Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,846 results
0.68s
Federal Register · Notice · Aug 7, 2013
In addition, all direct current electrical power was lost early in the event on Units 1 and 2, and after some period of time at the other units. Unit 6 retained the function of one air-cooled EDG. … Congressional Review Act This interim staff guidance is a rule as designated in the Congressional Review Act (5 U.S.C. 801-808).
78 FR 48201Nuclear Regulatory CommissionFederal Register · Notice · Aug 27, 1998
In accordance with the February 8, 1996, staff position paper, a draft EA and finding of no significant impact is being published in the Federal Register for a 30-day public comment period. … DATES: The comment period will expire 30 days after publication.
63 FR 45874Nuclear Regulatory CommissionFederal Register · Notice · Jul 25, 2006
Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … However, should circumstances change during the notice period, such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the
71 FR 42134Nuclear Regulatory CommissionFederal Register · Notice · Oct 2, 1996
Under accident conditions, the facility could release higher concentrations over a short period of time. … In addition, CPM has committed to perform a temporary air monitoring program using a mobile air sampler at additional locations near the site boundaries.
61 FR 51470Nuclear Regulatory CommissionFederal Register · Notice · Dec 7, 2012
In addition, all direct current electrical power was lost early in the event on Units 1 and 2 and after some period of time at the other units. Unit 6 retained the function of one air-cooled EDG. … , 2012 (Act).
77 FR 73057Nuclear Regulatory CommissionEvent Notification Requirements
Federal Register · Rule · Jun 5, 2003
The comment period closed on November 5, 2002. The NRC received four comment letters on the proposed rule. … of these comments.
68 FR 33611Nuclear Regulatory CommissionFederal Register · Notice · May 22, 2007
These consultations were intended to ensure that the requirements of Section 106 of the National Historic Preservation Act and Section 7 of the Endangered Species Act were met and provided the designated … state liaison agency the opportunity to comment on the proposed action.
72 FR 28715Nuclear Regulatory CommissionFederal Register · Notice · Mar 29, 2013
Further Information Under the NRC's environmental protection regulations in part 51 of Title 10 of the Code of Federal Regulations (10 CFR), which implement the National Environmental Policy Act … The Draft SEIS is being issued for public comment. The public comment period on the Draft SEIS begins with publication of this notice and continues until May 13, 2013.
78 FR 19330Nuclear Regulatory CommissionEvent Notification Requirements
Federal Register · Proposed Rule · Aug 22, 2002
DATES: The comment period expires November 5, 2002. … Comments should be sent to the address listed under the heading ADDRESSES above. Voluntary Consensus Standards The National Technology Transfer Act of 1995 (Pub.
67 FR 54360Nuclear Regulatory CommissionLicense Amendment for Aptuit, LLC, Kansas City, Missouri
Federal Register · Notice · Sep 13, 2013
Therefore, no further consultation is required under Section 7 of the Endangered Species Act. … The State informed the NRC on March 19, 2013, that they had no comments on the EA.
78 FR 56753Nuclear Regulatory CommissionFederal Register · Notice · Oct 31, 2001
Laufer, Acting. … Laufer, Acting.
66 FR 55007Nuclear Regulatory CommissionDominion Energy Kewaunee, Inc.; Kewaunee Power Station
Federal Register · Notice · Nov 5, 2014
This time period is based on a heat-up calculation which uses several simplifying assumptions. … Among the changes, the definition of “hostile action” was added as an act directed toward a nuclear power plant or its personnel.
79 FR 65715Nuclear Regulatory CommissionFederal Register · Notice · Mar 30, 2000
Routine activities which generate waste oil and cleanup materials include periodic PCP oil changes, pumpdown of oil collection tanks, PCP oil system piping and equipment repairs, and cleaning of equipment … The State official had no comments.
65 FR 16971Nuclear Regulatory CommissionFederal Register · Notice · Apr 11, 1995
The NRC will consider comments received from interested parties in the final evaluation of the proposed contract action. DATES: Comment period expires May 26, 1995. … NRC-licensed facilities are under strict NRC requirements to monitor and control the release of radioactive materials to the air, water and ground around their facilities.
60 FR 18428Nuclear Regulatory CommissionRevision of Fee Schedules; Fee Recovery for FY 2006
Federal Register · Rule · May 30, 2006
The NRC received three comments dated on or before the close of the comment period (March 13, 2006) and four additional comments thereafter, for a total of seven comments that were considered in this fee … tailings impoundments, and groundwater clean-up.
71 FR 30722Nuclear Regulatory CommissionFederal Register · Notice · May 2, 2001
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
66 FR 22021Nuclear Regulatory CommissionFederal Register · Notice · Dec 28, 2010
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
75 FR 81667Nuclear Regulatory CommissionFederal Register · Notice · Jul 28, 1998
Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
63 FR 40321Nuclear Regulatory CommissionRadiation Protection Regulations and Guidance; Public Meetings and Request for Comments
Federal Register · Proposed Rule · Sep 27, 2010
period for the proposed rule. … Currently, the dose limit to the embryo/fetus of a declared pregnant worker is 0.5 rem (5 mSv) for the gestation period with 0.05 rem (0.5 mSv) additional dose during the gestation period if the dose to
75 FR 59160Nuclear Regulatory CommissionFederal Register · Notice · Aug 15, 2017
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
82 FR 38714Nuclear Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.