The opinion

1

2

3

4

5

6 UNITED STATES DISTRICT COURT

7

EASTERN DISTRICT OF CALIFORNIA

8

9 NICHOLAS HONCHARIW, Trustee, Case No. 1:21-cv-00801-SKO

Honchariw Family Trust,

10 ORDER DENYING DEFENDANT’S

MOTION TO DISMISS PLAINTIFF’S

Plaintiff,

11 SECOND AMENDED COMPLAINT

12 v. (Doc. 45)

13 COUNTY OF STANISLAUS,

14 Defendant.

15

16 I. INTRODUCTION

17 Before the Court is Defendant County of Stanislaus’ Motion to Dismiss Plaintiff Nicholas

18 Honchariw’s Second Amended Complaint1 (the “Motion”). (Doc. 35.) On May 30, 2023, Plaintiff

19 filed his opposition (Doc. 48), and Defendant filed its reply on June 5, 2023 (Doc. 49). The hearing

20 set for June 21, 2023, on the Motion was vacated and the matter was taken under submission.2 (Doc.

21 50.) Having considered the briefing, and for the reasons set forth below, Defendant’s Motion will

22 be DENIED.

23 II. FACTUAL AND PROCEDURAL BACKGROUND

24 In considering Defendant’s Motion, the Court accepts as true all of the following factual

25 allegations contained in the SAC. See, e.g., Rotkiske v. Klemm, 140 S. Ct. 355, 359 n.1 (2019)

26 (citing Swierkiewicz v. Sorema N. A., 534 U.S. 506, 508 n.1 (2002)).

27

28 1 The operative pleading is Plaintiff’s Second Amended Complaint (“SAC”). (Doc. 44.)

1 Plaintiff, in his capacity as trustee for the Honchariw Family Trust, sought to divide land in

2 the Knights Ferry area of Stanislaus County into a development of several residential lots and one

3 undeveloped parcel (SAC ¶¶ 1–3). See also Honchariw v. Cty. of Stanislaus, 51 Cal. App. 5th 243,

4 246–47 (2020).3 The Board of Supervisors of the County of Stanislaus approved the vesting

5 tentative map application for Plaintiff’s development subject to several conditions of approval. Id.

6 at 249. One of these conditions of approval was a site improvement request for an extension of fire

7 hydrants to provide a higher level of fire protection for the development. Id. at 250.

8 The current dispute between the parties stems from Plaintiff’s submission of a proposed final

9 subdivision map in April 2016, with plans and specifications in accordance with Defendant’s

10 previously requested conditions of approval. (SAC ¶¶ 49–50). See also Honchariw, 51 Cal. App.

11 5th at 250. In November 2016, Stanislaus County’s Department of Public Works (“DPW”) sent

12 Plaintiff’s engineers a letter stating it could not approve the proposed plans for the water system

13 without further information about several items, including fire hydrants (SAC ¶ 51). Honchariw,

14 51 Cal. App. 5th at 250–51. At a meeting in March 2017 with DPW, Plaintiff was informed that his

15 proposed plans did not comply with the conditions of approval. Id. at 251. DPW interpreted the

16 conditions of approval as requiring a fire suppression system based on functional fire hydrants,

17 which were hydrants that could meet fire flows for volume and pressure required by the California

18 Fire Code (SAC ¶ 51). Honchariw, 51 Cal. App. 5th at 251–53. In June and July of 2017, Plaintiff

19 and DPW exchanged correspondence in an effort to resolve their dispute. Id. at 251–52.

20 After reaching an impasse, in August 2017, Plaintiff filed a Verified Petition for Writ of

21 Mandate and Complaint for Declaratory Relief and Damages in state court raising three state law

22 claims seeking a writ of mandate, declaratory relief, and damages (SAC ¶ 58; see Doc. 1 at 8–16).

23 Honchariw, 51 Cal. App. 5th at 253. The trial court issued a judgment denying the petition, and

24 Plaintiff appealed. Id. The California Court of Appeal reversed, concluding that Defendant had

25

3 The Court previously took judicial notice of the facts and proceedings in Honchariw v. Cty. of Stanislaus, 51 Cal. App.

