Opinion

Sequoia ForestKeeper v. United States Forest Service

Court
District Court, E.D. California
Filed
Oct 5, 2021
Cited by
0 cases
Authority
More cited than 17.7%

“After Winter, ‘plaintiffs must establish that 10 irreparable harm is likely, not just possible, in order to obtain a preliminary injunction.’”

How later courts described this case

  • “After Winter, ‘plaintiffs must establish that 10 irreparable harm is likely, not just possible, in order to obtain a preliminary injunction.’”

Written by the judges who cited it.

The opinion

1

2

3

4

5

6

7

8 UNITED STATES DISTRICT COURT

9 FOR THE EASTERN DISTRICT OF CALIFORNIA

10

11 SEQUOIA FORESTKEEPER, et al. No. 1:21-cv-01041-DAD-BAM

12 Plaintiffs,

13 v. ORDER GRANTING PLAINTIFFS’ MOTION

FOR A PRELIMINARY INJUNCTION

14 UNITED STATES FOREST SERVICE,

(Doc. No. 7)

15 Defendant.

16

17 This matter is before the court on a motion for a preliminary injunction brought by

18 plaintiffs Sequoia ForestKeeper (“SFK”) and Earth Island Institute (“Earth Island”) (collectively,

19 “plaintiffs”) against defendant United States Forest Service (“USFS” or “agency”). A hearing on

20 this motion was originally scheduled for August 3, 2021; however, on July 30, 2021, following

21 entry of the court’s order granting plaintiffs’ motion for a temporary restraining order (Doc. No.

22 7) and in consultation with the parties, the court took this matter under submission to be decided

23 on the papers without holding a hearing. (Doc. Nos. 19, 21, 22.) The court now adopts the

24 reasoning set forth in its July 23, 2021 order granting plaintiffs’ motion for a temporary

25 restraining order and will grant plaintiffs’ motion for a preliminary injunction.

26 BACKGROUND

27 Plaintiffs allege as follows. The Plateau Roads Hazard Tree Project (also at times referred

28 to as the Plateau Roads Timber Sale) (hereinafter “Plateau Roads Project” or the “Project”) is a

1 hazard tree removal project and commercial timber sale on the Central Kern Plateau of the

2 Sequoia National Forest that has been authorized by USFS. (Doc. No. 1 at ¶¶ 1, 19.) The Project

3 authorizes hazard tree mitigation along approximately 45 miles of forest roads over 2,193 acres

4 and up to 200 feet from the roads, and the commercial timber sale authorizes the logging of 2.1

5 million board feet of timber from 1,498 acres, a subset of the Project. (Id. at ¶¶ 2, 20, 26; Doc.

6 Nos. 7-1 at 14; 8-3 at 2.)

7 The Plateau Roads Project was authorized pursuant to a categorical exclusion defined in

8 36 C.F.R. § 220.6(d)(4) (hereinafter “CE 4”).1 (Doc. No. 1 at ¶ 23.) On June 2, 2020, the Deputy

9 District Ranger for the Kern River Ranger District USFS issued a “NEPA Compliance Checklist”

10 for the Project,2 which outlines the project’s purpose as follows:

11 The purpose of the Plateau Roads HT project is to fell and remove

hazard trees that have potential to fail and cause injury to either

12 people or property. The project may fell and remove dead, dying or

live trees of any size which are hazards to roads, campgrounds,

13 power lines or other infrastructure, as defined by the Hazard Tree

Guidelines for Forest Service Facilities and Roads in the Pacific

14 Southwest Region (USFS 2012). Trees determined to pose either a

high or moderate hazard risk may be cut on about 2,193 acres and

15 may be sold as timber, fuelwood, or commercial biomass, chips or

other forest products.

16

17 1 CE 4 applies only to the following activities:

18 (4) Repair and maintenance of roads, trails, and landline

boundaries. Examples include but are not limited to:

19

(i) Authorizing a user to grade, resurface, and clean the culverts of

20 an established NFS road;

21 (ii) Grading a road and clearing the roadside of brush without the

use of herbicides;

22

(iii) Resurfacing a road to its original condition;

23

(iv) Pruning vegetation and cleaning culverts along a trail and

24 grooming the surface of the trail; and

25 (v) Surveying, painting, and posting landline boundaries.

26 § 220.6(d)(4).

27 2 USFS utilizes two types of CEs: those which require “a case file and decision memo” and

those which do not. 36 C.F.R. § 220.6(e). CE 4 is the latter type, and thus no documentation was

28 required. (Doc. No. 16 at 9.)

