 that right is subject to the timeliness requirement imposed by Rule 24(a) (which governs

23

7 The Ninth Circuit has not addressed whether a party in interest has an unconditional right under

24

§ 1109(b) to appear at any time in a contested matter, or in an adversary proceeding generally.

See In re Cath. Bishop of Spokane, No. ADV 04-00291, 2006 WL 6817586, at *6 (B.A.P. 9th Cir.

25

Sept. 6, 2006) (holding that the court did not need to determine whether § 1109(b) confers an

unconditional right to intervene in an adversary proceeding because appellant had an independent

26

right to intervene under Rule 24(a)). And cases analyzing § 1109(b), including those cited by

Appellant, have not found that the statute grants an unconditional right to intervene. See Fuel Oil

27

Supply & Terminaling v. Gulf Oil Corp., 762 F.2d 1283, 1286 (5th Cir. 1985) (finding that

1 intervention as of right). For example, while the Second Circuit held in In re Caldor Corp., 303

2 F.3d 161, 172 (2d Cir. 2002), that § 1109(b) “grants a right to raise, appear and be heard on any

3 issue regardless whether it arises in a contested matter or an adversary proceeding,” id. at 172, that

4 court also recognized later that the timeliness requirement of Rule 24(a) qualifies that right.

5 Iridium India Telecom Ltd. v. Motorola, Inc., 165 F. App'x 878, 880 (2d Cir. 2005) (rejecting

6 appellant’s argument that it had an unconditional right to intervene under section 1109 that

7 “cannot be limited by Federal Rule of Civil Procedure 24(a)’s requirement that applications to

8 intervene be ‘timely’”). And the First Circuit’s decision in In re: the Financial Oversight and

9 Management Board for Puerto Rico, 872 F.3d 57 (1st Cir. 2017), involved an adversary

10 proceeding rather than a contested matter. See id. at 62 (“[W]e consider afresh whether § 1109(b)

11 confers an unconditional right to intervene in an adversary proceeding.”). Moreover, the First

12 Circuit ultimately found that the appellant there “was entitled to intervene under § 1109(b) and

13 Rule 24(a)(1).” Id. at 63. And Rule 24(a) requires a “timely motion.” FRCP 24(a).8

14 Accordingly, the Court finds that the Bankruptcy Court properly found that Appellants’

15 request “to intervene and submit a brief” had to be timely, and their after-the-fact invocation of

16 section 1109(b) on appeal does not change that conclusion.

17 2. The Bankruptcy Court Did Not Abuse its Discretion In Denying Appellants’

Motion to Intervene As Untimely

18

“Denial of a motion to intervene as of right is reviewed de novo, with the exception of

19

timeliness, which is reviewed for abuse of discretion.” In re Cath. Bishop of Spokane, No. ADV

20

04-00291, 2006 WL 6817586, at *3 (citing Sw. Ctr. for Biological Diversity v. Berg, 268 F.3d

21

810, 817 (9th Cir. 2001)). In assessing the timeliness of Appellants’ intervention motion, the

22

Bankruptcy Court properly considered “(1) the stage of the proceedings; (2) whether the parties

23

would be prejudiced; and (3) the reason for any delay in moving to intervene.” BR Dkt. No.

24

25

8 To the extent SVP & NCPA argue that they were entitled to an adversary proceeding,

Appellants’ Brief at 31-33, the Court notes that Rule 24(a)’s timeliness requirement logically

26

would apply equally in adversary proceedings and contested matters. See Iridium India Telecom

Ltd., 165 F. App'x at 880 (holding that the district court did not abuse its discretion in affirming

27

bankruptcy court’s denial of an § 1109(b) intervention motion as untimely in an adversary

1 12054 at 4 (citing Nw. Forest Res. Council v. Glickman, 82 F.3d 825, 836 (9th Cir. 1996), as

2 amended on denial of reh'g (May 30, 1996)); see also In re White Savage Assocs., 860 F.2d 1090

3 (9th Cir. 1988) (determining the timeliness of a motion for intervention in a bankruptcy

4 proceeding by weighing “1) the stage of the proceeding at which an applicant seeks to intervene;

5 2) the prejudice to other parties; and, 3) the reason for the length of the delay”). SVP & NCPA

6 argue that these factors weigh in favor of intervention, because “(a) Appellants’ motion was timely

7 made after the Court denied the Arbitration Motion; (b) Appellants claimed direct separate

