Opinion

Honchariw v. County of Stanislaus

Court
District Court, E.D. California
Filed
Mar 31, 2021
Cited by
0 cases
Authority
More cited than 17.6%

“As a general matter, equitable 24 tolling pauses the running of, or ‘tolls,’ a statute of limitations when a litigant has pursued his rights diligently but some extraordinary circumstance prevents him from bringing a timely 25 action.” (citation omitted)

How later courts described this case

  • “As a general matter, equitable 24 tolling pauses the running of, or ‘tolls,’ a statute of limitations when a litigant has pursued his rights diligently but some extraordinary circumstance prevents him from bringing a timely 25 action.” (citation omitted)
  • holding that the complaint should be construed “in the 17 light most favorable to the nonmoving party.”
  • finding that timely notice was not satisfied where the defendants “were not named 14 within the limitations period” in a previous proceeding
  • “A claim under section 1983 is not 10 ripe—and a cause of action under section 1983 does not accrue—until that point.”

Written by the judges who cited it.

The opinion

1

2

3

4

5

6

7

8 UNITED STATES DISTRICT COURT

9 FOR THE EASTERN DISTRICT OF CALIFORNIA

10

11 NICHOLAS HONCHARIW, Trustee, No. 1:16-cv-01183-NONE-BAM

Honchariw Family Trust,

12 ORDER GRANTING DEFENDANTS’

Plaintiff, MOTION FOR JUDGMENT ON THE

13 PLEADINGS

v.

14 (Doc. No. 27)

COUNTY OF STANISLAUS; BOARD

15 OF SUPERVISORS OF COUNTY OF

STANISLAUS,

16

Defendants.

17

18 Pursuant to a Ninth Circuit’s order remanding this case in light of the Supreme Court’s

19 decision in this matter, the court set a dispositive motion schedule in order to facilitate

20 reconsideration of the previously assigned district judge’s November 14, 2016 order dismissing

21 this case with prejudice. (Doc. No. 21.) Plaintiff Nicholas Honchariw, as trustee for the

22 Honchariw Family Trust, brought this action against defendants County of Stanislaus (the

23 “County”) and the Board of Supervisors of the County of Stanislaus (the “Board”) seeking just

24 compensation for temporary regulatory takings under the Fifth Amendment and denial of due

25 process under 42 U.S.C. § 1983 (“§ 1983”). (Doc. No. 1 ¶¶ 1, 9.) In this court’s November 14,

26 2016 order granting defendants’ motion to the dismiss, the court found that plaintiff’s takings

27 /////

28 /////

1 claim1 was not ripe for federal adjudication under the decision in Williamson County Regional

2 Planning Commission v. Hamilton Bank of Johnson City, 473 U.S. 172 (1985), overruled in part

3 by Knick v. Township of Scott, Pennsylvania, ___U.S.___, 139 S. Ct. 2162 (2019), and that his

4 due process claim was time-barred. (Doc. No. 13 at 8–11.) Accordingly, the court entered

5 judgment in defendants’ favor and dismissed this action on November 14, 2016. (Doc. No. 14.)

6 Plaintiff appealed the judgment. (Doc. No. 15.) After the Ninth Circuit affirmed this court’s

7 judgment (Doc. No. 18), plaintiff sought review in the Supreme Court (Doc. No. 28-1).

8 Following its decision in Knick, in which Williamson County was partially overruled, the

9 Supreme Court remanded this case back to the Ninth Circuit for reconsideration. See Honchariw

10 v. Cty. of Stanislaus, Cal., ___U.S.___, 139 S. Ct. 2772 (2019). The Ninth Circuit in turn

11 remanded this case to this court for reconsideration in light of the decision in Knick. (Doc. No.

12 21).

13 Rather than reconsidering its decision without the benefit of further input from the parties,

14 the court instructed them to file a new round of briefing. (Doc. No. 25.) Thereafter, on

15 September 27, 2019, defendants filed a motion for judgment on the pleadings arguing that the

16 court should still enter judgment in their favor, notwithstanding the decision in Knick. (Doc. No.

17 27 at 1–3.) Plaintiff opposed defendants’ motion on October 18, 2019 (Doc. No. 31), and

18 defendants replied thereto six days later (Doc. No. 32).

