More cited than 18.9%

describing the equal- 14 treatment principle in the context of waiver

How later courts described this case

  • describing the equal- 14 treatment principle in the context of waiver
  • declining the enforcement of an arbitration 2 agreement when AAA terminated its proceedings after sending several notices of unpaid fees
  • stating “the requirement of performance” of a 12 contractual obligation “may be excused by the other party’s breach” or default
  • “The 16 requirement of performance may be excused by the other party's breach.”

Written by the judges who cited it.

The opinion

1

2

3

4 UNITED STATES DISTRICT COURT

5 NORTHERN DISTRICT OF CALIFORNIA

6

7 ELIZABETH BELYEA, et al., Case No. 20-cv-01693-JSC

8 Plaintiffs,

ORDER REGARDING MOTION TO

9 v. SET ASIDE JUDGMENT

10 GREENSKY, INC., et al., Re: Dkt. No. 176

Defendants.

11

12

13 Elizabeth Belyea (“Belyea”) moves to set aside the entry of partial judgment against her

14 under Federal Rule of Civil Procedure 60(b)(6). (Dkt. No. 176.) Defendants (collectively,

15 “GreenSky”) oppose. Having carefully reviewed the parties’ briefing and having had the benefit

16 of oral argument on September 15, 2022, the Court DENIES Belyea’s motion.

17 BACKGROUND

18 Belyea and several other plaintiffs brought this case against GreenSky arising out of loans

19 for home improvements. The relevant arbitration agreement delegates all claims including “the

20 validity, enforceability or scope of this Arbitration Provision or the Agreement” to the arbitrator.

21 (Dkt. No. 5-1 at 10 ¶ 25.) GreenSky moved to compel arbitration against Belyea. (Dkt. No. 134.)

22 Plaintiffs opposed. The Court found a trial would be necessary to determine whether the parties

23 formed an agreement to arbitrate. (Dkt. No. 148.) Rather than conduct a trial, Belyea and

24 GreenSky stipulated to certain facts regarding contract formation. (Dkt. No. 156.) This Court

25 then compelled Belyea and Greensky to arbitration and dismissed her claims without prejudice.

26 (Dkt. No. 159.)

27 Because a different plaintiff’s claims are still pending in this Court, Belyea and two co-

1 partial judgment in favor of GreenSky as to those plaintiffs’ claims. (Dkt. No. 163.) Belyea’s co-

2 plaintiff appealed that final order. See Ferguson v. GreenSky, Inc., 22-15780, 22-15817 (9th Cir.).

3 Belyea chose to proceed with arbitration. The arbitration agreement required that the party

4 initiating arbitration select either JAMS or AAA as an arbitration provider. (Dkt. No. 176-2 at

5 52.) Belyea filed a demand for arbitration with JAMS. (Id. at 29.) Before JAMS, Belyea argued

6 two questions related to the validity and scope of the arbitration agreement. (Id. at 5.) GreenSky

7 responded on June 22, 2022. (Id. at 27.) JAMS then issued a bill to GreenSky for $1500.00 on

8 June 24, 2022, with “payment due upon receipt.” (Id. at 29.) On July 15, 2022, JAMS again

9 requested payment. (Id. at 35.)

10 Because GreenSky had not yet paid the JAMS bill as of August 3, 2022, Belyea moved to

11 set aside this Court’s final judgment on that date. (Dkt. No. 176.) GreenSky paid JAMS the

12 following day. (Dkt. No. 178 at 3.)

13 DISCUSSION

14 Belyea moves to set aside the final judgment against her under Federal Rule of Civil

15 Procedure 60(b)(6). Rule 60(b)(6) allows the Court to “relieve a party . . . from a final judgment,

16 order, or proceeding” for “any other reason that justifies relief.” Fed. R. Civ. P. 60(b)(6). “Rule

17 60(b)(6) has been used sparingly as an equitable remedy to prevent manifest injustice” and is used

18 “only where extraordinary circumstances prevented a party from taking timely action to prevent or

19 correct an erroneous judgment.” United States v. Alpine Land & Reservoir Co., 984 F.2d 1047,

20 1049 (9th Cir. 1993). “A movant seeking relief under Rule 60(b)(6) must show extraordinary

21 circumstances justifying the reopening of a final judgment.” Henson v. Fidelity Nat’l Fin., Inc.,

22 943 F.3d 434, 443–44 (9th Cir. 2019) (internal quotation marks omitted).

23 Belyea alleges GreenSky materially breached the parties’ delegation clause in the

24 arbitration agreement when it failed to pay the JAMS invoice in accordance with California Code

25 of Civil Procedure (“CCP”) § 1281.97. CCP § 1281.97 requires certain parties to pay arbitration

26 fees within 30-days of the invoice date. Failure to comply constitutes “material breach” of the

27 agreement and “waiver” of the right to enforce the agreement. Id. Because GreenSky failed pay

1 I. Threshold Questions

2 The Court must resolve two threshold questions before considering Plaintiff’s request for

3 relief under Rule 60(b)(6). First, GreenSky argues the Court lacks jurisdiction to consider

4 Plaintiff’s post-judgment motion. Second, GreenSky contends that the arbitration agreement

5 delegates this dispute to the arbitrator. The Court disagrees on both counts.