1 (Id. at ¶¶ 20–21.) Plaintiffs allege that “[a]ccording to information provided by the Forest

2 Service, while the hazard tree guidelines were followed, hazard tree evaluation forms that

3 document each hazard tree and its status or rating were not prepared due to the large scale of the

4 project.” (Id.)3

5 On July 1, 2021, plaintiffs filed their complaint in this action seeking declaratory and

6 injunctive relief and challenging the Plateau Roads Project’s authorization pursuant to CE 4,

7 arguing that USFS violated NEPA by relying upon this categorical exclusion, which covers the

8 repair and maintenance of roads, to authorize a large-scale tree removal and timber sale without

9 conducting the necessary environmental analysis. (Id. at ¶¶ 8, 56–60.) Plaintiffs filed the

10 pending motion for a preliminary injunction on July 6, 2021. (Doc. No. 7.) On July 15, 2021,

11 plaintiffs filed a motion for a temporary restraining order, in order to preserve the status quo

12 because defendants had already begun the logging that plaintiffs sought to enjoin. (Doc. Nos. 12;

13 7 at 2.) On July 19, 2021, the government filed a combined opposition to both plaintiffs’ then-

14 pending motion for a temporary restraining order and to plaintiffs’ motion for a preliminary

15 injunction. (Doc. No. 16.)

16 On July 23, 2021, this court issued an order granting plaintiffs’ motion for temporary

17 restraining order. (Doc. No. 19.) Therein, the court also directed the parties to file a joint

18 response as to their positions regarding whether any further evidence or briefing was needed or

19 whether the court may adopt its July 23, 2021 order in ruling on the pending motion for

20 preliminary injunction. (Id. at 17.) On July 30, 2021, the parties filed a joint response. (Doc. No.

21 21.) Defendant requested additional, but modest, briefing. Plaintiffs disagreed that additional

22 briefing was necessary, but stated that they were nonetheless amenable to defendant’s proposed

23 briefing schedule if the court found further briefing to be appropriate. Good cause appearing, the

24 court granted defendant’s request for leave to file a short memorandum of no more than five

25 pages in length. (Doc. No. 22.) Defendant filed its supplemental memorandum on August 6,

26

27 3 Additional pertinent factual background may be found in the court’s July 23, 2021 order

granting plaintiffs’ motion for a temporary restraining order (Doc. No. 19), and will not be

28 repeated here.

1 2021, and plaintiffs filed their response thereto on August 13, 2021. (Doc. Nos. 23, 24.)

2 LEGAL STANDARDS

3 A. Motion for Preliminary Injunction

4 “The proper legal standard for preliminary injunctive relief requires a party to demonstrate

5 ‘that he is likely to succeed on the merits, that he is likely to suffer irreparable harm in the

6 absence of preliminary relief, that the balance of equities tips in his favor, and that an injunction

7 is in the public interest.’” Stormans, Inc. v. Selecky, 586 F.3d 1109, 1127 (9th Cir. 2009) (quoting

8 Winter v. Nat. Res. Def. Council, Inc., 555 U.S. 7, 20 (2008)); see also Ctr. for Food Safety v.

9 Vilsack, 636 F.3d 1166, 1172 (9th Cir. 2011) (“After Winter, ‘plaintiffs must establish that

10 irreparable harm is likely, not just possible, in order to obtain a preliminary injunction.’”)

11 (quoting All. for Wild Rockies v. Cottrell, 632 F.3d 1127, 1131 (9th Cir. 2011)). The Ninth

12 Circuit has also held that an “injunction is appropriate when a plaintiff demonstrates . . . that

13 serious questions going to the merits were raised and the balance of hardships tips sharply in the

14 plaintiff’s favor.” All. for Wild Rockies, 632 F.3d at 1134–35 (quoting Lands Council v. McNair,

15 537 F.3d 981, 987 (9th Cir. 2008) (en banc), overruled on other grounds by Winter, 555 U.S. 7.4

16 The party seeking the injunction bears the burden of proof as to each of these elements. See Klein

17 v. City of San Clemente, 584 F.3d 1196, 1201 (9th Cir. 2009); Caribbean Marine Servs. Co. v.

