Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,846 results
1.64s
Power Reactors in Extended Shutdowns
Federal Register · Proposed Rule · Mar 3, 2020
The NRC also sought public comment on six specific questions. The public comment period closed on February 22, 2017. … The NRC received two public comment submissions during the 75-day public comment period; both submissions, which were from industry representatives, were in favor of denying the petition and provided a
85 FR 12442Nuclear Regulatory CommissionFederal Register · Notice · Aug 3, 2006
As defined in the Clean Water Act (CWA), wetlands are, “those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances … PADEP agreed with the conclusions of the EA, and otherwise had no comments.
71 FR 44049Nuclear Regulatory CommissionFederal Register · Notice · Jan 29, 1997
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
62 FR 4341Nuclear Regulatory CommissionBiweekly NoticeFederal Register · Notice · Oct 27, 2003
Under accident conditions, higher concentrations of materials could be released to the environment over a short period of time. … On August 22, 2003, the Director responded that they had reviewed the draft EA and had no comments.
68 FR 61235Nuclear Regulatory CommissionIntegrated Low-Level Radioactive Waste Disposal
Federal Register · Proposed Rule · Jul 1, 2026
The NRC requests comment on this document with respect to the clarity and effectiveness of the language used. XI. National Environmental Policy Act A. … The NRC encourages anyone interested in commenting on the compatibility category designations in any manner to do so during the comment period. XVII.
91 FR 40290Nuclear Regulatory CommissionFee Schedules; Fee Recovery for Fiscal Year 2025
Federal Register · Proposed Rule · Feb 19, 2025
, and thus is unable to grant any extension request of the comment period. … Additionally, on July 9, 2024, the President signed into law the Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024 (ADVANCE Act), which, among other things, amended fee-related
90 FR 9848Nuclear Regulatory CommissionFederal Register · Rule · Jun 17, 2011
contamination to be cleaned up and placed on the tailings impoundment. … However, the commenter stated that a small leak or spill inside a building that is promptly cleaned up is not a decommissioning issue.
76 FR 35512Nuclear Regulatory CommissionConsideration of Potassium Iodide in Emergency Plans
Federal Register · Proposed Rule · Jun 14, 1999
In response to several requests, the comment period was extended until February 17, 1998, by a Federal Register notice published on January 21, 1998 (63 FR 3052). … The Commission decision is implemented by publication of this proposed rule that would change 10 CFR 50.47(b)(10) with a 90-day public comment period.
64 FR 31737Nuclear Regulatory CommissionFederal Register · Notice · Oct 23, 2007
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
72 FR 60032Nuclear Regulatory CommissionDesign, Inspection, and Testing Criteria for Air Filtration and Adsorption Units
Federal Register · Notice · Dec 30, 2011
Nuclear Regulatory Commission (NRC or the Commission) is issuing for public comment draft regulatory guide (DG), DG-1274, “Design, Inspection, and Testing Criteria for Air Filtration and Adsorption Units … Harriet Karagiannis, Acting Chief, Regulatory Guide Development Branch, Division of Engineering, Office of Nuclear Regulatory Research.
76 FR 82323Nuclear Regulatory CommissionFederal Register · Notice · Mar 19, 2007
Comment: In the Model SE, Section 3.1.2 states “The determination of DOSE EQUIVALENT XE-133 shall be performed using effective dose conversion factors for air submersion listed in Table III.1 of EPA … The off-site dose criteria are 25 rem total effective dose equivalent (TEDE) at the EAB for any 2-hour period following the onset of the postulated fission product release and 25 rem TEDE at the outer
72 FR 12838Nuclear Regulatory CommissionFederal Register · Notice · Mar 15, 2007
Comment: In the Model SE, Section 3.1.2 states “The determination of DOSE EQUIVALENT XE-133 shall be performed using effective dose conversion factors for air submersion listed in Table III.1 of EPA … The off-site dose criteria are 25 rem total effective dose equivalent (TEDE) at the EAB for any 2-hour period following the onset of the postulated fission product release and 25 rem TEDE at the outer
72 FR 12217Nuclear Regulatory CommissionFederal Register · Notice · Oct 3, 2017
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish a notice of issuance in the Federal Register .
82 FR 46094Nuclear Regulatory CommissionFederal Register · Notice · Dec 18, 2018
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
83 FR 64889Nuclear Regulatory CommissionFederal Register · Notice · Apr 26, 2016
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
81 FR 24659Nuclear Regulatory CommissionFederal Register · Notice · Aug 1, 2006
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register notice of issuance.
71 FR 43528Nuclear Regulatory CommissionFederal Register · Notice · Aug 1, 2017
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
82 FR 35835Nuclear Regulatory CommissionFederal Register · Notice · Jun 9, 2003
Air sampling will also be conducted at work area boundaries to evaluate off-site releases. … By facsimile dated May 30, 2003, ODEQ informed NRC that it had no comments on the draft EA. NRC contacted the U.S.
68 FR 34422Nuclear Regulatory CommissionFederal Register · Notice · May 26, 2026
The NRC received a comment from the State of New Mexico on April 8, 2026, after the close of the comment period. … NRC Response to comment from State of New Mexico, “Response to comment re: Request for State comments regarding and environmental assessment—Urenco USA,” dated April 10, 2026 ML26100A208.
91 FR 30733Nuclear Regulatory CommissionFederal Register · Notice · Sep 18, 2003
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
68 FR 54747Nuclear Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.