6 A. Jurisdiction After Entry of Judgment

7 GreenSky invokes what it calls a “general rule of divestiture” after final judgment. (Dkt.

8 No. 178 at 4.) According to GreenSky, this Court’s order entering final judgment against Belyea

9 divested it of jurisdiction “over anything related to [Belyea’s] claims, which includes her present

10 motion.” (Id.)

11 GreenSky is incorrect. The very purpose of Federal Rule of Civil Procedure 60(b) is to

12 allow district courts to consider whether to set aside earlier judgments. The principle that a court

13 loses jurisdiction over an “independent action” to compel arbitration after compelling arbitration

14 does not apply here. See Matter of Arb. Between Chung and Pres. Enterprises Corp., 943 F.2d

15 225, 228 (2d Cir. 1991) (describing jurisdiction over “independent” vs. “embedded” orders to

16 compel arbitration). This matter is not an independent action where “plaintiff seeks only an order

17 compelling or staying arbitration.” (Dkt. No. 178 at 4 (quoting Philadelphia Elec. Co. v. Nuclear

18 Elec. Ins. Ltd., 845 F. Supp. 1026, 1028 (S.D.N.Y. 1994).) Rather, this matter is an action for other

19 relief (an “embedded” action) in which a defendant moved to compel arbitration under the terms

20 of the agreement. See Chung, 943 F.2d at 228. GreenSky cites no cases in which a court held it

21 could not consider whether to reopen a matter under these circumstances. Thus, because Rule

22 60(b) explicitly allows a court to revisit earlier decisions, the Court has jurisdiction here.

23 B. Delegation

24 Under CCP § 1281.97, a drafting party’s failure to pay required arbitration fees within 30-

25 days of the invoice due date constitutes “material breach” of the arbitration agreement, “default”

26 of arbitration, and “waive[r]” of the right to compel arbitration under California law.

27 The parties’ arbitration agreement delegates all claims including “the validity,

1 5-1 at 10 ¶ 25.) GreenSky argues that this “delegation clause” requires the arbitrator to decide

2 whether GreenSky complied with CCP § 1281.97. The Court disagrees.

3 1. Delegation of Waiver and Breach

4 When enforcing arbitration agreements, certain issues must presumptively be decided in a

5 court. Others are better suited to the arbitration forum. In Howsam v. Dean Witter Reynolds, Inc.,

6 the Supreme Court distinguished between two categories of gateway issues on motions to compel

7 arbitration, each of which has a different presumption as to whether a court or an arbitrator should

8 decide. 537 U.S. 79, 83 (2002); see also Cox v. Ocean View Hotel Corp., 533 F.3d 1114, 1120–21

9 (9th Cir. 2008) (describing two categories).

10 The first category of gateway issues are “question[s] of arbitrability”—that is, “whether the

11 parties have submitted a particular dispute to arbitration.” Howsam, 537 U.S. at 83. This category

12 includes issues that the parties would have expected a court to decide such as “whether the parties

13 are bound by a given arbitration clause” or whether “an arbitration clause in a concededly binding

14 contract applies to a particular type of controversy.” Id. at 84. These disputes are “for judicial

15 determination unless the parties clearly and unmistakably provide otherwise.” Id. at 83 (quoting

16 AT&T Techs., Inc. v. Commc’ns Workers of Am., 475 U.S. 643, 649 (1986)) (emphasis added).

17 The second category—“procedural” issues—are “presumptively not for the judge, but for

18 an arbitrator, to decide.” Id. at 84. In Howsam, for example, the Court held that compliance with

19 the arbitral forum’s statute of limitations was a procedural question that the parties would have

20 expected the arbitrator to decide. Id. Accordingly, the arbitrator should presumptively decide

21 such disputes. Id. at 85.

22 a. Decision-maker Presumption

23 CCP § 1287.97 compliance sits uncomfortably between a “question of arbitrability” and a

24 “procedural” question, as described in Howsam, 537 U.S. at 83–84. Howsam presumes the

25 arbitrator should decide “allegation[s] of waiver, delay, or a like defense to arbitrability.” Id.

26 (quoting Moses H. Cone Memorial Hospital v. Mercury Constr. Corp., 460 U.S. 1, 24-25, (1983)).

27 But the Ninth Circuit has subsequently made it clear that “waiver by litigation conduct” and

1 (9th Cir. 2016); see also Cox, 533 F.3d at 1121. In Cox, the employee contended “he was not

2 bound” by an arbitration agreement because his employer breached or waived the agreement when

3 it refused an earlier request to arbitrate. Cox, 533 F.3d at 1118–21. The Ninth Circuit held a

4 court, not the arbitrator, could decide the matter because the “reasoning of Howsam is simply

5 inapplicable to resolution of the first gateway issue: whether the parties are bound by the

6 arbitration clause.” Id. (emphasis in original). Likewise in Yasuda, the Ninth Circuit noted that

7 “the reference to waiver in Howsam” was limited to “whether the party waived arbitration by

8 failing to comply with the arbitration forum’s specific rules—a question that the Supreme Court

9 logically concluded was better answered by the forum that wrote the rules.” Yasuda, 829 F.3d at

10 1123, n.3. By contrast, a court is better suited to resolve issues of litigation conduct in front of

11 that court. Id.

