Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,846 results
0.34s
Federal Register · Uncategorized Document · May 3, 1994
The State had no comments. Finding of No Significant Impact The Commission has determined not to prepare an environmental impact statement for the proposed exemption. … Hickman, Acting Director, Project Directorate III-1, Division of Reactor Projects--III/IV, Office of Nuclear Reactor Regulation. [FR Doc. 94-10527 Filed 5-2-94; 8:45 am] BILLING CODE 7590-01-M
Nuclear Regulatory CommissionFederal Register · Notice · Aug 4, 2020
Impact levels (small, moderate, or large) have been determined for most NEPA issues ( e.g., land use, air, water) evaluated in the LR GEIS. … At the conclusion of the scoping period, the NRC will consider the results of its review and public comments to determine whether to proceed with the update.
85 FR 47252Nuclear Regulatory CommissionFederal Register · Notice · Feb 19, 2002
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
67 FR 7410Nuclear Regulatory CommissionFederal Register · Notice · Dec 5, 2006
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
71 FR 70553Nuclear Regulatory CommissionFederal Register · Notice · Jan 20, 2015
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
80 FR 2747Nuclear Regulatory CommissionFederal Register · Notice · Jul 28, 2008
The public scoping comment period for the GEIS closed on November 30, 2007. … Following the end of the public comment period, the NRC staff will publish a Final GEIS that addresses, as appropriate, the public comments on the Draft GEIS.
73 FR 43795Nuclear Regulatory CommissionFederal Register · Notice · Jan 15, 2013
In addition, all direct current electrical power was lost early in the event on Units 1 and 2, and after some period of time at the other units. Unit 6 retained the function of one air-cooled EDG. … Congressional Review Act This interim staff guidance is a rule as designated in the Congressional Review Act (5 U.S.C. 801-808).
78 FR 3039Nuclear Regulatory CommissionCharles T. Gallagher, Gammatron, Inc.; Denial of Petition for Rulemaking
Federal Register · Proposed Rule · Apr 19, 2001
The letter also disagrees with the petitioner's belief that financial assurance should be provided by a small business licensee over a longer period of time, rather than all at one time upon licensing. … The licensee must have funding available to clean up a site and package the waste for disposal.
66 FR 20099Nuclear Regulatory CommissionMaryland Safe Energy Coalition; Denial of Petition for Rulemaking
Federal Register · Proposed Rule · Jul 26, 1995
DOE is required by the Nuclear Waste Policy Act of 1982 to accept spent fuel for ultimate disposal. … The petitioner cited additional references during the comment period. Section 72.104(a) does not incorporate exposure limits that are unique to ISFSI operation.
60 FR 38286Nuclear Regulatory CommissionFederal Register · Notice · Feb 13, 2002
Also, in accordance with the February 8, 1996, staff position paper, the draft EA and finding of no significant impact is being published in the Federal Register with a 30-day public comment period … DATES: The comment period expires March 15, 2002.
67 FR 6758Nuclear Regulatory CommissionSouthern Nuclear Company, Inc.; Vogtle Electric Generating Plant, Units 1, 2, 3 and 4
Federal Register · Notice · Feb 17, 2017
changes in ambient air quality would be expected. … The state official had no comments. III.
82 FR 11064Nuclear Regulatory CommissionFederal Register · Notice · Sep 20, 2000
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
65 FR 56946Nuclear Regulatory CommissionFederal Register · Notice · Aug 11, 2009
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
74 FR 40233Nuclear Regulatory CommissionFederal Register · Notice · Aug 7, 2013
In addition, all direct current electrical power was lost early in the event on Units 1 and 2, and after some period of time at the other units. Unit 6 retained the function of one air-cooled EDG. … Congressional Review Act This interim staff guidance is a rule as designated in the Congressional Review Act (5 U.S.C. 801-808).
78 FR 48201Nuclear Regulatory CommissionTransportation of Radioactive Material in Quantities of Concern
Federal Register · Proposed Rule · Jan 4, 2008
This policy change will not address air and water transport. Transport of this material within airports and by air is regulated by the Federal Aviation Administration. … Sources lose their effectiveness and have to be replaced or replenished periodically with new sources and older sources must be transported for disposal.
73 FR 826Nuclear Regulatory CommissionFederal Register · Notice · Jul 25, 2006
Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … However, should circumstances change during the notice period, such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the
71 FR 42134Nuclear Regulatory CommissionFederal Register · Notice · Oct 2, 1996
Under accident conditions, the facility could release higher concentrations over a short period of time. … In addition, CPM has committed to perform a temporary air monitoring program using a mobile air sampler at additional locations near the site boundaries.
61 FR 51470Nuclear Regulatory CommissionFederal Register · Notice · Dec 7, 2012
In addition, all direct current electrical power was lost early in the event on Units 1 and 2 and after some period of time at the other units. Unit 6 retained the function of one air-cooled EDG. … , 2012 (Act).
77 FR 73057Nuclear Regulatory CommissionEvent Notification Requirements
Federal Register · Rule · Jun 5, 2003
The comment period closed on November 5, 2002. The NRC received four comment letters on the proposed rule. … of these comments.
68 FR 33611Nuclear Regulatory CommissionFederal Register · Notice · May 22, 2007
These consultations were intended to ensure that the requirements of Section 106 of the National Historic Preservation Act and Section 7 of the Endangered Species Act were met and provided the designated … state liaison agency the opportunity to comment on the proposed action.
72 FR 28715Nuclear Regulatory Commission
Ask Donna what matters in the record.