26 5th 243 (2020), given its direct relationship with the present case (Doc. 29 at 2 n.3). See Fed. R. Evid. 201(c)(1) (the

court may take judicial notice on its own); U.S. ex rel. Robinson Rancheria Citizens Council v. Borneo, Inc., 971 F.2d

27 244, 248 (9th Cir. 1992) (“[W]e ‘may take notice of proceedings in other courts, both within and without the federal

judicial system, if those proceedings have a direct relation to matters at issue.’”). Pursuant to Rule 201, the Court also

28 granted Defendant’s prior request to take judicial notice of Plaintiff’s vesting tentative map, which was made part of

1 misinterpreted the conditions of approval and remanded the matter to the trial court to determine the

2 terms of the writ of mandate, which, at a minimum, would require Defendant and its officials to

3 interpret the conditions of approval in accordance with its opinion (SAC ¶ 58). Honchariw, 51 Cal.

4 App. 5th at 246, 256.

5 In April 2021, Plaintiff filed a Verified Supplemental and Amended Complaint4 in state court

6 asserting three state and federal claims arising from Defendant’s rejection of his April 2016

7 proposed final subdivision map for his failure to comply with the conditions of approval. Plaintiff

8 alleged (1) a violation of California Government Code § 815.6 (Supp. Compl. ¶¶ 10–14); (2) inverse

9 condemnation and temporary taking under the Fifth and Fourteenth Amendments to the U.S.

10 Constitution; Article I, Section 19 of the California Constitution; and 42 U.S.C. § 1983 (Supp.

11 Compl. ¶¶ 15–21); and (3) denial of his substantive due process rights under the Fifth and Fourteenth

12 Amendments to the U.S. Constitution; Article 1, Section 7 of the California Constitution; and 42

13 U.S.C. § 1983 (Supp. Compl. ¶¶ 22–25).

14 In May 2021, Defendant removed the action to this federal court. (Doc. 1.) On December

15 3, 2021, Defendant filed a motion to dismiss pursuant to Rule 12(b)(6) of the Federal Rules of Civil

16 Procedure, asserting that Plaintiff’s claims were procedurally and/or substantively defective. (Doc.

17 15.) On November 7, 2022, this Court granted Defendant’s motion in part, dismissing without leave

18 to amend Plaintiff’s claim under California Government Code § 815.6, and dismissing with leave

19 to amend Plaintiff’s takings and substantive due process claims. (Doc. 29.)

20 Plaintiff timely filed his First Amended Complaint, proceeding with the remaining two

21 claims. (Doc. 32.) On April 13, 2023, the Court granted Defendant’s motion to dismiss with leave

22 to amend. (Doc. 41.)

23 Plaintiff filed his SAC on May 3, 2023. (Doc. 44.) Defendant filed the instant Motion

24 pursuant to Rule 12(b)(6), asserting that Plaintiff’s operative complaint, as amended, again fails to

25 state plausible claims for relief. (Doc. 45.)

26

27

28 4 The original pleading, Plaintiff’s Verified Supplemental and Amended Complaint (“Supp. Compl.”), is attached to

1

A motion to dismiss brought pursuant to Rule 12(b)(6) for failure to state a claim upon which

2

relief can be granted “tests the legal sufficiency of a claim,” and dismissal is “proper if there is a

3

‘lack of a cognizable legal theory or the absence of sufficient facts alleged under a cognizable legal

4

theory.’” Conservation Force v. Salazar, 646 F.3d 1240, 1241–42 (9th Cir. 2011). “To survive a

5

motion to dismiss, the plaintiff’s complaint ‘must contain sufficient factual matter, accepted as true,

6

to “state a claim to relief that is plausible on its face.”’” Boquist v. Courtney, 32 F.4th 764, 773 (9th

7

Cir. 2022) (citing Ashcroft v. Iqbal, 556 U.S. 662, 678 (2009); Bell Atlantic Corp. v. Twombly, 550

8

U.S. 544, 570 (2007)).