19 /////

20 /////

21 /////

22 /////

23 /////

24 /////

25 1 The Takings Clause of the Fifth Amendment, “which constrains municipalities through its

incorporation by the Fourteenth Amendment, states ‘nor shall private property be taken for public

26

use, without just compensation.’” Weinberg v. Whatcom Cty., 241 F.3d 746, 752 (9th Cir. 2001)

27 (quoting U.S. Const. amend. V). “[W]hile property may be regulated to a certain extent, if

regulation goes too far it will be recognized as a taking.” Pennsylvania Coal Co. v. Mahon, 260

28 U.S. 393, 415 (1922).

1 BACKGROUND2

2 In 1992, plaintiff was named as the trustee to 33 acres of real property, also known as the

3 Honchariw Family Trust, located along the Stanislaus River. (Doc. No. 1 ¶¶ 9, 14, 16.) The

4 controversy in this case sprung from defendants’ alleged temporary regulatory taking of

5 plaintiff’s real property. It all began in June 2006, when plaintiff proposed to the County that his

6 real property be subdivided into ten lots. (Id. ¶¶ 1, 17, 20.) The Stanislaus County Planning

7 Commission rejected his proposal and plaintiff appealed that decision to the Board, which in turn

8 affirmed the Commission’s rejection on March 24, 2009, without making any findings. (Id.

9 ¶¶ 26, 28.) In response, on June 22, 2009, plaintiff filed a writ of administrative mandamus

10 against defendants in the Stanislaus County Superior Court challenging the Board’s decision. (Id.

11 ¶ 36.) Although the state trial court initially affirmed the Board’s decision, the California Court

12 of Appeal later reversed that determination. (Id. ¶¶ 45–47). The state appellate court found that

13 the Board’s rejection of plaintiff’s proposal without making any findings was inconsistent with

14 California law, and it ordered the trial court to direct the Board to reconsider its decision and, if

15 the Board were to disapprove of plaintiff’s proposal again, it must do so with “written findings.”

16 Honchariw v. Cty. of Stanislaus, 200 Cal. App. 4th 1066, 1081–82 (2011) (“Honchariw I”).

17 Following these instructions, the state trial court issued the prescribed order to the Board. (Doc.

18 /////

19

2 Defendants ask the court to take judicial notice of (1) plaintiff’s petition for writ of certiorari of

20 this case to the Supreme Court, (2) the Supreme Court’s judgment in this case, and (3) a graph of

the house price index for Stanislaus County from the Federal Housing Finance Agency’s website.

21 (Doc. No. 28.) Defendants’ request is partially granted pursuant to Federal Rules of Evidence

201. The court hereby takes judicial notice of the graph on the County’s webpage because it is

22

made “publicly available” by a government entity, and “neither party disputes the authenticity of

23 the web sites or the accuracy of the information displayed therein.” Daniels-Hall v. Nat’l Educ.

Ass’n, 629 F.3d 992, 998–99 (9th Cir. 2010) (citations omitted). It is unnecessary for the court to

24 take judicial notice of plaintiff’s petition and the Supreme Court’s judgment as they are part of

the current proceeding, but the court takes judicial notice of the facts and proceedings in

25

Honchariw v. Cty. of Stanislaus, 200 Cal. App. 4th 1066 (2011) and Honchariw v. Cty. of

Stanislaus, 238 Cal. App. 4th 1 (2015). See United States ex rel. Robinson Rancheria Citizens

26

Council v. Borneo, Inc., 971 F.2d 244, 248 (9th Cir.1992) (“[W]e may take notice of proceedings

27 in other courts, both within and without the federal judicial system, if those proceedings have a

direct relation to matters at issue.”). As it will become apparent below, the two California

28 appellate court decisions that this court is taking judicial notice of are directly related to this case.

1 No. 1 ¶ 47.) On reconsideration, the Board changed course and approved plaintiff’s application

2 to subdivide his real property on May 22, 2012. (Id. ¶ 49.)

3 On December 12, 2012, plaintiff brought another suit against defendants in state court,

4 this time seeking damages for (1) temporary taking of his property by inverse condemnation

5 under California and federal constitutions, and (2) the denial of his substantive due process rights

6 under the Fifth and Fourteenth Amendments. (Id. ¶ 61; Doc. No. 7-2 ¶¶ 41, 47.) The state trial

7 court ultimately dismissed plaintiff’s claims as untimely under the California Subdivision Map

8 Act, and the state appellate court affirmed that dismissal order in June 2015. (Doc. No. 1 ¶ 65);

9 Honchariw v. Cty. of Stanislaus, 238 Cal. App. 4th 1, 4 (2015) (“Honchariw II”). Plaintiff then

10 petitioned the California Supreme Court for review, but that petition was denied on August 19,

11 2015.3 (Doc. Nos. 1 ¶ 71; 7-4.)

12 After waiting approximately a year, plaintiff brought his takings and due process claims

13 here in federal court on August 10, 2016. (Doc. No. 1 ¶¶ 77–90.) Plaintiff claims that he was

14 deprived of substantially viable economic use of his property from March 2009—when

15 defendants rejected his application to subdivide his property—to May 2012—when defendants

16 finally approved his application to subdivide the property. (Id. ¶¶ 78, 80–85.)

17 LEGAL STANDARD

18 Rule 12(c) of the Federal Rules of Civil Procedure states that “[a]fter the pleadings are

19 closed—but early enough not to delay trial—a party may move for judgment on the pleadings.”