18 Baldrige, 844 F.2d 668, 674 (9th Cir. 1988) (“A plaintiff must do more than merely allege

19 imminent harm sufficient to establish standing; a plaintiff must demonstrate immediate threatened

20 injury as a prerequisite to preliminary injunctive relief.”). Finally, an injunction is “an

21 extraordinary remedy that may only be awarded upon a clear showing that the plaintiff is entitled

22 to such relief.” Winter, 555 U.S. at 22.

23 /////

24 /////

25 4 The Ninth Circuit has found that this “serious question” version of the circuit’s sliding scale

approach survives “when applied as part of the four-element Winter test.” All. for the Wild

26

Rockies, 632 F.3d at 1134. “That is, ‘serious questions going to the merits’ and a balance of

27 hardships that tips sharply towards the plaintiff can support issuance of a preliminary injunction,

so long as the plaintiff also shows that there is a likelihood of irreparable injury and that the

28 injunction is in the public interest.” Id. at 1135.

1 B. Administrative Procedure Act

2 Compliance with NEPA is reviewed under the APA. 5 U.S.C. §§ 701–706; Grand

3 Canyon Trust v. U.S. Bureau of Reclamation, 691 F.3d 1008, 1016 (9th Cir. 2012); Nw.

4 Ecosystem All. v. U.S. Fish & Wildlife Serv., 475 F.3d 1136, 1140 (9th Cir. 2007).

5 “The APA sets forth the procedures by which federal agencies are accountable to the

6 public and their actions subject to review by the courts.” Dep’t of Homeland Sec. v. Regents of

7 the Univ. of California, __U.S.__, 140 S. Ct. 1891, 1905 (2020) (internal quotation marks and

8 citation omitted). Only “final agency actions” are reviewable under the APA. 5 U.S.C. § 704;

9 see also id. § 701 (for purposes of the APA’s judicial review provisions, “agency action” has “the

10 meaning[] given” by § 551). An “‘agency action’ includes the whole or a part of an agency rule,

11 order, license, sanction, relief, or the equivalent or denial thereof, or failure to act.” Id. § 551(13).

12 Under § 706 of the APA, the court is “to assess only whether the decision was based on a

13 consideration of the relevant factors and whether there has been a clear error of judgment.”

14 Regents, 140 S. Ct. at 1905 (internal quotation marks and citation omitted).

15 The APA “requires agencies to engage in reasoned decisionmaking, and directs that

16 agency actions be set aside if they are arbitrary or capricious.” Regents, 140 S. Ct. at 1905

17 (internal citations and quotation marks omitted). An agency’s “determination in an area

18 involving a ‘high level of technical expertise’” is to be afforded deference. McNair, 537 F.3d at

19 993 (citing 5 U.S.C. § 706(2)(A)). The district court’s role “is simply to ensure that the [agency]

20 made no ‘clear error of judgment’ that would render its action ‘arbitrary and capricious.’” Id.

21 (citing Marsh v. Or. Nat. Res. Council, 490 U.S. 360, 378 (1989)); see also Earth Island Institute

22 v. Carlton, 626 F.3d 462, 472 (9th Cir. 2010). “Factual determinations must be supported by

23 substantial evidence,” and “[t]he arbitrary and capricious standard requires ‘a rational connection

24 between facts found and conclusions made.’” League of Wilderness Defs./Blue Mountains

25 Biodiversity Project v. Connaughton, 752 F.3d 755, 759–60 (9th Cir. 2014) (internal citations

26 omitted). Applying these legal standards, the court is required

27 to ensure that the agency has not, for instance, “relied on factors

which Congress has not intended it to consider, entirely failed to

28 consider an important aspect of the problem, offered an explanation

1 for its decision that runs counter to the evidence before the agency,

or [an explanation that] is so implausible that it could not be

2 ascribed to a difference in view or the product of agency expertise.”

3 McNair, 537 F.3d at 987 (quoting Motor Vehicle Mfrs. Assn., Inc. v. State Farm Mut. Auto. Ins.

4 Co., 463 U.S. 29, 43 (1983)); see also Friends of Santa Clara River v. U.S. Army Corps of

5 Engineers, 887 F.3d 906, 920 (9th Cir. 2018).

6 C. National Environmental Policy Act

7 “[R]ecognizing the profound impact of man’s activity on the interrelations of all

8 components of the natural environment,” Congress enacted NEPA in 1969. 42 U.S.C. § 4331.