9

“At this stage, the Court must take all well-pleaded allegations of material fact as true and

10

construe them in the light most favorable to the non-moving party.” Great Minds v. Office Depot,

11

Inc., 945 F.3d 1106, 1109 (9th Cir. 2019). “[D]etermining whether a complaint states a plausible

12

claim is context specific, requiring the reviewing court to draw on its experience and common

13

sense.” Iqbal, 556 U.S. at 663–64. “‘[I]n practice, a complaint . . . must contain either direct or

14

inferential allegations respecting all the material elements necessary to sustain recovery under some

15

viable legal theory.’” Twombly, 550 U.S. at 562.

16

In resolving a Rule 12(b)(6) motion, the Court's review is generally limited to the

17

“allegations contained in the pleadings, exhibits attached to the complaint, and matters properly

18

subject to judicial notice.” Manzarek v. St. Paul Fire & Marine Ins. Co., 519 F.3d 1025, 1030–31

19

(9th Cir. 2008) (internal quotation marks omitted). “[C]onclusory allegations of law and

20

unwarranted inferences are insufficient to defeat a motion to dismiss for failure to state a claim.”

21

Caviness v. Horizon Cmty. Learning Ctr., Inc., 590 F.3d 806, 812 (9th Cir. 2010).

22

To the extent the pleadings can be cured by the allegation of additional facts, the plaintiff

23

should be afforded leave to amend. Cook, Perkiss and Liehe, Inc. v. N. Cal. Collection Serv. Inc.,

24

911 F.2d 242, 247 (9th Cir. 1990); Crowley v. Bannister, 734 F.3d 967, 977 (9th Cir. 2013). Federal

25

Rule of Civil Procedure 15(a)(2) advises that “[t]he court should freely give leave when justice so

26

requires.” “This policy is ‘to be applied with extreme liberality.’” Eminence Capital, LLC v.

27

Aspeon, Inc., 316 F.3d 1048, 1051 (9th Cir. 2003).

28

1

A. Defendant’s Request for Judicial Notice

2

The Court first addresses Defendant’s request for judicial notice. (Doc. 46.) Federal Rule

3

of Evidence 201 (“FRE 201”) allows a court to take judicial notice of “a fact that is not subject to

4

reasonable dispute because it: (1) is generally known within the trial court’s territorial jurisdiction;

5

or (2) can be accurately and readily determined from sources whose accuracy cannot reasonably be

6

questioned.” Fed. R. Civ. P. 201(b).

7

Defendant requests that the Court take judicial notice of a version of Plaintiff’s SAC in which

8

Defendant highlighted language changed or added to Plaintiff’s prior pleading. (Doc. 46.) The

9

highlighting consists of sentences added to portions of Plaintiff’s SAC, as well as words and clauses

10

interspersed among sentences throughout the pleading. (Id.) This highlighting does not constitute

11

a “fact” that meets the FRE 201 standard, and thus, it is not properly the subject of judicial notice at

12

this time. Accordingly, the Court DENIES Defendant’s request for judicial notice. See, e.g., Uyanik

13

v. Wawanesa Gen. Ins. Co., No. 22-cv-02361-NC, 2022 WL 16625800, at *3 (N.D. Cal. June 23,

14

2022); Allen v. Cty. of Lake, No. 14–cv–03934–TEH, 2014 WL 4979348, at *2 (N.D. Cal. Oct. 6,

15

2014).