12 Neither paradigm fits here. CCP § 1287.97 compliance differs from the circumstances in

13 Yasuda because the crux of the dispute is conduct before the arbitrator—i.e. untimely payment—

14 not conduct in the trial court. But CCP § 1287.97 compliance does not fit squarely within

15 Howsam either. In Howsam, the arbitration provider’s specific rules were at issue, but here, the

16 California legislature wrote CCP § 1287.97. And here, unlike in Howsam, an arbitrator is not

17 better positioned to determine the dispute because if a defendant refuses to pay the arbitrator’s

18 fees, no arbitration will ever take place.

19 The only workable solution is that “waiver” and “breach” for failure to pay the arbitrator

20 under CCP § 1281.97 are presumptively disputes “for judicial determination unless the parties

21 clearly and unmistakably provide otherwise.” Howsam, 537 U.S. at 83. This interpretation

22 comports with common sense. While payment timing seems “procedural,” it would defy logic to

23 require that an arbitrator must presumptively resolve issues of waiver and breach under § 1281.97

24 where the dispute’s substance is the failure to pay the arbitrator to decide the case. If a party

25 continued to withhold payment, the arbitrator would never resolve the dispute.

26 b. Application

27 “Gateway issues can be expressly delegated to the arbitrator where ‘the parties clearly and

1 (quoting AT&T Techs., 475 U.S. at 649). “Such ‘clear and unmistakable evidence of [an]

2 agreement to arbitrate arbitrability might include a course of conduct demonstrating assent or an

3 express agreement to do so’—i.e., a delegation clause.” Lim v. TForce Logistics, LLC, 8 F.4th

4 992, 999–1000 (9th Cir. 2021) (citing Momot v. Mastro, 652 F.3d 982, 988 (9th Cir. 2011)

5 (cleaned up)). Here, the parties’ arbitration agreement delegates disputes over “the validity,

6 enforceability or scope of this Arbitration Provision or the Agreement” to the arbitrator. (Dkt. No.

7 5-1 at 10 ¶ 25.) Belyea argues that (1) this clause fails to clearly delegate disputes regarding CCP

8 § 1281.97 compliance and (2) the clause itself is unenforceable because GreenSky waived its right

9 to enforce just that provision under CCP § 1281.97. The latter argument controls here.

10 If the Court assumes—without deciding—that the delegation clause clearly and

11 unmistakably delegates this dispute, the Court may still analyze the merits of Belyea’s challenge

12 to that delegation clause under 9 U.S.C. § 2. Critically, Belyea challenges only the enforceability

13 of the delegation clause itself, not the contract generally. See Lim, 8 F.4th at 1000 (considering

14 unconscionability challenge to clause that “clearly and unmistakably” delegated arbitrability

15 questions). A court, not an arbitrator, must address that question. See Rent-A-Ctr., W., Inc., v.

16 Jackson, 561 U.S. 63, 71 (2010).

17 FAA Section 2 provides that a “written provision” “to settle by arbitration a controversy”

18 is “valid, irrevocable, and enforceable, save upon such grounds as exist at law or in equity for the

19 revocation of any contract.” 9 U.S.C. § 2. Under § 4, if the court is satisfied “that the making of

20 the arbitration agreement or the failure to comply with the agreement is not in issue, the court shall

21 make an order directing the parties to proceed to arbitration in accordance with the terms of the

22 agreement.” 9 U.S.C. § 4.

23 A delegation clause is a “written provision” to “settle by arbitration a controversy.” See

24 Rent-A-Ctr., 561 U.S. at 70. “Thus, a delegation clause is essentially a mini-arbitration agreement,

25 nested within a larger one.” Caremark, LLC v. Chickasaw Nation, 43 F.4th 1021, 1029 (9th Cir.

26 2022) “[T]he FAA operates on this additional arbitration agreement just as it does on any

27 other.” Id. (quoting Rent-A-Ctr., 561 U.S. at 71). “[I]f a party challenges the validity . . . of the

1 ordering compliance with that agreement.” Rent-A-Ctr., 561 U.S. at 71.1 But a challenge to the

2 entire agreement rather than the specific arbitration provision does not trigger judicial

3 determination. Id. Put differently, “a party seeking to invalidate a [delegation] provision must

4 challenge it specifically rather than the agreement it is part of generally.” Mesachi v. Postmates,

5 3:20-CV-07028-WHO, 2021 WL 736270, at *4 (N.D. Cal. Jan. 8, 2021).

6 Belyea’s challenge goes solely to the “enforceability” of a specific written provision—the

7 delegation clause—under state contract law. Before JAMS, Belyea argued two questions related

8 to arbitrability. (Dkt. No. 176-2 at 5.) Now, Belyea specifically argues that GreenSky cannot

9 enforce delegation of those arbitrability questions to an arbitrator because GreenSky waived the

10 right to enforce the delegation clause under CCP § 1281.97. (Dkt. No. 176 at 8 (“Greensky has

11 materially breached the delegation clause and waived its rights to have the issues in the Demand

12 heard by an arbitrator.”) Thus, Belyea’s challenge goes solely to the delegation clause’s

13 enforceability, not to the validity, enforceability, and scope of the entire contract.