9 NEPA established the Council of Environmental Quality, which interprets the Act by

10 “promulgat[ing] regulations to guide federal agencies in determining what actions are subject to

11 that statutory requirement.” Dep’t of Transp. v. Pub. Citizen, 541 U.S. 752, 757 (2004) (citing 40

12 C.F.R. § 1500.3). NEPA requires an agency to “provide full and fair discussion of significant

13 environmental impacts,” 40 C.F.R. § 1502.1, and to prepare an Environmental Impact Statement

14 (“EIS”) for “major Federal actions significantly affecting the quality of the human

15 environment[.]” 42 U.S.C. § 4332(2)(C). Among other specifications, an EIS details the

16 environmental impact of the proposed action, any unavoidable adverse environmental effects, and

17 alternatives to the proposed action. Id. NEPA imposes procedural rather than substantive

18 requirements. Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 350 (1989); Ctr. for

19 Biological Diversity v. IIano, 928 F.3d 774, 777 (9th Cir. 2019). So long as “the adverse

20 environmental effects of the proposed action are adequately identified and evaluated, the agency

21 is not constrained by NEPA from deciding that other values outweigh the environmental costs.”

22 Robertson, 490 U.S. at 350; see also Conner v. Burford, 848 F.2d 1441, 1450 (9th Cir. 1988)

23 (“NEPA does not require that mitigation measures completely compensate for the adverse

24 environmental effects”); Japanese Village, LLC v. Federal Transit Admin., 843 F.3d 445, 455

25 (9th Cir. 2016).

26 Agencies are required to prepare supplemental environmental reviews when “[t]here are

27 significant new circumstances or information relevant to environmental concerns and bearing on

28 the proposed action or its impacts.” 40 C.F.R. § 1502.9(d)(1)(ii).

1 DISCUSSION

2 As indicated in its July 23, 2021 order granting plaintiff’s motion for a temporary

3 injunction, due to the joint briefing addressing both plaintiffs’ motion for a temporary injunction

4 and the pending motion, the court was inclined to adopt that order in ruling on the pending

5 motion for a preliminary injunction unless the parties wished to raise additional arguments. (Doc.

6 No. 19 at 17.) Defendants requested and were granted the opportunity to present further briefing,

7 and plaintiffs filed a reply. (Doc. No. 23.) Upon consideration of that additional briefing, the

8 court will begin here by addressing the Ninth Circuit’s ruling in Environmental Protection

9 Information Center v. Carlson, 968 F.3d 985 (9th Cir. 2020) (“EPIC”), which directly governs

10 this action.

11 A. The Ninth Circuit’s Decision in EPIC and the Motion for a Preliminary Injunction

12 In EPIC, the Ninth Circuit reversed a district court’s denial of a preliminary injunction

13 and held that CE 4 could not be relied upon to authorize an “extensive commercial logging

14 project” that allowed for the felling and removal of millions of board feet of timber on nearly

15 4,700 acres of National Forest Land. EPIC, 968 F.3d at 988. As with the Plateau Roads Project,

16 the timber salvage project at issue in EPIC provided for the felling of commercially valuable,

17 fire-damaged trees within “one and a half tree-heights of the road.” Id. at 991.

18 In the supplemental briefing filed in this case, USFS again argues that this court is not

19 bound by the factual findings of EPIC, as it is distinguishable in their view, and instead “should

20 defer to the agency’s factual findings here.” (Doc. No. 23 at 2–4.) However, as explained in the

21 court’s order granting the temporary restraining order, the parties in this case do not meaningfully

22 dispute that the project at issue in EPIC is strikingly similar to the Plateau Roads Project. The

23 undersigned remains persuaded that indeed the pending case presents a nearly identical factual

24 situation as that presented in EPIC. (Doc. No. 19 at 9.) Moreover, in its supplemental brief,

25 USFS merely elaborates on the arguments that this court has previously rejected in this regard.

26 (See, e.g., Doc. Nos. 23 at 3–7; 19 at 10.)

27 USFS’s maintaining of its position compels the court to expound upon its reading of the

28 Ninth Circuit’s opinion in EPIC. The central holding of EPIC was that—as a matter of statutory

1 interpretation —CE 4 could not be used to authorize a large-scale commercial logging project.