8 interests related to the transactions that were subject of [C]DWR’s contested matter; and (c)

9 PG&E could not adequately represent Appellants’ separate contract rights under the Agreement

10 and TSA….” Appellants’ Brief at 34-35. CDWR responds that the Bankruptcy Court properly

11 concluded that “[t]he proceedings are nearly over, [C]DWR would be prejudiced in having

12 previously defaulted parties enter the fray, and the reason for the delay is entirely the choice of

13 SVP and NCPA.” BR Dkt. No. 12054 at 3. The Court agrees with CDWR.

14

On appeal, SVP & NCPA contends that PG&E could not represent their separate interests

15

under the Cotenancy Agreement and the TSA, such that the Bankruptcy Court prejudiced them by

16

denying intervention. Appellant’s Brief at 34-35. But as the Bankruptcy Court explained, that

17

argument is undermined by the record, including admissions in Appellants’ own briefs, and

18

Appellants’ voluntary decision not to argue CDWR’s motion. First, Appellants sought to

19

intervene only after the Bankruptcy Court denied PG&E’s arbitration motion and granted

20

CDWR’s motion, and never raised any TSA-specific argument before that. Second, CDWR

21

would have been prejudiced by permitting SVP & NCPA a second opportunity to argue the merits

22

of removal cost liability. Moreover, the TSA is an entirely separate agreement, and the

23

Bankruptcy Court made clear that it was not adjudicating any rights under that agreement. BR

24

Dkt. No. 12207 at 3 (“[T]he Court is not making any ruling as to any dispute between [C]DWR on

25

the one hand, and the City of Santa Clara dba Silicon Valley Power and Northern California

26

Power Agency on the other, under the Transmission Services Agreement between those parties,

27

which issues shall be dealt with outside this Court.”). And PG&E and Appellants were aligned

1 with respect to their interpretation of the Cotenancy Agreement: Appellants acknowledged there

2 || were “common arguments to be advanced by PGE, SVP, and NCPA in response to [C]DWR’s

3 motion.” BR Dkt. No. 12024 at 4. Third, SVP & NCPA voluntarily chose to not argue the

4 || substance of CDWR’s motion, instead supporting PG&E’s motion. BR Dkt. No. 11896 at 5 n.1;

5 BR Dkt. No. 11937 at 2 n. 1. The Bankruptcy Court reasonably determined that after being served

6 || with CDWR’s motion and attending a hearing at which removal cost liability was discussed at

7 || length, SVP & NCPA “remained on the sideline, casting their fate with the Reorganized Debtors.”

8 || BR Dkt. No. 12054 at 3.

9 The Court finds that the Bankruptcy Court did not abuse its discretion in denying

10 || intervention as untimely, and thus affirms the Bankruptcy Court’s denial of Appellants’

11 || application.?

12

IV. CONLCUSION

13 The Court AFFIRMS the Bankruptcy Court’s ruling.'° The Clerk is directed to close the

14 case.

IT IS SO ORDERED.

16 |! Dated: 5/30/2023

= 17

1 aden S. GILLIAM, JR. i

United States District Judge

19

20

21 ? CDWR contends that March 21 order was final and immediately appealable, making this appeal

untimely in its entirety. Appellee’s Opp. at 1. The Court agrees that a denial of intervention is a

99 || final and immediately appealable order because it definitively determines a party’s right to

intervene in the case. See United States v. State of Or., 913 F.2d 576, 580 (9th Cir. 1990) (“Denial

3 of a motion to intervene is a final order and immediately appealable.”). SVP & NCPA argue that

their appeal from the Bankruptcy Court’s denial of intervention is timely because their substantive

24 || tights were not affected until the April 22 order. Appellant’s Brief at 34-35. While CDWR makes

a persuasive case that SVP & NCPA’s appeal is untimely given its focus on the threshold issue of

25 whether the Bankruptcy Court erred in denying intervention, even accepting SVP & NCPA’s

argument, the appeal fails on the merits for the reasons explained above.

26 ‘0 Given the holdings in this order, the Court need not decide whether Appellants impliedly

07 consented to jurisdiction, whether an adversary proceeding was required, whether the Bankruptcy

Court properly denied arbitration and interpreted the Cotenancy Agreement in CDWR’s favor, or

28 whether the Bankruptcy Court had constitutional authority to enter a final judgment. Appellants’

Brief at 20-33, 37-41; Appellee’s Opp. 24-39.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.