14 A hypothetical helps illustrate the distinction. Were Belyea to prevail on this motion, the

15 Court would then decide the questions that were delegated to the arbitrator, whose authority was

16 then waived under CCP § 1281.97—namely (1) whether Belyea’s substantive claims fell within

17 the scope of the arbitration agreement, and (2) whether the arbitration agreement itself was

18 enforceable under the Credit Services Act of 1984. (See Dkt. No. 176-2 at 5–8 ¶¶ 20–53.) If the

19 Court then found that the arbitration agreement is enforceable and Belyea’s claims are within the

20 scope of the arbitration agreement, the Court would—again—compel arbitration under the

21 contract to resolve the underlying dispute. The arbitration agreement could stand, even if the

22 severable delegation clause challenged here falls.

23 GreenSky’s contrary caselaw is unpersuasive. In Mesachi v. Postmates, for example, the

24

25

1 Rent-A-Center addressed only challenges to the “validity” under § 2. See Rent-A-Ctr., 561 U.S.

at 70 n.2. There is no reason why its holding—that a court must address a § 2 challenge directed

26

specifically to the delegation clause—should not apply to questions of “enforceability” under § 2

as well. See Kindred, 137 S. Ct. at 1428 (discussing equal-treatment principle in 9 U.S.C. § 2 and

27

finding that a “rule selectively finding arbitration contracts invalid because improperly formed

1 plaintiff argued that the § 1281.97(a) violation “would invalidate the entire agreement to arbitrate

2 including the delegation clause.” See 3:20-CV-07028-WHO, 2021 WL 736270, at *5 (N.D. Cal.

3 Jan. 8, 2021). Here, by contrast, Belyea challenges only the delegation clause. GreenSky’s other

4 cited authority, Farmer v. Airbnb, did not consider a challenge specifically to the delegation

5 clause. See No. 20-CV-07842-JST, 2021 WL 4942675, at *1 (N.D. Cal. June 1, 2021).

6 Belyea’s challenge goes only to waiver and breach of the delegation clause—not the

7 enforceability of the entire arbitration agreement. Under the FAA, “the federal court must

8 consider the challenge before ordering compliance with that agreement.” Rent-A-Ctr., 561 U.S. at

9 71 (emphasis added).

10 II. The Merits

11 GreenSky argues that relief under Rule 60(b)(6) is unwarranted because the Federal

12 Arbitration Act (“FAA”) preempts CCP § 1281.97. The Court agrees. Because the FAA

13 preempts Belyea’s invocation of CCP § 1281.97 and traditional principles of waiver do not apply

14 here, Belyea’s motion for relief is denied.

15 A. FAA Preemption

16 1. CCP § 1281.97

17 Section 1281.97 places requirements on the arbitration agreement’s “drafting party”—the

18 company or business that included a pre-dispute arbitration provision in the contract. See CCP

19 § 1280 (defining drafting party). Specifically, CCP § 1281.97(a)(1) provides that:

20

In an employment or consumer arbitration that requires, either

21 expressly or through application of state or federal law or the rules of

the arbitration provider, the drafting party to pay certain fees and costs

22 before the arbitration can proceed, if the fees or costs to initiate an

arbitration proceeding are not paid within 30 days after the due date

23 the drafting party is in material breach of the arbitration agreement, is

in default of the arbitration, and waives its right to compel arbitration

24 under Section 1281.2.

25 Section § 1281.97(a)(2) requires that

26 After an employee or consumer meets the filing requirements

necessary to initiate an arbitration, the arbitration provider shall

27 immediately provide an invoice for any fees and costs required before

owed and the date that payment is due, and shall be sent to all parties

1 by the same means on the same day. To avoid delay, absent an express

provision in the arbitration agreement stating the number of days in

2 which the parties to the arbitration must pay any required fees or

costs, the arbitration provider shall issue all invoices to the parties as

3 due upon receipt.

4 If the drafting party fails to comply with § 1281.97(a), the employee may withdraw the

5 claim from arbitration and proceed in a court of appropriate jurisdiction. Id. § 1281.97(b)(1). “If

6 the employee or consumer proceeds with an action in a court of appropriate jurisdiction, the court

7 shall impose sanctions on the drafting party in accordance with Section 1281.99” Id. § 1281.97(d).

8 Specifically, “[t]he court shall impose a monetary sanction against a drafting party,” and “may

9 order” additional sanctions, including evidentiary sanctions, default on the underlying claims, and

10 contempt of court. Id. § 1281.99.

11 2. The FAA Preempts CCP § 1281.97

12 “The FAA contains no express pre-emptive provision, nor does it reflect a congressional

13 intent to occupy the entire field of arbitration.” Volt Info. Scis., Inc. v. Bd. of Trustees of Leland

14 Stanford Junior Univ., 489 U.S. 468, 477 (1989). Nonetheless, the FAA may preempt a state law

15 under two circumstances. First, under the “equal-treatment” principle, a court may invalidate or

16 refuse to enforce an arbitration agreement based on “generally applicable contract defenses” like

17 “fraud or unconscionability,” but not on legal rules that “apply only to arbitration or that derive

18 their meaning from the fact that an agreement to arbitrate is at issue.” Viking River Cruises, Inc. v.