2 EPIC, 968 F.3d at 990 (examining “whether an extensive commercial logging project that

3 includes felling large, partially burned ‘merchantable’ trees—including 100- and 111-foot trees

4 located 150 and 166 feet from roads, as well as taller trees even farther away—is ‘repair and

5 maintenance’ within the meaning of [CE 4].”) (emphasis added.) The Ninth Circuit determined

6 that the project at issue in EPIC could not qualify for the categorical exclusion for road

7 maintenance and repair base because:

8 The rationale for a CE is that a project that will have only a

minimal impact on the environment should be allowed to proceed

9 without an EIS or and [Environmental Assessment (“]EA[”)]. The

CE upon which the Forest Service relies authorizes projects for

10 such things as grading and resurfacing of existing roads, cleaning

existing culverts, and clearing roadside brush. A CE of such

11 limited scope cannot reasonably be interpreted to authorize a

Project such as the one before us, which allows logging of large

12 trees up to 200 feet away from either side of hundreds of miles

of Forest Service roads.

13

14 Id. at 990 (emphasis added.) While the Ninth Circuit clearly stated that “felling a dangerous dead

15 or dying tree right next to the road comes within the scope of the ‘repair and maintenance’ CE,”

16 because “the [EPIC] Project allow[ed] the felling of many more trees than that,” an EIS or EA

17 was required for the project. Id. at 990 (emphasis added.)

18 In support of its conclusion that the project did not fall under a categorical exclusion for

19 repair and maintenance, the Ninth Circuit in EPIC explained that “a number of the trees” to be

20 felled as a part of the project “will not come close to the road even if they fall directly toward it.”

21 Id. After the decision in EPIC and “in large part due to the EPIC ruling,” USFS issued the 2020

22 Hazard Tree Guidelines Addendum, which USFS asserts “did not change regional guidance on

23 hazard tree identification but simply provided a more detailed explanation of the guidance that

24 had already been in place.” (Doc. Nos. 16 at 24; 16-2 at 63–73.) USFS contends that, as a result

25 of the subsequent issuance of those guidelines, it has now established the factual support for its

26 position that the trees it sought to fell and at issue in EPIC posed a danger to the roads and that

27 the Ninth Circuit’s decision in EPIC was factually inaccurate and incorrect. (Doc. No. 23 at 3–4.)

28 /////

1 The undersigned once again concludes that USFS’s argument in this regard misses the

2 point.5 The Ninth Circuit did acknowledge that felling of dangerous trees located “right next to

3 the road” would come within the scope of the “repair and maintenance” CE and, in that context,

4 discussed the scope of a project that could be authorized pursuant to CE 4. EPIC, 968 F.3d at

5 990–91. Nonetheless, the court made clear that it was the type and scale of the project at issue in

6 that case which prevented it from being authorized pursuant to CE 4 and mandated further NEPA

7 environmental analysis. Id. In focusing its supplemental arguments on tree heights,6 defendant

8 USFS has failed to address the foundation of the EPIC holding—that the text and nature of CE 4

9 does not apply to this type of extensive project at all. Thus, defendant USFS has failed to justify

10 the type of NEPA approval relied upon for the Plateau Roads Project.

11 Moreover, in crafting its temporary restraining order, the court gave all due deference to

12 the findings and needs of the agency, which is why the court allowed hazard trees within striking

13 distance of roadways to be felled and removed. The court is unable to permit any broader or

14 additional USFS forest management activity in reliance upon a categorical exclusion that is

15 limited on its face to “repair and maintenance” of roads. Thus, as noted in the court’s previous

16 order, plaintiffs have demonstrated standing and have made a sufficient showing as to all four

17 prongs of the Winter test in order to be entitled to the requested preliminary relief. All. for the

18 Wild Rockies, 632 F.3d at 1135.

19 The court finds that requiring any additional security bond to be posted in this case is

20 unwarranted, particularly in light of the fact that plaintiffs have already posted a $100.00 bond as

21 previously ordered by the court. (Doc. No. 20.) This court has discretion “as to the amount of

22

23 5 USFS also asks, in a contradictory fashion, for this court to rule that the Ninth Circuit’s

references in EPIC to “tree height is dicta that is not binding on this [c]ourt” but also that those

24 references, if shown to be false, can serve as a basis to authorize the Project under CE 4 and

without requiring further environmental analysis.

25

6 Moreover, and as already addressed in the court’s earlier order, the agency’s 2020 Hazard Tree

26

Guidelines does not provide any significant scientific evidence or support for the agency’s

27 contentions. (Doc. No. 19 at 10.) Indeed, those guidelines offer only brief, conclusory and

unsubstantiated statements of the kind that the Ninth Circuit specifically rejected in EPIC. (Id.)

28 Labelling those contentions as guidelines does not cure the deficiency.

1 security required, if any” and “may dispense with the filing of a bond when it concludes there is

2 no realistic likelihood of harm to the defendant from enjoining his or her conduct.” Johnson v.

