Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
1.59s
Energy Conservation Program: Energy Conservation Standards for Dehumidifiers
Federal Register · Proposed Rule · Nov 6, 2023
DOE requested comment in the June 2021 RFI on the technical and economic analyses and provided stakeholders a 45-day comment period, after granting a 15-day comment period extension. 86 FR 29964 and 86 … Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (“DC”). (42 U.S.C. 7651 et seq. ) SO 2 emissions
88 FR 76510Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Consumer Furnaces
Federal Register · Proposed Rule · Jul 7, 2022
www.aqmd.gov/home/air-quality/clean-air-plans/air-quality-mgt-plan/final-2016-aqmp ) (Last accessed Feb. 15, 2022). 2. … Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (“DC”). (42 U.S.C. 7651 et seq. ) SO 2 emissions
87 FR 40590Energy DepartmentPuget Sound Energy, Inc., et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Dec 7, 1999
(the Company), tendered for filing an application, under Section 203 of the Federal Power Act and Part 33 of the Commission's Rules and Regulations, for authority to effect a ``disposition of facilities … Entergy requests an effective date of January 1, 2000, for the filing, to coincide with the commencement of Phase II of the Title IV (the acid rain control title) of the Clean Air Act Amendments.
64 FR 68348Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Dec 18, 2025
(Fall River) submitted to the Federal Energy Regulatory Commission (Commission) a copy of its application for a Clean Water Act section 401(a)(1) water quality certification filed with the Idaho Department … Reasonable Period of Time to Act on the Certification Request: One year [December 5, 2026].
90 FR 59104Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Jun 6, 2008
After the public meeting and the close of the comment period on the Framework Document, DOE will begin collecting data, conducting the analyses as discussed in the Framework Document and at the public … DOE actively encourages the participation and interaction of the public during the comment period in each stage of the rulemaking process.
73 FR 32243Energy DepartmentFederal Register · Notice · Mar 2, 2012
The ISOs and RTOs subsequently submitted a report providing data for the 2006-2010 period. … Clean Energy 1. Clean Energy megawatt hours, by resource type, as a percentage of total energy. 2. Clean Energy megawatts, by resource type, as a percentage of total capacity.
77 FR 12832Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Mar 25, 2010
Policy Act of 1992, Pub. … air-conditioning heat pumps (hereafter referred to as central air conditioners and heat pumps). (42 U.S.C. 6292(3)) The National Appliance Energy Conservation Act of 1987 (NAECA), Pub.
75 FR 14368Energy DepartmentFederal Register · Proposed Rule · Jun 27, 2011
The Energy Independence and Security Act of 2007 (EISA 2007; Pub. … For split-system air conditioners (coil-only), the median payback period is 1 year. For split-system air conditioners (blower-coil), the median payback period is 6 years.
76 FR 37549Energy DepartmentEnergy Conservation Program: Commercial Warm Air Furnaces; Final Determination
Federal Register · Rule · Jan 17, 2025
Comment Period Length Several commenters expressed concerns about the length of the comment period provided in the December 2024 NOTD. … AHRI stated that the comment period fell short of the minimum 45-day comment period required for proposed test procedures under 42 U.S.C. 6314(b).
90 FR 5560Energy DepartmentFederal Register · Proposed Rule · Jul 29, 2019
After the close of the comment period, DOE will review the public comments received and may begin collecting data and conducting the analyses discussed in this RFI. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of the rulemaking process.
84 FR 36480Energy DepartmentFederal Register · Notice · Aug 24, 2006
The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a Final General Conformity Determination to assess the potential air quality impacts associated with the construction … This Final General Conformity Determination was prepared to satisfy the requirements of the Clean Air Act.
71 FR 50055Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 29, 2005
The staff of the Federal Energy Regulatory Commission has prepared a Final General Conformity Determination to assess the potential air quality impacts associated with the construction and operation of … This Final General Conformity Determination was prepared to satisfy the requirements of the Clean Air Act.
70 FR 43855Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Uncategorized Document · Nov 29, 1994
Clean cast metal technology, c. Lost Foam casting technology, d. Cast metal properties, e. Porosity and inclusion defect elimination technology, f. … The project period may be divided into several budget periods. The project period shall not exceed three years. Each application must contain Standard Forms 424 and 424A.
Energy DepartmentFederal Register · Notice · Sep 20, 2017
Background and Authority Title III, Part B 1 of the Energy Policy and Conservation Act of 1975 (EPCA), Public Law 94-163 (42 U.S.C. 6291-6309, as codified) established the Energy Conservation … Pursuant to 10 CFR 430.27(d), any person submitting written comments to DOE must also send a copy of such comments to the petitioner.
82 FR 43952Energy DepartmentEnergy Efficiency and Renewable Energy OfficeAlternative Fuel Transportation Program
Federal Register · Proposed Rule · Apr 19, 1995
Reformulated gasoline is an enumerated ``clean alternative fuel'' in section 241 of the Clean Air Act. 42 U.S.C. 7581. … It is not mentioned at all in the definition of ``alternative fuel'' in section 301 of the Energy Policy Act of 1992.
60 FR 19544Energy DepartmentEnergy Efficiency and Renewable Energy OfficeNortheast Generation Company, et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Feb 28, 2000
The change is designed to conform the rate schedules to the Commission's rule regarding the ratemaking treatment of SO 2 emissions allowances for Phase II units issued under the Clean Air Act Amendments … All such motions or protests should be filed on or before the comment date.
65 FR 10485Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Uncategorized Document · Apr 28, 1994
Technologies for characterization and monitoring are required for site clean-up and waste processing applications. … Engineered barriers are required to contain wastes which might otherwise release contaminants along air, surface water and/or groundwater pathways.
Energy DepartmentFederal Register · Proposed Rule · Aug 9, 2021
Life-Cycle Cost and Payback Period Analysis III. Submission of Comments I. … and the Negotiated Rulemaking Act. (5 U.S.C.
86 FR 43430Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Expanded Scope Electric Motors
Federal Register · Proposed Rule · Dec 15, 2023
Public Comment Period Section 6(f)(2) of the Process Rule specifies that the length of the public comment period for a NOPR will be not less than 75 calendar days. … Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (“DC”). (42 U.S.C. 7651 et seq. ) SO 2 emissions
88 FR 87062Energy DepartmentFederal Register · Proposed Rule · Mar 22, 2012
Compressor Break-In Period The DOE test procedure for commercial air-conditioning equipment does not provide for a compressor “break-in” period prior to initiating testing. … DOE seeks comment as to whether a longer break-in period is necessary for VRF systems, small air conditioners and heat pumps, and SPVUs, and why these types of equipment need a longer break-in period.
77 FR 16769Energy Department
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.