19 Moriana, 142 S. Ct. 1906, 1917 (2022) (quoting Kindred Nursing Centers L. P. v. Clark, 137 S.

20 Ct. 1421, 1426 (2017)). Second, under “obstacle preemption,” a state law is preempted if it

21 “stands as an obstacle to the accomplishment and execution of the full purposes and objectives of

22 Congress” in enacting the FAA. AT&T Mobility LLC v. Concepcion, 563 U.S. 333, 352 (2011).

23 The Ninth Circuit has not yet decided whether the FAA preempts CCP Section 1281.97.

24 And every court considering the issue to date has found that the FAA does not preempt CCP

25 Section 1281.97. See Espinoza v. Superior Ct. of Los Angeles Cnty., 83 Cal. App. 5th 761

26 (2022)2; Gallo v. Wood Ranch USA, Inc., 81 Cal. App. 5th 621 (2022); Agerkop v. Sisyphian LLC,

27

1 2021 WL 1940456, at *4–5 (C.D. Cal. Apr. 13, 2021); Postmates Inc. v. 10,356 Individuals, 2021

2 WL 540155, at *8–10 (C.D. Cal. Jan. 19, 2021).

3 Respectfully, the Court disagrees. Because CCP § 1281.97 violates the “equal-treatment”

4 principle under the FAA, the FAA preempts CCP § 1281.97.

5 a. The Equal-Treatment Principle

6 “The FAA was enacted in response to judicial hostility to arbitration. Section 2 of the

7 statute makes arbitration agreements ‘valid, irrevocable, and enforceable, save upon such grounds

8 as exist at law or in equity for the revocation of any contract.’” Viking River Cruises, 142 S. Ct. at

9 1917 (quoting 9 U.S.C. § 2). As interpreted, that statute contains two clauses: An enforcement

10 mandate, which renders agreements to arbitrate enforceable as a matter of federal law, and a

11 saving clause, which permits invalidation or non-enforcement of arbitration clauses on grounds

12 applicable to “any contract.” Concepcion, 563 U.S. at 339–340; see also Kindred, 137 S. Ct. at

13 1428 (“A rule selectively finding arbitration contracts invalid because improperly formed fares no

14 better under the Act than a rule selectively refusing to enforce those agreements once properly

15 made.”)3

16 These clauses jointly establish “an equal-treatment principle”: A court may invalidate or

17 refuse to enforce an arbitration agreement based on “generally applicable contract defenses” like

18 “fraud or unconscionability,” but not on legal rules that “apply only to arbitration or that derive

19 their meaning from the fact that an agreement to arbitrate is at issue.” Viking River Cruises, 142 S.

20

21

this Court heard oral argument and took the matter under submission. Plaintiff made a motion to

22 file a statement of a recent decision. (Dkt. No. 182.) That motion is GRANTED.

23 3 Recent cases—such as Concepcion, Kindred, and Viking River Cruises—describe the equal

treatment principle in the context of “validity” rules: A court may invalidate an arbitration

24

agreement based on “generally applicable contract defenses” like fraud or unconscionability, but

25 not on legal rules that “apply only to arbitration or that derive their meaning from the fact that an

agreement to arbitrate is at issue.” Viking River Cruises, 142 S. Ct. at 1917 (quoting Kindred, 137

26 S. Ct. at 1426). However, the text of the FAA and this quoted language in Kindred suggest the

equal-treatment principle is not limited to questions of validity under FAA § 2. Kindred, 137 S.

27 Ct. at 142. Rather, the equal treatment principle applies to questions of enforceability and

1 Ct. at 1917 (quoting Kindred, 137 S. Ct. at 1426). Thus, the FAA preempts rules “too tailor-made

2 to arbitration agreements—subjecting them, by virtue of their defining trait, to uncommon

3 barriers.” Kindred, 137 S. Ct. at 1427.

4 b. Application

5 CCP § 1281.97 violates the equal-treatment principle under 9 U.S.C. § 2 because it makes

6 arbitration provisions unenforceable on arbitration-specific grounds. Indeed, as Plaintiff notes in

7 her opening brief, “[t]he 30-day requirement, under sections 1281.97 and 1281.98, is a substantive

8 modification of California contract law with respect to waiver and material breach.” (Dkt. No.

9 176 at 10.) Waiver and breach are, of course, background principles of contract law. See Cinel v.

10 Barna, 206 Cal. App. 4th 1383, 1389 (2012) (“Contractual rights are subject to waiver.”); Loral

11 Corp. v. Moyes, 174 Cal. App. 3d 268, 280 (1985) (stating “the requirement of performance” of a

12 contractual obligation “may be excused by the other party’s breach” or default). And failure to

13 pay an arbitrator or refusal to participate in arbitration can constitute waiver or breach of an

14 agreement to arbitrate. See Brown v. Dillard’s, Inc., 430 F.3d 1004, 1010–13 (9th Cir. 2005)

15 (finding waiver and breach for refusal to pay arbitration fees and participate in arbitration); Sink v.