16

B. Plaintiff States a Cognizable Regulatory Takings Claim

17

1. Legal Standard

18

The Takings Clause of the Fifth Amendment provides that private property shall not be taken

19

for public use without just compensation. U.S. Const. Amend. V. There are three types of

20

regulatory takings. McCarron v. Cty. of Ventura, No. CV 21-5234 MWF (PDx), 2022 WL 3575319,

21

at *2 (C.D. Cal. July 8, 2022). “Of these, ‘[t]wo types of regulatory actions—Loretto and Lucas

22

takings—are per se takings.’” Id. (quoting Bridge Aina Le‘a, LLC v. Land Use Comm’n, 950 F.3d

23

610, 625 (9th Cir. 2020)). Loretto applies where the government “requires an owner to suffer a

24

permanent physical invasion of her property,” even if such a physical invasion is minor. McCarron,

25

2022 WL 3575319, at *2 (citing Lingle v. Chevron U.S.A. Inc., 544 U.S. 528, 538 (2005); Loretto

26

v. Teleprompter Manhattan CATV Corp., 458 U.S. 419 (1982)). Lucas applies “to regulations that

27

completely deprive an owner of ‘all economically beneficial us[e]’ of her property.’” McCarron,

28

1 2022 WL 3575319, at *2 (citing Lingle, 544 U.S. at 538; Lucas v. South Carolina Coastal Council,

2 505 U.S. 1003, 1019 (1992)).

3 “The third type of regulatory taking is a Penn Central taking.” McCarron, 2022 WL

4 3575319, at *2; see also Penn Cen. Transp. Co. v. City of N.Y., 438 U.S. 104 (1978) (“Penn

5 Central”). “Under Penn Central, a taking takes place when regulatory actions [occur] that are

6 functionally equivalent to the classic taking in which government directly appropriates private

7 property or ousts the owner with the inquiry focus[ing] directly upon the severity of the burden that

8 government imposes upon private property rights.” Colony Cove Props., LLC v. City of Carson,

9 No. CV 14-3242 PSG (PJWx), 2014 WL 12629951, at *9 (C.D. Cal. Dec. 18, 2014) (internal

10 quotation marks omitted) (citing MHC Fin. Ltd. P’ship v. City of San Rafael, 714 F.3d 1118, 1127

11 (9th Cir. 2013)). The Court evaluates the following three factors of “particular significance”

12 identified in Penn Central: (1) the economic impact of the regulation on the claimant; (2) the extent

13 to which the regulation has interfered with distinct investment-backed expectations; and (3) the

14 character of the governmental action. DoorDash, Inc. v. City and Cty. of San Francisco, No. 21-

15 cv-05502-EMC, 2022 WL 867254, at *18 (N.D. Cal. Mar. 23, 2022) (citing Penn Central, 438 U.S.

16 at 124).

17 Evaluations of regulatory takings claims are characterized by “ad hoc, factual inquiries.”

18 Tahoe-Sierra Pres. Council, Inc. v. Tahoe Reg’l Plan. Agency, 535 U.S. 302, 322 (2002). “Although

19 the Penn Central balancing test is necessarily quite fact specific, federal courts often examine these

20 factors at the motion to dismiss stage to assure plaintiffs have satisfied their burden to establish the

21 plausibility of their claims.” Pakdel v. City and Cty. of San Francisco, No. 17-cv-03638-RS, 2022

22 WL 14813709, at *6 (N.D. Cal. Oct. 25, 2022); see also Hotel & Motel Ass’n of Oakland v. City of

23 Oakland, 344 F.3d 959, 966 (9th Cir. 2003).

24 2. Analysis

25 In his opposition, Plaintiff contends that Defendant’s refusal to approve his improvement

26 plans constituted a taking under Lucas. (Doc. 48 at 5, 8.) In the SAC and his opposition to

27 Defendant’s Motion, however, Plaintiff acknowledges that the alleged taking was temporary and he

28 was not deprived of all economically viable use of his property. (See, e.g., SAC ¶ 67 (“[Defendant]

1 finally approved his final map plans in 2021, so this claim is for a temporary taking, but [P]laintiff

2 had suffered significant costs as a result of the delay.”); Doc. 48 at 8 (“the confiscation was only

3 temporary.”).) “Anything less than a ‘complete elimination of value,’ or a ‘total loss,’ . . . would

4 require the kind of analysis applied in Penn Central.” Tahoe-Sierra, 535 U.S. at 330 (citing Lucas,

5 505 U.S. at 1019–20 n.8); see, e.g., Colony Cove Props., LLC, 2014 WL 12629951, at *9 (dismissing

6 a Lucas claim without leave to amend where plaintiff’s complaint undermined its claim that

7 defendant’s decisions deprived it of all economically productive or beneficial use of the land.).

