Public Meeting on Part 70 Rulemaking Activities
FederalRegulations
Ask Donna
How this section applies to your facts.
Federal Register › Vol. 63 › 63 FR 27870
Text
Proposed Rules
Federal Register
________________________________________________________________________
========================================================================
Proposed Rules
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
10 CFR Part 70
Public Meeting on Part 70 Rulemaking Activities
AGENCY: Nuclear Regulatory Commission (NRC).
ACTION: Notice of meeting.
-----------------------------------------------------------------------
SUMMARY: NRC will host a public meeting in Rockville, Maryland to
discuss issues associated with NRC 10 CFR Part 70 rulemaking
activities. This meeting will provide information on the status of
staff activities consistent with Commission direction in a Staff
Requirements Memorandum (SRM) dated August 26, 1997.
DATES: The meeting is scheduled for May 28, 1998 from 9:00 a.m. to 1:00
p.m. The meeting is open to the public. Persons who wish to attend the
meeting should contact Jim Hennigan at (301) 415-6850 at least one week
prior to the meeting.
ADDRESSES: NRC's auditorium at Two White Flint North, 11545 Rockville
Pike, Rockville, Maryland. Visitor parking around the NRC building is
limited; however, the meeting site is located adjacent to the White
Flint Station on the Metro Red Line.
FOR FURTHER INFORMATION CONTACT: Lidia Roche, Office of Nuclear
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission,
Washington, DC 20555, telephone: (301) 415-7830, fax: (301) 415-5390,
e-mail: [email protected]. Copies of the documents referred to above can be
obtained from the NRC public document room. In addition, you can view
SECY-97-137 via the Internet at http://www.nrc.gov/NRC/COMMISSION/
activities.html.
ia Roche, Office of Nuclear
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission,
Washington, DC 20555, telephone: (301) 415-7830, fax: (301) 415-5390,
e-mail: [email protected]. Copies of the documents referred to above can be
obtained from the NRC public document room. In addition, you can view
SECY-97-137 via the Internet at http://www.nrc.gov/NRC/COMMISSION/
activities.html.
SUPPLEMENTARY INFORMATION: The purpose of the meeting is to provide
information on the status of NRC staff activities pertaining to the
revision of 10 CFR Part 70. The focus of the rulemaking under
development is on the features recommended in SECY-97-137, ``Proposed
Resolution to Petition for Rulemaking Filed by the Nuclear Energy
Institute'' (June 30, 1997) which was approved by the Commission in an
SRM dated August 26, 1997. The basic elements of the rule under
development are 1) the performance of an Integrated Safety Analysis
(ISA) by licensees authorized to possess Special Nuclear Material (SNM)
in quantities sufficient to constitute a potential for a nuclear
criticality; 2) the establishment of limits to identify the adverse
consequences that the licensee must protect against; 3) the inclusion
of the safety bases in the license; and 4) allowance for licensees to
make certain change to their facilities without prior approval by NRC.
Dated at Rockville, Maryland this 15th day of May, 1998.
For the Nuclear Regulatory Commission.
Elizabeth Q. Ten Eyck,
Director, Division of Fuel Cycle Safety and Safeguards.
[FR Doc. 98-13556 Filed 5-20-98; 8:45 am]
BILLING CODE 7590-01-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.