16 Aden Enters., Inc., 352 F.3d 1197, 1201 (9th Cir. 2003) (finding arbitration agreement

17 unenforceable for failure to pay arbitration fees after arbitrator granted a motion for default).

18 But Plaintiff cites no case where failure to comply with a strict 30-day payment window

19 constitutes breach or waiver, absent a “time is of the essence” clause in a contract.4 Rather, waiver

20 or breach for failure to pay fees are traditionally fact-specific inquiries rather than bright-line

21 rules. See Brown, 430 F.3d at 1010–13. And neither waiver nor breach would apply under the

22 factual circumstances alleged here. See Part II.B infra. Thus, CCP § 1281.97’s “strict” 30-day

23 defense to enforceability is arbitration specific. Espinoza, 83 Cal. App. 5th 761 at *5.

24

25

4 Compare Espinoza, 83 Cal. App. 5th 761 at *5 (“Section 1281.97 Contains No Exceptions for

Substantial Compliance, Unintentional Nonpayment, or Absence of Prejudice”) with Leiter v.

26

Handelsman, 125 Cal. App. 2d 243, 250 (1954) (“The general rule is that time is not of the

essence unless it has been made so by the express terms of a contract or is necessarily so from the

27

very nature of the contract”); see also McLellan v. Fitbit, Inc., No. 16-cv-00036-JD, 2018 WL

1 Plaintiff argues the “FAA does not prohibit state laws that make arbitration more effective

2 by providing targeted remedies in aid of arbitration.” (Dkt. No. 179 at 16) (emphasis in original);

3 see also Postmates Inc. v. 10,356 Individuals, 2021 WL 540155, at *7 (C.D. Cal. Jan. 19, 2021);

4 Gallo, 81 Cal. App. 5th at 641 (“sections 1281.97 and 1281.99 do not commit the additional—and,

5 as noted above, necessary for preemption—sin of outright prohibiting arbitration or more subtly

6 discouraging arbitration”). This argument is premised upon a distinction without a difference.

7 CCP § 1281.97 is a stick—failure to pay within 30-days constitutes material breach of the

8 arbitration agreement and waiver of the right to enforce the contract—not a carrot to incentivize

9 arbitration. While there is a benefit for paying on time, that benefit is simply not being hit by the

10 stick—i.e., losing a contractually binding right to arbitrate disputes. CCP § 1281.97 only aids

11 arbitration because failure to comply makes the arbitration agreement unenforceable. That is

12 exactly what 9 U.S.C. § 2 prohibits unless all contracts would be unenforceable under the same

13 circumstances. See Morgan v. Sundance, Inc., 142 S. Ct. 1708, 1713 (2022) (describing the equal-

14 treatment principle in the context of waiver). In other words, the remedy’s nature matters, not

15 whether that remedy promotes or inhibits arbitration as a practical matter. An arbitration-specific

16 rule incentivizing arbitration by threatening invalidity or unenforceability fairs no better under 9

17 U.S.C. § 2 than a rule undermining arbitration via the same means. See id. (“[T]he FAA’s ‘policy

18 favoring arbitration’ does not authorize federal courts to invent special, arbitration-preferring

19 procedural rules.”) (emphasis added).

20 Enforcement discretion also makes no difference. In Postmates, Gallo, and Espinoza, the

21 courts emphasized that CCP § 1281.97 does not “automatically render arbitration agreements

22 unenforceable—it simply gives non-drafting parties the option to choose to litigate their claim in a

23 court of appropriate jurisdiction or compel arbitration.” Postmates, 2021 WL 540155, at *8; see

24 also Espinoza, 83 Cal. App. 5th 761 at *10; Gallo, 81 Cal. App. 5th at 642. But it is not clear why

25 that matters. Any non-breaching party can choose to continue to enforce a contract against a party

26 in breach. What matters under CCP § 1281.97 is that the drafting party may no longer enforce the

27 agreement if they miss a 30-day payment deadline—which, as shown above, is a condition unique

1 determines that one side may enforce the contract, but the other may not.

2 Finally, that CCP § 1281.97 is a “procedural” rule makes no difference to the equal-

3 treatment inquiry. See Morgan, 142 S. Ct. at 1713. In Gallo, the California Court of Appeal

4 described § 1281.97 as a procedural rule and emphasized that “there is no federal policy favoring

5 arbitration under a certain set of procedural rules.” See id. at 639, 641–642 (quoting Volt, 489 U.S.

6 at 476). The Gallo court described the consequences if such procedural rules were disallowed:

7

Section 1281.97 is one of several statutes that are part of the

8 [California Arbitration Act], which defines the very procedures by

which arbitration is to be conducted under California law. These

9 statutes, by definition, set up different procedures from those

governing litigation in the California courts. In any given case (and

10 thus in every single case), one of the parties to an arbitration will be

able to show that it was harmed by being subject to those arbitration-

11 specific procedures . . .. If that showing were enough to justify

preemption under the FAA, then preemption would be found in every

12 case and the CAA would cease to exist.