20 Fed. R. Civ. P. 12. The standard of review on a 12(c) motion is “functionally identical” to its

21 counterpart, a motion to dismiss under Rule 12(b)(6), with timing being the “principal difference”

22 between them. Dworkin v. Hustler Magazine Inc., 867 F.2d 1188, 1192 (1989). “On a 12(c)

23 motion, the court considers ‘the complaint, the answer, any written documents attached to them,

24 and any matter of which the court can take judicial notice for the factual background of the

25

3 Plaintiff alleges that his petition for review was denied on August 10, 2015 (Doc. No. 1 ¶ 71),

26

but the judgment issued by the California Supreme Court shows that the petition was denied on

27 August 19, 2015 (see Doc. No. 7-4). This discrepancy in the date of denial, however, is not

material to the disposition of defendants’ pending motion, although the court will use the correct

28 date for purposes of addressing the motion.

1 case.’” L–7 Designs, Inc. v. Old Navy, LLC, 647 F.3d 419, 422 (2d Cir. 2011) (citation omitted).

2 In resolving a motion for judgment on the pleadings, the court “must accept all factual allegations

3 in the complaint as true and construe them in the light most favorable to the nonmoving party.”

4 Fleming v. Pickard, 581 F.3d 922, 925 (9th Cir. 2009); see also Hal Roach Studios, Inc. v.

5 Richard Feiner & Co., 896 F.2d 1542, 1550 (9th Cir. 1989) (noting that “the allegations of the

6 moving party which have been denied [by the non-moving party] are assumed to be false.”). To

7 survive a 12(c) motion, “a plaintiff must allege ‘enough facts to state a claim to relief that is

8 plausible on its face.’” Lowden v. T-Mobile USA Inc., 378 F. App’x 693, 694 (9th Cir. 2010)4

9 (quoting Bell Atl. Corp. v. Twombly, 550 U.S. 544, 570 (2007)).

10 “A judgment on the pleadings is properly granted when, taking all the allegations in the

11 non-moving party’s pleadings as true, the moving party is entitled to judgment as a matter of

12 law.” Marshall Naify Revocable Tr. v. United States, 672 F.3d 620, 623 (9th Cir. 2012) (quoting

13 Fajardo v. Cty. of Los Angeles, 179 F.3d 698, 699 (9th Cir. 1999)); see also Fleming, 581 F.3d at

14 925 (noting that “judgment on the pleadings is properly granted when there is no issue of material

15 fact in dispute, and the moving party is entitled to judgment as a matter of law”).

16 ANALYSIS

17 Defendants move for judgment on the pleadings as to plaintiff’s takings and due process

18 claims based on the statute of limitations under California law. (Doc. Nos. 27 at 6–8, 18–19; 32

19 at 2–4, 9–10; see also Doc. No. 13 at 10–11.) While plaintiff’s claims are based on different legal

20 theories, both are based on the same alleged misconduct: defendants’ “arbitrary and capricious”

21 delay in approving plaintiff’s application to subdivide his real property. (Doc. No. 1 ¶ 3.) For the

22 reasons explained below, the court concludes that both of plaintiff’s claims are time-barred and

23 must be dismissed. The court turns first to plaintiff’s takings claim.

24 A. Plaintiff’s Takings Claim is Time-Barred

25 Defendants contend that plaintiff’s takings claim is time-barred. (Doc. No. 27 at 6–8.)

26 Plaintiff opposes the pending motion on the ground that his takings claim is not subject to any

27

4 Citation to this unpublished Ninth Circuit opinion is appropriate pursuant to Ninth Circuit Rule

28 36-3(b).

1 statute of limitations. (Doc. No. 31 at 8). As a preliminary matter, the court must therefore

2 decide whether there is an applicable statute of limitations governing the initiation of plaintiff’s

3 takings claim. To determine this, the court must first identify the nature of that claim.

4 Plaintiff does not bring his takings claim in this court pursuant to 42 U.S.C. § 1983,

5 arguing that reliance on § 1983 is unnecessary because his takings claim “is rooted in the

6 Constitution itself” and is “self-executing”—though, plaintiff cites no authority in support of this

7 interpretation of the Constitution and § 1983. (See Doc. Nos. 1 ¶¶ 77–85; 31 at 8.) More

8 importantly, the Ninth Circuit has held that “[t]aking claims must be brought under § 1983.”