3 Couturier, 572 F.3d 1067, 1086 (9th Cir. 2009) (internal quotation marks and citation omitted);

4 see also E. Bay Sanctuary Covenant v. Trump, 349 F. Supp. 3d 838, 868–69 (N.D. Cal. 2018)

5 (waiving a bond where defendants had not requested a bond, the balance of the hardships

6 weighed strongly in favor of plaintiffs, and there was a significant public interest underling the

7 action), aff’d, 950 F.3d 1242 (9th Cir. 2020), and aff’d, 950 F.3d 1242 (9th Cir. 2020).

8 Accordingly, the court will adopt the analysis and findings of its July 23, 2021 temporary

9 restraining order in their entirety, and grant the preliminary injunction subject to the slight

10 modification described below.

11 C. Defendants’ Request to Modify the Temporary Restraining Order

12 In their supplemental opposition to the pending motion, USFS urges the court to modify

13 the temporary restraining order to allow for the felling and removal of “incidental trees,” defined

14 as trees “that need to be removed for [1] operator safety and [2] to get downed material out of the

15 forest.” (Doc. No. 23 at 2–3.) In order to remove the hazard trees permitted under the court’s

16 temporary restraining order, USFS asserts that “trees that are off-limits under the TRO need to be

17 felled so that the Forest Service can create the necessary landings and skid trails for the Project”

18 and to proceed at a faster pace. (Id. at 2; Decl. of Robert Guebard (“Guebard Decl.”) at ¶ 4.)

19 Defendants argue that if the temporary restraining order remains as is, the contractor will be

20 unable to remove all of the trees adjacent to the roadways that the agency believes “continue to

21 pose a safety risk to the public.” (Doc. No. 23 at 3; Guebard Decl. at ¶ 4.)

22 In their response, plaintiffs state that they do not object to a limited modification of the

23 temporary restraining order to allow for the removal of trees dangerous to the contractor because

24 plaintiffs do not believe that the court’s prior order “was intended to restrict the contractor’s

25 ability to safely operate and abate hazards within the scope of the TRO.” (Doc. No. 24 at 2.)

26 However, plaintiffs do object to the felling of additional “live trees for landings and for what

27 appears to be a substantial network of skid roads” because it represents a project with a much

28 more substantial environmental impact than that envisioned under CE 4. (Id.)

1 Based on the parties’ agreement and for good cause show, the court will modify its

2 temporary restraining order to allow for the limited felling and removal of trees needed for safety.

3 However, for the reasons that the Ninth Circuit explained in EPIC, allowing for large scale tree

4 removal projects is inconsistent with the purposes of categorical exclusions and additional felling

5 for skid roads or large landings cannot be authorized under CE 4. To allow large-scale, additional

6 felling and removal of trees—determined at the sole discretion of the contractor that is ultimately

7 compensated based on the number of merchantable trees felled—would permit the exception to

8 swallow the rule and would be inconsistent with the Ninth Circuit’s recent guidance on this

9 precise issue in EPIC.

10 CONCLUSION

11 For the reasons set forth above and in the July 23, 2021 order granting plaintiffs’ motion

12 for a temporary restraining order (Doc. No. 19):

13 1) Plaintiffs’ motion for a preliminary injunction (Doc. No. 7) is granted;

14 2) The court orders that defendant United States Forest Service and/or any its contractors

15 shall be restrained and enjoined from felling any trees in the Plateau Roads Hazard

16 Tree Project area, except for:

17 a) Those trees that will imminently fall, which is defined as those that (a) have been

18 individually evaluated to have a “high” or “moderate” hazard rating; and (b) are

19 within striking distance of the road, which shall be determined based on the height

20 of the tree;7 and

21 b) Those trees which pose a safety risk to defendant United States Forest Service

22 and/or any of its contractors while removing those trees that will imminently fall

23 as defined above; and

24 /////

25 /////

26 /////

27

7 To illustrate: a 100-foot tree evaluated as a high or moderate hazard tree may be felled only if it

28 is within 100 feet of the nearest road.

1 3) No further bond will be required to be posted by plaintiffs pursuant to Rule 65(c) of

2 the Federal Rules of Civil Procedure.

3 | IT IS SO ORDERED. a 7.

Dated: _ October 5, 2021 VL AL oye

5 UNITED STATES DISTRICT JUDGE

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

12