13 Id. at 644–45. On this reasoning, the Gallo court found CCP § 1281.97 not preempted because it

14 “define[s] the procedures governing the date by which the party who drafted an agreement to

15 arbitrate against an employee or consumer must pay the initial fees and costs to arbitrate, and

16 specif[ies] the consequences of untimely payment.” Id. at 641. (emphasis in original).

17 But—as with the incentivization argument—this “procedural” argument misses the mark

18 precisely because of CCP § 1281.97’s “consequences.” Id. Under the equal-treatment principle,

19 preemption does not occur because an arbitration specific statute “harmed” a party. Id. at 644.

20 Preemption occurs when an arbitration-specific rule invalidates, revokes, or makes unenforceable

21 an arbitration agreement upon grounds that do not exist “at law or in equity” for the “revocation of

22 any contract.” 9 U.S.C. § 2. As discussed above, CCP § 1281.97 bears directly on enforceability.

23 Many other “procedural” rules do not.

24 A specific procedural rule referenced in Gallo and Espinoza illustrates the distinction. See

25 id. at 640; Espinoza, 83 Cal. App. 5th 761, at *10. Those courts cite CCP § 1286.2 as a procedural

26 rule not preempted under the FAA’s equal-treatment principle. Id. But CCP § 1286.2 merely

27 limits judicial review of the merits of arbitration decisions, it does not render any agreement to

1 arbitrate unenforceable or invalid.5 It is true that CCP § 1286.2’s consequences can harm a party.

2 But those consequences have no bearing on the agreements’ “enforceability” or “validity.” By

3 contrast, CCP § 1281.97 explicitly redefines “material breach” and “waiver” in its text.

4 In sum, while “[t]here is no federal policy favoring arbitration under a certain set of

5 procedural rules; the federal policy is simply to ensure the enforceability, according to their terms,

6 of private agreements to arbitrate.” Volt, 489 U.S. at 476.6 “If an ordinary procedural rule—

7 whether of waiver or forfeiture or what-have-you—would counsel against enforcement of an

8 arbitration contract, then so be it. The federal policy is about treating arbitration contracts like all

9 others, not about fostering arbitration.” Morgan, 142 S. Ct. at 1713. Because CCP § 1281.97

10 “counsel[s] against enforcement of an arbitration contract,” the question is whether § 1281.97 is an

11 “ordinary procedural rule” applicable to all contracts. Id. As explained above, it is not.

12 * * *

13 To summarize, there is an inherent contradiction in Belyea’s position. Belyea avoids the

14 delegation clause by arguing that a challenge to the enforceability of the delegation clause itself is

15 permissible under 9 U.S.C. § 2. The Court agrees. But at the preemption stage, Belyea shirks the

16 language of 9 U.S.C. § 2. Belyea cannot both challenge the enforceability of the delegation clause

17 under CCP § 1281.97 and claim that CCP § 1281.97 does not affect the enforceability of

18 arbitration agreements. Instead, Belyea attempts to argue that CCP § 1281.97 encourages

19

5 Gallo also cites CCP § 1281.2 as an example of a procedural rule that is not preempted under the

20

FAA. “Section 1281.2, a provision of the CAA that is arbitration-specific, empowers a trial court

21 to stay arbitration or even altogether deny a petition to compel arbitration if one of the parties to

the arbitration agreement is “also a party to a pending” judicial action with a third party

22 that involves the same transaction as the nascent arbitration and that could result in a conflicting

ruling.” Gallo, 81 Cal. App. 5th at 639. The United States Supreme Court blessed the provision

23 allowing a “stay” to avoid contradictory judgments. Volt, 489 U.S. at 476 n.5. But the decision in

Volt made no mention of § 1281.2’s provision allowing non-enforcement altogether.

24

25

6 There is one additional distinction between this case and the procedural rules discussion in Volt,

Gallo, and Espinoza. In each of those cases, the parties agreed to incorporate the CAA into the

26 arbitration agreement. See Volt, 489 U.S. at 472; Espinoza, 83 Cal. App. 5th 761 at *12; Gallo, 81

Cal. App. 5th at 642. Volt emphasized that such incorporation agreements should be “vigorously

27 enforce[d]” according to their terms. Volt, 489 U.S. at 479. Here, the parties agreed that the FAA

1 arbitration. But how? It does so by making arbitration agreements unenforceable.

2 Under 9 U.S.C. § 2, arbitration agreements are “enforceable, save upon such grounds as

3 exist at law or in equity for the revocation of any contract.” As discussed above, CCP § 1281.97

4 makes arbitration agreements unenforceable on grounds that exist in the arbitration context only.

5 That violates the equal-footing principle inherent in 9 U.S.C. § 2. Because CCP § 1281.97

6 violates the equal-treatment principle under 9 U.S.C. § 2, the FAA preempts its application here.

7 B. General Principles of Waiver and Breach

8 Belyea also argues that GreenSky breached the agreement to arbitrate or waived its right to

9 enforce the delegation clause under traditional principles of contract law. (Dkt. No. 176 at 12.)