9 Hacienda Valley Mobile Estates v. City of Morgan Hill, 353 F.3d 651, 655 (9th Cir. 2003)

10 (emphasis added) (citation omitted); see also Azul-Pacifico, Inc. v. City of Los Angeles, 973 F.2d

11 704, 705 (9th Cir. 1992) (“Plaintiff has no cause of action directly under the United States

12 Constitution. We have previously held that a litigant complaining of a violation of a

13 constitutional right must utilize 42 U.S.C. § 1983.” (citations omitted)). Since plaintiff’s takings

14 claim is not cognizable as a claim brought under the Constitution itself, the court liberally

15 construes plaintiff’s takings claim as one brought pursuant to § 1983 for violation of the Takings

16 Clause. See Fleming, 581 F.3d at 925 (holding that the complaint should be construed “in the

17 light most favorable to the nonmoving party.”); see also Foman v. Davis, 371 U.S. 178, 181

18 (1962) (holding the Federal Rules of Civil Procedure favors “decisions on the merits” and

19 disfavors dismissal of claims based on “mere technicalities”). In so doing, the court notes that

20 “[i]t is well-established that claims brought under § 1983 borrow the forum state’s statute of

21 limitations for personal injury claims, and in California, that limitations period is two years.”

22 Action Apartment Ass’n, Inc. v. Santa Monica Rent Control Bd., 509 F.3d 1020, 1026–27 (9th

23 Cir. 2007) (citing Cal. Civ. Proc. Code § 335.1)5. Thus, there is a prescribed period of time after

24 a takings claim accrues following which such a claim cannot be brought, and that period of time

25 5 California Code of Civil Procedure § 335.1 states in pertinent part, “Within two years: An

action for assault, battery, or injury to, or for the death of, an individual caused by the wrongful

26

act or neglect of another.” See also CTS Corp. v. Waldburger, 573 U.S. 1, 8–9 (2014) (“Statutes

27 of limitations ‘promote justice by preventing surprises through [plaintiffs’] revival of claims that

have been allowed to slumber until evidence has been lost, memories have faded, and witnesses

28 have disappeared.’”).

1 in California is two years from the date of accrual. See Lukovsky v. City & Cty. of San Francisco,

2 535 F.3d 1044, 1048 (9th Cir. 2008) (“Accrual is the date on which the statute of limitations

3 begins to run . . . .” (citation omitted)).

4 The parties dispute when plaintiff’s takings claim accrued as well as whether plaintiff is

5 entitled to equitable tolling of the applicable statute of limitations.6 Defendants argue that the

6 two-year time limitations accrued when the Board denied plaintiff’s appeal of his proposal to

7 subdivide his property on March 24, 2009. (Doc. Nos. 27 at 7; 32 at 2.) Under this theory,

8 plaintiff had until March 24, 2011 to timely file his takings claim. (Doc. No. 27 at 7.) Since

9 plaintiff did not initiate this action until August 10, 2016, his takings claim would clearly be time-

10 barred and, according to defendants, he is not entitled to any tolling. (Id.; Doc. No. 32 at 3–4.)

11 Plaintiff disagrees, arguing first that his takings claim did not accrue until May 22, 2012 when the

12 Board finally approved his application for subdivision. (Doc. No. 31 at 3–4.) Moreover, plaintiff

13 contends, he is entitled to equitable tolling of the limitations period while his takings claim was

14 being litigated in state court from December 12, 2012 until August 19, 2015—when the

15 California Supreme Court denied plaintiff’s petition for review. (Id. at 7.) Under plaintiff’s

16 theory, his takings claim filed on August 10, 2016, was timely brought because, with tolling

17 accounted for, it was filed within two years of May 22, 2012.7 These accrual date and tolling

18 issues are legal, as opposed to factual, since the parties disagree only with respect to the legal

19 significance of the facts and not the facts themselves. It appears that in order for his claim to be

20 timely filed, plaintiff must prevail as a matter of law both on his contention that his claim did not

21 accrue until May 22, 2012 and on his contention that the statute of limitations for the bringing of

22 that claim was equitably tolled from December 12, 2012 until August 19, 2015. Below the court

23

6 See also Lozano v. Montoya Alvarez, 572 U.S. 1, 10 (2014) (“As a general matter, equitable

24 tolling pauses the running of, or ‘tolls,’ a statute of limitations when a litigant has pursued his

rights diligently but some extraordinary circumstance prevents him from bringing a timely

25

action.” (citation omitted)).

26

7 There are 2,696 days from March 24, 2009 to August 10, 2016. If the accrual date is May 22,

27 2012, 1155 days may be subcontracted from 2,696, which equal 1,541 days. If plaintiff entitled

to equitable tolling from December 12, 2012 to August 19, 2015, then another 980 days may be

28 subcontracted from 1,541, which equal 561 days. That is less than two years, or 730 days.

1 will address the controlling legal standard governing when a takings claim accrues.