8 Thus, Plaintiff fails to state a plausible claim of an impermissible taking under Lucas. With the

9 above principles in mind, the Court next evaluates whether the SAC pleads a cognizable regulatory

10 takings claim under Penn Central.5

11 As for the second Penn Central factor, Plaintiff adequately pleads that Defendant interfered

12 with his investment-backed expectations. “[T]his factor must consider the extent to which the

13 challenged regulation departs from or extends beyond past or conceivable future regulatory

14 developments.” Pakdel, 2022 WL 14813709, at *7 (citing Kaiser Aetna v. United States, 444 U.S.

15 164, 178 (1979)). Thus, Plaintiff’s SAC must sufficiently plead how Defendant’s regulation

16 interfered with Plaintiff’s plausibly reasonable expectations to finalize the development plans for

17 his property. See Pakdel, 2022 WL 14813709, at *7.

18 In short, Plaintiff alleges that he secured Defendant’s approval of his final subdivision map

19 after investing significant time and money into the project, and thus, he had a right to finalize his

20 property, but Defendant made demands for additional improvements “out of the blue” and at the

21 eleventh hour. (See SAC at 1–4; SAC ¶¶ 53–55, 59–60.) The SAC alleges that “[a]lthough there

22 was no question that the plans submitted by [P]laintiff with his proposed final map complied with

23 applicable ordinances, policies, and standards, [Defendant] refused to approve his final map upon

24 submission in 2016.” (SAC at 2.) Plaintiff contends that Defendant demanded he “install a

25 municipal-sized fire suppression system on the water line extension wholly out of proportion to his

26

5 The Court observes that despite having been granted leave to amend twice, Plaintiff has failed to correct the factual

27 deficiencies identified by the Court as to first Penn Central factor, the economic impact of Defendant’s regulation on

Plaintiff. Accordingly, as noted in the Court’s prior order, Plaintiff fails to plausibly plead economic impact for

28 purposes of his regulatory takings claim (Doc. 41 at 9–11). See Evans Creek, LLC v. City of Reno, No. 21-16620,

1 small subdivision and the [Knights Ferry Community Services District (“KFCSD”)] system and

2 provide an independent water supply for the massive amounts of water required to make the system

3 operational.” (Id.) Plaintiff alleges Defendant had no right to make such demands, given that the

4 prior conditions of approval “delegated responsibility for water line improvements, including fire

5 suppression, to KFCSD, which had approved the plans.” (Id.) Moreover, Defendant’s Planning

6 Department had made representations that fire suppression would be addressed upon construction

7 of the homes for the project, “years down the road, with water to be provided for fire suppression

8 as well as domestic use by KFCSD.” (Id. at 2–3.) Plaintiff pleads that Defendant’s Planning

9 Department confirmed these representations at the Board hearing approving his tentative vesting

10 map and again to Plaintiff by conference call, and Plaintiff had accepted the conditions of approval

11 based on these representations. (Id. at 3.) The SAC alleges that despite Defendant finally

12 withdrawing its demands, approval of his tentative vesting map did not occur until four years later.

13 (Id.) Plaintiff alleges that when Defendant finally agreed to approve his final map, Defendant

14 abandoned its demand for a full fire suppression system, but by that point, Plaintiff had already

15 incurred significant costs. (SAC ¶ 60.) Thus, Plaintiff pleads that Defendant’s disapproval of his

16 final map plans “was only the most recent of many efforts” to obstruct Plaintiff’s plans to develop

17 his property since his original subdivision application in 2006. (SAC ¶ 68.)

18 The Court accepts the facts pleaded in the SAC as true, and construes them in the light most

19 favorable to Plaintiff. Colony Cove Props., LLC, 2014 WL 12629951, at *10 (citing Faulkner v.