10 The Court disagrees.

11 1. Breach

12 A bedrock principle of California contract law is that the party “who seeks to enforce a

13 contract must show that he has complied with the conditions and agreements of the contract on his

14 part to be performed.” Pry Corp. of Am. v. Leach, 177 Cal.App.2d 632 (1960) (citing Cameron v.

15 Burnham, 146 Cal. 580 (1905)). See also Loral Corp. v. Moyes, 174 Cal.App.3d 268 (1985) (“The

16 requirement of performance may be excused by the other party's breach.”). This is a contract rule

17 of general application and is thus available to Belyea as a defense against an attempted

18 enforcement of the arbitration agreement. See Brown v. Dillard’s, Inc., 430 F.3d 1004, 1010 (9th

19 Cir. 2005).

20 Failure to pay arbitration fees in a timely manner or to participate in arbitration can

21 constitute breach. See Brown v. Dillard’s, Inc., 430 F.3d 1004, 1010–13 (9th Cir. 2005); see also

22 Eliasieh v. Legally Mine, LLC, No. 18-CV-03622-JSC, 2020 WL 1929244, at *3 (N.D. Cal. Apr.

23 21, 2020) (collecting cases). However, in most cases finding material breach, a defendant either

24 utterly refuses to participate in arbitration proceeding, see Brown, 430 F.3d at 1010–13, or an

25 arbitration provider terminates the proceedings after sending several notices of unpaid fees. See,

26 e.g., Sink, Inc., 352 F.3d at 1201 (finding arbitration agreement unenforceable for failure to pay

27 arbitration fees after arbitrator granted a motion for default); Eliasieh, 2020 WL 1929244, at *3

1 Inc. v. Cahill, 786 F.3d 1287, 1289 (10th Cir. 2015) (declining the enforcement of an arbitration

2 agreement when AAA terminated its proceedings after sending several notices of unpaid fees).

3 Absent a “time is of the essence” clause, slow payment—as opposed to no payment at all—is not

4 usually sufficient to constitute breach under general principles of California contract law. See

5 McLellan v. Fitbit, Inc., No. 3:16-CV-00036-JD, 2018 WL 3549042, at *5 (N.D. Cal. July 24,

6 2018) (upholding arbitration agreement where “no more than a few weeks passed” before

7 payment, and AAA “never suspended or terminated the proceedings).

8 The factual circumstances do not constitute breach here. The contract contains no “time is

9 of the essence” clause. And, unlike in Brown, Sink, and Eliasieh, GreenSky paid the fees before

10 the arbitration provider terminated the proceedings. Thus, while GreenSky’s late payment may

11 have been inefficient, it does not constitute a breach of the agreement to arbitrate.

12 2. Waiver

13 General principles of waiver are also inapposite here. Traditionally, “[a] party seeking to

14 prove waiver of a right to arbitrate must demonstrate (1) knowledge of an existing right to compel

15 arbitration; (2) acts inconsistent with that existing right; and (3) prejudice to the party opposing

16 arbitration resulting from such inconsistent acts.” Britton v. Co-op Banking Group, 916 F.2d 1405,

17 1412 (9th Cir.1990). Recently, however, the Supreme Court found that prejudice is not necessary

18 to find waiver of a right to arbitrate. See Morgan, 142 S. Ct. at 1713.

19 Assuming GreenSky’s knowledge of its right to compel arbitration, GreenSky did not act

20 so inconsistent with that right as to waive it. In Brown v. Dillard’s, for example, the defendant

21 refused to arbitrate altogether. See 430 F.3d at 1010–13. Here, by contrast, GreenSky participated

22 in arbitration, filed a timely answer before JAMS, and paid its share of fees roughly 40 days post

23 invoice. (Dkt. No. 176-2 at 27; Dkt. No. 178 at 3.) Under general principles of waiver, those acts

24 are consistent with the right to arbitrate under the agreement. Nor is there any evidence in this

25 record that GreenSky acted in bad faith as to the arbitration fees. See McLellan, No. 3:16-CV-

26 00036-JD, 2018 WL 3549042, at *5 (finding no breach or waiver but assessing sanctions for

27 tactical delay in arbitration fee payment).

1 II. Summary

2 “A movant seeking relief under Rule 60(b)(6) must show extraordinary circumstances

3 || justifying the reopening of a final judgment.” Henson v. Fidelity Nat’l Fin., Inc., 943 F.3d 434,

4 ||} 443-44 (9th Cir. 2019). The Court may hear Belyea’s challenge to the delegation clause. But her

5 arguments fail to meet the standard for relief under Rule 60(b)(6). The Federal Arbitration Act, 9

6 || U.S.C. § 2 preempts application of CCP § 1281.97 here. And traditional principles of waiver do

7 || not apply under these circumstances.

8 CONCLUSION

9 For the reasons stated above, Belyea’s motion for relief under Rule 60(b)(6) is DENIED.

10 This Order disposes of Docket Nos. 176, 182.

11 IT IS SO ORDERED.

e 12 Dated: October 26, 2022

ne

4

JAQQUELINE SCOTT CORL

IS United States District Judge

16

it

Z 18

19

20

21

22

23

24

25

26

27

28

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.