2 1. Plaintiff’s Takings Claim Accrued When It was Ripe

3 “Although state law determines the statute of limitations for § 1983 claims, federal law

4 governs when a claim accrues.” Soto v. Sweetman, 882 F.3d 865, 870 (9th Cir. 2018) (emphasis

5 added) (citation omitted). Under federal law, the statute of limitations on a takings claim cannot

6 begin to run until it has ripened. See Norco Constr., Inc. v. King Cnty., 801 F.2d 1143, 1145–46

7 (9th Cir. 1986); see also Wallace v. Kato, 549 U.S. 384, 388 (2007) (“[I]t is ‘the standard rule that

8 [accrual occurs] when the plaintiff has ‘a complete and present cause of action . . ..”); Levald, Inc.

9 v. City of Palm Desert, 998 F.2d 680, 687 (9th Cir. 1993) (“A claim under section 1983 is not

10 ripe—and a cause of action under section 1983 does not accrue—until that point.”). More

11 specifically, “[c]onstitutional challenges to local land use regulations are not considered by

12 federal courts until the posture of the challenges makes them ‘ripe’ for federal adjudication.”8 S.

13 Pac. Transp. Co. v. City of Los Angeles, 922 F.2d 498, 502 (9th Cir. 1990). Thus, to determine

14 when plaintiff’s § 1983 claim accrued, the court must first determine when plaintiff’s takings

15 claim was ripe for federal adjudication. See Ventura Mobilehome Communities Owners Ass’n v.

16 City of San Buenaventura, 371 F.3d 1046, 1051–52 (9th Cir. 2004) (“In determining whether

17 takings claims are properly before the court, we first determine whether the claim is ripe and then

18 determine whether the claim is barred by a statute of limitations.”)

19 Prior to the Supreme Court’s recent decision in Knick, pursuant to Williamson County, a

20 takings claim was deemed to be ripe when (1) “‘the government entity charged with

21 implementing the regulations has reached a final decision regarding the application of the

22 [challenged] regulations to the property at issue,’” and the plaintiff has (2) “sought ‘compensation

23

8 The Supreme court has “noted that ripeness doctrine is drawn both from Article III limitations

24 on judicial power and from prudential reasons for refusing to exercise jurisdiction.” Suitum v.

Tahoe Reg’l Planning Agency, 520 U.S. 725, 734 n.7 (1997) (quoting Reno v. Catholic Soc.

25

Servs., Inc., 509 U.S. 43, 58 n.18 (1993)); see also McClung v. City of Sumner, 548 F.3d 1219,

1224 (9th Cir. 2008), abrogated on other grounds by Koontz v. St. Johns River Water Mgmt.

26

Dist., 570 U.S. 595 (2013) (“We need not determine the exact contours of when takings claim

27 ripeness is merely prudential and not jurisdictional”). The basic rationale of ripeness is “to

prevent the courts, through premature adjudication, from entangling themselves in abstract

28 disagreements.” Thomas v. Union Carbide Agr. Prod. Co., 473 U.S. 568, 580 (1985).

1 through the procedures the State has provided.’” Adam Bros. Farming v. Cty. of Santa Barbara,

2 604 F.3d 1142, 1146–47 (9th Cir. 2010) (alteration in original) (quoting Williamson Cty., 473

3 U.S. at 194). In Knick, however, the Supreme Court overruled the second requirement, also

4 known as the state-litigation requirement, but left the first requirement referred to as the “finality

5 requirement untouched, so that aspect of Williamson County remains good law.” Pakdel v. City

6 & Cty. of San Francisco, 952 F.3d 1157, 1163 (9th Cir. 2020). Thus, under the holding in Knick,

7 plaintiff’s takings claim was ripe for federal adjudication when the finality requirement is

8 satisfied.9 “[A] final decision exists when (1) a decision has been made ‘about how a plaintiff’s

9 own land may be used’ and (2) the local land-use board has exercised its judgment regarding a

10 particular use of a specific parcel of land, eliminating the possibility that it may ‘soften[ ] the

11 strictures of the general regulations [it] administer[s].’” Id. at 1164 (citation omitted). Specific to

12 the present circumstance, where the “takings or due process claims are based on a permitting

13 authority’s unreasonable delay or failure to act within mandated time periods,” “a permit approval

14 constitutes a final decision for ripeness purposes.” Woods View II, LLC v. Kitsap Cty., 484 F.

15 App’x 160, 161 (9th Cir. 2012)10 (citing Norco, 801 F.2d at 1145–46 (holding that when a takings

16 claim is based on an unlawful delay in the processing of a land-use application, “[t]he duration of

17 the wrongful taking may be relevant to determining whether a wrong has occurred, as well as the

18 extent of the damage suffered.”); accord New Port Largo, Inc. v. Monroe Cty., 985 F.2d 1488,

19 1493 (11th Cir. 1993) (citing Norco., 801 F.2d 1143); Biddison v. City of Chicago, 921 F.2d 724,

20 728 (7th Cir. 1991) (same); see also Palazzolo v. Rhode Island, 533 U.S. 606, 620–21 (2001)

21 (“As a general rule, until these ordinary processes have been followed the extent of the restriction

22 on property is not known and a regulatory taking has not yet been established.”); Oblates of St.