20 ADT Sec. Servs., Inc., 706 F.3d 1017, 1019 (9th Cir. 2013); Cousins v. Lockyer, 568 F.3d 1063,

21 1067–68 (9th Cir. 2009)). As such, the Court finds that Plaintiff has adequately pleaded sufficient

22 facts to support the allegation that Defendant’s actions interfered with his plausible distinct

23 investment-backed expectations to finalize the development plans for his property. See, e.g., Colony

24 Cove Props., LLC, 2014 WL 12629951, at *10 (finding the plaintiff pled sufficient facts as to the

25 second Penn Central factor where the complaint alleged plaintiff’s expectations were based on the

26 terms of the ordinance and guidelines at issue and how the defendant’s board had previously

27 analyzed and calculated rent); DoorDash, Inc., 2022 WL 867254, at *19 (denying a motion to

28 dismiss a takings claim where, inter alia, factual questions remained as to the second Penn Central

1 factor and finding that this factor could plausibly be resolved in the plaintiffs’ favor).

2 The Court next considers the third Penn Central factor, or the character of Defendant’s

3 action. “A government’s action is more likely to support a Penn Central taking ‘when the

4 interference with property can be characterized as a physical invasion by government’ and not ‘when

5 interference arises from some public program adjusting the benefits and burdens of economic life

6 to promote the common good.’” Colony Cove Props., LLC, 2014 WL 12629951, at *11 (quoting

7 MHC Fin. Ltd. P’ship, 714 F.3d at 1128). “The government generally cannot ‘forc[e] some people

8 alone to bear public burdens which, in all fairness and justice, should be borne by the public as a

9 whole.’” Bridge Aina Le‘a, LLC, 950 F.3d at 636 (citing Lingle, 544 U.S. at 537).

10 Here, as with his prior pleading, Plaintiff alleges that the “gravamen” of the SAC is that the

11 delay in moving forward with development of his property due to Defendant’s demands “was not a

12 normal incident of the regulatory process.” (SAC at 3.) He contends defendant’s disapproval was

13 “arbitrary and capricious [and/or] willful and deliberate obstruction of his constitutionally-protected

14 property rights to finalize his approved tentative subdivision map,” “continuing a long history of

15 obstruction by [Defendant].” (SAC at 3–4; see also SAC ¶ 66.) Plaintiff alleges that Defendant’s

16 demands were “beyond its authority,” given that the demands were “not rooted in any written or

17 accessible ordinance, policy, or standard applicable when the application was submitted in 2006.”

18 (SAC ¶ 66.) The conditions of approval “‘unambiguously’ delegated authority and responsibility

19 for the design of the water system extension to KFCSD.” (Id.) And, as provided above, Defendant’s

20 Planning Department had made representations that fire suppression would be addressed upon

21 construction of the homes for the project, “years down the road, with water to be provided for fire

22 suppression as well as domestic use by KFCSD.” (Id. at 2–3.)

23 Accepting all of Plaintiff’s factual allegations as true, as the Court must at this stage of the

24 proceedings, the character of Defendant’s actions in arbitrarily requiring a more advanced fire

25 suppression system as a part of Plaintiff’s development can again be plausibly construed as

26 “physical invasion” of his property. See, e.g., Laurel Park Cmty., LLC v. City of Tumwater, 698

27 F.3d 1180, 1190–91 (9th Cir. 2012).

28 In sum, Plaintiff has adequately pled the second and third Penn Central factors.

1 Accordingly, the Court DENIES Defendant’s request to dismiss Plaintiff’s takings claim. See

2 Colony Cove Props., LLC, 2014 WL 12629951, at *9 (citing Garneau v. City of Seattle, 147 F.3d

3 802, 807 (9th Cir. 1998)).

4 C. Plaintiff States a Cognizable Substantive Due Process Claim

5 To state a substantive due process claim, the plaintiff must plead, as a threshold matter, that

6 “a state actor deprived it of a constitutionally protected life, liberty or property interest.” Shanks v.