23 Joseph v. Nichols, No. CIV. S-01-2349 LKK DAD, 2002 WL 34938200, at *3 (E.D. Cal. Apr.

24

9 The Supreme Court has held “that this Court’s application of a rule of federal law to the parties

25

before the Court requires every court to give retroactive effect to that decision.” Harper v.

Virginia Dep’t of Taxation, 509 U.S. 86, 90 (1993). Pursuant the Supreme Court’s instructions

26

remanding this case, there is no question Knick is retroactively applicable here. (See Doc. No.

27 28-2, Ex. B.)

28 10 See note 4 and accompanying text.

1 26, 2002) (“‘Excessive delay’ may, however, supply the requisite finality.”). In effect, if the

2 plaintiff’s takings claim brought in this action is based on the permitting authority’s alleged

3 unreasonable delay in approving the land-use application, both elements of the finality

4 requirement are satisfied when the permitting authority approves the plaintiff’s application.

5 Here, plaintiff’s takings claim is based on defendants’ alleged unlawful delay in approving

6 plaintiff’s application to subdivide his real property. In his complaint plaintiff alleges as follows:

7 The gravamen of this Complaint is that the delay was not a normal

incident of the regulatory process but that the Board’s disapproval

8 and course of conduct in opposing Plaintiffs subdivision application

and mandamus action were arbitrary and capricious and / or willful

9 and deliberate obstruction of his constitutionally-protected property

rights upending his reasonable investment backed expectations and

10 causing significant economic loss.

11 (Doc. No. 1 ¶ 3.) Given plaintiff’s theory of liability, his takings claim became ripe under Knick

12 and accrued when the Board finally approved his application for subdivision of the real property

13 on May 22, 2012. See MacDonald, Sommer & Frates v. Yolo Cty., 477 U.S. 340, 348 (1986) (“A

14 court cannot determine whether a regulation has gone ‘too far’ unless it knows how far the

15 regulation goes.”); Sinaloa Lake Owners Ass’n v. City of Simi Valley, 864 F.2d 1475, 1481 (9th

16 Cir. 1989) (“Regardless of the type of claim, it is generally impossible to determine the extent of

17 the infringement absent a final determination by the relevant governmental body.”).

18 2. Plaintiff’s Takings Claim is Nonetheless Time-Barred

19 Given the accrual date of May 22, 2012, plaintiff had until May 22, 2014—or two years

20 later under California Code of Civil Procedure § 335.1—to timely file his takings claim in federal

21 court. Because plaintiff did not file this action until August 10, 2016, it is untimely absent tolling

22 of the limitations period. See California Pub. Employees’ Ret. Sys. v. ANZ Sec., Inc., 137 S. Ct.

23 2042, 2050–51 (2017) (“The classic example [of tolling] is the doctrine of equitable tolling,

24 which permits a court to pause a statutory time limit ‘when a litigant has pursued his rights

25 diligently but some extraordinary circumstance prevents him from bringing a timely action.’”

26 (citation omitted)). Plaintiff does not dispute the fact that his takings claim is untimely absent

27 tolling, even if his date of May 22, 2012 is used as the accrual date. (Doc. No. 31 at 7.)

28 /////

1 3. Plaintiff Has Failed to Establish that He is Entitled to Equitable Tolling

2 Plaintiff insists that he is entitled to equitable tolling of the applicable statute of

3 limitations for the period of time during which he was litigating his takings claim in state court

4 from December 12, 2012 to August 19, 2015, thus rendering this action timely brought. (Id.)

5 Defendants counter that plaintiff is not entitled to equitable tolling because his state action was

6 itself dismissed as untimely. (Doc. No. 32 at 2–4.) Defendants’ argument is well-taken.

7 The Supreme Court has “indicated that state law doctrines allowing for tolling may be

8 applicable to section 1983 actions,” “unless they are inconsistent with federal policy underlying

9 the cause of action under consideration.” Donoghue v. Orange Cty., 848 F.2d 926, 930 (9th Cir.

10 1987) (citing Board of Regents v. Tomanio, 446 U.S. 478, 486–87 (1980)); see also Young v.

11 United States, 535 U.S. 43, 49 (2002) (“It is hornbook law that limitations periods are customarily

12 subject to ‘equitable tolling’ . . . .” (citations omitted)). The parties agree that California’s

13 equitable tolling doctrine should apply here (see Doc. Nos. 31 at 7; 32 at 3–4) and the court will

14 therefore apply that doctrine in this case.

15 In California, equitable tolling is a “judicially created, nonstatutory doctrine” that, where

16 applicable, will “suspend or extend a statute of limitations as necessary to ensure fundamental

17 practicality and fairness.” McDonald v. Antelope Valley Cmty. Coll. Dist., 45 Cal. 4th 88, 99

18 (2008). “Broadly speaking, the doctrine applies ‘[w]hen an injured person has several legal

19 remedies and, reasonably and in good faith, pursues one.’”11 Id. at 100. “To determine whether

20 equitable tolling may extend a statute of limitations, courts must analyze whether a plaintiff has

21 established the doctrine’s three elements: [(1)] timely notice to the defendant, [(2)] lack of

22

11 The California Supreme Court has recognized three circumstances in which equitable tolling

23 has been applied in California. When (1) “some flexibility from the statute of limitations” is

called for because “a plaintiff was already involved in one lawsuit, and filed a subsequent case

24 that could lessen the damage or harm that would otherwise have to be remedied through a

separate case”; (2) “where a plaintiff was required to pursue, and did indeed pursue, an

25

administrative remedy before filing a civil action”; or (3) where tolling would “serve the ends of

justice [because] technical forfeitures would unjustifiably prevent a trial on the merits.” Saint

26

Francis Mem’l Hosp. v. State Dep’t of Pub. Health, 9 Cal. 5th 710, 724 (2020) (citation omitted).

27 Here, plaintiff does not explain which circumstance fits his case (Doc. No. 31 at 7), but such an

explanation is not necessary. Regardless of which circumstance is applicable, the elements of

28 equitable tolling are the same.

1 prejudice to the defendant, and [(3)] reasonable and good faith conduct by the plaintiff.” Saint

2 Francis Mem’l Hosp. v. State Dep’t of Pub. Health, 9 Cal. 5th 710, 725–26 (alteration in original)

3 (citation omitted). The plaintiff “bears the burden of proving the applicability of equitable

4 tolling.” In re Marriage of Zimmerman, 183 Cal. App. 4th 900, 912 (2010) (citations omitted);

5 see also Hinton v. Pac. Enterprises, 5 F.3d 391, 395 (9th Cir. 1993) (“The burden of alleging

6 facts which would give rise to tolling falls upon the plaintiff.”). The court will address only the

7 first element of timely notice in the context of this case.

8 “The timely notice requirement essentially means that the first claim must have been filed

9 within the statutory period,” and that “the filing of the first claim must alert the defendant in the

10 second claim of the need to begin investigating the facts which form the basis for the second

11 claim.” McDonald, 45 Cal. 4th at 102 n.2. The element of timely notice “ought to be interpreted

12 literally.” Saint Francis, 9 Cal. 5th at 727. Here, plaintiff argues that “the County had explicit

13 notice of a possible future suit” when he litigated his takings claim in state court from December

14 12, 2012 to August 19, 2015. (Doc. No. 31 at 7.) This argument, however, is unpersuasive

15 because it overlooks the fact that the state trial court dismissed plaintiff’s takings claim as

16 “untimely” under limitations period provided for in the California Subdivision Map Act. (Doc.

17 No. 1 ¶ 65.) In other words, plaintiff failed to bring his takings claim in state court “within the

18 statutory period” as required by the timely notice element. McDonald, 45 Cal. 4th at 102 n.2.

19 The California Court of Appeal later affirmed the state trial court’s dismissal of plaintiff’s action

20 for lack of timeliness. See Honchariw II, 238 Cal. App. 4th 1. Moreover, even though plaintiff

21 petitioned the California Supreme Court for review, his petition was denied in August 2015.

22 (Doc. Nos. 1 ¶ 71; 7-4.) Indeed, plaintiff concedes these facts in the allegations of his complaint.

23 (Doc. No. 1 ¶¶ 65, 68–71.)

24 Federal and California courts have uniformly held, as the court does so here, that the

25 element of timely notice is not satisfied when the same claim brought previously in another

26 /////

27 /////

28 /////

1 proceeding was deemed to be untimely.12 See, e.g., Wade v. Ratella, 407 F. Supp. 2d 1196,

2 1205–06 (S.D. Cal. 2005) (finding that the timely notice element is not satisfied because plaintiff

3 unduly delayed in bringing his inmate claims to the prison tribunal to completion); Diggs v.

4 Williams, No. CIV S-05-1168 DFL GGH P, 2006 WL 1627887, at *3–4 (E.D. Cal. June 8, 2006),

5 report and recommendation adopted, No. CIV S-05-1168 DFLGGH P, 2006 WL 2527949 (E.D.