7 Dressel, 540 F.3d 1082, 1087 (9th Cir. 2008). However, “[t]he Supreme Court has ‘long eschewed

8 . . . heightened [means-end] scrutiny when addressing substantive due process challenges to

9 government regulation’ that does not impinge on fundamental rights.” Id. at 1088 (quoting Lingle,

10 544 U.S. at 545). “Accordingly, the ‘irreducible minimum’ of a substantive due process claim

11 challenging land use action is failure to advance any legitimate governmental purpose.” Shanks,

12 540 F.3d at 1088 (citing N. Pacifica LLC v. City of Pacifica, 526 F.3d 478, 484 (9th Cir. 2008)).

13 Thus, “[w]hen executive action like a discrete permitting decision is at issue, only egregious

14 official conduct can be said to be arbitrary in the constitutional sense: it must amount to an abuse of

15 power lacking any reasonable justification in the service of a legitimate governmental objective.”

16 Shanks, 540 F.3d at 1088 (internal quotation marks omitted). “Official decisions that rest on an

17 erroneous legal interpretation are not necessarily constitutionally arbitrary.” Id. at 1089. The Ninth

18 Circuit has recognized that a meritorious due process claim may exist “where a ‘land use action

19 lacks any substantial relation to the public health, safety, or general welfare.’” N. Pacifica LLC,

20 526 F.3d at 484 (citing Crown Point Dev., Inc. v. City of Sun Valley, 506 F.3d 851, 856 (9th Cir.

21 2007)). For example, in Shanks, the Ninth Circuit found that the plaintiffs failed to state a

22 substantive due process claim where there was no suggestion of “a sudden change in course, malice,

23 bias, pretext or, indeed, anything more than a lack of due care on [the defendant’s] part.” Shanks,

24 540 F.3d at 1089.

25 Here, unlike in Shanks, Plaintiff alleges Defendant had a “sudden change in course” by

26 making demands for additional improvements “out of the blue” and at the eleventh hour. (See SAC

27 at 1–4; SAC ¶¶ 53–55, 59–60.) “Substantive due process is intended to protect from arbitrary

28 government action.” Sherouse v. City of Costa Mesa, No. SACV 22-756 JVS (ADSx), 2022 WL

1 18278382, at *4 (C.D. Cal. Oct. 20, 2022) (citing Cty. of Sacramento v. Lewis, 523 U.S. 833, 845

2 (1998)). As described above, Plaintiff pleads that Defendant’s disapproval of his tentative

3 subdivision map was arbitrary and capricious, and a willful and deliberate effort to obstruct his

4 project, “continuing a long history of obstruction by [Defendant].” (SAC at 3–4; see also SAC

5 ¶¶ 66, 72.) Plaintiff further alleges that Defendant “had no rational basis to disapprove [his] final

6 map.” (SAC ¶ 72.)

7 Accepting the facts as pleaded in the SAC as true and construing them in the light most

8 favorable to Plaintiff, Colony Cove Props., LLC, 2014 WL 12629951, at *10, the Court finds that

9 Plaintiff has sufficiently pleaded arbitrary conduct amounting to “more than a lack of due care on

10 [Defendant’s] part.” Shanks, 540 F.3d at 1089; see, e.g., Salkhi v. Dueweke, No. 20-cv-06047-YGR,

11 2021 WL 2224333, at *4 (N.D. Cal. June 2, 2021) (“the allegations against [the defendant], while

12 inartfully pled, collectively suggest that she acted improperly for reasons unrelated to the merits of

13 the [citations at issue] . . . Indeed, the lack of justification itself only goes to support a finding that

14 [defendant] acted arbitrarily and irrationally.”). Accordingly, the Court DENIES Defendant’s

15 request to dismiss Plaintiff’s substantive due process claim.

16 V. CONCLUSION AND ORDER

17 For the foregoing reasons, Plaintiff has plausibly alleged a regulatory takings claim and a

18 substantive due process claim. Accordingly, Defendant’s motion to dismiss (Doc. 45) is DENIED.

19

IT IS SO ORDERED.

20

21 Dated: July 18, 2023 /s/ Sheila K. Oberto .

UNITED STATES MAGISTRATE JUDGE

22

23

24

25

26

27

28

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.