6 Cal. Aug. 31, 2006) (finding that the plaintiff was not entitled to equitable tolling because his

7 previous actions in state court were dismissed on statute of limitations grounds); Willis v. City of

8 Carlsbad, 48 Cal. App. 5th 1104, 1123 (2020) (declining to apply equitable tolling because the

9 plaintiff had failed to timely file its government claim); J.M. v. Huntington Beach Union High

10 Sch. Dist., 2 Cal. 5th 648, 658 (2017) (affirming the denial of equitable tolling because the

11 plaintiff “simply failed to comply with the claims statutes, missing an easily ascertainable

12 deadline that has been in place for over 50 years.”); Aguilera v. Heiman, 174 Cal. App. 4th 590,

13 600 (2009) (finding that timely notice was not satisfied where the defendants “were not named

14 within the limitations period” in a previous proceeding). But see, e.g., Tarkington v. California

15 Unemployment Ins. Appeals Bd., 172 Cal. App. 4th 1494, 1499–500, 1503–04 (2009) (finding

16 that there was timely notice because the plaintiffs timely brought their joint petition for writ of

17 administrative mandate “within the six-month statutory period”). Because plaintiff failed to

18 timely pursue his takings claim in state court, the element of timely notice cannot now be

19 satisfied. It must follow that plaintiff is not entitled to equitable tolling of the applicable statute

20 of limitations based upon his untimely pursuit of claims in state court and his takings claim

21 brought in this federal court action is therefore time-barred.

22 B. Plaintiff’s Due Process Claim is Also Precluded

23 The court now turns to defendants’ request for judgment on the pleadings as to plaintiff’s

24 due process claim. (Doc. No. 27 at 18–19.) In its November 14, 2016 order, the court found that

25 plaintiff’s due process claim—which was also predicated on the Board’s denial of his application

26

27 12 Plaintiff has failed to cite to any authority holding that the element of timely notice can ever be

satisfied when the previous claim or action was dismissed on statute of limitations grounds, nor

28 has the undersigned located any such authority.

1 to subdivide his property—was time-barred under California Civil Procedure Code § 335.1, and

2 that plaintiff had failed to state a cognizable claim. (Doc. No. 13 at 10–11.) As a result, the court

3 dismissed plaintiff’s due process claim with prejudice.13 (Id.) Defendants now urge the court to

4 follow the law of case doctrine and again dismiss plaintiff’s due process claim for the same

5 reasons stated in the November 14, 2016 order. (Doc. No. 27 at 18–19.) In opposition, plaintiff

6 asks the court to reconsider its previous ruling and allow his due process claim to proceed “for the

7 same reasons that the takings claim is timely.” (Doc. No. 31 at 22.) However, above the court

8 has concluded that plaintiff’s takings claim is time-barred in light of the decision in Knick. In any

9 event, the law of the case doctrine—where “a court is ordinarily precluded from reexamining an

10 issue previously decided by the same court, or a higher court, in the same case,” United States v.

11 Smith, 389 F.3d 944, 948 (9th Cir. 2004)—is appropriately followed here. For the same reasons

12 set forth above and in the court’s November 14, 2016 order (see Doc. No. 13 at 10–11), the

13 undersigned concludes that plaintiff’s due process claim is time-barred and insufficiently pled.

14 Accordingly, plaintiff’s second claim asserting violation of his due process rights must also be

15 dismissed.

16 C. Granting Leave to Amend Would be Futile

17 “Although, under Federal Rule of Civil Procedure 15(a)(2), leave to amend should be

18 ‘freely’ given, that liberality does not apply when amendment would be futile.” Ebner v. Fresh,

19 Inc., 838 F.3d 958, 968 (9th Cir. 2016). Here, the court finds that amendment of the complaint

20 would be futile because plaintiff’s claims are clearly time-barred based on the allegations of the

21 complaint and the undisputed facts regarding the history of plaintiff’s pursuit of his previous case

22 in state court. Under these circumstances, plaintiff cannot cure the noted deficiencies nor

23 establish that he is entitled to equitable tolling of the applicable statute of limitations by way of

24 amendment. Thus, granting leave to amend here is not justified.

25 13 The Ninth Circuit initially affirmed the court’s judgment dismissing plaintiff’s action (Doc.

No. 18), but later modified its judgment and remanded this case for reconsideration in light of the

26

decision in Knick (Doc. No. 21). Although the court’s judgment as a whole was remanded, the

27 court’s reasoning in dismissing plaintiff’s due process claim on November 14, 2016 did not rely

on the decision in Williamson County. Thus, the change in law brought about by Knick does not

28 implicate the court’s previous rationale for dismissing plaintiff’s due process claim.

1 CONCLUSION

2 In light of the foregoing, defendants’ motion for judgment on the pleadings (Doc. No. 27)

3 | GRANTED. The complaint is hereby DISMISSED with prejudice. The Clerk of Court is

4 | directed to CLOSE this case.

5 | IT IS SO ORDERED. a "

6 ji je Ff;

Dated: _ March 31, 2021 Aa oe

7 UNITED STATES DISTRICT JUDGE

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

15

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.